Award recordCONTRACT

G&C FAB-CON, LLC

PIID VA101CFMC0165· VA Staff Offices· OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)· Y299 · CONTRUCT/ALL OTHER NON-BLDG FACS· FY2011· $18,626,889 net obligations· UEI CFZ1ZEPL22N9· NJ

Description

FINAL CLOSEOUT MODIFICATION

Base award description: INDIANTOWN GAP NATIONAL CEMETERY PHASE 4 GRAVESITE EXPANSION AND CEMETERY IMPROVEMENTS PROJECT NO. 813CM2024 ANNVILLE, PA

First action · last action
2011-09-23 · 2017-04-26
Transactions
54
First transaction's obligation
$16,846,300
Base + all options value (sum of deltas)
$18,626,889
Extent competed
FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
Other than full & open authority
—
Set-aside
SERVICE DISABLED VETERAN OWNED SMALL BUSINESS SET-ASIDE
Offers received
6
SDVOSB flag on record
Yes (self-representation)
NAICS
237990 · OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION

Modification chain · 54 transactions

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$18,626,889$0Base award · 2011-09-23 · this action $16,846,300 · running total $16,846,300Modification SA001 · 2012-01-31 · this action $41,364 · running total $16,887,664Modification SA004 · 2012-03-12 · this action $16,698 · running total $16,904,362Modification SA003 · 2012-04-18 · this action $20,957 · running total $16,925,319Modification SA005 · 2012-05-08 · this action $77,695 · running total $17,003,014Modification CO01A · 2012-06-15 · this action $42,103 · running total $17,045,117Modification SA006 · 2012-06-15 · this action $1,895 · running total $17,047,012Modification SA007 · 2012-06-15 · this action $1,906 · running total $17,048,918Modification SA002 · 2012-07-03 · this action $57,146 · running total $17,106,064Modification SA011 · 2012-07-24 · this action $25,341 · running total $17,131,405Modification SA012 · 2012-07-24 · this action $10,986 · running total $17,142,391Modification SA013 · 2012-07-24 · this action $11,428 · running total $17,153,819Modification SA014 · 2012-07-24 · this action $1,719 · running total $17,155,538Modification SA009 · 2012-07-25 · this action $90,971 · running total $17,246,509Modification SA010 · 2012-07-25 · this action $6,045 · running total $17,252,554Modification SA015 · 2012-08-02 · this action $4,043 · running total $17,256,597Modification SA016 · 2012-08-17 · this action $13,813 · running total $17,270,410Modification SA008 · 2012-08-21 · this action $123,673 · running total $17,394,083Modification SA017 · 2012-08-27 · this action $8,807 · running total $17,402,891Modification P0019 · 2012-11-29 · this action $21,896 · running total $17,424,787Modification P0020 · 2012-12-04 · this action $18,931 · running total $17,443,718Modification P00022 · 2012-12-06 · this action $72,927 · running total $17,516,645Modification P00023 · 2012-12-06 · this action $1,289 · running total $17,517,934Modification P00018 · 2012-12-10 · this action $23,379 · running total $17,541,313Modification P00020 · 2012-12-10 · this action $18,931 · running total $17,560,244Modification P00021 · 2012-12-10 · this action $6,054 · running total $17,566,298Modification P00019 · 2012-12-27 · this action $21,896 · running total $17,588,194Modification P00024 · 2013-01-29 · this action $1,066 · running total $17,589,260Modification P00025 · 2013-01-29 · this action $15,627 · running total $17,604,887Modification P00026 · 2013-01-29 · this action $30,406 · running total $17,635,293Modification P00027 · 2013-01-29 · this action $3,603 · running total $17,638,896Modification P00031 · 2013-02-07 · this action $98,988 · running total $17,737,884Modification P00033 · 2013-02-26 · this action $3,490 · running total $17,741,374Modification P00034 · 2013-02-26 · this action $917 · running total $17,742,291Modification P00032 · 2013-03-01 · this action $67,065 · running total $17,809,356Modification P00035 · 2013-03-08 · this action $16,046 · running total $17,825,402Modification P00036 · 2013-03-08 · this action $3,548 · running total $17,828,950Modification P00037 · 2013-03-12 · this action $49,573 · running total $17,878,523Modification P00030 · 2013-03-27 · this action $73,689 · running total $17,952,212Modification P00038 · 2013-04-16 · this action $6,205 · running total $17,958,417Modification P00040 · 2013-05-01 · this action $50,818 · running total $18,009,235Modification P00041 · 2013-05-10 · this action $4,698 · running total $18,013,933Modification P00042 · 2013-05-13 · this action $8,407 · running total $18,022,340Modification P00043 · 2013-05-13 · this action $3,436 · running total $18,025,776Modification P00044 · 2013-05-16 · this action $5,379 · running total $18,031,155Modification P00039 · 2013-05-24 · this action $121,135 · running total $18,152,290Modification P00045 · 2013-05-24 · this action $400,000 · running total $18,552,290Modification P00046 · 2013-11-19 · this action $7,311 · running total $18,559,601Modification P00047 · 2013-11-19 · this action $414 · running total $18,560,014Modification P00048 · 2013-11-19 · this action $37,128 · running total $18,597,142Modification P00049 · 2013-11-26 · this action $9,642 · running total $18,606,784Modification P00050 · 2014-03-04 · this action $2,908 · running total $18,609,692Modification P00051 · 2014-03-04 · this action $17,197 · running total $18,626,889Modification P00052 · 2017-04-26 · this action $0 · running total $18,626,889
  • Base2011-09-23+$16,846,300= $16,846,300
  • Mod SA0012012-01-31+$41,364= $16,887,664
  • Mod SA0042012-03-12+$16,698= $16,904,362
  • Mod SA0032012-04-18+$20,957= $16,925,319
  • Mod SA0052012-05-08+$77,695= $17,003,014
  • Mod CO01A2012-06-15+$42,103= $17,045,117
  • Mod SA0062012-06-15+$1,895= $17,047,012
  • Mod SA0072012-06-15+$1,906= $17,048,918
  • Mod SA0022012-07-03+$57,146= $17,106,064
  • Mod SA0112012-07-24+$25,341= $17,131,405
  • Mod SA0122012-07-24+$10,986= $17,142,391
  • Mod SA0132012-07-24+$11,428= $17,153,819
  • Mod SA0142012-07-24+$1,719= $17,155,538
  • Mod SA0092012-07-25+$90,971= $17,246,509
  • Mod SA0102012-07-25+$6,045= $17,252,554
  • Mod SA0152012-08-02+$4,043= $17,256,597
  • Mod SA0162012-08-17+$13,813= $17,270,410
  • Mod SA0082012-08-21+$123,673= $17,394,083
  • Mod SA0172012-08-27+$8,807= $17,402,891
  • Mod P00192012-11-29+$21,896= $17,424,787
  • Mod P00202012-12-04+$18,931= $17,443,718
  • Mod P000222012-12-06+$72,927= $17,516,645
  • Mod P000232012-12-06+$1,289= $17,517,934
  • Mod P000182012-12-10+$23,379= $17,541,313
  • Mod P000202012-12-10+$18,931= $17,560,244
  • Mod P000212012-12-10+$6,054= $17,566,298
  • Mod P000192012-12-27+$21,896= $17,588,194
  • Mod P000242013-01-29+$1,066= $17,589,260
  • Mod P000252013-01-29+$15,627= $17,604,887
  • Mod P000262013-01-29+$30,406= $17,635,293
  • Mod P000272013-01-29+$3,603= $17,638,896
  • Mod P000312013-02-07+$98,988= $17,737,884
  • Mod P000332013-02-26+$3,490= $17,741,374
  • Mod P000342013-02-26+$917= $17,742,291
  • Mod P000322013-03-01+$67,065= $17,809,356
  • Mod P000352013-03-08+$16,046= $17,825,402
  • Mod P000362013-03-08+$3,548= $17,828,950
  • Mod P000372013-03-12+$49,573= $17,878,523
  • Mod P000302013-03-27+$73,689= $17,952,212
  • Mod P000382013-04-16+$6,205= $17,958,417
  • Mod P000402013-05-01+$50,818= $18,009,235
  • Mod P000412013-05-10+$4,698= $18,013,933
  • Mod P000422013-05-13+$8,407= $18,022,340
  • Mod P000432013-05-13+$3,436= $18,025,776
  • Mod P000442013-05-16+$5,379= $18,031,155
  • Mod P000392013-05-24+$121,135= $18,152,290
  • Mod P000452013-05-24+$400,000= $18,552,290
  • Mod P000462013-11-19+$7,311= $18,559,601
  • Mod P000472013-11-19+$414= $18,560,014
  • Mod P000482013-11-19+$37,128= $18,597,142
  • Mod P000492013-11-26+$9,642= $18,606,784
  • Mod P000502014-03-04+$2,908= $18,609,692
  • Mod P000512014-03-04+$17,197= $18,626,889
  • Mod P000522017-04-26+$0= $18,626,889
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2011-09-23+$16,846,300$16,846,300INDIANTOWN GAP NATIONAL CEMETERY PHASE 4 GRAVESITE EXPANSION AND CEMETERY IMPROVEMENTS PROJECT NO. 813CM2024 A…
Mod SA001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-01-31+$41,364$16,887,664CONTRACTOR RECOMMENDED INSTALLING SOME OVERSIZED CRYPTS BASED ON EXPERIENCE HAVING TO GO BACK AFTER COMPLETION…
Mod SA004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-03-12+$16,698$16,904,362PERMIT ISSUANCE PUSHED THE TURN OVER OF COLUMBARIUM A&B INTO JUNE 2012. CEMETERY DIRECTOR IS EXPECTING TO RUN…
Mod SA003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-04-18+$20,957$16,925,319THE DEPTHS OF EXISTING UTILITIES WERE UNKONOWN AT THE CROSSING OF THE PROPOSED TWO WAY ROAD. THEY WERE SHALLO…
Mod SA005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-05-08+$77,695$17,003,014INCLUDES MATERIAL AND LABOR AND EQUIPMENT FOR DOMESTIC WATER LINE SERVICE AND FLUSH VALVE ASSEMBLY (3) FLOWER…
Mod CO01A· CHANGE ORDER2012-06-15+$42,103$17,045,117MET ED COULD NOT PROVIDE POWER AS DESIGNED. DECSISION WAS MADE TO EXTEND POWER FROM EXISTING MED VOLTAGE POWE…
Mod SA006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-06-15+$1,895$17,047,012FLOWERING WATERING STATION AT COLUMBAARIUM B DID NOT SHOW ANY CONNECTIONS TO UTILITY SERVICES IN THE CONTRACT…
Mod SA007· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-06-15+$1,906$17,048,918ORIGNIAL MATERIAL LIST DID NOT WAS SHORT OF SOME MATERIAL AND MORE WAS NEEDED TO COMPLETE THE VA SUPPLIED SIG…
Mod SA002· CHANGE ORDER2012-07-03+$57,146$17,106,064MET ED COULD NOT PROVIDE POWER AS DESIGNED. DECSISION WAS MADE TO EXTEND POWER FROM EXISTING MED VOLTAGE POWE…
Mod SA011· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-24+$25,341$17,131,405ORIGNIAL MATERIAL LIST DID NOT WAS SHORT OF SOME MATERIAL AND MORE WAS NEEDED TO COMPLETE THE VA SUPPLIED SIG…
Mod SA012· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-24+$10,986$17,142,391ORIGNIAL MATERIAL LIST DID NOT WAS SHORT OF SOME MATERIAL AND MORE WAS NEEDED TO COMPLETE THE VA SUPPLIED SIG…
Mod SA013· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-24+$11,428$17,153,819ORIGNIAL MATERIAL LIST DID NOT WAS SHORT OF SOME MATERIAL AND MORE WAS NEEDED TO COMPLETE THE VA SUPPLIED SIG…
Mod SA014· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-24+$1,719$17,155,538ORIGNIAL MATERIAL LIST DID NOT WAS SHORT OF SOME MATERIAL AND MORE WAS NEEDED TO COMPLETE THE VA SUPPLIED SIG…
Mod SA009· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-25+$90,971$17,246,509DRILL 6" DIAMETER WELL TO 400'-0" DEPTH AT LOCATION #4.
Mod SA010· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-25+$6,045$17,252,554FURNISH MATERIAL, LABOR, AND EQUIPMENT TO PERFORM AN 8 HOUR PUMP TEST FOR THE 10" IRRIGATIOIN REPLENISHMENT WE…
Mod SA015· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-02+$4,043$17,256,597ORIGNIAL MATERIAL LIST DID NOT WAS SHORT OF SOME MATERIAL AND MORE WAS NEEDED TO COMPLETE THE VA SUPPLIED SIG…
Mod SA016· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-17+$13,813$17,270,410THE PVC WATERLINE PIPE HAD TO BE RELOCATED SO THAT THE ROAD WIDENING COULD CONTINUE.
Mod SA008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-21+$123,673$17,394,083ORIGNIAL MATERIAL LIST DID NOT WAS SHORT OF SOME MATERIAL AND MORE WAS NEEDED TO COMPLETE THE VA SUPPLIED SIG…
Mod SA017· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-27+$8,807$17,402,891THIS MODIFICATION IS ISSUED TO RELOCATE A WATERLINE WHICH IS INTERFERING WITH THE ROAD WIDENING CONSTRUCTION.
Mod P0019· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-11-29+$21,896$17,424,787THIS MODIFICATION IS REQUIRED FOR 6 INCH PUMP
Mod P0020· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-12-04+$18,931$17,443,718THIS MODIFICATION IS TO RESOLVE STORMWATER CONFLICTS
Mod P00022· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-12-06+$72,927$17,516,645THIS MODIFICATION IS FOR STORMWATER REVISIONS.
Mod P00023· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-12-06+$1,289$17,517,934THIS MODIFICATION REPRESENTS THE RELOCATION OF A YARD INLET AT COLUMBARIUM C.
Mod P00018· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-12-10+$23,379$17,541,313THIS MODIFICATION IS TOE KICKS
Mod P00020· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-12-10+$18,931$17,560,244THIS MODIFICATION REPRESENTS THE INSTALLATION OF DIP PIPES AND ELBOWS TO REROUTE THE WATERLINE AROUND THE NEW…
Mod P00021· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-12-10+$6,054$17,566,298THIS MODIFICATION REPRESENTS THE INSTALLATION OF FIBER OPTIC CABLE TO PROVIDE POWER TO THE COMPUTERS IN THE AD…
Mod P00019· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-12-27+$21,896$17,588,194THIS MODIFICATION IS REQUIRED FOR 6 INCH WELL PUMP
Mod P00024· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-01-29+$1,066$17,589,260THIS MODIFICATION REPRESENTS THE CONE AND RISER FOR MH 608, REFERENCING RFI#28.
Mod P00025· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-01-29+$15,627$17,604,887THIS MODIFICATION REPRESENTS THE WIRING AND PVC CONDUIT NECESSARY TO INSTALL FLAGPOLE LIGHTS AT THE ADMINISTRA…
Mod P00026· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-01-29+$30,406$17,635,293THIS MODIFICATION REPRESENTS THE LANDSCAPING TO BE INSTALLED ADJACENT TO COMMITTAL SHELTER #1.
Mod P00027· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-01-29+$3,603$17,638,896THIS MODIFICATION REPRESENTS THE INSTALLATION OF DETECTABLE PAVERS.
Mod P00031· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-02-07+$98,988$17,737,884THIS MODIFICATION REPRESENTS THE INSTALLATION OF APPROXIMATELY 400 FLAGPOLE SLEEVES THROUGH THE INDIANTOWN GAP…
Mod P00033· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-02-26+$3,490$17,741,374THIS MODIFICATION REPRESENTS THE RELOCATION OF THE WATERLINE VALVE AT THE NE CORNER OF THE CURBING ADJACENT TO…
Mod P00034· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-02-26+$917$17,742,291THIS MODIFICATION REPRESENTS THE INSTALLATION OF A 1'-6" CONCRETE COLLAR ON I-611, PER AE'S RESPONSE TO RFI #3…
Mod P00032· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-03-01+$67,065$17,809,356THIS MODIFICATION REPRESENTS THE INSTALLATION OF TRIMBLE GIS EQUIPMENT IN LIEU OF THE LEICA EQUIPMENT SPECIFIE…
Mod P00035· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-03-08+$16,046$17,825,402THIS MODIFICATION REPRESENTS THE GRADING AND STORMWATER MANAGEMENT IN RESPONSE TO RFI#36, TO OBTAIN THE SOIL A…
Mod P00036· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-03-08+$3,548$17,828,950THIS MODIFICATION REPRESENTS THE DEMOLITION OF THE DOWNED TREES DUE TO HURRICANE SANDY.
Mod P00037· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-03-12+$49,573$17,878,523THIS MODIFICATION REPRESENTS THE DEMOLITION OF THE DOWNED TREES DUE TO HURRICANE SANDY.
Mod P00030· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-03-27+$73,689$17,952,212THIS MODIFICATION IS TOE KICKS
Mod P00038· CHANGE ORDER2013-04-16+$6,205$17,958,417THIS MODIFICATION REPRESENTS THE INSTALLTION OF CUT LIMESTONE TO THE SOUTH ENTRANCE OF THE ADMINISTRATION BUIL…
Mod P00040· CHANGE ORDER2013-05-01+$50,818$18,009,235THIS MODIFICATION REPRESENTS THE DEMOLITION OF THE DOWNED TREES DUE TO HURRICANE SANDY.
Mod P00041· CHANGE ORDER2013-05-10+$4,698$18,013,933THIS MODIFICATION REPRESENTS THE INSTALLATION OF THE COMPONENTS FOR THE FLOWER WATERING STATION AT THE MEMORIA…
Mod P00042· CHANGE ORDER2013-05-13+$8,407$18,022,340THIS MODIFICATION REPRESENTS THE EXTENSION OF THE EXPOSED AGGREGATE SIDEWALK TO THE SOUTH OF THE ADMINISTRATIO…
Mod P00043· CHANGE ORDER2013-05-13+$3,436$18,025,776THIS MODIFICATION REPRESENTS THE DEMOLITION OF THE DOWNED TREES DUE TO HURRICANE SANDY.
Mod P00044· CHANGE ORDER2013-05-16+$5,379$18,031,155THIS MODIFICATION REPRESENTS THE DEMOLITION OF THE DOWNED TREES DUE TO HURRICANE SANDY.
Mod P00039· CHANGE ORDER2013-05-24+$121,135$18,152,290THIS MODIFICATION REPRESENTS THE DEMOLITION OF THE DOWNED TREES DUE TO HURRICANE SANDY.
Mod P00045· CHANGE ORDER2013-05-24+$400,000$18,552,290THIS MODIFICATION REPRESENTS THE DEMOLITION OF THE DOWNED TREES DUE TO HURRICANE SANDY.
Mod P00046· CHANGE ORDER2013-11-19+$7,311$18,559,601THIS MODIFICATION REPRESENTS THE REQUIERD LANDSCAPING CHANGES AT ADMIN BUILDING
Mod P00047· CHANGE ORDER2013-11-19+$414$18,560,014ADMIN BUILDING CEILING FAN
Mod P00048· CHANGE ORDER2013-11-19+$37,128$18,597,142FLAG POLE SLEEVE INSTALLATION
Mod P00049· CHANGE ORDER2013-11-26+$9,642$18,606,784WATERING LANDSCAPING WHEN IRRIGATION SYSTEM WAS DOWN.
Mod P00050· CHANGE ORDER2014-03-04+$2,908$18,609,692GIS SOFTWARE
Mod P00051· CHANGE ORDER2014-03-04+$17,197$18,626,889FINAL BOND ADJUSTMENT
Mod P00052· CLOSE OUT2017-04-26+$0$18,626,889FINAL CLOSEOUT MODIFICATION

Related awards · 11

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other VA awards to the same recipient (UEI CFZ1ZEPL22N9)

AwardOffice · PSC / listingNet obligationsFY
36C78621P0137NATIONAL CEMETERY ADMIN (36C786) · H224 · EQUIPMENT AND MATERIALS TESTING- TRACTORS$1,965FY2021
36C78621P0075NATIONAL CEMETERY ADMIN (36C786) · Y1AZ · CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS$530FY2021
36C78621P0063NATIONAL CEMETERY ADMIN (36C786) · Y1AZ · CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS$1,965FY2021
36C10F18C3383OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) · Y1AZ · CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS$24,343,213FY2018
36C10F18C3386OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) · Y1PZ · CONSTRUCTION OF OTHER NON-BUILDING FACILITIES$28,968,604FY2018
36C78618N0186NATIONAL CEMETERY ADMIN (36C786) · S208 · HOUSEKEEPING- LANDSCAPING/GROUNDSKEEPING$86,400FY2018

Other recipients under Y299 from OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) (most recent first)

AwardRecipientOfficeNet obligationsFY
VA101CFMC0093KEPA SERVICES INC.OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$23,946,212FY2010
VA101CFMC0081WEST CONSTRUCTION, INC.OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$22,945,085FY2010
VA101CFMP0021SMITHGROUPJJR, INC.OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$3,343,772FY2009
VA101183B4C0046EMERSON CONSTRUCTION COMPANY, INC.OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$21,687,294FY2008
VA101183B4C0047KEVCON, INCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$16,297,324FY2008