Award recordCONTRACT

MCCARTHY BUILDING COMPANIES, INC.

PIID VA101CFMC0039· VA Staff Offices· OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)· Y111 · CONSTRUCTION OF OFFICE BUILDINGS· FY2009· $43,512,526 net obligations· UEI GZH9ED5FL2V3· MO

Description

ADMINISTRATIVE MODIFICATION TO FUND THE SETTLEMENT AGREEMENT MADE UNDER CIVILIAN BOARD OF CONTRACT APPEALS CBCA 4598.

Base award description: CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA

First action · last action
2009-04-30 · 2017-10-23
Transactions
262
First transaction's obligation
$25,974,844
Base + all options value (sum of deltas)
$43,544,631
Extent competed
FULL AND OPEN COMPETITION
Other than full & open authority
—
Set-aside
NO SET ASIDE USED.
Offers received
10
SDVOSB flag on record
No
NAICS
236220 · COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION

Modification chain · 262 transactions

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$43,512,526$0Base award · 2009-04-30 · this action $25,974,844 · running total $25,974,844Modification CO01A · 2009-06-06 · this action $5,155 · running total $25,979,999Modification CO01B · 2009-08-24 · this action $6,000 · running total $25,985,999Modification CO01C · 2009-08-24 · this action $6,000 · running total $25,991,999Modification CO01D · 2009-08-24 · this action $9,900 · running total $26,001,899Modification CO01E · 2009-08-24 · this action $30,000 · running total $26,031,899Modification CO01F · 2009-08-24 · this action $10,000 · running total $26,041,899Modification CO01G · 2009-08-24 · this action $2,500 · running total $26,044,399Modification CO01H · 2009-08-25 · this action $7,100 · running total $26,051,499Modification SA001 · 2009-08-31 · this action $16,671 · running total $26,068,170Modification SA002 · 2009-09-10 · this action $0 · running total $26,068,170Modification CO01I · 2009-09-11 · this action $40,000 · running total $26,108,170Modification CO01J · 2009-09-23 · this action $46,000 · running total $26,154,170Modification CO01K · 2009-09-25 · this action $45,203 · running total $26,199,373Modification CO01M · 2009-10-13 · this action $48,000 · running total $26,247,373Modification CO01L · 2009-10-14 · this action $30,000 · running total $26,277,373Modification CO01N · 2009-10-16 · this action $59,000 · running total $26,336,373Modification CO01O · 2009-10-23 · this action $35,000 · running total $26,371,373Modification CO01P · 2009-10-28 · this action $6,000 · running total $26,377,373Modification CO01Q · 2009-11-16 · this action $7,451 · running total $26,384,824Modification CO01S · 2009-12-07 · this action $61,888 · running total $26,446,712Modification CO01R · 2009-12-09 · this action $73,923 · running total $26,520,635Modification CO01U · 2009-12-30 · this action $30,011 · running total $26,550,646Modification CO01V · 2009-12-30 · this action $13,530 · running total $26,564,176Modification CO01X · 2010-01-26 · this action $97,937 · running total $26,662,113Modification SA003 · 2010-02-11 · this action $130,642 · running total $26,792,755Modification CO01Y · 2010-03-26 · this action $96,110 · running total $26,888,865Modification SA004 · 2010-03-26 · this action $6,314 · running total $26,895,179Modification SA005 · 2010-03-26 · this action -$22,311 · running total $26,872,868Modification CO01T · 2010-04-05 · this action $94,000 · running total $26,966,868Modification CO01Z · 2010-04-05 · this action $89,463 · running total $27,056,331Modification CO02A · 2010-04-05 · this action $10,000 · running total $27,066,331Modification CO01W · 2010-04-07 · this action $3,808 · running total $27,070,139Modification SA006 · 2010-04-14 · this action -$857 · running total $27,069,282Modification SA007 · 2010-04-26 · this action $16,830 · running total $27,086,112Modification SA008 · 2010-04-26 · this action -$12,701 · running total $27,073,411Modification SA009 · 2010-05-17 · this action $9,387 · running total $27,082,798Modification SA010 · 2010-05-17 · this action $251,656 · running total $27,334,454Modification SA011 · 2010-05-21 · this action $5,387 · running total $27,339,841Modification SA012 · 2010-05-25 · this action -$21,921 · running total $27,317,920Modification SA013 · 2010-05-27 · this action -$3,998 · running total $27,313,922Modification SA014 · 2010-05-27 · this action -$911 · running total $27,313,011Modification SA015 · 2010-05-28 · this action $0 · running total $27,313,011Modification SA016 · 2010-06-07 · this action $7,885 · running total $27,320,896Modification CO02B · 2010-06-23 · this action $3,750 · running total $27,324,646Modification SA018 · 2010-07-06 · this action $3,298 · running total $27,327,944Modification CO02G · 2010-07-16 · this action $43,112 · running total $27,371,056Modification CO02E · 2010-07-22 · this action $25,000 · running total $27,396,056Modification CO02F · 2010-08-09 · this action $5,517 · running total $27,401,573Modification CO02H · 2010-08-18 · this action $51,880 · running total $27,453,453Modification CO02I · 2010-08-26 · this action $14,000 · running total $27,467,453Modification SA019 · 2010-08-26 · this action $356,842 · running total $27,824,295Modification CO02J · 2010-09-01 · this action $81,790 · running total $27,906,085Modification CO02D · 2010-09-10 · this action $4,750,000 · running total $32,656,085Modification CO02K · 2010-09-10 · this action $327,572 · running total $32,983,657Modification CO02L · 2010-10-19 · this action $60,000 · running total $33,043,657Modification CO02N · 2010-11-29 · this action $94,000 · running total $33,137,657Modification SA017 · 2010-11-30 · this action $5,323 · running total $33,142,980Modification SA021 · 2010-11-30 · this action $22,283 · running total $33,165,263Modification SA022 · 2010-11-30 · this action -$14,601 · running total $33,150,662Modification SA025 · 2010-12-29 · this action $69,554 · running total $33,220,216Modification SA026 · 2010-12-31 · this action $16,088 · running total $33,236,304Modification SA027 · 2010-12-31 · this action $7,227 · running total $33,243,531Modification CO02O · 2011-01-10 · this action $65,683 · running total $33,309,214Modification SA028 · 2011-01-13 · this action $9,116 · running total $33,318,330Modification SA029 · 2011-01-13 · this action $4,961 · running total $33,323,291Modification SA030 · 2011-01-13 · this action $3,063 · running total $33,326,354Modification SA023 · 2011-01-26 · this action $9,377 · running total $33,335,731Modification SA024 · 2011-01-31 · this action $16,508 · running total $33,352,239Modification SA031 · 2011-01-31 · this action $39,360 · running total $33,391,599Modification SA034 · 2011-02-14 · this action -$5,692 · running total $33,385,907Modification SA035 · 2011-02-16 · this action -$6,666 · running total $33,379,241Modification SA039 · 2011-02-25 · this action $13,028 · running total $33,392,269Modification SA037 · 2011-02-28 · this action $29,945 · running total $33,422,214Modification CO02P · 2011-03-08 · this action $8,864 · running total $33,431,078Modification CO02R · 2011-03-10 · this action $89,000 · running total $33,520,078Modification SA041 · 2011-03-24 · this action -$5,831 · running total $33,514,247Modification SA043 · 2011-03-24 · this action $6,835 · running total $33,521,082Modification CO02Q · 2011-03-29 · this action $1,250,000 · running total $34,771,082Modification SA032 · 2011-03-29 · this action $106,856 · running total $34,877,938Modification SA033 · 2011-03-30 · this action $39,549 · running total $34,917,487Modification SA038 · 2011-03-30 · this action $15,403 · running total $34,932,890Modification SA042 · 2011-03-30 · this action $16,928 · running total $34,949,818Modification CO02S · 2011-03-31 · this action $9,719 · running total $34,959,537Modification SA040 · 2011-04-14 · this action $5,463 · running total $34,965,000Modification SA044 · 2011-04-18 · this action $26,623 · running total $34,991,623Modification SA045 · 2011-04-18 · this action $28,118 · running total $35,019,741Modification SA046 · 2011-04-27 · this action $12,467 · running total $35,032,208Modification SA048 · 2011-04-27 · this action $622 · running total $35,032,830Modification SA047 · 2011-05-06 · this action $47,917 · running total $35,080,747Modification SA049 · 2011-05-06 · this action $12,848 · running total $35,093,595Modification SA050 · 2011-05-16 · this action $6,412 · running total $35,100,007Modification CO02T · 2011-05-20 · this action $6,000 · running total $35,106,007Modification SA036 · 2011-05-20 · this action $225,613 · running total $35,331,620Modification CO02W · 2011-05-27 · this action $6,758 · running total $35,338,378Modification SA053 · 2011-05-27 · this action $972 · running total $35,339,350Modification SA058 · 2011-05-27 · this action -$420 · running total $35,338,930Modification SA059 · 2011-05-27 · this action $13,849 · running total $35,352,779Modification SA061 · 2011-05-27 · this action $9,610 · running total $35,362,389Modification SA054 · 2011-05-31 · this action $0 · running total $35,362,389Modification SA056 · 2011-06-01 · this action $1,927 · running total $35,364,316Modification SA057 · 2011-06-01 · this action -$4,615 · running total $35,359,701Modification SA055 · 2011-06-14 · this action $1,572 · running total $35,361,273Modification SA063 · 2011-06-21 · this action $7,978 · running total $35,369,251Modification SA064 · 2011-06-27 · this action $877 · running total $35,370,128Modification SA065 · 2011-06-27 · this action $13,666 · running total $35,383,794Modification SA067 · 2011-07-22 · this action $6,933 · running total $35,390,727Modification SA070 · 2011-07-22 · this action $247 · running total $35,390,974Modification SA074 · 2011-07-22 · this action $7,766 · running total $35,398,740Modification SA020 · 2011-07-28 · this action $53,372 · running total $35,452,112Modification SA066 · 2011-07-28 · this action $717 · running total $35,452,829Modification SA068 · 2011-07-28 · this action $2,195 · running total $35,455,024Modification SA069 · 2011-07-28 · this action $16,054 · running total $35,471,078Modification SA072 · 2011-07-28 · this action $8,538 · running total $35,479,616Modification SA073 · 2011-07-28 · this action $4,373 · running total $35,483,989Modification SA075 · 2011-07-28 · this action $5,249 · running total $35,489,238Modification CO02X · 2011-08-01 · this action $2,000,000 · running total $37,489,238Modification SA079 · 2011-08-02 · this action -$2,969 · running total $37,486,269Modification SA080 · 2011-08-12 · this action $4,829 · running total $37,491,098Modification SA088 · 2011-08-15 · this action $10,029 · running total $37,501,127Modification SA077 · 2011-08-18 · this action $10,690 · running total $37,511,817Modification SA089 · 2011-08-18 · this action $3,743 · running total $37,515,560Modification SA052 · 2011-08-22 · this action $79,709 · running total $37,595,269Modification SA078 · 2011-08-22 · this action $5,361 · running total $37,600,630Modification SA083 · 2011-08-22 · this action -$2,083 · running total $37,598,547Modification SA051 · 2011-08-26 · this action -$4,240 · running total $37,594,307Modification SA084 · 2011-08-26 · this action $3,466 · running total $37,597,773Modification SA096 · 2011-08-26 · this action $1,775 · running total $37,599,548Modification SA099 · 2011-08-26 · this action $1,180 · running total $37,600,728Modification SA092 · 2011-08-29 · this action $3,455 · running total $37,604,183Modification SA090 · 2011-08-30 · this action $4,807 · running total $37,608,990Modification SA091 · 2011-08-30 · this action $4,391 · running total $37,613,381Modification SA100 · 2011-08-30 · this action -$6,300 · running total $37,607,081Modification SA105 · 2011-08-30 · this action $5,409 · running total $37,612,490Modification SA107 · 2011-08-30 · this action $1,473 · running total $37,613,963Modification SA087 · 2011-09-01 · this action $13,003 · running total $37,626,966Modification SA101 · 2011-09-01 · this action $15,129 · running total $37,642,095Modification SA097 · 2011-09-21 · this action $5,258 · running total $37,647,353Modification SA104 · 2011-09-21 · this action $16,341 · running total $37,663,694Modification SA106 · 2011-09-21 · this action -$3,356 · running total $37,660,338Modification SA108 · 2011-09-21 · this action $14,300 · running total $37,674,638Modification SA109 · 2011-09-21 · this action $19,031 · running total $37,693,669Modification SA110 · 2011-09-21 · this action $14,300 · running total $37,707,969Modification SA111 · 2011-09-21 · this action $20,393 · running total $37,728,362Modification SA112 · 2011-09-21 · this action -$4,210 · running total $37,724,152Modification SA113 · 2011-09-21 · this action $1,751 · running total $37,725,903Modification SA114 · 2011-09-21 · this action $8,500 · running total $37,734,403Modification SA117 · 2011-09-21 · this action $10,850 · running total $37,745,253Modification SA093 · 2011-09-27 · this action $8,500 · running total $37,753,753Modification SA102 · 2011-09-27 · this action $11,714 · running total $37,765,467Modification SA103 · 2011-09-27 · this action $16,867 · running total $37,782,334Modification SA115 · 2011-09-27 · this action $2,318 · running total $37,784,652Modification SA082 · 2011-09-30 · this action $8,535 · running total $37,793,187Modification SA086 · 2011-09-30 · this action $2,016 · running total $37,795,203Modification SA094 · 2011-09-30 · this action $1,231 · running total $37,796,434Modification SA095 · 2011-09-30 · this action $1,332 · running total $37,797,766Modification SA098 · 2011-09-30 · this action -$30,000 · running total $37,767,766Modification SA121 · 2011-09-30 · this action $26,007 · running total $37,793,773Modification SA118 · 2011-10-13 · this action $13,111 · running total $37,806,884Modification SA122 · 2011-10-14 · this action $7,160 · running total $37,814,044Modification SA123 · 2011-10-14 · this action $13,714 · running total $37,827,758Modification SA124 · 2011-10-14 · this action $8,752 · running total $37,836,510Modification SA125 · 2011-10-14 · this action $4,833 · running total $37,841,343Modification SA126 · 2011-10-14 · this action $7,131 · running total $37,848,474Modification SA127 · 2011-10-24 · this action $12,000 · running total $37,860,474Modification SA128 · 2011-10-24 · this action -$7,681 · running total $37,852,793Modification SA060 · 2011-10-27 · this action $344 · running total $37,853,137Modification SA130 · 2011-10-27 · this action $85,000 · running total $37,938,137Modification SA129 · 2011-10-28 · this action $49,295 · running total $37,987,432Modification SA133 · 2011-10-31 · this action $61,069 · running total $38,048,501Modification SA137 · 2011-11-01 · this action $94,641 · running total $38,143,142Modification CO02Z · 2011-11-09 · this action $92,000 · running total $38,235,142Modification CO03A · 2011-11-17 · this action $12,000 · running total $38,247,142Modification CO03B · 2011-11-17 · this action $5,300 · running total $38,252,442Modification SA134 · 2011-11-29 · this action $8,529 · running total $38,260,971Modification SA136 · 2011-11-29 · this action $27,253 · running total $38,288,224Modification SA139 · 2011-11-29 · this action $784 · running total $38,289,008Modification SA140 · 2011-11-29 · this action -$8,500 · running total $38,280,508Modification SA141 · 2011-11-29 · this action $3,898 · running total $38,284,406Modification SA142 · 2011-11-29 · this action $28,988 · running total $38,313,394Modification SA143 · 2011-11-29 · this action $1,268 · running total $38,314,662Modification SA145 · 2011-11-29 · this action $17,598 · running total $38,332,260Modification SA146 · 2011-11-29 · this action $28,782 · running total $38,361,042Modification SA147 · 2011-11-29 · this action $30,941 · running total $38,391,983Modification SA135 · 2011-11-30 · this action -$713 · running total $38,391,270Modification SA138 · 2011-11-30 · this action $6,366 · running total $38,397,636Modification SA144 · 2011-11-30 · this action $11,207 · running total $38,408,843Modification SA148 · 2011-11-30 · this action $3,099 · running total $38,411,942Modification SA149 · 2011-11-30 · this action $10,000 · running total $38,421,942Modification SA152 · 2011-11-30 · this action $5,938 · running total $38,427,880Modification SA154 · 2011-11-30 · this action $5,453 · running total $38,433,333Modification SA155 · 2011-11-30 · this action $6,368 · running total $38,439,701Modification SA156 · 2011-11-30 · this action -$686 · running total $38,439,015Modification SA157 · 2011-11-30 · this action $46,154 · running total $38,485,169Modification SA158 · 2011-11-30 · this action $3,235 · running total $38,488,404Modification SA159 · 2011-11-30 · this action $13,645 · running total $38,502,049Modification SA160 · 2011-11-30 · this action $10,204 · running total $38,512,253Modification SA161 · 2011-11-30 · this action $17,265 · running total $38,529,518Modification CO03C · 2011-12-02 · this action $4,869 · running total $38,534,387Modification SA163 · 2011-12-02 · this action $94,642 · running total $38,629,029Modification SA151 · 2011-12-06 · this action $93,941 · running total $38,722,970Modification CO03D · 2011-12-14 · this action $99,000 · running total $38,821,970Modification SA162 · 2011-12-16 · this action $3,729 · running total $38,825,699Modification SA168 · 2011-12-30 · this action $4,328 · running total $38,830,027Modification SA169 · 2011-12-30 · this action $3,243 · running total $38,833,270Modification SA170 · 2011-12-30 · this action $6,140 · running total $38,839,410Modification SA175 · 2011-12-30 · this action $60,483 · running total $38,899,893Modification SA176 · 2011-12-30 · this action $10,433 · running total $38,910,326Modification SA116 · 2012-01-02 · this action $4,154 · running total $38,914,480Modification CO03E · 2012-01-10 · this action $4,038 · running total $38,918,518Modification CO03F · 2012-01-12 · this action $1,719 · running total $38,920,237Modification SA171 · 2012-01-16 · this action $16,741 · running total $38,936,978Modification SA172 · 2012-01-16 · this action $40,485 · running total $38,977,463Modification SA173 · 2012-01-16 · this action $49,950 · running total $39,027,413Modification SA174 · 2012-01-16 · this action $71,357 · running total $39,098,770Modification SA119 · 2012-01-17 · this action $43,081 · running total $39,141,851Modification SA120 · 2012-01-17 · this action $16,941 · running total $39,158,792Modification SA131 · 2012-01-17 · this action $73,349 · running total $39,232,141Modification SA167 · 2012-01-30 · this action $78,747 · running total $39,310,888Modification SA178 · 2012-02-14 · this action $6,054 · running total $39,316,942Modification SA179 · 2012-02-14 · this action $7,484 · running total $39,324,426Modification SA180 · 2012-02-14 · this action $58,388 · running total $39,382,814Modification SA181 · 2012-02-14 · this action $56,350 · running total $39,439,164Modification SA132 · 2012-03-05 · this action $28,714 · running total $39,467,878Modification SA062 · 2012-03-06 · this action $46,778 · running total $39,514,656Modification SA150 · 2012-03-06 · this action $5,315 · running total $39,519,971Modification SA166 · 2012-03-06 · this action $4,303 · running total $39,524,274Modification SA182 · 2012-03-06 · this action $2,851 · running total $39,527,125Modification SA183 · 2012-03-06 · this action $2,043 · running total $39,529,168Modification SA184 · 2012-03-06 · this action $4,688 · running total $39,533,856Modification SA185 · 2012-03-06 · this action $1,912 · running total $39,535,768Modification SA186 · 2012-03-06 · this action $63,303 · running total $39,599,071Modification SA187 · 2012-03-06 · this action $3,285 · running total $39,602,356Modification CO03H · 2012-04-16 · this action $3,000 · running total $39,605,356Modification SA193 · 2012-04-21 · this action $14,067 · running total $39,619,423Modification SA085 · 2012-04-27 · this action -$3,462 · running total $39,615,961Modification SA190 · 2012-04-27 · this action $9,900 · running total $39,625,861Modification SA191 · 2012-04-27 · this action $5,991 · running total $39,631,852Modification SA195 · 2012-04-27 · this action $9,880 · running total $39,641,732Modification SA196 · 2012-04-27 · this action $1,290 · running total $39,643,022Modification SA197 · 2012-04-27 · this action $7,612 · running total $39,650,634Modification SA198 · 2012-04-27 · this action $3,798 · running total $39,654,432Modification SA189 · 2012-06-25 · this action $2,401 · running total $39,656,833Modification SA192 · 2012-06-25 · this action $27,109 · running total $39,683,942Modification SA200 · 2012-06-25 · this action $8,691 · running total $39,692,633Modification SA201 · 2012-06-25 · this action $4,290 · running total $39,696,923Modification SA202 · 2012-06-25 · this action $22,748 · running total $39,719,671Modification SA203 · 2012-06-25 · this action $7,500 · running total $39,727,171Modification SA204 · 2012-06-25 · this action $5,570 · running total $39,732,741Modification SA207 · 2012-06-25 · this action $2,021 · running total $39,734,762Modification SA208 · 2012-06-25 · this action $29,235 · running total $39,763,997Modification SA194 · 2012-06-27 · this action $24,456 · running total $39,788,453Modification SA210 · 2012-08-14 · this action $2,000 · running total $39,790,453Modification SA211 · 2012-08-14 · this action $3,430 · running total $39,793,883Modification SA212 · 2012-08-14 · this action $4,533 · running total $39,798,416Modification SA213 · 2012-08-14 · this action $4,478 · running total $39,802,894Modification SA214 · 2012-08-14 · this action $39,209 · running total $39,842,103Modification SA215 · 2012-08-14 · this action $4,389 · running total $39,846,492Modification SA216 · 2012-08-14 · this action $38,000 · running total $39,884,492Modification SA206 · 2012-09-06 · this action $8,031 · running total $39,892,523Modification SA177 · 2012-09-07 · this action $2,795,003 · running total $42,687,526Modification SA217 · 2017-10-23 · this action $825,000 · running total $43,512,526
  • Base2009-04-30+$25,974,844= $25,974,844
  • Mod CO01A2009-06-06+$5,155= $25,979,999
  • Mod CO01B2009-08-24+$6,000= $25,985,999
  • Mod CO01C2009-08-24+$6,000= $25,991,999
  • Mod CO01D2009-08-24+$9,900= $26,001,899
  • Mod CO01E2009-08-24+$30,000= $26,031,899
  • Mod CO01F2009-08-24+$10,000= $26,041,899
  • Mod CO01G2009-08-24+$2,500= $26,044,399
  • Mod CO01H2009-08-25+$7,100= $26,051,499
  • Mod SA0012009-08-31+$16,671= $26,068,170
  • Mod SA0022009-09-10+$0= $26,068,170
  • Mod CO01I2009-09-11+$40,000= $26,108,170
  • Mod CO01J2009-09-23+$46,000= $26,154,170
  • Mod CO01K2009-09-25+$45,203= $26,199,373
  • Mod CO01M2009-10-13+$48,000= $26,247,373
  • Mod CO01L2009-10-14+$30,000= $26,277,373
  • Mod CO01N2009-10-16+$59,000= $26,336,373
  • Mod CO01O2009-10-23+$35,000= $26,371,373
  • Mod CO01P2009-10-28+$6,000= $26,377,373
  • Mod CO01Q2009-11-16+$7,451= $26,384,824
  • Mod CO01S2009-12-07+$61,888= $26,446,712
  • Mod CO01R2009-12-09+$73,923= $26,520,635
  • Mod CO01U2009-12-30+$30,011= $26,550,646
  • Mod CO01V2009-12-30+$13,530= $26,564,176
  • Mod CO01X2010-01-26+$97,937= $26,662,113
  • Mod SA0032010-02-11+$130,642= $26,792,755
  • Mod CO01Y2010-03-26+$96,110= $26,888,865
  • Mod SA0042010-03-26+$6,314= $26,895,179
  • Mod SA0052010-03-26-$22,311= $26,872,868
  • Mod CO01T2010-04-05+$94,000= $26,966,868
  • Mod CO01Z2010-04-05+$89,463= $27,056,331
  • Mod CO02A2010-04-05+$10,000= $27,066,331
  • Mod CO01W2010-04-07+$3,808= $27,070,139
  • Mod SA0062010-04-14-$857= $27,069,282
  • Mod SA0072010-04-26+$16,830= $27,086,112
  • Mod SA0082010-04-26-$12,701= $27,073,411
  • Mod SA0092010-05-17+$9,387= $27,082,798
  • Mod SA0102010-05-17+$251,656= $27,334,454
  • Mod SA0112010-05-21+$5,387= $27,339,841
  • Mod SA0122010-05-25-$21,921= $27,317,920
  • Mod SA0132010-05-27-$3,998= $27,313,922
  • Mod SA0142010-05-27-$911= $27,313,011
  • Mod SA0152010-05-28+$0= $27,313,011
  • Mod SA0162010-06-07+$7,885= $27,320,896
  • Mod CO02B2010-06-23+$3,750= $27,324,646
  • Mod SA0182010-07-06+$3,298= $27,327,944
  • Mod CO02G2010-07-16+$43,112= $27,371,056
  • Mod CO02E2010-07-22+$25,000= $27,396,056
  • Mod CO02F2010-08-09+$5,517= $27,401,573
  • Mod CO02H2010-08-18+$51,880= $27,453,453
  • Mod CO02I2010-08-26+$14,000= $27,467,453
  • Mod SA0192010-08-26+$356,842= $27,824,295
  • Mod CO02J2010-09-01+$81,790= $27,906,085
  • Mod CO02D2010-09-10+$4,750,000= $32,656,085
  • Mod CO02K2010-09-10+$327,572= $32,983,657
  • Mod CO02L2010-10-19+$60,000= $33,043,657
  • Mod CO02N2010-11-29+$94,000= $33,137,657
  • Mod SA0172010-11-30+$5,323= $33,142,980
  • Mod SA0212010-11-30+$22,283= $33,165,263
  • Mod SA0222010-11-30-$14,601= $33,150,662
  • Mod SA0252010-12-29+$69,554= $33,220,216
  • Mod SA0262010-12-31+$16,088= $33,236,304
  • Mod SA0272010-12-31+$7,227= $33,243,531
  • Mod CO02O2011-01-10+$65,683= $33,309,214
  • Mod SA0282011-01-13+$9,116= $33,318,330
  • Mod SA0292011-01-13+$4,961= $33,323,291
  • Mod SA0302011-01-13+$3,063= $33,326,354
  • Mod SA0232011-01-26+$9,377= $33,335,731
  • Mod SA0242011-01-31+$16,508= $33,352,239
  • Mod SA0312011-01-31+$39,360= $33,391,599
  • Mod SA0342011-02-14-$5,692= $33,385,907
  • Mod SA0352011-02-16-$6,666= $33,379,241
  • Mod SA0392011-02-25+$13,028= $33,392,269
  • Mod SA0372011-02-28+$29,945= $33,422,214
  • Mod CO02P2011-03-08+$8,864= $33,431,078
  • Mod CO02R2011-03-10+$89,000= $33,520,078
  • Mod SA0412011-03-24-$5,831= $33,514,247
  • Mod SA0432011-03-24+$6,835= $33,521,082
  • Mod CO02Q2011-03-29+$1,250,000= $34,771,082
  • Mod SA0322011-03-29+$106,856= $34,877,938
  • Mod SA0332011-03-30+$39,549= $34,917,487
  • Mod SA0382011-03-30+$15,403= $34,932,890
  • Mod SA0422011-03-30+$16,928= $34,949,818
  • Mod CO02S2011-03-31+$9,719= $34,959,537
  • Mod SA0402011-04-14+$5,463= $34,965,000
  • Mod SA0442011-04-18+$26,623= $34,991,623
  • Mod SA0452011-04-18+$28,118= $35,019,741
  • Mod SA0462011-04-27+$12,467= $35,032,208
  • Mod SA0482011-04-27+$622= $35,032,830
  • Mod SA0472011-05-06+$47,917= $35,080,747
  • Mod SA0492011-05-06+$12,848= $35,093,595
  • Mod SA0502011-05-16+$6,412= $35,100,007
  • Mod CO02T2011-05-20+$6,000= $35,106,007
  • Mod SA0362011-05-20+$225,613= $35,331,620
  • Mod CO02W2011-05-27+$6,758= $35,338,378
  • Mod SA0532011-05-27+$972= $35,339,350
  • Mod SA0582011-05-27-$420= $35,338,930
  • Mod SA0592011-05-27+$13,849= $35,352,779
  • Mod SA0612011-05-27+$9,610= $35,362,389
  • Mod SA0542011-05-31+$0= $35,362,389
  • Mod SA0562011-06-01+$1,927= $35,364,316
  • Mod SA0572011-06-01-$4,615= $35,359,701
  • Mod SA0552011-06-14+$1,572= $35,361,273
  • Mod SA0632011-06-21+$7,978= $35,369,251
  • Mod SA0642011-06-27+$877= $35,370,128
  • Mod SA0652011-06-27+$13,666= $35,383,794
  • Mod SA0672011-07-22+$6,933= $35,390,727
  • Mod SA0702011-07-22+$247= $35,390,974
  • Mod SA0742011-07-22+$7,766= $35,398,740
  • Mod SA0202011-07-28+$53,372= $35,452,112
  • Mod SA0662011-07-28+$717= $35,452,829
  • Mod SA0682011-07-28+$2,195= $35,455,024
  • Mod SA0692011-07-28+$16,054= $35,471,078
  • Mod SA0722011-07-28+$8,538= $35,479,616
  • Mod SA0732011-07-28+$4,373= $35,483,989
  • Mod SA0752011-07-28+$5,249= $35,489,238
  • Mod CO02X2011-08-01+$2,000,000= $37,489,238
  • Mod SA0792011-08-02-$2,969= $37,486,269
  • Mod SA0802011-08-12+$4,829= $37,491,098
  • Mod SA0882011-08-15+$10,029= $37,501,127
  • Mod SA0772011-08-18+$10,690= $37,511,817
  • Mod SA0892011-08-18+$3,743= $37,515,560
  • Mod SA0522011-08-22+$79,709= $37,595,269
  • Mod SA0782011-08-22+$5,361= $37,600,630
  • Mod SA0832011-08-22-$2,083= $37,598,547
  • Mod SA0512011-08-26-$4,240= $37,594,307
  • Mod SA0842011-08-26+$3,466= $37,597,773
  • Mod SA0962011-08-26+$1,775= $37,599,548
  • Mod SA0992011-08-26+$1,180= $37,600,728
  • Mod SA0922011-08-29+$3,455= $37,604,183
  • Mod SA0902011-08-30+$4,807= $37,608,990
  • Mod SA0912011-08-30+$4,391= $37,613,381
  • Mod SA1002011-08-30-$6,300= $37,607,081
  • Mod SA1052011-08-30+$5,409= $37,612,490
  • Mod SA1072011-08-30+$1,473= $37,613,963
  • Mod SA0872011-09-01+$13,003= $37,626,966
  • Mod SA1012011-09-01+$15,129= $37,642,095
  • Mod SA0972011-09-21+$5,258= $37,647,353
  • Mod SA1042011-09-21+$16,341= $37,663,694
  • Mod SA1062011-09-21-$3,356= $37,660,338
  • Mod SA1082011-09-21+$14,300= $37,674,638
  • Mod SA1092011-09-21+$19,031= $37,693,669
  • Mod SA1102011-09-21+$14,300= $37,707,969
  • Mod SA1112011-09-21+$20,393= $37,728,362
  • Mod SA1122011-09-21-$4,210= $37,724,152
  • Mod SA1132011-09-21+$1,751= $37,725,903
  • Mod SA1142011-09-21+$8,500= $37,734,403
  • Mod SA1172011-09-21+$10,850= $37,745,253
  • Mod SA0932011-09-27+$8,500= $37,753,753
  • Mod SA1022011-09-27+$11,714= $37,765,467
  • Mod SA1032011-09-27+$16,867= $37,782,334
  • Mod SA1152011-09-27+$2,318= $37,784,652
  • Mod SA0822011-09-30+$8,535= $37,793,187
  • Mod SA0862011-09-30+$2,016= $37,795,203
  • Mod SA0942011-09-30+$1,231= $37,796,434
  • Mod SA0952011-09-30+$1,332= $37,797,766
  • Mod SA0982011-09-30-$30,000= $37,767,766
  • Mod SA1212011-09-30+$26,007= $37,793,773
  • Mod SA1182011-10-13+$13,111= $37,806,884
  • Mod SA1222011-10-14+$7,160= $37,814,044
  • Mod SA1232011-10-14+$13,714= $37,827,758
  • Mod SA1242011-10-14+$8,752= $37,836,510
  • Mod SA1252011-10-14+$4,833= $37,841,343
  • Mod SA1262011-10-14+$7,131= $37,848,474
  • Mod SA1272011-10-24+$12,000= $37,860,474
  • Mod SA1282011-10-24-$7,681= $37,852,793
  • Mod SA0602011-10-27+$344= $37,853,137
  • Mod SA1302011-10-27+$85,000= $37,938,137
  • Mod SA1292011-10-28+$49,295= $37,987,432
  • Mod SA1332011-10-31+$61,069= $38,048,501
  • Mod SA1372011-11-01+$94,641= $38,143,142
  • Mod CO02Z2011-11-09+$92,000= $38,235,142
  • Mod CO03A2011-11-17+$12,000= $38,247,142
  • Mod CO03B2011-11-17+$5,300= $38,252,442
  • Mod SA1342011-11-29+$8,529= $38,260,971
  • Mod SA1362011-11-29+$27,253= $38,288,224
  • Mod SA1392011-11-29+$784= $38,289,008
  • Mod SA1402011-11-29-$8,500= $38,280,508
  • Mod SA1412011-11-29+$3,898= $38,284,406
  • Mod SA1422011-11-29+$28,988= $38,313,394
  • Mod SA1432011-11-29+$1,268= $38,314,662
  • Mod SA1452011-11-29+$17,598= $38,332,260
  • Mod SA1462011-11-29+$28,782= $38,361,042
  • Mod SA1472011-11-29+$30,941= $38,391,983
  • Mod SA1352011-11-30-$713= $38,391,270
  • Mod SA1382011-11-30+$6,366= $38,397,636
  • Mod SA1442011-11-30+$11,207= $38,408,843
  • Mod SA1482011-11-30+$3,099= $38,411,942
  • Mod SA1492011-11-30+$10,000= $38,421,942
  • Mod SA1522011-11-30+$5,938= $38,427,880
  • Mod SA1542011-11-30+$5,453= $38,433,333
  • Mod SA1552011-11-30+$6,368= $38,439,701
  • Mod SA1562011-11-30-$686= $38,439,015
  • Mod SA1572011-11-30+$46,154= $38,485,169
  • Mod SA1582011-11-30+$3,235= $38,488,404
  • Mod SA1592011-11-30+$13,645= $38,502,049
  • Mod SA1602011-11-30+$10,204= $38,512,253
  • Mod SA1612011-11-30+$17,265= $38,529,518
  • Mod CO03C2011-12-02+$4,869= $38,534,387
  • Mod SA1632011-12-02+$94,642= $38,629,029
  • Mod SA1512011-12-06+$93,941= $38,722,970
  • Mod CO03D2011-12-14+$99,000= $38,821,970
  • Mod SA1622011-12-16+$3,729= $38,825,699
  • Mod SA1682011-12-30+$4,328= $38,830,027
  • Mod SA1692011-12-30+$3,243= $38,833,270
  • Mod SA1702011-12-30+$6,140= $38,839,410
  • Mod SA1752011-12-30+$60,483= $38,899,893
  • Mod SA1762011-12-30+$10,433= $38,910,326
  • Mod SA1162012-01-02+$4,154= $38,914,480
  • Mod CO03E2012-01-10+$4,038= $38,918,518
  • Mod CO03F2012-01-12+$1,719= $38,920,237
  • Mod SA1712012-01-16+$16,741= $38,936,978
  • Mod SA1722012-01-16+$40,485= $38,977,463
  • Mod SA1732012-01-16+$49,950= $39,027,413
  • Mod SA1742012-01-16+$71,357= $39,098,770
  • Mod SA1192012-01-17+$43,081= $39,141,851
  • Mod SA1202012-01-17+$16,941= $39,158,792
  • Mod SA1312012-01-17+$73,349= $39,232,141
  • Mod SA1672012-01-30+$78,747= $39,310,888
  • Mod SA1782012-02-14+$6,054= $39,316,942
  • Mod SA1792012-02-14+$7,484= $39,324,426
  • Mod SA1802012-02-14+$58,388= $39,382,814
  • Mod SA1812012-02-14+$56,350= $39,439,164
  • Mod SA1322012-03-05+$28,714= $39,467,878
  • Mod SA0622012-03-06+$46,778= $39,514,656
  • Mod SA1502012-03-06+$5,315= $39,519,971
  • Mod SA1662012-03-06+$4,303= $39,524,274
  • Mod SA1822012-03-06+$2,851= $39,527,125
  • Mod SA1832012-03-06+$2,043= $39,529,168
  • Mod SA1842012-03-06+$4,688= $39,533,856
  • Mod SA1852012-03-06+$1,912= $39,535,768
  • Mod SA1862012-03-06+$63,303= $39,599,071
  • Mod SA1872012-03-06+$3,285= $39,602,356
  • Mod CO03H2012-04-16+$3,000= $39,605,356
  • Mod SA1932012-04-21+$14,067= $39,619,423
  • Mod SA0852012-04-27-$3,462= $39,615,961
  • Mod SA1902012-04-27+$9,900= $39,625,861
  • Mod SA1912012-04-27+$5,991= $39,631,852
  • Mod SA1952012-04-27+$9,880= $39,641,732
  • Mod SA1962012-04-27+$1,290= $39,643,022
  • Mod SA1972012-04-27+$7,612= $39,650,634
  • Mod SA1982012-04-27+$3,798= $39,654,432
  • Mod SA1892012-06-25+$2,401= $39,656,833
  • Mod SA1922012-06-25+$27,109= $39,683,942
  • Mod SA2002012-06-25+$8,691= $39,692,633
  • Mod SA2012012-06-25+$4,290= $39,696,923
  • Mod SA2022012-06-25+$22,748= $39,719,671
  • Mod SA2032012-06-25+$7,500= $39,727,171
  • Mod SA2042012-06-25+$5,570= $39,732,741
  • Mod SA2072012-06-25+$2,021= $39,734,762
  • Mod SA2082012-06-25+$29,235= $39,763,997
  • Mod SA1942012-06-27+$24,456= $39,788,453
  • Mod SA2102012-08-14+$2,000= $39,790,453
  • Mod SA2112012-08-14+$3,430= $39,793,883
  • Mod SA2122012-08-14+$4,533= $39,798,416
  • Mod SA2132012-08-14+$4,478= $39,802,894
  • Mod SA2142012-08-14+$39,209= $39,842,103
  • Mod SA2152012-08-14+$4,389= $39,846,492
  • Mod SA2162012-08-14+$38,000= $39,884,492
  • Mod SA2062012-09-06+$8,031= $39,892,523
  • Mod SA1772012-09-07+$2,795,003= $42,687,526
  • Mod SA2172017-10-23+$825,000= $43,512,526
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2009-04-30+$25,974,844$25,974,844CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA
Mod CO01A· CHANGE ORDER2009-06-06+$5,155$25,979,999CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA
Mod CO01B· CHANGE ORDER2009-08-24+$6,000$25,985,999CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA
Mod CO01C· CHANGE ORDER2009-08-24+$6,000$25,991,999CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA
Mod CO01D· CHANGE ORDER2009-08-24+$9,900$26,001,899CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA
Mod CO01E· CHANGE ORDER2009-08-24+$30,000$26,031,899CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA
Mod CO01F· CHANGE ORDER2009-08-24+$10,000$26,041,899CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA
Mod CO01G· CHANGE ORDER2009-08-24+$2,500$26,044,399CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA
Mod CO01H· CHANGE ORDER2009-08-25+$7,100$26,051,499CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA
Mod SA001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-08-31+$16,671$26,068,170CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA
Mod SA002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-09-10+$0$26,068,170CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA
Mod CO01I· CHANGE ORDER2009-09-11+$40,000$26,108,170CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA
Mod CO01J· CHANGE ORDER2009-09-23+$46,000$26,154,170CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA
Mod CO01K· CHANGE ORDER2009-09-25+$45,203$26,199,373CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA
Mod CO01M· CHANGE ORDER2009-10-13+$48,000$26,247,373CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA
Mod CO01L· CHANGE ORDER2009-10-14+$30,000$26,277,373CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA
Mod CO01N· CHANGE ORDER2009-10-16+$59,000$26,336,373CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA
Mod CO01O· CHANGE ORDER2009-10-23+$35,000$26,371,373CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA
Mod CO01P· CHANGE ORDER2009-10-28+$6,000$26,377,373CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA
Mod CO01Q· CHANGE ORDER2009-11-16+$7,451$26,384,824CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA
Mod CO01S· CHANGE ORDER2009-12-07+$61,888$26,446,712CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA
Mod CO01R· CHANGE ORDER2009-12-09+$73,923$26,520,635CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA
Mod CO01U· CHANGE ORDER2009-12-30+$30,011$26,550,646CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA
Mod CO01V· CHANGE ORDER2009-12-30+$13,530$26,564,176CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA
Mod CO01X· CHANGE ORDER2010-01-26+$97,937$26,662,113CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA
Mod SA003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-02-11+$130,642$26,792,755CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA
Mod CO01Y· CHANGE ORDER2010-03-26+$96,110$26,888,865CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA
Mod SA004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-03-26+$6,314$26,895,179CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA
Mod SA005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-03-26−$22,311$26,872,868CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA
Mod CO01T· CHANGE ORDER2010-04-05+$94,000$26,966,868CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA
Mod CO01Z· CHANGE ORDER2010-04-05+$89,463$27,056,331CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA
Mod CO02A· CHANGE ORDER2010-04-05+$10,000$27,066,331CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA
Mod CO01W· CHANGE ORDER2010-04-07+$3,808$27,070,139CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA
Mod SA006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-04-14−$857$27,069,282CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA
Mod SA007· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-04-26+$16,830$27,086,112CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA
Mod SA008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-04-26−$12,701$27,073,411CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA
Mod SA009· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-05-17+$9,387$27,082,798A. DIFFERING SITE CONDITIONS. B. DURING THE EXCAVATION FOR THE NEW SSMH #200 ON DRAWING GS C 4.01, FOUR (4) X…
Mod SA010· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-05-17+$251,656$27,334,454A. DIFFERING SITE CONDITIONS. THE PROJECT SITE WAS NOT IDENTIFIED AS HAVING CONTAMINATED SOIL. TEST RESULTS TA…
Mod SA011· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-05-21+$5,387$27,339,841RE-FABRICATING AND RE-DETAILING OF GRADE BEAMS WAS REQUIRED DUE TO CONFLICTS IN THE BEAM DIMENSIONS IN THE ST…
Mod SA012· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-05-25−$21,921$27,317,920EXISTING B-48 WAS SUPPOSED TO BE ALREADY DEMOLISHED BEFORE THE START OF CONSTRUCTION FOR B-520. IT IS NOW TO…
Mod SA013· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-05-27−$3,998$27,313,922A) DIFFERING SITE CONDITIONS. ALONG THE SOUTHERN BORDER OF THE EXISTING PARKING LOT, A CONCRETE SLAB WAS DISCO…
Mod SA014· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-05-27−$911$27,313,011LOCAL LANDFILLS WILL NOT ACCEPT THE SURPLUS SOIL UNLESS IT IS TESTED FOR SPECIFIC CONTAMINANTS. CONTRACTOR N…
Mod SA015· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-05-28+$0$27,313,011REVISE STITCH NAILING AT SHEAR PANEL TYPE 2,4 AND 5, AS SHOWN IN ATTACHED ASI SHT. 012-S01.
Mod SA016· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-06-07+$7,885$27,320,896AS SHOWN IN DRAWING GS C4.01, THE NEW 6" SANITARY SEWER INSTALLATION WAS IMPEDED BY THE EXISTING 27" STORM DR…
Mod CO02B· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-06-23+$3,750$27,324,646CO-2B, IDENTIFY 12 KV FEEDER CABLES
Mod SA018· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-07-06+$3,298$27,327,944PROVIDE ADDITIONAL FOOTINGS NEEDED TO PROVIDE THE 80 BED PSYCHIATRIC FACILITY WITH A STABLE FOUNDATION.
Mod CO02G· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-07-16+$43,112$27,371,056IN ORDER TO INSTALL THE METASYS SECURE FOLDING DESK LAP TOP SYSTEM, THE CURRENT 120 VAC AND DATA OUTLETS WILL…
Mod CO02E· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-07-22+$25,000$27,396,056THE ELEVATOR JACKHOLE NEEDS TO BE EXCAVATED/DRILLED PRIOR TO INSTALLATION OF THE STRUCTURAL STEEL.
Mod CO02F· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-08-09+$5,517$27,401,573CONSTRUCTION OF BUILDING 520 REQUIRED RELOCATION OF THE SEWER SYSTEM SUPPORTING BUILDING 2. THE SEWER LIFT STA…
Mod CO02H· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-08-18+$51,880$27,453,453THIS PROJECT REQUIRES TROL CONNECTIVITY FOR THE PATIENT SHOWERS AND THE MASTER CONTROLLER (LOCATED BEHIND THE…
Mod CO02I· CHANGE ORDER2010-08-26+$14,000$27,467,453A. THE CURRENT MENTAL HEALTH FACILITY DESIGN GUIDE DO NOT ALLOW THE USE OF CERAMIC TILES IN PATIENT BATHROOMS.…
Mod SA019· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-08-26+$356,842$27,824,2951. THIS MODIFICATION DEFINITIZES CO-01Z, ISSUED ON APRIL 5, 2010. 2. CO-01Z WAS ISSUED TO START THE PROCUREME…
Mod CO02J· CHANGE ORDER2010-09-01+$81,790$27,906,085A. THE TESTING AND INSPECTION SERVICES WAS ORIGINALLY PROVIDED BY THE VA UNDER A SEPARATE CONTRACT. THIS CONTR…
Mod CO02D· CHANGE ORDER2010-09-10+$4,750,000$32,656,085ADMINISTRATION BUILDING CHANGES IAW ASI #14
Mod CO02K· CHANGE ORDER2010-09-10+$327,572$32,983,657FINISH GRADES OUTSIDE OF THE LOADING DOCK AND UNIT D IS LOWER THAN THE BOTTOM OF THE BUILDING FOOTINGS PER DES…
Mod CO02L· CHANGE ORDER2010-10-19+$60,000$33,043,657A. SUICIDE PREVENTION DOORS WERE NOT REQUIRED UNDER THE ORIGINAL CONTRACT. B. CURRENT VA MENTAL HEALTH GUIDE R…
Mod CO02N· CHANGE ORDER2010-11-29+$94,000$33,137,6571. THE CONTRACT DOES NOT INCLUDE PROVISIONS FOR ANTI-LIGATURE CONSTRUCTION ON THE STEEL WINDOWS LOCATED IN THE…
Mod SA017· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-11-30+$5,323$33,142,980THE APPROVED INSTITUTIONAL SPRINKLER HEAD (VIKING) PER THE CONTRACT SPECIFICATIONS WAS NOT ACCEPTABLE TO THE U…
Mod SA021· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-11-30+$22,283$33,165,2631. BUILDING 48 (BLIND REHAB) IS ADJACENT THE CONSTRUCTION AREA. THE CONSTRUCTION RIGHT OF WAY CLOSES OFF THE…
Mod SA022· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-11-30−$14,601$33,150,662CONTRACT DRAWING GS-C-0.02, 1.01, AND 1.02 SHOWED ONLY ONE EXISTING 3" GAS LINE INSIDE B-520 FOOT PRINT TO BE…
Mod SA025· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-12-29+$69,554$33,220,216A) DESIGN ERROR/OMISSION. B) WINDOW DESIGN UNDER THE ORIGINAL CONTRACT NEEDED IMPROVEMENTS TO ENSURE THEY ARE…
Mod SA026· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-12-31+$16,088$33,236,304REQUIRED UNDERGROUND PLUMBING FOR THE FLOOR DRAINS IN THE FOOD CART ROOMS WERE NOT SHOWN IN THE DRAWINGS. B.…
Mod SA027· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-12-31+$7,227$33,243,531A WETTED P-TRAP WAS REQUIRED AT THE LOADING DOCK DUMPSTER LOCATION. PLANS DID NOT INCLUDE DRAWINGS FOR THE WET…
Mod CO02O· CHANGE ORDER2011-01-10+$65,683$33,309,214THE NEW MENTAL HEALTH STANDARD DO NOT ALLOW INSTALALTION OF CERAMIC TILE WALLS (PER CONTRACT) IN THE PATIENT B…
Mod SA028· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-01-13+$9,116$33,318,330REROUTE SUMP PUMP DISCHARGE PIPING.
Mod SA029· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-01-13+$4,961$33,323,291REMOVE AND DISPOSE OF ALL TRANSITE PIPING IAW PERTAINENT REGULATIONS.
Mod SA030· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-01-13+$3,063$33,326,354INSTALLATION OF REVEALS AND STUCCO AT LOADING DOCK.
Mod SA023· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-01-26+$9,377$33,335,731TO PROVIDE ADDITIONAL PIPE INSULLATION FOR THE ADMINSTRATION AND PIC BUILDINGS.
Mod SA024· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-01-31+$16,508$33,352,239THE EXISTING FEEDER CABLES (F2 AND F6) IDENTIFIED IN THE PLANS AS THE CONNECTION POINTS FOR THE PRIMARY POWER…
Mod SA031· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-01-31+$39,360$33,391,599INSTALLATION OF ADDITIONAL PLUMBING AND FIXTURES IN ROOMS A-10 A/B/C AS DESCRIBED IN ASI 016 AND P RFI 0006 SK…
Mod SA034· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-02-14−$5,692$33,385,907A. THE FINAL CHANGE TO THE ADMIN BUILDING HAS NOT BEEN ISSUED. INCLUDED IN THE CHANGE TO BE ISSUED IS THE INST…
Mod SA035· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-02-16−$6,666$33,379,241A. THE CURRENT MENTAL HEALTH FACILITY DESIGN GUIDE DO NOT ALLOW THE USE OF CERAMIC TILES IN PATIENT BATHROOMS.…
Mod SA039· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-02-25+$13,028$33,392,269THE ORIGINAL CONTRACT DID NOT SPECIFY A WATERPROOF TRAP PRIMER ACCESS PANELS AND TAMPER PROOF TORX HEAD SCREW…
Mod SA037· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-02-28+$29,945$33,422,214ELIMINATION OF UNDER FLOOR UTILITY TRENCH ROUTING OF HHW AND HHWR LINES AND RE-ROUTE OVERHEAD PER RFI SHEETS M…
Mod CO02P· CHANGE ORDER2011-03-08+$8,864$33,431,078THE INITIAL CONTRACT DRAWINGS ONLY SHOWED 2 EACH OUTLETS FOR THE 2 EACH A LA CART FOOD WARMING EQUIPMENT LOC…
Mod CO02R· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-03-10+$89,000$33,520,078A. THE CONTRACT PLANS AND SPECIFICATIONS DID NOT INCLUDE A REQUIREMENT FOR ANTI-LIGATURE DOORS OR SENSORS. B.…
Mod SA041· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-03-24−$5,831$33,514,247CO-01D WAS ISSUED TO LOCATE DOCUMENTED AND UNDOCUMENTED SHUT OFF VALVES OF THE EXISTING IRRIGATION SYSTEM THAT…
Mod SA043· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-03-24+$6,835$33,521,082AT EACH OF THE 4 NURSING UNITS TWO VENT LINES ONE ABOVE THE PATIENT ROOMS 135, 136, 137 AND THE OTHER ABOVE PA…
Mod CO02Q· CHANGE ORDER2011-03-29+$1,250,000$34,771,082A. REFERENCE CO-02D ISSUED ON 9/10/2010. B. THIS CHANGE INCREASES THE FUNDING FOR THE CHANGE ISSUED UNDER CO-…
Mod SA032· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-03-29+$106,856$34,877,9381. THE CONTRACT DOES NOT INCLUDE PROVISIONS FOR ANTI-LIGATURE FEATURES ON THE STEEL WINDOWS LOCATED IN THE PAT…
Mod SA033· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-03-30+$39,549$34,917,487CONTRACT PLANS GS C1.01, C1.02 SHOWED THE NEW 42' STORM DRAIN TO RUN UNDERNEATH THE LOOP ROAD BASICALLY IN THE…
Mod SA038· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-03-30+$15,403$34,932,890REMOVAL AND INSTALLATION OF THE STREET LIGHTS IMPACTED BY THE DEMOLITION WORK AND NEW STORM DRAIN ALIGNMENT. P…
Mod SA042· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-03-30+$16,928$34,949,818A. USER REQUESTED CHANGE. WITH THE SOLID SURFACE PATTERN ON THE FLOOR TILE, IT WAS DIFFICULT TO DETERMINE WHER…
Mod CO02S· CHANGE ORDER2011-03-31+$9,719$34,959,537A. THE UTILITY COMPANY GAS METER SERVICE NEEDS TO BE INCREASED. THE NEW FACILITY INCREASES THE DEMAND AND CURR…
Mod SA040· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-04-14+$5,463$34,965,000TO PROVIDE A FACILITATOR FOR PARTNERING SESSION
Mod SA044· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-04-18+$26,623$34,991,623A. DESIGN CHANGES. CIVIL AND ELECTRICAL CHANGES ARE NECESSARY TO COORDINATE THE UTILITY CONNECTIONS AND SITE W…
Mod SA045· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-04-18+$28,118$35,019,741THE USER REQUESTED TO CHANGE THE TPO ROOFING ON THE ROOF MONITORS TO STANDING SEAM METAL ROOF IN ORDER TO MATC…
Mod SA046· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-04-27+$12,467$35,032,208A. DESIGN CHANGE. DETAILS TO CONNECT RB6 BEAM TO RB3 AND RB2 BEAMS WERE IN CONFLICT AND CAN NOT BE CONSTRUCTED…
Mod SA048· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-04-27+$622$35,032,830THE INITIAL CONTRACT DRAWINGS ONLY SHOWED 2 EACH OUTLET FOR THE 2 EACH A LA CART FOOD WARMING EQUIPMENT LOCA…
Mod SA047· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-05-06+$47,917$35,080,747USER REQUESTED CHANGE. THE CONTRACT SPECIFICATIONS DID NOT SPECIFY ANTI-LIGATURE FAUCETS IN THE PATIENT BATHRO…
Mod SA049· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-05-06+$12,848$35,093,595RECONFIGURATION OF RISER TO ADMIN BUILDING FOR GAS, DOMESTIC WATER AND HOT WATER SUPPLY AND RETURN.
Mod SA050· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-05-16+$6,412$35,100,007THE CHANGE IN GRADING AND THE SIDE WALK LOCATION, ELIMINATES THE CONFLICT BETWEEN THE COURTYARD WALL SPREAD FO…
Mod CO02T· CHANGE ORDER2011-05-20+$6,000$35,106,007THE VA MEDICAL CENTER WILL BE INSTALLING A PROJECTOR, A VETEL T.V. MONITOR AND A SMART BOARD IN 4EACH CONFER…
Mod SA036· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-05-20+$225,613$35,331,620A. THE USER REQUESTED TO CHANGE FROM THE CERAMIC WALL TILE TO A SOLID SURFACE MATERIAL IN ORDER TO COMPLY WITH…
Mod CO02W· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-05-27+$6,758$35,338,378LOCATION OF THE HELP BUTTONS IN THE EXAM ROOMS OF THE ADMIN BUILDING WILL BE OUT OF REACH OF THE MEDCAL STAFF…
Mod SA053· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-05-27+$972$35,339,350DEFINITIZE CO-02S ISSUED ON 31 MARCH 2011.
Mod SA058· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-05-27−$420$35,338,930PATIENT SAFETY. THE SOUTH-WEST COURTYARD WINDOWS NEED TO BE RE-ALIGNED TO THE INTERIOR SIDE IN ORDER TO PREVEN…
Mod SA059· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-05-27+$13,849$35,352,779DEFINITIZE CO-01S.
Mod SA061· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-05-27+$9,610$35,362,389DESIGN CHANGE. PER ORIGINAL DESIGN, THE TYVECK WOULD BE VISIBLE IN THE SOFFIT VENTS AROUND THE BUILDING.
Mod SA054· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-05-31+$0$35,362,389USER REQUESTED CHANGE. RAISING THE SCREEN 1'-0" WOULD COMPLETELY COVER THE MECHANICAL EQUIPMENT ON THE ROOF OF…
Mod SA056· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-06-01+$1,927$35,364,316FUR WALL TO INTERIOR OF ROTUNDA WHERE BEAM PROTRUDES.
Mod SA057· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-06-01−$4,615$35,359,701USER REQUESTED CHANGE. PATIENT SAFETY CONCERN.
Mod SA055· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-06-14+$1,572$35,361,273DESIGN OMISSION. PER DESIGN, A GAP IS LEFT IN PLACE AT THE LOCATIONS WHERE THE ALUMINUM PLATE WRPAS THE OPENIN…
Mod SA063· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-06-21+$7,978$35,369,2511. DEFINITIZE CO-01U AND CO-01O. 2. CO-01O AND CO-01U WERE ISSUED DUE TO A DESIGN OMISSION. AN EXISTING SEWER…
Mod SA064· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-06-27+$877$35,370,128DEFINITIZE CO-01Q. EXISTING WATER LINE TO BLDG 2 WAS DISCOVERED TO BE ONLY 2 FT BELOW GRADE. REQUIREMENT FOR T…
Mod SA065· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-06-27+$13,666$35,383,794DESIGN OMISSION. PER CONTRACT THE BOILERS REQUIRE 14" OF WC (WATER COLUMN) PRESSURE. PER THE AE, THE BUILDING…
Mod SA067· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-22+$6,933$35,390,727THE SINKS CALLED OUT IN THE PLUMBING DRAWINGS WERE FLOOR MOUNTED AND WALL MOUNTED CONFLICTING WITH THE CABIN…
Mod SA070· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-22+$247$35,390,974LOCATION OF THE HELP BUTTONS IN THE EXAM ROOMS OF THE ADMIN BUILDING WILL BE OUT OF REACH OF THE MEDICAL STAFF…
Mod SA074· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-22+$7,766$35,398,740DESIGN CHANGE. CONTRACT DID NOT INCLUDE DRAIN CONNECTION REQUIREMENTS FOR THE GFE ICE MAKERS.
Mod SA020· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-28+$53,372$35,452,112USER REQUESTED CHANGE. PROXIMITY SYSTEMS FURNITURE WILL BE INSTALLED BY USER PRIOR TO ACTIVATION. WALL REQUI…
Mod SA066· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-28+$717$35,452,829THE EXHAUST AND SUPPLY FANS IN ROOM A-176 NEEDS TO PROVIDE SUFFICIENT AIR FLOW FOR THE FOOD CART.
Mod SA068· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-28+$2,195$35,455,024THE COOLING UNITS REQUIRE A CONCRETE PAD AND THE CONCRETE PAD DESIGNED BY THE AE WASN'T LARGE ENOUGH FOR BOTH…
Mod SA069· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-28+$16,054$35,471,078PROVIDE TWO PRESSURE REDUCING VALVES ON 4" WATER LINES ENTERING BUILDING 520.
Mod SA072· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-28+$8,538$35,479,616THE CMU WALL IN THE OUTDOOR COURTYARD IS NOT ATTACHED TO THE EXTERIOR WALLS OF WINGS B AND C. THIS LEAVES A GA…
Mod SA073· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-28+$4,373$35,483,989A. ORIGINAL DRAWINGS HAD SIDE LIGHTS AND DOOR OPENINGS IN C-128 AND D-128 ON THE SAME SIDE AS THE WASHER AND…
Mod SA075· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-07-28+$5,249$35,489,238A. ORIGINAL CONTRACT REQUIREMENT IS TO PROVIDE NCM-NF NETWORK CARDS. AN UPGRADE TO HIGHSPEED NETWORK CARDS IS…
Mod CO02X· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-01+$2,000,000$37,489,2381. INCREASE FUNDING FOR THE CHANGE ORDER CO-02D AND CO-02Q WERE PREPARED AND APPROVED FOR A TOTAL OF $6,000,00…
Mod SA079· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-02−$2,969$37,486,269USER REQUESTED CHANGE. USER WILL INSTALL SMARTBOARDS IN THE CONFERENCE ROOM. PLAN DID NOT INCLUDE BACKING FOR…
Mod SA080· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-12+$4,829$37,491,098A. THE LIGHT FIXTURES AT BATHROOMS F-102 AND F-103 DOES NOT FIT DUE TO THE DUCT WORK. THE ORIGINAL (F-12) LIGH…
Mod SA088· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-15+$10,029$37,501,127DESIGN OMISSION. THE CONTRACT DRAWINGS DO NOT INCLUDE THE UNDERGROUND PLUMBING IN THE ADMINISTRATION BUILDING…
Mod SA077· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-18+$10,690$37,511,817A. ORIGINAL CONTRACT REQUIREMENT USED THE ZURN Z-1231 LAVATORY CARRIER, BUT DUE TO MULTIPLE STRUCTURAL INTERFE…
Mod SA089· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-18+$3,743$37,515,560ASI #026, REVISIONS TO CHANGE DOOR MATERIALS FROM METAL TO ALUMINUM AS WELL AS CHANGE A DOOR TO THE FIRE RATIN…
Mod SA052· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-22+$79,709$37,595,269A. THE USER REQUESTED TO CHANGE FROM THE CERAMIC WALL TILE TO A SOLID SURFACE MATERIAL IN ORDER TO COMPLY WITH…
Mod SA078· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-22+$5,361$37,600,630A. THE CUSTONER REQUESTED A COLOR CHANGE FOR FIFTY-FOUR (54) WALLS ON THE FIRST AND SECOND FLOORS OF THE ADMIN…
Mod SA083· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-22−$2,083$37,598,547DAYROOMS DO NOT REQUIRE SINKS.
Mod SA051· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-26−$4,240$37,594,307DESIGN CHANGE. PLAN WAS REVISED SINCE THE TELECOM MANHOLE (FUTURE) IDENTIFIED IN THE CONTRACT DRAWINGS WILL NO…
Mod SA084· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-26+$3,466$37,597,773DESIGN OMISSION. REQUIRED COILING COUNTER DOOR CAN NOT BE INSTALLED WITH THE DESIGNED WALL FRAMING. 16 GAUGE M…
Mod SA096· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-26+$1,775$37,599,548DEFINITIZE CO-02F. CONSTRUCTION OF BUILDING 520 REQUIRED RELOCATION OF THE SEWER SYSTEM SUPPORTING BUILDING2.…
Mod SA099· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-26+$1,180$37,600,728THE ORIGINAL SPECS CALLED FOR A STEEL OR COPPER PIPE FOR HEATING HOT WATER PIPING. IT WAS INSTALLED AS STEEL P…
Mod SA092· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-29+$3,455$37,604,183DESIGN CHANGE. PER OAC MEETING ON 12/14/10 THE DOORS IN ROOMS A-145, B-145, C-145, AND D-145 PATIENT SAFETY IS…
Mod SA090· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-30+$4,807$37,608,990IN RFI E-0098 DATED 7/6/2010, CLARIFICATIONS ON THE CIRCUITS FOR HUMIDIFIER CONTROLS WERE REQUESTED. THE RESPO…
Mod SA091· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-30+$4,391$37,613,381DESIGN ERROR. IN RFI E-0108 DATED 8/10/2010 THE LNC1 WAS BEING FED WITH F80 DESIGNATION AND IT SHOULD HAVE A 4…
Mod SA100· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-30−$6,300$37,607,081DEFINITIZE CO-02H FOR INSTALLATION OF LOW VOLTAGE WIRING INSIDE CONDUITS.
Mod SA105· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-30+$5,409$37,612,490CHANGES WERE DUE TO DESIGN ERRORS AND OMISSIONS. THIS SA COVERS MISCELLANEOUS CHANGES RESULTING FROM THE RFI P…
Mod SA107· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-08-30+$1,473$37,613,963DESIGN ERROR. IN 1/AS7.02 THE SIZE OF THE GUTTERS WAS DETERMINED TO BE SMALL AND WOULD NOT WORK AS DESIGNED.
Mod SA087· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-01+$13,003$37,626,966REVISE DOOR FRAME TYPE TO ACCOMODATE DESIGN ERROR. SPECIFIED FRAME WOULD NOT WORK AS INTENDED IN THE DESIGN.
Mod SA101· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-01+$15,129$37,642,095CHANGES WERE DUE TO DESIGN ERRORS AND OMISSIONS. THIS SA COVERS MISCELLANEOUS CHANGES RESULTING FROM THE RFI P…
Mod SA097· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-21+$5,258$37,647,353DESIGN OMISSION. IN RFI A-0157, THE CONTTRACTOR REQUESTED LOCATIONS FOR THE TELEVISIONS THAT WOULD REQUIRE MOU…
Mod SA104· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-21+$16,341$37,663,694THIS SUPPLEMENTAL AGREEMENT IS TO CONSOLIDATE CHANGE PROPOSAL REQUEST 107, SOIL CONDITIONS PUMPING UNDER BASKE…
Mod SA106· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-21−$3,356$37,660,338THIS SUPPLEMENTAL AGREEMENT CONSOLIDATES FIVE CHANGE PROPOSAL REQUESTS: 74, 84, 101, 148, 162.
Mod SA108· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-21+$14,300$37,674,638RFI E-0049 STATED THAT MECHANICAL DUCT WORK WAS RELOCATED OUT OF ELECTRICAL ROOM D EC1 BUT WITH THIS RELOCATIO…
Mod SA109· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-21+$19,031$37,693,669RFI M-0001 WAS SUBMITTED ON 9/11/2009 TO GET GUIDANCE ON A CONFLICT WITH THE LOW ROOF SHOWN ON DRAWING MH 2.14…
Mod SA110· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-21+$14,300$37,707,969RFI S 0141 REQUIRED THE RB5 TO BE MOVED TO THE SAME LOCATION AS EXISTING DUCTWORK CAUSING THE DUCTWORK TO BE M…
Mod SA111· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-21+$20,393$37,728,362THIS SUPPLEMENTAL AGREEMENT IS TO COMBINE THE WORK FROM FOUR PROPOSALS INTO ONE AGREEMENT.
Mod SA112· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-21−$4,210$37,724,152THE CONTRACT REQUIRED TRAINING FOR TELECOMMUNICATION, NURSE CALL, SECURITY DURESS ALARM, CCTV, AND MATV TRAINI…
Mod SA113· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-21+$1,751$37,725,903PATIENT BATHROOMS REQUIRE 20"X36" SECURITY MIRRORS, RATHER THAN 4"X6", SO THAT PATIENTS CONFINED TO A WHEEL C…
Mod SA114· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-21+$8,500$37,734,403DESIGN OMISSION. CONTRACT DRAWINGS DID NOT SHOW CONTINUATION OF THE REVEAL ON TOP OF THE WINDOWS. AS DRAWN, WA…
Mod SA117· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-21+$10,850$37,745,253DESIGN OMISSION. BLOCKING IN SHEAR WALLS FOR ELECTRICAL OUTLET OPENINGS WERE NOT INCORPORATED IN THE DESIGN. D…
Mod SA093· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-27+$8,500$37,753,753EQUIPMENT IN ROOMS F 140, 107, 123, 201, AND 247 CONTAIN EQUIPMENT THAT REQUIRED COORDINATION WITH AV SUPPLIER…
Mod SA102· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-27+$11,714$37,765,467CHANGES CAUSED BY SEVERAL RFI'S DUE TO VARIOUS DESIGN ERRORS AND OMISSIONS
Mod SA103· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-27+$16,867$37,782,334CHANGES WERE DUE TO DESIGN ERRORS AND OMISSIONS. THIS SA COVERS MISCELLANEOUS CHANGES RESULTING FROM THE RFI P…
Mod SA115· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-27+$2,318$37,784,652IN RESPONSE TO RFI 0247 THAT REQUIRED ADDITIONAL INFILL FRAMING, JOINT SEALANT, AND WINDOW TRIM AT SILL TO TWO…
Mod SA082· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-30+$8,535$37,793,187USER REQUESTED CHANGE. THE CLEAN STORAGE ROOMS A160&D160 WILL HAVE 3 OMNICELL TOWERS WHICH REQUIRE POWER AND…
Mod SA086· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-30+$2,016$37,795,203DESIGN CHANGES RESULTING FROM STRUCTURAL AND ARCHITECTURAL RFI'S. CHANGES WERE NECESSARY FOR CONSTRUCTABILITY…
Mod SA094· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-30+$1,231$37,796,434DESIGN ERROR. PER SHEET ES 3.10 THERE IS ONLY ONE J-BOX IN ROOM E ME1 FOR WH 1 EQUIPMENT. PER PS2.10, THERE AR…
Mod SA095· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-30+$1,332$37,797,766RFP D-0016 DATED 4/26/2010 REQUESTED THE ADDITION OF A J-BOX TO DOOR C-WL1 AND DC-050. THIS IS A LUMP SUM REQU…
Mod SA098· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-30−$30,000$37,767,766THE SECTION OF THE ACCESS ROAD WILL BE USED FOR THE FUTURE PROJECT TO DEMO BUILDING 2. DELETION OF THIS WORK A…
Mod SA121· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-30+$26,007$37,793,773CHANGES WERE DUE TO DESIGN ERRORS AND OMISSIONS. THIS SA COVERS MISCELLANEOUS CHANGES RESULTING FROM THE RFI P…
Mod SA118· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-10-13+$13,111$37,806,8841. AT DATA ROOMS F124 AND F226 THERE WAS A NEED TO EXTEND THE PARTIAL HEIGHT WALL TO FULL HEIGHT TO PREVENT C…
Mod SA122· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-10-14+$7,160$37,814,044A RFI 0151 AND A RFI 0151 R1 REQUIRED THE MECHANICAL UNIT CURBS TO BE ADJUSTED IN HEIGHT AND PROVIDE ADDITIONA…
Mod SA123· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-10-14+$13,714$37,827,758S RFI 0180, 0199, 0205, AND 0208 R1 REQUIRED REWORK TO UNITS A AND B AT 11 LOCATIONS WHERE THE KINGSTUD NEEDED…
Mod SA124· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-10-14+$8,752$37,836,510S RFI 204 REQUIRED ADDITIONAL MECHANICAL HEADOUTS FOR DUCTWORK CHANGES TO SHEAR WALL PENETRATIONS AND ADDITION…
Mod SA125· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-10-14+$4,833$37,841,343S RFI 0122 AND A RFI 0078 REQUIRED SHEAR WALLS TO BE MOVED, WALLS TO BE EXPANDED, AND HEADOUTS TO BE PROVIDED…
Mod SA126· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-10-14+$7,131$37,848,474IN RESPONSE TO ASI #25 AND S RFI 0218, THE CONTRACTOR WAS REQUIRED TO ADD FRAMING AND SHIFTING THE LOCATIONS O…
Mod SA127· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-10-24+$12,000$37,860,474DESIGN OMISSION.
Mod SA128· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-10-24−$7,681$37,852,793DEFINITIZE CHANGE ORDER CO-02A FOR ANALYTICAL SOIL TESTING.
Mod SA060· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-10-27+$344$37,853,137ROOF VENTING MONITORS REQUIRED WOOD FRAMING MEMBERS TO BE UPGRADED FROM 2X4'S TO 2X6'S PER THE RESPONSE TO RFI…
Mod SA130· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-10-27+$85,000$37,938,137DESIGN CHANGES DUE TO ERRORS AND OMISSIONS.
Mod SA129· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-10-28+$49,295$37,987,432CRITICAL FUNCTION: RELOCATE THE FIRE MAIN TO THE EXTERIOR ROOF WALL.
Mod SA133· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-10-31+$61,069$38,048,501DESIGN CHANGES DUE TO ERRORS AND OMISSIONS.
Mod SA137· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-11-01+$94,641$38,143,142USER REQUESTED CHANGE. CURRENT MH DESIGN GUIDE REQUIRED ANTI-LIGATURE DOOR SENSORS WHICH WERE NOT INCLUDED IN…
Mod CO02Z· CHANGE ORDER2011-11-09+$92,000$38,235,142CRITICAL FUNCTION: DESIGN CHANGE. ORIGINAL ROUTE FOR THE CONDUITS IS UNDER BUILDING 2, WHICH WAS SUPPOSED TO B…
Mod CO03A· CHANGE ORDER2011-11-17+$12,000$38,247,142PROVIDE FOR THE FABRICATION AND INSTALLATION OF DRYER VENTS IN ROOMS A-128, B-128, C-128,&D-128 DUE TO ERRORS…
Mod CO03B· CHANGE ORDER2011-11-17+$5,300$38,252,442SPECIFICATION 16781, REQUIRES THE CONTRACTOR TO RUN THE COAX FEEDER TO THE NEAREST BUILDING, WHICH IS BUILDING…
Mod SA134· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-11-29+$8,529$38,260,971SEAL GAPS BELOW ALUMINUM PLATES IN WINDOWS.
Mod SA136· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-11-29+$27,253$38,288,224PROVIDE MODIFICATION TO THE CONTRACT TO ACCOUNT FOR SEVERAL DESIGN CHANGES RESULTING FROM ERRORS AND OMISSIONS…
Mod SA139· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-11-29+$784$38,289,008PER RFI A 488, AT THE ADMINISTRATION BUILDING, THERE WAS A NEED TO EITHER RAISE THE CEILING HEIGHT OR LOWER TH…
Mod SA140· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-11-29−$8,500$38,280,508MOST OFFICE WINDOWS ARE INCLUDED WITH INTERIOR VENETIAN BLINDS. THE MEDICAL CENTER WILL PROVIDE THE OTHER WIN…
Mod SA141· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-11-29+$3,898$38,284,406DESIGN ERROR. DESIGNED DOOR LOCK FUNCTION DOES NOT MEET THE USER'S REQUIREMENTS.
Mod SA142· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-11-29+$28,988$38,313,394CRITICAL FUNCTION: DESIGN ERRORS AND OMISSIONS. ABOVE CEILING ELECTRICAL ROUTING NEEDED TO BE CHANGED PER ASI…
Mod SA143· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-11-29+$1,268$38,314,662USER REQUESTED CHANGES. DESIGN WILL NOT WORK FOR THE ROOMS INTENDED USE.
Mod SA145· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-11-29+$17,598$38,332,260CRITICAL FUNCTION: DESIGN CHANGES DUE TO CONFLICT WITH EXISTING FIRE WATER LINE.
Mod SA146· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-11-29+$28,782$38,361,042CRITICAL FUNCTION: RELOCATE THE FIRE HYDRANT IMPACTED BY THE LOOP ROAD RE-ALIGNMENT.
Mod SA147· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-11-29+$30,941$38,391,983CRITICAL FUNCTION: DESIGN CHANGE. THE ORIGINAL SIDEWALK ONLY SHOWED A SLAB ON GRADE CONCRETE PAVEMENT WHICH WO…
Mod SA135· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-11-30−$713$38,391,270PER ASI 050, AT DOORS F104D&F200C THERE WAS A NEED TO CLARIFY AND MODIFY THE DOOR JAMBS, AND THERE WAS ALSO A…
Mod SA138· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-11-30+$6,366$38,397,636PER RFI A 452, AT THE ADMINISTRATION BUILDING, THERE WAS A NEED TO CHANGE THE LAYOUT OF THE CEILING TILES TO P…
Mod SA144· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-11-30+$11,207$38,408,843TO PROVIDE AND INSTALL TANKLESS WATERHEATERS PER RFI 043 RESPONSE.
Mod SA148· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-11-30+$3,099$38,411,942THE DESIGNED CEILING HEIGHT IS TOO HIGH FOR THE DRINKING FOUNTAIN CHILLER. THERE IS NOT ENOUGH CEILING SPACE F…
Mod SA149· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-11-30+$10,000$38,421,942CRITICAL FUNCTION: CHANGE DUE TO DESIGN ERRORS AND OMISSIONS. IN CLARIFYING THE CURB DIMENSIONS, WOOD FRAMING…
Mod SA152· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-11-30+$5,938$38,427,880HARDWIRE CONNECTION FOR THE FIRE MONITORING SYSTEM IS NOT AVAILABLE UNTIL AFTER THE BUILDING IS NEAR COMPLETIO…
Mod SA154· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-11-30+$5,453$38,433,333WIRE GUARDS FOR THE SERVICE FIXTURES ARE NEEDED TO PROTECT MAINTENANCE WORKERS, WORKING UNDERNEATH THE FLUORE…
Mod SA155· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-11-30+$6,368$38,439,701PER RFI A 154&A 167, THERE WAS A NEED TO CLARIFY THE TYPE OF FOUNDATION SUPPORT FOR THE GARDEN COURTYARD CLOSE…
Mod SA156· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-11-30−$686$38,439,015SPECIFICATION 16781, REQUIRES THE CONTRACTOR TO RUN THE COAX FEEDER TO THE NEAREST BUILDING, WHICH IS BUILDING…
Mod SA157· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-11-30+$46,154$38,485,169CRITICAL FUNCTION: DESIGN CHANGE. ARCHITECTURAL SUPPLEMENTAL INFORMATION WAS ISSUED TO PROVIDE FIRE WALL AND S…
Mod SA158· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-11-30+$3,235$38,488,404DESIGN CHANGE. ASI 46 WAS ISSUED TO CORRECT DIMENSION OF SPLICE LENGTH/BAR ON CMU WALL FOUNDATION.
Mod SA159· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-11-30+$13,645$38,502,049PROVIDE FOR THE FABRICATION AND INSTALLATION OF DRYER VENTS IN ROOMS A-128, B-128, C-128,&D-128 DUE TO ERRORS…
Mod SA160· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-11-30+$10,204$38,512,253ADJUST MECHANICAL SCREEN SUPPORTS TO AVOID THE RB5 SPLICE PLATE CONNECTIONS PER RFI 0210. DELETE PARAPET WALL…
Mod SA161· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-11-30+$17,265$38,529,518TO PROVIDE FOR ERRORS AND OMISSIONS IN THE DRAWINGS REGARDING CONCRETE PLACEMENT AND SEVERAL ARCHITECTURAL INS…
Mod CO03C· CHANGE ORDER2011-12-02+$4,869$38,534,387DIFFERING SITE AND DESIGN OMISSION.
Mod SA163· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-12-02+$94,642$38,629,029CRITICAL FUNCTION: USER REQUESTED CHANGE. ANTI-LIGATURE SENSORS WERE NOT INCLUDED IN THE ORIGINAL CONTRACT. CU…
Mod SA151· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-12-06+$93,941$38,722,970DESIGN OMISSION. ALL THE NECESSARY/REQUIRED CEILING ACCESS PANELS WERE NOT IDENTIFIED IN THE DRAWINGS.
Mod CO03D· CHANGE ORDER2011-12-14+$99,000$38,821,970THE CONTRACTING OFFICER IS ISSUING A CHANGE ORDER TO PROVIDE PARTIAL FUNDING PENDING THE DEFINITIZATION OF THE…
Mod SA162· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-12-16+$3,729$38,825,699SPECIFIED LIGHT FIXTURES AS INSTALLED ARE INSUFFICIENT TO PROVIDE THE REQUIRED 10 FT CANDLES ILLUMINATION IN T…
Mod SA168· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-12-30+$4,328$38,830,027DETAILS FOR THE INSTALLATION OF THE SHADE POCKET WERE NOT PROVIDED IN THE DRAWINGS. INSTALLATION CAN NOT BE AC…
Mod SA169· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-12-30+$3,243$38,833,270USER REQUESTED CHANGE. USER REQUESTED TO MATCH THE CURRENT PAHCS STANDARD FOR BUILDING SIGNS.
Mod SA170· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-12-30+$6,140$38,839,410USER REQUESTED CHANGE. DUE TO HEIGHT OF THE BAMBOO SPECIES (TALLER THAN THE BUILDING) AND MAINTENANCE CONCERNS…
Mod SA175· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-12-30+$60,483$38,899,893DIFFERING SITE CONDITIONS. MORE OF THE EXCESS SOIL REMOVED ON SITE WERE CONTAMINATED BUT NOT HAZARDOUS.
Mod SA176· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-12-30+$10,433$38,910,326DEFINITIZE CO-01W ADDITIONAL COURTYARD DRAINS
Mod SA116· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-01-02+$4,154$38,914,480DIFFERING SITE CONDITIONS. CONTAMINATED SOIL DISPOSAL GENERATED BY THE TRENCHING. CONTRACT DID NOT HAVE PROVIS…
Mod CO03E· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-01-10+$4,038$38,918,518ADDED WORK TO INSTALL AN ADDED DATA LINE FOR A-LA CART ROOMS A-176 AND D-176. ADDED WORK TO INSTALL 1 EA NOTI…
Mod CO03F· CHANGE ORDER2012-01-12+$1,719$38,920,237THE FIRE ALARM TIE IN FROM BLD 520 TO BUILDINGS 100 AND BLD 40 REQUIRES PROGRAMMING AND CONNECTIVITY INFORMATI…
Mod SA171· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-01-16+$16,741$38,936,978AHU PENETRATION ON ROOF AND MISCELLANEOUS CHANGES AS REFLECTED IN THE ATTACHED ARCHITECTURAL SUPPLEMENTAL INST…
Mod SA172· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-01-16+$40,485$38,977,463AHU PENETRATION ON ROOF AND MISCELLANEOUS CHANGES AS REFLECTED IN THE ATTACHED ARCHITECTURAL SUPPLEMENTAL INST…
Mod SA173· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-01-16+$49,950$39,027,413AHU PENETRATION ON ROOF AND MISCELLANEOUS CHANGES AS REFLECTED IN THE ATTACHED ARCHITECTURAL SUPPLEMENTAL INST…
Mod SA174· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-01-16+$71,357$39,098,770CRITICAL FUNCTION: DESIGN OMISSION AND USER REQUESTED CHANGES. DESIGN CHANGES TO VENT AND PREVENT WATER INFIL…
Mod SA119· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-01-17+$43,081$39,141,851RELOCATE 12.47 KV 3 PHASE 750 KVA EMERGENCY POWER TRANSFORMER. INSTALL 4.16 KV PRIMARY 480/277 V SECONDARY 3…
Mod SA120· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-01-17+$16,941$39,158,792THIS INCLUDES DEMOLITION OF (E) SHEARWALLS/FRYWALL, SHEARWALL REPAIR AND DRYWALL REPAIR IN ACCORDANCE WITH ASI…
Mod SA131· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-01-17+$73,349$39,232,141A PORTABLE GENERATOR IS REQUIRED TO PROVIDE TEMPORARY POWER TO BUILDING 520, UNTIL THE POLYTRAUMA PROJECT INST…
Mod SA167· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-01-30+$78,747$39,310,888AHU PENETRATION ON ROOF AND MISCELLANEOUS CHANGES AS REFLECTED IN THE ATTACHED ARCHITECTURAL SUPPLEMENTAL INST…
Mod SA178· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-02-14+$6,054$39,316,942USER REQUESTED CHANGE. FAUCETS IN THE DINING ROOMS AND DAY ROOMS ARE NOT ANTI-LIGATURE. USER REQUESTED TO CHA…
Mod SA179· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-02-14+$7,484$39,324,426DESIGN OMISSION. POWER FOR GOVERNMENT FURNISHED TRASH COMPACTOR WAS NOT INCLUDED IN THE CONTRACT.
Mod SA180· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-02-14+$58,388$39,382,814DESIGN OMISSION. ORIGINAL CONTRACT ONLY REQUIRED THE THIN BRICK TO BE INSTALLED OVER CEMENT BOARD. DUE TO WATE…
Mod SA181· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-02-14+$56,350$39,439,164DESIGN ERROR/OMISSION. CHANGE IN THE LAYOUT OF THE FIRE SPRINKLER WAS NECESSARY DUE TO CONFLICTS WITH OTHER UT…
Mod SA132· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-03-05+$28,714$39,467,878DUE TO ADA CONCERNS, REMOVE AND RECESS THE TOP DOOR AND THE TROL CABINET PANELS IN WIINGS B,C AND D.
Mod SA062· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-03-06+$46,778$39,514,656120 VAC EMERGENCY POWER IS NEEDED TO POWER 12 EACH SMOKE DAMPERS PER WING. THE ELECTRICAL DRAWINGS DID NOT SHO…
Mod SA150· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-03-06+$5,315$39,519,971THE CONSTRUCTION DRAWINGS SHOWED METAL ACCESS PANELS INSTALL LOCATIONS BUT DID NOT SHOW WOOD ACCESS PANEL LOCA…
Mod SA166· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-03-06+$4,303$39,524,274TO PROVIDE FOR THE OMISSION OF AUTOMATIC MECHANICAL CONTROL VALVES AT THE BOILERS.
Mod SA182· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-03-06+$2,851$39,527,125CORRECT A DESIGN OMISSION THAT DID NOT PROVIDE A DETAIL TO COVER GAP BETWEEN THE EDGE OF SLAB AND FACE OF GYPS…
Mod SA183· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-03-06+$2,043$39,529,168PER RFI A 0462, AT THE ADMINISTRATION BUILDING ROTUNDA, THERE WAS A NEED TO CONSTRUCT A CONTINUOUS RECESS UNDE…
Mod SA184· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-03-06+$4,688$39,533,856RESPONSE ISSUED IN RFI A 498, RESULTED IN CONFLICT WITH THE THRESHOLD AND DOOR DIMENSION. DOORS ALREADY ON SIT…
Mod SA185· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-03-06+$1,912$39,535,768PER RFI P 0004, IN THE AREA BOUNDED BY GRIDS Y1.5, Y1.0, D6&D2, THERE WAS A NEED TO REROUTE RWL&OFD DRAINAGE P…
Mod SA186· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-03-06+$63,303$39,599,071DESIGN OMISSION. DETAILS WERE MISSING IN THE DESIGN FOR ATTACHING (STRUCTURAL) THE CEILING AND LIGHT ALCOVES T…
Mod SA187· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-03-06+$3,285$39,602,356PATIENT SAFETY. THE CONTRACT SPECIFIED STRIKE PLATE PROTRUDES 1/2INCH BEYOND THE FACE OF THE DOOR FRAME. THE O…
Mod CO03H· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-04-16+$3,000$39,605,356TO PROVIDE FOR THE REDESIGN OF THE HOT WATER RECIRCULATION LINE DUE TO DESIGN ERROR.
Mod SA193· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-04-21+$14,067$39,619,423CRITICAL FUNCTION: TO PROVIDE FOR OMISSIONS IN THE DRAWINGS RELATED TO THE FIRE-RATED FRAMES COLOR AND FASTENE…
Mod SA085· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-04-27−$3,462$39,615,961CRITICAL FUNCTION: PER REQUEST BY VAPA MADICAL CENTER: DELETE INSTALL OF NCA-2 FOR BLD 40 AND BLD 100. ADD O…
Mod SA190· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-04-27+$9,900$39,625,861CRITICAL FUNCTION: TO ACCOUNT FOR THE RELOCATION OF WASTE&VENT PIPING, AND INSTALLATION OF AN ADDITIONAL TOILE…
Mod SA191· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-04-27+$5,991$39,631,852CRITICAL FUNCTION: DUE TO THE FOLLOWING DESIGN OVERSIGHTS AND OMISSION, ADDITIONAL CARPENTRY WORK IS REQUIRED:…
Mod SA195· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-04-27+$9,880$39,641,732CRITICAL FUNCTION: CORRECT A DESIGN OMISSION THAT DID NOT PROVIDE ACCURATE ELEVATIONS OF AN EXISTING CURB INLE…
Mod SA196· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-04-27+$1,290$39,643,022CRITICAL FUNCTION: THIS CHANGE IS DUE TO AN AE DESIGN ERROR, NOTED ON SHEET ES5.00. THE CONTRACT DOCUMENTS C…
Mod SA197· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-04-27+$7,612$39,650,634CRITICAL FUNCTION: A CANE RAIL IS NEEDED BELOW THE ADMINISTRATION BUILDING CIRCULAR STAIR TO ALLOW SIGHT IMPAI…
Mod SA198· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-04-27+$3,798$39,654,432TO PROVIDE FOR THE INSTALLATION OF 3 ADDITIONAL HELP BUTTONS IN THE ADMINISTRATION BUILDING, ROOMS F-117, F-11…
Mod SA189· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-06-25+$2,401$39,656,833PER ASI 058R1, RFI'S A 425, A 425R1, L 020, A 496&A 496R1, AT THE BUILDING SITE, THERE WAS A NEED TO ADJUST T…
Mod SA192· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-06-25+$27,109$39,683,942CONTRACT DRAWING HAD MATV RUNNING TO THE FLOOR OF 4 EACH CONFERENCE ROOMS. THE MEDICAL CENTER WOULD LIKE THE…
Mod SA200· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-06-25+$8,691$39,692,633TO PROVIDE FOR THE REDESIGN OF THE HOT WATER RECIRCULATION LINE DUE TO DESIGN ERROR.
Mod SA201· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-06-25+$4,290$39,696,923THIS CHANGE IS DUE TO A DESIGN ERROR. THE LIGHTS SPECIFIED IN THE CONTRACT DOCUMENTS DO NOT PROVIDE SUFFICIENT…
Mod SA202· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-06-25+$22,748$39,719,671USER REQUESTED. USER PREVIOUSLY REQUESTED TO DELETE THE LANDSCAPING (TREES AND GROUND COVER) FROM THE MAIN COU…
Mod SA203· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-06-25+$7,500$39,727,171TO ACCOUNT FOR THE NEED TO INCREASE THE MOTOR SIZE&CHANGE THE FILTER TYPE ON TWO EXHAUST FANS TO MEET THE DESI…
Mod SA204· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-06-25+$5,570$39,732,741TO ALLOW FOR THE INSTALLATION OF AN MSB-M AND R-CIRCULATION PUMP DUE TO A/E OMISSION AND ERROR.
Mod SA207· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-06-25+$2,021$39,734,762SUMP PIT COVER FOR THE ELEVATOR PIT WAS NOT CLEARLY INDICATED IN THE DRAWINGS. RESPONSE TO A RFI 0359 PROVIDE…
Mod SA208· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-06-25+$29,235$39,763,997CONTRACT STATED 12 X 12 ACCESS PANELS FOR PLUMBING ACCESS. USER REQUESTED 24 X 24 PANELS SINCE THE 12 X 12 IS…
Mod SA194· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-06-27+$24,456$39,788,453REQUIRED MOISTURE LEVEL CONTENT ON THE CONCRETE FLOOR COULD NOT BE ACHIEVED WITH THE SPECIFIED HYDROSEAL PRODU…
Mod SA210· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-14+$2,000$39,790,453THE MEDICAL CENTER NEEDED TO USE THE SOUTH LOOP ROAD TO ACCESS BUILDINGS 4, 48 AND 101. THE SOUTH LOOP ROAD WA…
Mod SA211· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-14+$3,430$39,793,883DEFINITIZE CO-03F FOR INTREPID FIRE ALARM TIE-IN. INTREPID IS THE MED CENTERS FIRE ALARM CONTRACTOR AND IS REQ…
Mod SA212· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-14+$4,533$39,798,416THIS SA IS TO DEFINITIZE CO-03E.
Mod SA213· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-14+$4,478$39,802,894DEFINITIZE CO-03C - ADDED ELECTRICAL WORK.
Mod SA214· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-14+$39,209$39,842,103DEFINITIZE CO-02L FOR THE ANTI-LIGATURE DOOR SENSORS.
Mod SA215· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-14+$4,389$39,846,492THE SHOWER FLOORS WERE STAYING WET AFTER RUNNING THE SHOWER. MOCK UPS WERE NEEDED TO DETERMINE POSSIBLE SOLUTI…
Mod SA216· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-14+$38,000$39,884,492DESIGN OMISSION. REQUIREMENTS FOR THE DEPRESSED FOOTINGS WERE NOT SHOWN NOR DETAILED IN THE CONTRACT DRAWINGS.…
Mod SA206· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-09-06+$8,031$39,892,523THE 12KV TIE-IN TO CONNECT TO THE EXISTING F2&F6 CIRCUIT CONNECTION COULD ONLY BE PERFORMED DURING THE WEEKEND…
Mod SA177· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-09-07+$2,795,003$42,687,526THE MENTAL HEALTH SERVICE HAS EXPANDED AND EVOLVED, PROVIDING STATE OF THE ART EVIDENCE-BASED MODERN PSYCHIATR…
Mod SA217· OTHER ADMINISTRATIVE ACTION2017-10-23+$825,000$43,512,526ADMINISTRATIVE MODIFICATION TO FUND THE SETTLEMENT AGREEMENT MADE UNDER CIVILIAN BOARD OF CONTRACT APPEALS CBC…

Related awards · 5

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other VA awards to the same recipient (UEI GZH9ED5FL2V3)

AwardOffice · PSC / listingNet obligationsFY
VA101F12C0039OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) · Y1DB · CONSTRUCTION OF LABORATORIES AND CLINICS$58,590,140FY2012
VA701C0171PCAC (36C776) · Y249 · CONSTRUCTION OF OTHER UTILITIES$25,360,242FY2011

Other recipients under Y111 from OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) (most recent first)

AwardRecipientOfficeNet obligationsFY
VA101CFMC0139ARCHER WESTERN-DEMARIA JV 11OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$109,327,964FY2011
VA101CFMC0080INTEGRATED PRO SERVICES, LLCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$12,513,790FY2010
VA101CFMC0064CLARK MCCARTHY HEALTHCARE PARTNERS, A JOINT VENTUREOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$1,055,767,844FY2009

Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA101CFMC0039_3600_-NONE-_-NONE- · retrieved 2026-09-26.