Award recordCONTRACT

EMERSON CONSTRUCTION COMPANY, INC.

PIID VA101183B4C0046· VA Staff Offices· OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)· Y299 · CONTRUCT/ALL OTHER NON-BLDG FACS· FY2008· $21,687,294 net obligations· UEI DEKMBJBCJER5· TX

Description

FINAL BONDING COSTS ADJUSTMENT

Base award description: BURIAL EXPANSION AT FORT SAM HOUSTON NATIONAL CEMETERY.

First action · last action
2008-09-15 · 2017-11-29
Transactions
63
First transaction's obligation
$19,975,000
Base + all options value (sum of deltas)
$21,687,294
Extent competed
FULL AND OPEN COMPETITION
Other than full & open authority
—
Set-aside
NO SET ASIDE USED.
Offers received
5
SDVOSB flag on record
No
NAICS
237990 · OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION

Modification chain · 63 transactions

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$21,723,463$0Base award · 2008-09-15 · this action $19,975,000 · running total $19,975,000Modification 1 · 2008-12-05 · this action $12,897 · running total $19,987,897Modification 2 · 2008-12-16 · this action $49,304 · running total $20,037,201Modification 3 · 2008-12-16 · this action $15,633 · running total $20,052,834Modification 4 · 2008-12-24 · this action $3,496 · running total $20,056,330Modification 5 · 2009-01-15 · this action $2,697 · running total $20,059,027Modification CO01A · 2009-01-24 · this action $50,000 · running total $20,109,027Modification 6 · 2009-02-12 · this action $21,793 · running total $20,130,820Modification 7 · 2009-02-12 · this action $99,187 · running total $20,230,007Modification 8 · 2009-03-03 · this action $43,886 · running total $20,273,893Modification 9 · 2009-03-19 · this action $6,454 · running total $20,280,347Modification 10 · 2009-04-08 · this action $40,498 · running total $20,320,845Modification 11 · 2009-04-10 · this action $91,655 · running total $20,412,500Modification 12 · 2009-04-11 · this action -$60,631 · running total $20,351,869Modification CO01B · 2009-04-13 · this action $100,000 · running total $20,451,869Modification 13 · 2009-04-17 · this action $11,866 · running total $20,463,735Modification 14 · 2009-04-17 · this action $6,282 · running total $20,470,017Modification 15 · 2009-04-17 · this action $15,805 · running total $20,485,822Modification CO01C · 2009-04-17 · this action $49,136 · running total $20,534,958Modification 16 · 2009-04-23 · this action $19,639 · running total $20,554,597Modification SA017 · 2009-07-19 · this action $190,360 · running total $20,744,957Modification CO01D · 2009-08-07 · this action $99,900 · running total $20,844,857Modification 27 · 2009-09-08 · this action $306,795 · running total $21,151,652Modification 28 · 2009-10-06 · this action $97,568 · running total $21,249,220Modification 29 · 2009-10-07 · this action $71,478 · running total $21,320,698Modification 30 · 2009-10-07 · this action $30,512 · running total $21,351,210Modification 31 · 2009-10-08 · this action $25,759 · running total $21,376,969Modification 32 · 2009-10-30 · this action $7,500 · running total $21,384,469Modification 33 · 2009-10-30 · this action $10,077 · running total $21,394,546Modification 34 · 2009-10-30 · this action $12,611 · running total $21,407,157Modification 35 · 2009-11-09 · this action $31,144 · running total $21,438,301Modification SA040 · 2009-11-09 · this action $3,458 · running total $21,441,759Modification 20 · 2009-11-30 · this action $12,539 · running total $21,454,298Modification SA036 · 2009-12-21 · this action $12,149 · running total $21,466,447Modification SA037 · 2009-12-21 · this action $10,170 · running total $21,476,617Modification CO01G · 2010-01-04 · this action $8,200 · running total $21,484,817Modification CO01H · 2010-01-04 · this action $5,200 · running total $21,490,017Modification SA042 · 2010-02-12 · this action $809 · running total $21,490,826Modification SA045 · 2010-02-16 · this action $95,159 · running total $21,585,985Modification SA044 · 2010-02-17 · this action $6,337 · running total $21,592,322Modification CO01I · 2010-03-10 · this action $50,000 · running total $21,642,322Modification SA046 · 2010-03-17 · this action $5,932 · running total $21,648,254Modification SA047 · 2010-04-01 · this action -$42,961 · running total $21,605,293Modification SA048 · 2010-05-20 · this action -$3,294 · running total $21,601,999Modification SA049 · 2010-06-07 · this action $545 · running total $21,602,544Modification SA050 · 2010-06-07 · this action $2,165 · running total $21,604,709Modification SA051 · 2010-06-07 · this action -$1,846 · running total $21,602,863Modification SA052 · 2010-06-29 · this action $48,259 · running total $21,651,122Modification SA056 · 2010-06-29 · this action $9,645 · running total $21,660,767Modification SA058 · 2010-06-29 · this action -$2,083 · running total $21,658,684Modification SA053 · 2010-07-09 · this action $48,259 · running total $21,706,943Modification 54 · 2010-07-15 · this action $12,474 · running total $21,719,417Modification SA055 · 2010-07-15 · this action $4,046 · running total $21,723,463Modification 58 · 2010-08-25 · this action -$2,083 · running total $21,721,380Modification SA059 · 2010-09-03 · this action -$87,021 · running total $21,634,359Modification CO01E · 2010-09-28 · this action $15,000 · running total $21,649,359Modification SA038 · 2010-09-28 · this action $2,958 · running total $21,652,317Modification SA039 · 2010-09-28 · this action $7,817 · running total $21,660,134Modification SA041 · 2010-09-28 · this action $9,672 · running total $21,669,806Modification SA043 · 2010-09-28 · this action $2,924 · running total $21,672,730Modification CO01F · 2010-09-29 · this action $4,825 · running total $21,677,555Modification SA061 · 2010-12-09 · this action $9,739 · running total $21,687,294Modification P00020 · 2017-11-29 · this action $0 · running total $21,687,294
  • Base2008-09-15+$19,975,000= $19,975,000
  • Mod 12008-12-05+$12,897= $19,987,897
  • Mod 22008-12-16+$49,304= $20,037,201
  • Mod 32008-12-16+$15,633= $20,052,834
  • Mod 42008-12-24+$3,496= $20,056,330
  • Mod 52009-01-15+$2,697= $20,059,027
  • Mod CO01A2009-01-24+$50,000= $20,109,027
  • Mod 62009-02-12+$21,793= $20,130,820
  • Mod 72009-02-12+$99,187= $20,230,007
  • Mod 82009-03-03+$43,886= $20,273,893
  • Mod 92009-03-19+$6,454= $20,280,347
  • Mod 102009-04-08+$40,498= $20,320,845
  • Mod 112009-04-10+$91,655= $20,412,500
  • Mod 122009-04-11-$60,631= $20,351,869
  • Mod CO01B2009-04-13+$100,000= $20,451,869
  • Mod 132009-04-17+$11,866= $20,463,735
  • Mod 142009-04-17+$6,282= $20,470,017
  • Mod 152009-04-17+$15,805= $20,485,822
  • Mod CO01C2009-04-17+$49,136= $20,534,958
  • Mod 162009-04-23+$19,639= $20,554,597
  • Mod SA0172009-07-19+$190,360= $20,744,957
  • Mod CO01D2009-08-07+$99,900= $20,844,857
  • Mod 272009-09-08+$306,795= $21,151,652
  • Mod 282009-10-06+$97,568= $21,249,220
  • Mod 292009-10-07+$71,478= $21,320,698
  • Mod 302009-10-07+$30,512= $21,351,210
  • Mod 312009-10-08+$25,759= $21,376,969
  • Mod 322009-10-30+$7,500= $21,384,469
  • Mod 332009-10-30+$10,077= $21,394,546
  • Mod 342009-10-30+$12,611= $21,407,157
  • Mod 352009-11-09+$31,144= $21,438,301
  • Mod SA0402009-11-09+$3,458= $21,441,759
  • Mod 202009-11-30+$12,539= $21,454,298
  • Mod SA0362009-12-21+$12,149= $21,466,447
  • Mod SA0372009-12-21+$10,170= $21,476,617
  • Mod CO01G2010-01-04+$8,200= $21,484,817
  • Mod CO01H2010-01-04+$5,200= $21,490,017
  • Mod SA0422010-02-12+$809= $21,490,826
  • Mod SA0452010-02-16+$95,159= $21,585,985
  • Mod SA0442010-02-17+$6,337= $21,592,322
  • Mod CO01I2010-03-10+$50,000= $21,642,322
  • Mod SA0462010-03-17+$5,932= $21,648,254
  • Mod SA0472010-04-01-$42,961= $21,605,293
  • Mod SA0482010-05-20-$3,294= $21,601,999
  • Mod SA0492010-06-07+$545= $21,602,544
  • Mod SA0502010-06-07+$2,165= $21,604,709
  • Mod SA0512010-06-07-$1,846= $21,602,863
  • Mod SA0522010-06-29+$48,259= $21,651,122
  • Mod SA0562010-06-29+$9,645= $21,660,767
  • Mod SA0582010-06-29-$2,083= $21,658,684
  • Mod SA0532010-07-09+$48,259= $21,706,943
  • Mod 542010-07-15+$12,474= $21,719,417
  • Mod SA0552010-07-15+$4,046= $21,723,463
  • Mod 582010-08-25-$2,083= $21,721,380
  • Mod SA0592010-09-03-$87,021= $21,634,359
  • Mod CO01E2010-09-28+$15,000= $21,649,359
  • Mod SA0382010-09-28+$2,958= $21,652,317
  • Mod SA0392010-09-28+$7,817= $21,660,134
  • Mod SA0412010-09-28+$9,672= $21,669,806
  • Mod SA0432010-09-28+$2,924= $21,672,730
  • Mod CO01F2010-09-29+$4,825= $21,677,555
  • Mod SA0612010-12-09+$9,739= $21,687,294
  • Mod P000202017-11-29+$0= $21,687,294
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2008-09-15+$19,975,000$19,975,000BURIAL EXPANSION AT FORT SAM HOUSTON NATIONAL CEMETERY.
Mod 1· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2008-12-05+$12,897$19,987,897BURIAL EXPANSION AT FORT SAM HOUSTON NATIONAL CEMETERY.
Mod 2· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2008-12-16+$49,304$20,037,201BURIAL EXPANSION AT FORT SAM HOUSTON NATIONAL CEMETERY.
Mod 3· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2008-12-16+$15,633$20,052,834BURIAL EXPANSION AT FORT SAM HOUSTON NATIONAL CEMETERY.
Mod 4· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2008-12-24+$3,496$20,056,330BURIAL EXPANSION AT FORT SAM HOUSTON NATIONAL CEMETERY.
Mod 5· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2009-01-15+$2,697$20,059,027BURIAL EXPANSION AT FORT SAM HOUSTON NATIONAL CEMETERY.
Mod CO01A· CHANGE ORDER2009-01-24+$50,000$20,109,027UNCHARTED NON-HAZMAT MATERIALS UNCOVERED DURING EXCAVATION.
Mod 6· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2009-02-12+$21,793$20,130,820BURIAL EXPANSION AT FORT SAM HOUSTON NATIONAL CEMETERY.
Mod 7· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2009-02-12+$99,187$20,230,007BURIAL EXPANSION AT FORT SAM HOUSTON NATIONAL CEMETERY.
Mod 8· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2009-03-03+$43,886$20,273,893BURIAL EXPANSION AT FORT SAM HOUSTON NATIONAL CEMETERY.
Mod 9· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2009-03-19+$6,454$20,280,347BURIAL EXPANSION AT FORT SAM HOUSTON NATIONAL CEMETERY.
Mod 10· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2009-04-08+$40,498$20,320,845BURIAL EXPANSION AT FORT SAM HOUSTON NATIONAL CEMETERY.
Mod 11· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2009-04-10+$91,655$20,412,500BURIAL EXPANSION AT FORT SAM HOUSTON NATIONAL CEMETERY.
Mod 12· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2009-04-11−$60,631$20,351,869BURIAL EXPANSION AT FORT SAM HOUSTON NATIONAL CEMETERY.
Mod CO01B· CHANGE ORDER2009-04-13+$100,000$20,451,869NON-HAZMAT WASTES UNCOVERED IN DEVELOPED AREA SOUTHWEST AND ADJACENT TO ASSEMBLY AREA.
Mod 13· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2009-04-17+$11,866$20,463,735BURIAL EXPANSION AT FORT SAM HOUSTON NATIONAL CEMETERY.
Mod 14· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2009-04-17+$6,282$20,470,017BURIAL EXPANSION AT FORT SAM HOUSTON NATIONAL CEMETERY.
Mod 15· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2009-04-17+$15,805$20,485,822BURIAL EXPANSION AT FORT SAM HOUSTON NATIONAL CEMETERY.
Mod CO01C· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2009-04-17+$49,136$20,534,958BURIAL EXPANSION AT FORT SAM HOUSTON NATIONAL CEMETERY.
Mod 16· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2009-04-23+$19,639$20,554,597BURIAL EXPANSION AT FORT SAM HOUSTON NATIONAL CEMETERY.
Mod SA017· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-07-19+$190,360$20,744,957NON-HAZMAT WASTES UNCOVERED IN DEVELOPED AREA SOUTHWEST AND ADJACENT TO ASSEMBLY AREA
Mod CO01D· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2009-08-07+$99,900$20,844,857BURIAL EXPANSION AT FORT SAM HOUSTON NATIONAL CEMETERY.
Mod 27· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2009-09-08+$306,795$21,151,652BURIAL EXPANSION AT FORT SAM HOUSTON NATIONAL CEMETERY.
Mod 28· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2009-10-06+$97,568$21,249,220BURIAL EXPANSION AT FORT SAM HOUSTON NATIONAL CEMETERY.
Mod 29· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2009-10-07+$71,478$21,320,698BURIAL EXPANSION AT FORT SAM HOUSTON NATIONAL CEMETERY.
Mod 30· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-10-07+$30,512$21,351,210C ST BASIN, BLOW ASSEMBLY, FLAGPOLE
Mod 31· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2009-10-08+$25,759$21,376,969BURIAL EXPANSION AT FORT SAM HOUSTON NATIONAL CEMETERY.
Mod 32· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2009-10-30+$7,500$21,384,469BURIAL EXPANSION AT FORT SAM HOUSTON NATIONAL CEMETERY.
Mod 33· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2009-10-30+$10,077$21,394,546BURIAL EXPANSION AT FORT SAM HOUSTON NATIONAL CEMETERY.
Mod 34· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2009-10-30+$12,611$21,407,157BURIAL EXPANSION AT FORT SAM HOUSTON NATIONAL CEMETERY.
Mod 35· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2009-11-09+$31,144$21,438,301BURIAL EXPANSION AT FORT SAM HOUSTON NATIONAL CEMETERY.
Mod SA040· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2009-11-09+$3,458$21,441,759BURIAL EXPANSION AT FORT SAM HOUSTON NATIONAL CEMETERY.
Mod 20· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-11-30+$12,539$21,454,298EXISTING CURB REPAIR AND REPLACEMENT
Mod SA036· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-12-21+$12,149$21,466,447CONCRETE AND FLAG POLE ROAD CHANGES
Mod SA037· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-12-21+$10,170$21,476,617BURIAL EXPANSION AT FORT SAM HOUSTON NATIONAL CEMETERY.
Mod CO01G· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2010-01-04+$8,200$21,484,817REVERSE IRRIGATION SECTION
Mod CO01H· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2010-01-04+$5,200$21,490,017IRRIGATION SYSTEMS REPAIR
Mod SA042· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-02-12+$809$21,490,826REVISE IRRIGATION
Mod SA045· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-02-16+$95,159$21,585,985EXISTING IRRIGATION POND CLEANUP
Mod SA044· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-02-17+$6,337$21,592,322VEHICLE SHELTER BOLLARD
Mod CO01I· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2010-03-10+$50,000$21,642,322DIRT RESTORATION AND BACKFILL
Mod SA046· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-03-17+$5,932$21,648,254ADD SECTION MARKERS
Mod SA047· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-04-01−$42,961$21,605,293CREDIT
Mod SA048· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-05-20−$3,294$21,601,999BURIAL EXPANSION AT FORT SAM HOUSTON NATIONAL CEMETERY.
Mod SA049· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-06-07+$545$21,602,544MAINTENANCE MODIFICATION
Mod SA050· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-06-07+$2,165$21,604,709DATA PORT AND WIRE ADDITION
Mod SA051· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-06-07−$1,846$21,602,863CREDIT
Mod SA052· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-06-29+$48,259$21,651,122MODIFY AND UPGRADE IRRIGATION SYSTEM
Mod SA056· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-06-29+$9,645$21,660,767BURIAL EXPANSION AT FORT SAM HOUSTON NATIONAL CEMETERY.
Mod SA058· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-06-29−$2,083$21,658,684BURIAL EXPANSION AT FORT SAM HOUSTON NATIONAL CEMETERY.
Mod SA053· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-07-09+$48,259$21,706,943SURVEY AND PLOT REMAIN
Mod 54· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-07-15+$12,474$21,719,417SA# 54 RESEED TRADITIONAL AREA.
Mod SA055· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-07-15+$4,046$21,723,463FT. SAM NC - PHASE II EXPANSION
Mod 58· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-08-25−$2,083$21,721,380SA# 58, DELETION OF IRRIGATION AT MAINTENANCE BUILDING.
Mod SA059· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-09-03−$87,021$21,634,359BURIAL EXPANSION AT FORT SAM HOUSTON NATIONAL CEMETERY.
Mod CO01E· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2010-09-28+$15,000$21,649,359BURIAL EXPANSION AT FORT SAM HOUSTON NATIONAL CEMETERY.
Mod SA038· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2010-09-28+$2,958$21,652,317BURIAL EXPANSION AT FORT SAM HOUSTON NATIONAL CEMETERY.
Mod SA039· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2010-09-28+$7,817$21,660,134BURIAL EXPANSION AT FORT SAM HOUSTON NATIONAL CEMETERY.
Mod SA041· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2010-09-28+$9,672$21,669,806BURIAL EXPANSION AT FORT SAM HOUSTON NATIONAL CEMETERY.
Mod SA043· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2010-09-28+$2,924$21,672,730BURIAL EXPANSION AT FORT SAM HOUSTON NATIONAL CEMETERY.
Mod CO01F· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2010-09-29+$4,825$21,677,555EXISTING CURB REPAIR AND REPLACEMENT
Mod SA061· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-12-09+$9,739$21,687,294FINAL BONDING COSTS ADJUSTMENT
Mod P00020· CLOSE OUT2017-11-29+$0$21,687,294FINAL BONDING COSTS ADJUSTMENT

Related awards · 5

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other recipients under Y299 from OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) (most recent first)

AwardRecipientOfficeNet obligationsFY
VA101CFMC0165G&C FAB-CON, LLCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$18,626,889FY2011
VA101CFMC0093KEPA SERVICES INC.OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$23,946,212FY2010
VA101CFMC0081WEST CONSTRUCTION, INC.OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$22,945,085FY2010
VA101CFMP0021SMITHGROUPJJR, INC.OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$3,343,772FY2009
VA101183B4C0047KEVCON, INCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$16,297,324FY2008

Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA101183B4C0046_3600_-NONE-_-NONE- · retrieved 2026-09-26.