Award recordCONTRACT

KEPA SERVICES INC.

PIID VA101CFMC0093· VA Staff Offices· OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)· Y299 · CONTRUCT/ALL OTHER NON-BLDG FACS· FY2010· $23,946,212 net obligations· UEI JKAHXUMJX5E3· WI

Description

DE-OBLIGATING $72,490.00 FROM CONTRACT IN PREPARATION FOR CLOSING OUT THE CONTRACT.

Base award description: CONSTRUCTION AT ABRAHAM LINCOLN NATIONAL CEMETERY

First action · last action
2010-08-04 · 2017-05-30
Transactions
65
First transaction's obligation
$22,978,000
Base + all options value (sum of deltas)
$23,946,214
Extent competed
FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
Other than full & open authority
—
Set-aside
SERVICE DISABLED VETERAN OWNED SMALL BUSINESS SET-ASIDE
Offers received
5
SDVOSB flag on record
Yes (self-representation)
NAICS
237990 · OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION

Modification chain · 65 transactions

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$24,018,702$0Base award · 2010-08-04 · this action $22,978,000 · running total $22,978,000Modification 1 · 2011-01-05 · this action $2,925 · running total $22,980,925Modification 2 · 2011-01-18 · this action $63,997 · running total $23,044,922Modification 3 · 2011-01-31 · this action $7,405 · running total $23,052,327Modification SA004 · 2011-03-10 · this action $17,885 · running total $23,070,212Modification SA05 · 2011-03-11 · this action $709 · running total $23,070,921Modification SA006 · 2011-04-20 · this action $36,183 · running total $23,107,104Modification SA007 · 2011-04-21 · this action $0 · running total $23,107,104Modification SA008 · 2011-06-09 · this action $24,138 · running total $23,131,242Modification SA009 · 2011-06-16 · this action $86,987 · running total $23,218,229Modification SA011 · 2011-07-01 · this action $82,587 · running total $23,300,816Modification SA012 · 2011-07-01 · this action $0 · running total $23,300,816Modification SA013 · 2011-07-01 · this action $0 · running total $23,300,816Modification SA014 · 2011-07-01 · this action $3,405 · running total $23,304,220Modification SA010 · 2011-07-18 · this action $18,920 · running total $23,323,140Modification CO01A · 2011-07-25 · this action $13,200 · running total $23,336,340Modification SA016 · 2011-08-02 · this action $1,772 · running total $23,338,112Modification SA015 · 2011-08-16 · this action $44,987 · running total $23,383,099Modification CO01B · 2011-09-22 · this action $75,000 · running total $23,458,099Modification SA017 · 2011-10-13 · this action -$9,832 · running total $23,448,267Modification SA018 · 2011-10-13 · this action $2,056 · running total $23,450,323Modification SA019 · 2011-10-13 · this action $3,180 · running total $23,453,503Modification SA020 · 2011-11-01 · this action -$9,844 · running total $23,443,659Modification SA021 · 2011-11-07 · this action $73,935 · running total $23,517,594Modification SA022 · 2011-11-16 · this action $9,376 · running total $23,526,970Modification SA023 · 2011-11-16 · this action $0 · running total $23,526,970Modification SA024 · 2011-11-18 · this action $5,407 · running total $23,532,377Modification SA025 · 2011-11-28 · this action $6,544 · running total $23,538,921Modification SA026 · 2011-11-28 · this action $17,633 · running total $23,556,554Modification SA027 · 2011-12-08 · this action $10,790 · running total $23,567,344Modification SA028 · 2011-12-19 · this action $69,489 · running total $23,636,833Modification SA029 · 2012-01-05 · this action $4,316 · running total $23,641,149Modification SA030 · 2012-01-05 · this action -$1,783 · running total $23,639,366Modification SA031 · 2012-01-19 · this action $1,440 · running total $23,640,806Modification SA032 · 2012-01-24 · this action $2,035 · running total $23,642,841Modification SA035 · 2012-02-27 · this action $3,363 · running total $23,646,204Modification SA036 · 2012-02-27 · this action -$2,510 · running total $23,643,694Modification SA037 · 2012-03-20 · this action $8,804 · running total $23,652,498Modification SA038 · 2012-04-13 · this action $34,571 · running total $23,687,069Modification SA039 · 2012-05-02 · this action $800 · running total $23,687,869Modification CO01C · 2012-05-09 · this action $24,509 · running total $23,712,378Modification SA033 · 2012-06-04 · this action $4,333 · running total $23,716,711Modification SA040 · 2012-07-27 · this action $2,018 · running total $23,718,729Modification SA041 · 2012-07-27 · this action $419 · running total $23,719,148Modification SA042 · 2012-07-27 · this action $954 · running total $23,720,102Modification SA043 · 2012-07-27 · this action $2,435 · running total $23,722,537Modification SA044 · 2012-07-27 · this action $5,716 · running total $23,728,253Modification SA034 · 2012-07-30 · this action $129,058 · running total $23,857,312Modification CO01D · 2012-08-02 · this action $15,852 · running total $23,873,164Modification SA048 · 2012-08-07 · this action $0 · running total $23,873,164Modification SA045 · 2012-08-08 · this action $2,489 · running total $23,875,653Modification SA046 · 2012-08-08 · this action $15,005 · running total $23,890,658Modification SA049 · 2012-08-09 · this action $3,337 · running total $23,893,995Modification SA050 · 2012-08-14 · this action $4,921 · running total $23,898,916Modification CO01E · 2012-08-23 · this action -$3,907 · running total $23,895,009Modification SA047 · 2012-08-24 · this action $11,067 · running total $23,906,076Modification SA051 · 2012-08-24 · this action $2,996 · running total $23,909,072Modification SA053 · 2012-08-29 · this action $8,721 · running total $23,917,793Modification SA054 · 2012-09-07 · this action $10,717 · running total $23,928,510Modification CO01F · 2012-09-10 · this action $47,250 · running total $23,975,760Modification SA055 · 2012-09-14 · this action $1,959 · running total $23,977,719Modification SA056 · 2012-09-24 · this action $34,711 · running total $24,012,430Modification CO01G · 2012-10-11 · this action $6,273 · running total $24,018,702Modification P00002 · 2013-08-01 · this action $0 · running total $24,018,702Modification P00010 · 2017-05-30 · this action -$72,490 · running total $23,946,212
  • Base2010-08-04+$22,978,000= $22,978,000
  • Mod 12011-01-05+$2,925= $22,980,925
  • Mod 22011-01-18+$63,997= $23,044,922
  • Mod 32011-01-31+$7,405= $23,052,327
  • Mod SA0042011-03-10+$17,885= $23,070,212
  • Mod SA052011-03-11+$709= $23,070,921
  • Mod SA0062011-04-20+$36,183= $23,107,104
  • Mod SA0072011-04-21+$0= $23,107,104
  • Mod SA0082011-06-09+$24,138= $23,131,242
  • Mod SA0092011-06-16+$86,987= $23,218,229
  • Mod SA0112011-07-01+$82,587= $23,300,816
  • Mod SA0122011-07-01+$0= $23,300,816
  • Mod SA0132011-07-01+$0= $23,300,816
  • Mod SA0142011-07-01+$3,405= $23,304,220
  • Mod SA0102011-07-18+$18,920= $23,323,140
  • Mod CO01A2011-07-25+$13,200= $23,336,340
  • Mod SA0162011-08-02+$1,772= $23,338,112
  • Mod SA0152011-08-16+$44,987= $23,383,099
  • Mod CO01B2011-09-22+$75,000= $23,458,099
  • Mod SA0172011-10-13-$9,832= $23,448,267
  • Mod SA0182011-10-13+$2,056= $23,450,323
  • Mod SA0192011-10-13+$3,180= $23,453,503
  • Mod SA0202011-11-01-$9,844= $23,443,659
  • Mod SA0212011-11-07+$73,935= $23,517,594
  • Mod SA0222011-11-16+$9,376= $23,526,970
  • Mod SA0232011-11-16+$0= $23,526,970
  • Mod SA0242011-11-18+$5,407= $23,532,377
  • Mod SA0252011-11-28+$6,544= $23,538,921
  • Mod SA0262011-11-28+$17,633= $23,556,554
  • Mod SA0272011-12-08+$10,790= $23,567,344
  • Mod SA0282011-12-19+$69,489= $23,636,833
  • Mod SA0292012-01-05+$4,316= $23,641,149
  • Mod SA0302012-01-05-$1,783= $23,639,366
  • Mod SA0312012-01-19+$1,440= $23,640,806
  • Mod SA0322012-01-24+$2,035= $23,642,841
  • Mod SA0352012-02-27+$3,363= $23,646,204
  • Mod SA0362012-02-27-$2,510= $23,643,694
  • Mod SA0372012-03-20+$8,804= $23,652,498
  • Mod SA0382012-04-13+$34,571= $23,687,069
  • Mod SA0392012-05-02+$800= $23,687,869
  • Mod CO01C2012-05-09+$24,509= $23,712,378
  • Mod SA0332012-06-04+$4,333= $23,716,711
  • Mod SA0402012-07-27+$2,018= $23,718,729
  • Mod SA0412012-07-27+$419= $23,719,148
  • Mod SA0422012-07-27+$954= $23,720,102
  • Mod SA0432012-07-27+$2,435= $23,722,537
  • Mod SA0442012-07-27+$5,716= $23,728,253
  • Mod SA0342012-07-30+$129,058= $23,857,312
  • Mod CO01D2012-08-02+$15,852= $23,873,164
  • Mod SA0482012-08-07+$0= $23,873,164
  • Mod SA0452012-08-08+$2,489= $23,875,653
  • Mod SA0462012-08-08+$15,005= $23,890,658
  • Mod SA0492012-08-09+$3,337= $23,893,995
  • Mod SA0502012-08-14+$4,921= $23,898,916
  • Mod CO01E2012-08-23-$3,907= $23,895,009
  • Mod SA0472012-08-24+$11,067= $23,906,076
  • Mod SA0512012-08-24+$2,996= $23,909,072
  • Mod SA0532012-08-29+$8,721= $23,917,793
  • Mod SA0542012-09-07+$10,717= $23,928,510
  • Mod CO01F2012-09-10+$47,250= $23,975,760
  • Mod SA0552012-09-14+$1,959= $23,977,719
  • Mod SA0562012-09-24+$34,711= $24,012,430
  • Mod CO01G2012-10-11+$6,273= $24,018,702
  • Mod P000022013-08-01+$0= $24,018,702
  • Mod P000102017-05-30-$72,490= $23,946,212
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2010-08-04+$22,978,000$22,978,000CONSTRUCTION AT ABRAHAM LINCOLN NATIONAL CEMETERY
Mod 1· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-01-05+$2,925$22,980,925PARTNERING SESSION FACILITATED BY FMI ALNC ELWOOD, IL
Mod 2· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-01-18+$63,997$23,044,922INSTALL ADDITIONAL FENCE; TO INSTALL APPROXIMATELY 2300LF OF ADDITIONAL BLACK (PVC) VINYL COATED FENCE ON THE…
Mod 3· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-01-31+$7,405$23,052,327VOICE, DATA AND INTERNET FOR RE OFFICE ALNC ELWOOD, IL
Mod SA004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-03-10+$17,885$23,070,212NO PROVISION WAS MADE IN THE ORIGINAL CONTRACT SOLICITATION FOR RE VEHICLE. THE CONTRACTOR WAS ASKED TO PROPO…
Mod SA05· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-03-11+$709$23,070,921PAVING AND CURB CHANGES ALNC ELWOOD, IL
Mod SA006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-04-20+$36,183$23,107,104ADDITIONAL ASBESTOS REMOVAL
Mod SA007· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-04-21+$0$23,107,104CONTRACTOR HAS OFFERED AN UNSOLICITED PROPOSAL TO REVISE THE AS BID PHASING PLAN IN AN EFFORT TO REDUCE DISRUP…
Mod SA008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-06-09+$24,138$23,131,242NECESSARY ADDITION OF A STORM SEWER STRUCTURE TO ACCOMODATE THE DISCOVERY OF AN EXISTING FOUNDATION. THE ADDIT…
Mod SA009· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-06-16+$86,987$23,218,229GENERALLY, THAT COMPENSATORY FLOODPLAIN BE DEVELOPED AS MITIGATIVE MEASURE WITHIN THE BOUNDARY OF THE FLOOD PL…
Mod SA011· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-01+$82,587$23,300,816DURING REMOVAL OF THE PAVING BRICK AND STONES IN COLUMBARIUM #3 A 4" SLAB OF CONCRETE NOT PREVIOUSLY NOTED O…
Mod SA012· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-01+$0$23,300,816MODIFY THE LOCATION OF THE NEW ELECTRICAL SERVICE ENTRANCE TO THE ADMINISTRATION BULDING TO AVOID CONFLICT WIT…
Mod SA013· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-01+$0$23,300,816REMOVAL OF UNSUITABLE MATERIAL FROM THE BOTTOM OF CRYPT FEILD 16 AND WITHIN THE BASE OF VAN BUREN LANE. SUBSTI…
Mod SA014· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-01+$3,405$23,304,220DELETE THE REQUIREMENT TO RELOCATE THE PEARL HARBOR MONUMENT DUE TO THE DISCOVERY OF A CRACK IN THE BASE OF TH…
Mod SA010· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-18+$18,920$23,323,140PROVIDE A PROPOSAL TO INCLUDE LABOR, MATERIALS AND EQUIPMENT TO ADJUST THE COVER OVER THE NICOR GAS LINES IN T…
Mod CO01A· CHANGE ORDER2011-07-25+$13,200$23,336,340PORVIDE ADDITIONAL TREE REMOVAL AND UNDERSTORY CLEARING AT COLUMBARIUM 7 AREA AND HONOR GUARD PARKING LOT.
Mod SA016· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-02+$1,772$23,338,112THE SA WAS UNDERTAKEN TO CORRECT A DESIGN BUST IN THE ACTUAL/EXISTING GRADE ELEVATIONS WHERE THE MAINTENANCE…
Mod SA015· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-16+$44,987$23,383,099NECESSARY CHANGE TO PROVIDE FOR THE PROPER ABANDONMENT OF A WELL THAT IS ON PROPERTY AND CHANGE IN LAYOUT AND…
Mod CO01B· CHANGE ORDER2011-09-22+$75,000$23,458,099NECESSARY CHANGE TO ACCOMODATE AN ERROR IN DESIGN DATA PROVIDED FOR ROAD ELEVATIONS AT THE CORTEGE LANES. THIS…
Mod SA017· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-10-13−$9,832$23,448,267AFTER SOIL ANALYSIS WAS PERFORMED, IT WAS IDENTIFIED THAT THE USE OF ORGANIC COMPOST WOULD NOT BE ADEQUATE IN…
Mod SA018· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-10-13+$2,056$23,450,323SA-018 DEFINITIZES CO-01A. NECESSARY REMOVAL OF ADDITIONAL TREES THAT WERE FOUND TO BE DEAD OR STORM DAMAGED P…
Mod SA019· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-10-13+$3,180$23,453,503CONTRACT REQUIRED THE RE-LOCATION OF THE POW/MIA FLAG POLE. THE EXISTING FLAG POLE WAS ORIGINALLY INSTALLED IN…
Mod SA020· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-11-01−$9,844$23,443,659NECESSARY DELETION OF THE SIX (6) DOOR CANOPIES FOUND TO BE IN CONFLICT WITH MECHANICAL LOUVERS. ADDITIONALLY,…
Mod SA021· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-11-07+$73,935$23,517,594THE EXISTING DOMESTIC WATER SUPPLY IS MINIMALLY TREATED WELL WATER, HIGHLY UNPALATABLE AND UNRELIABLE. BID DE…
Mod SA022· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-11-16+$9,376$23,526,970A CONTRACT MODIFICATION IS NECESSARY TO DELIVER THE EQUIPMENT, MATERIAL, LABOR TO PROVIDE FOR THE REVISION OF…
Mod SA023· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-11-16+$0$23,526,970SUBSTITUTION NECESSITATED BY THE DIFFICULTIES ENCOUNTERED BY THE CONTRACTOR IN FINDING A QUALIFIED MANUFACTURE…
Mod SA024· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-11-18+$5,407$23,532,377NECESSARY REQUIREMENTS TO CONVEY PAYMENT FOR UNFORESEEN CONNECTION FEES TO THE LOCAL UTILITY PROVIDER.
Mod SA025· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-11-28+$6,544$23,538,921THE EXISTING CONCRETE SLAB UNDER THE BRICK PAVERS WAS FOUND TO BE AT THE WRONG ELEVATION TO ACCOMMODATE THE NE…
Mod SA026· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-11-28+$17,633$23,556,554BUILDING 3001 IN THE MAINTENANCE COMPLEX NEEDED TO BE INSULATED AND THE SCOPE WAS DROPPED IN THE DESIGN PERIOD…
Mod SA027· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-12-08+$10,790$23,567,344NECESSARY ALTERATION TO THE PLANNED FENCE ALIGNMENT TO CAPTURE THE PROPERTY CORNER THEREBY PREVENTING ENCROACH…
Mod SA028· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-12-19+$69,489$23,636,833PROVIDE FOR ADEQUATE BATHROOM AND HYDRATION FACILITIES FOR THE ALNC HONOR GUARD AND ADMIN BUILDING AND PROVIDE…
Mod SA029· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-01-05+$4,316$23,641,149IT WAS NECESSARY INVESTIGATIVE AND REPAIR WORK TO CORRECT DAMAGE TO AN EXISTING IRRIGATION VALVE AND QUICK COU…
Mod SA030· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-01-05−$1,783$23,639,366PROVIDE FOR THE INSTALLATION OF FLOWER WATERING HYDRANTS ALONG THE MEMORIAL WALK WAY THAT WERE REQUESTED BY TH…
Mod SA031· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-01-19+$1,440$23,640,806NECESSSARY ADDITION OF FEES TO COMPENSATE THE GC AFTER A PREVIOUSLY UNKNOWN DELIVERY FEE WAS IMPOSED ON THE VI…
Mod SA032· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-01-24+$2,035$23,642,841NECESSARY ADJUSTMENT TO DESIGN GRADING TO STOP POOLING OF RUN OFF AT THE HIGHLY VISIBLE ENTRY TO THE CEMETERY.
Mod SA035· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-02-27+$3,363$23,646,204NECESSARY DELETION OF MILLING REQUIREMENTS TO ACCOMODATE AN ELEVATIONAL BUST IN DESIGN DOCUMENTS. CHANGE WILL…
Mod SA036· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-02-27−$2,510$23,643,694NECESSARY CHANGE TO ACCOMMODATE AN ERROR IN DESIGN DATA PROVIDED FOR ROAD ELEVATIONS AT THE CORTEGE LANES. THI…
Mod SA037· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-03-20+$8,804$23,652,498NECESSARY ADDITION OF LABOR AND MATERIALS TO REMOVE AND RESET 39 MEMORIAL HEADSTONES THAT WERE NOT ACCOUNTED F…
Mod SA038· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-04-13+$34,571$23,687,069NECESSARY ADDITIONS AND DELETIONS TO THE STORM SEWER AND ASSOCIATED DISCIPLINES DESIGN AS DISCREPENCIES WERE…
Mod SA039· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-05-02+$800$23,687,869TO COMPLETE THE TREE REMOVAL/TRANSPLANTING PRPCESS AND TO CORRECT THE CONFILICTS BETWEEN SOME EXISTING TREES A…
Mod CO01C· CHANGE ORDER2012-05-09+$24,509$23,712,378ROAD GRADE AND PROFILE CHANGES ABRAHAM LINCOLN NATIONAL CEMETERY ELWOOD, ILLINOIS
Mod SA033· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-06-04+$4,333$23,716,711THE SEALER FOR THE LIMESTONE CAPS AND VENEER STONE IS TO BE DELETED. THIS WAS RECOMMENDED BY THE STONE SUPPLIE…
Mod SA040· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-27+$2,018$23,718,729PROVIDE PAYMENT OF FEES TO COMED, THE LOCAL UTILITY PROVIDER, TO PERFORM THE SERVICE DISCONNECT AND RE-CONNECT…
Mod SA041· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-27+$419$23,719,148PROVIDE SEAL OFF COUPLINGS TO THE SERVICE ENTRY CONDUITS LOCATED IN THE HONOR GUARD BUILDING TO MITIGATE GROUN…
Mod SA042· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-27+$954$23,720,102DUE TO THE CHANGE OF THE ELEVATIONS OF THE WALKWAYS AT COLUMBARIUM #7 TO MAKE THEM ADA COMPLIANT IT WAS REQUIR…
Mod SA043· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-27+$2,435$23,722,537UPON COMPLETION OF VARIOUS REPAIRS AND UP GRADES AT THE PIC IT WAS NOTED THAT REPAIRS TO THE ROOF DRAINS IN TH…
Mod SA044· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-27+$5,716$23,728,253THIS SA WAS NECESSARY DUE TO VARIOUS DESIGN GRADE DEFICIENCIES WHICH WILL REQUIRE ADDITIONAL GRADING AND A TRE…
Mod SA034· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-30+$129,058$23,857,312CONTRACT REQUIRES THAT THE CONTRACTOR WAS TO PROVIDE FOR ELECTRICAL POWER TO THE RE JOB TRAILER. THE SITE ELEC…
Mod CO01D· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-02+$15,852$23,873,164PROVIDE IRRIGATION AT COLUMBARIA 1 AND 2 IN ACCORDANCE WITH EXHIBIT A. THIS WORK SHALL ALSO INCLUDE THE INSTAL…
Mod SA048· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-07+$0$23,873,164THE EXISTING DRAIN TILE AROUND THE SIDES OF THE BUILDING WAS FOUND TO BE OPEN AND VIABLE WHICH MADE IT UNNECE…
Mod SA045· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-08+$2,489$23,875,653REPAIR THE 6" DIA. IRRIGATION LINE RUNNING ALONG THE NORTH EDGE OF HOFF ROAD AT THE LUNCH PAIL STATUE. THIS RE…
Mod SA046· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-08+$15,005$23,890,658PROVIDE AN AREA DRAIN AND PIPING TO EXISTING STRUCTURES AT THE LIMESTONE RETAINING WALL BY THE CORTEGE LANE EN…
Mod SA049· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-09+$3,337$23,893,995MAKE NECESSARY CHANGES IN THE DESIGN CONCEPT OF APRONS TO BE INSTALLED AT COMMITTAL SHELTER D AND REMOVE AND R…
Mod SA050· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-14+$4,921$23,898,916IT WAS NECESSARY CHANGE FROM THE EXISTING LOCATION TO THE PIC AND CHANGE TO "LANDSCAPE" ORIENTATION AND ADD NE…
Mod CO01E· CHANGE ORDER2012-08-23−$3,907$23,895,009PROVIDE FOR AN ALTERNATE ROUTING TO INSTALL NATURAL GAS LINE FROM THE METER TO THE GENERATOR AT THE ADMIN BUIL…
Mod SA047· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-24+$11,067$23,906,076PROVIDE NECESSARY REPAIRS TO THE FIBER OPTIC AND COMMUNICATIONS LINES SERVICING THE PIC BUILDING AS THE CONDIT…
Mod SA051· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-24+$2,996$23,909,072TO ELEVIATE THE CONSTANT PONDING AND OVER SATURATION OF THE GRASS AREA AT THE LOCATIONS INDICATED ON JACKSON L…
Mod SA053· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-29+$8,721$23,917,793NECESSARY ADDITION TO REQUIRED DEBRIS REMOVAL TO ACCOUNT FOR UNIDENTIFIED/CONCEALED MATERIALS WHEN GRADING AND…
Mod SA054· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-09-07+$10,717$23,928,510PROVIDE FOR THE CONTINUED LEASING OF THE RE GATORS PAST THE ORIGINAL CCD DATE OF 03/12. THE CONTINUED USE OF T…
Mod CO01F· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-09-10+$47,250$23,975,760MAKE NECESSARY GRADE ADJUSTMENTS TO THE CONVERGENCE OF HOFF ROAD AND LINCOLN THAT CREATES THE NEW ENTRY TO ALN…
Mod SA055· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-09-14+$1,959$23,977,719PROVIDE FOR THE CONTINUED LEASING OF THE RE GATORS PAST THE ORIGINAL CCD DATE OF 03/12. THE CONTINUED USE OF T…
Mod SA056· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-09-24+$34,711$24,012,430NECESSARY CHANGES TO ACCOMODATE SAFETY ISSUES IDENTIFIED ON STATION INSPECTIONS AND PROVIDE FOR OMMISSIONS IN…
Mod CO01G· CHANGE ORDER2012-10-11+$6,273$24,018,702MAKE NECESSARY GRADE ADJUSTMENTS TO THE CONVERGENCE OF HOFF ROAD AND LINCOLN THAT CREATES THE NEW ENTRY TO ALN…
Mod P00002· OTHER ADMINISTRATIVE ACTION2013-08-01+$0$24,018,702MAKE NECESSARY GRADE ADJUSTMENTS TO THE CONVERGENCE OF HOFF ROAD AND LINCOLN THAT CREATES THE NEW ENTRY TO ALN…
Mod P00010· CLOSE OUT2017-05-30−$72,490$23,946,212DE-OBLIGATING $72,490.00 FROM CONTRACT IN PREPARATION FOR CLOSING OUT THE CONTRACT.

Related awards · 11

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other VA awards to the same recipient (UEI JKAHXUMJX5E3)

AwardOffice · PSC / listingNet obligationsFY
VA24714P3210508-ATLANTA · H343 · INSPECTION- PUMPS AND COMPRESSORS$116,289FY2014
VA24414P0550693-WILKES-BARRE · 5925 · CIRCUIT BREAKERS$45,334FY2014
VA24413C0405693-WILKES-BARRE · 6150 · MISCELLANEOUS ELECTRIC POWER AND DISTRIBUTION EQUIPMENT$308,124FY2013
VA25712P1420257-NETWORK CONTRACT OFFICE 17 · H336 · INSPECTION- SPECIAL INDUSTRY MACHINERY$100,000FY2012
VA26312P1990636-NEBRASKA WESTERN-IOWA · 7125 · CABINETS, LOCKERS, BINS, AND SHELVING$17,433FY2012
VA69DP068369D-NETWORK CONTRACT OFFICE 12 · R499 · OTHER PROFESSIONAL SERVICES$11,900FY2011

Other recipients under Y299 from OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) (most recent first)

AwardRecipientOfficeNet obligationsFY
VA101CFMC0165G&C FAB-CON, LLCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$18,626,889FY2011
VA101CFMC0081WEST CONSTRUCTION, INC.OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$22,945,085FY2010
VA101CFMP0021SMITHGROUPJJR, INC.OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$3,343,772FY2009
VA101183B4C0046EMERSON CONSTRUCTION COMPANY, INC.OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$21,687,294FY2008
VA101183B4C0047KEVCON, INCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$16,297,324FY2008

Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA101CFMC0093_3600_-NONE-_-NONE- · retrieved 2026-09-26.