Award recordCONTRACT

KEVCON, INC

PIID VA101183B4C0047· VA Staff Offices· OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)· Y299 · CONTRUCT/ALL OTHER NON-BLDG FACS· FY2008· $16,297,324 net obligations· UEI YQKLNFR9N289· CA

Description

AE IDIQ CONTRACT CLOSEOUT

Base award description: PHASE 1B DEVELOPMENT SOUTH FLORIDA NATIONAL CEMETERY.

First action · last action
2008-08-28 · 2016-04-29
Transactions
67
First transaction's obligation
$13,750,000
Base + all options value (sum of deltas)
$16,297,324
Extent competed
FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
Other than full & open authority
—
Set-aside
SERVICE DISABLED VETERAN OWNED SMALL BUSINESS SET-ASIDE
Offers received
13
SDVOSB flag on record
Yes (self-representation)
NAICS
237990 · OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION

Modification chain · 67 transactions

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$16,418,151$0Base award · 2008-08-28 · this action $13,750,000 · running total $13,750,000Modification CO01A · 2008-10-30 · this action -$35,041 · running total $13,714,959Modification SA001 · 2008-12-11 · this action $3,758 · running total $13,718,717Modification CO01C · 2009-01-14 · this action $3,041 · running total $13,721,758Modification SA003 · 2009-01-22 · this action $2,783 · running total $13,724,541Modification CO01B · 2009-02-05 · this action -$1,000,000 · running total $12,724,541Modification SA004 · 2009-02-12 · this action $5,865 · running total $12,730,406Modification SA002 · 2009-02-19 · this action $1,824 · running total $12,732,230Modification SA005 · 2009-03-03 · this action $1,320 · running total $12,733,550Modification SA006 · 2009-04-29 · this action $21,157 · running total $12,754,707Modification CO01D · 2009-05-14 · this action $37,912 · running total $12,792,619Modification SA007 · 2009-05-14 · this action $4,723 · running total $12,797,342Modification SA008 · 2009-06-02 · this action $5,667 · running total $12,803,009Modification SA009 · 2009-06-10 · this action $9,451 · running total $12,812,460Modification SA010 · 2009-06-16 · this action -$19,730 · running total $12,792,730Modification SA011 · 2009-06-23 · this action $9,647 · running total $12,802,377Modification 1214 · 2009-08-06 · this action $55,853 · running total $12,858,230Modification SA015 · 2009-08-12 · this action $11,515 · running total $12,869,745Modification SA016 · 2009-08-12 · this action $5,268 · running total $12,875,013Modification SA017 · 2009-08-12 · this action $16,355 · running total $12,891,368Modification SA019 · 2009-09-03 · this action $4,271 · running total $12,895,639Modification SA018 · 2009-09-10 · this action $1,930 · running total $12,897,569Modification SA021 · 2009-09-16 · this action $1,018 · running total $12,898,587Modification SA022 · 2009-09-16 · this action $4,019 · running total $12,902,606Modification SA023 · 2009-09-16 · this action $0 · running total $12,902,606Modification SA024 · 2009-09-16 · this action $5,784 · running total $12,908,390Modification 2528 · 2009-09-23 · this action $34,933 · running total $12,943,323Modification SA029 · 2009-10-01 · this action $7,549 · running total $12,950,872Modification SA030 · 2009-10-06 · this action $9,196 · running total $12,960,068Modification SA031 · 2009-10-15 · this action $2,969 · running total $12,963,037Modification SA032 · 2009-11-05 · this action $4,726 · running total $12,967,763Modification SA033 · 2009-11-05 · this action $18,050 · running total $12,985,813Modification SA034 · 2009-11-05 · this action $4,344 · running total $12,990,157Modification SA035 · 2009-11-05 · this action $7,745 · running total $12,997,902Modification SA036 · 2009-11-05 · this action $1,845 · running total $12,999,747Modification SA037 · 2009-11-05 · this action $6,008 · running total $13,005,755Modification SA038 · 2009-11-19 · this action $2,489 · running total $13,008,244Modification SA020 · 2009-12-07 · this action $2,839,504 · running total $15,847,748Modification SA039 · 2009-12-09 · this action $1,627 · running total $15,849,375Modification SA040 · 2009-12-10 · this action $773 · running total $15,850,148Modification SA041 · 2009-12-10 · this action $3,945 · running total $15,854,093Modification SA043 · 2009-12-16 · this action $489 · running total $15,854,582Modification SA044 · 2009-12-16 · this action $1,393 · running total $15,855,975Modification SA042 · 2009-12-31 · this action $661 · running total $15,856,636Modification CO01E · 2010-01-05 · this action $40,000 · running total $15,896,636Modification SA045 · 2010-01-05 · this action $44,945 · running total $15,941,581Modification SA046 · 2010-01-06 · this action $2,057 · running total $15,943,638Modification SA047 · 2010-01-20 · this action $5,011 · running total $15,948,649Modification SA048 · 2010-01-20 · this action $66,708 · running total $16,015,357Modification SA049 · 2010-01-28 · this action $1,885 · running total $16,017,242Modification SA050 · 2010-02-09 · this action $968 · running total $16,018,210Modification SA051 · 2010-02-18 · this action $1,453 · running total $16,019,663Modification SA052 · 2010-03-11 · this action $75,000 · running total $16,094,663Modification SA053 · 2010-03-17 · this action $1,347 · running total $16,096,010Modification SA054 · 2010-03-18 · this action $27,159 · running total $16,123,169Modification SA055 · 2010-03-30 · this action $3,616 · running total $16,126,785Modification SA056 · 2010-04-08 · this action $45,263 · running total $16,172,048Modification SA057 · 2010-04-14 · this action $12,400 · running total $16,184,448Modification SA058 · 2010-04-15 · this action $96,835 · running total $16,281,283Modification SA059 · 2010-04-29 · this action $1,210 · running total $16,282,493Modification SA060 · 2010-05-05 · this action $602 · running total $16,283,095Modification SA061 · 2010-05-06 · this action $4,660 · running total $16,287,755Modification SA062 · 2010-06-17 · this action $992 · running total $16,288,747Modification SA063 · 2010-08-18 · this action $14,602 · running total $16,303,349Modification SA064 · 2011-04-19 · this action $15,302 · running total $16,318,651Modification SA065 · 2012-05-15 · this action $99,500 · running total $16,418,151Modification P00001 · 2016-04-29 · this action -$120,827 · running total $16,297,324
  • Base2008-08-28+$13,750,000= $13,750,000
  • Mod CO01A2008-10-30-$35,041= $13,714,959
  • Mod SA0012008-12-11+$3,758= $13,718,717
  • Mod CO01C2009-01-14+$3,041= $13,721,758
  • Mod SA0032009-01-22+$2,783= $13,724,541
  • Mod CO01B2009-02-05-$1,000,000= $12,724,541
  • Mod SA0042009-02-12+$5,865= $12,730,406
  • Mod SA0022009-02-19+$1,824= $12,732,230
  • Mod SA0052009-03-03+$1,320= $12,733,550
  • Mod SA0062009-04-29+$21,157= $12,754,707
  • Mod CO01D2009-05-14+$37,912= $12,792,619
  • Mod SA0072009-05-14+$4,723= $12,797,342
  • Mod SA0082009-06-02+$5,667= $12,803,009
  • Mod SA0092009-06-10+$9,451= $12,812,460
  • Mod SA0102009-06-16-$19,730= $12,792,730
  • Mod SA0112009-06-23+$9,647= $12,802,377
  • Mod 12142009-08-06+$55,853= $12,858,230
  • Mod SA0152009-08-12+$11,515= $12,869,745
  • Mod SA0162009-08-12+$5,268= $12,875,013
  • Mod SA0172009-08-12+$16,355= $12,891,368
  • Mod SA0192009-09-03+$4,271= $12,895,639
  • Mod SA0182009-09-10+$1,930= $12,897,569
  • Mod SA0212009-09-16+$1,018= $12,898,587
  • Mod SA0222009-09-16+$4,019= $12,902,606
  • Mod SA0232009-09-16+$0= $12,902,606
  • Mod SA0242009-09-16+$5,784= $12,908,390
  • Mod 25282009-09-23+$34,933= $12,943,323
  • Mod SA0292009-10-01+$7,549= $12,950,872
  • Mod SA0302009-10-06+$9,196= $12,960,068
  • Mod SA0312009-10-15+$2,969= $12,963,037
  • Mod SA0322009-11-05+$4,726= $12,967,763
  • Mod SA0332009-11-05+$18,050= $12,985,813
  • Mod SA0342009-11-05+$4,344= $12,990,157
  • Mod SA0352009-11-05+$7,745= $12,997,902
  • Mod SA0362009-11-05+$1,845= $12,999,747
  • Mod SA0372009-11-05+$6,008= $13,005,755
  • Mod SA0382009-11-19+$2,489= $13,008,244
  • Mod SA0202009-12-07+$2,839,504= $15,847,748
  • Mod SA0392009-12-09+$1,627= $15,849,375
  • Mod SA0402009-12-10+$773= $15,850,148
  • Mod SA0412009-12-10+$3,945= $15,854,093
  • Mod SA0432009-12-16+$489= $15,854,582
  • Mod SA0442009-12-16+$1,393= $15,855,975
  • Mod SA0422009-12-31+$661= $15,856,636
  • Mod CO01E2010-01-05+$40,000= $15,896,636
  • Mod SA0452010-01-05+$44,945= $15,941,581
  • Mod SA0462010-01-06+$2,057= $15,943,638
  • Mod SA0472010-01-20+$5,011= $15,948,649
  • Mod SA0482010-01-20+$66,708= $16,015,357
  • Mod SA0492010-01-28+$1,885= $16,017,242
  • Mod SA0502010-02-09+$968= $16,018,210
  • Mod SA0512010-02-18+$1,453= $16,019,663
  • Mod SA0522010-03-11+$75,000= $16,094,663
  • Mod SA0532010-03-17+$1,347= $16,096,010
  • Mod SA0542010-03-18+$27,159= $16,123,169
  • Mod SA0552010-03-30+$3,616= $16,126,785
  • Mod SA0562010-04-08+$45,263= $16,172,048
  • Mod SA0572010-04-14+$12,400= $16,184,448
  • Mod SA0582010-04-15+$96,835= $16,281,283
  • Mod SA0592010-04-29+$1,210= $16,282,493
  • Mod SA0602010-05-05+$602= $16,283,095
  • Mod SA0612010-05-06+$4,660= $16,287,755
  • Mod SA0622010-06-17+$992= $16,288,747
  • Mod SA0632010-08-18+$14,602= $16,303,349
  • Mod SA0642011-04-19+$15,302= $16,318,651
  • Mod SA0652012-05-15+$99,500= $16,418,151
  • Mod P000012016-04-29-$120,827= $16,297,324
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2008-08-28+$13,750,000$13,750,000PHASE 1B DEVELOPMENT SOUTH FLORIDA NATIONAL CEMETERY.
Mod CO01A· CHANGE ORDER2008-10-30−$35,041$13,714,959A. PHASE 1B DEVELOPMENT SOUTH FLORIDA NATIONAL CEMETERY B. TOTAL CONTRACT PRICE IS DECREASED BY <$35,041.00> A…
Mod SA001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2008-12-11+$3,758$13,718,717A. SOUTH FLORIDA NATIONAL CEMETERY PH 1B IN LAKE WORTH, FL. B. TOTAL CONTRACT PRICE INCREASED BY $3,758.00 AND…
Mod CO01C· CHANGE ORDER2009-01-14+$3,041$13,721,758PHASE 1B DEVELOPMENT SOUTH FLORIDA NATIONAL CEMETERY. B. TOTAL CONTRACT PRICE INCREASED BY $3,041.00 AND 0 DAY…
Mod SA003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-01-22+$2,783$13,724,541A. SOUTH FLORIDA NATIONAL CEMETERY PH 1B IN LAKE WORTH, FL. B. TOTAL CONTRACT PRICE INCREASED BY $2,783.00 AND…
Mod CO01B· CHANGE ORDER2009-02-05−$1,000,000$12,724,541PHASE 1B DEVELOPMENT SOUTH FLORIDA NATIONAL CEMETERY.
Mod SA004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-02-12+$5,865$12,730,406A. SOUTH FLORIDA NATIONAL CEMETERY PH 1B IN LAKE WORTH, FL. B. TOTAL CONTRACT PRICE INCREASED BY $5,865.00 AND…
Mod SA002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-02-19+$1,824$12,732,230A. SOUTH FLORIDA NATIONAL CEMETERY PH 1B IN LAKE WORTH, FL. B. TOTAL CONTRACT PRICE INCREASED BY $1,824.00 AND…
Mod SA005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-03-03+$1,320$12,733,550A. SOUTH FLORIDA NATIONAL CEMETERY PH 1B IN LAKE WORTH, FL. B. TOTAL CONTRACT PRICE INCREASED BY $1,320.00 AND…
Mod SA006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-04-29+$21,157$12,754,707A. SOUTH FLORIDA NATIONAL CEMETERY PH 1B IN LAKE WORTH, FL. B. TOTAL CONTRACT PRICE INCREASED BY $21,157.00 AN…
Mod CO01D· CHANGE ORDER2009-05-14+$37,912$12,792,619A. SOUTH FLORIDA NATIONAL CEMETERY PHASE 1B IN LAKE WORTH, FL B. TOTAL CONTRACT PRICE INCREASED BY $37,912.00…
Mod SA007· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-05-14+$4,723$12,797,342A. SOUTH FLORIDA NATIONAL CEMETERY PH 1B IN LAKE WORTH, FL. B. TOTAL CONTRACT PRICE INCREASED BY $4,723.00 AND…
Mod SA008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-06-02+$5,667$12,803,009A. SOUTH FLORIDA NATIONAL CEMETERY PH 1B IN LAKE WORTH, FL. B. TOTAL CONTRACT PRICE INCREASED BY $5,667.00 AND…
Mod SA009· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-06-10+$9,451$12,812,460A. SOUTH FLORIDA NATIONAL CEMETERY PH 1B IN LAKE WORTH, FL. B. TOTAL CONTRACT PRICE DECREASED BY <-25,590.00>…
Mod SA010· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-06-16−$19,730$12,792,730A. SOUTH FLORIDA NATIONAL CEMETERY PH 1B IN LAKE WORTH, FL. B. TOTAL CONTRACT PRICE INCREASED BY $18,182.00 AN…
Mod SA011· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-06-23+$9,647$12,802,377A. SOUTH FLORIDA NATIONAL CEMETERY PH 1B IN LAKE WORTH, FL. B. TOTAL CONTRACT PRICE INCREASED BY $9,647.00 AND…
Mod 1214· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-08-06+$55,853$12,858,230A. SOUTH FLORIDA NATIONAL CEMETERY PH 1B IN LAKE WORTH, FL. SA-12: B. TOTAL CONTRACT PRICE INCREASED BY $53,2…
Mod SA015· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-08-12+$11,515$12,869,745A. SOUTH FLORIDA NATIONAL CEMETERY PH 1B IN LAKE WORTH, FL. B. TOTAL CONTRACT PRICE INCREASED BY $11,515.00 AN…
Mod SA016· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-08-12+$5,268$12,875,013A. SOUTH FLORIDA NATIONAL CEMETERY PH 1B IN LAKE WORTH, FL. B. TOTAL CONTRACT PRICE INCREASED BY $5,268.00 AND…
Mod SA017· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-08-12+$16,355$12,891,368A. SOUTH FLORIDA NATIONAL CEMETERY PH 1B IN LAKE WORTH, FL. B. TOTAL CONTRACT PRICE INCREASED BY $16,355.00 AN…
Mod SA019· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-09-03+$4,271$12,895,639A. SOUTH FLORIDA NATIONAL CEMETERY PH 1B IN LAKE WORTH, FL. B. TOTAL CONTRACT PRICE INCREASED BY $1,930.00 AND…
Mod SA018· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-09-10+$1,930$12,897,569A. SOUTH FLORIDA NATIONAL CEMETERY PH 1B IN LAKE WORTH, FL. B. TOTAL CONTRACT PRICE INCREASED BY $1,930.00 AND…
Mod SA021· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-09-16+$1,018$12,898,587A. SOUTH FLORIDA NATIONAL CEMETERY PH 1B IN LAKE WORTH, FL. B. TOTAL CONTRACT PRICE INCREASED BY $1,018.00 AND…
Mod SA022· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-09-16+$4,019$12,902,606A. SOUTH FLORIDA NATIONAL CEMETERY PH 1B IN LAKE WORTH, FL. B. TOTAL CONTRACT PRICE INCREASED BY $4,019.00 AND…
Mod SA023· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-09-16+$0$12,902,606A. SOUTH FLORIDA NATIONAL CEMETERY PH 1B IN LAKE WORTH, FL. B. TOTAL CONTRACT PRICE INCREASED BY $0.00 AND 0 D…
Mod SA024· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-09-16+$5,784$12,908,390A. SOUTH FLORIDA NATIONAL CEMETERY PH 1B IN LAKE WORTH, FL. B. TOTAL CONTRACT PRICE INCREASED BY $5,784.00 AND…
Mod 2528· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-09-23+$34,933$12,943,323A. SOUTH FLORIDA NATIONAL CEMETERY PH 1B IN LAKE WORTH, FL. SA-025 B. TOTAL CONTRACT PRICE INCREASED BY $1,80…
Mod SA029· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-10-01+$7,549$12,950,872SOUTH FLORIDA NATIONAL CEMETERY PHASE 1B SA-029, ELECTRICAL AND AIR PIPING AT NAINT. BUILDING
Mod SA030· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-10-06+$9,196$12,960,068SOUTH FLORDIA NATIONAL CEMETERY PHASE 1B LAKE WORTH, FL
Mod SA031· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-10-15+$2,969$12,963,037SOUTH FLORIDA NATIONAL CEMETERY PHASE 1B SA-031, EXISTING IRRIGATION PUMP
Mod SA032· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-11-05+$4,726$12,967,763SOUTH FLORIDA NATIONAL CEMETERY PHASE 1B SA-032, INLET WORK AT COLUMBARIUM
Mod SA033· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-11-05+$18,050$12,985,813SOUTH FLORIDA NATIONAL CEMETERY PHASE 1B SA-033, DRAINAGE DITCH
Mod SA034· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-11-05+$4,344$12,990,157SOUTH FLORIDA NATIONAL CEMETERY PHASE 1B SA-034, DRAINAGE DITCH
Mod SA035· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-11-05+$7,745$12,997,902SOUTH FLORIDA NATIONAL CEMETERY PHASE 1B SA-035, SOD MODIFICATIONS
Mod SA036· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-11-05+$1,845$12,999,747SOUTH FLORIDA NATIONAL CEMETERY PHASE 1B SA-036, MAINTENANCE YARD STONE AND IRRIGATION
Mod SA037· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-11-05+$6,008$13,005,755SOUTH FLORIDA NATIONAL CEMETERY PHASE 1B SA-037, IRRIGATION MAIN WORK
Mod SA038· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-11-19+$2,489$13,008,244SOUTH FLORIDA NATIONAL CEMETERY PHASE 1B SA-038, RELOCATE CONTROL BOXES
Mod SA020· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-12-07+$2,839,504$15,847,748A. SOUTH FLORIDA NATIONAL CEMETERY PH 1B IN LAKE WORTH, FL. B. TOTAL CONTRACT PRICE INCREASED BY $1,930.00 AND…
Mod SA039· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-12-09+$1,627$15,849,375SOUTH FLORIDA NATIONAL CEMETERY PHASE 1B SA-039, SIDEWALK AT ENTRANCE
Mod SA040· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-12-10+$773$15,850,148SOUTH FLORIDA NATIONAL CEMETERY PHASE 1B REMOVE LETTERS "VA" FROM THE ENTRANCE SIGN, REPAINT SIGN ORIGINAL COL…
Mod SA041· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-12-10+$3,945$15,854,093SOUTH FLORIDA NATIONAL CEMETERY PHASE 1B TAPS PLAYER FOR BOTH COMMITTAL SHELTER
Mod SA043· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-12-16+$489$15,854,582SOUTH FLORIDA NATIONAL CEMTERY PHASE 1B DRAIN AT RETAINING WALL
Mod SA044· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-12-16+$1,393$15,855,975SOUTH FLORIDA NATIONAL CEMETERY WORK ON THE IRRIGATION MAIN LINE
Mod SA042· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-12-31+$661$15,856,636ADD 2 ELECTRICAL SWITCHES AT THE COMMITTAL SHELTERS FOR FAN OPERATION
Mod CO01E· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-01-05+$40,000$15,896,636SOUTH FLORIDA NATIONAL CEMETERY PHASE 1B COLUMBARIUM WORK AND EXTEND THE CONTRACT DURATION 19 DAYS
Mod SA045· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-01-05+$44,945$15,941,581SOUTH FLORIDA NATIONAL CEMETERY INSTALL BAHIA SOD/TURF ON BURIAL AREAS 19, 20, 21, AND 34
Mod SA046· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-01-06+$2,057$15,943,638SOUTH FLORIDA NATIONAL CEMETERY PHASE 1B IRRIGATION WORK
Mod SA047· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-01-20+$5,011$15,948,649SOUTH FLORIDA NATIONAL CEMETERY PHASE 1B INSTALLATION OF 2 PLANTING BED DRAINS IN THE COLUMBARIA PLAZA
Mod SA048· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-01-20+$66,708$16,015,357SOUTH FLORIDA NATIONAL CEMETERY PHASE 1B EXCAVATE AND BACKFILL FOR THE IRRIGATION MODIFICATIONS
Mod SA049· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-01-28+$1,885$16,017,242SOUTH FLORIDA NATIONAL CEMETERY PHASE 1B STORM SEWER MODIFICATIONS
Mod SA050· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-02-09+$968$16,018,210SOUTH FLORIDA NATIONAL CEMETERY PHASE 1B ENGRAVE BURIAL MONUMENTS
Mod SA051· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-02-18+$1,453$16,019,663SOUTH FLORIDA NATIONAL CEMETERY PHASE 1B IRRIGATION MODIFICATIONS #6A
Mod SA052· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-03-11+$75,000$16,094,663SOUTH FLORIDA NATIONAL CEMETERY PHASE 1B ADDITIONAL WORK, OVERHEAD COSTS AND DELAY COSTS INVOLVE WITH IMPACTS…
Mod SA053· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-03-17+$1,347$16,096,010SOUTH FLORIDA NATIONAL CEMETERY PHASE 1B REVISED PIC DRAWINGS FOR PIC/ADMINISTRATION
Mod SA054· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-03-18+$27,159$16,123,169SOUTH FLORIDA NATIONAL CEMETERY PHASE 1B IRRIGATION MODIFICATIONS UNDER ROAD
Mod SA055· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-03-30+$3,616$16,126,785SOUTH FLORIDA NATIONAL CEMETERY PHASE 1B INSTALL A NEW 8" YARD DRAIN NEAR WEST COMMITTAL SHELTER
Mod SA056· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-04-08+$45,263$16,172,048SOUTH FLORIDA NATIONAL CEMETERY PHASE 1B SA-056, COLUMBARIUM WORK
Mod SA057· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-04-14+$12,400$16,184,448SOUTH FLORIDA NATIONAL CEMETERY PHASE 1B SA-057, NETWORK CABLE AND SECURITY SYSTEM
Mod SA058· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-04-15+$96,835$16,281,283SOUTH FLORIDA NATIONAL CEMETERY PHASE 1B INSTALL A NEW 8" YARD DRAIN NEAR WEST COMMITTAL SHELTER
Mod SA059· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-04-29+$1,210$16,282,493SOUTH FLORIDA NATIONAL CEMETERY PHASE 1B INSTALL A NEW 8" YARD DRAIN NEAR WEST COMMITTAL SHELTER
Mod SA060· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-05-05+$602$16,283,095SOUTH FLORIDA NATIONAL CEMETERY PHASE 1B SA-060, PIC/ADMIN EXTERIOR FURNISHINGS
Mod SA061· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-05-06+$4,660$16,287,755SOUTH FLORIDA NATIONAL CEMETERY PHASE 1B SA-061, HONOR GUARD, CURBING AND CAST STONE
Mod SA062· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-06-17+$992$16,288,747SOUTH FLORIDA NATIONAL CEMETERY PHASE 1B SA-062, IRRIGATION MODIFICATIONS
Mod SA063· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-08-18+$14,602$16,303,349SOUTH FLORIDA NATIONAL CEMETERY PHASE 1B SA-063, MISC. ITEMS
Mod SA064· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-04-19+$15,302$16,318,651SOUTH FLORIDA NATIONAL CEMETERY PHASE 1B BOND PREMIUM ADJUSTMENT
Mod SA065· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-05-15+$99,500$16,418,151SOUTH FLORIDA NATIONAL CEMETERY PHASE 1B BOND PREMIUM ADJUSTMENT
Mod P00001· CLOSE OUT2016-04-29−$120,827$16,297,324AE IDIQ CONTRACT CLOSEOUT

Related awards · 11

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other VA awards to the same recipient (UEI YQKLNFR9N289)

AwardOffice · PSC / listingNet obligationsFY
VA26117J3073261-NETWORK CONTRACT OFFICE 21 (36C261) · Y1DZ · CONSTRUCTION OF OTHER HOSPITAL BUILDINGS$5,000FY2017
VA26014J0501260-NETWORK CONTRACT OFFICE 20 · Z2DA · REPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES$10,000FY2014
VA26014J0499260-NETWORK CONTRACT OFFICE 20 · Z2DA · REPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES$10,000FY2014
VA26014J0500260-NETWORK CONTRACT OFFICE 20 · Z2DA · REPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES$10,000FY2014
VA101F13C0069OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT · Y1DZ · CONSTRUCTION OF OTHER HOSPITAL BUILDINGS$4,487,309FY2013
VA26013J1579260-NETWORK CONTRACT OFFICE 20 · Z2DA · REPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES$1,189,723FY2013

Other recipients under Y299 from OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) (most recent first)

AwardRecipientOfficeNet obligationsFY
VA101CFMC0165G&C FAB-CON, LLCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$18,626,889FY2011
VA101CFMC0093KEPA SERVICES INC.OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$23,946,212FY2010
VA101CFMC0081WEST CONSTRUCTION, INC.OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$22,945,085FY2010
VA101CFMP0021SMITHGROUPJJR, INC.OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$3,343,772FY2009
VA101183B4C0046EMERSON CONSTRUCTION COMPANY, INC.OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$21,687,294FY2008