Description
FINAL CLOSEOUT MOD
Base award description: SEISMIC CORRECTIONS BUILDINGS 7 & 126 OUTPATIENT CONSOLIDATION VA MEDICAL CENTER, LONG BEACH, CA
Modification chain · 372 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2008-09-26+$99,997,000= $99,997,000
- Mod CO01A2009-01-23-$9,500= $99,987,500
- Mod CO01B2009-02-20+$6,800= $99,994,300
- Mod CO01C2009-04-07+$1,250= $99,995,550
- Mod CO01CR2009-04-07+$0= $99,995,550
- Mod CO01E2009-04-17-$9,000= $99,986,550
- Mod CO01D2009-04-23-$41,000= $99,945,550
- Mod CO01F2009-04-29+$14,300= $99,959,850
- Mod CO01G2009-04-30+$3,100= $99,962,950
- Mod CO01H2009-05-06+$4,900= $99,967,850
- Mod CO01I2009-05-18+$2,522= $99,970,372
- Mod CO01J2009-05-18+$3,900= $99,974,272
- Mod SA0012009-06-29-$1,620= $99,972,652
- Mod SA0022009-06-29+$4,069= $99,976,721
- Mod SA0032009-06-29+$5,634= $99,982,355
- Mod SA0042009-06-29-$3,339= $99,979,016
- Mod CO01K2009-07-01+$14,100= $99,993,116
- Mod SA0052009-07-31-$61,300= $99,931,816
- Mod CO01L2009-08-31+$4,200= $99,936,016
- Mod CO01M2009-08-31+$5,450= $99,941,466
- Mod CO01N2009-09-11-$97,400= $99,844,066
- Mod CO01O2009-09-15+$8,500= $99,852,566
- Mod SA0062009-09-16+$334= $99,852,900
- Mod CO01P2009-09-29+$30,600= $99,883,500
- Mod SA0072009-09-29+$3,408= $99,886,908
- Mod CO01Q2009-10-06+$8,000= $99,894,908
- Mod SA0082009-10-30+$798= $99,895,706
- Mod SA0092009-10-30-$19,915= $99,875,791
- Mod SA0102009-11-20+$0= $99,875,791
- Mod CO01S2009-11-27-$42,000= $99,833,791
- Mod CO01T2009-11-27-$35,000= $99,798,791
- Mod CO01U2009-11-27+$15,400= $99,814,191
- Mod CO01V2009-11-27-$1,000= $99,813,191
- Mod CO01W2009-11-27-$8,000= $99,805,191
- Mod CO01X2009-12-03+$2,392= $99,807,583
- Mod CO01Y2009-12-03+$3,200= $99,810,783
- Mod SA0112009-12-09+$2,917= $99,813,700
- Mod CO01R2009-12-10-$83,100= $99,730,600
- Mod CO01Z2009-12-15+$20,000= $99,750,600
- Mod SA0122009-12-17+$843= $99,751,443
- Mod CO02A2009-12-22+$31,000= $99,782,443
- Mod CO02B2009-12-28+$0= $99,782,443
- Mod SA0132010-01-19+$8,014= $99,790,457
- Mod CO02C2010-01-25+$8,100= $99,798,557
- Mod SA0142010-01-26-$3,856= $99,794,701
- Mod SA0152010-01-27+$50,250= $99,844,951
- Mod CO02D2010-01-28+$7,300= $99,852,251
- Mod SA0172010-01-29+$1,621= $99,853,872
- Mod SA0182010-02-01+$3,174= $99,857,046
- Mod SA0162010-02-02-$2,050= $99,854,996
- Mod SA0192010-02-11+$7,614= $99,862,610
- Mod CO02E2010-02-17+$14,000= $99,876,610
- Mod TE0012010-02-24+$0= $99,876,610
- Mod CO02F2010-02-26+$7,000= $99,883,610
- Mod SA0212010-03-04+$954= $99,884,564
- Mod SA0232010-03-04+$1,836= $99,886,400
- Mod SA0242010-03-04+$2,502= $99,888,902
- Mod SA0202010-03-10+$7,878= $99,896,780
- Mod SA0222010-03-10+$14,791= $99,911,571
- Mod SA0252010-03-10-$38,270= $99,873,301
- Mod SA0262010-03-19-$10,432= $99,862,869
- Mod CO02G2010-03-22+$10,000= $99,872,869
- Mod CO02H2010-03-22+$4,420= $99,877,289
- Mod SA0272010-03-23+$91,166= $99,968,455
- Mod SA0292010-03-23+$3,575= $99,972,030
- Mod CO02I2010-03-25+$4,200= $99,976,230
- Mod CO02J2010-03-30+$6,500= $99,982,730
- Mod CO02K2010-04-08+$22,400= $100,005,130
- Mod SA0302010-04-12+$16,815= $100,021,945
- Mod CO02M2010-04-13+$22,400= $100,044,345
- Mod SA0322010-04-15+$2,415= $100,046,760
- Mod SA0332010-04-15+$3,861= $100,050,621
- Mod SA0352010-04-16+$648= $100,051,269
- Mod SA0362010-04-16+$3,773= $100,055,042
- Mod SA0372010-04-16+$6,238= $100,061,280
- Mod SA0382010-04-17-$1,260= $100,060,020
- Mod SA0392010-04-17-$4,016= $100,056,004
- Mod SA0342010-04-20-$5,103= $100,050,901
- Mod SA0402010-04-20+$2,833= $100,053,734
- Mod SA0412010-04-27+$11,472= $100,065,206
- Mod SA0422010-04-27+$10,190= $100,075,396
- Mod SA0312010-05-03+$1,033= $100,076,429
- Mod SA0432010-05-03+$25,106= $100,101,535
- Mod SA0442010-05-03+$2,714= $100,104,249
- Mod SA0452010-05-04+$1,394= $100,105,643
- Mod SA0462010-05-04+$18,083= $100,123,726
- Mod SA0472010-05-05+$15,390= $100,139,116
- Mod CO02O2010-05-06+$5,500= $100,144,616
- Mod CO02P2010-05-11+$5,800= $100,150,416
- Mod SA0482010-05-11+$3,905= $100,154,321
- Mod SA0492010-05-13+$5,193= $100,159,514
- Mod SA0502010-05-13+$16,238= $100,175,752
- Mod SA0512010-05-14+$3,539= $100,179,291
- Mod CO02S2010-05-18+$13,000= $100,192,291
- Mod CO02N2010-05-20+$12,800= $100,205,091
- Mod CO02Q2010-05-20+$5,200= $100,210,291
- Mod SA0532010-06-04+$554= $100,210,845
- Mod SA0542010-06-04+$1,093= $100,211,938
- Mod SA0552010-06-08-$2,441= $100,209,497
- Mod SA0562010-06-09+$2,683= $100,212,180
- Mod CO02R2010-06-11+$1,150= $100,213,330
- Mod SA0572010-06-14+$4,240= $100,217,570
- Mod SA0582010-06-14+$102= $100,217,672
- Mod SA0592010-06-14+$43,281= $100,260,953
- Mod SA0602010-06-14+$1,745= $100,262,698
- Mod SA0612010-06-14+$7,026= $100,269,724
- Mod SA0622010-06-15+$10,130= $100,279,854
- Mod SA0632010-06-16+$5,838= $100,285,692
- Mod SA0652010-06-17+$1,700= $100,287,392
- Mod CO02T2010-06-18+$9,000= $100,296,392
- Mod SA0672010-06-29+$35,995= $100,332,387
- Mod SA0682010-06-29-$7,077= $100,325,310
- Mod SA0692010-06-29-$2,145= $100,323,165
- Mod SA0702010-06-29+$1,731= $100,324,896
- Mod SA0712010-06-29+$14,852= $100,339,748
- Mod SA0722010-06-30+$16,617= $100,356,365
- Mod SA0732010-07-01+$4,271= $100,360,636
- Mod CO02U2010-07-09+$37,000= $100,397,636
- Mod SA0282010-07-12+$17,225= $100,414,861
- Mod SA0792010-07-15+$10,150= $100,425,011
- Mod CO02V2010-07-16+$7,300= $100,432,311
- Mod SA0642010-07-16+$3,843= $100,436,154
- Mod SA0742010-07-16+$22,398= $100,458,552
- Mod SA0752010-07-16+$2,651= $100,461,203
- Mod SA0762010-07-16+$1,092= $100,462,295
- Mod SA0772010-07-16+$2,097= $100,464,392
- Mod SA0782010-07-16+$11,086= $100,475,478
- Mod CO02W2010-07-20+$34,000= $100,509,478
- Mod SA0802010-07-20+$44,595= $100,554,073
- Mod SA0812010-07-20+$1,181= $100,555,254
- Mod TE0022010-07-24+$0= $100,555,254
- Mod SA0822010-07-26+$8,489= $100,563,743
- Mod SA0832010-07-26+$3,159= $100,566,902
- Mod SA0842010-07-27+$2,579= $100,569,481
- Mod CO02X2010-07-29+$2,872= $100,572,353
- Mod CO02Y2010-08-04-$6,000= $100,566,353
- Mod CO02Z2010-08-10+$8,500= $100,574,853
- Mod SA0862010-08-11+$10,523= $100,585,376
- Mod SA0872010-08-11+$2,956= $100,588,332
- Mod SA0882010-08-11+$38,770= $100,627,102
- Mod SA0892010-08-11+$4,783= $100,631,885
- Mod SA0902010-08-11+$14,359= $100,646,244
- Mod SA0522010-08-13-$1,164= $100,645,080
- Mod SA0922010-08-17+$1,220= $100,646,300
- Mod SA0852010-08-20+$12,055= $100,658,355
- Mod SA0932010-08-23-$1,199= $100,657,156
- Mod SA0942010-08-23-$16,720= $100,640,436
- Mod CO03A2010-08-25+$11,000= $100,651,436
- Mod SA0912010-08-25+$4,152= $100,655,588
- Mod SA0962010-08-25+$3,051= $100,658,639
- Mod CO03C2010-08-26-$810= $100,657,829
- Mod SA0952010-08-30+$17,389= $100,675,218
- Mod SA0972010-08-30-$3,145= $100,672,073
- Mod SA0982010-08-30-$1,796= $100,670,277
- Mod SA0992010-08-30-$5,100= $100,665,177
- Mod SA1002010-08-30+$1,600= $100,666,777
- Mod SA1012010-08-30+$7,359= $100,674,136
- Mod SA1022010-08-31-$38,027= $100,636,109
- Mod SA0662010-09-02+$1,583= $100,637,692
- Mod SA1032010-09-14-$9,416= $100,628,276
- Mod CO03B2010-09-20+$7,500= $100,635,776
- Mod CO03D2010-09-20+$8,528= $100,644,304
- Mod SA1062010-09-28-$1,228= $100,643,076
- Mod SA1072010-09-28-$1,209= $100,641,867
- Mod SA1082010-09-28-$913= $100,640,954
- Mod SA1092010-09-29+$1,278= $100,642,232
- Mod SA1102010-09-29+$3,354= $100,645,586
- Mod SA1052010-10-05+$21,500= $100,667,086
- Mod SA1112010-10-05+$1,400= $100,668,486
- Mod SA1122010-10-08+$27,517= $100,696,003
- Mod SA1132010-10-08+$16,977= $100,712,980
- Mod SA1042010-10-14+$4,219= $100,717,199
- Mod CO03E2010-10-18+$39,000= $100,756,199
- Mod SA1152010-10-28-$3,465= $100,752,734
- Mod SA1162010-10-28+$61,994= $100,814,728
- Mod CO03G2010-10-29+$1,200= $100,815,928
- Mod SA1172010-10-29+$14,928= $100,830,856
- Mod SA1182010-11-01+$5,965= $100,836,821
- Mod CO03F2010-11-02+$10,000= $100,846,821
- Mod SA1192010-11-04-$5,203= $100,841,618
- Mod SA1202010-11-09+$19,507= $100,861,125
- Mod SA1212010-11-09+$1,827= $100,862,952
- Mod SA1232010-12-06+$11,080= $100,874,032
- Mod SA1252010-12-06+$395= $100,874,427
- Mod SA1242010-12-08+$11,718= $100,886,145
- Mod SA1262010-12-08+$14,522= $100,900,667
- Mod SA1272010-12-08+$1,121= $100,901,788
- Mod SA1222010-12-09+$4,709= $100,906,497
- Mod SA1282010-12-09+$1,216= $100,907,713
- Mod SA1292010-12-09+$38,030= $100,945,743
- Mod SA1312010-12-09+$1,446= $100,947,189
- Mod SA1302010-12-10+$10,841= $100,958,030
- Mod SA1322010-12-10-$203= $100,957,827
- Mod SA1342010-12-10+$16,076= $100,973,903
- Mod SA1352010-12-14-$689= $100,973,214
- Mod SA1362010-12-21-$2,267= $100,970,947
- Mod SA1372010-12-21+$322= $100,971,269
- Mod SA1382010-12-22+$29,082= $101,000,351
- Mod SA1392010-12-22+$1,618= $101,001,969
- Mod SA1402010-12-22+$565= $101,002,534
- Mod SA1412011-01-14+$1,475= $101,004,009
- Mod SA1422011-01-14+$5,855= $101,009,864
- Mod SA1432011-01-18+$3,641= $101,013,505
- Mod SA1442011-01-18+$9,325= $101,022,830
- Mod SA1452011-01-18+$51,098= $101,073,928
- Mod SA1472011-01-18+$2,713= $101,076,641
- Mod SA1462011-01-20+$4,305= $101,080,946
- Mod SA1482011-01-20+$886= $101,081,832
- Mod SA1492011-01-25+$5,838= $101,087,670
- Mod SA1502011-01-25-$1,400= $101,086,270
- Mod SA1512011-01-25+$9,471= $101,095,741
- Mod CO03I2011-01-27+$1,420= $101,097,161
- Mod SA1532011-01-27+$1,000= $101,098,161
- Mod SA1522011-01-31+$5,762= $101,103,923
- Mod SA1552011-01-31+$3,472= $101,107,395
- Mod SA1562011-01-31+$2,608= $101,110,003
- Mod SA1142011-02-01+$3,494= $101,113,497
- Mod SA1542011-02-02-$544= $101,112,953
- Mod SA1572011-02-02+$25,928= $101,138,881
- Mod SA1582011-02-08+$5,094= $101,143,975
- Mod SA1592011-02-08+$2,405= $101,146,380
- Mod SA1612011-02-09+$17,454= $101,163,834
- Mod SA1632011-02-09+$20,994= $101,184,828
- Mod CO03J2011-02-14+$10,000= $101,194,828
- Mod SA1622011-02-14+$6,665= $101,201,493
- Mod SA1642011-02-14+$1,550= $101,203,043
- Mod SA1332011-02-17+$4,844= $101,207,887
- Mod SA1602011-02-17+$56,000= $101,263,887
- Mod SA1652011-02-17+$1,667= $101,265,554
- Mod CO03K2011-02-28+$48,500= $101,314,054
- Mod TE0032011-02-28+$0= $101,314,054
- Mod SA1672011-03-01-$10,000= $101,304,054
- Mod SA1692011-03-01+$45,388= $101,349,442
- Mod SA1702011-03-01+$10,212= $101,359,654
- Mod SA1712011-03-09+$10,500= $101,370,154
- Mod SA1682011-03-10+$10,000= $101,380,154
- Mod SA1732011-03-10-$4,500= $101,375,654
- Mod CO03M2011-03-14+$20,000= $101,395,654
- Mod SA1662011-03-14-$10,000= $101,385,654
- Mod SA1722011-03-14+$808= $101,386,462
- Mod SA1742011-03-14+$665= $101,387,127
- Mod CO03N2011-03-15+$20,400= $101,407,527
- Mod SA1752011-03-17+$7,740= $101,415,267
- Mod SA1762011-03-17+$3,204= $101,418,471
- Mod SA1772011-03-21+$9,000= $101,427,471
- Mod SA1782011-03-23+$4,919= $101,432,390
- Mod SA1792011-03-23+$4,491= $101,436,881
- Mod SA1802011-03-23+$6,000= $101,442,881
- Mod SA1812011-03-28+$1,780= $101,444,661
- Mod CO03L2011-03-30+$16,300= $101,460,961
- Mod CO03O2011-03-30+$2,000= $101,462,961
- Mod SA1822011-03-30+$4,153= $101,467,114
- Mod SA1832011-03-30+$1,668= $101,468,782
- Mod SA1842011-03-30+$3,750= $101,472,532
- Mod SA1852011-04-06+$950= $101,473,482
- Mod SA1862011-04-06+$905= $101,474,387
- Mod SA1872011-04-08+$8,055= $101,482,442
- Mod SA1882011-04-08+$2,903= $101,485,345
- Mod TE0042011-04-13+$0= $101,485,345
- Mod CO03P2011-04-14+$8,400= $101,493,745
- Mod SA1892011-04-14+$3,400= $101,497,145
- Mod SA1902011-04-14+$4,906= $101,502,051
- Mod SA1912011-04-18+$2,554= $101,504,605
- Mod SA1922011-04-18+$3,626= $101,508,231
- Mod CO03H2011-04-19+$23,000= $101,531,231
- Mod CO03Q2011-04-26+$16,000= $101,547,231
- Mod SA1932011-04-27+$1,607= $101,548,838
- Mod SA1952011-04-29+$9,693= $101,558,531
- Mod SA1962011-05-03+$41,847= $101,600,378
- Mod SA1972011-05-03+$36,153= $101,636,531
- Mod SA1982011-05-03+$2,399= $101,638,930
- Mod SA1942011-05-05+$525= $101,639,455
- Mod SA1992011-05-11+$10,599= $101,650,054
- Mod CO03S2011-06-07+$1,750= $101,651,804
- Mod SA2002011-06-07-$608= $101,651,196
- Mod CO03T2011-06-17+$7,400= $101,658,596
- Mod SA2012011-06-23+$3,707= $101,662,303
- Mod SA2022011-06-23+$8,399= $101,670,702
- Mod CO03R2011-06-30+$828= $101,671,530
- Mod SA2032011-06-30+$4,911= $101,676,441
- Mod SA2042011-06-30-$4,522= $101,671,919
- Mod SA2052011-06-30+$910= $101,672,829
- Mod CO03U2011-07-08+$12,400= $101,685,229
- Mod CO03V2011-07-14+$13,400= $101,698,629
- Mod CO03W2011-07-15+$40,000= $101,738,629
- Mod SA2112011-07-20+$12,661= $101,751,290
- Mod SA2122011-07-20+$9,309= $101,760,599
- Mod SA2072011-07-22+$7,044= $101,767,643
- Mod SA2082011-07-22+$3,334= $101,770,977
- Mod SA2092011-07-22-$4,273= $101,766,704
- Mod SA2102011-07-22+$24,728= $101,791,432
- Mod CO03X2011-08-12+$4,400= $101,795,832
- Mod SA2132011-08-18+$1,795= $101,797,627
- Mod SA2142011-08-25+$2,928= $101,800,555
- Mod SA2152011-08-30+$14,267= $101,814,822
- Mod SA2162011-08-30+$58,486= $101,873,308
- Mod SA2172011-08-30+$1,669= $101,874,977
- Mod SA2182011-08-31-$92,510= $101,782,467
- Mod SA2192011-08-31+$71,745= $101,854,212
- Mod SA2212011-08-31+$46,598= $101,900,810
- Mod SA2222011-09-02+$1,573= $101,902,383
- Mod SA2232011-09-02+$2,294= $101,904,677
- Mod SA2202011-09-14+$67= $101,904,744
- Mod CO03Y2011-09-20+$5,700= $101,910,444
- Mod SA2242011-09-20+$2,363= $101,912,807
- Mod SA2062011-09-21+$44,450= $101,957,257
- Mod SA2252011-09-27+$5,955= $101,963,212
- Mod SA2262011-09-28+$25,698= $101,988,910
- Mod CO03Z2011-09-29+$5,355= $101,994,265
- Mod SA2292011-10-18+$2,099= $101,996,364
- Mod SA2302011-10-18+$23,166= $102,019,530
- Mod SA2312011-10-18+$4,392= $102,023,922
- Mod SA2272011-10-20+$3,788= $102,027,710
- Mod SA2282011-10-20+$8,690= $102,036,400
- Mod SA2322011-10-20+$4,340= $102,040,740
- Mod SA2332011-10-28+$5,822= $102,046,562
- Mod SA2342011-10-28+$32,132= $102,078,694
- Mod SA2352011-10-28+$2,475= $102,081,169
- Mod SA2362011-10-28+$2,422= $102,083,591
- Mod SA2372011-11-07+$5,142= $102,088,733
- Mod SA2382011-11-07+$9,381= $102,098,114
- Mod SA2392011-11-07+$4,789= $102,102,903
- Mod SA2402011-11-08+$1,511= $102,104,414
- Mod SA2422011-11-08+$1,240= $102,105,654
- Mod SA2412011-11-16+$2,503= $102,108,157
- Mod SA2432011-11-16+$11,965= $102,120,122
- Mod SA2442011-11-16+$8,992= $102,129,114
- Mod SA2452011-11-16+$20,441= $102,149,555
- Mod SA2462011-11-30+$2,341= $102,151,896
- Mod SA2472011-11-30+$2,398= $102,154,294
- Mod SA2482011-12-01+$3,247= $102,157,541
- Mod SA2492011-12-01-$4,016= $102,153,525
- Mod SA2502011-12-02+$2,842= $102,156,367
- Mod SA2512011-12-08-$12,126= $102,144,241
- Mod SA2522011-12-09-$5,614= $102,138,627
- Mod SA2532011-12-09+$4,979= $102,143,606
- Mod SA2542011-12-12+$16,775= $102,160,381
- Mod SA2552011-12-21+$1,002= $102,161,383
- Mod SA2562012-01-06+$6,380= $102,167,763
- Mod SA2572012-01-06+$3,521= $102,171,284
- Mod SA2582012-01-06+$4,720= $102,176,004
- Mod SA2592012-01-06+$5,065= $102,181,069
- Mod SA2602012-01-06+$1,603= $102,182,672
- Mod SA2612012-01-06+$31,807= $102,214,479
- Mod SA2622012-01-06+$4,607= $102,219,086
- Mod SA2632012-01-06+$1,510= $102,220,596
- Mod SA2652012-01-06+$2,862= $102,223,458
- Mod SA2672012-01-06+$2,848= $102,226,306
- Mod SA2682012-01-18-$8,080= $102,218,226
- Mod SA2642012-01-20+$9,123= $102,227,349
- Mod SA2692012-01-25+$1,044= $102,228,393
- Mod SA2702012-01-25-$19,172= $102,209,221
- Mod SA2712012-01-31+$5,000= $102,214,221
- Mod SA2722012-02-03+$21,334= $102,235,555
- Mod SA2742012-02-10-$12,129= $102,223,426
- Mod SA2752012-03-01+$11,291= $102,234,717
- Mod SA2662012-03-09-$129,780= $102,104,937
- Mod SA2772012-03-22+$5,308= $102,110,245
- Mod SA2802012-03-22+$2,758= $102,113,003
- Mod SA2762012-03-23-$3,172= $102,109,831
- Mod SA2782012-03-23+$11,181= $102,121,012
- Mod SA2792012-03-23+$3,281= $102,124,293
- Mod SA2732012-04-03+$97,364= $102,221,657
- Mod SA2822012-04-18+$20,201= $102,241,858
- Mod SA2832012-04-25+$11,478= $102,253,336
- Mod SA2842012-05-25+$2,668= $102,256,004
- Mod SA2852012-05-25+$10,953= $102,266,957
- Mod SA2812012-06-18+$35,515= $102,302,472
- Mod SA2862012-06-18+$15,071= $102,317,543
- Mod SA2872012-06-27+$9,942= $102,327,485
- Mod P000012012-12-18+$57,461= $102,384,946
- Mod P000022013-12-05+$43,629= $102,428,575
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2008-09-26 | +$99,997,000 | $99,997,000 | SEISMIC CORRECTIONS BUILDINGS 7 & 126 OUTPATIENT CONSOLIDATION VA MEDICAL CENTER, LONG BEACH, CA |
| Mod CO01A· CHANGE ORDER | 2009-01-23 | −$9,500 | $99,987,500 | SEISMIC CORRECTIONS BUILDINGS 7 & 126 OUTPATIENT CONSOLIDATION VA MEDICAL CENTER, LONG BEACH, CA |
| Mod CO01B· CHANGE ORDER | 2009-02-20 | +$6,800 | $99,994,300 | SEISMIC CORRECTIONS BUILDINGS 7 & 126 OUTPATIENT CONSOLIDATION VA MEDICAL CENTER, LONG BEACH, CA |
| Mod CO01C· CHANGE ORDER | 2009-04-07 | +$1,250 | $99,995,550 | SEISMIC CORRECTIONS BUILDINGS 7 & 126 OUTPATIENT CONSOLIDATION VA MEDICAL CENTER, LONG BEACH, CA |
| Mod CO01CR· CHANGE ORDER | 2009-04-07 | +$0 | $99,995,550 | SEISMIC CORRECTIONS BUILDINGS 7 & 126 OUTPATIENT CONSOLIDATION VA MEDICAL CENTER, LONG BEACH, CA |
| Mod CO01E· CHANGE ORDER | 2009-04-17 | −$9,000 | $99,986,550 | SEISMIC CORRECTIONS BUILDINGS 7 & 126 OUTPATIENT CONSOLIDATION VA MEDICAL CENTER, LONG BEACH, CA |
| Mod CO01D· CHANGE ORDER | 2009-04-23 | −$41,000 | $99,945,550 | SEISMIC CORRECTIONS BUILDINGS 7 & 126 OUTPATIENT CONSOLIDATION VA MEDICAL CENTER, LONG BEACH, CA |
| Mod CO01F· CHANGE ORDER | 2009-04-29 | +$14,300 | $99,959,850 | SEISMIC CORRECTIONS BUILDINGS 7 & 126 OUTPATIENT CONSOLIDATION VA MEDICAL CENTER, LONG BEACH, CA |
| Mod CO01G· CHANGE ORDER | 2009-04-30 | +$3,100 | $99,962,950 | SEISMIC CORRECTIONS BUILDINGS 7 & 126 OUTPATIENT CONSOLIDATION VA MEDICAL CENTER, LONG BEACH, CA |
| Mod CO01H· CHANGE ORDER | 2009-05-06 | +$4,900 | $99,967,850 | SEISMIC CORRECTIONS BUILDINGS 7 & 126 OUTPATIENT CONSOLIDATION VA MEDICAL CENTER, LONG BEACH, CA |
| Mod CO01I· CHANGE ORDER | 2009-05-18 | +$2,522 | $99,970,372 | SEISMIC CORRECTIONS BUILDINGS 7 & 126 OUTPATIENT CONSOLIDATION VA MEDICAL CENTER, LONG BEACH, CA |
| Mod CO01J· CHANGE ORDER | 2009-05-18 | +$3,900 | $99,974,272 | SEISMIC CORRECTIONS BUILDINGS 7 & 126 OUTPATIENT CONSOLIDATION VA MEDICAL CENTER, LONG BEACH, CA |
| Mod SA001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-06-29 | −$1,620 | $99,972,652 | SEISMIC CORRECTIONS BUILDINGS 7 & 126 OUTPATIENT CONSOLIDATION VA MEDICAL CENTER, LONG BEACH, CA |
| Mod SA002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-06-29 | +$4,069 | $99,976,721 | SEISMIC CORRECTIONS BUILDINGS 7 & 126 OUTPATIENT CONSOLIDATION VA MEDICAL CENTER, LONG BEACH, CA |
| Mod SA003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-06-29 | +$5,634 | $99,982,355 | SEISMIC CORRECTIONS BUILDINGS 7 & 126 OUTPATIENT CONSOLIDATION VA MEDICAL CENTER, LONG BEACH, CA |
| Mod SA004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-06-29 | −$3,339 | $99,979,016 | SEISMIC CORRECTIONS BUILDINGS 7 & 126 OUTPATIENT CONSOLIDATION VA MEDICAL CENTER, LONG BEACH, CA |
| Mod CO01K· CHANGE ORDER | 2009-07-01 | +$14,100 | $99,993,116 | SEISMIC CORRECTIONS BUILDINGS 7 & 126 OUTPATIENT CONSOLIDATION VA MEDICAL CENTER, LONG BEACH, CA |
| Mod SA005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-07-31 | −$61,300 | $99,931,816 | SEISMIC CORRECTIONS BUILDINGS 7 & 126 OUTPATIENT CONSOLIDATION VA MEDICAL CENTER, LONG BEACH, CA |
| Mod CO01L· CHANGE ORDER | 2009-08-31 | +$4,200 | $99,936,016 | SEISMIC CORRECTIONS BUILDINGS 7 & 126 OUTPATIENT CONSOLIDATION VA MEDICAL CENTER, LONG BEACH, CA |
| Mod CO01M· CHANGE ORDER | 2009-08-31 | +$5,450 | $99,941,466 | SEISMIC CORRECTIONS BUILDINGS 7 & 126 OUTPATIENT CONSOLIDATION VA MEDICAL CENTER, LONG BEACH, CA |
| Mod CO01N· CHANGE ORDER | 2009-09-11 | −$97,400 | $99,844,066 | SEISMIC CORRECTIONS BUILDINGS 7 & 126 OUTPATIENT CONSOLIDATION VA MEDICAL CENTER, LONG BEACH, CA |
| Mod CO01O· CHANGE ORDER | 2009-09-15 | +$8,500 | $99,852,566 | SEISMIC CORRECTIONS BUILDINGS 7 & 126 OUTPATIENT CONSOLIDATION VA MEDICAL CENTER, LONG BEACH, CA |
| Mod SA006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-09-16 | +$334 | $99,852,900 | SEISMIC CORRECTIONS BUILDINGS 7 & 126 OUTPATIENT CONSOLIDATION VA MEDICAL CENTER, LONG BEACH, CA |
| Mod CO01P· CHANGE ORDER | 2009-09-29 | +$30,600 | $99,883,500 | SEISMIC CORRECTIONS BUILDINGS 7 & 126 OUTPATIENT CONSOLIDATION VA MEDICAL CENTER, LONG BEACH, CA |
| Mod SA007· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-09-29 | +$3,408 | $99,886,908 | SEISMIC CORRECTIONS BUILDINGS 7 & 126 OUTPATIENT CONSOLIDATION VA MEDICAL CENTER, LONG BEACH, CA |
| Mod CO01Q· CHANGE ORDER | 2009-10-06 | +$8,000 | $99,894,908 | SEISMIC CORRECTIONS BUILDINGS 7 & 126 OUTPATIENT CONSOLIDATION VA MEDICAL CENTER, LONG BEACH, CA |
| Mod SA008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-10-30 | +$798 | $99,895,706 | SEISMIC CORRECTIONS BUILDINGS 7 & 126 OUTPATIENT CONSOLIDATION VA MEDICAL CENTER, LONG BEACH, CA |
| Mod SA009· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-10-30 | −$19,915 | $99,875,791 | SEISMIC CORRECTIONS BUILDINGS 7 & 126 OUTPATIENT CONSOLIDATION VA MEDICAL CENTER, LONG BEACH, CA |
| Mod SA010· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-11-20 | +$0 | $99,875,791 | SEISMIC CORRECTIONS BUILDINGS 7 & 126 OUTPATIENT CONSOLIDATION VA MEDICAL CENTER, LONG BEACH, CA |
| Mod CO01S· CHANGE ORDER | 2009-11-27 | −$42,000 | $99,833,791 | SEISMIC CORRECTIONS BUILDINGS 7 & 126 OUTPATIENT CONSOLIDATION VA MEDICAL CENTER, LONG BEACH, CA |
| Mod CO01T· CHANGE ORDER | 2009-11-27 | −$35,000 | $99,798,791 | SEISMIC CORRECTIONS BUILDINGS 7 & 126 OUTPATIENT CONSOLIDATION VA MEDICAL CENTER, LONG BEACH, CA |
| Mod CO01U· CHANGE ORDER | 2009-11-27 | +$15,400 | $99,814,191 | SEISMIC CORRECTIONS BUILDINGS 7 & 126 OUTPATIENT CONSOLIDATION VA MEDICAL CENTER, LONG BEACH, CA |
| Mod CO01V· CHANGE ORDER | 2009-11-27 | −$1,000 | $99,813,191 | SEISMIC CORRECTIONS BUILDINGS 7 & 126 OUTPATIENT CONSOLIDATION VA MEDICAL CENTER, LONG BEACH, CA |
| Mod CO01W· CHANGE ORDER | 2009-11-27 | −$8,000 | $99,805,191 | SEISMIC CORRECTIONS BUILDINGS 7 & 126 OUTPATIENT CONSOLIDATION VA MEDICAL CENTER, LONG BEACH, CA |
| Mod CO01X· CHANGE ORDER | 2009-12-03 | +$2,392 | $99,807,583 | SEISMIC CORRECTIONS BUILDINGS 7 & 126 OUTPATIENT CONSOLIDATION VA MEDICAL CENTER, LONG BEACH, CA |
| Mod CO01Y· CHANGE ORDER | 2009-12-03 | +$3,200 | $99,810,783 | SEISMIC CORRECTIONS BUILDINGS 7 & 126 OUTPATIENT CONSOLIDATION VA MEDICAL CENTER, LONG BEACH, CA |
| Mod SA011· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-12-09 | +$2,917 | $99,813,700 | SEISMIC CORRECTIONS BUILDINGS 7 & 126 OUTPATIENT CONSOLIDATION VA MEDICAL CENTER, LONG BEACH, CA |
| Mod CO01R· CHANGE ORDER | 2009-12-10 | −$83,100 | $99,730,600 | SEISMIC CORRECTIONS BUILDINGS 7 & 126 OUTPATIENT CONSOLIDATION VA MEDICAL CENTER, LONG BEACH, CA |
| Mod CO01Z· CHANGE ORDER | 2009-12-15 | +$20,000 | $99,750,600 | SEISMIC CORRECTIONS BUILDINGS 7 & 126 OUTPATIENT CONSOLIDATION VA MEDICAL CENTER, LONG BEACH, CA |
| Mod SA012· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-12-17 | +$843 | $99,751,443 | SEISMIC CORRECTIONS BUILDINGS 7 & 126 OUTPATIENT CONSOLIDATION VA MEDICAL CENTER, LONG BEACH, CA |
| Mod CO02A· CHANGE ORDER | 2009-12-22 | +$31,000 | $99,782,443 | SEISMIC CORRECTIONS BUILDINGS 7 & 126 OUTPATIENT CONSOLIDATION VA MEDICAL CENTER, LONG BEACH, CA |
| Mod CO02B· CHANGE ORDER | 2009-12-28 | +$0 | $99,782,443 | SEISMIC CORRECTIONS BUILDINGS 7 & 126 OUTPATIENT CONSOLIDATION VA MEDICAL CENTER, LONG BEACH, CA |
| Mod SA013· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-01-19 | +$8,014 | $99,790,457 | REVISE THE SHOP DRAWINGS INCLUDING PLANS, SECTIONS, ELEVATIONS AND DETAILS AND REPRODUCE A NEW SET(S) NECESSAR… |
| Mod CO02C· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-01-25 | +$8,100 | $99,798,557 | A PASS THRU IS REQUIRED BETWEEN IV PREP AND THE ADJACENT ANTE ROOM IN BUILDING 164A. |
| Mod SA014· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-01-26 | −$3,856 | $99,794,701 | THE DELETION OF WATER COOLERS IN BASEMENT OF B165E IN CORRIDOR OUTSIDE STAIRS C001 AND C002. WATER COOLERS IN… |
| Mod SA015· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-01-27 | +$50,250 | $99,844,951 | ADD ELECTRIACL AND PLUMBING THAT WERE OMMITED IN THE ORIGINAL CONTRACT DOCUMENTS. ADDITIONALLY, UNFORSEEN SIT… |
| Mod CO02D· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-01-28 | +$7,300 | $99,852,251 | ELECTRICAL ROUGH-IN WAS NOT SHOWN IN THE CONTRACT DOCUMENTS FOR THE OWNER-FURNISHED/OWNER-INSTALLED X-RAY EQUI… |
| Mod SA017· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-01-29 | +$1,621 | $99,853,872 | DETAILING WORK AS NEEDED TO REVISE DOUBLE ANGLE LENGTH AND TO REVISE NO PAINT AREA, WHERE THE MOVED DOUBLE ANG… |
| Mod SA018· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-02-01 | +$3,174 | $99,857,046 | PROVIDE DIMMING BALLAST COMPATIBLE WITH LFD TYPE LIGHT FIXTURES IN BLDG 166G GRIDS F/7 AS SHOWN ON SKETCH SKE-… |
| Mod SA016· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-02-02 | −$2,050 | $99,854,996 | DELETE THE TWO FIRE SMOKE DAMPERS AND CHANGE FIRE RATING OF DOORS FROM 45 MINUTES TO 1 HOUR OF BUILDING 165E R… |
| Mod SA019· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-02-11 | +$7,614 | $99,862,610 | PAYMENT FOR 50% OF THE COSTS FOR PARTNERING MEETINGS HELD OCTOBER 27, 2009 AND DECEMBER 8, 2009. |
| Mod CO02E· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-02-17 | +$14,000 | $99,876,610 | ADD HSS SUPPORTS AT WEST SIDE OF B165C, 1ST FLOOR, TO SUPPORT BOTTOM OF STRIP WINDOWS, AS THIS WAS NOT INCLUDE… |
| Mod TE001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-02-24 | +$0 | $99,876,610 | DUE TO UNUSUALLY SEVERE WEATHER (EXCESSIVE RAINFALL) IN JANUARY 2010, IT HAS BEEN DETERMINED THAT THE CONTRACT… |
| Mod CO02F· CHANGE ORDER | 2010-02-26 | +$7,000 | $99,883,610 | MINOR REVISIONS TO THE LAYOUT IN THE EMERGENCY ROOM WERE DETERMINED NECESSARY BY THE USERS TO IMPROVE EFFICIEN… |
| Mod SA021· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-03-04 | +$954 | $99,884,564 | ADDITIONAL STEEL AND CONCRETE WAS REQUIRED AT B165E TO SUPPORT THE CANTILEVER OF THE 2ND FLOOR BALCONY. |
| Mod SA023· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-03-04 | +$1,836 | $99,886,400 | REVISE WALLS TYPES AT B164A AND B166G TO ENCLOSE PIPING BASED ON ARCHITECT RECOMMEDATIONS. |
| Mod SA024· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-03-04 | +$2,502 | $99,888,902 | MECHANICAL, ELECTRICAL AND PLUMBING CHANGES RESULTING FROM DESIGN ERRORS IN THE ORIGINAL CONTRACT DOCUMENTS. |
| Mod SA020· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-03-10 | +$7,878 | $99,896,780 | REVISE SIZE OF OX PIPE FROM 3/4" TO 1" TO MATCH RISER VS PLAN, AND REVISE ROUTING OF MED GAS SERVICES DUE TO L… |
| Mod SA022· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-03-10 | +$14,791 | $99,911,571 | BASED ON RECOMMENDATIONS FROM THE ARCHITECT, WALLS TYPES ARE BEING REVISED TO BETTER SUPPORT THE AREAS. |
| Mod SA025· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-03-10 | −$38,270 | $99,873,301 | REROUTING OF B164 12 KV PRIMARY FEEDER CABLE, COAXIAL CABLE AND CONDUITS FROM ORIGINAL LOCATION REFLECTED ON T… |
| Mod SA026· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-03-19 | −$10,432 | $99,862,869 | TO ENSURE THAT FINISHES MATCH THE COLOR SCHEME OF THE MEDICAL CENTER, MATERIALS ARE BEING REVISED PER THE REQU… |
| Mod CO02G· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-03-22 | +$10,000 | $99,872,869 | MINOR REVISIONS TO THE LAYOUT IN THE EMERGENCY ROOM WERE DETERMINED NECESSARY BY THE USERS TO IMPROVE EFFICIEN… |
| Mod CO02H· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-03-22 | +$4,420 | $99,877,289 | RELOCATE 2 FIRE ALARM CONTROL PANELS AND 3 POWER SUPPLY PER REQUEST OF VA FACILITY DUE TO SECURITY REQUIREMENT… |
| Mod SA027· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-03-23 | +$91,166 | $99,968,455 | AE FAILED TO SHOW CASEWORK IN ALL LOCATIONS ON THE CONTRACT DOCUMENTS. |
| Mod SA029· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-03-23 | +$3,575 | $99,972,030 | A/E CHANGES TO CONTRACT DRAWINGS AS REVISED PER RFI-0435 (REVISION TO DRAWING SHEETS 164-AS1.20, 165-AS1.20, A… |
| Mod CO02I· CHANGE ORDER | 2010-03-25 | +$4,200 | $99,976,230 | LOBBY C100 OF BUILDING 165-C AND LOBBY F170 OF BUILDING 166-F, FLAT BEAMS ONLY ALLOW 7-3/4" GAP BETWEEN SLAB… |
| Mod CO02J· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-03-30 | +$6,500 | $99,982,730 | PER REQUEST OF THE MEDICAL CENTER, CASEWORK IN PHARMACY IS NOT BEING INSTALLED TO ALLOW FOR INSTALLATION OF MC… |
| Mod CO02K· CHANGE ORDER | 2010-04-08 | +$22,400 | $100,005,130 | COORDINATE ELEVATOR FINISHES WITH SPECIFICATIONS AND DRAWINGS AS REQUIRED BY THE A/E. |
| Mod SA030· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-04-12 | +$16,815 | $100,021,945 | A/E CHANGES TO CONTRACT DRAWINGS AS REVISED PER SUBMITTAL 03300-14 AND RFI-0418, SUBMITTAL 03300-11, 0300-17,… |
| Mod CO02M· CHANGE ORDER | 2010-04-13 | +$22,400 | $100,044,345 | PROVIDE CEILING AND FLOOR SUPPORT SYSTEM FOR X-RAY EQUIPMENT BEING INSTALLED IN B164A. EQUIPMENT WAS NOT DETE… |
| Mod SA032· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-04-15 | +$2,415 | $100,046,760 | PER RECOMMENDATION OF THE ARCHITECT, CHANGE TYPE OF KICK PLATES UNDER HARDWARE SET #203 FOR 126-007,165-136… |
| Mod SA033· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-04-15 | +$3,861 | $100,050,621 | POTHOLE ON THE EAST SIDE OF BLDG #8 TO DETERMINE THE EXTENT OF EXISTING CHILL WATER LINES. |
| Mod SA035· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-04-16 | +$648 | $100,051,269 | REVISE COLOR OF COILING COUNTER FIRE DOOR TO MATCH THE GRID CEILING IN DISPENSING ROOM 136 OF BUILDING 164A PE… |
| Mod SA036· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-04-16 | +$3,773 | $100,055,042 | PROVIDE TRAP PRIMER PIPING FOR 4" HUB DRAIN IN BLDG 164A IN ROOM 159. |
| Mod SA037· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-04-16 | +$6,238 | $100,061,280 | REVISE SIZES AND LOCATION OF ENTRY FLOOR MATS IN BLDG # 126, 164B, 165 AND 166, PER THE ARCHITECT'S RECOMMENDA… |
| Mod SA038· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-04-17 | −$1,260 | $100,060,020 | A PASS THRU IS REQUIRED BETWEEN IV PREP AND THE ADJACENT ANTE ROOM IN BUILDING 164A. |
| Mod SA039· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-04-17 | −$4,016 | $100,056,004 | DELETING HANDRAILS IN BLDG.165C, CORRIDOR C002, THAT ARE NOT NECESSARY PER RECOMMENDATIONS OF THE ARCHITECT. |
| Mod SA034· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-04-20 | −$5,103 | $100,050,901 | DELETE HANDRAILS IN DOOR ALCOVES OF BUILDING 165C AND BUILDING 166F AS PER A/E'S RECOMMENDATION. |
| Mod SA040· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-04-20 | +$2,833 | $100,053,734 | DEMOLITION OF A WALL THAT WAS NOT SHOWN ON THE EXISTING SURVEY OR DEMO DRAWINGS. |
| Mod SA041· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-04-27 | +$11,472 | $100,065,206 | PROVIDE ADDITIONAL LIGHT SWITCHES, TEL/DATA AND ELECTRIC JUNCTION BOX FOR THE PATIENT HEADWALL SYSTEM DUE TO A… |
| Mod SA042· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-04-27 | +$10,190 | $100,075,396 | A/E CHANGES TO THE CONTRACT DRAWINGS DUE TO LACK OF STEEL DETAILS AND ARCHITECTURAL DETAILS FOR THE WINDOW AND… |
| Mod SA031· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-05-03 | +$1,033 | $100,076,429 | REPAIR AND REPLACE WALKWAY DELINEATORS DAMAGED BY VA EMPLOYEES AND VISITORS USING THE ROADWAY AND PARKING LOT. |
| Mod SA043· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-05-03 | +$25,106 | $100,101,535 | THE A/E CHANGED THE ORIGINAL CONTRACT DOCUMENT DIMENSIONS, ADDED ADDITIONAL STRUCTURAL STEEL, AND REVISED SIZE… |
| Mod SA044· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-05-03 | +$2,714 | $100,104,249 | COORDINATE ELEVATOR FINISHES WITH SPECIFICATIONS AND DRAWINGS AS REQUIRED BY THE A/E. |
| Mod SA045· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-05-04 | +$1,394 | $100,105,643 | A/E CHANGED THE ORIGINAL CONTRACT DOCUMENT DIMENSIONS, ADDED ADDITIONAL DIMENSION LENGTHS FROM THE NORTH FACE… |
| Mod SA046· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-05-04 | +$18,083 | $100,123,726 | A/E CHANGED THE ORIGINAL CONTRACT DOCUMENT DIMENSIONS, ADDED ADDITIONAL STRUCTURAL STEEL, AND REVISED SIZES OF… |
| Mod SA047· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-05-05 | +$15,390 | $100,139,116 | A/E CHANGED THE ORIGINAL CONTRACT DOCUMENT DIMENSIONS, ADDED ADDITIONAL STRUCTURAL STEEL, AND REVISED SIZES OF… |
| Mod CO02O· CHANGE ORDER | 2010-05-06 | +$5,500 | $100,144,616 | MOVE THE BACK FLOW PREVENTER OUT OF THE SIDEWALK AS CURRENTLY INDICATED ON CONTRACT DOCUMENTS. |
| Mod CO02P· CHANGE ORDER | 2010-05-11 | +$5,800 | $100,150,416 | PROVIDE POWER FOR COFFEE SHOP IN BUILDING 165E AS REQUESTED BY THE MEDICAL CENTER. |
| Mod SA048· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-05-11 | +$3,905 | $100,154,321 | AN EXISTING 8" WATER LINE WAS FOUND TO BE LOCATED DIRECTLY OVER THE SITE OF A NEW STORM DRAIN REQUIRING ITS RE… |
| Mod SA049· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-05-13 | +$5,193 | $100,159,514 | ENLARGE MULLION FOR THE STOREFRONT SYSTEM PER REVISIONS BY THE AE DURING SHOP DRAWING REVIEW. |
| Mod SA050· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-05-13 | +$16,238 | $100,175,752 | CHANGE HARDWARE SETS AND DOOR SIZE IN B165D, ROOMS D101, D104 AND D105 TO MEET THE LIFE SAFETY CODE. |
| Mod SA051· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-05-14 | +$3,539 | $100,179,291 | ADD FIVE (5) F7 TYPE LIGHT FIXTURES ON THE 2ND FLOOR OF BUILDING 165C TO ILLUMINATE EACH DOOR ENTRY ALCOVES OF… |
| Mod CO02S· CHANGE ORDER | 2010-05-18 | +$13,000 | $100,192,291 | A VAULT DOOR IS BEING ADDED AT THE PHARMACY NARCOTICS ROOM TO COMPLY WITH VA HANDBOOK 0730/1 SECURITY AND LAW… |
| Mod CO02N· CHANGE ORDER | 2010-05-20 | +$12,800 | $100,205,091 | AT THE REQUEST OF THE MEDICAL CENTER DIRECTOR, ADDED DATA AND POWER, DELETING CASEWORK IN PHARMACY |
| Mod CO02Q· CHANGE ORDER | 2010-05-20 | +$5,200 | $100,210,291 | AT THE REQUEST OF THE MEDICAL CENTER, REVISIONS TO WALLS IN THE CANTEEN OFFICE ARE BEING IMPLEMENTED. |
| Mod SA053· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-06-04 | +$554 | $100,210,845 | A/E CHANGED THE ORIGINAL CONTRACT DOCUMENT DIMENSIONS, ADDED ADDITIONAL TUBE STEEL WORK SUPPORTS ON THE WEST E… |
| Mod SA054· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-06-04 | +$1,093 | $100,211,938 | A/E CHANGES TO CONTRACT DRAWINGS AS REVISED PER RFI-0563 (REVISION TO CONTRACT DRAWINGS 164-SS107, AND SUBMITT… |
| Mod SA055· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-06-08 | −$2,441 | $100,209,497 | A/E CHANGED THE ORIGINAL CONTRACT DOCUMENT DIMENSIONS FOR THE BRIDGE CONNECTION SO THE CURTAIN WALL COULD BE I… |
| Mod SA056· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-06-09 | +$2,683 | $100,212,180 | ADD FILTER HOUSING AND DI MIXED BED RESIN FILTER TO EACH ULTRASONIC HUMIDIFIER LOCATED AT EACH IT CLOSET TO IN… |
| Mod CO02R· CHANGE ORDER | 2010-06-11 | +$1,150 | $100,213,330 | INSTALL 1" (ONE INCH) CONDUIT FROM THE ROOF TO 3RD FLOOR TELECOM ROOM # 323 IN BLDG. 164A AS REQUESTED BY THE… |
| Mod SA057· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-06-14 | +$4,240 | $100,217,570 | PROVIDING TEMPORARY CORRIDOR AROUND CONSTRUCTION AREAS TO ALLOW ACCESS FOR PATIENTS AND EMPLOYEES TO THE CLC,… |
| Mod SA058· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-06-14 | +$102 | $100,217,672 | A TEMPORARY CORRIDOR IS BEING CONSTRUCTED TO ALLOW PATIENT ACCESS BETWEEN THE MAIN HOSPITAL AND BUILDINGS 128… |
| Mod SA059· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-06-14 | +$43,281 | $100,260,953 | DURING EXCAVATION FOR THE FOUNDATION OF BUILDINGS 165 AND 166 THE CONTRACTOR ENCOUNTERED EXISTING CONCRETE STR… |
| Mod SA060· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-06-14 | +$1,745 | $100,262,698 | PER THE AE, CHANGE LIGHT FIXTURES FROM TYPE F7 TO F7A IN B165E, CORRIDOR E072. THE AREA HAS AN OPEN CEILING AN… |
| Mod SA061· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-06-14 | +$7,026 | $100,269,724 | REVISE EXHAUST DUCTWORK SIZES IN BUILDING 166F FROM 10"X8" TO 20"X 10" OR 18"X10" PER A/E RECOMMENDATION. |
| Mod SA062· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-06-15 | +$10,130 | $100,279,854 | REVISE EMERGENCY POWER SOURCE AND FEEDER ROUTING FOR BUILDING 165 AND 166 DUE TO MORE ECONOMICAL APPROACH. |
| Mod SA063· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-06-16 | +$5,838 | $100,285,692 | PER RECOMMENDATION OF THE ARCHITECT: 1. FURRED WALL NEEDED TO COVER PLUMBING. 2. WALL CAVITY NOT LARGE ENOUGH… |
| Mod SA065· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-06-17 | +$1,700 | $100,287,392 | THE DETAILS FOR THE ROOF EXIT DOOR AT B164 DID NOT CALL OUT A CURB DETAIL AT THE THRESHOLD OF THE DOOR FOR THE… |
| Mod CO02T· CHANGE ORDER | 2010-06-18 | +$9,000 | $100,296,392 | BASED ON A REVIEW BY THE LONG BEACH FIRE DEPARTMENT, THESE CHANGES ARE BEING ADDED TO PROVIDE BETTER FIRE ACC… |
| Mod SA067· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-06-29 | +$35,995 | $100,332,387 | CORRECT DESIGN ERROR BY CHANGING LFB FIXTURES IN BUILDING 164 AND 166 TO TYPE SFD AND F25. |
| Mod SA068· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-06-29 | −$7,077 | $100,325,310 | ARCHITECT CHANGED LIGHT POLES TO COORDINATE WITH OTHER EXTERIOR LIGHT FIXTURES BEING INSTALLED ON THE PROJECT:… |
| Mod SA069· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-06-29 | −$2,145 | $100,323,165 | CHANGE DOOR HARDWARE SETS IN ROOMS 402, 114, 137, AND 192 IN BUILDINGS 164A; ROOM E009 IN B165E AND ROOMS F170… |
| Mod SA070· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-06-29 | +$1,731 | $100,324,896 | ADDING 3/4" HORIZONTAL REVEALS TO THE EXTERIOR CONCRETE SURFACES PER RECOMMENDATION OF THE ARCHITECT. |
| Mod SA071· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-06-29 | +$14,852 | $100,339,748 | ADDITIONAL SIDEWALK AND RAMPS ARE REQUIRED AT ENTRANCES TO MEDICAL CENTER OCCUPIED BUILDINGS 8 AND 150, DUE TO… |
| Mod SA072· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-06-30 | +$16,617 | $100,356,365 | ARCHITECT CHANGES TO SHOP DRAWINGS (VA FILE NO. 05120-03R) FOR DEPRESSED AREAS ON 2ND AND 3RD FLOORS OF BLDG.… |
| Mod SA073· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-07-01 | +$4,271 | $100,360,636 | REPLACE A SECTION OF EXISTING 6" WATER LINE WITH 8", TO MATCH NEW WATER LINE BEING INSTALLED. REMOVE AND CAP A… |
| Mod CO02U· CHANGE ORDER | 2010-07-09 | +$37,000 | $100,397,636 | PER VALBHS REQUEST, MODIFY SECURITY SYSTEM IN BUILDING 164A TO COMPLY WITH ITOC RECOMMENDATIONS. |
| Mod SA028· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-07-12 | +$17,225 | $100,414,861 | DURING EXCAVATION FOR THE FOUNDATION OF BUILDINGS 165 AND 166 THE CONTRACTOR ENCOUNTERED EXISTING CONCRETE STR… |
| Mod SA079· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-07-15 | +$10,150 | $100,425,011 | CONTRACT DOCUMENTS FAILED TO SHOWN FLOWABLE FILL AT ALL LOCATIONS REQUIRED BY THE ARCHITECT-ENGINEER. |
| Mod CO02V· CHANGE ORDER | 2010-07-16 | +$7,300 | $100,432,311 | REVISIONS TO WALLS PER REQUEST OF THE MEDIACL CENTER. |
| Mod SA064· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-07-16 | +$3,843 | $100,436,154 | UNFORESEEN CONDITIONS AT NEW WATER TIE IN AT B164 TO AVOID CONFLICT WITH EXISTING STRUCTURES. DEMO MANHOLE/VAL… |
| Mod SA074· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-07-16 | +$22,398 | $100,458,552 | RFI-072 REFERS TO REVISED RE-LOCATION OF FIRE SUPPLY LINE TO BLDG 164A. RFI - 0196 REFERS TO ADDITIONAL DEMO… |
| Mod SA075· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-07-16 | +$2,651 | $100,461,203 | REVISE 26 LIGHT FIXTURES IN BUILDING 166G LEVEL 1 AT THE EAST AND WEST END OF CORRIDOR BETWEEN GRIDLINES J AND… |
| Mod SA076· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-07-16 | +$1,092 | $100,462,295 | ELECTRICAL REVISIONS REQUIRED BY THE A/E. |
| Mod SA077· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-07-16 | +$2,097 | $100,464,392 | PROVIDE WALKWAY DELINEATOR FOR PEDESTRIANS ALONG CONTRUCTION FENCE LEADING TO BUILDINGS 150 AND 126OP. |
| Mod SA078· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-07-16 | +$11,086 | $100,475,478 | A/E REVISED THE ELECTRICAL SERVICE TO SPLIT AC UNITS DUE TO MANUFACTURER'S LIMITS ON REFRIGERANT LINE DISTANCE… |
| Mod CO02W· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-07-20 | +$34,000 | $100,509,478 | CONTRACT DOCUMENTS FAILED TO SHOW NEW STRUCTURE STEEL FOR THE BUILDING 8 CORRIDOR TO BUILDING 165C. |
| Mod SA080· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-07-20 | +$44,595 | $100,554,073 | MEDICAL CENTER REQUESTED A CHANGE TO PRIVACY CURTAINS WITH A PICTURE/SCENE IN THE NEW CLINIC THAT WERE CONSIST… |
| Mod SA081· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-07-20 | +$1,181 | $100,555,254 | CORRECT DESIGN ERROR BY RELOCATING POWER RECEPTACLES TO RECEPTION DESK IN 164B LOBBY. |
| Mod TE002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-07-24 | +$0 | $100,555,254 | DUE TO UNUSUALLY SEVERE WEATHER (EXCESSIVE RAINFALL) IN FEBRUARY 2010, IT HAS BEEN DETERMINED THAT THE CONTRAC… |
| Mod SA082· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-07-26 | +$8,489 | $100,563,743 | CORRECT DESIGN ERROR TO SUSPEND TYPE F22 "SURFACE MOUNTED" LIGHT FIXTURES IN CORRIDORS E001, C002, AND C003, W… |
| Mod SA083· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-07-26 | +$3,159 | $100,566,902 | THE ARCHITECT ADDED STEEL SUPPORTS IN THE LOW WALLS IN E101 DURING HIS REVIEW OF RFI-1059. THESE SUPPORTS AR… |
| Mod SA084· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-07-27 | +$2,579 | $100,569,481 | THE ARCHITECT DELETED THE 2-1 " DEPRESSED FLOORS IN THE FOLLOWING ROOMS C106, F107, AND F206, IN BUILDING 165C… |
| Mod CO02X· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-07-29 | +$2,872 | $100,572,353 | MOVE BOOSTER PUMPS AND IRRIGATION CONTROLLERS AT BUILDINGS 164, 165 AND 166 SITE AS REQUIRED BY FACILITY MAINT… |
| Mod CO02Y· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-08-04 | −$6,000 | $100,566,353 | THE "FLOATING CEILINGS" AT THE WAITING ROOMS IN B164A ARE BEING ENCLOSED TO HIDE THE MEP INSTALLATIONS PER THE… |
| Mod CO02Z· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-08-10 | +$8,500 | $100,574,853 | IN ORDER TO PROVIDE A STABLE PLATFORM FOR WINDOW WASHERS, THE ARCHITECT ADDED A PAVING SYSTEM AROUND THE BUILD… |
| Mod SA086· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-08-11 | +$10,523 | $100,585,376 | THE ARCHITECT PROVIDED THE PROPER LOCATION OF THE NEW FENCE AND WALL HEIGHTS THAT WERE INCORRECTLY SHOWN ON SE… |
| Mod SA087· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-08-11 | +$2,956 | $100,588,332 | THE ARCHITECT/ENGINEER PROVIDED THE PROPER LOCATION OF THE BASE PLATES AND ANCHOR BOLTS WITHIN THE PILASTERS T… |
| Mod SA088· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-08-11 | +$38,770 | $100,627,102 | THE ARCHITECT/ENGINEER PROVIDED THE PROPER SIZING FOR DELETING AND ADDING BEAMS, AND CHANGING CONNECTION DURIN… |
| Mod SA089· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-08-11 | +$4,783 | $100,631,885 | ADDITIONAL LOUVER/BIRDSCREEN |
| Mod SA090· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-08-11 | +$14,359 | $100,646,244 | PARTNERING FOR FEB - JULY 2010 |
| Mod SA052· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-08-13 | −$1,164 | $100,645,080 | DELETE TWO LOW WALLS IN ROOM 114 (PHARMACY) PER REQUEST OF THE VAMC AND ADD STEEL SUPPORT IN A WALL IN ROOM 18… |
| Mod SA092· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-08-17 | +$1,220 | $100,646,300 | RECEPTACLE RELOCATION IN B64A |
| Mod SA085· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-08-20 | +$12,055 | $100,658,355 | THE ARCHITECT REQUESTED THAT ALL EXPOSED STRUCTURAL STEEL IN B164 BE PAINTED A DIFFERNT COLOR FROM ALL OTHER S… |
| Mod SA093· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-08-23 | −$1,199 | $100,657,156 | REVISE CEILING IN ROOM C261 |
| Mod SA094· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-08-23 | −$16,720 | $100,640,436 | REVISE B150 FIRE PUMP FEEDER |
| Mod CO03A· CHANGE ORDER | 2010-08-25 | +$11,000 | $100,651,436 | PROVIDING TEMPORARY CORRIDOR AROUND CONSTRUCTION AREAS TO ALLOW ACCESS FOR PATIENTS AND EMPLOYEES BETWEEN THE… |
| Mod SA091· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-08-25 | +$4,152 | $100,655,588 | DRYWALL OVER WINDOW FRAMING B164 |
| Mod SA096· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-08-25 | +$3,051 | $100,658,639 | ADD 3-WAY LIGHT SWITCHES |
| Mod CO03C· CHANGE ORDER | 2010-08-26 | −$810 | $100,657,829 | ELECTRICAL REVISIONS REQUIRED BY THE A/E TO CORRECT DESIGN ERROR. |
| Mod SA095· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-08-30 | +$17,389 | $100,675,218 | ADD/MODIFY/DELETE CURTAIN WALLS BLD 165E |
| Mod SA097· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-08-30 | −$3,145 | $100,672,073 | CHANGE PLASTER TO ARCH CONCRETE |
| Mod SA098· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-08-30 | −$1,796 | $100,670,277 | REVISE DOOR F036 BLD 166-F |
| Mod SA099· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-08-30 | −$5,100 | $100,665,177 | DELETE METAL LAVATORY KNEE GUARDS ON DETAIL 13/ASS4.19 |
| Mod SA100· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-08-30 | +$1,600 | $100,666,777 | HSS CONNECTION CONFLICT B164-A |
| Mod SA101· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-08-30 | +$7,359 | $100,674,136 | CPE #081 SEWER MAIN @B164; REMOVE AND REPLACE A SECTION OF NEWLY INSTALLED SANITARY SEWER LINE FROM MANHOLE MH… |
| Mod SA102· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-08-31 | −$38,027 | $100,636,109 | CPE #235; DELETE THE REPLACEMENT OF NEW FIRE PUMP SYSTEM IN BUILDING 139. |
| Mod SA066· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-02 | +$1,583 | $100,637,692 | PROVIDE SHOTCRETE AT OPENING CUT IN EXISTING STRUCTURE TO PROVIDE ADDITIONAL SUPPORT. |
| Mod SA103· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-14 | −$9,416 | $100,628,276 | SEWER LINE REVISION AT B164; THIS MODIFICATION DEFINITIZES CO-01A DATED 1/23/2009 AND ISSUED FOR $-9,500.00 |
| Mod CO03B· CHANGE ORDER | 2010-09-20 | +$7,500 | $100,635,776 | THE ARCHITECT DETERMINED THAT THE RAILING AT THE BASE OF EACH STAIRWAY NEEDED TO BE EXTENDED TO PREVENT ENTRY… |
| Mod CO03D· CHANGE ORDER | 2010-09-20 | +$8,528 | $100,644,304 | PHARMACY IV PREP AND ANTE ROOMS REQUIRE A ROOM PRESSURE MONITORING SYSTEM, ALONG WITH ISOLATION ROOM 195 IN ER… |
| Mod SA106· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-28 | −$1,228 | $100,643,076 | STRUCTURAL AND EARTHWORK; MODIFICATION DEFINITIZES CO-01U DATED 11/27/2009 ISSUED FOR $15,400 |
| Mod SA107· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-28 | −$1,209 | $100,641,867 | B8 EXTERIOR REPAIRS; THIS MODIFICATION DEFINITIZES CO-02G DATED 3/22/2010 ISSUED FOR $10,000 |
| Mod SA108· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-28 | −$913 | $100,640,954 | B8/165C STR. STEEL; THIS MODIFICATION DEFINITIZES CO-02W DATE 7/21/2010 ISSUED $34,000 |
| Mod SA109· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-29 | +$1,278 | $100,642,232 | THE ARCHITECT ADDED CURBS IN CORRIDOR C-146 TO ENSURE THE ELEVATIONS WERE AT THE SAME LEVEL THE FULL LENGTH OF… |
| Mod SA110· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-29 | +$3,354 | $100,645,586 | IN BUILDING 166G, EXTEND INTERIOR WALLS TO FORM A CLOSURE WITH THE WINDOW MULLION AS INDICATED ON THE ATTACHED… |
| Mod SA105· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-10-05 | +$21,500 | $100,667,086 | CHANGES AT BUILDING 164A :1. THE A/E SHOWS TWO (2) HANDRAILS AT THE SAME LOCATION, ONE LIGHTED AND ONE NON-LIG… |
| Mod SA111· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-10-05 | +$1,400 | $100,668,486 | IN BUILDING 165-C AND 166-F, INSTALL CONCRETE CURBS AT THE BASE OF CURTAIN WALLS IN SUPPORT OF THE WINDOW FRAM… |
| Mod SA112· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-10-08 | +$27,517 | $100,696,003 | PLUMBING CHANGES IN BLDG'S 164A, 165C, 166F AND 128 WITH REGARD TO RFI NO'S -883, 905, 909, 981, 1002 AND 1081… |
| Mod SA113· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-10-08 | +$16,977 | $100,712,980 | MODIFICATIONS MADE DURING SUBMITTAL PROCESS DELETING AND ADDING CORNER AND WALL GUARDS ALONG WITH HANDRAILS I… |
| Mod SA104· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-10-14 | +$4,219 | $100,717,199 | CORRECT DESIGN ERRORS IN 164A PHARMACY AREA BY ADDING A RECEPTACLE, A COAXIAL CONNECTION, AND DATA CONNECTIONS… |
| Mod CO03E· CHANGE ORDER | 2010-10-18 | +$39,000 | $100,756,199 | THE ARCHITECT FAILED TO SHOW FINISHES AND FIRE SEPARATION WHERE BUILDING 164B CONNECTS TO BUILDING 126OP. THE… |
| Mod SA115· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-10-28 | −$3,465 | $100,752,734 | PROVIDE CEILING AND FLOOR SUPPORT SYSTEM FOR X-RAY EQUIPMENT BEING INSTALLED IN B164A. EQUIPMENT WAS NOT DETE… |
| Mod SA116· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-10-28 | +$61,994 | $100,814,728 | 1.VAMC REQUESTED CHANGES TO PHARMACY (RMS. 112 HALL&113 INVEST. DRUGS, BLDG. 164A) FOR SECURITY. 2. ENLARGE CH… |
| Mod CO03G· CHANGE ORDER | 2010-10-29 | +$1,200 | $100,815,928 | MODIFY LIGHT FIXTURE LAYOUT DUE TO OVERHEAD CONFLICTS OF UNISTRUT SUPPORT SYSTEM INSTALLATION IN THE RADIOLOGY… |
| Mod SA117· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-10-29 | +$14,928 | $100,830,856 | THE AE ADDED WOOD PANELS ON THE WALL DURING SUBMITTAL REVIEW, AS THEY WERE NOT INDICATED ON THE CONTRACT DRAWI… |
| Mod SA118· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-11-01 | +$5,965 | $100,836,821 | THE DRAWINGS FAILED TO SHOW STRUCTURAL SUPPORT FOR THE CURTAIN WALL SYSTEM. |
| Mod CO03F· CHANGE ORDER | 2010-11-02 | +$10,000 | $100,846,821 | CHANGES TO ROOMS 112 AND 113 IN PHARMACY AREA. ROOM 112 NEED THE BULLET PROOF WALL ON EAST SIDE OF THIS ROOM… |
| Mod SA119· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-11-04 | −$5,203 | $100,841,618 | DURING REVIEW OF SUBMITTALS FOR CURTAIN WALL SYSTEM (VA FILE NO. 08920-05R) THE AE DELETED SHADOW BOX FEATURE… |
| Mod SA120· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-11-09 | +$19,507 | $100,861,125 | DOCUMENTS FAILED TO PROVIDED A CLOSURE PANEL WHERE THE INTERIOR WALLS MET THE EXTERIOR WINDOWS AND AT WALL FRA… |
| Mod SA121· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-11-09 | +$1,827 | $100,862,952 | DOCUMENTS FAILED TO PROVIDE A FINISH SCHEDULE AS TO WALL AND FLOOR FINISH FOR ROOM 156 IN B164. THE A/E PROVI… |
| Mod SA123· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-06 | +$11,080 | $100,874,032 | CHANGE FIXTURE TYPE FROM F-14 TYPE LIGHT FIXTURES TO RAB TYPE LIGHT FIXTURES IN THE CONCRETE WALL AT THE EXTER… |
| Mod SA125· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-06 | +$395 | $100,874,427 | INSTALL ADDITIONAL CIRCUIT FOR STAIR CLIMBER (ST-40) TO MEET THE ELECTRICAL EQUIPMENT REQUIREMENT TO HAVE A DE… |
| Mod SA124· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-08 | +$11,718 | $100,886,145 | AS A RESULT OF SAFETY CONCERNS WITH GLASS WALLS, CLIMB INHIBITORS ARE BEING ADDED TO DETER ATTEMPTS TO CLIMB T… |
| Mod SA126· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-08 | +$14,522 | $100,900,667 | ADD WOOD WALL PANELS IN B164B AS RECOMMENDED BY THE ARCHITECT. |
| Mod SA127· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-08 | +$1,121 | $100,901,788 | THE ARCHITECT DETERMINED THAT THE RAILING AT THE BASE OF EACH STAIRWAY NEEDED TO BE EXTENDED TO PREVENT ENTRY… |
| Mod SA122· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-09 | +$4,709 | $100,906,497 | PROVIDE DATA CONNECTIONS TO CAROUSELS CA-81 IN PHARMACY AREA OF B164A AND EXTEND POWER TO ONE OF THESE, WHICH… |
| Mod SA128· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-09 | +$1,216 | $100,907,713 | ADD DRYWALL AT EXTERIOR WALL OF ROOM 133 TO COVER BACK SIDE OF UNFINISHED FRAMING SYSTEM PER AE REVISION. |
| Mod SA129· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-09 | +$38,030 | $100,945,743 | A/E CHANGES ADDING ROOF DRAINAGE AND LIGHTING TO CANOPIES OUTSIDE BUILDING 164A AND ROOF DRAINAGE TO CANOPIES… |
| Mod SA131· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-09 | +$1,446 | $100,947,189 | MEDICAL GAS LINE WERE INSTALLED IN KITCHEN AREA OF BUILDING 165E AND ARE NOT PERMITTED IN THIS AREA PER NFPA 9… |
| Mod SA130· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-10 | +$10,841 | $100,958,030 | DRAWINGS FAILED TO SHOW DOWNSPOUT NOZZELS AT THE ENDS OF RAINWATER OUTLETS AT ALL BUILDING LOCATIONS. |
| Mod SA132· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-10 | −$203 | $100,957,827 | PER REQUEST OF THE MEDICAL CENTER, CASEWORK IN PHARMACY IS NOT BEING INSTALLED TO ALLOW FOR INSTALLATION OF MC… |
| Mod SA134· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-10 | +$16,076 | $100,973,903 | PROVIDE POWER FOR COFFEE SHOP IN BUILDING 165E AS REQUESTED BY THE MEDICAL CENTER. |
| Mod SA135· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-14 | −$689 | $100,973,214 | AT THE REQUEST OF THE MEDICAL CENTER, REVISIONS TO WALLS IN THE CANTEEN OFFICE ARE BEING IMPLEMENTED. |
| Mod SA136· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-21 | −$2,267 | $100,970,947 | MINOR REVISIONS TO THE LAYOUT IN THE EMERGENCY ROOM WERE DETERMINED NECESSARY BY THE USERS TO IMPROVE EFFICIEN… |
| Mod SA137· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-21 | +$322 | $100,971,269 | REMOVE RECEPTACLE WIRINGS AND ABANDON THE RECEPTACLE IN ROOM 120A AND 169 IN BUILDING B164A DUE TO LOCKER INST… |
| Mod SA138· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-22 | +$29,082 | $101,000,351 | MOVE BOOSTER PUMPS AND IRRIGATION CONTROLLERS AT BUILDINGS 164, 165 AND 166 SITE AS REQUIRED BY FACILITY MAINT… |
| Mod SA139· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-22 | +$1,618 | $101,001,969 | PER RECOMMENDATION OF THE AE'S LANDSCAPE ARCHITECT, TREE PROTECTORS ARE BEING ADDED AT ALL NEW INSTALLATIONS T… |
| Mod SA140· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-22 | +$565 | $101,002,534 | INSTALL 1" (ONE INCH) CONDUIT FROM THE ROOF TO 3RD FLOOR TELECOM ROOM # 323 IN BLDG. 164A AS REQUESTED BY THE… |
| Mod SA141· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-14 | +$1,475 | $101,004,009 | PROVIDE ADDITIONAL LABOR TO INSTALL FIBER CABLES IN EXISTING CONDUITS WITH CABLES LOCATED IN BUILDING 126. |
| Mod SA142· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-14 | +$5,855 | $101,009,864 | ADD DRYWALL AT THE WEST WALL IN ROOM 137 TO COVER BACK SIDE OF SHADOW BOX SYSTEM DUE TO ARCHITECT'S OMISSION. |
| Mod SA143· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-18 | +$3,641 | $101,013,505 | DRILL HOLES IN COUNTERTOPS TO PROVIDE ACCESS TO POWER AND DATA OUTLETS IN B-164A DUE TO ARCHITECT'S OMISSION. |
| Mod SA144· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-18 | +$9,325 | $101,022,830 | REPLACE EXTERIOR WALL GLASS BROKEN BY VANDALS. |
| Mod SA145· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-18 | +$51,098 | $101,073,928 | IN ORDER TO PROVIDE A STABLE PLATFORM FOR WINDOW WASHERS, THE ARCHITECT ADDED A PAVING SYSTEM AROUND THE BUILD… |
| Mod SA147· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-18 | +$2,713 | $101,076,641 | ROOMS ARE BEING REVISED AT THE REQUEST OF THE MEDICAL CENTER DIRECTOR TO BETTER SERVE THE CLINIC STAFF. |
| Mod SA146· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-20 | +$4,305 | $101,080,946 | MEDICAL CENTER REQUEST THAT EXPOSED DUCTWORK IN BLDG 164A ROOMS 123, 125 AND 195 BE COVERED WITH STAINLESS S… |
| Mod SA148· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-20 | +$886 | $101,081,832 | REVISIONS TO WALLS PER MEDICAL CENTER REQUEST. |
| Mod SA149· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-25 | +$5,838 | $101,087,670 | CHANGE THE LIGHT FIXTURE TYPE FROM FX9 TO IG7 AT THE TREE GRATES BEHIND B164A AS REQUIRED BY THE A/E. |
| Mod SA150· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-25 | −$1,400 | $101,086,270 | THE ARCHITECT REDUCED THE HEIGHT OF THE CONCRETE BARRIER WALLS TO COORDINATE WITH THE LINES OF THE ADJACENT BU… |
| Mod SA151· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-25 | +$9,471 | $101,095,741 | ARCHITECT ISSUED CORRECTIVE DRAWINGS TO COVER OR PAINT UNFINISHED WALLS IN THE STAIRS AND ROOMS OF BUILDING 16… |
| Mod CO03I· CHANGE ORDER | 2011-01-27 | +$1,420 | $101,097,161 | REROUTE THE ELECTRICAL, TELEPHONE AND DATA CABLE FEED TO CONFORM TO THE REQUIREMENTS FOR THE RESOLVE WORK STAT… |
| Mod SA153· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-27 | +$1,000 | $101,098,161 | THE CONTRACT DRAWINGS, INCLUDING 164-AS1.20, INCORRECTLY DEPICTED THE NUMBER AND TYPE OF REQUIRED CAMERA BOXES… |
| Mod SA152· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-31 | +$5,762 | $101,103,923 | THE ARCHITECT ISSUED INSTRUCTIONS FOR PAINTING VISIBLE WALLS BEHIND RESIN PANELS IN B164A WAITING ROOMS. THE… |
| Mod SA155· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-31 | +$3,472 | $101,107,395 | PARTNERING MEETING HELD ON JANUARY 25, 2011, WITH CONTRACTOR AND ARCHITECT. |
| Mod SA156· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-31 | +$2,608 | $101,110,003 | PROVIDE A WOOD DOOR FRAME AT THE WON DOORS TO COORDINATE WITH THE DOOR AND HARDWARE SPECIFIED. |
| Mod SA114· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-02-01 | +$3,494 | $101,113,497 | PAYMENT FOR 50% OF THE PARTNERING COSTS FOR TEAM TECH INC., TO PROVIDE ALL SERVICES/COSTS FOR PARTNERING MEETI… |
| Mod SA154· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-02-02 | −$544 | $101,112,953 | DELETE THE 3'-0" ROOF ACCESS LADDER ON BUILDING 165E ROOF AREA AS SHOWN ON DRAWING 165-AS3.28 DETAIL 2, AS REC… |
| Mod SA157· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-02-02 | +$25,928 | $101,138,881 | PER MEDICAL CENTER IT STAFF DIRECTIVE, RELOCATE FIRE ALARM CONTROL PANELS AND POWER SUPPLIES OUT OF TELECOM RO… |
| Mod SA158· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-02-08 | +$5,094 | $101,143,975 | MOVE THE BACK FLOW PREVENTER OUT OF THE SIDEWALK AS CURRENTLY INDICATED ON CONTRACT DOCUMENTS. |
| Mod SA159· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-02-08 | +$2,405 | $101,146,380 | REVISE DUCT DROPS IN BUILDING 165E PER SKETCH 12-17-10A, 12-17-10B, AS RECOMMENDED BY THE ARCHITECT |
| Mod SA161· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-02-09 | +$17,454 | $101,163,834 | ALUMINUM PANELS WERE ADDED AT THE INTERIOR SPACES BY THE ARCHITECT TO COORDINATE WITH THE EXTERIOR FINISH. |
| Mod SA163· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-02-09 | +$20,994 | $101,184,828 | ADDITIONAL WALL PANELS ARE BEING ADDED IN THE CORRIDOR OF BUILDING 164B (THE EGG) BY THE ARCHITECT TO MATCH AD… |
| Mod CO03J· CHANGE ORDER | 2011-02-14 | +$10,000 | $101,194,828 | MEDICAL CENTER HAS REQUESTED REVISIONS IN B165D TO ACCOMODATE FUTURE IT NEEDS. |
| Mod SA162· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-02-14 | +$6,665 | $101,201,493 | BASED ON A REVIEW BY THE LONG BEACH FIRE DEPARTMENT, THESE CHANGES ARE BEING ADDED TO PROVIDE BETTER FIRE ACCE… |
| Mod SA164· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-02-14 | +$1,550 | $101,203,043 | RELOCATION OF RECEPTACLES IN BUILDING 164A, ROOMS 115, 122, 164, 169, 177, 181 AND 182 DUE TO THE CONFLICT OF… |
| Mod SA133· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-02-17 | +$4,844 | $101,207,887 | REVISE ROUTING OF THE 6" AND 8" SANITARY SEWER LINES, MANHOLES AND GREASE TRAP DUE TO EXISTING CONDITIONS. |
| Mod SA160· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-02-17 | +$56,000 | $101,263,887 | MODIFY SECURITY SYSTEM TO ACCOMMODATE VA LONG BEACH MEDICAL CENTER IT LIMITATIONS. THE EXISTING NETWORK DOES… |
| Mod SA165· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-02-17 | +$1,667 | $101,265,554 | THE VA FACILITY DID NOT HAVE THE NECESSARY INFORMATION TO COMPLETE THE SHORT CIRCUIT STUDY FOR THE ELECTRICAL… |
| Mod CO03K· CHANGE ORDER | 2011-02-28 | +$48,500 | $101,314,054 | THE MEDICAL CENTER HAS REQUESTED B165 AND B166 FIRE ALARM NETWORK CONNECTIONS, MATV, NURSE CALL, AND JOHNSON C… |
| Mod TE003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-02-28 | +$0 | $101,314,054 | DUE TO UNUSUALLY SEVERE WEATHER (EXCESSIVE RAINFALL) IN DECEMBER 2010, IT HAS BEEN DETERMINED THAT THE CONTRAC… |
| Mod SA167· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-03-01 | −$10,000 | $101,304,054 | CHANGES TO ROOMS 112 AND 113 IN PHARMACY AREA. ROOM 112 NEEDS THE BULLET PROOF WALL ON EAST SIDE OF THIS ROOM… |
| Mod SA169· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-03-01 | +$45,388 | $101,349,442 | THE DETAIL FOR THE CEILING GRID EDGE WAS REVISED AT 2 WALLS TO PROVIDE A BETTER SYSTEM FOR THE FLOATING EDGE O… |
| Mod SA170· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-03-01 | +$10,212 | $101,359,654 | THE STRUCTURAL DRAWINGS WERE NOT COORDINATED WITH THE ARCHITECTURAL DRAWINGS FOR THE ROOF CURB AT BUILDING 12… |
| Mod SA171· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-03-09 | +$10,500 | $101,370,154 | A VAULT DOOR IS BEING ADDED AT THE PHARMACY NARCOTICS ROOM TO COMPLY WITH VA HANDBOOK 0730/1 SECURITY AND LAW… |
| Mod SA168· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-03-10 | +$10,000 | $101,380,154 | REVISE CEILING HEIGHTS ON 3RD FLOOR IN B-164A DUE TO CONGESTION WITH UTILITIES AS RECOMMENDED BY THE ARCHITECT… |
| Mod SA173· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-03-10 | −$4,500 | $101,375,654 | DELETED STAINLESS STEEL HANDRAILS AT V-COLUMNS AT BUILDING 165E, WHICH ARE NOT NECESSARY IN THE LANDSCAPED ARE… |
| Mod CO03M· CHANGE ORDER | 2011-03-14 | +$20,000 | $101,395,654 | MEDICAL CENTER DIRECTOR REQUESTED ADDITIONAL POWER AND DATA OUTLETS, AND A NEW DOOR TO SERVE EMPLOYEE NEEDS IN… |
| Mod SA166· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-03-14 | −$10,000 | $101,385,654 | REVISE THE WALL LAYOUT IN BLDG 165C, EDUCATION DEPARTMENT, AT THE REQUEST OF THE MEDICAL CENTER. |
| Mod SA172· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-03-14 | +$808 | $101,386,462 | AT THE REQUEST OF THE MEDICAL CENTER DIRECTOR, ADDED DATA AND POWER, DELETING CASEWORK IN PHARMACY TO COMPLY… |
| Mod SA174· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-03-14 | +$665 | $101,387,127 | THE ARCHITECTURAL DRAWINGS INCORRECTLY LOCATED TWO TELEVISIONS IN THE PHARMACY WAITING AREA OF B164A. THIS CHA… |
| Mod CO03N· CHANGE ORDER | 2011-03-15 | +$20,400 | $101,407,527 | THE MEDICAL CENTER DIRECTOR REQUESTED AN OFFICE SPACE BE ADDED IN THE WOOD SHOP AREA OF THE BLIND REHAB. |
| Mod SA175· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-03-17 | +$7,740 | $101,415,267 | RELOCATE FIRE ALARM CONTROL PANELS IN B165C AND B166F FROM TELECOM ROOMS TO CORRIDORS TO ACCOMMODATE IT SECURE… |
| Mod SA176· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-03-17 | +$3,204 | $101,418,471 | DUE TO A MISTAKE ON AN RFI RESPONSE, THE CONTRACTOR FOLLOWED AN INCORRECT LABELING SCHEME FOR ALL TELECOM DATA… |
| Mod SA177· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-03-21 | +$9,000 | $101,427,471 | CONSTRUCTION DRAWINGS FAILED TO PROVIDE ADEQUATE STRUCTURAL STEEL FOR THE SPECIFIED SUPPORT METHOD FOR THE EXT… |
| Mod SA178· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-03-23 | +$4,919 | $101,432,390 | DRAWINGS FAILED TO SHOW REMOVAL OF AN EXISTING PARKING LOT AT BUILDING 165C. |
| Mod SA179· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-03-23 | +$4,491 | $101,436,881 | CONSTRUCTION DRAWINGS DID NOT INDICATE CLOSURE BETWEEN INTERIOR CURTAIN WALL AND EDGE OF SLAB ON 2ND AND 3RD F… |
| Mod SA180· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-03-23 | +$6,000 | $101,442,881 | CODE REVIEW FOUND THAT FIRE DOORS IN B164 NEEDED TO BE CHANGED FROM 20 MINUTE TO 45 MINUTE TO PROVIDE A 1-HOU… |
| Mod SA181· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-03-28 | +$1,780 | $101,444,661 | ELECTRICAL REVISIONS REQUIRED BY THE A/E TO CORRECT DESIGN ERROR. |
| Mod CO03L· CHANGE ORDER | 2011-03-30 | +$16,300 | $101,460,961 | THE LOCATION AND SIZE OF THE REPLACEMENT FLAGPOLE IS BEING CHANGED TO MATCH THE UNIT IT IS REPLACING AT THE MA… |
| Mod CO03O· CHANGE ORDER | 2011-03-30 | +$2,000 | $101,462,961 | INSTALL ADDITIONAL P-808 WASHING MACHINE SUPPLY/DRAIN AND NECESSARY POWER FOR ADDITIONAL WASHER AND DRYER IN B… |
| Mod SA182· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-03-30 | +$4,153 | $101,467,114 | PROVIDING TEMPORARY CORRIDOR AROUND CONSTRUCTION AREAS TO ALLOW ACCESS FOR PATIENTS AND EMPLOYEES BETWEEN THE… |
| Mod SA183· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-03-30 | +$1,668 | $101,468,782 | THE ELEVATIONS AT THE PATIO NORTH OF B165E WAS REVISED BY THE AE AFTER THE CONTRACTOR HAD COMPLETED ROUGH GRAD… |
| Mod SA184· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-03-30 | +$3,750 | $101,472,532 | BATHROOM DOORS WERE SHOWN WITH VIEW WINDOWS AND ARE NOW BEING CHANGED TO SOLID DOORS TO PROVIDE PRIVACY. |
| Mod SA185· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-06 | +$950 | $101,473,482 | CONSTRUCTION DRAWINGS DID NOT INDICATE CLOSURE BETWEEN THE DIMINISHING WALL AND POP OUT WINDOW OF ROOM F154.… |
| Mod SA186· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-06 | +$905 | $101,474,387 | PROVIDE GFCI RECEPTACLES ABOVE THE COUNTER SPACE NEXT TO EACH RANGE IN B166 ROOMS F135 AND F160 TO COMPLY WITH… |
| Mod SA187· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-08 | +$8,055 | $101,482,442 | PROVIDE A TEMPORARY WALKWAY BETWEEN CONSTRUCTION AREAS AS AN EMERGENCY ESCAPE FOR PATIENTS AND EMPLOYEES FROM… |
| Mod SA188· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-08 | +$2,903 | $101,485,345 | PHARMACY IV PREP AND ANTE ROOMS REQUIRE A ROOM PRESSURE MONITORING SYSTEM, ALONG WITH ISOLATION ROOM 195 IN ER… |
| Mod TE004· OTHER ADMINISTRATIVE ACTION | 2011-04-13 | +$0 | $101,485,345 | DUE TO UNUSUALLY SEVERE WEATHER (EXCESSIVE RAINFALL) IN MARCH 2011, IT HAS BEEN DETERMINED THAT THE CONTRACTOR… |
| Mod CO03P· CHANGE ORDER | 2011-04-14 | +$8,400 | $101,493,745 | THE ARCHITECT IS CHANGING THE GLASS SLIDING DOORS AT THE CANTEEN TO A ROLLING FIRE DOOR TO MAINTAIN THE CORRIO… |
| Mod SA189· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-14 | +$3,400 | $101,497,145 | CORRECT DESIGN ERROR BY RELOCATING TYPE F37 LIGHTS IN ALL PATIENT BEDROOMS OF B166G. THE APPROVED LIGHT FIXTU… |
| Mod SA190· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-14 | +$4,906 | $101,502,051 | CONSTRUCTION DRAWINGS FAILED TO PROVIDE ADEQUATE STRUCTURAL STEEL FOR THE SPECIFIED SUPPORT METHOD FOR THE EXT… |
| Mod SA191· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-18 | +$2,554 | $101,504,605 | PROVIDE POWER RECEPTACLE AND SWITCH FOR EACH SINK DISPOSAL IN BUILDING 166F ROOMS F139 AND F140. DRAWING 166-A… |
| Mod SA192· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-18 | +$3,626 | $101,508,231 | PARTNERING MEETING HELD ON SITE WITH THE CONTRACTOR, ARCHTIECT AND THE VA ON 4/5/11. |
| Mod CO03H· CHANGE ORDER | 2011-04-19 | +$23,000 | $101,531,231 | THESE MODIFICATIONS WERE REQUESTED BY THE MEDICAL CENTER TO ADD A STORE ROOM IN THE CANTEEN RETAIL STORE, ENLA… |
| Mod CO03Q· CHANGE ORDER | 2011-04-26 | +$16,000 | $101,547,231 | AN EXISTING ELECTRICAL VAULT AND INCORRECT GRADES SHOWN ON THE ORIGINAL DOCUMENTS HAVE REQUIRED REVISIONS TO G… |
| Mod SA193· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-27 | +$1,607 | $101,548,838 | MODIFY LIGHT FIXTURE LAYOUT DUE TO OVERHEAD CONFLICTS OF UNISTRUT SUPPORT SYSTEM INSTALLATION IN THE RADIOLOGY… |
| Mod SA195· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-29 | +$9,693 | $101,558,531 | CONTRACT DRAWINGS FAILED TO PROVIDE A STAIR AT THE EXIT DOOR AT THE EAST SIDE OF THE PENTHOUSE ON B164A. |
| Mod SA196· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-03 | +$41,847 | $101,600,378 | THE "FLOATING CEILINGS" AT THE WAITING ROOMS IN B164A ARE BEING ENCLOSED TO HIDE THE MEP INSTALLATIONS PER THE… |
| Mod SA197· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-03 | +$36,153 | $101,636,531 | THE ARCHITECT FAILED TO SHOW FINISHES AND FIRE SEPARATION WHERE BUILDING 164B CONNECTS TO BUILDING 126OP. THE… |
| Mod SA198· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-03 | +$2,399 | $101,638,930 | AN EXISTING 6" WATER LINE WAS FOUND TO BE ACTIVE LINE WHERE DRAWINGS INDICATED IT HAD BEEN CAPPED AND ABANDONE… |
| Mod SA194· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-05 | +$525 | $101,639,455 | CORRECT DESIGN ERROR BY REPLACING THE RECESS MOUNTED F19 FIXTURES IN THE 1ST FLOOR SPRINKLER CLOSET IN EACH OF… |
| Mod SA199· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-11 | +$10,599 | $101,650,054 | AN EXISTING DUCT BANK REQUIRED RELOCATION OF THE SERPENTINE WALK AT THE WEST SIDE OF BUILDING 165E. |
| Mod CO03S· CHANGE ORDER | 2011-06-07 | +$1,750 | $101,651,804 | CORRECT A DESIGN OMISSION THAT DID NOT SCHEDULE A FIRE ALARM MANUAL PULL STATION FOR THE EGRESS DOUBLE DOORS A… |
| Mod SA200· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-06-07 | −$608 | $101,651,196 | TO REPLACE 60" TREE BOX WITH A 24" TREE BOX. |
| Mod CO03T· CHANGE ORDER | 2011-06-17 | +$7,400 | $101,658,596 | VAMC REQUESTED REVISIONS AS FOLLOWS: 1. TO THE SECURITY LAYOUT IN THE B165C CANTEEN RETAIL STORE, DUE TO CONF… |
| Mod SA201· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-06-23 | +$3,707 | $101,662,303 | PAYMENT FOR 50% OF THE PARTNERING COSTS FOR TEAM TECH INC., TO PROVIDE ALL SERVICES/COSTS FOR PARTNERING MEETI… |
| Mod SA202· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-06-23 | +$8,399 | $101,670,702 | TO PROVIDE LATERAL BRACING BEAMS. |
| Mod CO03R· CHANGE ORDER | 2011-06-30 | +$828 | $101,671,530 | RELOCATE POWER POLES AND INSTALL ADDITIONAL POWER OUTLETS IN BUILDING 166F ROOM F227 AS SHOWN ON SKETCH SKE-RF… |
| Mod SA203· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-06-30 | +$4,911 | $101,676,441 | REROUTE THE ELECTRICAL, TELEPHONE AND DATA CABLE FEED TO CONFORM TO THE REQUIREMENTS FOR THE RESOLVE WORK STAT… |
| Mod SA204· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-06-30 | −$4,522 | $101,671,919 | UNDERGROUND STEAM EXPANSION LOOP WAS REQUIRED IN CONTRACT AND CONTRACTOR DEMONSTRATED IT WAS NOT REQUIRED PER… |
| Mod SA205· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-06-30 | +$910 | $101,672,829 | ARCHITECT ISSUED INSTRUCTIONS TO DELETE INSULATION AND PAINT INTERIOR SIDE OF SHADOW BOXES TO MATCH CURTAIN WA… |
| Mod CO03U· CHANGE ORDER | 2011-07-08 | +$12,400 | $101,685,229 | THERE ARE REQUIRED CHANGES TO TYPE OF SINKS IN BLDG 165F ROOMS F222 AND F252 DO TO THE AREA OF THE SINK LOCATI… |
| Mod CO03V· CHANGE ORDER | 2011-07-14 | +$13,400 | $101,698,629 | INSTALL 12 COLLAPSIBLE BOLLARDS. |
| Mod CO03W· CHANGE ORDER | 2011-07-15 | +$40,000 | $101,738,629 | INSTALL HOLLOW METAL DOORS IN CORRIDORS. |
| Mod SA211· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-07-20 | +$12,661 | $101,751,290 | MODIFY ACCESS TO PARKING LOTS SOUTH OF BUILDING 150 |
| Mod SA212· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-07-20 | +$9,309 | $101,760,599 | TO CONSTRUCT A SIDEWALK NORTH OF B165E IN THE CALIFORNIA NATIVE GARDEN |
| Mod SA207· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-07-22 | +$7,044 | $101,767,643 | DRAWINGS FAILED TO PROVIDE COMPLETE DETAILS FOR THE PARAPET WALL ALONG EACH SIDE OF 165D. ADDITIONAL STEEL S… |
| Mod SA208· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-07-22 | +$3,334 | $101,770,977 | ARCHITECT ISSUED INSTRUCTIONS TO DELETE INSULATION AND ADD DRYWALL ON THE INSIDE OF 4 CLOSETS HOUSING THE MOVA… |
| Mod SA209· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-07-22 | −$4,273 | $101,766,704 | AN EXISTING ELECTRICAL VAULT AND INCORRECT GRADES SHOWN ON THE ORIGINAL DOCUMENTS HAVE REQUIRED REVISIONS TO G… |
| Mod SA210· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-07-22 | +$24,728 | $101,791,432 | VAMC REQUESTED THAT FLOORING IN THE CANTEEN RETAIL STORED BE REVISED FOR CARPET TO WOOD (VINYL) FOR ADDED DUR… |
| Mod CO03X· CHANGE ORDER | 2011-08-12 | +$4,400 | $101,795,832 | INSTALL LIGHT FIXTURES IN ROOMS F134 AND F136 IN B166F, REMOVE AND REFINISH ALL DOORS IN B165D, AND ALSO PAINT… |
| Mod SA213· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-18 | +$1,795 | $101,797,627 | ENVIRONMENTAL SAMPLES OF A SEWAGE SPILL IN THE SUBBASEMENT OF B126, WHICH RESULTED FROM AN OBSTRUCTION AT MANH… |
| Mod SA214· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-25 | +$2,928 | $101,800,555 | THE AE DETERMINED THAT ADDED REINFORCEMENT WAS REQUIRED AT EACH LOCATION WHERE THE CANOPY ROOF CHANGED DIRECTI… |
| Mod SA215· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-30 | +$14,267 | $101,814,822 | THE LOCATION AND SIZE OF THE REPLACEMENT FLAGPOLE IS BEING CHANGED TO MATCH THE UNIT IT IS REPLACING AT THE MA… |
| Mod SA216· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-30 | +$58,486 | $101,873,308 | THE MEDICAL CENTER REQUESTED THAT THE NEW EMERGENCY GENERATOR UTILIZE THE EXISTING BUILDING (B152), IN LIEU OF… |
| Mod SA217· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-30 | +$1,669 | $101,874,977 | PLANTER DRAINS (3) LOCATED IN THE TEXTURE GARDEN REQUIRES PIPING FROM DRAINS TO THE STORM DRAIN SYSTEM, SINCE… |
| Mod SA218· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-31 | −$92,510 | $101,782,467 | LOCATIONS FOR FIRE AND SMOKE DAMPERS WERE MODIFIED BASED ON THE REQUIREMENTS OF NFPA90, IN LIEU OF USING THE I… |
| Mod SA219· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-31 | +$71,745 | $101,854,212 | WITH COMPLETION OF THE NEW CORRIDOR BETWEEN BUILDINGS 8 AND 150, THE TEMPORARY PASSAGEWAY BETWEEN BUILDINGS 12… |
| Mod SA221· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-31 | +$46,598 | $101,900,810 | THE ARCHITECT REVISED THE ROOF DECK AT BUILDING 126 AS A RESULT OF AN ERROR ON THE ORIGINAL CONTRACT DRAWINGS. |
| Mod SA222· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-02 | +$1,573 | $101,902,383 | THE MEDICAL CENTER HAS REQUESTED THAT BOLLARDS BE ADDED TO CONTROL PARKING AND THAT HANDICAP PARKING SPACES A… |
| Mod SA223· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-02 | +$2,294 | $101,904,677 | THE ARCHITECT ADDED GATES AT THE TEXTURE AND ATRIUM GARDENS TO PROVIDE ACCESS TO SIDEWALKS ALONG THE SOUTH SID… |
| Mod SA220· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-14 | +$67 | $101,904,744 | CORRECT A DESIGN OMISSION THAT DID NOT SCHEDULE A FIRE ALARM MANUAL PULL STATION FOR THE EGRESS DOUBLE DOORS A… |
| Mod CO03Y· CHANGE ORDER | 2011-09-20 | +$5,700 | $101,910,444 | CODE REVIEW FOUND THAT FIRE DOORS IN B166G NEEDED TO BE CHANGED FROM 20 MINUTE TO 45 MINUTE TO PROVIDE A 1-HO… |
| Mod SA224· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-20 | +$2,363 | $101,912,807 | THE EXISTING CATCH BASIN LOCATED SOUTH OF BUILDING 126L WAS NOT SHOWN TO BE REMOVED, HOWEVER IT IS NOT REQUIRE… |
| Mod SA206· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-21 | +$44,450 | $101,957,257 | LOCATIONS FOR FIRE AND SMOKE DAMPERS WERE MODIFIED BASED ON THE REQUIREMENTS OF NFPA90, IN LIEU OF USING THE I… |
| Mod SA225· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-27 | +$5,955 | $101,963,212 | REROUTING OF EXISTING MOAT DRAIN AT BUILDING 126, REQUIRING THE DRAIN PIPING TO BE EXTENDED AND TIE INTO STORM… |
| Mod SA226· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-28 | +$25,698 | $101,988,910 | THE ARCHITECT MISSED DRAINAGE POC FOR DRAINAGE TRENCHES AT THE HORIZON GARDENS TO PROVIDE REVISED PIPE SIZES A… |
| Mod CO03Z· CHANGE ORDER | 2011-09-29 | +$5,355 | $101,994,265 | PROVIDE CONDUIT FOR POWER AND DATA IN B165C CANTEEN AND RECEPTION AREA. ALSO INSTALL CONDUIT TO RUN THE NECESS… |
| Mod SA229· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-18 | +$2,099 | $101,996,364 | DELETE INSTALLATION OF THE NEW 4" FIRE LINE, TIE-IN AND VALVE AT B126L. RELOCATE THE EXISTING POST INDICATOR V… |
| Mod SA230· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-18 | +$23,166 | $102,019,530 | REVISE THE INSTALLATION OF TYPE SFB LIGHTED HANDRAILS FROM WALL MOUNT TO FLOOR MOUNT AT BUILDING 164B CORRIDOR… |
| Mod SA231· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-18 | +$4,392 | $102,023,922 | CONTRACT DRAWINGS FAILED TO INDICATE MODIFICATION TO A CURB ISLAND AT THE EAST END OF MAGNOLIA ROAD. MODIFICA… |
| Mod SA227· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-20 | +$3,788 | $102,027,710 | TROUBLESHOOT AND REWIRE HANDHOLES ON EXISTING PARKING LOT C LIGHTS DUE TO DAMAGES DONE DURING EXCAVATION. FIX/… |
| Mod SA228· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-20 | +$8,690 | $102,036,400 | REQUIREMENT TO ADD ROOF DRAINS ON THE LOWER ROOF AREA OF B126L ALONG WITH PIPING. PLUMBING DRAWINGS FAILED TO… |
| Mod SA232· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-20 | +$4,340 | $102,040,740 | INSTALL THE LFB LIGHT FIXTURES IN BUILDING 165E DINING ROOM AS DIRECTED IN ATTACHED RFP # D-069 SKETCH 1 DATED… |
| Mod SA233· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-28 | +$5,822 | $102,046,562 | THE EXISTING CANOPY ON THE SOUTH SIDE OF B126OP WAS DEMOLISHED AND THE EXISTING ROOF DRAINS PIPING NEEDED TO B… |
| Mod SA234· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-28 | +$32,132 | $102,078,694 | ELECTRIAL ROUGH-IN WAS NOT SHOWN IN THE CONTRACT FOR THE OWNER-FURNISHED/OWNER-INSTALLED X-RAY EQUIPMENT IN BU… |
| Mod SA235· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-28 | +$2,475 | $102,081,169 | LOCATIONS FOR NEW CATCH BASINS ENCOUNTERED UNFORESEEN ITEMS WHICH NEEDED TO BE REMOVED TO ALLOW THEIR INSTALLA… |
| Mod SA236· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-28 | +$2,422 | $102,083,591 | VAMC REQUESTED REVISIONS AS FOLLOWS: 1. TO THE SECURITY LAYOUT IN THE B165C CANTEEN RETAIL STORE, DUE TO CONF… |
| Mod SA237· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-07 | +$5,142 | $102,088,733 | PROVIDE ANGLE SUPPORT FOR TYPE LFB LIGHT FIXTURES IN B165C/B166F, C100 AND F170 LOBBIES AS DIRECTED BY THE ARC… |
| Mod SA238· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-07 | +$9,381 | $102,098,114 | PROVIDE DEDICATION PLAQUE FOR THE 402 PROJECT AND MEMORIAL PLAQUES FOR THE NAMING OF THE BLIND REHAB CENTER. |
| Mod SA239· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-07 | +$4,789 | $102,102,903 | AS A RESULT OF CONFLICTS WITH EXISTING UTILITIES IT IS NECESSARY TO POTHOLE ALL UTILITIES IN THE AREA OF THE… |
| Mod SA240· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-08 | +$1,511 | $102,104,414 | DRYWALL IS BEING USED TO COVER THE EXISTING BRICK IN THE NEW LOBBY OF B126L SINCE THIS MATERIAL DOES NOT COOR… |
| Mod SA242· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-08 | +$1,240 | $102,105,654 | REMOVE AND INSTALL PANIC DOOR HARDWARE IN BUILDING 166G, DOORS G101 AND G157. SECURITY DRAWING SC1.1 SHOW THES… |
| Mod SA241· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-16 | +$2,503 | $102,108,157 | UNFORESEEN ASPHALT, CONCRETE AND PIPING OBSTRUCTIONS WERE ENCOUNTERED WHEN DRILLING PIERS FOR BOLLARD INSTALLA… |
| Mod SA243· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-16 | +$11,965 | $102,120,122 | CORRECT A DESIGN OMISSION THAT DID NOT SCHEDULE QUARRY TILE IN THE SERVING AREA OF E101 IN B165E. |
| Mod SA244· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-16 | +$8,992 | $102,129,114 | THE AE FAILED TO CORDINATE PILE CAP HEIGHT WITH FINISHED GRADE, REQUIRING RAISING/LOWERING PILE CAPS TO SUITE… |
| Mod SA245· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-16 | +$20,441 | $102,149,555 | MEDICAL CENTER HAS REQUESTED REVISIONS TO POWER, DATA AND AUDIO VISUAL IN B165D TO ACCOMMODATE FUTURE IT NEEDS… |
| Mod SA246· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-30 | +$2,341 | $102,151,896 | INSTALL ADDITIONAL P-808 WASHING MACHINE SUPPLY/DRAIN AND NECESSARY POWER FOR ADDITIONAL WASHER AND DRYER IN B… |
| Mod SA247· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-30 | +$2,398 | $102,154,294 | CODE REVIEW FOUND THAT FIRE DOORS IN B166G NEEDED TO BE CHANGED FROM 20 MINUTE TO 45 MINUTE TO PROVIDE A 1-HO… |
| Mod SA248· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-01 | +$3,247 | $102,157,541 | ADD ELECTRICAL PROVISIONS TO DOORS AT C100 AND F170. ARCHITECTURAL DRAWINGS CALL THESE DOORS TO HAVE AUTOMATIC… |
| Mod SA249· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-01 | −$4,016 | $102,153,525 | ARCHITECT ISSUED INSTRUCTIONS TO DELETE STAINLESS STEEL HANDRAILS IN CORRIDOR C145 OF B165C. HANDRAILS WERE N… |
| Mod SA250· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-02 | +$2,842 | $102,156,367 | THE ARCHITECT IS CHANGING THE GLASS SLIDING DOORS AT THE CANTEEN TO A ROLLING FIRE DOOR TO MAINTAIN THE CORRID… |
| Mod SA251· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-08 | −$12,126 | $102,144,241 | LANDSCAPE WORK IS BEING DELETED ALONG THE ENTRANCE OF CHANNEL ROAD TO PREVENT REPLACEMENT OF EXISTING NEWER WO… |
| Mod SA252· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-09 | −$5,614 | $102,138,627 | CONTRACT DRAWINGS SHOWED BOTH ACOUSTICAL CEILING TILES AND F22 PENDANT MOUNTED LIGHT FIXTURES. THE ACOUSTICAL… |
| Mod SA253· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-09 | +$4,979 | $102,143,606 | MEDICAL CENTER DIRECTOR REQUESTED ADDITIONAL POWER AND DATA OUTLETS, AND A NEW DOOR TO SERVE EMPLOYEE NEEDS IN… |
| Mod SA254· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-12 | +$16,775 | $102,160,381 | THE MEDICAL CENTER REQUESTED TO CHANGE AND RELOCATE SIGNAGE IN B165, B166, AND ON PINE ROAD WEST OF B164A. |
| Mod SA255· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-21 | +$1,002 | $102,161,383 | DEMOLISH LIGHT POLE AND ITS BASE IN PARKING LOT D. |
| Mod SA256· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-06 | +$6,380 | $102,167,763 | REVERSE DOOR SWINGS TO ALLOW FOR PROPER EGRESS FROM CLASSROOMS FORMED BY MOVABLE PARTITIONS IN BUILDING 165D. |
| Mod SA257· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-06 | +$3,521 | $102,171,284 | THE EXISTING IRRIGATION MAIN IN THE AREA SOUTH OF BLDG #150 IS BEING RELOCATED TO A LOWER DEPTH TO BE LOWER TH… |
| Mod SA258· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-06 | +$4,720 | $102,176,004 | 1. INSTALL F21 LIGHT FIXTURES IN BUILDING 166F, SHOWER ROOMS F134 AND F136. THE ROOMS DON'T HAVE ENOUGH ILLUMI… |
| Mod SA259· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-06 | +$5,065 | $102,181,069 | ARCHITECT ISSUED DIRECTIONS TO RE-DESIGN AND RE-ENGINEER THE CURTAIN WALL CORNERS ON THE 2ND FLOOR OF B165E. |
| Mod SA260· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-06 | +$1,603 | $102,182,672 | THE VAMC CENTER DIRECTOR REQUESTED AN OFFICE SPACE BE ADDED IN THE WOOD SHOP AREA OF THE BLIND REHAB. |
| Mod SA261· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-06 | +$31,807 | $102,214,479 | THE CONTRACTOR PROVIDED FOOTINGS FOR THE LIGHT BOLLARDS THAT WERE LARGER THAN REQUIRED BY SPECIFICATIONS. |
| Mod SA262· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-06 | +$4,607 | $102,219,086 | DRAWINGS DID NOT INDICATE POWER TO SECURITY EQUIPMENT IN ROOM G010. |
| Mod SA263· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-06 | +$1,510 | $102,220,596 | CORRECT A DESIGN OMISSION TO INSTALL EXPANSION JOINT COVERS WHERE EXISITING CORRIDOR WALLS BUTT THE NORTH SIDE… |
| Mod SA265· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-06 | +$2,862 | $102,223,458 | THESE MODIFICATIONS WERE REQUESTED BY THE MEDICAL CENTER TO ADD A STORE ROOM IN THE CANTEEN RETAIL STORE, ENLA… |
| Mod SA267· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-06 | +$2,848 | $102,226,306 | ARCHITECT ISSUED INSTRUCTIONS TO ADD ALUMINUM BRAKE METAL FILLER TO THE OPENING OF EXTERIOR WINDOW B150. |
| Mod SA268· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-18 | −$8,080 | $102,218,226 | CURBS ALONG THE PLANTING AREAS ON EACH SIDE OF CHANNEL ROAD WERE DETERMINED TO BE UNNECESSARY AND WERE THEREFO… |
| Mod SA264· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-20 | +$9,123 | $102,227,349 | THERE ARE REQUIRED CHANGES TO TYPE OF SINKS IN BLDG 165F ROOMS F222 AND F252 DUE TO THE AREA OF THE SINK LOCAT… |
| Mod SA269· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-25 | +$1,044 | $102,228,393 | RELOCATE POWER POLES AND INSTALL ADDITIONAL POWER OUTLETS IN BUILDING 166F ROOM F227 AS SHOWN ON SKETCH SKE-RF… |
| Mod SA270· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-25 | −$19,172 | $102,209,221 | PROVIDE CREDIT FOR HOMERUN CONDUITS AT LOCATIONS WITH MORE THAN THREE (3) CIRCUITS PER CONDUIT IN B165/B166. I… |
| Mod SA271· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-31 | +$5,000 | $102,214,221 | ARCHITECT ISSUED INSTRUCTIONS TO ADD ALUMINUM BRAKE METAL TO COVER GAP BETWEEN CURTAIN WALL AND PARALLEL BEAM… |
| Mod SA272· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-02-03 | +$21,334 | $102,235,555 | PROVIDE CONDUIT FOR POWER AND DATA IN B165C CANTEEN AND RECEPTION AREA. ALSO INSTALL CONDUIT TO RUN THE NECESS… |
| Mod SA274· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-02-10 | −$12,129 | $102,223,426 | THE AE DETERMINED THAT DAVITS AND TIE BACKS WERE NOT REQUIRED FOR WINDOW WASHING. IN LIEU, AN AREA AT THE GROU… |
| Mod SA275· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-01 | +$11,291 | $102,234,717 | A TEMPORARY CORRIDOR WAS CONSTRUCTED TO MAINTAIN PEDESTRIAN TRAFFIC BETWEEN BUILDINGS 8 AND 128; WITH THE COMP… |
| Mod SA266· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-09 | −$129,780 | $102,104,937 | DUE TO BOTH AN INCORRECT LAYOUT AND INCOMPLETE DESIGN DOCUMENTS, IT HAS BEEN DETERMINED THAT THE NEW LOBBY INS… |
| Mod SA277· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-22 | +$5,308 | $102,110,245 | ARCHITECT ISSUED CORRECTED ELEVATION GRADES FOR THE PLANTING AREAS ON BOTH SIDE CHANNEL ROAD AND ALSO THE ELEV… |
| Mod SA280· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-22 | +$2,758 | $102,113,003 | INSTALL ADDITIONAL TUBE CELL DISTRIBUTION UNIT IN MANHOLE MH20 DUE TO THE CLOSE PROXIMITY OF INCOMING CONDUITS… |
| Mod SA276· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-23 | −$3,172 | $102,109,831 | WINDOW SHADES WERE NOT SHOWN AT ALL WINDOWS IN BLDG 165D AND, THEREFORE, THOSE SHOWN ARE BEING DELETED. ADDIN… |
| Mod SA278· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-23 | +$11,181 | $102,121,012 | ARCHITECTS ISSUED CORRECTION TO THE INSTALLATION OF PLANTER WALLS AT THE TEXTURE GARDEN AND PROVIDE SKETCH 1 D… |
| Mod SA279· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-23 | +$3,281 | $102,124,293 | RE-ROUTE, REPLACE OLD AND INSTALL NEW CONDUITS FOR THE EXISTING VA MARQUEE SIGN, AND PARKING LOT LIGHTS IN FRO… |
| Mod SA273· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-03 | +$97,364 | $102,221,657 | IN THE ORIGINAL CONTRACT DRAWINGS, THE ARCHITECTURAL DRAWINGS AND THE STRUCTURAL DRAWINGS DO NOT MATCH FOR THE… |
| Mod SA282· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-18 | +$20,201 | $102,241,858 | DEMOLITION OF THE TUNNEL (2 STORIES) CONNECTION TO BLDG. 150 DID NOT INCLUDE ALL REPAIR WORK TO BLDG. 150. WHI… |
| Mod SA283· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-25 | +$11,478 | $102,253,336 | THE MEDICAL CENTER HAS REQUESTED B165 AND B166 FIRE ALARM NETWORK CONNECTIONS, MATV, NURSE CALL, AND JOHNSON C… |
| Mod SA284· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-05-25 | +$2,668 | $102,256,004 | THE AE DETERMINED THAT ADDITIONAL DOORS WERE REQUIRED TO PROVIDE SEPARATION BETWEEN THE ASSEMBLY OCCUPANCY OF… |
| Mod SA285· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-05-25 | +$10,953 | $102,266,957 | SECURITY DOOR HARDWARE MODIFICATION TO DOORS AND DOOR FRAMES IN ROOMS 137, 192, 217, 226 AND 317 OF BUILDING… |
| Mod SA281· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-18 | +$35,515 | $102,302,472 | ARCHITECT ISSUED CORRECTION TO REVISE FOOTINGS LOCATION FOR THE SECURITY BARRIER CANOPY DUE TO AN EXISTING MAN… |
| Mod SA286· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-18 | +$15,071 | $102,317,543 | ARCHITECT ISSUED DOCUMENTS TO REVISE THE REPAIRS TO EXISTING FA ADE AT EXISTING BUILDING 126 TO INCLUDE COVERI… |
| Mod SA287· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-27 | +$9,942 | $102,327,485 | 1. REPLACE TELECOMMUNICATION SERVER RACK FROM TWO POST RACKS TO FOUR POST RACKS AS REQUIRED BY THE IT DEPARTME… |
| Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-12-18 | +$57,461 | $102,384,946 | 1. REPLACE TELECOMMUNICATION SERVER RACK FROM TWO POST RACKS TO FOUR POST RACKS AS REQUIRED BY THE IT DEPARTME… |
| Mod P00002· CLOSE OUT | 2013-12-05 | +$43,629 | $102,428,575 | FINAL CLOSEOUT MOD |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI KU19CNLCK2K7)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C10F26P0007 | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) · Y1DZ · CONSTRUCTION OF OTHER HOSPITAL BUILDINGS | $10,000 | FY2026 |
| 36C10F25C0001 | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) · Y1DZ · CONSTRUCTION OF OTHER HOSPITAL BUILDINGS | $69,636,302 | FY2025 |
| 36C26122C0022 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · Z1DA · MAINTENANCE OF HOSPITALS AND INFIRMARIES | $8,861,096 | FY2022 |
| VA101F16C2782 | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES | $26,067,145 | FY2016 |
| VA101F16C2610 | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) · Y1DZ · CONSTRUCTION OF OTHER HOSPITAL BUILDINGS | $110,710,165 | FY2016 |
| VA101F14C0003 | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) · Y1DZ · CONSTRUCTION OF OTHER HOSPITAL BUILDINGS | $127,518,496 | FY2014 |
Other recipients under Y141 from OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA101CFMC0167 | THE R.E.M. ENGINEERING CO INC | OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT | $384,303 | FY2011 |
| VA101CFMC0130 | TTL ASSOCIATES INC | OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT | $101,742 | FY2011 |
| VA101CFMC0111 | WALSH CONSTRUCTION PUERTO RICO | OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT | $52,457,646 | FY2010 |
| VA101CFMC0085 | ARCHER WESTERN/DEMARIA JOINT VENTURE III | OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT | $58,427,947 | FY2010 |
| VACFM05I0064 | N.K. BHANDARI, ARCHITECTURE & ENGINEERING, P.C. | OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT | $114,946 | FY2010 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA101CFMC0005_3600_-NONE-_-NONE- · retrieved 2026-09-26.