Award recordCONTRACT

WEST CONSTRUCTION, INC.

PIID VA101CFMC0081· VA Staff Offices· OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)· Y299 · CONTRUCT/ALL OTHER NON-BLDG FACS· FY2010· $22,945,085 net obligations· UEI W6TCMS5EGTE7· FL

Description

DE-OBLIGATION OF $22,502.81 FOR CONTRACT CLOSEOUT

Base award description: CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, AND MATERIALS FOR GRAVESITE IMPROVEMENTS, AND EXPANSION AT THE PUERTO RICO NATIONAL CEMETERY, BAYAMON, PR.

First action · last action
2010-04-19 · 2017-05-03
Transactions
136
First transaction's obligation
$18,972,199
Base + all options value (sum of deltas)
$22,947,205
Extent competed
FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
Other than full & open authority
—
Set-aside
SMALL BUSINESS SET ASIDE - TOTAL
Offers received
14
SDVOSB flag on record
No
NAICS
237990 · OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION

Modification chain · 136 transactions

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$22,969,491$0Base award · 2010-04-19 · this action $18,972,199 · running total $18,972,199Modification CO01A · 2010-09-23 · this action $31,708 · running total $19,003,907Modification SA002 · 2010-12-14 · this action $0 · running total $19,003,907Modification TE001 · 2011-01-04 · this action $0 · running total $19,003,907Modification SA001 · 2011-04-19 · this action $27,163 · running total $19,031,070Modification TE002 · 2011-04-19 · this action $0 · running total $19,031,070Modification SA003 · 2011-04-27 · this action $2,130 · running total $19,033,201Modification TE003 · 2011-07-28 · this action $0 · running total $19,033,201Modification CO01B · 2011-08-09 · this action $63,000 · running total $19,096,201Modification SA004 · 2011-09-15 · this action $87,141 · running total $19,183,342Modification SA005 · 2011-10-05 · this action $9,769 · running total $19,193,110Modification CO01C · 2011-10-28 · this action $19,250 · running total $19,212,360Modification CO01D · 2011-11-02 · this action $45,000 · running total $19,257,360Modification SA006 · 2011-11-02 · this action $4,436 · running total $19,261,796Modification SA007 · 2011-11-03 · this action $3,520 · running total $19,265,317Modification SA008 · 2011-11-03 · this action $3,891 · running total $19,269,208Modification SA010 · 2011-11-07 · this action $5,585 · running total $19,274,793Modification SA011 · 2011-11-07 · this action $2,275 · running total $19,277,068Modification CO01F · 2011-11-08 · this action $63,447 · running total $19,340,515Modification CO01G · 2011-11-14 · this action $28,269 · running total $19,368,784Modification SA012 · 2011-11-14 · this action $1,990 · running total $19,370,774Modification SA013 · 2011-12-14 · this action $1,793 · running total $19,372,567Modification CO01E · 2011-12-28 · this action $131,291 · running total $19,503,858Modification SA014 · 2011-12-30 · this action $10,326 · running total $19,514,184Modification SA015 · 2011-12-30 · this action $14,928 · running total $19,529,112Modification TE004 · 2012-01-17 · this action $0 · running total $19,529,112Modification TE005 · 2012-01-17 · this action $0 · running total $19,529,112Modification SA016 · 2012-02-01 · this action $22,703 · running total $19,551,815Modification CO01H · 2012-02-11 · this action $50,500 · running total $19,602,315Modification SA017 · 2012-03-09 · this action $0 · running total $19,602,315Modification CO01I · 2012-03-13 · this action $8,499 · running total $19,610,813Modification CO01J · 2012-03-16 · this action $13,609 · running total $19,624,422Modification SA018 · 2012-03-21 · this action $13,344 · running total $19,637,765Modification CO01K · 2012-04-30 · this action $15,000 · running total $19,652,765Modification CO01L · 2012-05-30 · this action $32,750 · running total $19,685,515Modification SA009 · 2012-07-06 · this action $345,000 · running total $20,030,515Modification SA019 · 2012-07-06 · this action $28,833 · running total $20,059,348Modification SA028 · 2012-07-12 · this action $9,416 · running total $20,068,765Modification SA021 · 2012-07-13 · this action $8,499 · running total $20,077,263Modification SA022 · 2012-07-13 · this action $9,666 · running total $20,086,930Modification SA024 · 2012-07-16 · this action $17,708 · running total $20,104,638Modification SA025 · 2012-07-16 · this action $60,841 · running total $20,165,478Modification SA023 · 2012-07-18 · this action $4,918 · running total $20,170,396Modification SA020 · 2012-07-19 · this action $0 · running total $20,170,396Modification SA026 · 2012-07-19 · this action $3,984 · running total $20,174,380Modification SA027 · 2012-07-19 · this action $3,006 · running total $20,177,387Modification SA029 · 2012-07-20 · this action $1,905 · running total $20,179,292Modification SA030 · 2012-07-20 · this action $1,972 · running total $20,181,264Modification SA032 · 2012-08-02 · this action $12,077 · running total $20,193,341Modification SA033 · 2012-08-02 · this action $2,008 · running total $20,195,349Modification SA034 · 2012-08-02 · this action $3,267 · running total $20,198,616Modification SA036 · 2012-08-02 · this action $10,512 · running total $20,209,128Modification SA037 · 2012-08-02 · this action $10,802 · running total $20,219,930Modification SA038 · 2012-08-02 · this action $75,000 · running total $20,294,930Modification SA031 · 2012-08-08 · this action $3,500 · running total $20,298,430Modification SA035 · 2012-08-13 · this action $1,925 · running total $20,300,355Modification SA039 · 2012-09-05 · this action $25,500 · running total $20,325,855Modification SA040 · 2012-10-10 · this action $55,879 · running total $20,381,734Modification SA041 · 2012-10-24 · this action $14,907 · running total $20,396,641Modification P00001 · 2013-02-07 · this action $99,500 · running total $20,496,141Modification P00003 · 2013-02-21 · this action $7,480 · running total $20,503,621Modification P00004 · 2013-02-22 · this action $18,464 · running total $20,522,085Modification P00002 · 2013-02-26 · this action $14,377 · running total $20,536,462Modification P00005 · 2013-03-22 · this action $6,060 · running total $20,542,522Modification P00006 · 2013-06-05 · this action $7,711 · running total $20,550,233Modification P00007 · 2013-06-05 · this action $3,289 · running total $20,553,522Modification P00008 · 2013-06-05 · this action $69,435 · running total $20,622,958Modification P00009 · 2013-06-21 · this action $125,186 · running total $20,748,144Modification P00011 · 2013-09-13 · this action $12,239 · running total $20,760,384Modification P00012 · 2013-11-18 · this action $74,054 · running total $20,834,438Modification P00013 · 2013-11-25 · this action $50,990 · running total $20,885,428Modification P00014 · 2014-01-24 · this action $8,550 · running total $20,893,978Modification P00023 · 2014-01-30 · this action $15,000 · running total $20,908,978Modification P00022 · 2014-01-31 · this action $25,000 · running total $20,933,978Modification P00024 · 2014-01-31 · this action $14,000 · running total $20,947,978Modification P00025 · 2014-01-31 · this action $99,147 · running total $21,047,125Modification P00026 · 2014-02-10 · this action $3,933 · running total $21,051,058Modification P00027 · 2014-02-11 · this action $9,666 · running total $21,060,724Modification P00028 · 2014-02-12 · this action -$20,317 · running total $21,040,407Modification P00021 · 2014-02-19 · this action $175,446 · running total $21,215,853Modification P00029 · 2014-02-20 · this action $2,557 · running total $21,218,410Modification P00030 · 2014-02-21 · this action $3,279 · running total $21,221,689Modification P00031 · 2014-03-13 · this action $536 · running total $21,222,225Modification P00032 · 2014-03-13 · this action $7,720 · running total $21,229,945Modification P00035 · 2014-04-22 · this action $1,729 · running total $21,231,674Modification P00033 · 2014-04-28 · this action $35,130 · running total $21,266,804Modification P00034 · 2014-04-30 · this action $0 · running total $21,266,804Modification P00018 · 2014-05-02 · this action $7,162 · running total $21,273,965Modification P00037 · 2014-05-09 · this action $1,255 · running total $21,275,220Modification P00036 · 2014-05-12 · this action -$3,954 · running total $21,271,266Modification P00015 · 2014-05-14 · this action $7,846 · running total $21,279,112Modification P00038 · 2014-05-16 · this action $2,257 · running total $21,281,369Modification P00040 · 2014-05-21 · this action $0 · running total $21,281,369Modification P00039 · 2014-05-22 · this action $4,974 · running total $21,286,343Modification P00019 · 2014-08-01 · this action -$60,575 · running total $21,225,768Modification P00042 · 2014-08-11 · this action $0 · running total $21,225,768Modification P00043 · 2014-08-13 · this action $20,317 · running total $21,246,085Modification P00044 · 2014-09-11 · this action $27,742 · running total $21,273,827Modification P00045 · 2014-09-22 · this action $4,208 · running total $21,278,035Modification P00046 · 2014-09-23 · this action $32,233 · running total $21,310,268Modification P00020 · 2014-10-27 · this action $34,814 · running total $21,345,082Modification P00047 · 2014-10-27 · this action $80,281 · running total $21,425,363Modification P00048 · 2014-11-04 · this action $3,278 · running total $21,428,641Modification P00049 · 2014-11-17 · this action $45,306 · running total $21,473,947Modification P00053 · 2015-01-08 · this action $16,384 · running total $21,490,331Modification P00016 · 2015-01-09 · this action -$3,500 · running total $21,486,831Modification P00050 · 2015-01-09 · this action $2,213 · running total $21,489,044Modification P00054 · 2015-01-09 · this action $0 · running total $21,489,044Modification P00059 · 2015-01-23 · this action $95,976 · running total $21,585,020Modification P00060 · 2015-02-11 · this action $16,669 · running total $21,601,689Modification P00062 · 2015-02-23 · this action $3,289 · running total $21,604,978Modification P00063 · 2015-02-27 · this action $18,589 · running total $21,623,567Modification P00064 · 2015-03-23 · this action $13,886 · running total $21,637,453Modification P00065 · 2015-03-31 · this action $12,665 · running total $21,650,118Modification P00041 · 2015-07-06 · this action $226,583 · running total $21,876,701Modification P00066 · 2015-07-30 · this action $3,450 · running total $21,880,151Modification P00068 · 2015-07-30 · this action $6,007 · running total $21,886,158Modification P00069 · 2015-07-30 · this action $12,804 · running total $21,898,962Modification P00072 · 2015-09-09 · this action $70,364 · running total $21,969,326Modification P00073 · 2015-09-22 · this action $2,041 · running total $21,971,367Modification P00075 · 2015-10-15 · this action $2,261 · running total $21,973,628Modification P00074 · 2015-10-22 · this action $0 · running total $21,973,628Modification P00076 · 2015-11-04 · this action $7,298 · running total $21,980,926Modification P00017 · 2015-12-09 · this action $0 · running total $21,980,926Modification P00078 · 2015-12-15 · this action -$5,558 · running total $21,975,369Modification P00055 · 2015-12-18 · this action $0 · running total $21,975,369Modification P00056 · 2015-12-18 · this action $0 · running total $21,975,369Modification P00057 · 2015-12-18 · this action $10,474 · running total $21,985,843Modification P00058 · 2015-12-18 · this action $0 · running total $21,985,843Modification P00061 · 2015-12-18 · this action $0 · running total $21,985,843Modification P00079 · 2016-10-18 · this action $274,431 · running total $22,260,274Modification P00080 · 2016-11-29 · this action $684,284 · running total $22,944,558Modification P00081 · 2016-12-20 · this action $24,933 · running total $22,969,491Modification P00084 · 2017-05-02 · this action -$1,903 · running total $22,967,588Modification P00082 · 2017-05-03 · this action -$0 · running total $22,967,587Modification P00083 · 2017-05-03 · this action -$22,502 · running total $22,945,085
  • Base2010-04-19+$18,972,199= $18,972,199
  • Mod CO01A2010-09-23+$31,708= $19,003,907
  • Mod SA0022010-12-14+$0= $19,003,907
  • Mod TE0012011-01-04+$0= $19,003,907
  • Mod SA0012011-04-19+$27,163= $19,031,070
  • Mod TE0022011-04-19+$0= $19,031,070
  • Mod SA0032011-04-27+$2,130= $19,033,201
  • Mod TE0032011-07-28+$0= $19,033,201
  • Mod CO01B2011-08-09+$63,000= $19,096,201
  • Mod SA0042011-09-15+$87,141= $19,183,342
  • Mod SA0052011-10-05+$9,769= $19,193,110
  • Mod CO01C2011-10-28+$19,250= $19,212,360
  • Mod CO01D2011-11-02+$45,000= $19,257,360
  • Mod SA0062011-11-02+$4,436= $19,261,796
  • Mod SA0072011-11-03+$3,520= $19,265,317
  • Mod SA0082011-11-03+$3,891= $19,269,208
  • Mod SA0102011-11-07+$5,585= $19,274,793
  • Mod SA0112011-11-07+$2,275= $19,277,068
  • Mod CO01F2011-11-08+$63,447= $19,340,515
  • Mod CO01G2011-11-14+$28,269= $19,368,784
  • Mod SA0122011-11-14+$1,990= $19,370,774
  • Mod SA0132011-12-14+$1,793= $19,372,567
  • Mod CO01E2011-12-28+$131,291= $19,503,858
  • Mod SA0142011-12-30+$10,326= $19,514,184
  • Mod SA0152011-12-30+$14,928= $19,529,112
  • Mod TE0042012-01-17+$0= $19,529,112
  • Mod TE0052012-01-17+$0= $19,529,112
  • Mod SA0162012-02-01+$22,703= $19,551,815
  • Mod CO01H2012-02-11+$50,500= $19,602,315
  • Mod SA0172012-03-09+$0= $19,602,315
  • Mod CO01I2012-03-13+$8,499= $19,610,813
  • Mod CO01J2012-03-16+$13,609= $19,624,422
  • Mod SA0182012-03-21+$13,344= $19,637,765
  • Mod CO01K2012-04-30+$15,000= $19,652,765
  • Mod CO01L2012-05-30+$32,750= $19,685,515
  • Mod SA0092012-07-06+$345,000= $20,030,515
  • Mod SA0192012-07-06+$28,833= $20,059,348
  • Mod SA0282012-07-12+$9,416= $20,068,765
  • Mod SA0212012-07-13+$8,499= $20,077,263
  • Mod SA0222012-07-13+$9,666= $20,086,930
  • Mod SA0242012-07-16+$17,708= $20,104,638
  • Mod SA0252012-07-16+$60,841= $20,165,478
  • Mod SA0232012-07-18+$4,918= $20,170,396
  • Mod SA0202012-07-19+$0= $20,170,396
  • Mod SA0262012-07-19+$3,984= $20,174,380
  • Mod SA0272012-07-19+$3,006= $20,177,387
  • Mod SA0292012-07-20+$1,905= $20,179,292
  • Mod SA0302012-07-20+$1,972= $20,181,264
  • Mod SA0322012-08-02+$12,077= $20,193,341
  • Mod SA0332012-08-02+$2,008= $20,195,349
  • Mod SA0342012-08-02+$3,267= $20,198,616
  • Mod SA0362012-08-02+$10,512= $20,209,128
  • Mod SA0372012-08-02+$10,802= $20,219,930
  • Mod SA0382012-08-02+$75,000= $20,294,930
  • Mod SA0312012-08-08+$3,500= $20,298,430
  • Mod SA0352012-08-13+$1,925= $20,300,355
  • Mod SA0392012-09-05+$25,500= $20,325,855
  • Mod SA0402012-10-10+$55,879= $20,381,734
  • Mod SA0412012-10-24+$14,907= $20,396,641
  • Mod P000012013-02-07+$99,500= $20,496,141
  • Mod P000032013-02-21+$7,480= $20,503,621
  • Mod P000042013-02-22+$18,464= $20,522,085
  • Mod P000022013-02-26+$14,377= $20,536,462
  • Mod P000052013-03-22+$6,060= $20,542,522
  • Mod P000062013-06-05+$7,711= $20,550,233
  • Mod P000072013-06-05+$3,289= $20,553,522
  • Mod P000082013-06-05+$69,435= $20,622,958
  • Mod P000092013-06-21+$125,186= $20,748,144
  • Mod P000112013-09-13+$12,239= $20,760,384
  • Mod P000122013-11-18+$74,054= $20,834,438
  • Mod P000132013-11-25+$50,990= $20,885,428
  • Mod P000142014-01-24+$8,550= $20,893,978
  • Mod P000232014-01-30+$15,000= $20,908,978
  • Mod P000222014-01-31+$25,000= $20,933,978
  • Mod P000242014-01-31+$14,000= $20,947,978
  • Mod P000252014-01-31+$99,147= $21,047,125
  • Mod P000262014-02-10+$3,933= $21,051,058
  • Mod P000272014-02-11+$9,666= $21,060,724
  • Mod P000282014-02-12-$20,317= $21,040,407
  • Mod P000212014-02-19+$175,446= $21,215,853
  • Mod P000292014-02-20+$2,557= $21,218,410
  • Mod P000302014-02-21+$3,279= $21,221,689
  • Mod P000312014-03-13+$536= $21,222,225
  • Mod P000322014-03-13+$7,720= $21,229,945
  • Mod P000352014-04-22+$1,729= $21,231,674
  • Mod P000332014-04-28+$35,130= $21,266,804
  • Mod P000342014-04-30+$0= $21,266,804
  • Mod P000182014-05-02+$7,162= $21,273,965
  • Mod P000372014-05-09+$1,255= $21,275,220
  • Mod P000362014-05-12-$3,954= $21,271,266
  • Mod P000152014-05-14+$7,846= $21,279,112
  • Mod P000382014-05-16+$2,257= $21,281,369
  • Mod P000402014-05-21+$0= $21,281,369
  • Mod P000392014-05-22+$4,974= $21,286,343
  • Mod P000192014-08-01-$60,575= $21,225,768
  • Mod P000422014-08-11+$0= $21,225,768
  • Mod P000432014-08-13+$20,317= $21,246,085
  • Mod P000442014-09-11+$27,742= $21,273,827
  • Mod P000452014-09-22+$4,208= $21,278,035
  • Mod P000462014-09-23+$32,233= $21,310,268
  • Mod P000202014-10-27+$34,814= $21,345,082
  • Mod P000472014-10-27+$80,281= $21,425,363
  • Mod P000482014-11-04+$3,278= $21,428,641
  • Mod P000492014-11-17+$45,306= $21,473,947
  • Mod P000532015-01-08+$16,384= $21,490,331
  • Mod P000162015-01-09-$3,500= $21,486,831
  • Mod P000502015-01-09+$2,213= $21,489,044
  • Mod P000542015-01-09+$0= $21,489,044
  • Mod P000592015-01-23+$95,976= $21,585,020
  • Mod P000602015-02-11+$16,669= $21,601,689
  • Mod P000622015-02-23+$3,289= $21,604,978
  • Mod P000632015-02-27+$18,589= $21,623,567
  • Mod P000642015-03-23+$13,886= $21,637,453
  • Mod P000652015-03-31+$12,665= $21,650,118
  • Mod P000412015-07-06+$226,583= $21,876,701
  • Mod P000662015-07-30+$3,450= $21,880,151
  • Mod P000682015-07-30+$6,007= $21,886,158
  • Mod P000692015-07-30+$12,804= $21,898,962
  • Mod P000722015-09-09+$70,364= $21,969,326
  • Mod P000732015-09-22+$2,041= $21,971,367
  • Mod P000752015-10-15+$2,261= $21,973,628
  • Mod P000742015-10-22+$0= $21,973,628
  • Mod P000762015-11-04+$7,298= $21,980,926
  • Mod P000172015-12-09+$0= $21,980,926
  • Mod P000782015-12-15-$5,558= $21,975,369
  • Mod P000552015-12-18+$0= $21,975,369
  • Mod P000562015-12-18+$0= $21,975,369
  • Mod P000572015-12-18+$10,474= $21,985,843
  • Mod P000582015-12-18+$0= $21,985,843
  • Mod P000612015-12-18+$0= $21,985,843
  • Mod P000792016-10-18+$274,431= $22,260,274
  • Mod P000802016-11-29+$684,284= $22,944,558
  • Mod P000812016-12-20+$24,933= $22,969,491
  • Mod P000842017-05-02-$1,903= $22,967,588
  • Mod P000822017-05-03-$0= $22,967,587
  • Mod P000832017-05-03-$22,502= $22,945,085
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2010-04-19+$18,972,199$18,972,199CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, AND MATERIALS FOR GRAVESITE IMPROVEMENTS, AND EXPANSION AT THE…
Mod CO01A· CHANGE ORDER2010-09-23+$31,708$19,003,907EMERGENCY GENERATOR
Mod SA002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-12-14+$0$19,003,907TO ALLOW FOR PAYMENT OF MATERIALS STORED OFF-SITE. CONCRETE CRYPTS STORED OFF-SITE. THIS SUPPLEMENTAL AGREEME…
Mod TE001· OTHER ADMINISTRATIVE ACTION2011-01-04+$0$19,003,907THIS TE IS A NO COST FOURTY (40) CALENDAR DAYS TIME EXTENSION DUE TO UNUSUALLY SEVERE WEATHER FROM JUNE 2010 T…
Mod SA001· CHANGE ORDER2011-04-19+$27,163$19,031,070PROVIDE FURNITURE FOR TEMP ADMIN TRAILER
Mod TE002· OTHER ADMINISTRATIVE ACTION2011-04-19+$0$19,031,070THIS TE IS A NO COST FOURTY FIVE (45) CALENDAR DAYS TIME EXTENSION DUE TO UNUSUALLY SEVERE WEATHER FROM DECEMB…
Mod SA003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-04-27+$2,130$19,033,201IN ACCORDANCE WITH THE CONTRACT GENERAL CONDITIONS A RECOMMENDED PARTNERING MEETING WAS HELD ON JANUARY 26, 20…
Mod TE003· OTHER ADMINISTRATIVE ACTION2011-07-28+$0$19,033,201THIS TE IS A NO COST FOURTY FIVE (45) CALENDAR DAYS TIME EXTENSION DUE TO UNUSUALLY SEVERE WEATHER FROM FEBRUA…
Mod CO01B· CHANGE ORDER2011-08-09+$63,000$19,096,201CHANGE THE ROUTE OF THE TELECOMMUNICATION AND ELECTRICAL TRENCH TO AVOID STRUCTURES AND TREES IN THE ORIGINAL…
Mod SA004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-15+$87,141$19,183,342IN ACCORDANCE WITH THE CONTRACT GENERAL CONDITIONS A RECOMMENDED PARTNERING MEETING WAS HELD ON JANUARY 26, 20…
Mod SA005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-10-05+$9,769$19,193,110HANDICAP RAMP NEEDED AN ADA LANDING AREA, HANDRAILS AND TO EXTEND THE LOW WALL TO PREVENT PEDESTRIAN FROM FALL…
Mod CO01C· CHANGE ORDER2011-10-28+$19,250$19,212,360TO PROVIDE NEEDED CONCRETE TESTING SERVICES FOR THE REMAINING OF THE PROJECT.
Mod CO01D· CHANGE ORDER2011-11-02+$45,000$19,257,360THE ORIGINAL CONTRACT DID NOT INCLUDED DATA RACKS, SWITCHES, PATCH PANELS, GROUNDING AND FIBER OPTIC BETWEEN T…
Mod SA006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-11-02+$4,436$19,261,796DETAILS IN CONTRACT DRAWINGS ARE DIFFERENT FROM THE EXISTING CONDITIONS. THE WINDOW SILLS HAVE TO BE CORRECTE…
Mod SA007· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-11-03+$3,520$19,265,317THE EXISTING CONCRETE ROOF SLAB AS SHOWN ON THE BUILDING IS ACTUALLY METAL LATH AND PLASTER AND NEED TO ADD A…
Mod SA008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-11-03+$3,891$19,269,208CONTRACT DRAWINGS SHOWS EXPOSED CONDUITS AND LUMINARIES IN ADMINISTRATION BUILDING BATHROOMS. RFI-0091 DIRECT…
Mod SA010· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-11-07+$5,585$19,274,793THE DESIGN DID NOT SHOW TERRAZO AND CORALINA STONE ON THE EDGES AND BORDERS AROUND THE INTERIOR PATIO INSIDE T…
Mod SA011· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-11-07+$2,275$19,277,068CONTRACT DRAWING DID NOT SHOWED A GOOD TERMINATION AT THE CORALINA STONE ON THE EDGES OF THE PIC BATHROOMS SID…
Mod CO01F· CHANGE ORDER2011-11-08+$63,447$19,340,515THE ORIGINAL CONTRACT DID NOT INCLUDED DATA RACKS, SWITCHES, PATCH PANELS, GROUNDING AND FIBER OPTIC BETWEEN T…
Mod CO01G· CHANGE ORDER2011-11-14+$28,269$19,368,784ACCORDING TO THE WINDOW MANUFACTURER HE COULD NOT WARRANTY THE INSTALLATION OF THE WINDOWS AND DOORS TO PROTEC…
Mod SA012· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-11-14+$1,990$19,370,7741. RFI-0079 REQUIRED TO CHANGE THE TYPE OF ROOF DRAIN (FROM A 4" DEEP BODY TO A 2" DEEP BODY) TO BE INSTALLE…
Mod SA013· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-12-14+$1,793$19,372,5671. RFI-0079 REQUIRED TO CHANGE THE TYPE OF ROOF DRAIN (FROM A 4" DEEP BODY TO A 2" DEEP BODY) TO BE INSTALLE…
Mod CO01E· CHANGE ORDER2011-12-28+$131,291$19,503,858THE ORIGINAL CONTRACT DID NOT INCLUDED DATA RACKS, SWITCHES, PATCH PANELS, GROUNDING AND FIBER OPTIC BETWEEN T…
Mod SA014· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-12-30+$10,326$19,514,184DESIGNER INCORRECTLY CHANGED THE DIMMENSION OF THE ROOF STRUCTURAL STEEL DIMMENSION AND CORRECTIONS HAVE TO BE…
Mod SA015· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-12-30+$14,928$19,529,112THE DEMOLITION DRAWINGS DID NOT SHOW A PORTION OF THE EXISTING SIDEWALK TO BE DEMOLISHED BUT SHOWED THE ELECTR…
Mod TE004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-01-17+$0$19,529,112THIS TE IS A NO COST FIFTY NINE (59) CALENDAR DAYS TIME EXTENSION DUE TO UNUSUALLY SEVERE WEATHER FROM JUNE 20…
Mod TE005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-01-17+$0$19,529,112THIS TE IS A NO COST FIFTY SIX (56) CALENDAR DAYS TIME EXTENSION DUE TO UNUSUALLY SEVERE WEATHER FROM SEPTEMBE…
Mod SA016· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-02-01+$22,703$19,551,815THE ROOF DRAINS WERE LOCATED ABOVE AND IN FRONT OF EXIT DOORS IN TWO LOCATIONS AND NEEDED TO BE MOVED. OTHER…
Mod CO01H· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-02-11+$50,500$19,602,315PROVIDE THE INTERNAL DATA AND TELEPHONE CABLING INSIDE THE ADMINISTRATION BUILDING. ALSO PROVIDE ADDITIONAL D…
Mod SA017· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-03-09+$0$19,602,315PROVIDE AN EMERGENCY GENERATOR FOR THE TEMPORARY ADMINISTRATION BUILDING THAT WAS REQUESTED BY THE CEMETERY AD…
Mod CO01I· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-03-13+$8,499$19,610,813CONTINUE FURNISHING THE 60KW GENERATOR FOR THE TEMPORARY ADMINISTRATION BUILDING OFFICES DUE TO ADDITIONAL TIM…
Mod CO01J· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-03-16+$13,609$19,624,422DUE TO TIME EXTENSIONS TO THE CONTRACT THE ADMINISTRATION BUILDING FINISH HAS BEEN DELAYED. THE TEMPORARY TRA…
Mod SA018· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-03-21+$13,344$19,637,765DESIGN CHANGE OF COMMITTAL SHELTERS ELECTRICAL ENCLOSURE. THE HEIGHT OF THE ENCLOSURES IN THE CONTRACT DRAWING…
Mod CO01K· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-04-30+$15,000$19,652,765THIS CO IS BEING ISSUED FOR PROGRAM CHANGES AS REQUEST BY NCA AT ADMIN BUILDING. THE ORIGINAL PLANS AND SPECIF…
Mod CO01L· CHANGE ORDER2012-05-30+$32,750$19,685,515TO PROVIDE NEEDED CONCRETE TESTING SERVICES FOR THE REMAINING OF THE PROJECT.
Mod SA009· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-06+$345,000$20,030,515THIS CO IS BEING ISSUED FOR PROGRAM CHANGES AS REQUEST BY NCA AT ADMIN BUILDING. THE ORIGINAL PLANS AND SPECIF…
Mod SA019· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-06+$28,833$20,059,348PROVIDE DATA AND TELEPHONE CABLING INSIDE THE ADMINISTRATION BUILDING WHICH WAS NOT INCLUDED IN THE ORIGINAL P…
Mod SA028· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-12+$9,416$20,068,765WHEN CONTRACTOR DEMOLISHED THE EXISTING BATHROOM ROOF SLAB IT WAS DISCOVERED THAT THE REINFORCING STEEL WAS NO…
Mod SA021· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-13+$8,499$20,077,263PROVIDE DATA AND TELEPHONE CABLING INSIDE THE ADMINISTRATION BUILDING WHICH WAS NOT INCLUDED IN THE ORIGINAL P…
Mod SA022· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-13+$9,666$20,086,930PROVIDE DATA AND TELEPHONE CABLING INSIDE THE ADMINISTRATION BUILDING WHICH WAS NOT INCLUDED IN THE ORIGINAL P…
Mod SA024· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-16+$17,708$20,104,638THE ORIGINAL CONTRACT DID NOT INCLUDE THE INTERCONNECT FIBER OPTIC CABLE BETWEEN THE ADMINISTRATION BUILDING A…
Mod SA025· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-16+$60,841$20,165,478THIS CO IS BEING ISSUED TO PROVIDE DATA AND TELEPHONE CABLING INSIDE THE MAINTENANCE BUILDING WHICH WAS NOT IN…
Mod SA023· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-18+$4,918$20,170,396CO-01K WAS ISSUED FOR PROGRAM CHANGES AS REQUEST BY NCA AT ADMIN BUILDING. THE ORIGINAL PLANS AND SPECIFICATI…
Mod SA020· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-19+$0$20,170,396TO PROVIDE NEEDED CONCRETE TESTING SERVICES FOR THE REMAINDER OF THE PROJECT.
Mod SA026· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-19+$3,984$20,174,380WHILE DEMOLISHING THE EXISTING WALL TO INSTALL A NEW DOOR AT THE DIRECTOR'S OFFICE IT WAS DISCOVERED THAT THE…
Mod SA027· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-19+$3,006$20,177,387AFTER DISCUSSION WITH THE CEMETERY ADMINISTRATION AND THE DESIGNER CHANGES WERE REQUESTED FOR RELOCATION AND A…
Mod SA029· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-20+$1,905$20,179,292THE DRAWINGS ONLY SHOWS A PERFORATED PVC PIPE BUT NO DETAIL FOR INSTALLATION OF A PROPER FRENCH DRAIN SYSTEM I…
Mod SA030· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-20+$1,972$20,181,264THERE IS A 4" PIPE FOR THE EXHAUST FAN SHOWN INSIDE A 6" CONCRETE WALL IN THE MAINTENANCE BUILDING. THIS DOES…
Mod SA032· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-02+$12,077$20,193,341THE ELEVATION FOR THE COMMITTAL SHELTER #2 IS LOWER THAN THE SURROUNDING AREA THUS CREATING A POND ON TOP OF T…
Mod SA033· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-02+$2,008$20,195,349THE SLOPE CHANGE BETWEEN SECTION P AND NEW SECTION Q IS TOO STEEP. THIS CAN CREATE PROBLEMS WITH VISITORS TO…
Mod SA034· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-02+$3,267$20,198,616THE AREA ALONG THE COURTAGE LANE, AT THE ADMINISTRATION BUILDING, AND THE BURIAL AREA HAS A SMALL FLAT AREA AN…
Mod SA036· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-02+$10,512$20,209,128AFTER CONTRACTOR BUILT THE WALLS AT THE ADMINISTRATION BUILDING TERRACE IT WAS FOUND THAT IT CREATED A CONFLIC…
Mod SA037· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-02+$10,802$20,219,930MEMORIAL WALL LETTERS WERE INTENDED TO BE INSTALLED AT EACH SIDE OF THE MEMORIAL WALL AS PER THE DESIGNER'S CO…
Mod SA038· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-02+$75,000$20,294,930TO PAY THE CONTRACTOR FOR THE RE-SOD OF CRYPT SECTION Q DUE TO NON ACCEPTANCE OF THE AREA BY THE PRNC AND MSN…
Mod SA031· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-08+$3,500$20,298,430IN THE ADMINISTRATION BUILDING FOR DOORS 201, 202, 203 AND 204 THE PROPOSED METAL LATH AND PLASTER ADDITION FO…
Mod SA035· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-13+$1,925$20,300,355DUE TO THE DESIGN ALONG NORTH AND SOUTH BUFFER FENCES LANDSCAPED AREAS WHEN THERE IS A HEAVY RAINFALL THE WATE…
Mod SA039· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-09-05+$25,500$20,325,855TO PAY FOR THE USE OF ADDITIONAL DUNNAGE TO STORE CRYPTS AT THE MANUFACTURING PLANT
Mod SA040· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-10-10+$55,879$20,381,734DUE TO CRACKS THAT DEVELOPED IN THE SHELTER #2 SLAB BECAUSE OF LACK OF EXPANSION JOINTS AROUND THE ROUND COLUM…
Mod SA041· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-10-24+$14,907$20,396,641DUE TO CRACKS THAT DEVELOPED IN THE SHELTER #2 SLAB BECAUSE OF LACK OF EXPANSION JOINTS AROUND THE ROUND COLUM…
Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-02-07+$99,500$20,496,141CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, AND MATERIALS FOR GRAVESITE IMPROVEMENTS, AND EXPANSION AT THE…
Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-02-21+$7,480$20,503,621CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, AND MATERIALS FOR GRAVESITE IMPROVEMENTS, AND EXPANSION AT THE…
Mod P00004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-02-22+$18,464$20,522,085CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, AND MATERIALS FOR GRAVESITE IMPROVEMENTS, AND EXPANSION AT THE…
Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-02-26+$14,377$20,536,462CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, AND MATERIALS FOR GRAVESITE IMPROVEMENTS, AND EXPANSION AT THE…
Mod P00005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-03-22+$6,060$20,542,522CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, AND MATERIALS FOR GRAVESITE IMPROVEMENTS, AND EXPANSION AT THE…
Mod P00006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-06-05+$7,711$20,550,233CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, AND MATERIALS FOR GRAVESITE IMPROVEMENTS, AND EXPANSION AT THE…
Mod P00007· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-06-05+$3,289$20,553,522CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, AND MATERIALS FOR GRAVESITE IMPROVEMENTS, AND EXPANSION AT THE…
Mod P00008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-06-05+$69,435$20,622,958CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, AND MATERIALS FOR GRAVESITE IMPROVEMENTS, AND EXPANSION AT THE…
Mod P00009· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-06-21+$125,186$20,748,144CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, AND MATERIALS FOR GRAVESITE IMPROVEMENTS, AND EXPANSION AT THE…
Mod P00011· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-09-13+$12,239$20,760,384CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, AND MATERIALS FOR ASBESTOS PIPE REMOVAL
Mod P00012· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-11-18+$74,054$20,834,438PROVIDE ALL LABOR AND EQUIPMENT, AS NECESSARY TO REMOVE AND DISPOSE OUT OF THE PROJECT SITE APPROXIMATLEY 3,00…
Mod P00013· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-11-25+$50,990$20,885,428.SCOPE OF WORK CONTRACTOR SHALL PROVIDE FOR THE DURATION OF THE FORTHCOMING TIME EXTENSION (SA-042) PLUS 3 MO…
Mod P00014· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-01-24+$8,550$20,893,978SA-066, INSTALL CCTV/DATA COMMUNICATION PULL BOX IN SECTION V AT THE PUERTO RICO NATIONAL CEMETERY.
Mod P00023· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-01-30+$15,000$20,908,978CO-01Q, INSTALL MOTOR FOR SLIDING GATE AT MAINTENANCE BUILDING AT THE PUERTO RICO NATIONAL CEMETERY.
Mod P00022· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-01-31+$25,000$20,933,978SCOPE OF WORK: INSTALL ROLLING DOOR MOTORS FOR THE MAINTENANCE BUILDING, PUERTO RICO NATIONAL CEMETERY (CO-0P1…
Mod P00024· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-01-31+$14,000$20,947,978FURNISH MATERIAL, LABOR, SUPERVISION AND EQUIPMENT, AS NECESSARY, TO PROVIDE AN INTERCONNECTION BETWEEN THE DI…
Mod P00025· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-01-31+$99,147$21,047,125REMOVE AND REPLACE SOIL AND LANDSLIDE REPAIRS AND THE STRONG TOE AT THE PUERTO RICO NATIONAL CEMETERY. SA-067…
Mod P00026· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-02-10+$3,933$21,051,058(SA-068)INSTALL NEW CHAIN LINK FENCE AT THE MAINTANCE AREA FOR THE PUERTO RICO NATIONAL CEMETERY PROJECT
Mod P00027· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-02-11+$9,666$21,060,724SA-069, INSTALL NEW DECORATIVE GATE AT MAINTENANCE BUILDING, PUERTO RICO NATIONAL CEMETERY
Mod P00028· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-02-12−$20,317$21,040,407CO-01R, PUERTO RICO NATIONAL CEMETERY-ORIGINAL DESIGNED SOLAR PANELS (AMORPHOUS LAMINATE PANELS) FOR THE MAINT…
Mod P00021· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-02-19+$175,446$21,215,853REMOVAL OF EXCESS SOIL ON THE NORTH MAGOTE AT THE PUERTO RICO NATIONAL CEMETERY. 6 CONTINUE TO PROVIDE…
Mod P00029· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-02-20+$2,557$21,218,410REMOVE AND REPLACE SOIL AND LANDSLIDE REPAIRS AND THE STRONG TOE AT THE PUERTO RICO NATIONAL CEMETERY. SA-067…
Mod P00030· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-02-21+$3,279$21,221,689SA-072, PROVIDE TRIGRIGA LICENCES FOR CONTRACTOR USE AT THE PUERTO RICO NATIONAL CEMETERY PROJECT.
Mod P00031· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-03-13+$536$21,222,225CO-01S. INSTALL NEW WINDOW INSECT SCREENS AT THE MAINTENANCE BUILDING AT THE PUERTO RICO NATIONAL CEMETERY.
Mod P00032· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-03-13+$7,720$21,229,945CO-01T. PROVIDE ADDITIONAL SERVICES TO VERIFY THE SOIL STABILITY BEHIND THE COLUMBARIUM.
Mod P00035· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-04-22+$1,729$21,231,674CO-01V. EXTEND SECTION R CHAIN-LINK FENCE TO THE MAGOTE
Mod P00033· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-04-28+$35,130$21,266,804SA-074, THIS SA DEFINIZITES CO-P00023 TO INSTALLING ROLLING DOOR MOTORS AT THE MAINTENANCE BUILDING, PUERTO RI…
Mod P00034· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-04-30+$0$21,266,804CO-1U: REPLACE SOLAR LIGHTING POLES WITH STANDARD POLE.
Mod P00018· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-05-02+$7,162$21,273,965PARTNERING MEETINGS FOR THE PUERTO RICO NATIONAL CEMETERY PROJECT 2. RENT FOR THE RE OFFICE / 2 (AS SH…
Mod P00037· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-05-09+$1,255$21,275,220PROVIDE POWER TO DATA CABINET AT MAINTENANCE BUILDING AT THE PUERTO RICO NATIONAL CEMETERY
Mod P00036· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-05-12−$3,954$21,271,266FURNISH MATERIAL, LABOR, SUPERVISION AND EQUIPMENT, AS NECESSARY, TO PROVIDE AN INTERCONNECTION BETWEEN THE DI…
Mod P00015· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-05-14+$7,846$21,279,112.SCOPE OF WORK CONTRACTOR SHALL PROVIDE FOR THE DURATION OF THE FORTHCOMING TIME EXTENSION (SA-042) PLUS 3 MO…
Mod P00038· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-05-16+$2,257$21,281,369SA-075, EXTEND CHAIN LINK FENCE ON SECTIONS R AND T AT THE PUERTO RICO NATIONAL CEMETERY PROJECT
Mod P00040· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-05-21+$0$21,281,369MODIFY SAFETY REQUIREMENTS TO INCLUDE SAFETY REPORTING
Mod P00039· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-05-22+$4,974$21,286,343(SA-077) REPLACE CONCRETE ROAD SLABS ON ROAD BY SECTION T AT THE PUERTO RICO NATIONAL CEMETERY, BAYAMON, PR.
Mod P00019· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-08-01−$60,575$21,225,768DELETE ENTRANCE BOLLARDS, ADD ARM GATE: ADD ARM GATE AT CEMETERY ENTRANCE BOLLARDS, ADD ARM GATE AT PRNC. CO…
Mod P00042· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-08-11+$0$21,225,768DEFINITIZE CHANGE ORDER P00037 (CO-01W) TO INSTALL CONDUIT, CABLING AND RECEPTACLES AND OTHER MISCELLANEOUS WO…
Mod P00043· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-08-13+$20,317$21,246,085(SA-079) INCORPORATE NEW PV SYSTEM DESIGN AT MAINTENANCE COMPLEX.
Mod P00044· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-09-11+$27,742$21,273,827REPLACE CONCRETE ROAD SLABS AND CURBS ON ROAD NEXT TO SECTION N AT THE PUERTO RICO NATIONAL CEMETERY, BAYAMON,…
Mod P00045· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-09-22+$4,208$21,278,035ADD CONDUIT AND WIRINGFOR CCTV AND OIL TRAP ALARM FOR THE PUERTO RICO NATIONAL CEMETERY
Mod P00046· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-09-23+$32,233$21,310,268PROVIDE ADDITIONAL CLEAN GRAVEL FOR FRENCH DRAIN AT THE PUERTO RICO NATIONAL CEMETERY.
Mod P00020· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-10-27+$34,814$21,345,082FORMERLY SA-055. TELECOMMUNICATION AND ELECTRICAL TRENCH WORK
Mod P00047· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-10-27+$80,281$21,425,363SA-086. REMOVE NECESSARY EXCAVATED SOIL ANDIMPORT NECESSARY BACKFILL AT SECTION DD AT THE PUERTO RICO NATIONA…
Mod P00048· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-11-04+$3,278$21,428,641PROVIDE ADDITIONAL CLEAN GRAVEL FOR FRENCH DRAIN AT THE PUERTO RICO NATIONAL CEMETERY.
Mod P00049· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-11-17+$45,306$21,473,947SA-083. ADD TOWO NEW TRAVELER CONNECTIONS AND REPALCE THE PVC PIPES ON ALL EXISTING ONES.
Mod P00053· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-01-08+$16,384$21,490,331PROVIDE SUITABLE SUB-BASE FOR THE SHELTER NO. 1 FOUNDATIONS.
Mod P00016· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-01-09−$3,500$21,486,831.SCOPE OF WORK CONTRACTOR SHALL PROVIDE FOR THE DURATION OF THE FORTHCOMING TIME EXTENSION (SA-042) PLUS 3 MO…
Mod P00050· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-01-09+$2,213$21,489,044SA-085, P0050 REMAINING DIESEL IN THE FUEL STORAGE TANKS
Mod P00054· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-01-09+$0$21,489,044INSTALL NEW WINDOW INSECT SCREENS AT THE MAINTENANCE BUILDING.
Mod P00059· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-01-23+$95,976$21,585,020SA-90. VARIOUS CONCRETE CHANGES AT COLUMBARIUM AND CS NO. 1
Mod P00060· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-02-11+$16,669$21,601,689SA-001. PROVIDE A BLOCK UNIT RETAINING WALL AND SPARE CONDUIT AT SHELTER NO. 1
Mod P00062· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-02-23+$3,289$21,604,978SA-093: REPLACE PVC PIPES ON 3 TRAVELER CONNECTIONS AND ADD EXTRA PIPES.
Mod P00063· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-02-27+$18,589$21,623,567SA-095 PLASTER AND PAINT THE NEW ALUMINUM PERIMETER FENCE.
Mod P00064· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-03-23+$13,886$21,637,453SA-096. COMMITTAL SHELTER NO. 1 ENTRANCE AND MULCH.
Mod P00065· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-03-31+$12,665$21,650,118SA-097. MODIFY FINAL GRADE ELEVATIONS AT SECTION DD.
Mod P00041· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-07-06+$226,583$21,876,701(SA-057) ENTRANCE CONCRETE ROAD AT THE PUERTO RICO NATIONAL CEMETERY.
Mod P00066· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-07-30+$3,450$21,880,151CHANGE THE LOCATION OF BOTH DIESEL AND GASOLINE TRANSFER CABINETS FROM ABOVE THE TANKS TO A BASE IN A LOWER PO…
Mod P00068· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-07-30+$6,007$21,886,158NEW CATCH BASINS AT NW AND SE OF FLAG ASSEMBLY AREA
Mod P00069· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-07-30+$12,804$21,898,962VARIOUS CONCRETE CHANGES AROUND THE FACILITY.
Mod P00072· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-09-09+$70,364$21,969,326REPLACE HISTORICAL FENCE DAMAGED ELEMENTS WITH NEW METAL ELEMENTS.
Mod P00073· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-09-22+$2,041$21,971,367RAISE THE MANHOLE THAT IS LOCATED IN THE SODDED AREA, NEAR THE LEFT LANE OF THE MAIN ROAD, IN FRONT OF THE FLA…
Mod P00075· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-10-15+$2,261$21,973,628PROVIDE ALL NECESSARY LABOR, MATERIALS, SUPERVISION AND EQUIPMENT TO CAP THE NORTH WEST SIDE OF THE EXISTING C…
Mod P00074· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-10-22+$0$21,973,628PER TO CONTRACTOR, THE CONSTRUCTION IS SCHEDULE TO BE COMPLETED BY NOVEMBER 15, 2015. THIS MODIFICATION EXTEN…
Mod P00076· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-11-04+$7,298$21,980,926INSTALL CONDUITS, PULLBOXES AND A RECEPTACLE FROM THE TEMPORARY ADMIN POWER LINE TO THE PLAZA WALL, TO HAVE TH…
Mod P00017· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-12-09+$0$21,980,926THIS MODIFICATION DEFINITIZES CO-01G DATE 12/15/11 FOR STRUCTURAL SUPPORT FOR OPENINGS.
Mod P00078· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-12-15−$5,558$21,975,369DELETE FROM CONTRACT THE ADDITIONAL CLEAN GRAVEL OF THE 12" FRENCH DRAIN PARALLEL TO THE SOUTH EAST MOGOTE. AS…
Mod P00055· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-12-18+$0$21,975,369PROVIDE ADDITIONAL SERVICES TO VERIFY THE SOIL STABILITY BEHIND THE COLUMBARIUM
Mod P00056· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-12-18+$0$21,975,369REMOVE AND REPLACE EXISTING STUCCO AT ADMIN.
Mod P00057· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-12-18+$10,474$21,985,843VARIOUS CHANGES AT MAINTENANCE COMPLEX AND SECTION DD
Mod P00058· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-12-18+$0$21,985,843TE-006-TIME EXTENSION FOR ELECTRICAL CONSTRUCTION PERMIT DELAYS.
Mod P00061· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-12-18+$0$21,985,843SA-094. ELECTRICAL OFFSITE REDESIGN
Mod P00079· OTHER ADMINISTRATIVE ACTION2016-10-18+$274,431$22,260,274THIS SETTLEMENT BY DETERMINATION IS ISSUED BASED ON THE FINAL DECISION OF THE CONTRACTING OFFICER ON SEPTEMBER…
Mod P00080· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-11-29+$684,284$22,944,558THE PURPOSE OF THIS MODIFICATION IS FOR THE FINAL NEGOTIATED SETTLEMENT OF THE CONTRACTOR'S REQUEST FOR EQUITA…
Mod P00081· OTHER ADMINISTRATIVE ACTION2016-12-20+$24,933$22,969,491THE PURPOSE OF THIS MODIFICATION IS FOR THE BOND PREMIUM ADJUSTMENT.
Mod P00084· CLOSE OUT2017-05-02−$1,903$22,967,588DE-OBLIGATION OF $1,903.00 FOR CLOSEOUT
Mod P00082· CLOSE OUT2017-05-03−$0$22,967,587DE-OBLIGATION OF $.40 CENTS FOR CONTRACT CLOSEOUT.
Mod P00083· CLOSE OUT2017-05-03−$22,502$22,945,085DE-OBLIGATION OF $22,502.81 FOR CONTRACT CLOSEOUT

Related awards · 5

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other recipients under Y299 from OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) (most recent first)

AwardRecipientOfficeNet obligationsFY
VA101CFMC0165G&C FAB-CON, LLCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$18,626,889FY2011
VA101CFMC0093KEPA SERVICES INC.OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$23,946,212FY2010
VA101CFMP0021SMITHGROUPJJR, INC.OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$3,343,772FY2009
VA101183B4C0046EMERSON CONSTRUCTION COMPANY, INC.OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$21,687,294FY2008
VA101183B4C0047KEVCON, INCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$16,297,324FY2008

Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA101CFMC0081_3600_-NONE-_-NONE- · retrieved 2026-09-26.