Award recordCONTRACT

G&C FAB-CON, LLC

PIID VA101CFMC0082· VA Staff Offices· OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT· Y299 · CONTRUCT/ALL OTHER NON-BLDG FACS· FY2010· $21,354,503 net obligations· UEI CFZ1ZEPL22N9· NJ

Description

PROVIDE ALL LABOR, MATERIALS AND EQUIPMENT NECESSARY TO CONSTRUCT A SPOILS STORAGE STRUCTURE AT THE WASHINGTON CROSSING NATIONAL CEMETERY AS FURTHER DESCRIBED ON SUPPLEMENTAL AGREEMENT P00005(PARAGON SA-078).

Base award description: CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, AND MATERIALS FOR GRAVESITED IMPROVEMENTS AND EXPANSION AT THE WASHINGTON CROSSING NATIONAL CEMETERY, NEWTOWN, PA

First action · last action
2010-04-20 · 2013-11-05
Transactions
106
First transaction's obligation
$19,497,300
Base + all options value (sum of deltas)
$21,363,143
Extent competed
FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
Other than full & open authority
—
Set-aside
SERVICE DISABLED VETERAN OWNED SMALL BUSINESS SET-ASIDE
Offers received
10
SDVOSB flag on record
Yes (self-representation)
NAICS
237990 · OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION

Modification chain · 106 transactions

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$21,354,503$0Base award · 2010-04-20 · this action $19,497,300 · running total $19,497,300Modification SA001 · 2010-08-31 · this action $2,275 · running total $19,499,575Modification SA002 · 2010-11-15 · this action $29,717 · running total $19,529,292Modification SA003 · 2010-11-17 · this action $52,634 · running total $19,581,926Modification SA004 · 2011-01-03 · this action $69,229 · running total $19,651,155Modification CO01A · 2011-01-20 · this action $9,226 · running total $19,660,381Modification SA007 · 2011-02-18 · this action $1,464 · running total $19,661,845Modification SA010 · 2011-04-05 · this action $20,839 · running total $19,682,684Modification SA011 · 2011-04-05 · this action $48,852 · running total $19,731,536Modification SA012 · 2011-04-21 · this action $2,228 · running total $19,733,764Modification SA008 · 2011-04-25 · this action $214,597 · running total $19,948,361Modification CO01B · 2011-05-03 · this action $10,735 · running total $19,959,096Modification SA005 · 2011-05-09 · this action $23,488 · running total $19,982,584Modification SA006 · 2011-05-09 · this action $32,154 · running total $20,014,738Modification SA013 · 2011-05-10 · this action $20,687 · running total $20,035,425Modification SA009 · 2011-05-16 · this action $73,566 · running total $20,108,991Modification SA014 · 2011-05-19 · this action $6,307 · running total $20,115,298Modification CO01C · 2011-05-23 · this action $11,595 · running total $20,126,893Modification SA015 · 2011-05-23 · this action $23,986 · running total $20,150,879Modification SA016 · 2011-05-23 · this action $23,096 · running total $20,173,975Modification SA017 · 2011-06-09 · this action $0 · running total $20,173,975Modification SA018 · 2011-06-22 · this action $1,666 · running total $20,175,641Modification SA019 · 2011-07-11 · this action $9,511 · running total $20,185,152Modification SA020 · 2011-07-25 · this action $8,894 · running total $20,194,046Modification SA021 · 2011-07-26 · this action -$6,813 · running total $20,187,233Modification SA022 · 2011-07-26 · this action $8,007 · running total $20,195,240Modification SA023 · 2011-08-05 · this action $14,620 · running total $20,209,860Modification CO01D · 2011-08-22 · this action $10,000 · running total $20,219,860Modification SA024 · 2011-08-24 · this action $5,246 · running total $20,225,106Modification SA025 · 2011-09-07 · this action $8,546 · running total $20,233,652Modification SA026 · 2011-09-07 · this action $14,447 · running total $20,248,099Modification SA027 · 2011-09-21 · this action $27,673 · running total $20,275,772Modification SA028 · 2011-09-21 · this action $41,677 · running total $20,317,449Modification SA029 · 2011-09-21 · this action -$5,009 · running total $20,312,441Modification CO01E · 2011-09-23 · this action $36,000 · running total $20,348,441Modification CO01F · 2011-09-23 · this action $99,800 · running total $20,448,241Modification TE001 · 2011-09-28 · this action $0 · running total $20,448,241Modification TE002 · 2011-09-28 · this action $0 · running total $20,448,241Modification SA030 · 2011-10-04 · this action $0 · running total $20,448,241Modification SA031 · 2011-10-05 · this action $81,816 · running total $20,530,057Modification TE003 · 2011-10-20 · this action $0 · running total $20,530,057Modification CO01G · 2011-11-10 · this action $50,953 · running total $20,581,010Modification TE004 · 2011-11-10 · this action $0 · running total $20,581,010Modification SA032 · 2011-12-22 · this action $36,825 · running total $20,617,835Modification SA033 · 2012-01-12 · this action $880 · running total $20,618,715Modification SA034 · 2012-01-17 · this action $2,574 · running total $20,621,289Modification SA035 · 2012-01-17 · this action $7,713 · running total $20,629,002Modification TE005 · 2012-01-24 · this action $0 · running total $20,629,002Modification SA036 · 2012-01-25 · this action $0 · running total $20,629,002Modification SA037 · 2012-01-30 · this action $35,450 · running total $20,664,452Modification SA038 · 2012-01-31 · this action $9,812 · running total $20,674,264Modification SA039 · 2012-02-21 · this action $43,993 · running total $20,718,257Modification SA040 · 2012-03-05 · this action $5,576 · running total $20,723,834Modification CO01H · 2012-03-09 · this action $12,712 · running total $20,736,546Modification SA041 · 2012-03-09 · this action $3,278 · running total $20,739,824Modification SA042 · 2012-03-21 · this action $2,992 · running total $20,742,816Modification CO01J · 2012-03-23 · this action $45,000 · running total $20,787,816Modification SA043 · 2012-04-13 · this action $10,274 · running total $20,798,090Modification SA044 · 2012-04-13 · this action $3,566 · running total $20,801,656Modification SA045 · 2012-04-16 · this action -$465 · running total $20,801,191Modification CO01I · 2012-04-19 · this action $5,170 · running total $20,806,361Modification SA046 · 2012-04-19 · this action $9,460 · running total $20,815,821Modification SA047 · 2012-04-24 · this action $16,844 · running total $20,832,665Modification CO01K · 2012-04-26 · this action $70,000 · running total $20,902,665Modification CO01L · 2012-04-26 · this action $64,700 · running total $20,967,365Modification TE006 · 2012-05-02 · this action $0 · running total $20,967,365Modification CO01M · 2012-05-04 · this action $20,560 · running total $20,987,925Modification SA048 · 2012-05-11 · this action $38,895 · running total $21,026,820Modification SA049 · 2012-05-22 · this action -$430 · running total $21,026,390Modification SA050 · 2012-05-23 · this action $19,284 · running total $21,045,674Modification CO01N · 2012-05-29 · this action $25,500 · running total $21,071,174Modification CO01O · 2012-05-29 · this action $17,900 · running total $21,089,074Modification SA051 · 2012-06-06 · this action $38,972 · running total $21,128,046Modification SA052 · 2012-06-08 · this action $3,028 · running total $21,131,074Modification SA053 · 2012-06-08 · this action $9,857 · running total $21,140,931Modification CO01P · 2012-06-11 · this action $5,480 · running total $21,146,411Modification SA054 · 2012-06-18 · this action $2,572 · running total $21,148,984Modification SA055 · 2012-06-18 · this action $16,356 · running total $21,165,340Modification SA056 · 2012-06-18 · this action $0 · running total $21,165,340Modification SA057 · 2012-06-20 · this action $0 · running total $21,165,340Modification SA058 · 2012-06-22 · this action $0 · running total $21,165,340Modification SA059 · 2012-06-26 · this action -$1,541 · running total $21,163,799Modification CO01Q · 2012-07-09 · this action $26,900 · running total $21,190,699Modification SA061 · 2012-07-13 · this action $28,022 · running total $21,218,721Modification SA060 · 2012-07-16 · this action $1,828 · running total $21,220,548Modification SA062 · 2012-07-18 · this action -$5,892 · running total $21,214,657Modification SA063 · 2012-07-18 · this action -$3,224 · running total $21,211,433Modification SA064 · 2012-07-18 · this action -$2,773 · running total $21,208,660Modification SA065 · 2012-07-18 · this action -$1,700 · running total $21,206,960Modification CO01R · 2012-07-23 · this action $13,700 · running total $21,220,660Modification SA066 · 2012-07-23 · this action -$1,154 · running total $21,219,506Modification SA068 · 2012-07-30 · this action $9,095 · running total $21,228,601Modification SA069 · 2012-07-30 · this action -$1,702 · running total $21,226,899Modification SA067 · 2012-08-01 · this action $22,137 · running total $21,249,036Modification SA070 · 2012-08-03 · this action -$1,223 · running total $21,247,813Modification SA072 · 2012-08-15 · this action $4,878 · running total $21,252,691Modification SA071 · 2012-09-12 · this action -$6,931 · running total $21,245,761Modification SA073 · 2012-09-13 · this action -$294 · running total $21,245,466Modification CO01S · 2012-09-21 · this action $4,289 · running total $21,249,755Modification SA074 · 2012-09-21 · this action $7,924 · running total $21,257,679Modification P00002 · 2012-10-08 · this action $2,724 · running total $21,260,403Modification SA075 · 2012-10-11 · this action $2,724 · running total $21,263,127Modification P00003 · 2012-10-18 · this action $67 · running total $21,263,195Modification P00004 · 2012-10-24 · this action -$8,640 · running total $21,254,555Modification P00005 · 2013-06-14 · this action $81,588 · running total $21,336,142Modification P00006 · 2013-11-05 · this action $18,361 · running total $21,354,503
  • Base2010-04-20+$19,497,300= $19,497,300
  • Mod SA0012010-08-31+$2,275= $19,499,575
  • Mod SA0022010-11-15+$29,717= $19,529,292
  • Mod SA0032010-11-17+$52,634= $19,581,926
  • Mod SA0042011-01-03+$69,229= $19,651,155
  • Mod CO01A2011-01-20+$9,226= $19,660,381
  • Mod SA0072011-02-18+$1,464= $19,661,845
  • Mod SA0102011-04-05+$20,839= $19,682,684
  • Mod SA0112011-04-05+$48,852= $19,731,536
  • Mod SA0122011-04-21+$2,228= $19,733,764
  • Mod SA0082011-04-25+$214,597= $19,948,361
  • Mod CO01B2011-05-03+$10,735= $19,959,096
  • Mod SA0052011-05-09+$23,488= $19,982,584
  • Mod SA0062011-05-09+$32,154= $20,014,738
  • Mod SA0132011-05-10+$20,687= $20,035,425
  • Mod SA0092011-05-16+$73,566= $20,108,991
  • Mod SA0142011-05-19+$6,307= $20,115,298
  • Mod CO01C2011-05-23+$11,595= $20,126,893
  • Mod SA0152011-05-23+$23,986= $20,150,879
  • Mod SA0162011-05-23+$23,096= $20,173,975
  • Mod SA0172011-06-09+$0= $20,173,975
  • Mod SA0182011-06-22+$1,666= $20,175,641
  • Mod SA0192011-07-11+$9,511= $20,185,152
  • Mod SA0202011-07-25+$8,894= $20,194,046
  • Mod SA0212011-07-26-$6,813= $20,187,233
  • Mod SA0222011-07-26+$8,007= $20,195,240
  • Mod SA0232011-08-05+$14,620= $20,209,860
  • Mod CO01D2011-08-22+$10,000= $20,219,860
  • Mod SA0242011-08-24+$5,246= $20,225,106
  • Mod SA0252011-09-07+$8,546= $20,233,652
  • Mod SA0262011-09-07+$14,447= $20,248,099
  • Mod SA0272011-09-21+$27,673= $20,275,772
  • Mod SA0282011-09-21+$41,677= $20,317,449
  • Mod SA0292011-09-21-$5,009= $20,312,441
  • Mod CO01E2011-09-23+$36,000= $20,348,441
  • Mod CO01F2011-09-23+$99,800= $20,448,241
  • Mod TE0012011-09-28+$0= $20,448,241
  • Mod TE0022011-09-28+$0= $20,448,241
  • Mod SA0302011-10-04+$0= $20,448,241
  • Mod SA0312011-10-05+$81,816= $20,530,057
  • Mod TE0032011-10-20+$0= $20,530,057
  • Mod CO01G2011-11-10+$50,953= $20,581,010
  • Mod TE0042011-11-10+$0= $20,581,010
  • Mod SA0322011-12-22+$36,825= $20,617,835
  • Mod SA0332012-01-12+$880= $20,618,715
  • Mod SA0342012-01-17+$2,574= $20,621,289
  • Mod SA0352012-01-17+$7,713= $20,629,002
  • Mod TE0052012-01-24+$0= $20,629,002
  • Mod SA0362012-01-25+$0= $20,629,002
  • Mod SA0372012-01-30+$35,450= $20,664,452
  • Mod SA0382012-01-31+$9,812= $20,674,264
  • Mod SA0392012-02-21+$43,993= $20,718,257
  • Mod SA0402012-03-05+$5,576= $20,723,834
  • Mod CO01H2012-03-09+$12,712= $20,736,546
  • Mod SA0412012-03-09+$3,278= $20,739,824
  • Mod SA0422012-03-21+$2,992= $20,742,816
  • Mod CO01J2012-03-23+$45,000= $20,787,816
  • Mod SA0432012-04-13+$10,274= $20,798,090
  • Mod SA0442012-04-13+$3,566= $20,801,656
  • Mod SA0452012-04-16-$465= $20,801,191
  • Mod CO01I2012-04-19+$5,170= $20,806,361
  • Mod SA0462012-04-19+$9,460= $20,815,821
  • Mod SA0472012-04-24+$16,844= $20,832,665
  • Mod CO01K2012-04-26+$70,000= $20,902,665
  • Mod CO01L2012-04-26+$64,700= $20,967,365
  • Mod TE0062012-05-02+$0= $20,967,365
  • Mod CO01M2012-05-04+$20,560= $20,987,925
  • Mod SA0482012-05-11+$38,895= $21,026,820
  • Mod SA0492012-05-22-$430= $21,026,390
  • Mod SA0502012-05-23+$19,284= $21,045,674
  • Mod CO01N2012-05-29+$25,500= $21,071,174
  • Mod CO01O2012-05-29+$17,900= $21,089,074
  • Mod SA0512012-06-06+$38,972= $21,128,046
  • Mod SA0522012-06-08+$3,028= $21,131,074
  • Mod SA0532012-06-08+$9,857= $21,140,931
  • Mod CO01P2012-06-11+$5,480= $21,146,411
  • Mod SA0542012-06-18+$2,572= $21,148,984
  • Mod SA0552012-06-18+$16,356= $21,165,340
  • Mod SA0562012-06-18+$0= $21,165,340
  • Mod SA0572012-06-20+$0= $21,165,340
  • Mod SA0582012-06-22+$0= $21,165,340
  • Mod SA0592012-06-26-$1,541= $21,163,799
  • Mod CO01Q2012-07-09+$26,900= $21,190,699
  • Mod SA0612012-07-13+$28,022= $21,218,721
  • Mod SA0602012-07-16+$1,828= $21,220,548
  • Mod SA0622012-07-18-$5,892= $21,214,657
  • Mod SA0632012-07-18-$3,224= $21,211,433
  • Mod SA0642012-07-18-$2,773= $21,208,660
  • Mod SA0652012-07-18-$1,700= $21,206,960
  • Mod CO01R2012-07-23+$13,700= $21,220,660
  • Mod SA0662012-07-23-$1,154= $21,219,506
  • Mod SA0682012-07-30+$9,095= $21,228,601
  • Mod SA0692012-07-30-$1,702= $21,226,899
  • Mod SA0672012-08-01+$22,137= $21,249,036
  • Mod SA0702012-08-03-$1,223= $21,247,813
  • Mod SA0722012-08-15+$4,878= $21,252,691
  • Mod SA0712012-09-12-$6,931= $21,245,761
  • Mod SA0732012-09-13-$294= $21,245,466
  • Mod CO01S2012-09-21+$4,289= $21,249,755
  • Mod SA0742012-09-21+$7,924= $21,257,679
  • Mod P000022012-10-08+$2,724= $21,260,403
  • Mod SA0752012-10-11+$2,724= $21,263,127
  • Mod P000032012-10-18+$67= $21,263,195
  • Mod P000042012-10-24-$8,640= $21,254,555
  • Mod P000052013-06-14+$81,588= $21,336,142
  • Mod P000062013-11-05+$18,361= $21,354,503
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2010-04-20+$19,497,300$19,497,300CONTRACTOR SHALL FURNISH ALL LABOR, EQUIPMENT, AND MATERIALS FOR GRAVESITED IMPROVEMENTS AND EXPANSION AT THE…
Mod SA001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-08-31+$2,275$19,499,575WASHINGTON CROSSING NATIONAL CEMETERY, NEWTOWN, PA SA-001, PARTNERING
Mod SA002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-11-15+$29,717$19,529,292REVISIONS TO CULVERTS #2&#3
Mod SA003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-11-17+$52,634$19,581,926REVISE THE SEPTIC SYSTEMS SERVICING THE ADMIN/PIC AND THE MAINTENANCE BUILDINGS AS NEEDED TO COMPLY WITH PA DE…
Mod SA004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-01-03+$69,229$19,651,155SCOTT FARM "MOTHBALL" PROTECTION; TP1, TEMPORARY WEATHER-PROTECTION MEASURES AT SCOTT FARM HOUSE AND BARN WASH…
Mod CO01A· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-01-20+$9,226$19,660,381WASHINGTON CROSSING NATIONAL CEMETERY, NEWTOWN, PA
Mod SA007· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-02-18+$1,464$19,661,845DURING DESIGN, AGREEMENTS WERE REACHED BETWEEN THE VA AND LOCAL GOVERNMENTAL AGENCIES AND NEIGHBORS, TO CONSTR…
Mod SA010· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-04-05+$20,839$19,682,684RELOCATE ELECTRIC TO PUMP PW-3 WASHINGTON CROSSING NATIONAL CEMETERY NEWTON, PA
Mod SA011· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-04-05+$48,852$19,731,536REVISED STORM WATER CASTING ELEV. WASHINGTON CROSSING NATIONAL CEMETERY NEWTON, PA
Mod SA012· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-04-21+$2,228$19,733,764TO PROVIDE FURTHER CLARIFICATIONS DUE TO THE AMBIGUITY OF THE AMENDMENT #3 PLANTING SCHEDULE (FOR REASONS EXPL…
Mod SA008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-04-25+$214,597$19,948,361RELOCATE ELECTRIC TO PUMP PW-3 WASHINGTON CROSSING NATIONAL CEMETERY NEWTON, PA
Mod CO01B· CHANGE ORDER2011-05-03+$10,735$19,959,096TO PROVIDE TEMPORARY INTERIM DRAINAGE AND SODDING BETWEEN THE PHASE 1B LANDSCAPE "HEDGEROW" BED AND THE EXISTI…
Mod SA005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-05-09+$23,488$19,982,584SA-005 UNDERGROUND ROCK FORMATIONS WERE FOUND WITHIN THE PROPOSED CREMAINS FIELDS #30, #31 AT ELEVATIONS CLOS…
Mod SA006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-05-09+$32,154$20,014,738SA-006 THE CONTRACTOR'S APPROVED CPM SCHEDULE INCLUDED WINTER OUTAGES AT THE ADMINISTRATION BUILDING AND THE M…
Mod SA013· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-05-10+$20,687$20,035,425TO CORRECT THE CONTRACT DOCUMENTS, THE AE FURNISHED ADDITIONAL INFORMATION FOR PROPERLY ATTACHING THE ATTIC FL…
Mod SA009· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-05-16+$73,566$20,108,991AS A RESULT OF THE ARCHEOLOGICAL SURVEY IMPACTS TO THE CONTRACT WORK (SEE SA-008), TWO WINTER OUTAGES AFFECTIN…
Mod SA014· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-05-19+$6,307$20,115,298REVISIONS TO THE ELECTRICAL AND PLUMBING UTILITIES TO SERVE THE VEHICLE WASHING EQUIPMENT ARE NECESSARY TO COO…
Mod CO01C· CHANGE ORDER2011-05-23+$11,595$20,126,893THE CONTRACT INDICATES THAT THE NEW ADMIN/PIC BUILDING DOMESTIC WATER SOURCE IS THE EXISTING WELL LOCATED AT T…
Mod SA015· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-05-23+$23,986$20,150,879A MODIFICATION TO THE CONTRACT DOCUMENTS WAS NECESSARY FOR PROPER ATTACHMENT OF THE EAVES FASCIA TO MEET THE E…
Mod SA016· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-05-23+$23,096$20,173,975PROPOSED LOCATIONS OF THE GEOTHERMAL WELLS FOR THE ADMIN/PIC BUILDING THE MAINTENANCE COMPLEX WERE CHANGED TO…
Mod SA017· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-06-09+$0$20,173,975CHANGES TO THE SPECIFIED WELDED HOLLOW METAL DOOR FRAMES WITH S59 COLONIAL CASING WERE NECESSARY DUE TO DIFFIC…
Mod SA018· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-06-22+$1,666$20,175,641AT THE REQUEST OF NCA OFFICE OF CONSTRUCTION MANAGEMENT (41F), THE DELETION OF THE OIL/WATER SEPARATOR AT THE…
Mod SA019· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-11+$9,511$20,185,152REVISIONS TO THE CONTOURS OF STORM WATER MANAGEMENT BASINS (SWMA) 6,7,8,9&10 WERE NECESSARY TO CORRECT THE CON…
Mod SA020· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-25+$8,894$20,194,046PORTIONS OF THE GRAVEL MAINTENANCE SERVICE ROAD WILL REQUIRE REALIGNMENT IN ORDER TO AVOID AN ACTIVE ARCHEOLOG…
Mod SA021· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-26−$6,813$20,187,233IN LIEU OF THE APPROVED NOISE BARRIER WALL SYSTEM TO BE INSTALLED ADJACENT TO THE EXISTING PHASE-1A COMMITTAL…
Mod SA022· DEFINITIZE CHANGE ORDER2011-07-26+$8,007$20,195,240THIS SA DEFINITIZES CO-01B. TO CORRECT BA #1 DRAINAGE ISSUES IN BURIAL AREA #1 AND TO PROVIDE GRADING SURVEYS…
Mod SA023· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-05+$14,620$20,209,860CHANGES TO THE IRRIGATION CONTROLLER LOCATIONS WERE NECESSARY TO CORRECT THE CONSTRUCTION DOCUMENTS.
Mod CO01D· CHANGE ORDER2011-08-22+$10,000$20,219,860TO PROVIDE NECCESSARY IN-WALL SUPPORT AND UTILITIES AS REQUESTED BY MSN#1 AND THE WASHINGTON CROSSING NATIONAL…
Mod SA024· DEFINITIZE CHANGE ORDER2011-08-24+$5,246$20,225,106THE CONTRACT INDICATES THAT THE NEW ADMIN/PIC BUILDING DOMESTIC WATER SOURCE IS THE EXISTING WELL LOCATED AT T…
Mod SA025· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-07+$8,546$20,233,652THE CONTRACT DOCUMENTS INDICATE THE MILITARY BRANCH EMBLEMS TO BE INSTALLED AT THE COMMITTAL SHELTERS BE VA F…
Mod SA026· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-07+$14,447$20,248,099CORRECTIONS WERE NECESSARY FOR UNDERDRAIN PIPING INSTALLED IN FIELD #29 TO CORRECT THE UNDERDRAIN PIPING ELEVA…
Mod SA027· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-21+$27,673$20,275,772PROVIDE CABLE TRAYS IN LIEU OF USING J-HOOKS FOR THE OVERHEAD LOW VOLTAGE ELECTRICAL RUNS TO FACILITATE THE IN…
Mod SA028· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-21+$41,677$20,317,449TO PROVIDE ADDITIONAL ELECTRICAL POWER AND SIGNAL CAPABILITY FOR THE MAINTENANCE OFFICE AND GARAGE AS REQUESTE…
Mod SA029· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-21−$5,009$20,312,441PRIOR TO HIS DEATH, A LOCAL RESIDENT STIPULATED IN HIS WILL THAT A SUM OF MONEY WAS TO BE SET ASIDE TO PURCHA…
Mod CO01E· CHANGE ORDER2011-09-23+$36,000$20,348,441TO IMPLEMENT THE CHANGES REQUIRED TO BE IN FULL COMPLIANCE WITH THE MOST RECENT THE INFORMATION TECHNOLOGY OF…
Mod CO01F· CHANGE ORDER2011-09-23+$99,800$20,448,241DUE TO ODOR ISSUES WITH THE EXISTING WELL SHOWN TO SERVE THE NEW ADMIN/PIC BUILDING, MSN#1 AND THE CEMETERY DI…
Mod TE001· OTHER ADMINISTRATIVE ACTION2011-09-28+$0$20,448,241IN ACCORDANCE WITH THE DEFAULTS CLAUSE OF THE CONTRACT IT IS NECESSARY TO EXTEND THE CONTRACT DURATION BY SIX…
Mod TE002· OTHER ADMINISTRATIVE ACTION2011-09-28+$0$20,448,241IN ACCORDANCE WITH THE DEFAULTS CLAUSE OF THE CONTRACT IT IS NECESSARY TO EXTEND THE CONTRACT DURATION BY TWO…
Mod SA030· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-10-04+$0$20,448,241FOR PAYMENT OF OFFSITE STORED FINISHED CARPENTERY AND MILLWORK MATERIALS FURNISHED BY ARTISAN DISPLAY INCORPOR…
Mod SA031· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-10-05+$81,816$20,530,057PROVIDE ADDITIONAL ORGANIC MATERIAL TO EXISTING TOPSOIL TO INCREASE TURF GRASS ROOT STRUCTURE AND HEALTH AND T…
Mod TE003· OTHER ADMINISTRATIVE ACTION2011-10-20+$0$20,530,057IN ACCORDANCE WITH THE DEFAULTS CLAUSE OF THE CONTRACT IT IS NECESSARY TO EXTEND THE CONTRACT DURATION BY FIVE…
Mod CO01G· CHANGE ORDER2011-11-10+$50,953$20,581,010A REQUEST BY MSN#1 WAS MADE TO INCREASE THE ENTRY ROADWAY WIDTHS LEADING INTO THE COMMITTAL SERVICE SHELTERS T…
Mod TE004· OTHER ADMINISTRATIVE ACTION2011-11-10+$0$20,581,010IN ACCORDANCE WITH THE DEFAULTS CLAUSE OF THE CONTRACT IT IS NECESSARY TO EXTEND THE CONTRACT DURATION BY NINE…
Mod SA032· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-12-22+$36,825$20,617,835IMPROVEMENTS TO MEMORIAL WALL/COLUMBARIUM WASHINGTON CROSSING NATIONAL CEMETERY PHASE 1B DEVELOPMENT NEWTOWN,…
Mod SA033· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-01-12+$880$20,618,715SEVERAL MODIFICATIONS TO THE ORIGINAL DESIGN OF THE MONUMENT AND CAST IN PLACE CONCRETE FOUNDATION FOR THE GET…
Mod SA034· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-01-17+$2,574$20,621,289ELECTRICAL SERVICE NOT SHOWN OR SPECIFIED FOR THE MAINTENANCE GARAGE ICE MAKING MACHINE LOCATED IN ROOM C100.
Mod SA035· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-01-17+$7,713$20,629,002CLIENT REQUESTED TO LOWER CLEANOUTS FOR CRYPT FIELD UNDERDRAIN PIPING TO PREVENT DAMAGE BY CEMETERY LAWN MOWIN…
Mod TE005· OTHER ADMINISTRATIVE ACTION2012-01-24+$0$20,629,002IN ACCORDANCE WITH THE DEFAULTS CLAUSE OF THE CONTRACT IT IS NECESSARY TO EXTEND THE CONTRACT DURATION BY TWO…
Mod SA036· DEFINITIZE CHANGE ORDER2012-01-25+$0$20,629,002DEFINITIZES CO-01G. A REQUEST BY MSN#1 WAS MADE TO INCREASE THE ENTRY ROADWAY WIDTHS LEADING INTO THE COMMITTA…
Mod SA037· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-01-30+$35,450$20,664,452ORIGINAL CONTRACT IRRIGATION PLANS AT THE ADMINISTRATION/PIC BLDG DID NOT INCORPORATE THE ADD ALTERNATE #5 ADD…
Mod SA038· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-01-31+$9,812$20,674,264THE CONTRACT DOCUMENTS DID NOT PROVIDE DIRECTIONAL SIGNAGE ALONG THE WASHINGTON CROSSING ROAD TO ALERT VISITOR…
Mod SA039· DEFINITIZE CHANGE ORDER2012-02-21+$43,993$20,718,257DURING HEAVY RAINFALL EVENTS, EXCESSIVE RUNOFF FROM AN ADJOINING AGRICULTURAL FIELD ON VA PROPERTY, BUT OUTSID…
Mod SA040· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-03-05+$5,576$20,723,834DUE TO DIMENSIONAL CONFLICTS BETWEEN THE CEILING HEIGHTS AND COLONIAL WOOD TRIM MOLDING AT WINDOW OPENINGS IN…
Mod CO01H· CHANGE ORDER2012-03-09+$12,712$20,736,546THE PROVISION AND INSTALLATION OF BENCHES AT THE COMMITTAL SHELTER WAS NOT INCLUDED IN THE SCOPE OF WORK FOR T…
Mod SA041· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-03-09+$3,278$20,739,824TO COMPLY WITH THE MOST RECENT NCA NETWORK CABLING SPECIFICATIONS (ISSUED BY THE VA OFFICE OF INFORMATION&TECH…
Mod SA042· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-03-21+$2,992$20,742,816CHANGES TO THE FIRE ALARM DEVICES SHOWN ON THE CONTRACT DOCUMENTS IN THE ADMIN/PIC BUILDING AND MAINTENANCE OF…
Mod CO01J· CHANGE ORDER2012-03-23+$45,000$20,787,816THE VARIOUS BUILDINGS CONSTRUCTED ON THIS PROJECT ARE SPECIFIED TO RECEIVE FIBER CONCRETE EXTERIOR TRIM AND GL…
Mod SA043· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-04-13+$10,274$20,798,090TO UPGRADE THE SURFACE OF THE MEMORIAL WALK FROM STONE DUST TO ASPHALT WEARING COURSE TO ALLOW WHEELCHAIR BOU…
Mod SA044· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-04-13+$3,566$20,801,656THE CONTRACT DOCUMENTS DID NOT INDICATE SUPPLY AIR FOR THE WOMEN'S LOCKEROOM B108. THE AE REVIEWED THIS MATTER…
Mod SA045· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-04-16−$465$20,801,191SEVERAL DOORS IN THE MAINTENANCE OFFICE WERE RECOMMENDED BY THE ARCHITECT TO BE CHANGED FROM ALUMINUM CLAD TO…
Mod CO01I· CHANGE ORDER2012-04-19+$5,170$20,806,361BY REQUEST FROM MSN#1 OFFICE AND THE WASHINGTON CROSSING NATIONAL CEMETERY, THE EXISTING RETURN AIR GRILLES IN…
Mod SA046· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-04-19+$9,460$20,815,821TO MODIFY THE OVERALL PHYSICAL LAYOUT OF PLANTING BED 6&7 AND ITS PLANTINGS TO PROVIDE FOR : 1. DRAINAGE/PREVE…
Mod SA047· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-04-24+$16,844$20,832,665A REQUEST FROM THE MSN#1 OFFICE AND THE WASHINGTON CROSSING NATIONAL CEMETERY DIRECTOR WAS MADE TO PROVIDE A P…
Mod CO01K· CHANGE ORDER2012-04-26+$70,000$20,902,665REPLACE THE SPECIFIED 1.5 FOOT LENGTH GRAVESITE GRID MONUMENTS WITH 4 FOOT LONG GRAVESITE GRID MONUMENTS TO EX…
Mod CO01L· CHANGE ORDER2012-04-26+$64,700$20,967,365DEMOLITION OF THE EXISTING BELKY FARM OUTBUILDINGS WAS REQUESTED BY THE WASHINGTON CROSSING NATIONAL CEMETERY…
Mod TE006· OTHER ADMINISTRATIVE ACTION2012-05-02+$0$20,967,365IN ACCORDANCE WITH THE DEFAULTS CLAUSE OF THE CONTRACT IT IS NECESSARY TO EXTEND THE CONTRACT DURATION BY ONE…
Mod CO01M· CHANGE ORDER2012-05-04+$20,560$20,987,925THE TWO SCOTT FARM SHEDS ADJACENT TO THE HISTORIC BARNS WERE DETERMINED BY THE HISTORICAL AE (AD MARBLE) TO BE…
Mod SA048· CHANGE ORDER2012-05-11+$38,895$21,026,820AN ADMINISTRATIVE DECISION WAS DETERMINED TO ABANDON IN PLACE FIVE TEST WELLS INSTALLED DURING THE DESIGN DEVE…
Mod SA049· CHANGE ORDER2012-05-22−$430$21,026,390THE PROVISION AND INSTALLATION OF BENCHES AT THE COMMITTAL SHELTER WAS NOT INCLUDED IN THE SCOPE OF WORK FOR T…
Mod SA050· CHANGE ORDER2012-05-23+$19,284$21,045,674DURING A PHASE 2 ARCHEOLOGICAL SITE SURVEY OF THE FORMER HOUGH FARM SITE, IT WAS DETERMINED THAT A MORE EXTENS…
Mod CO01N· CHANGE ORDER2012-05-29+$25,500$21,071,174ADDITIONAL FIRE ALARM DEVICES NECESSARY TO MEET INTERNATIONAL BUILDING CODE (IBC) AND NATIONAL FIRE PROTECTION…
Mod CO01O· CHANGE ORDER2012-05-29+$17,900$21,089,074THE DOMESTIC WATER SYSTEM DESIGN INDICATED A UV FILTRATION SYSTEM WITH A MAXIMUM FLOW RATE OF 8 GALLONS PER MI…
Mod SA051· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-06-06+$38,972$21,128,0461. THE PREVIOUS WORK UNDER THE PHASE-1A CONTRACT DID NOT PROVIDE SUFFICIENT ZONE WIRING FOR THE PHASE-1B IRRI…
Mod SA052· CHANGE ORDER2012-06-08+$3,028$21,131,074THE CONTRACT DOCUMENTS INDICATE THAT THE "TAPS" AUDIO REPEATER SYSTEM IS TO BE INSTALLED INSIDE THE LOCKED ELE…
Mod SA053· CHANGE ORDER2012-06-08+$9,857$21,140,931A CLIENT REQUEST WAS MADE BY THE MSN#1 OFFICE TO RELOCATE THE EXTERIOR LIGHT FIXTURES LOCATED ON THE CONCRETE…
Mod CO01P· CHANGE ORDER2012-06-11+$5,480$21,146,4111. THE PHASE 1B BID SPECIFICATIONS AND DRAWINGS CALLED FOR 8 FULL LOCKERS IN THE MAINT OFFICE MEN'S LOCKER ROO…
Mod SA054· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-06-18+$2,572$21,148,984LANGUAGE WAS NOT PROVIDED IN THE CONTRACT TO MAINTAIN UNINTERRUPTED ELECTRICAL SERVICE TO THE EXISTING CEMETER…
Mod SA055· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-06-18+$16,356$21,165,340AFTER THE AWARD OF THIS CONTRACT, CFM LEARNED THAT THE VA IS UNDERGOING A NATION-WIDE STUDY OF ITS OVERALL SEC…
Mod SA056· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-06-18+$0$21,165,340DURING THE SUBMITTAL PROCESS FOR ARCHITECTURAL PRECAST CONCRETE, WE FOUND A VERY LIMITED POOL OF PRECAST CONCR…
Mod SA057· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-06-20+$0$21,165,340THE NATURAL SANDSTONE VENEER SPECIFIED AS THE DESIGN BASIS FOR THE PROJECT DID NOT PROVIDE THE EXPECTED COLOR…
Mod SA058· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-06-22+$0$21,165,3401. USER/OPERATIONAL: ADDRESSES ON-GOING CONCERNS WITH HIGH WATER PRESSURE AND MEETING NEEDS OF USERS OF THE SM…
Mod SA059· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-06-26−$1,541$21,163,7991. USER/OPERATIONAL: ADDRESSES ON-GOING CONCERNS WITH HIGH WATER PRESSURE AND MEETING NEEDS OF USERS OF THE SM…
Mod CO01Q· CHANGE ORDER2012-07-09+$26,900$21,190,6991. THE PHASE 1B BID SPECIFICATIONS AND DRAWINGS CALLED FOR 8 FULL LOCKERS IN THE MAINT OFFICE MEN'S LOCKER ROO…
Mod SA061· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-13+$28,022$21,218,721THE VARIOUS BUILDINGS CONSTRUCTED ON THIS PROJECT ARE SPECIFIED TO RECEIVE FIBER CONCRETE EXTERIOR TRIM AND GL…
Mod SA060· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-16+$1,828$21,220,548SINCE THE SLOPED PATHWAYS FROM THE ROADWAY TO THE COLUMBARIUM WALLS APPEARED TO STEEPER THAN THE ADA ALLOWABLE…
Mod SA062· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-18−$5,892$21,214,657DEMOLITION OF THE EXISTING BELKY FARM OUTBUILDINGS WAS REQUESTED BY THE WASHINGTON CROSSING NATIONAL CEMETERY…
Mod SA063· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-18−$3,224$21,211,433THE PHASE 1B BID SPECIFICATIONS AND DRAWINGS CALLED FOR 8 NEW FULL LOCKERS IN THE MAINT OFFICE MEN'S LOCKER RO…
Mod SA064· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-18−$2,773$21,208,660ADDITIONAL FIRE ALARM DEVICES ARE NECESSARY TO MEET INTERNATIONAL BUILDING CODE (IBC) AND NATIONAL FIRE PROTEC…
Mod SA065· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-18−$1,700$21,206,960SCOTT FARM TWO SHED REMOVAL WASHINGTON CROSSING NATIONAL CEMETERY PHASE 1B DEVELOPMENT NEWTOWN, PENNSYLVANIA
Mod CO01R· CHANGE ORDER2012-07-23+$13,700$21,220,6601. THE PHASE 1B BID SPECIFICATIONS AND DRAWINGS CALLED FOR 8 FULL LOCKERS IN THE MAINT OFFICE MEN'S LOCKER ROO…
Mod SA066· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-23−$1,154$21,219,506THE DOMESTIC WATER SYSTEM DESIGN INDICATED A UV FILTRATION SYSTEM WITH A MAXIMUM FLOW RATE OF 8 GALLONS PER MI…
Mod SA068· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-30+$9,095$21,228,601THE DOMESTIC WATER SYSTEM DESIGN INDICATED A UV FILTRATION SYSTEM WITH A MAXIMUM FLOW RATE OF 8 GALLONS PER MI…
Mod SA069· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-30−$1,702$21,226,899THE DOMESTIC WATER SYSTEM DESIGN INDICATED A UV FILTRATION SYSTEM WITH A MAXIMUM FLOW RATE OF 8 GALLONS PER MI…
Mod SA067· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-01+$22,137$21,249,036DUE TO ODOR ISSUES WITH THE EXISTING WELL SHOWN TO SERVE THE NEW ADMIN/PIC BUILDING, MSN#1 AND THE CEMETERY DI…
Mod SA070· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-03−$1,223$21,247,813TO PROVIDE NECESSARY IN-WALL SUPPORT AND UTILITIES AS REQUESTED BY MSN#1 AND THE WASHINGTON CROSSING NATIONAL…
Mod SA072· DEFINITIZE CHANGE ORDER2012-08-15+$4,878$21,252,691REPLACE THE SPECIFIED 1.5 FOOT LENGTH GRAVESITE GRID MONUMENTS WITH 4 FOOT LONG GRAVESITE GRID MONUMENTS TO EX…
Mod SA071· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-09-12−$6,931$21,245,761TO IMPLEMENT THE CHANGES REQUIRED TO BE IN COMPLIANCE WITH THE MOST RECENT INFORMATION TECHNOLOGY OFFICE OF CO…
Mod SA073· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-09-13−$294$21,245,466REPLACE THE SPECIFIED 1.5 FOOT LENGTH GRAVESITE GRID MONUMENTS WITH 4 FOOT LONG GRAVESITE GRID MONUMENTS TO EX…
Mod CO01S· CHANGE ORDER2012-09-21+$4,289$21,249,755THE WCNC DECIDED TO INSTALL A GRAVEL ROAD TO FACILITATE ACCESS FROM THE GENERAL GEORGE WASHINGTON BLVD FROM TH…
Mod SA074· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-09-21+$7,924$21,257,679ELECTRICT TO IRRIGATION CONTROLS
Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-10-08+$2,724$21,260,403ELECTRICT TO IRRIGATION CONTROLS
Mod SA075· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-10-11+$2,724$21,263,127ELECTRICT TO IRRIGATION CONTROLS
Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-10-18+$67$21,263,195RELOCATE TREES IN CONFLICT WITH GRAVEL ROAD BEING INSTALLED BY CEMETERY PERSONNEL.
Mod P00004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-10-24−$8,640$21,254,555DELETE YEARS 2-5 OF THE FIRE ALARM GUARANTEE PERIOD SERVICES SPECIFIED WITHIN THE CONTRACT. THIS ACTION DOES…
Mod P00005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-06-14+$81,588$21,336,142PROVIDE ALL LABOR, MATERIALS AND EQUIPMENT NECESSARY TO CONSTRUCT A SPOILS STORAGE STRUCTURE AT THE WASHINGTON…
Mod P00006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-11-05+$18,361$21,354,503PROVIDE ALL LABOR, MATERIALS AND EQUIPMENT NECESSARY TO CONSTRUCT A SPOILS STORAGE STRUCTURE AT THE WASHINGTON…

Related awards · 11

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other VA awards to the same recipient (UEI CFZ1ZEPL22N9)

AwardOffice · PSC / listingNet obligationsFY
36C78621P0137NATIONAL CEMETERY ADMIN (36C786) · H224 · EQUIPMENT AND MATERIALS TESTING- TRACTORS$1,965FY2021
36C78621P0075NATIONAL CEMETERY ADMIN (36C786) · Y1AZ · CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS$530FY2021
36C78621P0063NATIONAL CEMETERY ADMIN (36C786) · Y1AZ · CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS$1,965FY2021
36C10F18C3383OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) · Y1AZ · CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS$24,343,213FY2018
36C10F18C3386OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) · Y1PZ · CONSTRUCTION OF OTHER NON-BUILDING FACILITIES$28,968,604FY2018
36C78618N0186NATIONAL CEMETERY ADMIN (36C786) · S208 · HOUSEKEEPING- LANDSCAPING/GROUNDSKEEPING$86,400FY2018

Other recipients under Y299 from OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT (most recent first)

AwardRecipientOfficeNet obligationsFY
VA101CFMP0254INTERNATIONAL PUBLIC WORKS, LLCOFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT$176,885FY2011
VA101CFMC0143SPANISH SPRINGS CONSTRUCTION INCOFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT$17,403,315FY2011
VA101CFMC0074KEVCON-TTP, JVOFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT$25,303,657FY2010
VA101CFMC0087US BUILDERS GROUP INC.OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT$13,860,444FY2010
VA101CFMC0062GLEN/MAR CONSTRUCTION, INC.OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT$16,301,436FY2010

Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA101CFMC0082_3600_-NONE-_-NONE- · retrieved 2026-09-26.