Description
EXTEND OBLIGATION END DATE TO NOVEMBER 30, 2021. FINAL DEOBLIGATION OF EXCESS FUNDS AND CONTRACT CLOSEOUT.
Base award description: IGF::OT::IGF
Modification chain · 285 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2016-09-30+$21,237,000= $21,237,000
- Mod P000012016-11-07+$0= $21,237,000
- Mod P000022016-11-07+$10,000= $21,247,000
- Mod P000032016-12-21+$6,077= $21,253,077
- Mod P000042017-01-27+$0= $21,253,077
- Mod P000062017-02-15+$695= $21,253,772
- Mod P000082017-02-15+$4,500= $21,258,272
- Mod P000102017-02-15+$2,497= $21,260,769
- Mod P000112017-02-24+$6,139= $21,266,908
- Mod P000132017-03-03+$1,383= $21,268,291
- Mod P000072017-03-06+$38,000= $21,306,291
- Mod P000172017-03-29+$6,909= $21,313,200
- Mod P000122017-04-10+$4,793= $21,317,993
- Mod P000152017-04-10+$1,885= $21,319,878
- Mod P000192017-04-10+$5,795= $21,325,673
- Mod P000202017-04-18+$9,186= $21,334,859
- Mod P000182017-04-25+$3,010= $21,337,869
- Mod P000222017-04-25+$23,000= $21,360,869
- Mod P000242017-05-03+$9,300= $21,370,169
- Mod P000262017-05-05+$2,500= $21,372,669
- Mod P000142017-05-10+$3,153= $21,375,822
- Mod P000162017-05-10+$1,342= $21,377,164
- Mod P000052017-05-17+$16,574= $21,393,738
- Mod P000092017-05-17+$3,978= $21,397,716
- Mod P000212017-05-17+$1,920= $21,399,636
- Mod P000252017-05-17+$14,020= $21,413,656
- Mod P000292017-05-22+$1,911= $21,415,567
- Mod P000282017-06-02-$218= $21,415,349
- Mod P000302017-06-07+$0= $21,415,349
- Mod P000232017-06-15+$26,554= $21,441,903
- Mod P000332017-06-16+$1,500= $21,443,403
- Mod P000322017-06-19+$3,764= $21,447,167
- Mod P000272017-06-21+$31,000= $21,478,167
- Mod P000362017-07-06+$0= $21,478,167
- Mod P000372017-07-06+$0= $21,478,167
- Mod P000382017-07-06+$18= $21,478,185
- Mod P000402017-07-14+$4,900= $21,483,085
- Mod P000352017-07-24+$15,000= $21,498,085
- Mod P000342017-07-25+$0= $21,498,085
- Mod P000392017-07-28+$3,000= $21,501,085
- Mod P000312017-08-02+$14,455= $21,515,540
- Mod P000412017-08-03+$1,796= $21,517,336
- Mod P000452017-08-09+$20,531= $21,537,867
- Mod P000462017-08-15+$4,122= $21,541,989
- Mod P000472017-08-16+$20,000= $21,561,989
- Mod P000512017-09-11+$29,000= $21,590,989
- Mod P000482017-09-12+$2,590= $21,593,579
- Mod P000502017-09-12+$696= $21,594,275
- Mod P000522017-09-13+$10,207= $21,604,482
- Mod P000432017-09-21+$45,611= $21,650,093
- Mod P000562017-10-02+$14,708= $21,664,801
- Mod P000582017-10-03+$0= $21,664,801
- Mod P000492017-10-05+$4,074= $21,668,875
- Mod P000532017-10-05+$2,493= $21,671,368
- Mod P000592017-10-06-$4,417= $21,666,951
- Mod P000602017-10-11+$0= $21,666,951
- Mod P000612017-10-18+$32,000= $21,698,951
- Mod P000622017-10-18+$55,000= $21,753,951
- Mod P000542017-11-01+$1,628= $21,755,579
- Mod P000552017-11-01+$7,912= $21,763,491
- Mod P000572017-11-01+$810= $21,764,301
- Mod P000632017-11-01+$2,575= $21,766,876
- Mod P000652017-11-01+$4,693= $21,771,569
- Mod P000642017-11-02+$3,284= $21,774,853
- Mod P000662017-11-02+$4,589= $21,779,442
- Mod P000682017-11-02+$1,122= $21,780,564
- Mod P000692017-11-02+$3,000= $21,783,564
- Mod P000752017-11-03+$0= $21,783,564
- Mod P000672017-11-16+$22,604= $21,806,168
- Mod P000702017-11-16+$8,875= $21,815,043
- Mod P000712017-11-16+$3,586= $21,818,629
- Mod P000722017-11-16+$3,600= $21,822,229
- Mod P000732017-11-16+$5,904= $21,828,133
- Mod P000742017-11-16+$2,488= $21,830,621
- Mod P000762017-11-22+$0= $21,830,621
- Mod P000782017-11-27+$18,000= $21,848,621
- Mod P000772017-11-29+$10,000= $21,858,621
- Mod P000792017-11-29+$10,618= $21,869,239
- Mod P000822017-11-30+$0= $21,869,239
- Mod P000802017-12-01+$3,112= $21,872,351
- Mod P000422017-12-04+$2,095= $21,874,446
- Mod P000832017-12-05+$9,000= $21,883,446
- Mod P000842017-12-05+$4,000= $21,887,446
- Mod P000812017-12-15+$2,649= $21,890,095
- Mod P000852018-01-03+$4,025= $21,894,120
- Mod P000862018-01-04+$2,840= $21,896,960
- Mod P000882018-01-11+$3,658= $21,900,618
- Mod P000892018-01-22+$11,954= $21,912,572
- Mod P000902018-01-22+$2,602= $21,915,174
- Mod P000442018-02-05+$35,391= $21,950,565
- Mod P000922018-02-21+$1,454= $21,952,019
- Mod P000952018-02-21+$26,822= $21,978,841
- Mod P000872018-02-26-$23,125= $21,955,716
- Mod P000962018-03-06+$6,577= $21,962,293
- Mod P000982018-03-06+$2,167= $21,964,460
- Mod P001012018-03-12+$7,500= $21,971,960
- Mod P000912018-03-14-$678= $21,971,282
- Mod P000942018-03-14+$12,622= $21,983,904
- Mod P000992018-03-14+$7,313= $21,991,217
- Mod P001002018-03-14+$17,227= $22,008,444
- Mod P001022018-03-28+$3,881= $22,012,325
- Mod P001032018-04-05+$7,680= $22,020,005
- Mod P001042018-04-05+$30,741= $22,050,746
- Mod P000932018-04-09+$5,280= $22,056,026
- Mod P001062018-04-09+$2,960= $22,058,986
- Mod P001072018-04-09+$2,678= $22,061,664
- Mod P001122018-04-20+$19,627= $22,081,291
- Mod P001132018-04-20+$4,338= $22,085,629
- Mod P001142018-04-20+$3,830= $22,089,459
- Mod P001152018-04-20+$10,881= $22,100,340
- Mod P001192018-04-23+$4,300= $22,104,640
- Mod P001202018-04-23+$9,000= $22,113,640
- Mod P000972018-04-30+$0= $22,113,640
- Mod P001172018-05-01+$7,341= $22,120,981
- Mod P001182018-05-01+$9,851= $22,130,832
- Mod P001212018-05-01+$4,997= $22,135,829
- Mod P001242018-05-08+$4,000= $22,139,829
- Mod P001112018-05-09+$17,600= $22,157,429
- Mod P001162018-05-09-$3,470= $22,153,959
- Mod P001102018-05-10+$12,693= $22,166,652
- Mod P001232018-05-10+$47,559= $22,214,211
- Mod P001252018-05-10+$0= $22,214,211
- Mod P001082018-05-17+$25,844= $22,240,055
- Mod P001222018-05-17+$2,132= $22,242,187
- Mod P001052018-05-18+$30,948= $22,273,135
- Mod P001262018-05-29+$6,794= $22,279,929
- Mod P001282018-06-01+$16,577= $22,296,506
- Mod P001302018-06-01+$4,772= $22,301,278
- Mod P001322018-06-01-$489= $22,300,789
- Mod P001332018-06-01+$1,869= $22,302,658
- Mod P001272018-06-11+$16,008= $22,318,666
- Mod P001362018-06-11+$10,058= $22,328,724
- Mod P001372018-06-11+$0= $22,328,724
- Mod P001292018-06-13-$20,238= $22,308,486
- Mod P001422018-07-02+$90,000= $22,398,486
- Mod P001392018-07-09+$3,644= $22,402,130
- Mod P001402018-07-09-$12,455= $22,389,675
- Mod P001382018-07-23+$7,626= $22,397,301
- Mod P001412018-07-23+$16,019= $22,413,320
- Mod P001432018-07-23-$5,797= $22,407,523
- Mod P001442018-08-06+$2,930= $22,410,453
- Mod P001462018-08-06+$20,479= $22,430,932
- Mod P001492018-08-13+$132,563= $22,563,495
- Mod P001502018-08-13+$0= $22,563,495
- Mod P001542018-08-22+$0= $22,563,495
- Mod P001472018-08-24+$28,642= $22,592,137
- Mod P001532018-08-24+$9,291= $22,601,428
- Mod P001512018-09-26+$21,379= $22,622,807
- Mod P001552018-09-26-$4,227= $22,618,580
- Mod P001572018-09-26+$16,337= $22,634,917
- Mod P001522018-10-26-$18,644= $22,616,273
- Mod P001452018-10-31-$33,258= $22,583,015
- Mod P001582018-10-31+$18,705= $22,601,720
- Mod P001592018-10-31+$5,049= $22,606,769
- Mod P001622018-11-09+$5,173= $22,611,942
- Mod P001602018-11-13+$0= $22,611,942
- Mod P001612018-11-13+$0= $22,611,942
- Mod P001632018-11-23-$5,173= $22,606,769
- Mod P001642018-11-26+$23,275= $22,630,044
- Mod P001682018-12-19+$0= $22,630,044
- Mod P001652019-01-31+$4,022= $22,634,066
- Mod P001662019-01-31+$25,952= $22,660,018
- Mod P001092019-02-01+$3,836= $22,663,854
- Mod P001672019-02-01+$16,611= $22,680,465
- Mod P001312019-02-23-$544= $22,679,921
- Mod P001482019-02-23+$14,739= $22,694,660
- Mod P001702019-03-11+$87,942= $22,782,602
- Mod P001692019-04-24+$7,942= $22,790,544
- Mod P001752019-04-29+$7,885= $22,798,429
- Mod P001722019-04-30+$93= $22,798,522
- Mod P001762019-05-08+$5,000= $22,803,522
- Mod P001772019-05-08+$5,000= $22,808,522
- Mod P001712019-05-09+$2,697= $22,811,219
- Mod P001732019-06-02+$5,159= $22,816,378
- Mod P001742019-06-02+$6,163= $22,822,541
- Mod P001872019-06-26+$2,605= $22,825,146
- Mod P001882019-06-26+$4,106= $22,829,252
- Mod P001352019-07-03+$5,292= $22,834,544
- Mod P001812019-07-03+$13,906= $22,848,450
- Mod P001832019-07-05+$26,223= $22,874,673
- Mod P001842019-07-05+$13,596= $22,888,269
- Mod P001852019-07-09+$3,401= $22,891,670
- Mod P001782019-07-10+$4,913= $22,896,583
- Mod P001792019-07-10+$2,230= $22,898,813
- Mod P001892019-07-10+$8,842= $22,907,655
- Mod P001902019-07-11+$16,219= $22,923,874
- Mod P001952019-08-02+$28,000= $22,951,874
- Mod P001862019-08-09+$7,272= $22,959,146
- Mod P001922019-08-09+$200,000= $23,159,146
- Mod P001962019-08-09+$35,497= $23,194,643
- Mod P001972019-08-09+$9,722= $23,204,365
- Mod P001992019-08-09+$6,971= $23,211,336
- Mod P002052019-08-13+$0= $23,211,336
- Mod P002002019-08-14+$12,572= $23,223,908
- Mod P002022019-08-14+$5,508= $23,229,416
- Mod P002032019-08-14+$12,261= $23,241,677
- Mod P002042019-08-14+$1,232= $23,242,909
- Mod P001912019-08-20+$4,349= $23,247,258
- Mod P001942019-08-20+$3,454= $23,250,712
- Mod P001932019-09-04+$7,023= $23,257,735
- Mod P002062019-09-04+$12,445= $23,270,180
- Mod P002072019-09-04+$14,595= $23,284,775
- Mod P001982019-09-05+$8,822= $23,293,597
- Mod P002152019-09-11+$15,135= $23,308,732
- Mod P002172019-09-11+$15,749= $23,324,481
- Mod P002082019-09-12+$5,979= $23,330,460
- Mod P002122019-09-12+$0= $23,330,460
- Mod P002162019-09-12+$47,059= $23,377,519
- Mod P002262019-09-13+$10,000= $23,387,519
- Mod P002092019-09-16+$5,838= $23,393,357
- Mod P002192019-09-16+$41,177= $23,434,534
- Mod P002142019-09-17+$44,000= $23,478,534
- Mod P002112019-09-18+$108,072= $23,586,606
- Mod P002182019-09-30+$36,081= $23,622,687
- Mod P002202019-09-30-$6,405= $23,616,282
- Mod P002212019-10-03+$14,508= $23,630,790
- Mod P002222019-10-03+$33,881= $23,664,671
- Mod P002232019-10-10+$26,744= $23,691,415
- Mod P002242019-10-10+$7,271= $23,698,686
- Mod P002322019-10-18+$2,954= $23,701,640
- Mod P002132019-10-21+$99,900= $23,801,540
- Mod P002272019-10-21+$99,900= $23,901,440
- Mod P002302019-10-21-$78,938= $23,822,502
- Mod P002312019-10-23+$31,589= $23,854,091
- Mod P002352019-10-31+$13,780= $23,867,871
- Mod P001822019-11-19+$96,379= $23,964,250
- Mod P002342019-12-02+$3,448= $23,967,698
- Mod P002372019-12-02+$75,500= $24,043,198
- Mod P002382019-12-02+$51,790= $24,094,988
- Mod P002392019-12-02+$30,717= $24,125,705
- Mod P002402019-12-11+$4,595= $24,130,300
- Mod P002412019-12-11+$21,975= $24,152,275
- Mod P002362019-12-19+$18,769= $24,171,044
- Mod P002452020-01-02+$29,696= $24,200,740
- Mod P002432020-01-14+$4,145= $24,204,885
- Mod P002462020-01-14+$14,125= $24,219,010
- Mod P002472020-01-14+$8,865= $24,227,875
- Mod P002492020-01-15+$5,336= $24,233,211
- Mod P001802020-01-22+$0= $24,233,211
- Mod P002512020-01-28+$0= $24,233,211
- Mod P002502020-01-30+$20,010= $24,253,221
- Mod P002542020-01-30+$4,395= $24,257,616
- Mod P002562020-01-30+$7,000= $24,264,616
- Mod P002572020-02-04+$20,000= $24,284,616
- Mod P002442020-02-11+$7,310= $24,291,926
- Mod P002602020-02-11+$2,100= $24,294,026
- Mod P002482020-02-12+$120,000= $24,414,026
- Mod P002582020-02-12+$1,040= $24,415,066
- Mod P002592020-02-12+$9,600= $24,424,666
- Mod P002612020-02-25+$9,095= $24,433,761
- Mod P002622020-02-26+$3,000= $24,436,761
- Mod P002332020-03-04+$14,950= $24,451,711
- Mod P002642020-03-09+$7,360= $24,459,071
- Mod P002552020-03-11+$42,900= $24,501,971
- Mod P002252020-03-20+$99,900= $24,601,871
- Mod P002422020-04-01+$15,295= $24,617,166
- Mod P002652020-04-01+$5,370= $24,622,536
- Mod P002682020-04-01+$9,471= $24,632,007
- Mod P002672020-04-10+$812,164= $25,444,171
- Mod P002632020-04-21+$58,000= $25,502,171
- Mod P002732020-04-21-$1,020= $25,501,151
- Mod P002742020-04-21+$5,690= $25,506,841
- Mod P002752020-05-06+$11,590= $25,518,431
- Mod P002762020-05-06+$24,025= $25,542,456
- Mod P002692020-05-07+$215,830= $25,758,286
- Mod P002772020-05-07+$8,580= $25,766,866
- Mod P002712020-05-20+$73,000= $25,839,866
- Mod P002722020-05-26+$0= $25,839,866
- Mod P002792020-05-28+$17,620= $25,857,486
- Mod P002822020-05-28+$4,064= $25,861,550
- Mod P002812020-06-02+$10,529= $25,872,079
- Mod P002782020-06-03+$7,120= $25,879,199
- Mod P002522020-06-09-$3,975= $25,875,224
- Mod P002802020-06-09+$10,685= $25,885,909
- Mod P002532020-06-17+$35,595= $25,921,504
- Mod P002832020-06-29+$31,660= $25,953,164
- Mod P001342020-06-30-$64,765= $25,888,399
- Mod P002852020-07-01+$29,434= $25,917,833
- Mod P002862020-07-08+$0= $25,917,833
- Mod P002872020-07-27+$9,475= $25,927,308
- Mod P002842020-08-20+$98,345= $26,025,653
- Mod P002892020-10-22+$92,785= $26,118,438
- Mod P002882020-12-31+$0= $26,118,438
- Mod P002902021-02-23+$0= $26,118,438
- Mod P002912021-11-16-$51,293= $26,067,145
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2016-09-30 | +$21,237,000 | $21,237,000 | IGF::OT::IGF |
| Mod P00001· OTHER ADMINISTRATIVE ACTION | 2016-11-07 | +$0 | $21,237,000 | IGF::OT::IGF |
| Mod P00002· CHANGE ORDER | 2016-11-07 | +$10,000 | $21,247,000 | IGF::OT::IGF |
| Mod P00003· CHANGE ORDER | 2016-12-21 | +$6,077 | $21,253,077 | IGF::OT::IGF |
| Mod P00004· CHANGE ORDER | 2017-01-27 | +$0 | $21,253,077 | IGF::OT::IGF |
| Mod P00006· CHANGE ORDER | 2017-02-15 | +$695 | $21,253,772 | IGF::OT::IGF |
| Mod P00008· CHANGE ORDER | 2017-02-15 | +$4,500 | $21,258,272 | IGF::OT::IGF |
| Mod P00010· CHANGE ORDER | 2017-02-15 | +$2,497 | $21,260,769 | IGF::OT::IGF |
| Mod P00011· CHANGE ORDER | 2017-02-24 | +$6,139 | $21,266,908 | IGF::OT::IGF |
| Mod P00013· CHANGE ORDER | 2017-03-03 | +$1,383 | $21,268,291 | IGF::OT::IGF |
| Mod P00007· CHANGE ORDER | 2017-03-06 | +$38,000 | $21,306,291 | IGF::OT::IGF |
| Mod P00017· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-03-29 | +$6,909 | $21,313,200 | IGF::OT::IGF |
| Mod P00012· CHANGE ORDER | 2017-04-10 | +$4,793 | $21,317,993 | IGF::OT::IGF |
| Mod P00015· CHANGE ORDER | 2017-04-10 | +$1,885 | $21,319,878 | IGF::OT::IGF |
| Mod P00019· CHANGE ORDER | 2017-04-10 | +$5,795 | $21,325,673 | IGF::OT::IGF |
| Mod P00020· OTHER ADMINISTRATIVE ACTION | 2017-04-18 | +$9,186 | $21,334,859 | IGF::OT::IGF |
| Mod P00018· CHANGE ORDER | 2017-04-25 | +$3,010 | $21,337,869 | IGF::OT::IGF |
| Mod P00022· CHANGE ORDER | 2017-04-25 | +$23,000 | $21,360,869 | IGF::OT::IGF |
| Mod P00024· CHANGE ORDER | 2017-05-03 | +$9,300 | $21,370,169 | IGF::OT::IGF |
| Mod P00026· CHANGE ORDER | 2017-05-05 | +$2,500 | $21,372,669 | IGF::OT::IGF |
| Mod P00014· CHANGE ORDER | 2017-05-10 | +$3,153 | $21,375,822 | IGF::OT::IGF |
| Mod P00016· CHANGE ORDER | 2017-05-10 | +$1,342 | $21,377,164 | IGF::OT::IGF |
| Mod P00005· CHANGE ORDER | 2017-05-17 | +$16,574 | $21,393,738 | IGF::OT::IGF |
| Mod P00009· CHANGE ORDER | 2017-05-17 | +$3,978 | $21,397,716 | IGF::OT::IGF |
| Mod P00021· CHANGE ORDER | 2017-05-17 | +$1,920 | $21,399,636 | IGF::OT::IGF |
| Mod P00025· CHANGE ORDER | 2017-05-17 | +$14,020 | $21,413,656 | IGF::OT::IGF |
| Mod P00029· CHANGE ORDER | 2017-05-22 | +$1,911 | $21,415,567 | IGF::OT::IGF |
| Mod P00028· CHANGE ORDER | 2017-06-02 | −$218 | $21,415,349 | IGF::OT::IGF |
| Mod P00030· CHANGE ORDER | 2017-06-07 | +$0 | $21,415,349 | IGF::OT::IGF |
| Mod P00023· CHANGE ORDER | 2017-06-15 | +$26,554 | $21,441,903 | IGF::OT::IGF |
| Mod P00033· CHANGE ORDER | 2017-06-16 | +$1,500 | $21,443,403 | IGF::OT::IGF |
| Mod P00032· CHANGE ORDER | 2017-06-19 | +$3,764 | $21,447,167 | IGF::OT::IGF |
| Mod P00027· CHANGE ORDER | 2017-06-21 | +$31,000 | $21,478,167 | IGF::OT::IGF |
| Mod P00036· CHANGE ORDER | 2017-07-06 | +$0 | $21,478,167 | IGF::OT::IGF |
| Mod P00037· OTHER ADMINISTRATIVE ACTION | 2017-07-06 | +$0 | $21,478,167 | IGF::OT::IGF |
| Mod P00038· OTHER ADMINISTRATIVE ACTION | 2017-07-06 | +$18 | $21,478,185 | IGF::OT::IGF |
| Mod P00040· CHANGE ORDER | 2017-07-14 | +$4,900 | $21,483,085 | IGF::OT::IGF |
| Mod P00035· CHANGE ORDER | 2017-07-24 | +$15,000 | $21,498,085 | IGF::OT::IGF |
| Mod P00034· OTHER ADMINISTRATIVE ACTION | 2017-07-25 | +$0 | $21,498,085 | IGF::OT::IGF |
| Mod P00039· CHANGE ORDER | 2017-07-28 | +$3,000 | $21,501,085 | IGF::OT::IGF |
| Mod P00031· CHANGE ORDER | 2017-08-02 | +$14,455 | $21,515,540 | IGF::OT::IGF |
| Mod P00041· CHANGE ORDER | 2017-08-03 | +$1,796 | $21,517,336 | IGF::OT::IGF |
| Mod P00045· CHANGE ORDER | 2017-08-09 | +$20,531 | $21,537,867 | IGF::OT::IGF |
| Mod P00046· CHANGE ORDER | 2017-08-15 | +$4,122 | $21,541,989 | IGF::OT::IGF |
| Mod P00047· CHANGE ORDER | 2017-08-16 | +$20,000 | $21,561,989 | IGF::OT::IGF |
| Mod P00051· CHANGE ORDER | 2017-09-11 | +$29,000 | $21,590,989 | IGF::OT::IGF |
| Mod P00048· CHANGE ORDER | 2017-09-12 | +$2,590 | $21,593,579 | IGF::OT::IGF |
| Mod P00050· CHANGE ORDER | 2017-09-12 | +$696 | $21,594,275 | IGF::OT::IGF |
| Mod P00052· CHANGE ORDER | 2017-09-13 | +$10,207 | $21,604,482 | IGF::OT::IGF |
| Mod P00043· CHANGE ORDER | 2017-09-21 | +$45,611 | $21,650,093 | IGF::OT::IGF |
| Mod P00056· CHANGE ORDER | 2017-10-02 | +$14,708 | $21,664,801 | IGF::OT::IGF |
| Mod P00058· CHANGE ORDER | 2017-10-03 | +$0 | $21,664,801 | IGF::OT::IGF |
| Mod P00049· CHANGE ORDER | 2017-10-05 | +$4,074 | $21,668,875 | IGF::OT::IGF |
| Mod P00053· CHANGE ORDER | 2017-10-05 | +$2,493 | $21,671,368 | IGF::OT::IGF |
| Mod P00059· CHANGE ORDER | 2017-10-06 | −$4,417 | $21,666,951 | IGF::OT::IGF |
| Mod P00060· CHANGE ORDER | 2017-10-11 | +$0 | $21,666,951 | IGF::OT::IGF |
| Mod P00061· CHANGE ORDER | 2017-10-18 | +$32,000 | $21,698,951 | IGF::OT::IGF |
| Mod P00062· CHANGE ORDER | 2017-10-18 | +$55,000 | $21,753,951 | IGF::OT::IGF |
| Mod P00054· CHANGE ORDER | 2017-11-01 | +$1,628 | $21,755,579 | IGF::OT::IGF |
| Mod P00055· CHANGE ORDER | 2017-11-01 | +$7,912 | $21,763,491 | IGF::OT::IGF |
| Mod P00057· CHANGE ORDER | 2017-11-01 | +$810 | $21,764,301 | IGF::OT::IGF |
| Mod P00063· CHANGE ORDER | 2017-11-01 | +$2,575 | $21,766,876 | IGF::OT::IGF |
| Mod P00065· CHANGE ORDER | 2017-11-01 | +$4,693 | $21,771,569 | IGF::OT::IGF |
| Mod P00064· CHANGE ORDER | 2017-11-02 | +$3,284 | $21,774,853 | IGF::OT::IGF |
| Mod P00066· CHANGE ORDER | 2017-11-02 | +$4,589 | $21,779,442 | IGF::OT::IGF |
| Mod P00068· CHANGE ORDER | 2017-11-02 | +$1,122 | $21,780,564 | IGF::OT::IGF |
| Mod P00069· CHANGE ORDER | 2017-11-02 | +$3,000 | $21,783,564 | IGF::OT::IGF |
| Mod P00075· CHANGE ORDER | 2017-11-03 | +$0 | $21,783,564 | IGF::OT::IGF |
| Mod P00067· CHANGE ORDER | 2017-11-16 | +$22,604 | $21,806,168 | IGF::OT::IGF |
| Mod P00070· CHANGE ORDER | 2017-11-16 | +$8,875 | $21,815,043 | IGF::OT::IGF |
| Mod P00071· CHANGE ORDER | 2017-11-16 | +$3,586 | $21,818,629 | IGF::OT::IGF |
| Mod P00072· CHANGE ORDER | 2017-11-16 | +$3,600 | $21,822,229 | IGF::OT::IGF |
| Mod P00073· CHANGE ORDER | 2017-11-16 | +$5,904 | $21,828,133 | IGF::OT::IGF |
| Mod P00074· CHANGE ORDER | 2017-11-16 | +$2,488 | $21,830,621 | IGF::OT::IGF |
| Mod P00076· CHANGE ORDER | 2017-11-22 | +$0 | $21,830,621 | IGF::OT::IGF |
| Mod P00078· CHANGE ORDER | 2017-11-27 | +$18,000 | $21,848,621 | IGF::OT::IGF |
| Mod P00077· CHANGE ORDER | 2017-11-29 | +$10,000 | $21,858,621 | IGF::OT::IGF |
| Mod P00079· CHANGE ORDER | 2017-11-29 | +$10,618 | $21,869,239 | IGF::OT::IGF |
| Mod P00082· CHANGE ORDER | 2017-11-30 | +$0 | $21,869,239 | IGF::OT::IGF |
| Mod P00080· CHANGE ORDER | 2017-12-01 | +$3,112 | $21,872,351 | IGF::OT::IGF |
| Mod P00042· CHANGE ORDER | 2017-12-04 | +$2,095 | $21,874,446 | IGF::OT::IGF |
| Mod P00083· CHANGE ORDER | 2017-12-05 | +$9,000 | $21,883,446 | IGF::OT::IGF |
| Mod P00084· CHANGE ORDER | 2017-12-05 | +$4,000 | $21,887,446 | IGF::OT::IGF |
| Mod P00081· CHANGE ORDER | 2017-12-15 | +$2,649 | $21,890,095 | IGF::OT::IGF |
| Mod P00085· CHANGE ORDER | 2018-01-03 | +$4,025 | $21,894,120 | IGF::OT::IGF |
| Mod P00086· CHANGE ORDER | 2018-01-04 | +$2,840 | $21,896,960 | IGF::OT::IGF |
| Mod P00088· CHANGE ORDER | 2018-01-11 | +$3,658 | $21,900,618 | IGF::OT::IGF |
| Mod P00089· CHANGE ORDER | 2018-01-22 | +$11,954 | $21,912,572 | IGF::OT::IGF |
| Mod P00090· CHANGE ORDER | 2018-01-22 | +$2,602 | $21,915,174 | IGF::OT::IGF |
| Mod P00044· CHANGE ORDER | 2018-02-05 | +$35,391 | $21,950,565 | IGF::OT::IGF |
| Mod P00092· CHANGE ORDER | 2018-02-21 | +$1,454 | $21,952,019 | IGF::OT::IGF |
| Mod P00095· CHANGE ORDER | 2018-02-21 | +$26,822 | $21,978,841 | IGF::OT::IGF |
| Mod P00087· CHANGE ORDER | 2018-02-26 | −$23,125 | $21,955,716 | IGF::OT::IGF |
| Mod P00096· CHANGE ORDER | 2018-03-06 | +$6,577 | $21,962,293 | IGF::OT::IGF |
| Mod P00098· CHANGE ORDER | 2018-03-06 | +$2,167 | $21,964,460 | IGF::OT::IGF |
| Mod P00101· OTHER ADMINISTRATIVE ACTION | 2018-03-12 | +$7,500 | $21,971,960 | IGF::OT::IGF |
| Mod P00091· CHANGE ORDER | 2018-03-14 | −$678 | $21,971,282 | IGF::OT::IGF |
| Mod P00094· CHANGE ORDER | 2018-03-14 | +$12,622 | $21,983,904 | IGF::OT::IGF |
| Mod P00099· CHANGE ORDER | 2018-03-14 | +$7,313 | $21,991,217 | IGF::OT::IGF |
| Mod P00100· CHANGE ORDER | 2018-03-14 | +$17,227 | $22,008,444 | IGF::OT::IGF |
| Mod P00102· CHANGE ORDER | 2018-03-28 | +$3,881 | $22,012,325 | IGF::OT::IGF |
| Mod P00103· CHANGE ORDER | 2018-04-05 | +$7,680 | $22,020,005 | IGF::OT::IGF |
| Mod P00104· CHANGE ORDER | 2018-04-05 | +$30,741 | $22,050,746 | IGF::OT::IGF |
| Mod P00093· CHANGE ORDER | 2018-04-09 | +$5,280 | $22,056,026 | IGF::OT::IGF |
| Mod P00106· CHANGE ORDER | 2018-04-09 | +$2,960 | $22,058,986 | IGF::OT::IGF |
| Mod P00107· CHANGE ORDER | 2018-04-09 | +$2,678 | $22,061,664 | IGF::OT::IGF |
| Mod P00112· CHANGE ORDER | 2018-04-20 | +$19,627 | $22,081,291 | IGF::OT::IGF |
| Mod P00113· CHANGE ORDER | 2018-04-20 | +$4,338 | $22,085,629 | IGF::OT::IGF |
| Mod P00114· CHANGE ORDER | 2018-04-20 | +$3,830 | $22,089,459 | IGF::OT::IGF |
| Mod P00115· CHANGE ORDER | 2018-04-20 | +$10,881 | $22,100,340 | IGF::OT::IGF |
| Mod P00119· CHANGE ORDER | 2018-04-23 | +$4,300 | $22,104,640 | IGF::OT::IGF |
| Mod P00120· CHANGE ORDER | 2018-04-23 | +$9,000 | $22,113,640 | IGF::OT::IGF |
| Mod P00097· CHANGE ORDER | 2018-04-30 | +$0 | $22,113,640 | IGF::OT::IGF |
| Mod P00117· CHANGE ORDER | 2018-05-01 | +$7,341 | $22,120,981 | IGF::OT::IGF |
| Mod P00118· CHANGE ORDER | 2018-05-01 | +$9,851 | $22,130,832 | IGF::OT::IGF |
| Mod P00121· CHANGE ORDER | 2018-05-01 | +$4,997 | $22,135,829 | IGF::OT::IGF |
| Mod P00124· CHANGE ORDER | 2018-05-08 | +$4,000 | $22,139,829 | IGF::OT::IGF |
| Mod P00111· CHANGE ORDER | 2018-05-09 | +$17,600 | $22,157,429 | IGF::OT::IGF |
| Mod P00116· CHANGE ORDER | 2018-05-09 | −$3,470 | $22,153,959 | IGF::OT::IGF |
| Mod P00110· CHANGE ORDER | 2018-05-10 | +$12,693 | $22,166,652 | IGF::OT::IGF |
| Mod P00123· CHANGE ORDER | 2018-05-10 | +$47,559 | $22,214,211 | IGF::OT::IGF |
| Mod P00125· CHANGE ORDER | 2018-05-10 | +$0 | $22,214,211 | IGF::OT::IGF |
| Mod P00108· CHANGE ORDER | 2018-05-17 | +$25,844 | $22,240,055 | IGF::OT::IGF |
| Mod P00122· CHANGE ORDER | 2018-05-17 | +$2,132 | $22,242,187 | IGF::OT::IGF |
| Mod P00105· CHANGE ORDER | 2018-05-18 | +$30,948 | $22,273,135 | IGF::OT::IGF |
| Mod P00126· CHANGE ORDER | 2018-05-29 | +$6,794 | $22,279,929 | IGF::OT::IGF |
| Mod P00128· CHANGE ORDER | 2018-06-01 | +$16,577 | $22,296,506 | IGF::OT::IGF |
| Mod P00130· CHANGE ORDER | 2018-06-01 | +$4,772 | $22,301,278 | IGF::OT::IGF |
| Mod P00132· CHANGE ORDER | 2018-06-01 | −$489 | $22,300,789 | IGF::OT::IGF |
| Mod P00133· CHANGE ORDER | 2018-06-01 | +$1,869 | $22,302,658 | IGF::OT::IGF |
| Mod P00127· CHANGE ORDER | 2018-06-11 | +$16,008 | $22,318,666 | IGF::OT::IGF |
| Mod P00136· CHANGE ORDER | 2018-06-11 | +$10,058 | $22,328,724 | IGF::OT::IGF |
| Mod P00137· CHANGE ORDER | 2018-06-11 | +$0 | $22,328,724 | IGF::OT::IGF |
| Mod P00129· CHANGE ORDER | 2018-06-13 | −$20,238 | $22,308,486 | IGF::OT::IGF |
| Mod P00142· CHANGE ORDER | 2018-07-02 | +$90,000 | $22,398,486 | IGF::OT::IGF |
| Mod P00139· CHANGE ORDER | 2018-07-09 | +$3,644 | $22,402,130 | IGF::OT::IGF |
| Mod P00140· CHANGE ORDER | 2018-07-09 | −$12,455 | $22,389,675 | IGF::OT::IGF |
| Mod P00138· CHANGE ORDER | 2018-07-23 | +$7,626 | $22,397,301 | IGF::OT::IGF |
| Mod P00141· CHANGE ORDER | 2018-07-23 | +$16,019 | $22,413,320 | IGF::OT::IGF |
| Mod P00143· CHANGE ORDER | 2018-07-23 | −$5,797 | $22,407,523 | IGF::OT::IGF |
| Mod P00144· CHANGE ORDER | 2018-08-06 | +$2,930 | $22,410,453 | IGF::OT::IGF |
| Mod P00146· CHANGE ORDER | 2018-08-06 | +$20,479 | $22,430,932 | IGF::OT::IGF |
| Mod P00149· CHANGE ORDER | 2018-08-13 | +$132,563 | $22,563,495 | IGF::OT::IGF |
| Mod P00150· CHANGE ORDER | 2018-08-13 | +$0 | $22,563,495 | IGF::OT::IGF |
| Mod P00154· CHANGE ORDER | 2018-08-22 | +$0 | $22,563,495 | IGF::OT::IGF |
| Mod P00147· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-08-24 | +$28,642 | $22,592,137 | IGF::OT::IGF |
| Mod P00153· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-08-24 | +$9,291 | $22,601,428 | IGF::OT::IGF |
| Mod P00151· CHANGE ORDER | 2018-09-26 | +$21,379 | $22,622,807 | IGF::OT::IGF |
| Mod P00155· CHANGE ORDER | 2018-09-26 | −$4,227 | $22,618,580 | IGF::OT::IGF |
| Mod P00157· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-09-26 | +$16,337 | $22,634,917 | IGF::OT::IGF |
| Mod P00152· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-10-26 | −$18,644 | $22,616,273 | IGF::OT::IGF CONSTRUCTION CREDIT |
| Mod P00145· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-10-31 | −$33,258 | $22,583,015 | IGF::OT::IGF |
| Mod P00158· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED) | 2018-10-31 | +$18,705 | $22,601,720 | IGF::OT::IGF |
| Mod P00159· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED) | 2018-10-31 | +$5,049 | $22,606,769 | IGF::OT::IGF |
| Mod P00162· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-11-09 | +$5,173 | $22,611,942 | IGF::OT::IGF |
| Mod P00160· CHANGE ORDER | 2018-11-13 | +$0 | $22,611,942 | IGF::OT::IGF |
| Mod P00161· CHANGE ORDER | 2018-11-13 | +$0 | $22,611,942 | IGF::OT::IGF |
| Mod P00163· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-11-23 | −$5,173 | $22,606,769 | IGF::OT::IGF |
| Mod P00164· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-11-26 | +$23,275 | $22,630,044 | IGF::OT::IGF |
| Mod P00168· OTHER ADMINISTRATIVE ACTION | 2018-12-19 | +$0 | $22,630,044 | IGF::OT::IGF ADMINISTRATIVE MOD FOR CONTRACTING OFFICER CHANGE. |
| Mod P00165· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-01-31 | +$4,022 | $22,634,066 | IGF::OT::IGF |
| Mod P00166· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-01-31 | +$25,952 | $22,660,018 | IGF::OT::IGF |
| Mod P00109· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-02-01 | +$3,836 | $22,663,854 | IGF::OT::IGF |
| Mod P00167· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-02-01 | +$16,611 | $22,680,465 | IGF::OT::IGF |
| Mod P00131· CHANGE ORDER | 2019-02-23 | −$544 | $22,679,921 | IGF::OT::IGF |
| Mod P00148· CHANGE ORDER | 2019-02-23 | +$14,739 | $22,694,660 | IGF::OT::IGF |
| Mod P00170· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-03-11 | +$87,942 | $22,782,602 | IGF::OT::IGF |
| Mod P00169· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-04-24 | +$7,942 | $22,790,544 | IGF::OT::IGF ADDITIONAL SERVICES FOR CPE'S 175, 205, 216 AND 229 |
| Mod P00175· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-04-29 | +$7,885 | $22,798,429 | IGF::OT::IGF |
| Mod P00172· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-04-30 | +$93 | $22,798,522 | IGF::OT::IGF |
| Mod P00176· CHANGE ORDER | 2019-05-08 | +$5,000 | $22,803,522 | IGF::OT::IGF CHANGES IN CONSTRUCTION WORK FOR PHASE II OF PROJECT 600-402 |
| Mod P00177· CHANGE ORDER | 2019-05-08 | +$5,000 | $22,808,522 | IGF::OT::IGF PROVIDE ADDED EMERGENCY POWER OUTLETS. |
| Mod P00171· CHANGE ORDER | 2019-05-09 | +$2,697 | $22,811,219 | IGF::OT::IGF TO PERFORM ARCHEOLOGICAL AND NATIVE AMERICAN SURVEYS IN LAY DOWN AREA. |
| Mod P00173· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-06-02 | +$5,159 | $22,816,378 | IGF::OT::IGF |
| Mod P00174· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-06-02 | +$6,163 | $22,822,541 | IGF::OT::IGF |
| Mod P00187· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-06-26 | +$2,605 | $22,825,146 | IGF::OT::IGF CPE 272 CABLE UPGRADE IN OP128 ELECTRICAL CLOSET |
| Mod P00188· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-06-26 | +$4,106 | $22,829,252 | IGF::OT::IGF CPE 262 ADJUSTABLE SHEAVE CHANGE AT EXHAUST FANS 1 AND 2 |
| Mod P00135· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-07-03 | +$5,292 | $22,834,544 | REVISED FIRE SPRINKLER SYSTEM. |
| Mod P00181· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-07-03 | +$13,906 | $22,848,450 | CPE 288 CLAY TILE MORTAR BED DEMOLITION AT SECOND FLOOR ATRIUM. CPE 192 SIX CORE DRILLS AT VARIOUS PHASE 3 SIN… |
| Mod P00183· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-07-05 | +$26,223 | $22,874,673 | THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIALS, TOOLS, EQUIPMENT, SUPERVISION AND ALL INCIDENTAL ITEMS TO C… |
| Mod P00184· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-07-05 | +$13,596 | $22,888,269 | WORK PERFORM FOR CPE 224 AND 256 |
| Mod P00185· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-07-09 | +$3,401 | $22,891,670 | CPE 196 |
| Mod P00178· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-07-10 | +$4,913 | $22,896,583 | TO PAY FOR PARTNERING SESSION. |
| Mod P00179· CHANGE ORDER | 2019-07-10 | +$2,230 | $22,898,813 | INSTALL SECURITY SWITCH. |
| Mod P00189· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-07-10 | +$8,842 | $22,907,655 | POST ABATEMENT AIR SAMPLING. |
| Mod P00190· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-07-11 | +$16,219 | $22,923,874 | CPE 247 NEW WALLS IN JANITORS CLOSET, CPE 248 REMOVE AND REPLACE RAIN DAMAGED AREAS, CPE 249 PROVIDE REVISED W… |
| Mod P00195· CHANGE ORDER | 2019-08-02 | +$28,000 | $22,951,874 | ELECTRICAL AND DATA CHANGES FOR AUDIOLOGY SUITE. |
| Mod P00186· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-08-09 | +$7,272 | $22,959,146 | DEMO SOFFIT AND DUCTWORK PER CPE 232. |
| Mod P00192· CHANGE ORDER | 2019-08-09 | +$200,000 | $23,159,146 | ASI 9 AUDIOLOGY BOOTHS PURCHASE AND INSTALLATION. |
| Mod P00196· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-08-09 | +$35,497 | $23,194,643 | ADDITIONAL PAYMENT FOR THE COST OF CORRECTING THE DAVIS BACON WAGE RATE. |
| Mod P00197· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-08-09 | +$9,722 | $23,204,365 | PHASE 3 BATHROOMS ROUGH-IN CHANGE/ CPE #0210 |
| Mod P00199· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-08-09 | +$6,971 | $23,211,336 | IT RACK UPGRADES (CPE #243R2) |
| Mod P00205· OTHER ADMINISTRATIVE ACTION | 2019-08-13 | +$0 | $23,211,336 | TO CHANGE THE OBLIGATION FROM AS FUNDS TO CA FUNDS. |
| Mod P00200· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-08-14 | +$12,572 | $23,223,908 | MISCELLANEOUS PHASE 3 AND PHASE 5 CHANGES (RFP 037) |
| Mod P00202· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-08-14 | +$5,508 | $23,229,416 | ADDED METAL COUNTERTOP SUPPORT LEGS (RFI 0466/ CPE #242) |
| Mod P00203· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-08-14 | +$12,261 | $23,241,677 | FUR OUT D2A WALLS (RFI 444&444.1/ CPE #238) |
| Mod P00204· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-08-14 | +$1,232 | $23,242,909 | FUR OUT WALL ROOM 2S121 (RFI 0472/ CPE #254) |
| Mod P00191· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-08-20 | +$4,349 | $23,247,258 | VARIOUS CARPENTRY WORK RELATED TO CPE'S 240, 245, AND 275. |
| Mod P00194· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-08-20 | +$3,454 | $23,250,712 | SERVICES RELATED TO CPE 010 MEDICAL GAS SYSTEM. |
| Mod P00193· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-09-04 | +$7,023 | $23,257,735 | PHASE 5 BASEMENT ACM ABATEMENT. |
| Mod P00206· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-09-04 | +$12,445 | $23,270,180 | CPE206,252,298, DEMOLISH DRYWALLS, IT FIBERS, CONDUITS AND MISC ITEMS IN PHASE 5 |
| Mod P00207· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-09-04 | +$14,595 | $23,284,775 | VARIOUS CARPENTRY WORK RELATED TO CPE'S 240, 245, AND 275. |
| Mod P00198· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-09-05 | +$8,822 | $23,293,597 | CPES 150, 236, 270 VARIOUS AIR CONDITIONING CHANGES |
| Mod P00215· CHANGE ORDER | 2019-09-11 | +$15,135 | $23,308,732 | RFP 40 ASI 9 ADDITIONAL SCOPE |
| Mod P00217· CHANGE ORDER | 2019-09-11 | +$15,749 | $23,324,481 | COPY OF SHUT DOWN REQUEST 95 CANCELLATION/ DEFINITIZE P00161 (FRAGNET #011) |
| Mod P00208· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-09-12 | +$5,979 | $23,330,460 | NEW ALARM CABLING TO OPERATOR'S OFFICE, RFI 0424/ 0424.1, CPE 231R2 |
| Mod P00212· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-09-12 | +$0 | $23,330,460 | SA - DEFINITIZE P00013, TEMPORARY CAP OF S-1, PHASE 1 |
| Mod P00216· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-09-12 | +$47,059 | $23,377,519 | SHUT DOWN REQUEST 95 CANCELLATION/ DEFINITIZE P00161 (FRAGNET #011) |
| Mod P00226· CHANGE ORDER | 2019-09-13 | +$10,000 | $23,387,519 | CO P00226 CLEANOUTS AND VARIOUS PLUMBING REPAIRS |
| Mod P00209· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-09-16 | +$5,838 | $23,393,357 | HVAC CHANGES RFI 449.1 AND RFI 450/ CPE 239 AND CPE 235R1 |
| Mod P00219· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-09-16 | +$41,177 | $23,434,534 | DEFINITIZE P00036 ADDITIONAL ASBESTOS ABATEMENT PHASE I FIRST FLOOR (FRAGNET #004) SEVEN DAYS COMPENSABLE |
| Mod P00214· CHANGE ORDER | 2019-09-17 | +$44,000 | $23,478,534 | CO MISCELLANEOUS USER REQUESTED CHANGES (CAT6A, 5 WAPS, SINK RELOCATE, KICK PLATES, DOOR HARDWARE) |
| Mod P00211· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-09-18 | +$108,072 | $23,586,606 | PH.3 BARN DOOR HARDWARE, SEALS, AD SYSTEM DOOR |
| Mod P00218· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-09-30 | +$36,081 | $23,622,687 | CPE 281 TO PROVIDE EXHAUST DUCTING AND FAN, AND SEVEN EMERGENCY POWER OUTLETS AND A NEW LIGHT FIXTURE IN 1N141… |
| Mod P00220· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-09-30 | −$6,405 | $23,616,282 | CPE246&268 CASEWORK, PLUMBING AND ARCHITECTURAL DESIGN CHANGES FOR PHASE 5 (RFP 041)AND TERRAZZO WORK AT PHAS… |
| Mod P00221· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-10-03 | +$14,508 | $23,630,790 | CPES 259, 305 WALL / SHAFT PATCHING |
| Mod P00222· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-10-03 | +$33,881 | $23,664,671 | CPE282,284,297&323 STEEL LEGERS AT PATIO, RELOCATE ELECTRICAL LINES&JANITOR CLOSET, RE-ROUTE EXISTING CONDENSA… |
| Mod P00223· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-10-10 | +$26,744 | $23,691,415 | CPE 244 MECHANICAL UTILITIES AT SECOND FLOOR ATRIUM |
| Mod P00224· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-10-10 | +$7,271 | $23,698,686 | CPES 285, 317 STEEL ERECTION AND SOFFIT |
| Mod P00232· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-10-18 | +$2,954 | $23,701,640 | CPE 308 AUDIO BOOTH CONCRETE DEMOLITION |
| Mod P00213· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-10-21 | +$99,900 | $23,801,540 | SA P00213 TIME SETTLEMENT FRAGNET# 009 RFI# 363 DEFINITIZE P00154 AND P00120. |
| Mod P00227· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-10-21 | +$99,900 | $23,901,440 | DEFINITIZE P00097, DELAY TO CASEWORK PROCUREMENT (FRAGNET #005R1 |
| Mod P00230· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-10-21 | −$78,938 | $23,822,502 | CPE 208R1, 255 - CREDIT FOR CURTAIN TRACKS, BLINDS, TOILET ACCESSORIES, PATIENT LIFTS, SIGNAGE, FLOOR BOXES, C… |
| Mod P00231· CHANGE ORDER | 2019-10-23 | +$31,589 | $23,854,091 | PLUMBING CHANGES, CPE 178, 211, 212, 280, 287, 311, 315, 320 AND 322 |
| Mod P00235· CHANGE ORDER | 2019-10-31 | +$13,780 | $23,867,871 | FRAMING CHANGES, CPE 209, 241, 296, 303, 304, 314, 316, 319, 321 AND 325 |
| Mod P00182· CHANGE ORDER | 2019-11-19 | +$96,379 | $23,964,250 | CPE 290&294 - ABATE ACM AT BASEMENT FLOOR AND 1ST FLOOR AUDIOLOGY, PHASE 5 |
| Mod P00234· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-12-02 | +$3,448 | $23,967,698 | CPE 253 COMPLETE ELEVATOR LOBBY. |
| Mod P00237· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-12-02 | +$75,500 | $24,043,198 | CPE #279R4, ADD/ RELOCATE POWER AND DATA OUTLETS, SLEEP LAB |
| Mod P00238· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-12-02 | +$51,790 | $24,094,988 | AVONITE SHOWER PANS (CPE #287) |
| Mod P00239· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-12-02 | +$30,717 | $24,125,705 | RE-WORK OF PHASE 1 AND PHASE 3 EPOXY RESINOUS BATHROOM FLOORS (CPE #326R2) |
| Mod P00240· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-12-11 | +$4,595 | $24,130,300 | CPES 269, 313, 328 WALL AND FLOORING |
| Mod P00241· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-12-11 | +$21,975 | $24,152,275 | CPE 331 ELECTRICAL CABLE RELOCATION IN STAFF LOCKER ROOM 2S149 |
| Mod P00236· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-12-19 | +$18,769 | $24,171,044 | CPE'S 218R2, 234, 273R2, 301, 310, 312, AND 327 |
| Mod P00245· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-01-02 | +$29,696 | $24,200,740 | CPES 278R3 AND 329 |
| Mod P00243· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-01-14 | +$4,145 | $24,204,885 | TWO LOCK INSTALLATIONS IN ROOMS 2S105 AND 2S105A |
| Mod P00246· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-01-14 | +$14,125 | $24,219,010 | CPE 334 DRAINAGE PIPING INSTALLATION IN SLEEP CLINIC RESTROOMS |
| Mod P00247· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-01-14 | +$8,865 | $24,227,875 | INSTALL CAN LIGHTS CPE 553 AND 553.1 |
| Mod P00249· CHANGE ORDER | 2020-01-15 | +$5,336 | $24,233,211 | CPE 337 SMART TV&332 LOBBY SOFFIT&WALL. |
| Mod P00180· OTHER ADMINISTRATIVE ACTION | 2020-01-22 | +$0 | $24,233,211 | BUILDING 126 RENOVATION, LONG BEACH CONSTRUCTION EXTENSION OF OBLIGATION END DATE |
| Mod P00251· DEFINITIZE CHANGE ORDER | 2020-01-28 | +$0 | $24,233,211 | DEFINITIZE SA P00182 (CPE290&294) - FRAGNET 013 PHASE 5, AUDIOLOGY ACM ABATEMENT |
| Mod P00250· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-01-30 | +$20,010 | $24,253,221 | CPE 250 - PROVIDE FIRE PROOFING ON NEW BEAMS AND EMBEDS AT 2ND FLOOR ATRIUM |
| Mod P00254· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-01-30 | +$4,395 | $24,257,616 | CPE 338 - ADD GFCI RECEPTACLE AND NEW CIRCUIT AT 2N100 CORRIDOR NORTH |
| Mod P00256· CHANGE ORDER | 2020-01-30 | +$7,000 | $24,264,616 | CO BOOSTER PUMP INSTALLATION |
| Mod P00257· CHANGE ORDER | 2020-02-04 | +$20,000 | $24,284,616 | CO SWITCHBOARD FEEDER REVISION FROM 50A TO 225A |
| Mod P00244· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-02-11 | +$7,310 | $24,291,926 | REMOVE AND INSTALL FLOOR (CPE 330) |
| Mod P00260· CHANGE ORDER | 2020-02-11 | +$2,100 | $24,294,026 | CPE 344 AND 345 - DRYWALL AND ADDITIONAL DOOR CLOSERS AT 2ND FLOOR RESTROOMS |
| Mod P00248· CHANGE ORDER | 2020-02-12 | +$120,000 | $24,414,026 | P00248 CPE 293 AUDIO BOOTH PROCUREMENT AND INSTALL |
| Mod P00258· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-02-12 | +$1,040 | $24,415,066 | CPE 341, LIGHT FIXTURE DELIVERY |
| Mod P00259· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-02-12 | +$9,600 | $24,424,666 | SA ASBESTOS PHASE 5 |
| Mod P00261· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-02-25 | +$9,095 | $24,433,761 | CPE 344&345, DRYWALL AND ADDITIONAL DOOR CLOSERS AT 2ND FLOOR RESTROOMS |
| Mod P00262· CHANGE ORDER | 2020-02-26 | +$3,000 | $24,436,761 | LASER ROOM CHANGES |
| Mod P00233· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-03-04 | +$14,950 | $24,451,711 | CPE 309 F4W LIGHT FIXTURE SUBSTITUTION |
| Mod P00264· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-03-09 | +$7,360 | $24,459,071 | CPE 322 CLEANOUTS AND VARIOUS PLUMBING REPAIRS |
| Mod P00255· CHANGE ORDER | 2020-03-11 | +$42,900 | $24,501,971 | STEEL BEAM AND UTILITIES DECONFLICTION IN BASEMENT |
| Mod P00225· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-03-20 | +$99,900 | $24,601,871 | DEFINITIZE P00137, PHASE 3 ASBESTOS ABATEMENT, FRAGNET #008 |
| Mod P00242· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-04-01 | +$15,295 | $24,617,166 | ROOF REPAIR", AND CPE 0267 |
| Mod P00265· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-04-01 | +$5,370 | $24,622,536 | CPE 343 - ROOM 2N125 ROLL-UP DOOR FRAMING MODS |
| Mod P00268· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-04-01 | +$9,471 | $24,632,007 | CPE 244 MECHANICAL UTILITIES AT SECOND FLOOR ATRIUM |
| Mod P00267· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-04-10 | +$812,164 | $25,444,171 | BUILDING 126 RENOVATION, LONG BEACH 402, FINAL NEGOTIATED COMPENSABLE TIME PAYMENT |
| Mod P00263· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-04-21 | +$58,000 | $25,502,171 | CPE 339 SWITCHBOARD FEEDER REVISION FROM 50A TO 225A |
| Mod P00273· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-04-21 | −$1,020 | $25,501,151 | DEFINITIZE P00195, ELECTRICAL AND DATA CHANGES FOR AUDIOLOGY SUITE |
| Mod P00274· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-04-21 | +$5,690 | $25,506,841 | CPES 199, 217 CABINETS AND FLOORING |
| Mod P00275· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-05-06 | +$11,590 | $25,518,431 | CPE 342, 350, 358 AND 359 - SAND INFILL, SCAFFOLDING, ACCESS PANEL AND NEW SOFFIT |
| Mod P00276· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-05-06 | +$24,025 | $25,542,456 | CPE 355, 356 AND 360R1 - NEW FLOOR STOPS, OVERHEAD STOP, LEVELING COMPOUND ON UNEVEN FLOOR AND NEW SVT FLOORIN… |
| Mod P00269· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-05-07 | +$215,830 | $25,758,286 | CPE 293R4 DEFINITIZATION OF P00192, P00248 AUDIO BOOTHS, ASI 9 |
| Mod P00277· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-05-07 | +$8,580 | $25,766,866 | CPE 361 STORM DRAIN REPAIR IN BASEMENT |
| Mod P00271· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-05-20 | +$73,000 | $25,839,866 | CPE 346 - DEFINITIZE CO P00256 ADDED BOOSTER PUMP FOR AHU-18 (ASI 010) |
| Mod P00272· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-05-26 | +$0 | $25,839,866 | NO COST TIME EXTENSION FROM MAY 1, 2020 TO MAY 31, 2020 |
| Mod P00279· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-05-28 | +$17,620 | $25,857,486 | CPE 0251, CPE 353&CPE370, PHASE 5 ROOF EXHAUST FAN DISCONNECT, ADD F4W LIGHT FIXTURES AND ADDITIONAL ACM SAMPL… |
| Mod P00282· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-05-28 | +$4,064 | $25,861,550 | CPE 332 AND CPE 337R1 - CEILING REVISIONS AND INSTALL SMART TV IN ROOM 1N109 |
| Mod P00281· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-06-02 | +$10,529 | $25,872,079 | CPES 357, 364 WALL MOUNTED SINK AND AUDIO BOOTH STORAGE |
| Mod P00278· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-06-03 | +$7,120 | $25,879,199 | CPE 363 RELOCATE POWER FOR LASER ROOM 2S144. |
| Mod P00252· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-06-09 | −$3,975 | $25,875,224 | DEFINITIZATION OF CPES 178, 211, 212, 280, 311, 315, AND 320. |
| Mod P00280· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-06-09 | +$10,685 | $25,885,909 | CPE 348R1, 353R2 AND 365, FLOORING CHANGES, TERRAZZO POLISHING AND NEW SMOKE DETECTOR |
| Mod P00253· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-06-17 | +$35,595 | $25,921,504 | VARIOUS TASKING INCLUDED IN CPES 209, 241, 296R2, 304, 314, 316R1, 319, 324 AND 325 |
| Mod P00283· CHANGE ORDER | 2020-06-29 | +$31,660 | $25,953,164 | CPE 362, 366, 367, 368 AND 369 - RELOCATE LIGHT FIXTURE, ADD ELECTRICAL OUTLETS, RELOCATE FIRE ALARM PULL STAT… |
| Mod P00134· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-06-30 | −$64,765 | $25,888,399 | CREDIT FOR DESCOPING BASEMENT CEILING |
| Mod P00285· CHANGE ORDER | 2020-07-01 | +$29,434 | $25,917,833 | VARIOUS CHANGES - CPES 379/382/383/385R1 AND 386 |
| Mod P00286· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-07-08 | +$0 | $25,917,833 | UTILITIES DECONFLICTION |
| Mod P00287· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-07-27 | +$9,475 | $25,927,308 | CPE 349R1, 371, 373 AND 374 VARIOUS TASKING ON WALLS, DAMPER, FIRE EXTINGUISHER ETC. |
| Mod P00284· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-08-20 | +$98,345 | $26,025,653 | CPE 228 AND 274, BARN DOOR HARDWARE AND REPAIR DAMAGED EXPANSION JOINT |
| Mod P00289· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-10-22 | +$92,785 | $26,118,438 | CPE 387 FINAL BOND REIMBURSEMENT |
| Mod P00288· CHANGE ORDER | 2020-12-31 | +$0 | $26,118,438 | EXTEND END DATE TO JANUARY 31, 2021. |
| Mod P00290· OTHER ADMINISTRATIVE ACTION | 2021-02-23 | +$0 | $26,118,438 | EXTEND OBLIGATION END DATE TO SEPTEMBER 30, 2021. |
| Mod P00291· OTHER ADMINISTRATIVE ACTION | 2021-11-16 | −$51,293 | $26,067,145 | EXTEND OBLIGATION END DATE TO NOVEMBER 30, 2021. FINAL DEOBLIGATION OF EXCESS FUNDS AND CONTRACT CLOSEOUT. |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI KU19CNLCK2K7)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C10F26P0007 | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) · Y1DZ · CONSTRUCTION OF OTHER HOSPITAL BUILDINGS | $10,000 | FY2026 |
| 36C10F25C0001 | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) · Y1DZ · CONSTRUCTION OF OTHER HOSPITAL BUILDINGS | $69,636,302 | FY2025 |
| 36C26122C0022 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · Z1DA · MAINTENANCE OF HOSPITALS AND INFIRMARIES | $8,861,096 | FY2022 |
| VA101F16C2610 | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) · Y1DZ · CONSTRUCTION OF OTHER HOSPITAL BUILDINGS | $110,710,165 | FY2016 |
| VA101F14C0003 | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) · Y1DZ · CONSTRUCTION OF OTHER HOSPITAL BUILDINGS | $127,518,496 | FY2014 |
| VA101CFMC0005 | OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT · Y141 · CONSTRUCT/HOSPITALS & INFIRMARIES | $102,428,575 | FY2008 |
Other recipients under Y1DA from OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| 36C10F26C0014 | PROJECT MANAGEMENT SOLUTIONS LLC | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | $2,229,000 | FY2026 |
| 36C10F26C0013 | V&C GENERAL CONTRACTOR LLC | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | $2,518,650 | FY2026 |
| 36C10F23C0007 | WALSH CONSTRUCTION COMPANY II, LLC | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | $215,172,226 | FY2023 |
| 36C10F23N0064 | SSPC LLC | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | $421,407 | FY2023 |
| 36C10F23C0003 | DAV ENERGY SOLUTIONS, INC. | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | $175,181 | FY2023 |