Description
DE-OBLIGATION OF $22,502.81 FOR CONTRACT CLOSEOUT
Base award description: CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, AND MATERIALS FOR GRAVESITE IMPROVEMENTS, AND EXPANSION AT THE PUERTO RICO NATIONAL CEMETERY, BAYAMON, PR.
Modification chain · 136 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2010-04-19+$18,972,199= $18,972,199
- Mod CO01A2010-09-23+$31,708= $19,003,907
- Mod SA0022010-12-14+$0= $19,003,907
- Mod TE0012011-01-04+$0= $19,003,907
- Mod SA0012011-04-19+$27,163= $19,031,070
- Mod TE0022011-04-19+$0= $19,031,070
- Mod SA0032011-04-27+$2,130= $19,033,201
- Mod TE0032011-07-28+$0= $19,033,201
- Mod CO01B2011-08-09+$63,000= $19,096,201
- Mod SA0042011-09-15+$87,141= $19,183,342
- Mod SA0052011-10-05+$9,769= $19,193,110
- Mod CO01C2011-10-28+$19,250= $19,212,360
- Mod CO01D2011-11-02+$45,000= $19,257,360
- Mod SA0062011-11-02+$4,436= $19,261,796
- Mod SA0072011-11-03+$3,520= $19,265,317
- Mod SA0082011-11-03+$3,891= $19,269,208
- Mod SA0102011-11-07+$5,585= $19,274,793
- Mod SA0112011-11-07+$2,275= $19,277,068
- Mod CO01F2011-11-08+$63,447= $19,340,515
- Mod CO01G2011-11-14+$28,269= $19,368,784
- Mod SA0122011-11-14+$1,990= $19,370,774
- Mod SA0132011-12-14+$1,793= $19,372,567
- Mod CO01E2011-12-28+$131,291= $19,503,858
- Mod SA0142011-12-30+$10,326= $19,514,184
- Mod SA0152011-12-30+$14,928= $19,529,112
- Mod TE0042012-01-17+$0= $19,529,112
- Mod TE0052012-01-17+$0= $19,529,112
- Mod SA0162012-02-01+$22,703= $19,551,815
- Mod CO01H2012-02-11+$50,500= $19,602,315
- Mod SA0172012-03-09+$0= $19,602,315
- Mod CO01I2012-03-13+$8,499= $19,610,813
- Mod CO01J2012-03-16+$13,609= $19,624,422
- Mod SA0182012-03-21+$13,344= $19,637,765
- Mod CO01K2012-04-30+$15,000= $19,652,765
- Mod CO01L2012-05-30+$32,750= $19,685,515
- Mod SA0092012-07-06+$345,000= $20,030,515
- Mod SA0192012-07-06+$28,833= $20,059,348
- Mod SA0282012-07-12+$9,416= $20,068,765
- Mod SA0212012-07-13+$8,499= $20,077,263
- Mod SA0222012-07-13+$9,666= $20,086,930
- Mod SA0242012-07-16+$17,708= $20,104,638
- Mod SA0252012-07-16+$60,841= $20,165,478
- Mod SA0232012-07-18+$4,918= $20,170,396
- Mod SA0202012-07-19+$0= $20,170,396
- Mod SA0262012-07-19+$3,984= $20,174,380
- Mod SA0272012-07-19+$3,006= $20,177,387
- Mod SA0292012-07-20+$1,905= $20,179,292
- Mod SA0302012-07-20+$1,972= $20,181,264
- Mod SA0322012-08-02+$12,077= $20,193,341
- Mod SA0332012-08-02+$2,008= $20,195,349
- Mod SA0342012-08-02+$3,267= $20,198,616
- Mod SA0362012-08-02+$10,512= $20,209,128
- Mod SA0372012-08-02+$10,802= $20,219,930
- Mod SA0382012-08-02+$75,000= $20,294,930
- Mod SA0312012-08-08+$3,500= $20,298,430
- Mod SA0352012-08-13+$1,925= $20,300,355
- Mod SA0392012-09-05+$25,500= $20,325,855
- Mod SA0402012-10-10+$55,879= $20,381,734
- Mod SA0412012-10-24+$14,907= $20,396,641
- Mod P000012013-02-07+$99,500= $20,496,141
- Mod P000032013-02-21+$7,480= $20,503,621
- Mod P000042013-02-22+$18,464= $20,522,085
- Mod P000022013-02-26+$14,377= $20,536,462
- Mod P000052013-03-22+$6,060= $20,542,522
- Mod P000062013-06-05+$7,711= $20,550,233
- Mod P000072013-06-05+$3,289= $20,553,522
- Mod P000082013-06-05+$69,435= $20,622,958
- Mod P000092013-06-21+$125,186= $20,748,144
- Mod P000112013-09-13+$12,239= $20,760,384
- Mod P000122013-11-18+$74,054= $20,834,438
- Mod P000132013-11-25+$50,990= $20,885,428
- Mod P000142014-01-24+$8,550= $20,893,978
- Mod P000232014-01-30+$15,000= $20,908,978
- Mod P000222014-01-31+$25,000= $20,933,978
- Mod P000242014-01-31+$14,000= $20,947,978
- Mod P000252014-01-31+$99,147= $21,047,125
- Mod P000262014-02-10+$3,933= $21,051,058
- Mod P000272014-02-11+$9,666= $21,060,724
- Mod P000282014-02-12-$20,317= $21,040,407
- Mod P000212014-02-19+$175,446= $21,215,853
- Mod P000292014-02-20+$2,557= $21,218,410
- Mod P000302014-02-21+$3,279= $21,221,689
- Mod P000312014-03-13+$536= $21,222,225
- Mod P000322014-03-13+$7,720= $21,229,945
- Mod P000352014-04-22+$1,729= $21,231,674
- Mod P000332014-04-28+$35,130= $21,266,804
- Mod P000342014-04-30+$0= $21,266,804
- Mod P000182014-05-02+$7,162= $21,273,965
- Mod P000372014-05-09+$1,255= $21,275,220
- Mod P000362014-05-12-$3,954= $21,271,266
- Mod P000152014-05-14+$7,846= $21,279,112
- Mod P000382014-05-16+$2,257= $21,281,369
- Mod P000402014-05-21+$0= $21,281,369
- Mod P000392014-05-22+$4,974= $21,286,343
- Mod P000192014-08-01-$60,575= $21,225,768
- Mod P000422014-08-11+$0= $21,225,768
- Mod P000432014-08-13+$20,317= $21,246,085
- Mod P000442014-09-11+$27,742= $21,273,827
- Mod P000452014-09-22+$4,208= $21,278,035
- Mod P000462014-09-23+$32,233= $21,310,268
- Mod P000202014-10-27+$34,814= $21,345,082
- Mod P000472014-10-27+$80,281= $21,425,363
- Mod P000482014-11-04+$3,278= $21,428,641
- Mod P000492014-11-17+$45,306= $21,473,947
- Mod P000532015-01-08+$16,384= $21,490,331
- Mod P000162015-01-09-$3,500= $21,486,831
- Mod P000502015-01-09+$2,213= $21,489,044
- Mod P000542015-01-09+$0= $21,489,044
- Mod P000592015-01-23+$95,976= $21,585,020
- Mod P000602015-02-11+$16,669= $21,601,689
- Mod P000622015-02-23+$3,289= $21,604,978
- Mod P000632015-02-27+$18,589= $21,623,567
- Mod P000642015-03-23+$13,886= $21,637,453
- Mod P000652015-03-31+$12,665= $21,650,118
- Mod P000412015-07-06+$226,583= $21,876,701
- Mod P000662015-07-30+$3,450= $21,880,151
- Mod P000682015-07-30+$6,007= $21,886,158
- Mod P000692015-07-30+$12,804= $21,898,962
- Mod P000722015-09-09+$70,364= $21,969,326
- Mod P000732015-09-22+$2,041= $21,971,367
- Mod P000752015-10-15+$2,261= $21,973,628
- Mod P000742015-10-22+$0= $21,973,628
- Mod P000762015-11-04+$7,298= $21,980,926
- Mod P000172015-12-09+$0= $21,980,926
- Mod P000782015-12-15-$5,558= $21,975,369
- Mod P000552015-12-18+$0= $21,975,369
- Mod P000562015-12-18+$0= $21,975,369
- Mod P000572015-12-18+$10,474= $21,985,843
- Mod P000582015-12-18+$0= $21,985,843
- Mod P000612015-12-18+$0= $21,985,843
- Mod P000792016-10-18+$274,431= $22,260,274
- Mod P000802016-11-29+$684,284= $22,944,558
- Mod P000812016-12-20+$24,933= $22,969,491
- Mod P000842017-05-02-$1,903= $22,967,588
- Mod P000822017-05-03-$0= $22,967,587
- Mod P000832017-05-03-$22,502= $22,945,085
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2010-04-19 | +$18,972,199 | $18,972,199 | CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, AND MATERIALS FOR GRAVESITE IMPROVEMENTS, AND EXPANSION AT THE… |
| Mod CO01A· CHANGE ORDER | 2010-09-23 | +$31,708 | $19,003,907 | EMERGENCY GENERATOR |
| Mod SA002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-14 | +$0 | $19,003,907 | TO ALLOW FOR PAYMENT OF MATERIALS STORED OFF-SITE. CONCRETE CRYPTS STORED OFF-SITE. THIS SUPPLEMENTAL AGREEME… |
| Mod TE001· OTHER ADMINISTRATIVE ACTION | 2011-01-04 | +$0 | $19,003,907 | THIS TE IS A NO COST FOURTY (40) CALENDAR DAYS TIME EXTENSION DUE TO UNUSUALLY SEVERE WEATHER FROM JUNE 2010 T… |
| Mod SA001· CHANGE ORDER | 2011-04-19 | +$27,163 | $19,031,070 | PROVIDE FURNITURE FOR TEMP ADMIN TRAILER |
| Mod TE002· OTHER ADMINISTRATIVE ACTION | 2011-04-19 | +$0 | $19,031,070 | THIS TE IS A NO COST FOURTY FIVE (45) CALENDAR DAYS TIME EXTENSION DUE TO UNUSUALLY SEVERE WEATHER FROM DECEMB… |
| Mod SA003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-27 | +$2,130 | $19,033,201 | IN ACCORDANCE WITH THE CONTRACT GENERAL CONDITIONS A RECOMMENDED PARTNERING MEETING WAS HELD ON JANUARY 26, 20… |
| Mod TE003· OTHER ADMINISTRATIVE ACTION | 2011-07-28 | +$0 | $19,033,201 | THIS TE IS A NO COST FOURTY FIVE (45) CALENDAR DAYS TIME EXTENSION DUE TO UNUSUALLY SEVERE WEATHER FROM FEBRUA… |
| Mod CO01B· CHANGE ORDER | 2011-08-09 | +$63,000 | $19,096,201 | CHANGE THE ROUTE OF THE TELECOMMUNICATION AND ELECTRICAL TRENCH TO AVOID STRUCTURES AND TREES IN THE ORIGINAL… |
| Mod SA004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-15 | +$87,141 | $19,183,342 | IN ACCORDANCE WITH THE CONTRACT GENERAL CONDITIONS A RECOMMENDED PARTNERING MEETING WAS HELD ON JANUARY 26, 20… |
| Mod SA005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-05 | +$9,769 | $19,193,110 | HANDICAP RAMP NEEDED AN ADA LANDING AREA, HANDRAILS AND TO EXTEND THE LOW WALL TO PREVENT PEDESTRIAN FROM FALL… |
| Mod CO01C· CHANGE ORDER | 2011-10-28 | +$19,250 | $19,212,360 | TO PROVIDE NEEDED CONCRETE TESTING SERVICES FOR THE REMAINING OF THE PROJECT. |
| Mod CO01D· CHANGE ORDER | 2011-11-02 | +$45,000 | $19,257,360 | THE ORIGINAL CONTRACT DID NOT INCLUDED DATA RACKS, SWITCHES, PATCH PANELS, GROUNDING AND FIBER OPTIC BETWEEN T… |
| Mod SA006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-02 | +$4,436 | $19,261,796 | DETAILS IN CONTRACT DRAWINGS ARE DIFFERENT FROM THE EXISTING CONDITIONS. THE WINDOW SILLS HAVE TO BE CORRECTE… |
| Mod SA007· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-03 | +$3,520 | $19,265,317 | THE EXISTING CONCRETE ROOF SLAB AS SHOWN ON THE BUILDING IS ACTUALLY METAL LATH AND PLASTER AND NEED TO ADD A… |
| Mod SA008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-03 | +$3,891 | $19,269,208 | CONTRACT DRAWINGS SHOWS EXPOSED CONDUITS AND LUMINARIES IN ADMINISTRATION BUILDING BATHROOMS. RFI-0091 DIRECT… |
| Mod SA010· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-07 | +$5,585 | $19,274,793 | THE DESIGN DID NOT SHOW TERRAZO AND CORALINA STONE ON THE EDGES AND BORDERS AROUND THE INTERIOR PATIO INSIDE T… |
| Mod SA011· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-07 | +$2,275 | $19,277,068 | CONTRACT DRAWING DID NOT SHOWED A GOOD TERMINATION AT THE CORALINA STONE ON THE EDGES OF THE PIC BATHROOMS SID… |
| Mod CO01F· CHANGE ORDER | 2011-11-08 | +$63,447 | $19,340,515 | THE ORIGINAL CONTRACT DID NOT INCLUDED DATA RACKS, SWITCHES, PATCH PANELS, GROUNDING AND FIBER OPTIC BETWEEN T… |
| Mod CO01G· CHANGE ORDER | 2011-11-14 | +$28,269 | $19,368,784 | ACCORDING TO THE WINDOW MANUFACTURER HE COULD NOT WARRANTY THE INSTALLATION OF THE WINDOWS AND DOORS TO PROTEC… |
| Mod SA012· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-14 | +$1,990 | $19,370,774 | 1. RFI-0079 REQUIRED TO CHANGE THE TYPE OF ROOF DRAIN (FROM A 4" DEEP BODY TO A 2" DEEP BODY) TO BE INSTALLE… |
| Mod SA013· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-14 | +$1,793 | $19,372,567 | 1. RFI-0079 REQUIRED TO CHANGE THE TYPE OF ROOF DRAIN (FROM A 4" DEEP BODY TO A 2" DEEP BODY) TO BE INSTALLE… |
| Mod CO01E· CHANGE ORDER | 2011-12-28 | +$131,291 | $19,503,858 | THE ORIGINAL CONTRACT DID NOT INCLUDED DATA RACKS, SWITCHES, PATCH PANELS, GROUNDING AND FIBER OPTIC BETWEEN T… |
| Mod SA014· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-30 | +$10,326 | $19,514,184 | DESIGNER INCORRECTLY CHANGED THE DIMMENSION OF THE ROOF STRUCTURAL STEEL DIMMENSION AND CORRECTIONS HAVE TO BE… |
| Mod SA015· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-30 | +$14,928 | $19,529,112 | THE DEMOLITION DRAWINGS DID NOT SHOW A PORTION OF THE EXISTING SIDEWALK TO BE DEMOLISHED BUT SHOWED THE ELECTR… |
| Mod TE004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-17 | +$0 | $19,529,112 | THIS TE IS A NO COST FIFTY NINE (59) CALENDAR DAYS TIME EXTENSION DUE TO UNUSUALLY SEVERE WEATHER FROM JUNE 20… |
| Mod TE005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-17 | +$0 | $19,529,112 | THIS TE IS A NO COST FIFTY SIX (56) CALENDAR DAYS TIME EXTENSION DUE TO UNUSUALLY SEVERE WEATHER FROM SEPTEMBE… |
| Mod SA016· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-02-01 | +$22,703 | $19,551,815 | THE ROOF DRAINS WERE LOCATED ABOVE AND IN FRONT OF EXIT DOORS IN TWO LOCATIONS AND NEEDED TO BE MOVED. OTHER… |
| Mod CO01H· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-02-11 | +$50,500 | $19,602,315 | PROVIDE THE INTERNAL DATA AND TELEPHONE CABLING INSIDE THE ADMINISTRATION BUILDING. ALSO PROVIDE ADDITIONAL D… |
| Mod SA017· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-09 | +$0 | $19,602,315 | PROVIDE AN EMERGENCY GENERATOR FOR THE TEMPORARY ADMINISTRATION BUILDING THAT WAS REQUESTED BY THE CEMETERY AD… |
| Mod CO01I· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-13 | +$8,499 | $19,610,813 | CONTINUE FURNISHING THE 60KW GENERATOR FOR THE TEMPORARY ADMINISTRATION BUILDING OFFICES DUE TO ADDITIONAL TIM… |
| Mod CO01J· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-16 | +$13,609 | $19,624,422 | DUE TO TIME EXTENSIONS TO THE CONTRACT THE ADMINISTRATION BUILDING FINISH HAS BEEN DELAYED. THE TEMPORARY TRA… |
| Mod SA018· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-21 | +$13,344 | $19,637,765 | DESIGN CHANGE OF COMMITTAL SHELTERS ELECTRICAL ENCLOSURE. THE HEIGHT OF THE ENCLOSURES IN THE CONTRACT DRAWING… |
| Mod CO01K· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-30 | +$15,000 | $19,652,765 | THIS CO IS BEING ISSUED FOR PROGRAM CHANGES AS REQUEST BY NCA AT ADMIN BUILDING. THE ORIGINAL PLANS AND SPECIF… |
| Mod CO01L· CHANGE ORDER | 2012-05-30 | +$32,750 | $19,685,515 | TO PROVIDE NEEDED CONCRETE TESTING SERVICES FOR THE REMAINING OF THE PROJECT. |
| Mod SA009· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-07-06 | +$345,000 | $20,030,515 | THIS CO IS BEING ISSUED FOR PROGRAM CHANGES AS REQUEST BY NCA AT ADMIN BUILDING. THE ORIGINAL PLANS AND SPECIF… |
| Mod SA019· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-07-06 | +$28,833 | $20,059,348 | PROVIDE DATA AND TELEPHONE CABLING INSIDE THE ADMINISTRATION BUILDING WHICH WAS NOT INCLUDED IN THE ORIGINAL P… |
| Mod SA028· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-07-12 | +$9,416 | $20,068,765 | WHEN CONTRACTOR DEMOLISHED THE EXISTING BATHROOM ROOF SLAB IT WAS DISCOVERED THAT THE REINFORCING STEEL WAS NO… |
| Mod SA021· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-07-13 | +$8,499 | $20,077,263 | PROVIDE DATA AND TELEPHONE CABLING INSIDE THE ADMINISTRATION BUILDING WHICH WAS NOT INCLUDED IN THE ORIGINAL P… |
| Mod SA022· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-07-13 | +$9,666 | $20,086,930 | PROVIDE DATA AND TELEPHONE CABLING INSIDE THE ADMINISTRATION BUILDING WHICH WAS NOT INCLUDED IN THE ORIGINAL P… |
| Mod SA024· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-07-16 | +$17,708 | $20,104,638 | THE ORIGINAL CONTRACT DID NOT INCLUDE THE INTERCONNECT FIBER OPTIC CABLE BETWEEN THE ADMINISTRATION BUILDING A… |
| Mod SA025· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-07-16 | +$60,841 | $20,165,478 | THIS CO IS BEING ISSUED TO PROVIDE DATA AND TELEPHONE CABLING INSIDE THE MAINTENANCE BUILDING WHICH WAS NOT IN… |
| Mod SA023· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-07-18 | +$4,918 | $20,170,396 | CO-01K WAS ISSUED FOR PROGRAM CHANGES AS REQUEST BY NCA AT ADMIN BUILDING. THE ORIGINAL PLANS AND SPECIFICATI… |
| Mod SA020· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-07-19 | +$0 | $20,170,396 | TO PROVIDE NEEDED CONCRETE TESTING SERVICES FOR THE REMAINDER OF THE PROJECT. |
| Mod SA026· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-07-19 | +$3,984 | $20,174,380 | WHILE DEMOLISHING THE EXISTING WALL TO INSTALL A NEW DOOR AT THE DIRECTOR'S OFFICE IT WAS DISCOVERED THAT THE… |
| Mod SA027· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-07-19 | +$3,006 | $20,177,387 | AFTER DISCUSSION WITH THE CEMETERY ADMINISTRATION AND THE DESIGNER CHANGES WERE REQUESTED FOR RELOCATION AND A… |
| Mod SA029· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-07-20 | +$1,905 | $20,179,292 | THE DRAWINGS ONLY SHOWS A PERFORATED PVC PIPE BUT NO DETAIL FOR INSTALLATION OF A PROPER FRENCH DRAIN SYSTEM I… |
| Mod SA030· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-07-20 | +$1,972 | $20,181,264 | THERE IS A 4" PIPE FOR THE EXHAUST FAN SHOWN INSIDE A 6" CONCRETE WALL IN THE MAINTENANCE BUILDING. THIS DOES… |
| Mod SA032· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-08-02 | +$12,077 | $20,193,341 | THE ELEVATION FOR THE COMMITTAL SHELTER #2 IS LOWER THAN THE SURROUNDING AREA THUS CREATING A POND ON TOP OF T… |
| Mod SA033· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-08-02 | +$2,008 | $20,195,349 | THE SLOPE CHANGE BETWEEN SECTION P AND NEW SECTION Q IS TOO STEEP. THIS CAN CREATE PROBLEMS WITH VISITORS TO… |
| Mod SA034· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-08-02 | +$3,267 | $20,198,616 | THE AREA ALONG THE COURTAGE LANE, AT THE ADMINISTRATION BUILDING, AND THE BURIAL AREA HAS A SMALL FLAT AREA AN… |
| Mod SA036· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-08-02 | +$10,512 | $20,209,128 | AFTER CONTRACTOR BUILT THE WALLS AT THE ADMINISTRATION BUILDING TERRACE IT WAS FOUND THAT IT CREATED A CONFLIC… |
| Mod SA037· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-08-02 | +$10,802 | $20,219,930 | MEMORIAL WALL LETTERS WERE INTENDED TO BE INSTALLED AT EACH SIDE OF THE MEMORIAL WALL AS PER THE DESIGNER'S CO… |
| Mod SA038· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-08-02 | +$75,000 | $20,294,930 | TO PAY THE CONTRACTOR FOR THE RE-SOD OF CRYPT SECTION Q DUE TO NON ACCEPTANCE OF THE AREA BY THE PRNC AND MSN… |
| Mod SA031· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-08-08 | +$3,500 | $20,298,430 | IN THE ADMINISTRATION BUILDING FOR DOORS 201, 202, 203 AND 204 THE PROPOSED METAL LATH AND PLASTER ADDITION FO… |
| Mod SA035· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-08-13 | +$1,925 | $20,300,355 | DUE TO THE DESIGN ALONG NORTH AND SOUTH BUFFER FENCES LANDSCAPED AREAS WHEN THERE IS A HEAVY RAINFALL THE WATE… |
| Mod SA039· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-09-05 | +$25,500 | $20,325,855 | TO PAY FOR THE USE OF ADDITIONAL DUNNAGE TO STORE CRYPTS AT THE MANUFACTURING PLANT |
| Mod SA040· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-10-10 | +$55,879 | $20,381,734 | DUE TO CRACKS THAT DEVELOPED IN THE SHELTER #2 SLAB BECAUSE OF LACK OF EXPANSION JOINTS AROUND THE ROUND COLUM… |
| Mod SA041· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-10-24 | +$14,907 | $20,396,641 | DUE TO CRACKS THAT DEVELOPED IN THE SHELTER #2 SLAB BECAUSE OF LACK OF EXPANSION JOINTS AROUND THE ROUND COLUM… |
| Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-02-07 | +$99,500 | $20,496,141 | CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, AND MATERIALS FOR GRAVESITE IMPROVEMENTS, AND EXPANSION AT THE… |
| Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-02-21 | +$7,480 | $20,503,621 | CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, AND MATERIALS FOR GRAVESITE IMPROVEMENTS, AND EXPANSION AT THE… |
| Mod P00004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-02-22 | +$18,464 | $20,522,085 | CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, AND MATERIALS FOR GRAVESITE IMPROVEMENTS, AND EXPANSION AT THE… |
| Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-02-26 | +$14,377 | $20,536,462 | CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, AND MATERIALS FOR GRAVESITE IMPROVEMENTS, AND EXPANSION AT THE… |
| Mod P00005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-03-22 | +$6,060 | $20,542,522 | CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, AND MATERIALS FOR GRAVESITE IMPROVEMENTS, AND EXPANSION AT THE… |
| Mod P00006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-06-05 | +$7,711 | $20,550,233 | CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, AND MATERIALS FOR GRAVESITE IMPROVEMENTS, AND EXPANSION AT THE… |
| Mod P00007· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-06-05 | +$3,289 | $20,553,522 | CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, AND MATERIALS FOR GRAVESITE IMPROVEMENTS, AND EXPANSION AT THE… |
| Mod P00008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-06-05 | +$69,435 | $20,622,958 | CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, AND MATERIALS FOR GRAVESITE IMPROVEMENTS, AND EXPANSION AT THE… |
| Mod P00009· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-06-21 | +$125,186 | $20,748,144 | CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, AND MATERIALS FOR GRAVESITE IMPROVEMENTS, AND EXPANSION AT THE… |
| Mod P00011· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-09-13 | +$12,239 | $20,760,384 | CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, AND MATERIALS FOR ASBESTOS PIPE REMOVAL |
| Mod P00012· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-11-18 | +$74,054 | $20,834,438 | PROVIDE ALL LABOR AND EQUIPMENT, AS NECESSARY TO REMOVE AND DISPOSE OUT OF THE PROJECT SITE APPROXIMATLEY 3,00… |
| Mod P00013· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-11-25 | +$50,990 | $20,885,428 | .SCOPE OF WORK CONTRACTOR SHALL PROVIDE FOR THE DURATION OF THE FORTHCOMING TIME EXTENSION (SA-042) PLUS 3 MO… |
| Mod P00014· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-01-24 | +$8,550 | $20,893,978 | SA-066, INSTALL CCTV/DATA COMMUNICATION PULL BOX IN SECTION V AT THE PUERTO RICO NATIONAL CEMETERY. |
| Mod P00023· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-01-30 | +$15,000 | $20,908,978 | CO-01Q, INSTALL MOTOR FOR SLIDING GATE AT MAINTENANCE BUILDING AT THE PUERTO RICO NATIONAL CEMETERY. |
| Mod P00022· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-01-31 | +$25,000 | $20,933,978 | SCOPE OF WORK: INSTALL ROLLING DOOR MOTORS FOR THE MAINTENANCE BUILDING, PUERTO RICO NATIONAL CEMETERY (CO-0P1… |
| Mod P00024· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-01-31 | +$14,000 | $20,947,978 | FURNISH MATERIAL, LABOR, SUPERVISION AND EQUIPMENT, AS NECESSARY, TO PROVIDE AN INTERCONNECTION BETWEEN THE DI… |
| Mod P00025· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-01-31 | +$99,147 | $21,047,125 | REMOVE AND REPLACE SOIL AND LANDSLIDE REPAIRS AND THE STRONG TOE AT THE PUERTO RICO NATIONAL CEMETERY. SA-067… |
| Mod P00026· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-02-10 | +$3,933 | $21,051,058 | (SA-068)INSTALL NEW CHAIN LINK FENCE AT THE MAINTANCE AREA FOR THE PUERTO RICO NATIONAL CEMETERY PROJECT |
| Mod P00027· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-02-11 | +$9,666 | $21,060,724 | SA-069, INSTALL NEW DECORATIVE GATE AT MAINTENANCE BUILDING, PUERTO RICO NATIONAL CEMETERY |
| Mod P00028· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-02-12 | −$20,317 | $21,040,407 | CO-01R, PUERTO RICO NATIONAL CEMETERY-ORIGINAL DESIGNED SOLAR PANELS (AMORPHOUS LAMINATE PANELS) FOR THE MAINT… |
| Mod P00021· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-02-19 | +$175,446 | $21,215,853 | REMOVAL OF EXCESS SOIL ON THE NORTH MAGOTE AT THE PUERTO RICO NATIONAL CEMETERY. 6 CONTINUE TO PROVIDE… |
| Mod P00029· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-02-20 | +$2,557 | $21,218,410 | REMOVE AND REPLACE SOIL AND LANDSLIDE REPAIRS AND THE STRONG TOE AT THE PUERTO RICO NATIONAL CEMETERY. SA-067… |
| Mod P00030· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-02-21 | +$3,279 | $21,221,689 | SA-072, PROVIDE TRIGRIGA LICENCES FOR CONTRACTOR USE AT THE PUERTO RICO NATIONAL CEMETERY PROJECT. |
| Mod P00031· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-03-13 | +$536 | $21,222,225 | CO-01S. INSTALL NEW WINDOW INSECT SCREENS AT THE MAINTENANCE BUILDING AT THE PUERTO RICO NATIONAL CEMETERY. |
| Mod P00032· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-03-13 | +$7,720 | $21,229,945 | CO-01T. PROVIDE ADDITIONAL SERVICES TO VERIFY THE SOIL STABILITY BEHIND THE COLUMBARIUM. |
| Mod P00035· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-04-22 | +$1,729 | $21,231,674 | CO-01V. EXTEND SECTION R CHAIN-LINK FENCE TO THE MAGOTE |
| Mod P00033· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-04-28 | +$35,130 | $21,266,804 | SA-074, THIS SA DEFINIZITES CO-P00023 TO INSTALLING ROLLING DOOR MOTORS AT THE MAINTENANCE BUILDING, PUERTO RI… |
| Mod P00034· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-04-30 | +$0 | $21,266,804 | CO-1U: REPLACE SOLAR LIGHTING POLES WITH STANDARD POLE. |
| Mod P00018· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-05-02 | +$7,162 | $21,273,965 | PARTNERING MEETINGS FOR THE PUERTO RICO NATIONAL CEMETERY PROJECT 2. RENT FOR THE RE OFFICE / 2 (AS SH… |
| Mod P00037· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-05-09 | +$1,255 | $21,275,220 | PROVIDE POWER TO DATA CABINET AT MAINTENANCE BUILDING AT THE PUERTO RICO NATIONAL CEMETERY |
| Mod P00036· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-05-12 | −$3,954 | $21,271,266 | FURNISH MATERIAL, LABOR, SUPERVISION AND EQUIPMENT, AS NECESSARY, TO PROVIDE AN INTERCONNECTION BETWEEN THE DI… |
| Mod P00015· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-05-14 | +$7,846 | $21,279,112 | .SCOPE OF WORK CONTRACTOR SHALL PROVIDE FOR THE DURATION OF THE FORTHCOMING TIME EXTENSION (SA-042) PLUS 3 MO… |
| Mod P00038· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-05-16 | +$2,257 | $21,281,369 | SA-075, EXTEND CHAIN LINK FENCE ON SECTIONS R AND T AT THE PUERTO RICO NATIONAL CEMETERY PROJECT |
| Mod P00040· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-05-21 | +$0 | $21,281,369 | MODIFY SAFETY REQUIREMENTS TO INCLUDE SAFETY REPORTING |
| Mod P00039· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-05-22 | +$4,974 | $21,286,343 | (SA-077) REPLACE CONCRETE ROAD SLABS ON ROAD BY SECTION T AT THE PUERTO RICO NATIONAL CEMETERY, BAYAMON, PR. |
| Mod P00019· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-08-01 | −$60,575 | $21,225,768 | DELETE ENTRANCE BOLLARDS, ADD ARM GATE: ADD ARM GATE AT CEMETERY ENTRANCE BOLLARDS, ADD ARM GATE AT PRNC. CO… |
| Mod P00042· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-08-11 | +$0 | $21,225,768 | DEFINITIZE CHANGE ORDER P00037 (CO-01W) TO INSTALL CONDUIT, CABLING AND RECEPTACLES AND OTHER MISCELLANEOUS WO… |
| Mod P00043· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-08-13 | +$20,317 | $21,246,085 | (SA-079) INCORPORATE NEW PV SYSTEM DESIGN AT MAINTENANCE COMPLEX. |
| Mod P00044· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-09-11 | +$27,742 | $21,273,827 | REPLACE CONCRETE ROAD SLABS AND CURBS ON ROAD NEXT TO SECTION N AT THE PUERTO RICO NATIONAL CEMETERY, BAYAMON,… |
| Mod P00045· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-09-22 | +$4,208 | $21,278,035 | ADD CONDUIT AND WIRINGFOR CCTV AND OIL TRAP ALARM FOR THE PUERTO RICO NATIONAL CEMETERY |
| Mod P00046· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-09-23 | +$32,233 | $21,310,268 | PROVIDE ADDITIONAL CLEAN GRAVEL FOR FRENCH DRAIN AT THE PUERTO RICO NATIONAL CEMETERY. |
| Mod P00020· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-10-27 | +$34,814 | $21,345,082 | FORMERLY SA-055. TELECOMMUNICATION AND ELECTRICAL TRENCH WORK |
| Mod P00047· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-10-27 | +$80,281 | $21,425,363 | SA-086. REMOVE NECESSARY EXCAVATED SOIL ANDIMPORT NECESSARY BACKFILL AT SECTION DD AT THE PUERTO RICO NATIONA… |
| Mod P00048· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-11-04 | +$3,278 | $21,428,641 | PROVIDE ADDITIONAL CLEAN GRAVEL FOR FRENCH DRAIN AT THE PUERTO RICO NATIONAL CEMETERY. |
| Mod P00049· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-11-17 | +$45,306 | $21,473,947 | SA-083. ADD TOWO NEW TRAVELER CONNECTIONS AND REPALCE THE PVC PIPES ON ALL EXISTING ONES. |
| Mod P00053· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-01-08 | +$16,384 | $21,490,331 | PROVIDE SUITABLE SUB-BASE FOR THE SHELTER NO. 1 FOUNDATIONS. |
| Mod P00016· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-01-09 | −$3,500 | $21,486,831 | .SCOPE OF WORK CONTRACTOR SHALL PROVIDE FOR THE DURATION OF THE FORTHCOMING TIME EXTENSION (SA-042) PLUS 3 MO… |
| Mod P00050· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-01-09 | +$2,213 | $21,489,044 | SA-085, P0050 REMAINING DIESEL IN THE FUEL STORAGE TANKS |
| Mod P00054· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-01-09 | +$0 | $21,489,044 | INSTALL NEW WINDOW INSECT SCREENS AT THE MAINTENANCE BUILDING. |
| Mod P00059· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-01-23 | +$95,976 | $21,585,020 | SA-90. VARIOUS CONCRETE CHANGES AT COLUMBARIUM AND CS NO. 1 |
| Mod P00060· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-02-11 | +$16,669 | $21,601,689 | SA-001. PROVIDE A BLOCK UNIT RETAINING WALL AND SPARE CONDUIT AT SHELTER NO. 1 |
| Mod P00062· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-02-23 | +$3,289 | $21,604,978 | SA-093: REPLACE PVC PIPES ON 3 TRAVELER CONNECTIONS AND ADD EXTRA PIPES. |
| Mod P00063· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-02-27 | +$18,589 | $21,623,567 | SA-095 PLASTER AND PAINT THE NEW ALUMINUM PERIMETER FENCE. |
| Mod P00064· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-03-23 | +$13,886 | $21,637,453 | SA-096. COMMITTAL SHELTER NO. 1 ENTRANCE AND MULCH. |
| Mod P00065· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-03-31 | +$12,665 | $21,650,118 | SA-097. MODIFY FINAL GRADE ELEVATIONS AT SECTION DD. |
| Mod P00041· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-07-06 | +$226,583 | $21,876,701 | (SA-057) ENTRANCE CONCRETE ROAD AT THE PUERTO RICO NATIONAL CEMETERY. |
| Mod P00066· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-07-30 | +$3,450 | $21,880,151 | CHANGE THE LOCATION OF BOTH DIESEL AND GASOLINE TRANSFER CABINETS FROM ABOVE THE TANKS TO A BASE IN A LOWER PO… |
| Mod P00068· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-07-30 | +$6,007 | $21,886,158 | NEW CATCH BASINS AT NW AND SE OF FLAG ASSEMBLY AREA |
| Mod P00069· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-07-30 | +$12,804 | $21,898,962 | VARIOUS CONCRETE CHANGES AROUND THE FACILITY. |
| Mod P00072· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-09 | +$70,364 | $21,969,326 | REPLACE HISTORICAL FENCE DAMAGED ELEMENTS WITH NEW METAL ELEMENTS. |
| Mod P00073· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-22 | +$2,041 | $21,971,367 | RAISE THE MANHOLE THAT IS LOCATED IN THE SODDED AREA, NEAR THE LEFT LANE OF THE MAIN ROAD, IN FRONT OF THE FLA… |
| Mod P00075· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-15 | +$2,261 | $21,973,628 | PROVIDE ALL NECESSARY LABOR, MATERIALS, SUPERVISION AND EQUIPMENT TO CAP THE NORTH WEST SIDE OF THE EXISTING C… |
| Mod P00074· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-22 | +$0 | $21,973,628 | PER TO CONTRACTOR, THE CONSTRUCTION IS SCHEDULE TO BE COMPLETED BY NOVEMBER 15, 2015. THIS MODIFICATION EXTEN… |
| Mod P00076· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-04 | +$7,298 | $21,980,926 | INSTALL CONDUITS, PULLBOXES AND A RECEPTACLE FROM THE TEMPORARY ADMIN POWER LINE TO THE PLAZA WALL, TO HAVE TH… |
| Mod P00017· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-09 | +$0 | $21,980,926 | THIS MODIFICATION DEFINITIZES CO-01G DATE 12/15/11 FOR STRUCTURAL SUPPORT FOR OPENINGS. |
| Mod P00078· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-15 | −$5,558 | $21,975,369 | DELETE FROM CONTRACT THE ADDITIONAL CLEAN GRAVEL OF THE 12" FRENCH DRAIN PARALLEL TO THE SOUTH EAST MOGOTE. AS… |
| Mod P00055· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-18 | +$0 | $21,975,369 | PROVIDE ADDITIONAL SERVICES TO VERIFY THE SOIL STABILITY BEHIND THE COLUMBARIUM |
| Mod P00056· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-18 | +$0 | $21,975,369 | REMOVE AND REPLACE EXISTING STUCCO AT ADMIN. |
| Mod P00057· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-18 | +$10,474 | $21,985,843 | VARIOUS CHANGES AT MAINTENANCE COMPLEX AND SECTION DD |
| Mod P00058· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-18 | +$0 | $21,985,843 | TE-006-TIME EXTENSION FOR ELECTRICAL CONSTRUCTION PERMIT DELAYS. |
| Mod P00061· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-18 | +$0 | $21,985,843 | SA-094. ELECTRICAL OFFSITE REDESIGN |
| Mod P00079· OTHER ADMINISTRATIVE ACTION | 2016-10-18 | +$274,431 | $22,260,274 | THIS SETTLEMENT BY DETERMINATION IS ISSUED BASED ON THE FINAL DECISION OF THE CONTRACTING OFFICER ON SEPTEMBER… |
| Mod P00080· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-29 | +$684,284 | $22,944,558 | THE PURPOSE OF THIS MODIFICATION IS FOR THE FINAL NEGOTIATED SETTLEMENT OF THE CONTRACTOR'S REQUEST FOR EQUITA… |
| Mod P00081· OTHER ADMINISTRATIVE ACTION | 2016-12-20 | +$24,933 | $22,969,491 | THE PURPOSE OF THIS MODIFICATION IS FOR THE BOND PREMIUM ADJUSTMENT. |
| Mod P00084· CLOSE OUT | 2017-05-02 | −$1,903 | $22,967,588 | DE-OBLIGATION OF $1,903.00 FOR CLOSEOUT |
| Mod P00082· CLOSE OUT | 2017-05-03 | −$0 | $22,967,587 | DE-OBLIGATION OF $.40 CENTS FOR CONTRACT CLOSEOUT. |
| Mod P00083· CLOSE OUT | 2017-05-03 | −$22,502 | $22,945,085 | DE-OBLIGATION OF $22,502.81 FOR CONTRACT CLOSEOUT |
Related awards · 5
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other recipients under Y299 from OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA101CFMC0165 | G&C FAB-CON, LLC | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | $18,626,889 | FY2011 |
| VA101CFMC0093 | KEPA SERVICES INC. | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | $23,946,212 | FY2010 |
| VA101CFMP0021 | SMITHGROUPJJR, INC. | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | $3,343,772 | FY2009 |
| VA101183B4C0046 | EMERSON CONSTRUCTION COMPANY, INC. | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | $21,687,294 | FY2008 |
| VA101183B4C0047 | KEVCON, INC | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | $16,297,324 | FY2008 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA101CFMC0081_3600_-NONE-_-NONE- · retrieved 2026-09-26.