Description
PROVIDE CENTRAL STATION MONITORING
Base award description: CALVERTON NATIONAL CEMETERY - GRAVESITE EXPANSION
Modification chain · 71 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2009-09-03+$32,191,900= $32,191,900
- Mod SA0012009-11-16+$9,936= $32,201,836
- Mod SA0022009-11-25+$11,779= $32,213,615
- Mod SA0042010-04-23-$92,767= $32,120,849
- Mod SA0052010-04-29+$3,258= $32,124,107
- Mod CO01A2010-05-05+$3,500= $32,127,607
- Mod SA0062010-05-10+$7,920= $32,135,527
- Mod SA0082010-06-17+$175= $32,135,702
- Mod SA0092010-06-17+$14,664= $32,150,366
- Mod SA0102010-06-29+$2,800= $32,153,166
- Mod SA0032010-07-06+$2,143= $32,155,309
- Mod CO01B2010-08-19+$34,685= $32,189,994
- Mod CO01C2010-08-23-$13,350= $32,176,644
- Mod SA0122010-08-23+$2,120= $32,178,764
- Mod SA0072010-08-24+$6,500= $32,185,264
- Mod SA0132010-08-24-$8,320= $32,176,944
- Mod SA0112010-09-01+$122,500= $32,299,444
- Mod SA0152010-09-17+$0= $32,299,444
- Mod SA0162010-09-17+$67,000= $32,366,444
- Mod SA0142010-09-22+$335,000= $32,701,444
- Mod SA0172010-09-22-$3,930= $32,697,514
- Mod SA0182010-12-20+$20,300= $32,717,814
- Mod SA0192010-12-20+$0= $32,717,814
- Mod SA0202010-12-20+$38,000= $32,755,814
- Mod 262010-12-21-$65,397= $32,690,417
- Mod SA0212010-12-27+$9,000= $32,699,417
- Mod SA0222010-12-27+$27,000= $32,726,417
- Mod SA0252010-12-27+$50,534= $32,776,951
- Mod SA0232010-12-28+$7,216= $32,784,167
- Mod SA0282011-01-06-$65,397= $32,718,770
- Mod SA0272011-01-11+$0= $32,718,770
- Mod SA0292011-01-18+$5,800= $32,724,570
- Mod SA0302011-01-18+$2,265= $32,726,835
- Mod SA0312011-01-18+$910= $32,727,745
- Mod TE0012011-01-19+$0= $32,727,745
- Mod SA0242011-01-24-$50,534= $32,677,211
- Mod SA0342011-03-15+$0= $32,677,211
- Mod CO01D2011-04-13+$2,145= $32,679,356
- Mod CO01E2011-04-13+$6,175= $32,685,531
- Mod SA0352011-04-19+$38,000= $32,723,531
- Mod SA0362011-04-19+$2,245= $32,725,776
- Mod SA0322011-04-25+$35,250= $32,761,026
- Mod SA0332011-04-25+$97,500= $32,858,526
- Mod TE0022011-04-25+$0= $32,858,526
- Mod SA0372011-05-11+$79,550= $32,938,076
- Mod SA0382011-05-13+$75,000= $33,013,076
- Mod SA0392011-06-30+$855= $33,013,931
- Mod SA0402011-06-30+$655= $33,014,586
- Mod SA0412011-07-19-$4,250= $33,010,336
- Mod SA0422011-08-18+$17,000= $33,027,336
- Mod SA0432011-08-18+$32,000= $33,059,336
- Mod SA0442011-08-18+$13,465= $33,072,801
- Mod SA0452011-08-18-$4,325= $33,068,476
- Mod CO01F2011-09-01+$13,000= $33,081,476
- Mod CO01G2011-09-02+$49,000= $33,130,476
- Mod TE0032011-09-26+$0= $33,130,476
- Mod SA0462011-10-18-$8,441= $33,122,035
- Mod SA0482011-10-21+$44,000= $33,166,035
- Mod SA0492011-10-21+$13,236= $33,179,271
- Mod SA0502011-10-28+$95,771= $33,275,042
- Mod SA0512011-10-28+$7,092= $33,282,134
- Mod TE0042011-10-28+$0= $33,282,134
- Mod SA0522011-11-04-$2,174= $33,279,960
- Mod CO01H2011-11-10+$16,000= $33,295,960
- Mod SA0532011-12-07+$0= $33,295,960
- Mod SA0542011-12-08+$17,573= $33,313,533
- Mod SA0552011-12-09+$7,370= $33,320,903
- Mod SA0472012-01-20+$475,000= $33,795,903
- Mod SA0562012-06-26+$9,690= $33,805,592
- Mod SA0572012-06-28+$10,493= $33,816,086
- Mod SA0582012-09-18+$1,616= $33,817,702
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2009-09-03 | +$32,191,900 | $32,191,900 | CALVERTON NATIONAL CEMETERY - GRAVESITE EXPANSION |
| Mod SA001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-11-16 | +$9,936 | $32,201,836 | GRAVESITE EXP. & SITE IMPROVEMENTS, CALVERTON, NY SA-001 ISSUED TO REMOVE AND RELOCATE TREES, CUT AND CAP AN E… |
| Mod SA002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-11-25 | +$11,779 | $32,213,615 | GRAVESITE EXP. & SITE IMPROVEMENTS, CALVERTON, NY SA-0002 ISSUED TO PROVIDE COPY FOR RE OFFICE. |
| Mod SA004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-04-23 | −$92,767 | $32,120,849 | CALVERTON NATIONAL CEMETERY - GRAVESITE EXPANSION |
| Mod SA005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-04-29 | +$3,258 | $32,124,107 | GRAVESITE EXP. & SITE IMPROVEMENTS, CALVERTON, NY SA-005 ISSUED FOR PARTNERING SESSION. |
| Mod CO01A· CHANGE ORDER | 2010-05-05 | +$3,500 | $32,127,607 | CALVERTON NATIONAL CEMETERY - GRAVESITE EXPANSION |
| Mod SA006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-05-10 | +$7,920 | $32,135,527 | GRAVESITE EXP. & SITE IMPROVEMENTS, CALVERTON, NY SA-006 ISSUED FOR MONTHLY AERIAL PHOTOGRAPHS. |
| Mod SA008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-06-17 | +$175 | $32,135,702 | GRAVESITE EXP. & SITE IMPROVEMENTS, CALVERTON, NY SA-008 ISSUED TO REMOVE AND REPAIR WALLBOARD. |
| Mod SA009· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-06-17 | +$14,664 | $32,150,366 | GRAVESITE EXP. & SITE IMPROVEMENTS, CALVERTON, NY SA-009 ISSUED TO RECONNECT IRRIGATION CONTROL WIRES. |
| Mod SA010· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-06-29 | +$2,800 | $32,153,166 | GRAVESITE EXP. & SITE IMPROVEMENTS, CALVERTON, NY, SA-010 |
| Mod SA003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-07-06 | +$2,143 | $32,155,309 | GRAVESITE EXP. & SITE IMPROVEMENTS, CALVERTON, NY |
| Mod CO01B· CHANGE ORDER | 2010-08-19 | +$34,685 | $32,189,994 | GRAVESITE EXP. & SITE IMPROVEMENTS, CALVERTON, NY CO-01B - ADDITIONAL ROAD RECONSTRUCTION |
| Mod CO01C· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-08-23 | −$13,350 | $32,176,644 | GRAVESITE EXP. & SITE IMPROVEMENTS, CALVERTON, NY CO-01C |
| Mod SA012· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-08-23 | +$2,120 | $32,178,764 | GRAVESITE EXP. & SITE IMPROVEMENTS, CALVERTON, NY SA-012 ISSUED FOR RE OFFICE SECURITY SYSTEM. |
| Mod SA007· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-08-24 | +$6,500 | $32,185,264 | GRAVESITE EXP. & SITE IMPROVEMENTS, CALVERTON, NY, SA-007 |
| Mod SA013· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-08-24 | −$8,320 | $32,176,944 | GRAVESITE EXP. & SITE IMPROVEMENTS, CALVERTON, NY |
| Mod SA011· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-01 | +$122,500 | $32,299,444 | GRAVESITE EXP. & SITE IMPROVEMENTS, CALVERTON, NY SA-011 |
| Mod SA015· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-17 | +$0 | $32,299,444 | GRAVESITE EXP. & SITE IMPROVEMENTS, CALVERTON, NY SA-015 |
| Mod SA016· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-17 | +$67,000 | $32,366,444 | GRAVESITE EXP. & SITE IMPROVEMENTS, CALVERTON, NY SA-016 |
| Mod SA014· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-22 | +$335,000 | $32,701,444 | GRAVESITE EXP. & SITE IMPROVEMENTS, CALVERTON, NY |
| Mod SA017· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-22 | −$3,930 | $32,697,514 | GRAVESITE EXP. & SITE IMPROVEMENTS, CALVERTON, NY SA-017 ISSUED TO DEFINITIZE CO-01B ADDITIONAL ROAD RECONSTRU… |
| Mod SA018· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-20 | +$20,300 | $32,717,814 | GRAVESITE EXP.&SITE IMPROVEMENTS, CALVERTON, NY SA-018 |
| Mod SA019· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-20 | +$0 | $32,717,814 | GRAVESITE EXP.&SITE IMPROVEMENTS, CALVERTON, NY SA-019 |
| Mod SA020· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-20 | +$38,000 | $32,755,814 | GRAVESITE EXP.&SITE IMPROVEMENTS, CALVERTON, NY SA-020 |
| Mod 26· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-21 | −$65,397 | $32,690,417 | ASPHALT SEAL COATING CNC CALVERTON, NY |
| Mod SA021· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-27 | +$9,000 | $32,699,417 | GRAVESITE EXP.&SITE IMPROVEMENTS, CALVERTON, NY SA-021 |
| Mod SA022· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-27 | +$27,000 | $32,726,417 | GRAVESITE EXP.&SITE IMPROVEMENTS, CALVERTON, NY SA-022 |
| Mod SA025· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-27 | +$50,534 | $32,776,951 | GRAVESITE EXP.&SITE IMPROVEMENTS, CALVERTON, NY SA-025 |
| Mod SA023· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-28 | +$7,216 | $32,784,167 | GRAVESITE EXP.&SITE IMPROVEMENTS, CALVERTON, NY SA-023 |
| Mod SA028· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-06 | −$65,397 | $32,718,770 | GRAVESITE EXP.&SITE IMPROVEMENTS, CALVERTON, NY SA-026 |
| Mod SA027· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-11 | +$0 | $32,718,770 | PROVIDE CONCEALED GRID PAN TYPE CEILINGS IN LIEU OF REVEALED GRID PANEL CEILINGS AT THE ADMIN BLDG ENTRANCE CA… |
| Mod SA029· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-18 | +$5,800 | $32,724,570 | PROVIDE KARNACK #220AF IN LIEU OF HENRY AIR BLOC 21 VAPOR BARRIER CNC CALVERTON, NY |
| Mod SA030· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-18 | +$2,265 | $32,726,835 | PROVIDE ADDITIONAL SIGNAGE PER SHEET SK-15 CNC CALVERTON, NY |
| Mod SA031· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-18 | +$910 | $32,727,745 | REVISED IRRIGATION LATERAL PIPING PER SHEET I-17 REVISED 12/1/2010 CNC CALVERTON, NY |
| Mod TE001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-19 | +$0 | $32,727,745 | GRAVESITE EXP.&SITE IMPROVEMENTS, CALVERTON, NY TE-001 |
| Mod SA024· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-24 | −$50,534 | $32,677,211 | GRAVESITE EXP.&SITE IMPROVEMENTS, CALVERTON, NY SA-024 |
| Mod SA034· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-03-15 | +$0 | $32,677,211 | PROVIDE LANDSCAPE PLANTING AT ALL COMMITTAL SHELTERS PER DRAWING SK-7 AND ELIMINATE SITE PLANTINGS AS SHOWN ON… |
| Mod CO01D· CHANGE ORDER | 2011-04-13 | +$2,145 | $32,679,356 | ADDING 8" SILENT WAFER CHECK VALVES GRAVESITE EXP.&SITE IMPROVEMENTS, CALVERTON, NY CO-01C |
| Mod CO01E· CHANGE ORDER | 2011-04-13 | +$6,175 | $32,685,531 | ADDITIONAL ROOF DRAIN GRAVESITE EXP.&SITE IMPROVEMENTS, CALVERTON, NY CO-01C |
| Mod SA035· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-19 | +$38,000 | $32,723,531 | MAINTENANCE YARD DRAINAGE CNC CALVERTON, NY |
| Mod SA036· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-19 | +$2,245 | $32,725,776 | 2011 PARTNERING SESSION CNC CALVERTON, NY |
| Mod SA032· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-25 | +$35,250 | $32,761,026 | HVAC REPAIRS AT MAINT. BUILDING CNC CALVERTON, NY |
| Mod SA033· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-25 | +$97,500 | $32,858,526 | ADDITIONAL HYDRANT STATIONS CNC CALVERTON, NY |
| Mod TE002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-25 | +$0 | $32,858,526 | WEATHER DELAYS - 11 CALENDAR DAYS GRAVESITE EXP.&SITE IMPROVEMENTS, CALVERTON, NY TE-002 |
| Mod SA037· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-11 | +$79,550 | $32,938,076 | RECONSTRUCT ALEXANDER HAMILTON DRIVE FROM THE INTERSECTION OF MOHICAN WAY TO CALVERTON DRIVE. |
| Mod SA038· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-13 | +$75,000 | $33,013,076 | REMOVE AND REPLACE THE EXISTING BARBED WIRE TOPPED FENCE AND GATES AT THE MAINTENANCE COMPLEX. |
| Mod SA039· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-06-30 | +$855 | $33,013,931 | INSTALL SILENT WAFER VALVE IN PUMP HOUSE 8 AND 9 PER DRAWING SK-20 PREPARED BY CVDA DATED 3/25/11. THIS SA WIL… |
| Mod SA040· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-06-30 | +$655 | $33,014,586 | INSTALL ADDITIONAL ROOF DRAINS AT THE ADMINISTRATION BUILDING |
| Mod SA041· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-07-19 | −$4,250 | $33,010,336 | PROVIDE 166 VIBURNUM PRUNIFOLIUM 'GUARDIAN' 5/6' HT IN LIEU OF 166 CORNUS RACEMOSA 'CUYZAM' 6/8' HT. |
| Mod SA042· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-18 | +$17,000 | $33,027,336 | RE-GRADE CATCHMENT AREAS TO PROVIDE POSITIVE DRAINAGE PREVENTING STANDING WATER CALVERTON NATIONAL CEMETERY -… |
| Mod SA043· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-18 | +$32,000 | $33,059,336 | ADDITIONAL CONCRETE FENCE PANELS AT THE COMMITTAL SHELTER SERVICES AREA CALVERTON NATIONAL CEMETERY - GRAVESIT… |
| Mod SA044· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-18 | +$13,465 | $33,072,801 | RE-CONSTRUCT ENTRY PER RFI-10 AND DRAWINGS CALVERTON NATIONAL CEMETERY - GRAVESITE EXPANSION CALVERTON, NEW YO… |
| Mod SA045· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-18 | −$4,325 | $33,068,476 | DELETE PLANTINGS ADD STONE AND TREES CALVERTON NATIONAL CEMETERY - GRAVESITE EXPANSION CALVERTON, NEW YORK |
| Mod CO01F· CHANGE ORDER | 2011-09-01 | +$13,000 | $33,081,476 | PROVIDE IRRIGATION CONTROL WIRE CONDUIT AT THE NEW COLUMBARIUM. |
| Mod CO01G· CHANGE ORDER | 2011-09-02 | +$49,000 | $33,130,476 | POSITIVE DRAINAGE |
| Mod TE003· OTHER ADMINISTRATIVE ACTION | 2011-09-26 | +$0 | $33,130,476 | SEVERE WEATHER DELAY |
| Mod SA046· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-18 | −$8,441 | $33,122,035 | THIS SA DEFINITIZES CO-01G WHICH INCLUDED THE FOLLOWING: PROVIDE POSITIVE DRAINAGE FOR CATCHMENT AREAS, INSTA… |
| Mod SA048· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-21 | +$44,000 | $33,166,035 | THIS SA DEFINITIZES CO-01G WHICH INCLUDED THE FOLLOWING: PROVIDE POSITIVE DRAINAGE FOR CATCHMENT AREAS, INSTA… |
| Mod SA049· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-21 | +$13,236 | $33,179,271 | THIS SA DEFINITIZES CO-01G WHICH INCLUDED THE FOLLOWING: PROVIDE POSITIVE DRAINAGE FOR CATCHMENT AREAS, INSTA… |
| Mod SA050· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-28 | +$95,771 | $33,275,042 | THIS SA DEFINITIZES CO-01G WHICH INCLUDED THE FOLLOWING: PROVIDE POSITIVE DRAINAGE FOR CATCHMENT AREAS, INSTA… |
| Mod SA051· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-28 | +$7,092 | $33,282,134 | THIS SA DEFINITIZES CO-01G WHICH INCLUDED THE FOLLOWING: PROVIDE POSITIVE DRAINAGE FOR CATCHMENT AREAS, INSTA… |
| Mod TE004· OTHER ADMINISTRATIVE ACTION | 2011-10-28 | +$0 | $33,282,134 | SEVERE WEATHER DELAY |
| Mod SA052· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-04 | −$2,174 | $33,279,960 | THIS SA DEFINITIZES CO-01G WHICH INCLUDED THE FOLLOWING: PROVIDE POSITIVE DRAINAGE FOR CATCHMENT AREAS, INSTA… |
| Mod CO01H· CHANGE ORDER | 2011-11-10 | +$16,000 | $33,295,960 | POSITIVE DRAINAGE |
| Mod SA053· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-07 | +$0 | $33,295,960 | THIS SA DEFINITIZES CO-01G WHICH INCLUDED THE FOLLOWING: PROVIDE POSITIVE DRAINAGE FOR CATCHMENT AREAS, INSTA… |
| Mod SA054· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-08 | +$17,573 | $33,313,533 | THIS SA DEFINITIZES CO-01G WHICH INCLUDED THE FOLLOWING: PROVIDE POSITIVE DRAINAGE FOR CATCHMENT AREAS, INSTA… |
| Mod SA055· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-09 | +$7,370 | $33,320,903 | THIS SA DEFINITIZES CO-01G WHICH INCLUDED THE FOLLOWING: PROVIDE POSITIVE DRAINAGE FOR CATCHMENT AREAS, INSTA… |
| Mod SA047· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-20 | +$475,000 | $33,795,903 | INSTALL FIRE DETECTION AND SECURITY SYSTEMS ACCORDING TO PLANS AND SPECIFICATIONS LISTED IN RFP D-1 0039, PREP… |
| Mod SA056· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-26 | +$9,690 | $33,805,592 | PROVIDE INTERNALLY BRACED DOUBLE SIDED ALUMINUM INFORMATIONAL SIGNS IN LIEU OFCONTRACT REQUIRED STEELL BACKED… |
| Mod SA057· DEFINITIZE CHANGE ORDER | 2012-06-28 | +$10,493 | $33,816,086 | REMOVE UNSTABLE SOIL FROM SITE, INSTALL SUB DRAINAGE AND REPAIR ROOF DRAIN. |
| Mod SA058· DEFINITIZE CHANGE ORDER | 2012-09-18 | +$1,616 | $33,817,702 | PROVIDE CENTRAL STATION MONITORING |
Related awards · 5
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other recipients under Y299 from OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA101CFMP0254 | INTERNATIONAL PUBLIC WORKS, LLC | OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT | $176,885 | FY2011 |
| VA101CFMC0143 | SPANISH SPRINGS CONSTRUCTION INC | OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT | $17,403,315 | FY2011 |
| VA101CFMC0074 | KEVCON-TTP, JV | OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT | $25,303,657 | FY2010 |
| VA101CFMC0087 | US BUILDERS GROUP INC. | OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT | $13,860,444 | FY2010 |
| VA101CFMC0082 | G&C FAB-CON, LLC | OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT | $21,354,503 | FY2010 |