Award recordCONTRACT

KEVCON-TTP, JV

PIID VA101CFMC0074· VA Staff Offices· OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT· Y299 · CONTRUCT/ALL OTHER NON-BLDG FACS· FY2010· $25,303,657 net obligations· UEI V56VAG9QR8K7· CA

Description

FURNISH LABOR, MATERIAL AND EQUIPMENT TO ADD HOLD MECHANISM MCMASTER-CARR STYLE 2 11615A11 FOR THE OSSUARY COVER FOR THE SOUTH MEMORIAL PLAZA PER SUBMITTAL 05 80 00 (2).

Base award description: FORT ROSECRANS NATIONAL CEMETERY - MIRAMAR ANNEX PHASE 1 DEVELOPMENT IN SAN DIEGO, CA.

First action · last action
2010-06-29 · 2014-03-10
Transactions
116
First transaction's obligation
$23,706,500
Base + all options value (sum of deltas)
$25,303,657
Extent competed
FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
Other than full & open authority
—
Set-aside
SERVICE DISABLED VETERAN OWNED SMALL BUSINESS SET-ASIDE
Offers received
13
SDVOSB flag on record
Yes (self-representation)
NAICS
237990 · OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION

Modification chain · 116 transactions

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$25,303,657$0Base award · 2010-06-29 · this action $23,706,500 · running total $23,706,500Modification 1 · 2010-09-15 · this action $3,300 · running total $23,709,800Modification 3 · 2010-09-29 · this action $0 · running total $23,709,800Modification 2 · 2010-10-06 · this action $20,988 · running total $23,730,788Modification 4 · 2010-10-06 · this action -$54,097 · running total $23,676,691Modification 5 · 2010-10-27 · this action $37,593 · running total $23,714,284Modification 7 · 2010-11-10 · this action $16,008 · running total $23,730,292Modification 8 · 2010-11-10 · this action $25,737 · running total $23,756,029Modification 14 · 2010-12-27 · this action $30,332 · running total $23,786,361Modification TE001 · 2010-12-28 · this action $0 · running total $23,786,361Modification SA051 · 2011-01-05 · this action $172 · running total $23,786,533Modification CO01A · 2011-01-06 · this action $50,820 · running total $23,837,353Modification 13 · 2011-01-07 · this action $0 · running total $23,837,353Modification SA015 · 2011-01-25 · this action $90,473 · running total $23,927,826Modification CO01B · 2011-01-26 · this action $35,051 · running total $23,962,877Modification CO01E · 2011-03-15 · this action $17,055 · running total $23,979,932Modification SA016 · 2011-03-15 · this action $46,124 · running total $24,026,056Modification TE003 · 2011-03-16 · this action $0 · running total $24,026,056Modification TE004 · 2011-03-16 · this action $0 · running total $24,026,056Modification SA017 · 2011-03-17 · this action $291,085 · running total $24,317,141Modification SA018 · 2011-03-24 · this action $17,160 · running total $24,334,301Modification SA019 · 2011-04-19 · this action $58,128 · running total $24,392,429Modification CO01C · 2011-04-28 · this action $17,160 · running total $24,409,589Modification CO01D · 2011-04-28 · this action $16,031 · running total $24,425,620Modification SA021 · 2011-05-06 · this action $7,423 · running total $24,433,043Modification CO01F · 2011-05-16 · this action $13,221 · running total $24,446,264Modification TE005 · 2011-05-18 · this action $0 · running total $24,446,264Modification CO01G · 2011-06-07 · this action $35,346 · running total $24,481,610Modification SA023 · 2011-06-07 · this action $9,907 · running total $24,491,517Modification SA022 · 2011-06-15 · this action $2,470 · running total $24,493,987Modification CO01H · 2011-06-21 · this action $9,747 · running total $24,503,734Modification CO01I · 2011-06-21 · this action $2,000 · running total $24,505,734Modification SA025 · 2011-06-21 · this action $26,518 · running total $24,532,252Modification SA026 · 2011-06-21 · this action $22,848 · running total $24,555,100Modification SA012 · 2011-06-24 · this action -$200,719 · running total $24,354,381Modification SA010 · 2011-07-01 · this action $19,081 · running total $24,373,462Modification SA011 · 2011-07-01 · this action $6,545 · running total $24,380,007Modification SA027 · 2011-07-13 · this action $762 · running total $24,380,769Modification CO01J · 2011-07-25 · this action $7,198 · running total $24,387,967Modification SA028 · 2011-07-29 · this action $10,033 · running total $24,398,000Modification SA029 · 2011-07-29 · this action $14,803 · running total $24,412,803Modification CO01K · 2011-08-03 · this action $5,032 · running total $24,417,835Modification CO01L · 2011-08-03 · this action $8,690 · running total $24,426,525Modification CO01N · 2011-08-24 · this action $10,662 · running total $24,437,187Modification CO01O · 2011-08-26 · this action $1,997 · running total $24,439,184Modification SA032 · 2011-08-26 · this action $19,014 · running total $24,458,198Modification SA034 · 2011-08-26 · this action $32,005 · running total $24,490,203Modification CO01M · 2011-08-29 · this action $5,000 · running total $24,495,203Modification SA039 · 2011-08-29 · this action -$1,092 · running total $24,494,111Modification CO01Q · 2011-09-06 · this action -$14,000 · running total $24,480,111Modification CO01R · 2011-09-06 · this action $3,000 · running total $24,483,111Modification SA030 · 2011-09-06 · this action $3,827 · running total $24,486,938Modification SA033 · 2011-09-06 · this action $3,949 · running total $24,490,887Modification SA035 · 2011-09-06 · this action $578 · running total $24,491,465Modification SA036 · 2011-09-06 · this action $9,405 · running total $24,500,870Modification SA037 · 2011-09-06 · this action -$3,050 · running total $24,497,820Modification SA038 · 2011-09-06 · this action $5,364 · running total $24,503,184Modification SA040 · 2011-09-06 · this action $927 · running total $24,504,111Modification SA041 · 2011-09-14 · this action $591 · running total $24,504,702Modification CO01S · 2011-09-28 · this action $4,000 · running total $24,508,702Modification SA045 · 2011-10-05 · this action $9,242 · running total $24,517,944Modification CO01T · 2011-10-06 · this action $60,259 · running total $24,578,203Modification CO01U · 2011-10-07 · this action $3,952 · running total $24,582,155Modification SA043 · 2011-10-24 · this action -$381 · running total $24,581,774Modification SA044 · 2011-10-24 · this action $0 · running total $24,581,774Modification SA046 · 2011-11-07 · this action $29,556 · running total $24,611,330Modification SA049 · 2011-11-08 · this action $0 · running total $24,611,330Modification CO01V · 2011-11-09 · this action $14,000 · running total $24,625,330Modification SA047 · 2011-12-05 · this action $880 · running total $24,626,210Modification SA048 · 2011-12-12 · this action $6,010 · running total $24,632,220Modification SA050 · 2011-12-12 · this action $4,330 · running total $24,636,550Modification CO01X · 2012-01-05 · this action $2,101 · running total $24,638,651Modification SA052 · 2012-01-05 · this action $7,065 · running total $24,645,716Modification SA053 · 2012-01-05 · this action $10,753 · running total $24,656,469Modification SA054 · 2012-01-05 · this action $12,804 · running total $24,669,273Modification SA055 · 2012-01-05 · this action $134 · running total $24,669,407Modification SA056 · 2012-01-05 · this action -$3,243 · running total $24,666,164Modification SA057 · 2012-01-05 · this action $2,584 · running total $24,668,748Modification CO01Y · 2012-01-07 · this action $4,605 · running total $24,673,353Modification CO02A · 2012-01-17 · this action -$13,685 · running total $24,659,668Modification CO01Z · 2012-01-23 · this action $78,443 · running total $24,738,111Modification CO02B · 2012-02-09 · this action $1,601 · running total $24,739,712Modification CO02C · 2012-02-24 · this action $1,429 · running total $24,741,141Modification SA060 · 2012-03-20 · this action $4,610 · running total $24,745,751Modification SA062 · 2012-03-27 · this action $8,825 · running total $24,754,576Modification CO02D · 2012-04-16 · this action -$10,443 · running total $24,744,133Modification CO02E · 2012-04-25 · this action -$19,250 · running total $24,724,883Modification SA070 · 2012-05-10 · this action $21,468 · running total $24,746,351Modification SA065 · 2012-05-18 · this action $1,707 · running total $24,748,058Modification SA068 · 2012-05-23 · this action $163,431 · running total $24,911,489Modification CO02F · 2012-05-29 · this action $923 · running total $24,912,412Modification SA067 · 2012-06-12 · this action $0 · running total $24,912,412Modification SA072 · 2012-06-12 · this action $0 · running total $24,912,412Modification CO02G · 2012-06-27 · this action $4,665 · running total $24,917,077Modification SA042 · 2012-07-06 · this action $7,650 · running total $24,924,727Modification SA061 · 2012-07-06 · this action $1,012 · running total $24,925,739Modification SA064 · 2012-07-06 · this action $0 · running total $24,925,739Modification SA074 · 2012-07-06 · this action $480 · running total $24,926,219Modification SA075 · 2012-07-06 · this action $1,327 · running total $24,927,546Modification SA058 · 2012-08-04 · this action $0 · running total $24,927,546Modification SA078 · 2012-08-04 · this action $28,708 · running total $24,956,254Modification SA079 · 2012-08-04 · this action -$975 · running total $24,955,279Modification SA080 · 2012-08-04 · this action $44,032 · running total $24,999,311Modification SA077 · 2012-08-14 · this action $11,738 · running total $25,011,049Modification SA066 · 2012-08-16 · this action $3,797 · running total $25,014,846Modification SA076 · 2012-09-24 · this action $8,643 · running total $25,023,489Modification P00017 · 2013-04-12 · this action $1,526 · running total $25,025,015Modification P00018 · 2013-04-24 · this action $5,493 · running total $25,030,508Modification P00021 · 2013-05-30 · this action $586 · running total $25,031,094Modification P00020 · 2013-09-26 · this action $184,083 · running total $25,215,177Modification P00019 · 2013-09-30 · this action -$1,046 · running total $25,214,131Modification P00022 · 2013-09-30 · this action $1,253 · running total $25,215,384Modification P00029 · 2014-01-31 · this action -$3,182 · running total $25,212,202Modification P00027 · 2014-03-07 · this action $21,150 · running total $25,233,352Modification P00024 · 2014-03-10 · this action $54,812 · running total $25,288,164Modification P00028 · 2014-03-10 · this action $15,493 · running total $25,303,657
  • Base2010-06-29+$23,706,500= $23,706,500
  • Mod 12010-09-15+$3,300= $23,709,800
  • Mod 32010-09-29+$0= $23,709,800
  • Mod 22010-10-06+$20,988= $23,730,788
  • Mod 42010-10-06-$54,097= $23,676,691
  • Mod 52010-10-27+$37,593= $23,714,284
  • Mod 72010-11-10+$16,008= $23,730,292
  • Mod 82010-11-10+$25,737= $23,756,029
  • Mod 142010-12-27+$30,332= $23,786,361
  • Mod TE0012010-12-28+$0= $23,786,361
  • Mod SA0512011-01-05+$172= $23,786,533
  • Mod CO01A2011-01-06+$50,820= $23,837,353
  • Mod 132011-01-07+$0= $23,837,353
  • Mod SA0152011-01-25+$90,473= $23,927,826
  • Mod CO01B2011-01-26+$35,051= $23,962,877
  • Mod CO01E2011-03-15+$17,055= $23,979,932
  • Mod SA0162011-03-15+$46,124= $24,026,056
  • Mod TE0032011-03-16+$0= $24,026,056
  • Mod TE0042011-03-16+$0= $24,026,056
  • Mod SA0172011-03-17+$291,085= $24,317,141
  • Mod SA0182011-03-24+$17,160= $24,334,301
  • Mod SA0192011-04-19+$58,128= $24,392,429
  • Mod CO01C2011-04-28+$17,160= $24,409,589
  • Mod CO01D2011-04-28+$16,031= $24,425,620
  • Mod SA0212011-05-06+$7,423= $24,433,043
  • Mod CO01F2011-05-16+$13,221= $24,446,264
  • Mod TE0052011-05-18+$0= $24,446,264
  • Mod CO01G2011-06-07+$35,346= $24,481,610
  • Mod SA0232011-06-07+$9,907= $24,491,517
  • Mod SA0222011-06-15+$2,470= $24,493,987
  • Mod CO01H2011-06-21+$9,747= $24,503,734
  • Mod CO01I2011-06-21+$2,000= $24,505,734
  • Mod SA0252011-06-21+$26,518= $24,532,252
  • Mod SA0262011-06-21+$22,848= $24,555,100
  • Mod SA0122011-06-24-$200,719= $24,354,381
  • Mod SA0102011-07-01+$19,081= $24,373,462
  • Mod SA0112011-07-01+$6,545= $24,380,007
  • Mod SA0272011-07-13+$762= $24,380,769
  • Mod CO01J2011-07-25+$7,198= $24,387,967
  • Mod SA0282011-07-29+$10,033= $24,398,000
  • Mod SA0292011-07-29+$14,803= $24,412,803
  • Mod CO01K2011-08-03+$5,032= $24,417,835
  • Mod CO01L2011-08-03+$8,690= $24,426,525
  • Mod CO01N2011-08-24+$10,662= $24,437,187
  • Mod CO01O2011-08-26+$1,997= $24,439,184
  • Mod SA0322011-08-26+$19,014= $24,458,198
  • Mod SA0342011-08-26+$32,005= $24,490,203
  • Mod CO01M2011-08-29+$5,000= $24,495,203
  • Mod SA0392011-08-29-$1,092= $24,494,111
  • Mod CO01Q2011-09-06-$14,000= $24,480,111
  • Mod CO01R2011-09-06+$3,000= $24,483,111
  • Mod SA0302011-09-06+$3,827= $24,486,938
  • Mod SA0332011-09-06+$3,949= $24,490,887
  • Mod SA0352011-09-06+$578= $24,491,465
  • Mod SA0362011-09-06+$9,405= $24,500,870
  • Mod SA0372011-09-06-$3,050= $24,497,820
  • Mod SA0382011-09-06+$5,364= $24,503,184
  • Mod SA0402011-09-06+$927= $24,504,111
  • Mod SA0412011-09-14+$591= $24,504,702
  • Mod CO01S2011-09-28+$4,000= $24,508,702
  • Mod SA0452011-10-05+$9,242= $24,517,944
  • Mod CO01T2011-10-06+$60,259= $24,578,203
  • Mod CO01U2011-10-07+$3,952= $24,582,155
  • Mod SA0432011-10-24-$381= $24,581,774
  • Mod SA0442011-10-24+$0= $24,581,774
  • Mod SA0462011-11-07+$29,556= $24,611,330
  • Mod SA0492011-11-08+$0= $24,611,330
  • Mod CO01V2011-11-09+$14,000= $24,625,330
  • Mod SA0472011-12-05+$880= $24,626,210
  • Mod SA0482011-12-12+$6,010= $24,632,220
  • Mod SA0502011-12-12+$4,330= $24,636,550
  • Mod CO01X2012-01-05+$2,101= $24,638,651
  • Mod SA0522012-01-05+$7,065= $24,645,716
  • Mod SA0532012-01-05+$10,753= $24,656,469
  • Mod SA0542012-01-05+$12,804= $24,669,273
  • Mod SA0552012-01-05+$134= $24,669,407
  • Mod SA0562012-01-05-$3,243= $24,666,164
  • Mod SA0572012-01-05+$2,584= $24,668,748
  • Mod CO01Y2012-01-07+$4,605= $24,673,353
  • Mod CO02A2012-01-17-$13,685= $24,659,668
  • Mod CO01Z2012-01-23+$78,443= $24,738,111
  • Mod CO02B2012-02-09+$1,601= $24,739,712
  • Mod CO02C2012-02-24+$1,429= $24,741,141
  • Mod SA0602012-03-20+$4,610= $24,745,751
  • Mod SA0622012-03-27+$8,825= $24,754,576
  • Mod CO02D2012-04-16-$10,443= $24,744,133
  • Mod CO02E2012-04-25-$19,250= $24,724,883
  • Mod SA0702012-05-10+$21,468= $24,746,351
  • Mod SA0652012-05-18+$1,707= $24,748,058
  • Mod SA0682012-05-23+$163,431= $24,911,489
  • Mod CO02F2012-05-29+$923= $24,912,412
  • Mod SA0672012-06-12+$0= $24,912,412
  • Mod SA0722012-06-12+$0= $24,912,412
  • Mod CO02G2012-06-27+$4,665= $24,917,077
  • Mod SA0422012-07-06+$7,650= $24,924,727
  • Mod SA0612012-07-06+$1,012= $24,925,739
  • Mod SA0642012-07-06+$0= $24,925,739
  • Mod SA0742012-07-06+$480= $24,926,219
  • Mod SA0752012-07-06+$1,327= $24,927,546
  • Mod SA0582012-08-04+$0= $24,927,546
  • Mod SA0782012-08-04+$28,708= $24,956,254
  • Mod SA0792012-08-04-$975= $24,955,279
  • Mod SA0802012-08-04+$44,032= $24,999,311
  • Mod SA0772012-08-14+$11,738= $25,011,049
  • Mod SA0662012-08-16+$3,797= $25,014,846
  • Mod SA0762012-09-24+$8,643= $25,023,489
  • Mod P000172013-04-12+$1,526= $25,025,015
  • Mod P000182013-04-24+$5,493= $25,030,508
  • Mod P000212013-05-30+$586= $25,031,094
  • Mod P000202013-09-26+$184,083= $25,215,177
  • Mod P000192013-09-30-$1,046= $25,214,131
  • Mod P000222013-09-30+$1,253= $25,215,384
  • Mod P000292014-01-31-$3,182= $25,212,202
  • Mod P000272014-03-07+$21,150= $25,233,352
  • Mod P000242014-03-10+$54,812= $25,288,164
  • Mod P000282014-03-10+$15,493= $25,303,657
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2010-06-29+$23,706,500$23,706,500FORT ROSECRANS NATIONAL CEMETERY - MIRAMAR ANNEX PHASE 1 DEVELOPMENT IN SAN DIEGO, CA.
Mod 1· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-09-15+$3,300$23,709,800PARTNERING SESSION
Mod 3· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-09-29+$0$23,709,800BUY AMERICAN ACT FAR 52.225-11 FRNC SAN DIEGO, CA
Mod 2· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-10-06+$20,988$23,730,788TEMPORARY ROAD AND FACILITIES, REVISE BURIAL SECTION 12 FROM CRYPTS TO CREMAINS FRNC SAN DIEGO, CA
Mod 4· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-10-06−$54,097$23,676,691MATERIAL CREDIT FOR CRYPTS FRNC SAN DIEGO, CA
Mod 5· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-10-27+$37,593$23,714,284SDGE FEES FOR RAISING 3 POWER POLES WITH TALLER POLES AND RELOCATE WHERE INTERFERRING WITH CONSTRUCTION SAFETY…
Mod 7· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-11-10+$16,008$23,730,2922" AC ON 9" PCC WITH 4000 PSI COMPRESSIVE STRENGTH AT THE CENTERLINE MEDIAN OF NOBEL DRIVE. FRNC SAN DIEGO, CA
Mod 8· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-11-10+$25,737$23,756,029FILTER FABRIC @ IRRIGATION AISLE; PROVIDE INSTALLATION OF MIRAFI 140N FILTER FABRIC ALONG THE 36" WIDE BURIAL…
Mod 14· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-12-27+$30,332$23,786,361REMOVE AND RE-INSTALL SILT FENCE AS REQUIRED, ADD SILT FENCE AT BORROW SITE. FRNC SAN DIEGO, CA
Mod TE001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-12-28+$0$23,786,361TIME EXTENSION FOR NEW CONTRACT COMPLETION OF JANUARY 31, 2012 FRNC SAN DIEGO, CA
Mod SA051· DEFINITIZE CHANGE ORDER2011-01-05+$172$23,786,533DEFINITIZES CO-01O. ADD DOWNSPOUTS TO MAINTENANCE VEHICLE BUILDING DUE TO EXCESS WATER BEING DELIVERED TO PEDE…
Mod CO01A· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-01-06+$50,820$23,837,353ADDITIONAL CONSTRUCTION ITEMS TO ALLOW EARLY EARLY TURNOVER (EETO) FOR BURIAL SECTION 12 MIRAMAR (FT. ROSECRAN…
Mod 13· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-01-07+$0$23,837,353MATERIAL STORED OFF-SITE - CRYPTS WITH LID: 7,336@$290.00 = $2,127,440.00 MIRAMAR (FT. ROSECRANS) NATIONAL CEM…
Mod SA015· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-01-25+$90,473$23,927,826ADD GLAZING INCLUDING SCREENS, ADD TOILET ACCESSORIES; $8626 CREDIT FOR DELETION OF DRAINAGE RISER; ADD GRADIN…
Mod CO01B· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-01-26+$35,051$23,962,877RELOCATED COMMITTAL SHELTER B; ADD SECURITY MESH FOR IT SECURITY; RELOCATE RECYCLED WATER PUMP; ADD 2" SPARE C…
Mod CO01E· CHANGE ORDER2011-03-15+$17,055$23,979,9321) ADDITION OF FIRE HYDRANT NEAR IRRIGATION PUMP ON ROAD "C". 2) ALTERING MIRAMAR ROAD ENTRY TO CORRECT FLOW O…
Mod SA016· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-03-15+$46,124$24,026,056CONVERT UNSOLICITED PROPOSALS TO SUPPLEMENTAL AGREEMENT.
Mod TE003· OTHER ADMINISTRATIVE ACTION2011-03-16+$0$24,026,056CONTRACT COMPLETION IS EXTENDED TO MARCH 7, 2011, FOR EARLY TURNOVER (ETO) AND FEBRUARY 28, 2012, FOR BALANCE…
Mod TE004· OTHER ADMINISTRATIVE ACTION2011-03-16+$0$24,026,056CONTRACT COMPLETION FOR EARLY TURNOVER (ETO) IS EXTENDED TO MARCH 18, 2011, AND REMAINS FEBRUARY 28, 2012, F…
Mod SA017· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-03-17+$291,085$24,317,141PH 1 DEVELOPMENT, NCA MIRAMAR, FRNC SAN DIEGO, CA
Mod SA018· DEFINITIZE CHANGE ORDER2011-03-24+$17,160$24,334,301DEFINITIZES CA-01C - REMAINING ROAD REMEDIATION WORK PH 1 DEVELOPMENT, NCA MIRAMAR, FRNC SAN DIEGO, CA
Mod SA019· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-04-19+$58,128$24,392,429ADDITIONAL CULTURED STONE TO BE INSTALLED TO COLUMBARIA AND MEMORIAL WALLS PER VARIOUS PRELIMINARY SKETCHES A…
Mod CO01C· CHANGE ORDER2011-04-28+$17,160$24,409,589CORRECT WET SOIL CONDITIONS AT ROADWAY FRNC SAN DIEGO, CA
Mod CO01D· CHANGE ORDER2011-04-28+$16,031$24,425,620OVERSEEDING W/RYE OF TURF AREAS FRN SAN DIEGO, CA
Mod SA021· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-05-06+$7,423$24,433,043DESIGN CHANGE RE-ROUTING REFRIGERANT LINES THRU WALLS VICE SURFACE AND ADDITIONAL MISSING ITEMS.
Mod CO01F· CHANGE ORDER2011-05-16+$13,221$24,446,264DUE TO CIVIL DESIGN ERROR ADDITIONAL WORK IS REQUIRED AT THE ASSEMBLY OF FLAGS. REFERENCE RFI02-283.
Mod TE005· OTHER ADMINISTRATIVE ACTION2011-05-18+$0$24,446,264CONTRACT COMPLETION FOR EARLY TURNOVER (ETO) IS EXTENDED TO APRIL 4, 2011, AND REMAINS FEBRUARY 28, 2012, FO…
Mod CO01G· CHANGE ORDER2011-06-07+$35,346$24,481,610ADDITIONAL CIP WALL AND FOOTING AT THE COLUMBARIUM PLAZA NORTH PER LX-32&LX-33. INCLUDE EXCAVATION AND REMOVA…
Mod SA023· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-06-07+$9,907$24,491,517PROVIDE LABOR&MATERIAL TO: - PROVIDE DIGITAL REPEATER SYSTEMS AT THE (2) COMMITTAL SHELTERS
Mod SA022· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-06-15+$2,470$24,493,987BASED ON THE CRYPTS NUMBERING SYSTEM COUNT WE RECEIVED FROM MSN V, AN ADDITIONAL 10 CRYPTS WERE ADDED WHICH WA…
Mod CO01H· CHANGE ORDER2011-06-21+$9,747$24,503,734LABOR&MATERIAL TO: - INSTALL APPROX 50LF X 10FT HIGH GALV CHAIN LINK FENCING W/ 2 4FT GATES $9,107 - PROVIDE…
Mod CO01I· CHANGE ORDER2011-06-21+$2,000$24,505,734ROUGH GRADE, REMOVE AND REPLACE SILT FENCE AS REQUIRED FOR SDGE EQUIPMENT ACCESS AT POWER POLE SOUTH OF ADMINI…
Mod SA025· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-06-21+$26,518$24,532,252A) MISSING HAZARDOUS MATERIAL LOCKERS - $12,055 B) GREAT SEAL REQUIRED IN ADDITION - $2,084 C) BAS RELIEF VS N…
Mod SA026· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-06-21+$22,848$24,555,100PROVIDE LABOR&MATERIAL TO: - RFP-036, RELOCATE RESTROOM TRAILER $13,047 - RFP-033, MOVE EMGNCY GENERATOR $7,5…
Mod SA012· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-06-24−$200,719$24,354,381ADD GLAZING INCLUDING SCREENS, ADD TOILET ACCESSORIES; $8626 CREDIT FOR DELETION OF DRAINAGE RISER; ADD GRADIN…
Mod SA010· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-01+$19,081$24,373,462INSTALL WATER GATE VALVES FRNC SAN DIEGO, CA
Mod SA011· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-01+$6,545$24,380,007RECONSTRUCT/REINSTALL ADA RAMPS @ NOBEL DRIVE FRNC SAN DIEGO, CA
Mod SA027· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-13+$762$24,380,769REVISED COST DUE TO CO-01F RECONCILIATION.
Mod CO01J· CHANGE ORDER2011-07-25+$7,198$24,387,967THIS SCOPE IS ASSOCIATED WITH ADDITIONAL FIRE SAFETY EQUIPMENT ITEMS TOTALS $7,198.00.
Mod SA028· DEFINITIZE CHANGE ORDER2011-07-29+$10,033$24,398,000REVISED COST ASSOCIATED WITH EARLY TURNOVER WORK THAT WAS NOT COMPLETED, AS WELL AS EARLY EARLY TURNOVER WOTK…
Mod SA029· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-29+$14,803$24,412,803SECURITY DVR @ ADMIN BLDG
Mod CO01K· CHANGE ORDER2011-08-03+$5,032$24,417,835THE SCOPE COVERS ALL ASSOCIATED COST FOR CHANGES TO LANDSCAPING DUE TO DROP OFF AT SOUTH COMMITTAL SHELTER.
Mod CO01L· CHANGE ORDER2011-08-03+$8,690$24,426,525EXTEND WALL BETWEEN ADMIN LOBBY AND WORKROOM FOR NOISE ATTENUATION
Mod CO01N· CHANGE ORDER2011-08-24+$10,662$24,437,187THIS SCOPE INCLUDES ALL COST ASSOCIATED WITH INSTALLATION OF UPGRADED MOTORIZED SLIDING GATE AT NOBEL DRIVE EN…
Mod CO01O· CHANGE ORDER2011-08-26+$1,997$24,439,184GUTTER SYSTEM AT MAINTENANCE VEHICLE BUILDING WAS DESIGNED WITHOUT DOWNSPOUTS OR RAIN CHAINS. MSN REQUESTED 3…
Mod SA032· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-26+$19,014$24,458,198ELECTRICAL CHANGES NOT ON BID DOCUMENTS.
Mod SA034· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-26+$32,005$24,490,203GRADING ABOVE THE KINDER-MORGAN JET FUEL LINE REQUIRED SPECIAL GRADING TECHNIQUES THAT WERE NOT SPECIFIED IN T…
Mod CO01M· CHANGE ORDER2011-08-29+$5,000$24,495,203THIS SCOPE IS ASSOCIATED WITH THE INSTALLATION OF EIGHT (8) PIPE BOLLARDS. FOUR (4) AT ADMIN PARKING LOT AREA,…
Mod SA039· DEFINITIZE CHANGE ORDER2011-08-29−$1,092$24,494,111DEFINITIZATION OF CO-01H ADDRESSING MAINT VEHICLE BLDG TOOL ROOM FENCE AND ICE MAKER INSTALLATION/RELOCATION.
Mod CO01Q· CHANGE ORDER2011-09-06−$14,000$24,480,111CODE CHANGE REQUIRED SMALLER DIAMETER RAIL. THIS CHANGE CREDITS LESS EXPENSIVE MATERIAL COSTS.
Mod CO01R· CHANGE ORDER2011-09-06+$3,000$24,483,111THE SCOPE IS ASSOCIATED WITH THE INSTALLATION OF ADDITIONAL MANUFACTURED STONE VENEER AT SOUTH COLUMBARIUM STE…
Mod SA030· DEFINITIZE CHANGE ORDER2011-09-06+$3,827$24,486,938REVISED COST ASSOCIATED WITH T&M INSTALLATION OF SECURITY MESH WIRE FOR EQUIPMENT ROOM AT ADMIN BUILDING AND A…
Mod SA033· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-06+$3,949$24,490,8871) LOWER (2) AIR RELEASE VALVES BELOW GRADE @ NORTH COLUMBARIA DUE TO ASTHETIC APPEARANCES @ COLUMBARIA WALL.…
Mod SA035· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-06+$578$24,491,465THE TOTAL COST ASSOCIATED WITH PRECAST CONCRETE DOUBLE CRYPT AND EXTRA CYPT INSTALLATION IN CRYPT FIELD 7 = $5…
Mod SA036· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-06+$9,405$24,500,870THE EQUIPMENT REQUIRED FOR IRRIGATION WOULD NOT FIT IN THE BUILDING PROVIDED BY DESIGN, THEREFORE THE PUMP BUI…
Mod SA037· DEFINITIZE CHANGE ORDER2011-09-06−$3,050$24,497,820THE SCOPE IS ASSOCIATED WITH DEFINITIZING CO-01K BASED ON COST PROPOSAL RFP02-041FOR LANDSCAPING AND IRRIGATIO…
Mod SA038· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-06+$5,364$24,503,184HARDWARE CHANGES TO BUILDINGS: MISSING THRESHOLDS, DOOR FRAME WIDTH ADJUSTMENTS, DOOR HARDWARE CORRECTIONS/AD…
Mod SA040· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-06+$927$24,504,111REPLACE CONTRACT HARDWARE WITH SDGE HARDWARE REQUIREMENT.
Mod SA041· DEFINITIZE CHANGE ORDER2011-09-14+$591$24,504,702THIS SCOPE IS ASSOCIATED WITH THE INSTALLATION OF EIGHT (8) PIPE BOLLARDS. FOUR (4) AT ADMIN PARKING LOT AREA,…
Mod CO01S· CHANGE ORDER2011-09-28+$4,000$24,508,702PROVIDE PERMANENT POWER TO FACILITY FROM SDG&E.
Mod SA045· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-10-05+$9,242$24,517,944INSTALL SECURITY GLAZING AT ADMIN OPERATIONS ROOM.
Mod CO01T· CHANGE ORDER2011-10-06+$60,259$24,578,203THIS CHANGE ORDER IS ASSOCIATED WITH THE CONSTRUCTION OF COLORED CONCRETE CURB AT THE NORTH AND SOUTH COMMITTA…
Mod CO01U· CHANGE ORDER2011-10-07+$3,952$24,582,155CEMETERY PURCHASED VEHICLE LIFT REQUIRING 220V OUTLET NOT IN CONTRACT.
Mod SA043· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-10-24−$381$24,581,774THIS SUPPLEMENTAL AGREEMENT IS ASSOCIATED WITH ADDITIONAL INSTALLATION OF MANUFACTURED STONE VENEER AT THE SOU…
Mod SA044· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-10-24+$0$24,581,774OVERSEED BERMUDA TURF WITH RYE FOR WINTER GREEN AFFECT.
Mod SA046· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-11-07+$29,556$24,611,330INSTALL SECURITY GLAZING AT ADMIN OPERATIONS ROOM.
Mod SA049· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-11-08+$0$24,611,330INSTALL SECURITY GLAZING AT ADMIN OPERATIONS ROOM.
Mod CO01V· CHANGE ORDER2011-11-09+$14,000$24,625,330CIVIL DESIGN DID NOT PREVENT EROSION PROBLEMS WHICH REQUIRED RIP RAP FROM HEADWALL TO END OF JUKE AT SWALE AND…
Mod SA047· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-12-05+$880$24,626,210THIS SA IS ASSOCIATED WITH DEFINITIZING CO-01I FOR ROUGH GRADING, REMOVING AND REPLACING OF SILT FENCE AS REQU…
Mod SA048· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-12-12+$6,010$24,632,220PROVIDE CROSS CONNECTS FOR IRRIGATION TESTING PER REQUEST BY CITY UTILITY SERVICES AND SHRUBS TO BLOCK FLOWER…
Mod SA050· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-12-12+$4,330$24,636,550DUE TO DEER DAMAGED PLANTING THE SPECIES OF PLANTING WAS REPLACED.
Mod CO01X· CHANGE ORDER2012-01-05+$2,101$24,638,651THE NCA DIRECTOR REQUESTED HEIGHT OF OSSUARY BE REDUCED. AS-BUILT CONDITION PER PLAN IS TOO TALL. THE SCOPE O…
Mod SA052· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-01-05+$7,065$24,645,716PROVIDE (3) FLORAL WATERING SIGNS THAT WERE RE-WORDED TO IMPROVE CLARIFICATION.
Mod SA053· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-01-05+$10,753$24,656,469INSTALL ADDITIONAL TREES REQUESTED BY NCA DIRECTOR TO BLOCK VIEW OF POWER LINES FOR SERVICES.
Mod SA054· DEFINITIZE CHANGE ORDER2012-01-05+$12,804$24,669,273DEFINITIZES CO-01Q. PROVIDE CREDIT STAINLESS STEEL HANDRAIL AFTER DIAMETER PIPE WAS REDUCED FROM 1.5IN TO 1.25…
Mod SA055· DEFINITIZE CHANGE ORDER2012-01-05+$134$24,669,407DEFINITIZES CO-01U. PROVIDE LABOR, MATERIAL&EQUIPMENT TO: -INSTALL 208V POWER TO SUPPORT NCA EQUIPMENT PURCHA…
Mod SA056· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-01-05−$3,243$24,666,164PROVIDE LABOR, MATERIAL&EQUIPMENT TO: - EXTEND INTERIOR DRYALL FROM PARAPIT WALL TO CEILING PER OWNERS REQUEST…
Mod SA057· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-01-05+$2,584$24,668,748PROVIDE LABOR, MATERIAL&EQUIPMENT TO INSTALL ADDITIONAL WAY FINDING SIGNAGE AT DESIGNATED INTERSECTIONS PER OW…
Mod CO01Y· CHANGE ORDER2012-01-07+$4,605$24,673,353AT THE MAIN ENTRY GATE THE CEMETERY DIRECTOR REQUESTED A TIMER CONTROL; AND THE VA POLICE REQUESTED A KEYPAD…
Mod CO02A· CHANGE ORDER2012-01-17−$13,685$24,659,668SPECIFIED EQUIPMENT NOT AVAILABLE BY MANUFACTURER DUE TO RADIO FREQUENCY ISSUES.
Mod CO01Z· CHANGE ORDER2012-01-23+$78,443$24,738,111DUE TO MARINE CORPS AIR STATION LESSOR WITHDRAWING APPROVAL DUE TO THE LOCATION OF THE ABOVE GROUND FUEL ISLAN…
Mod CO02B· CHANGE ORDER2012-02-09+$1,601$24,739,712DUE TO NATURAL GAS PIPING FAILURE'S AND SPECIFICATION AMBIGUITY CONTRACTOR WAS DIRECTED TO REPLACE NATURAL GAS…
Mod CO02C· CHANGE ORDER2012-02-24+$1,429$24,741,1411. NCA ORDERED AN ICE MACHINE THAT NEEDS 208 VOLT POWER INSTEAD OF THE 120 VOLT SHOWN ON THE CONTRACT DOCUMENT…
Mod SA060· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-03-20+$4,610$24,745,751THIS SUPPLEMENTAL AGREEMENT IS ASSOCIATED WITH THE CONSTRUCTION OF SECURITY PIPE BOLLARDS AT THE EAST SIDE OF…
Mod SA062· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-03-27+$8,825$24,754,576NO CIRCUITS WERE PROVIDED FOR SEWER EJECTOR PUMP POWER AND GENERATOR ANNUNCIATOR. ADDITIONAL WORK WAS REQUIRED…
Mod CO02D· CHANGE ORDER2012-04-16−$10,443$24,744,1331. NOBEL ENTRY SHRUBS REPLACEMENT DUE TO NON-CONFORMANCE. 2. ORIGINAL 5GAL SHRUBS BEING SUBSTITUTED WITH 1GAL…
Mod CO02E· CHANGE ORDER2012-04-25−$19,250$24,724,883MEMORIAL PROGRAM SERVICES (MPS) CONDUCTED AN INSPECTION OF THE SOUTH COLUMBARIUM NICHE COVERS. MPS REJECTED 7…
Mod SA070· DEFINITIZE CHANGE ORDER2012-05-10+$21,468$24,746,351PROVIDE MDPE (LPG) LIQUID PROPANE GAS PIPING FROM STORAGE TANK TO MAINTENANCE BUILDINGS.
Mod SA065· DEFINITIZE CHANGE ORDER2012-05-18+$1,707$24,748,058GRADING ISSUES TO UN-STABLE SWALE AND DRAINAGE LED TO CORRECTIVE MEASURES BEING IMPLEMENTED, SUMP PITS AND ADD…
Mod SA068· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-05-23+$163,431$24,911,489ORIGINAL DESIGN DOCUMENTS DID NOT INCLUDE A COMPLETED DESIGN FOR THE SOUTH MEMORIAL WALK BECAUSE THE REQUIRED…
Mod CO02F· CHANGE ORDER2012-05-29+$923$24,912,412THIS CHANGE ORDER IS REQUIRED TO OBSERVE / RESOLVE SYSTEM ISSUES AND THE CONCERN FOR THE MAIN LINE BREAK AT TH…
Mod SA067· DEFINITIZE CHANGE ORDER2012-06-12+$0$24,912,412THIS SA IS ASSOCIATED WITH THE CONSTRUCTION OF COLORED CONCRETE CURB AT THE NORTH AND SOUTH COMMITTAL SHELTER…
Mod SA072· CHANGE ORDER2012-06-12+$0$24,912,412CREDIT FOR REJECTED NICHE COVERS
Mod CO02G· CHANGE ORDER2012-06-27+$4,665$24,917,077MASONRY AT MAINTENANCE BUILDINGS HAD DEVELOPED EFFLORESCENCE. SOLUTION IS TO SEAL THE MASONRY AFTER THE EFFLO…
Mod SA042· CHANGE ORDER2012-07-06+$7,650$24,924,727MASONRY AT MAINTENANCE BUILDINGS HAD DEVELOPED EFFLORESCENCE. SOLUTION IS TO SEAL THE MASONRY AFTER THE EFFLO…
Mod SA061· DEFINITIZE CHANGE ORDER2012-07-06+$1,012$24,925,739CONTRACT DOCUMENTS FOR FIRE ALARM DID NOT MEET CODE REQUIREMENTS. ADDITIONAL DEVICES WERE ADDED TO COMPLY.
Mod SA064· DEFINITIZE CHANGE ORDER2012-07-06+$0$24,925,739PER DIRECTOR, NCA CEMETERY A REQUEST TO ADD A ENTRY KEY PAD AND SEVEN DAY TIMER TO THE MAIN ENTRANCE GATE AT N…
Mod SA074· DEFINITIZE CHANGE ORDER2012-07-06+$480$24,926,219PROVIDE ELECTRICAL SUPPORT FOR: - NCA SUPPLIED ICE MACHINE - AIR COMPRESSOR VENT PIPE - AIR PRESSURE REGULATO…
Mod SA075· DEFINITIZE CHANGE ORDER2012-07-06+$1,327$24,927,546PROVIDE IRRIGATION LEAK DETECTION SERVICES FOR EXCESS WATER IN LOW AREA AND ADJUST SPRINKLER COVERAGE ON TURF…
Mod SA058· DEFINITIZE CHANGE ORDER2012-08-04+$0$24,927,546THIS SA IS ASSOCIATED WITH ADDITIONAL CIP WALL AND FOOTING AT THE COLUMBARIUM PLAZA NORTH PER LX-32&LX-33. IT…
Mod SA078· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-04+$28,708$24,956,254PROVIDE CONCRETE FLATWORK TO REPLACE CRACKED AREAS.
Mod SA079· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-04−$975$24,955,279SA-001 WAS ISSUED FOR A TOTAL OF $3,300.00 FOR A PARTNERING SESSION, PROJECT COMPLETE ($975) UNSPENT.
Mod SA080· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-04+$44,032$24,999,311PROVIDE MISCELLANEOUS SITE REVISIONS I.E. ADDITIONAL BURIAL SECTION MONUMENTS, TURF WEEDING AND SURVEYING.
Mod SA077· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-14+$11,738$25,011,049ADMIN SECURITY BOLLARDS
Mod SA066· DEFINITIZE CHANGE ORDER2012-08-16+$3,797$25,014,846THIS SUPPLEMENTAL AGREEMENT IS ASSOCIATED WITH CLN-04 (REVISE ENTRY GATE) REQUIRED BY CONTRACTOR TO PROVIDE GA…
Mod SA076· DEFINITIZE CHANGE ORDER2012-09-24+$8,643$25,023,489REPLACE DEAD 5GAL SHRUBS WITH 1GAL AND PROVIDE A CREDIT FOR THE ORIGINAL 5 GAL SHRUBS.
Mod P00017· DEFINITIZE CHANGE ORDER2013-04-12+$1,526$25,025,015REPLACE DEAD 5GAL SHRUBS WITH 1GAL AND PROVIDE A CREDIT FOR THE ORIGINAL 5 GAL SHRUBS.
Mod P00018· DEFINITIZE CHANGE ORDER2013-04-24+$5,493$25,030,508REPLACE DEAD 5GAL SHRUBS WITH 1GAL AND PROVIDE A CREDIT FOR THE ORIGINAL 5 GAL SHRUBS.
Mod P00021· DEFINITIZE CHANGE ORDER2013-05-30+$586$25,031,094FURNISH LABOR, MATERIAL AND EQUIPMENT TO ADD HOLD MECHANISM MCMASTER-CARR STYLE 2 11615A11 FOR THE OSSUARY COV…
Mod P00020· DEFINITIZE CHANGE ORDER2013-09-26+$184,083$25,215,177REPLACE DEAD 5GAL SHRUBS WITH 1GAL AND PROVIDE A CREDIT FOR THE ORIGINAL 5 GAL SHRUBS.
Mod P00019· DEFINITIZE CHANGE ORDER2013-09-30−$1,046$25,214,131REPLACE DEAD 5GAL SHRUBS WITH 1GAL AND PROVIDE A CREDIT FOR THE ORIGINAL 5 GAL SHRUBS.
Mod P00022· DEFINITIZE CHANGE ORDER2013-09-30+$1,253$25,215,384FURNISH LABOR, MATERIAL AND EQUIPMENT TO ADD HOLD MECHANISM MCMASTER-CARR STYLE 2 11615A11 FOR THE OSSUARY COV…
Mod P00029· DEFINITIZE CHANGE ORDER2014-01-31−$3,182$25,212,202IGF:CT:IGF
Mod P00027· DEFINITIZE CHANGE ORDER2014-03-07+$21,150$25,233,352FURNISH LABOR, MATERIAL AND EQUIPMENT TO ADD HOLD MECHANISM MCMASTER-CARR STYLE 2 11615A11 FOR THE OSSUARY COV…
Mod P00024· DEFINITIZE CHANGE ORDER2014-03-10+$54,812$25,288,164FURNISH LABOR, MATERIAL AND EQUIPMENT TO ADD HOLD MECHANISM MCMASTER-CARR STYLE 2 11615A11 FOR THE OSSUARY COV…
Mod P00028· DEFINITIZE CHANGE ORDER2014-03-10+$15,493$25,303,657FURNISH LABOR, MATERIAL AND EQUIPMENT TO ADD HOLD MECHANISM MCMASTER-CARR STYLE 2 11615A11 FOR THE OSSUARY COV…

Related awards · 5

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other recipients under Y299 from OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT (most recent first)

AwardRecipientOfficeNet obligationsFY
VA101CFMP0254INTERNATIONAL PUBLIC WORKS, LLCOFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT$176,885FY2011
VA101CFMC0143SPANISH SPRINGS CONSTRUCTION INCOFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT$17,403,315FY2011
VA101CFMC0087US BUILDERS GROUP INC.OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT$13,860,444FY2010
VA101CFMC0082G&C FAB-CON, LLCOFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT$21,354,503FY2010
VA101CFMC0062GLEN/MAR CONSTRUCTION, INC.OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT$16,301,436FY2010