Description
ADMINISTRATIVE MODIFICATION TO FUND THE SETTLEMENT AGREEMENT MADE UNDER CIVILIAN BOARD OF CONTRACT APPEALS CBCA 4598.
Base award description: CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA
Modification chain · 262 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2009-04-30+$25,974,844= $25,974,844
- Mod CO01A2009-06-06+$5,155= $25,979,999
- Mod CO01B2009-08-24+$6,000= $25,985,999
- Mod CO01C2009-08-24+$6,000= $25,991,999
- Mod CO01D2009-08-24+$9,900= $26,001,899
- Mod CO01E2009-08-24+$30,000= $26,031,899
- Mod CO01F2009-08-24+$10,000= $26,041,899
- Mod CO01G2009-08-24+$2,500= $26,044,399
- Mod CO01H2009-08-25+$7,100= $26,051,499
- Mod SA0012009-08-31+$16,671= $26,068,170
- Mod SA0022009-09-10+$0= $26,068,170
- Mod CO01I2009-09-11+$40,000= $26,108,170
- Mod CO01J2009-09-23+$46,000= $26,154,170
- Mod CO01K2009-09-25+$45,203= $26,199,373
- Mod CO01M2009-10-13+$48,000= $26,247,373
- Mod CO01L2009-10-14+$30,000= $26,277,373
- Mod CO01N2009-10-16+$59,000= $26,336,373
- Mod CO01O2009-10-23+$35,000= $26,371,373
- Mod CO01P2009-10-28+$6,000= $26,377,373
- Mod CO01Q2009-11-16+$7,451= $26,384,824
- Mod CO01S2009-12-07+$61,888= $26,446,712
- Mod CO01R2009-12-09+$73,923= $26,520,635
- Mod CO01U2009-12-30+$30,011= $26,550,646
- Mod CO01V2009-12-30+$13,530= $26,564,176
- Mod CO01X2010-01-26+$97,937= $26,662,113
- Mod SA0032010-02-11+$130,642= $26,792,755
- Mod CO01Y2010-03-26+$96,110= $26,888,865
- Mod SA0042010-03-26+$6,314= $26,895,179
- Mod SA0052010-03-26-$22,311= $26,872,868
- Mod CO01T2010-04-05+$94,000= $26,966,868
- Mod CO01Z2010-04-05+$89,463= $27,056,331
- Mod CO02A2010-04-05+$10,000= $27,066,331
- Mod CO01W2010-04-07+$3,808= $27,070,139
- Mod SA0062010-04-14-$857= $27,069,282
- Mod SA0072010-04-26+$16,830= $27,086,112
- Mod SA0082010-04-26-$12,701= $27,073,411
- Mod SA0092010-05-17+$9,387= $27,082,798
- Mod SA0102010-05-17+$251,656= $27,334,454
- Mod SA0112010-05-21+$5,387= $27,339,841
- Mod SA0122010-05-25-$21,921= $27,317,920
- Mod SA0132010-05-27-$3,998= $27,313,922
- Mod SA0142010-05-27-$911= $27,313,011
- Mod SA0152010-05-28+$0= $27,313,011
- Mod SA0162010-06-07+$7,885= $27,320,896
- Mod CO02B2010-06-23+$3,750= $27,324,646
- Mod SA0182010-07-06+$3,298= $27,327,944
- Mod CO02G2010-07-16+$43,112= $27,371,056
- Mod CO02E2010-07-22+$25,000= $27,396,056
- Mod CO02F2010-08-09+$5,517= $27,401,573
- Mod CO02H2010-08-18+$51,880= $27,453,453
- Mod CO02I2010-08-26+$14,000= $27,467,453
- Mod SA0192010-08-26+$356,842= $27,824,295
- Mod CO02J2010-09-01+$81,790= $27,906,085
- Mod CO02D2010-09-10+$4,750,000= $32,656,085
- Mod CO02K2010-09-10+$327,572= $32,983,657
- Mod CO02L2010-10-19+$60,000= $33,043,657
- Mod CO02N2010-11-29+$94,000= $33,137,657
- Mod SA0172010-11-30+$5,323= $33,142,980
- Mod SA0212010-11-30+$22,283= $33,165,263
- Mod SA0222010-11-30-$14,601= $33,150,662
- Mod SA0252010-12-29+$69,554= $33,220,216
- Mod SA0262010-12-31+$16,088= $33,236,304
- Mod SA0272010-12-31+$7,227= $33,243,531
- Mod CO02O2011-01-10+$65,683= $33,309,214
- Mod SA0282011-01-13+$9,116= $33,318,330
- Mod SA0292011-01-13+$4,961= $33,323,291
- Mod SA0302011-01-13+$3,063= $33,326,354
- Mod SA0232011-01-26+$9,377= $33,335,731
- Mod SA0242011-01-31+$16,508= $33,352,239
- Mod SA0312011-01-31+$39,360= $33,391,599
- Mod SA0342011-02-14-$5,692= $33,385,907
- Mod SA0352011-02-16-$6,666= $33,379,241
- Mod SA0392011-02-25+$13,028= $33,392,269
- Mod SA0372011-02-28+$29,945= $33,422,214
- Mod CO02P2011-03-08+$8,864= $33,431,078
- Mod CO02R2011-03-10+$89,000= $33,520,078
- Mod SA0412011-03-24-$5,831= $33,514,247
- Mod SA0432011-03-24+$6,835= $33,521,082
- Mod CO02Q2011-03-29+$1,250,000= $34,771,082
- Mod SA0322011-03-29+$106,856= $34,877,938
- Mod SA0332011-03-30+$39,549= $34,917,487
- Mod SA0382011-03-30+$15,403= $34,932,890
- Mod SA0422011-03-30+$16,928= $34,949,818
- Mod CO02S2011-03-31+$9,719= $34,959,537
- Mod SA0402011-04-14+$5,463= $34,965,000
- Mod SA0442011-04-18+$26,623= $34,991,623
- Mod SA0452011-04-18+$28,118= $35,019,741
- Mod SA0462011-04-27+$12,467= $35,032,208
- Mod SA0482011-04-27+$622= $35,032,830
- Mod SA0472011-05-06+$47,917= $35,080,747
- Mod SA0492011-05-06+$12,848= $35,093,595
- Mod SA0502011-05-16+$6,412= $35,100,007
- Mod CO02T2011-05-20+$6,000= $35,106,007
- Mod SA0362011-05-20+$225,613= $35,331,620
- Mod CO02W2011-05-27+$6,758= $35,338,378
- Mod SA0532011-05-27+$972= $35,339,350
- Mod SA0582011-05-27-$420= $35,338,930
- Mod SA0592011-05-27+$13,849= $35,352,779
- Mod SA0612011-05-27+$9,610= $35,362,389
- Mod SA0542011-05-31+$0= $35,362,389
- Mod SA0562011-06-01+$1,927= $35,364,316
- Mod SA0572011-06-01-$4,615= $35,359,701
- Mod SA0552011-06-14+$1,572= $35,361,273
- Mod SA0632011-06-21+$7,978= $35,369,251
- Mod SA0642011-06-27+$877= $35,370,128
- Mod SA0652011-06-27+$13,666= $35,383,794
- Mod SA0672011-07-22+$6,933= $35,390,727
- Mod SA0702011-07-22+$247= $35,390,974
- Mod SA0742011-07-22+$7,766= $35,398,740
- Mod SA0202011-07-28+$53,372= $35,452,112
- Mod SA0662011-07-28+$717= $35,452,829
- Mod SA0682011-07-28+$2,195= $35,455,024
- Mod SA0692011-07-28+$16,054= $35,471,078
- Mod SA0722011-07-28+$8,538= $35,479,616
- Mod SA0732011-07-28+$4,373= $35,483,989
- Mod SA0752011-07-28+$5,249= $35,489,238
- Mod CO02X2011-08-01+$2,000,000= $37,489,238
- Mod SA0792011-08-02-$2,969= $37,486,269
- Mod SA0802011-08-12+$4,829= $37,491,098
- Mod SA0882011-08-15+$10,029= $37,501,127
- Mod SA0772011-08-18+$10,690= $37,511,817
- Mod SA0892011-08-18+$3,743= $37,515,560
- Mod SA0522011-08-22+$79,709= $37,595,269
- Mod SA0782011-08-22+$5,361= $37,600,630
- Mod SA0832011-08-22-$2,083= $37,598,547
- Mod SA0512011-08-26-$4,240= $37,594,307
- Mod SA0842011-08-26+$3,466= $37,597,773
- Mod SA0962011-08-26+$1,775= $37,599,548
- Mod SA0992011-08-26+$1,180= $37,600,728
- Mod SA0922011-08-29+$3,455= $37,604,183
- Mod SA0902011-08-30+$4,807= $37,608,990
- Mod SA0912011-08-30+$4,391= $37,613,381
- Mod SA1002011-08-30-$6,300= $37,607,081
- Mod SA1052011-08-30+$5,409= $37,612,490
- Mod SA1072011-08-30+$1,473= $37,613,963
- Mod SA0872011-09-01+$13,003= $37,626,966
- Mod SA1012011-09-01+$15,129= $37,642,095
- Mod SA0972011-09-21+$5,258= $37,647,353
- Mod SA1042011-09-21+$16,341= $37,663,694
- Mod SA1062011-09-21-$3,356= $37,660,338
- Mod SA1082011-09-21+$14,300= $37,674,638
- Mod SA1092011-09-21+$19,031= $37,693,669
- Mod SA1102011-09-21+$14,300= $37,707,969
- Mod SA1112011-09-21+$20,393= $37,728,362
- Mod SA1122011-09-21-$4,210= $37,724,152
- Mod SA1132011-09-21+$1,751= $37,725,903
- Mod SA1142011-09-21+$8,500= $37,734,403
- Mod SA1172011-09-21+$10,850= $37,745,253
- Mod SA0932011-09-27+$8,500= $37,753,753
- Mod SA1022011-09-27+$11,714= $37,765,467
- Mod SA1032011-09-27+$16,867= $37,782,334
- Mod SA1152011-09-27+$2,318= $37,784,652
- Mod SA0822011-09-30+$8,535= $37,793,187
- Mod SA0862011-09-30+$2,016= $37,795,203
- Mod SA0942011-09-30+$1,231= $37,796,434
- Mod SA0952011-09-30+$1,332= $37,797,766
- Mod SA0982011-09-30-$30,000= $37,767,766
- Mod SA1212011-09-30+$26,007= $37,793,773
- Mod SA1182011-10-13+$13,111= $37,806,884
- Mod SA1222011-10-14+$7,160= $37,814,044
- Mod SA1232011-10-14+$13,714= $37,827,758
- Mod SA1242011-10-14+$8,752= $37,836,510
- Mod SA1252011-10-14+$4,833= $37,841,343
- Mod SA1262011-10-14+$7,131= $37,848,474
- Mod SA1272011-10-24+$12,000= $37,860,474
- Mod SA1282011-10-24-$7,681= $37,852,793
- Mod SA0602011-10-27+$344= $37,853,137
- Mod SA1302011-10-27+$85,000= $37,938,137
- Mod SA1292011-10-28+$49,295= $37,987,432
- Mod SA1332011-10-31+$61,069= $38,048,501
- Mod SA1372011-11-01+$94,641= $38,143,142
- Mod CO02Z2011-11-09+$92,000= $38,235,142
- Mod CO03A2011-11-17+$12,000= $38,247,142
- Mod CO03B2011-11-17+$5,300= $38,252,442
- Mod SA1342011-11-29+$8,529= $38,260,971
- Mod SA1362011-11-29+$27,253= $38,288,224
- Mod SA1392011-11-29+$784= $38,289,008
- Mod SA1402011-11-29-$8,500= $38,280,508
- Mod SA1412011-11-29+$3,898= $38,284,406
- Mod SA1422011-11-29+$28,988= $38,313,394
- Mod SA1432011-11-29+$1,268= $38,314,662
- Mod SA1452011-11-29+$17,598= $38,332,260
- Mod SA1462011-11-29+$28,782= $38,361,042
- Mod SA1472011-11-29+$30,941= $38,391,983
- Mod SA1352011-11-30-$713= $38,391,270
- Mod SA1382011-11-30+$6,366= $38,397,636
- Mod SA1442011-11-30+$11,207= $38,408,843
- Mod SA1482011-11-30+$3,099= $38,411,942
- Mod SA1492011-11-30+$10,000= $38,421,942
- Mod SA1522011-11-30+$5,938= $38,427,880
- Mod SA1542011-11-30+$5,453= $38,433,333
- Mod SA1552011-11-30+$6,368= $38,439,701
- Mod SA1562011-11-30-$686= $38,439,015
- Mod SA1572011-11-30+$46,154= $38,485,169
- Mod SA1582011-11-30+$3,235= $38,488,404
- Mod SA1592011-11-30+$13,645= $38,502,049
- Mod SA1602011-11-30+$10,204= $38,512,253
- Mod SA1612011-11-30+$17,265= $38,529,518
- Mod CO03C2011-12-02+$4,869= $38,534,387
- Mod SA1632011-12-02+$94,642= $38,629,029
- Mod SA1512011-12-06+$93,941= $38,722,970
- Mod CO03D2011-12-14+$99,000= $38,821,970
- Mod SA1622011-12-16+$3,729= $38,825,699
- Mod SA1682011-12-30+$4,328= $38,830,027
- Mod SA1692011-12-30+$3,243= $38,833,270
- Mod SA1702011-12-30+$6,140= $38,839,410
- Mod SA1752011-12-30+$60,483= $38,899,893
- Mod SA1762011-12-30+$10,433= $38,910,326
- Mod SA1162012-01-02+$4,154= $38,914,480
- Mod CO03E2012-01-10+$4,038= $38,918,518
- Mod CO03F2012-01-12+$1,719= $38,920,237
- Mod SA1712012-01-16+$16,741= $38,936,978
- Mod SA1722012-01-16+$40,485= $38,977,463
- Mod SA1732012-01-16+$49,950= $39,027,413
- Mod SA1742012-01-16+$71,357= $39,098,770
- Mod SA1192012-01-17+$43,081= $39,141,851
- Mod SA1202012-01-17+$16,941= $39,158,792
- Mod SA1312012-01-17+$73,349= $39,232,141
- Mod SA1672012-01-30+$78,747= $39,310,888
- Mod SA1782012-02-14+$6,054= $39,316,942
- Mod SA1792012-02-14+$7,484= $39,324,426
- Mod SA1802012-02-14+$58,388= $39,382,814
- Mod SA1812012-02-14+$56,350= $39,439,164
- Mod SA1322012-03-05+$28,714= $39,467,878
- Mod SA0622012-03-06+$46,778= $39,514,656
- Mod SA1502012-03-06+$5,315= $39,519,971
- Mod SA1662012-03-06+$4,303= $39,524,274
- Mod SA1822012-03-06+$2,851= $39,527,125
- Mod SA1832012-03-06+$2,043= $39,529,168
- Mod SA1842012-03-06+$4,688= $39,533,856
- Mod SA1852012-03-06+$1,912= $39,535,768
- Mod SA1862012-03-06+$63,303= $39,599,071
- Mod SA1872012-03-06+$3,285= $39,602,356
- Mod CO03H2012-04-16+$3,000= $39,605,356
- Mod SA1932012-04-21+$14,067= $39,619,423
- Mod SA0852012-04-27-$3,462= $39,615,961
- Mod SA1902012-04-27+$9,900= $39,625,861
- Mod SA1912012-04-27+$5,991= $39,631,852
- Mod SA1952012-04-27+$9,880= $39,641,732
- Mod SA1962012-04-27+$1,290= $39,643,022
- Mod SA1972012-04-27+$7,612= $39,650,634
- Mod SA1982012-04-27+$3,798= $39,654,432
- Mod SA1892012-06-25+$2,401= $39,656,833
- Mod SA1922012-06-25+$27,109= $39,683,942
- Mod SA2002012-06-25+$8,691= $39,692,633
- Mod SA2012012-06-25+$4,290= $39,696,923
- Mod SA2022012-06-25+$22,748= $39,719,671
- Mod SA2032012-06-25+$7,500= $39,727,171
- Mod SA2042012-06-25+$5,570= $39,732,741
- Mod SA2072012-06-25+$2,021= $39,734,762
- Mod SA2082012-06-25+$29,235= $39,763,997
- Mod SA1942012-06-27+$24,456= $39,788,453
- Mod SA2102012-08-14+$2,000= $39,790,453
- Mod SA2112012-08-14+$3,430= $39,793,883
- Mod SA2122012-08-14+$4,533= $39,798,416
- Mod SA2132012-08-14+$4,478= $39,802,894
- Mod SA2142012-08-14+$39,209= $39,842,103
- Mod SA2152012-08-14+$4,389= $39,846,492
- Mod SA2162012-08-14+$38,000= $39,884,492
- Mod SA2062012-09-06+$8,031= $39,892,523
- Mod SA1772012-09-07+$2,795,003= $42,687,526
- Mod SA2172017-10-23+$825,000= $43,512,526
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2009-04-30 | +$25,974,844 | $25,974,844 | CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA |
| Mod CO01A· CHANGE ORDER | 2009-06-06 | +$5,155 | $25,979,999 | CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA |
| Mod CO01B· CHANGE ORDER | 2009-08-24 | +$6,000 | $25,985,999 | CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA |
| Mod CO01C· CHANGE ORDER | 2009-08-24 | +$6,000 | $25,991,999 | CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA |
| Mod CO01D· CHANGE ORDER | 2009-08-24 | +$9,900 | $26,001,899 | CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA |
| Mod CO01E· CHANGE ORDER | 2009-08-24 | +$30,000 | $26,031,899 | CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA |
| Mod CO01F· CHANGE ORDER | 2009-08-24 | +$10,000 | $26,041,899 | CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA |
| Mod CO01G· CHANGE ORDER | 2009-08-24 | +$2,500 | $26,044,399 | CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA |
| Mod CO01H· CHANGE ORDER | 2009-08-25 | +$7,100 | $26,051,499 | CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA |
| Mod SA001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-08-31 | +$16,671 | $26,068,170 | CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA |
| Mod SA002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-09-10 | +$0 | $26,068,170 | CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA |
| Mod CO01I· CHANGE ORDER | 2009-09-11 | +$40,000 | $26,108,170 | CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA |
| Mod CO01J· CHANGE ORDER | 2009-09-23 | +$46,000 | $26,154,170 | CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA |
| Mod CO01K· CHANGE ORDER | 2009-09-25 | +$45,203 | $26,199,373 | CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA |
| Mod CO01M· CHANGE ORDER | 2009-10-13 | +$48,000 | $26,247,373 | CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA |
| Mod CO01L· CHANGE ORDER | 2009-10-14 | +$30,000 | $26,277,373 | CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA |
| Mod CO01N· CHANGE ORDER | 2009-10-16 | +$59,000 | $26,336,373 | CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA |
| Mod CO01O· CHANGE ORDER | 2009-10-23 | +$35,000 | $26,371,373 | CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA |
| Mod CO01P· CHANGE ORDER | 2009-10-28 | +$6,000 | $26,377,373 | CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA |
| Mod CO01Q· CHANGE ORDER | 2009-11-16 | +$7,451 | $26,384,824 | CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA |
| Mod CO01S· CHANGE ORDER | 2009-12-07 | +$61,888 | $26,446,712 | CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA |
| Mod CO01R· CHANGE ORDER | 2009-12-09 | +$73,923 | $26,520,635 | CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA |
| Mod CO01U· CHANGE ORDER | 2009-12-30 | +$30,011 | $26,550,646 | CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA |
| Mod CO01V· CHANGE ORDER | 2009-12-30 | +$13,530 | $26,564,176 | CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA |
| Mod CO01X· CHANGE ORDER | 2010-01-26 | +$97,937 | $26,662,113 | CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA |
| Mod SA003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-02-11 | +$130,642 | $26,792,755 | CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA |
| Mod CO01Y· CHANGE ORDER | 2010-03-26 | +$96,110 | $26,888,865 | CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA |
| Mod SA004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-03-26 | +$6,314 | $26,895,179 | CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA |
| Mod SA005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-03-26 | −$22,311 | $26,872,868 | CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA |
| Mod CO01T· CHANGE ORDER | 2010-04-05 | +$94,000 | $26,966,868 | CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA |
| Mod CO01Z· CHANGE ORDER | 2010-04-05 | +$89,463 | $27,056,331 | CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA |
| Mod CO02A· CHANGE ORDER | 2010-04-05 | +$10,000 | $27,066,331 | CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA |
| Mod CO01W· CHANGE ORDER | 2010-04-07 | +$3,808 | $27,070,139 | CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA |
| Mod SA006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-04-14 | −$857 | $27,069,282 | CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA |
| Mod SA007· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-04-26 | +$16,830 | $27,086,112 | CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA |
| Mod SA008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-04-26 | −$12,701 | $27,073,411 | CONSTRUCITION OF AN 80-BED PSYCHIATRIC FACILITY, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA |
| Mod SA009· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-05-17 | +$9,387 | $27,082,798 | A. DIFFERING SITE CONDITIONS. B. DURING THE EXCAVATION FOR THE NEW SSMH #200 ON DRAWING GS C 4.01, FOUR (4) X… |
| Mod SA010· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-05-17 | +$251,656 | $27,334,454 | A. DIFFERING SITE CONDITIONS. THE PROJECT SITE WAS NOT IDENTIFIED AS HAVING CONTAMINATED SOIL. TEST RESULTS TA… |
| Mod SA011· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-05-21 | +$5,387 | $27,339,841 | RE-FABRICATING AND RE-DETAILING OF GRADE BEAMS WAS REQUIRED DUE TO CONFLICTS IN THE BEAM DIMENSIONS IN THE ST… |
| Mod SA012· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-05-25 | −$21,921 | $27,317,920 | EXISTING B-48 WAS SUPPOSED TO BE ALREADY DEMOLISHED BEFORE THE START OF CONSTRUCTION FOR B-520. IT IS NOW TO… |
| Mod SA013· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-05-27 | −$3,998 | $27,313,922 | A) DIFFERING SITE CONDITIONS. ALONG THE SOUTHERN BORDER OF THE EXISTING PARKING LOT, A CONCRETE SLAB WAS DISCO… |
| Mod SA014· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-05-27 | −$911 | $27,313,011 | LOCAL LANDFILLS WILL NOT ACCEPT THE SURPLUS SOIL UNLESS IT IS TESTED FOR SPECIFIC CONTAMINANTS. CONTRACTOR N… |
| Mod SA015· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-05-28 | +$0 | $27,313,011 | REVISE STITCH NAILING AT SHEAR PANEL TYPE 2,4 AND 5, AS SHOWN IN ATTACHED ASI SHT. 012-S01. |
| Mod SA016· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-06-07 | +$7,885 | $27,320,896 | AS SHOWN IN DRAWING GS C4.01, THE NEW 6" SANITARY SEWER INSTALLATION WAS IMPEDED BY THE EXISTING 27" STORM DR… |
| Mod CO02B· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-06-23 | +$3,750 | $27,324,646 | CO-2B, IDENTIFY 12 KV FEEDER CABLES |
| Mod SA018· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-07-06 | +$3,298 | $27,327,944 | PROVIDE ADDITIONAL FOOTINGS NEEDED TO PROVIDE THE 80 BED PSYCHIATRIC FACILITY WITH A STABLE FOUNDATION. |
| Mod CO02G· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-07-16 | +$43,112 | $27,371,056 | IN ORDER TO INSTALL THE METASYS SECURE FOLDING DESK LAP TOP SYSTEM, THE CURRENT 120 VAC AND DATA OUTLETS WILL… |
| Mod CO02E· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-07-22 | +$25,000 | $27,396,056 | THE ELEVATOR JACKHOLE NEEDS TO BE EXCAVATED/DRILLED PRIOR TO INSTALLATION OF THE STRUCTURAL STEEL. |
| Mod CO02F· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-08-09 | +$5,517 | $27,401,573 | CONSTRUCTION OF BUILDING 520 REQUIRED RELOCATION OF THE SEWER SYSTEM SUPPORTING BUILDING 2. THE SEWER LIFT STA… |
| Mod CO02H· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-08-18 | +$51,880 | $27,453,453 | THIS PROJECT REQUIRES TROL CONNECTIVITY FOR THE PATIENT SHOWERS AND THE MASTER CONTROLLER (LOCATED BEHIND THE… |
| Mod CO02I· CHANGE ORDER | 2010-08-26 | +$14,000 | $27,467,453 | A. THE CURRENT MENTAL HEALTH FACILITY DESIGN GUIDE DO NOT ALLOW THE USE OF CERAMIC TILES IN PATIENT BATHROOMS.… |
| Mod SA019· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-08-26 | +$356,842 | $27,824,295 | 1. THIS MODIFICATION DEFINITIZES CO-01Z, ISSUED ON APRIL 5, 2010. 2. CO-01Z WAS ISSUED TO START THE PROCUREME… |
| Mod CO02J· CHANGE ORDER | 2010-09-01 | +$81,790 | $27,906,085 | A. THE TESTING AND INSPECTION SERVICES WAS ORIGINALLY PROVIDED BY THE VA UNDER A SEPARATE CONTRACT. THIS CONTR… |
| Mod CO02D· CHANGE ORDER | 2010-09-10 | +$4,750,000 | $32,656,085 | ADMINISTRATION BUILDING CHANGES IAW ASI #14 |
| Mod CO02K· CHANGE ORDER | 2010-09-10 | +$327,572 | $32,983,657 | FINISH GRADES OUTSIDE OF THE LOADING DOCK AND UNIT D IS LOWER THAN THE BOTTOM OF THE BUILDING FOOTINGS PER DES… |
| Mod CO02L· CHANGE ORDER | 2010-10-19 | +$60,000 | $33,043,657 | A. SUICIDE PREVENTION DOORS WERE NOT REQUIRED UNDER THE ORIGINAL CONTRACT. B. CURRENT VA MENTAL HEALTH GUIDE R… |
| Mod CO02N· CHANGE ORDER | 2010-11-29 | +$94,000 | $33,137,657 | 1. THE CONTRACT DOES NOT INCLUDE PROVISIONS FOR ANTI-LIGATURE CONSTRUCTION ON THE STEEL WINDOWS LOCATED IN THE… |
| Mod SA017· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-11-30 | +$5,323 | $33,142,980 | THE APPROVED INSTITUTIONAL SPRINKLER HEAD (VIKING) PER THE CONTRACT SPECIFICATIONS WAS NOT ACCEPTABLE TO THE U… |
| Mod SA021· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-11-30 | +$22,283 | $33,165,263 | 1. BUILDING 48 (BLIND REHAB) IS ADJACENT THE CONSTRUCTION AREA. THE CONSTRUCTION RIGHT OF WAY CLOSES OFF THE… |
| Mod SA022· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-11-30 | −$14,601 | $33,150,662 | CONTRACT DRAWING GS-C-0.02, 1.01, AND 1.02 SHOWED ONLY ONE EXISTING 3" GAS LINE INSIDE B-520 FOOT PRINT TO BE… |
| Mod SA025· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-29 | +$69,554 | $33,220,216 | A) DESIGN ERROR/OMISSION. B) WINDOW DESIGN UNDER THE ORIGINAL CONTRACT NEEDED IMPROVEMENTS TO ENSURE THEY ARE… |
| Mod SA026· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-31 | +$16,088 | $33,236,304 | REQUIRED UNDERGROUND PLUMBING FOR THE FLOOR DRAINS IN THE FOOD CART ROOMS WERE NOT SHOWN IN THE DRAWINGS. B.… |
| Mod SA027· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-31 | +$7,227 | $33,243,531 | A WETTED P-TRAP WAS REQUIRED AT THE LOADING DOCK DUMPSTER LOCATION. PLANS DID NOT INCLUDE DRAWINGS FOR THE WET… |
| Mod CO02O· CHANGE ORDER | 2011-01-10 | +$65,683 | $33,309,214 | THE NEW MENTAL HEALTH STANDARD DO NOT ALLOW INSTALALTION OF CERAMIC TILE WALLS (PER CONTRACT) IN THE PATIENT B… |
| Mod SA028· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-13 | +$9,116 | $33,318,330 | REROUTE SUMP PUMP DISCHARGE PIPING. |
| Mod SA029· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-13 | +$4,961 | $33,323,291 | REMOVE AND DISPOSE OF ALL TRANSITE PIPING IAW PERTAINENT REGULATIONS. |
| Mod SA030· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-13 | +$3,063 | $33,326,354 | INSTALLATION OF REVEALS AND STUCCO AT LOADING DOCK. |
| Mod SA023· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-26 | +$9,377 | $33,335,731 | TO PROVIDE ADDITIONAL PIPE INSULLATION FOR THE ADMINSTRATION AND PIC BUILDINGS. |
| Mod SA024· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-31 | +$16,508 | $33,352,239 | THE EXISTING FEEDER CABLES (F2 AND F6) IDENTIFIED IN THE PLANS AS THE CONNECTION POINTS FOR THE PRIMARY POWER… |
| Mod SA031· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-31 | +$39,360 | $33,391,599 | INSTALLATION OF ADDITIONAL PLUMBING AND FIXTURES IN ROOMS A-10 A/B/C AS DESCRIBED IN ASI 016 AND P RFI 0006 SK… |
| Mod SA034· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-02-14 | −$5,692 | $33,385,907 | A. THE FINAL CHANGE TO THE ADMIN BUILDING HAS NOT BEEN ISSUED. INCLUDED IN THE CHANGE TO BE ISSUED IS THE INST… |
| Mod SA035· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-02-16 | −$6,666 | $33,379,241 | A. THE CURRENT MENTAL HEALTH FACILITY DESIGN GUIDE DO NOT ALLOW THE USE OF CERAMIC TILES IN PATIENT BATHROOMS.… |
| Mod SA039· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-02-25 | +$13,028 | $33,392,269 | THE ORIGINAL CONTRACT DID NOT SPECIFY A WATERPROOF TRAP PRIMER ACCESS PANELS AND TAMPER PROOF TORX HEAD SCREW… |
| Mod SA037· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-02-28 | +$29,945 | $33,422,214 | ELIMINATION OF UNDER FLOOR UTILITY TRENCH ROUTING OF HHW AND HHWR LINES AND RE-ROUTE OVERHEAD PER RFI SHEETS M… |
| Mod CO02P· CHANGE ORDER | 2011-03-08 | +$8,864 | $33,431,078 | THE INITIAL CONTRACT DRAWINGS ONLY SHOWED 2 EACH OUTLETS FOR THE 2 EACH A LA CART FOOD WARMING EQUIPMENT LOC… |
| Mod CO02R· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-03-10 | +$89,000 | $33,520,078 | A. THE CONTRACT PLANS AND SPECIFICATIONS DID NOT INCLUDE A REQUIREMENT FOR ANTI-LIGATURE DOORS OR SENSORS. B.… |
| Mod SA041· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-03-24 | −$5,831 | $33,514,247 | CO-01D WAS ISSUED TO LOCATE DOCUMENTED AND UNDOCUMENTED SHUT OFF VALVES OF THE EXISTING IRRIGATION SYSTEM THAT… |
| Mod SA043· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-03-24 | +$6,835 | $33,521,082 | AT EACH OF THE 4 NURSING UNITS TWO VENT LINES ONE ABOVE THE PATIENT ROOMS 135, 136, 137 AND THE OTHER ABOVE PA… |
| Mod CO02Q· CHANGE ORDER | 2011-03-29 | +$1,250,000 | $34,771,082 | A. REFERENCE CO-02D ISSUED ON 9/10/2010. B. THIS CHANGE INCREASES THE FUNDING FOR THE CHANGE ISSUED UNDER CO-… |
| Mod SA032· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-03-29 | +$106,856 | $34,877,938 | 1. THE CONTRACT DOES NOT INCLUDE PROVISIONS FOR ANTI-LIGATURE FEATURES ON THE STEEL WINDOWS LOCATED IN THE PAT… |
| Mod SA033· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-03-30 | +$39,549 | $34,917,487 | CONTRACT PLANS GS C1.01, C1.02 SHOWED THE NEW 42' STORM DRAIN TO RUN UNDERNEATH THE LOOP ROAD BASICALLY IN THE… |
| Mod SA038· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-03-30 | +$15,403 | $34,932,890 | REMOVAL AND INSTALLATION OF THE STREET LIGHTS IMPACTED BY THE DEMOLITION WORK AND NEW STORM DRAIN ALIGNMENT. P… |
| Mod SA042· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-03-30 | +$16,928 | $34,949,818 | A. USER REQUESTED CHANGE. WITH THE SOLID SURFACE PATTERN ON THE FLOOR TILE, IT WAS DIFFICULT TO DETERMINE WHER… |
| Mod CO02S· CHANGE ORDER | 2011-03-31 | +$9,719 | $34,959,537 | A. THE UTILITY COMPANY GAS METER SERVICE NEEDS TO BE INCREASED. THE NEW FACILITY INCREASES THE DEMAND AND CURR… |
| Mod SA040· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-14 | +$5,463 | $34,965,000 | TO PROVIDE A FACILITATOR FOR PARTNERING SESSION |
| Mod SA044· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-18 | +$26,623 | $34,991,623 | A. DESIGN CHANGES. CIVIL AND ELECTRICAL CHANGES ARE NECESSARY TO COORDINATE THE UTILITY CONNECTIONS AND SITE W… |
| Mod SA045· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-18 | +$28,118 | $35,019,741 | THE USER REQUESTED TO CHANGE THE TPO ROOFING ON THE ROOF MONITORS TO STANDING SEAM METAL ROOF IN ORDER TO MATC… |
| Mod SA046· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-27 | +$12,467 | $35,032,208 | A. DESIGN CHANGE. DETAILS TO CONNECT RB6 BEAM TO RB3 AND RB2 BEAMS WERE IN CONFLICT AND CAN NOT BE CONSTRUCTED… |
| Mod SA048· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-27 | +$622 | $35,032,830 | THE INITIAL CONTRACT DRAWINGS ONLY SHOWED 2 EACH OUTLET FOR THE 2 EACH A LA CART FOOD WARMING EQUIPMENT LOCA… |
| Mod SA047· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-06 | +$47,917 | $35,080,747 | USER REQUESTED CHANGE. THE CONTRACT SPECIFICATIONS DID NOT SPECIFY ANTI-LIGATURE FAUCETS IN THE PATIENT BATHRO… |
| Mod SA049· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-06 | +$12,848 | $35,093,595 | RECONFIGURATION OF RISER TO ADMIN BUILDING FOR GAS, DOMESTIC WATER AND HOT WATER SUPPLY AND RETURN. |
| Mod SA050· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-16 | +$6,412 | $35,100,007 | THE CHANGE IN GRADING AND THE SIDE WALK LOCATION, ELIMINATES THE CONFLICT BETWEEN THE COURTYARD WALL SPREAD FO… |
| Mod CO02T· CHANGE ORDER | 2011-05-20 | +$6,000 | $35,106,007 | THE VA MEDICAL CENTER WILL BE INSTALLING A PROJECTOR, A VETEL T.V. MONITOR AND A SMART BOARD IN 4EACH CONFER… |
| Mod SA036· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-20 | +$225,613 | $35,331,620 | A. THE USER REQUESTED TO CHANGE FROM THE CERAMIC WALL TILE TO A SOLID SURFACE MATERIAL IN ORDER TO COMPLY WITH… |
| Mod CO02W· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-27 | +$6,758 | $35,338,378 | LOCATION OF THE HELP BUTTONS IN THE EXAM ROOMS OF THE ADMIN BUILDING WILL BE OUT OF REACH OF THE MEDCAL STAFF… |
| Mod SA053· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-27 | +$972 | $35,339,350 | DEFINITIZE CO-02S ISSUED ON 31 MARCH 2011. |
| Mod SA058· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-27 | −$420 | $35,338,930 | PATIENT SAFETY. THE SOUTH-WEST COURTYARD WINDOWS NEED TO BE RE-ALIGNED TO THE INTERIOR SIDE IN ORDER TO PREVEN… |
| Mod SA059· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-27 | +$13,849 | $35,352,779 | DEFINITIZE CO-01S. |
| Mod SA061· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-27 | +$9,610 | $35,362,389 | DESIGN CHANGE. PER ORIGINAL DESIGN, THE TYVECK WOULD BE VISIBLE IN THE SOFFIT VENTS AROUND THE BUILDING. |
| Mod SA054· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-31 | +$0 | $35,362,389 | USER REQUESTED CHANGE. RAISING THE SCREEN 1'-0" WOULD COMPLETELY COVER THE MECHANICAL EQUIPMENT ON THE ROOF OF… |
| Mod SA056· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-06-01 | +$1,927 | $35,364,316 | FUR WALL TO INTERIOR OF ROTUNDA WHERE BEAM PROTRUDES. |
| Mod SA057· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-06-01 | −$4,615 | $35,359,701 | USER REQUESTED CHANGE. PATIENT SAFETY CONCERN. |
| Mod SA055· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-06-14 | +$1,572 | $35,361,273 | DESIGN OMISSION. PER DESIGN, A GAP IS LEFT IN PLACE AT THE LOCATIONS WHERE THE ALUMINUM PLATE WRPAS THE OPENIN… |
| Mod SA063· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-06-21 | +$7,978 | $35,369,251 | 1. DEFINITIZE CO-01U AND CO-01O. 2. CO-01O AND CO-01U WERE ISSUED DUE TO A DESIGN OMISSION. AN EXISTING SEWER… |
| Mod SA064· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-06-27 | +$877 | $35,370,128 | DEFINITIZE CO-01Q. EXISTING WATER LINE TO BLDG 2 WAS DISCOVERED TO BE ONLY 2 FT BELOW GRADE. REQUIREMENT FOR T… |
| Mod SA065· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-06-27 | +$13,666 | $35,383,794 | DESIGN OMISSION. PER CONTRACT THE BOILERS REQUIRE 14" OF WC (WATER COLUMN) PRESSURE. PER THE AE, THE BUILDING… |
| Mod SA067· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-07-22 | +$6,933 | $35,390,727 | THE SINKS CALLED OUT IN THE PLUMBING DRAWINGS WERE FLOOR MOUNTED AND WALL MOUNTED CONFLICTING WITH THE CABIN… |
| Mod SA070· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-07-22 | +$247 | $35,390,974 | LOCATION OF THE HELP BUTTONS IN THE EXAM ROOMS OF THE ADMIN BUILDING WILL BE OUT OF REACH OF THE MEDICAL STAFF… |
| Mod SA074· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-07-22 | +$7,766 | $35,398,740 | DESIGN CHANGE. CONTRACT DID NOT INCLUDE DRAIN CONNECTION REQUIREMENTS FOR THE GFE ICE MAKERS. |
| Mod SA020· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-07-28 | +$53,372 | $35,452,112 | USER REQUESTED CHANGE. PROXIMITY SYSTEMS FURNITURE WILL BE INSTALLED BY USER PRIOR TO ACTIVATION. WALL REQUI… |
| Mod SA066· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-07-28 | +$717 | $35,452,829 | THE EXHAUST AND SUPPLY FANS IN ROOM A-176 NEEDS TO PROVIDE SUFFICIENT AIR FLOW FOR THE FOOD CART. |
| Mod SA068· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-07-28 | +$2,195 | $35,455,024 | THE COOLING UNITS REQUIRE A CONCRETE PAD AND THE CONCRETE PAD DESIGNED BY THE AE WASN'T LARGE ENOUGH FOR BOTH… |
| Mod SA069· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-07-28 | +$16,054 | $35,471,078 | PROVIDE TWO PRESSURE REDUCING VALVES ON 4" WATER LINES ENTERING BUILDING 520. |
| Mod SA072· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-07-28 | +$8,538 | $35,479,616 | THE CMU WALL IN THE OUTDOOR COURTYARD IS NOT ATTACHED TO THE EXTERIOR WALLS OF WINGS B AND C. THIS LEAVES A GA… |
| Mod SA073· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-07-28 | +$4,373 | $35,483,989 | A. ORIGINAL DRAWINGS HAD SIDE LIGHTS AND DOOR OPENINGS IN C-128 AND D-128 ON THE SAME SIDE AS THE WASHER AND… |
| Mod SA075· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-07-28 | +$5,249 | $35,489,238 | A. ORIGINAL CONTRACT REQUIREMENT IS TO PROVIDE NCM-NF NETWORK CARDS. AN UPGRADE TO HIGHSPEED NETWORK CARDS IS… |
| Mod CO02X· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-01 | +$2,000,000 | $37,489,238 | 1. INCREASE FUNDING FOR THE CHANGE ORDER CO-02D AND CO-02Q WERE PREPARED AND APPROVED FOR A TOTAL OF $6,000,00… |
| Mod SA079· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-02 | −$2,969 | $37,486,269 | USER REQUESTED CHANGE. USER WILL INSTALL SMARTBOARDS IN THE CONFERENCE ROOM. PLAN DID NOT INCLUDE BACKING FOR… |
| Mod SA080· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-12 | +$4,829 | $37,491,098 | A. THE LIGHT FIXTURES AT BATHROOMS F-102 AND F-103 DOES NOT FIT DUE TO THE DUCT WORK. THE ORIGINAL (F-12) LIGH… |
| Mod SA088· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-15 | +$10,029 | $37,501,127 | DESIGN OMISSION. THE CONTRACT DRAWINGS DO NOT INCLUDE THE UNDERGROUND PLUMBING IN THE ADMINISTRATION BUILDING… |
| Mod SA077· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-18 | +$10,690 | $37,511,817 | A. ORIGINAL CONTRACT REQUIREMENT USED THE ZURN Z-1231 LAVATORY CARRIER, BUT DUE TO MULTIPLE STRUCTURAL INTERFE… |
| Mod SA089· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-18 | +$3,743 | $37,515,560 | ASI #026, REVISIONS TO CHANGE DOOR MATERIALS FROM METAL TO ALUMINUM AS WELL AS CHANGE A DOOR TO THE FIRE RATIN… |
| Mod SA052· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-22 | +$79,709 | $37,595,269 | A. THE USER REQUESTED TO CHANGE FROM THE CERAMIC WALL TILE TO A SOLID SURFACE MATERIAL IN ORDER TO COMPLY WITH… |
| Mod SA078· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-22 | +$5,361 | $37,600,630 | A. THE CUSTONER REQUESTED A COLOR CHANGE FOR FIFTY-FOUR (54) WALLS ON THE FIRST AND SECOND FLOORS OF THE ADMIN… |
| Mod SA083· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-22 | −$2,083 | $37,598,547 | DAYROOMS DO NOT REQUIRE SINKS. |
| Mod SA051· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-26 | −$4,240 | $37,594,307 | DESIGN CHANGE. PLAN WAS REVISED SINCE THE TELECOM MANHOLE (FUTURE) IDENTIFIED IN THE CONTRACT DRAWINGS WILL NO… |
| Mod SA084· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-26 | +$3,466 | $37,597,773 | DESIGN OMISSION. REQUIRED COILING COUNTER DOOR CAN NOT BE INSTALLED WITH THE DESIGNED WALL FRAMING. 16 GAUGE M… |
| Mod SA096· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-26 | +$1,775 | $37,599,548 | DEFINITIZE CO-02F. CONSTRUCTION OF BUILDING 520 REQUIRED RELOCATION OF THE SEWER SYSTEM SUPPORTING BUILDING2.… |
| Mod SA099· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-26 | +$1,180 | $37,600,728 | THE ORIGINAL SPECS CALLED FOR A STEEL OR COPPER PIPE FOR HEATING HOT WATER PIPING. IT WAS INSTALLED AS STEEL P… |
| Mod SA092· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-29 | +$3,455 | $37,604,183 | DESIGN CHANGE. PER OAC MEETING ON 12/14/10 THE DOORS IN ROOMS A-145, B-145, C-145, AND D-145 PATIENT SAFETY IS… |
| Mod SA090· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-30 | +$4,807 | $37,608,990 | IN RFI E-0098 DATED 7/6/2010, CLARIFICATIONS ON THE CIRCUITS FOR HUMIDIFIER CONTROLS WERE REQUESTED. THE RESPO… |
| Mod SA091· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-30 | +$4,391 | $37,613,381 | DESIGN ERROR. IN RFI E-0108 DATED 8/10/2010 THE LNC1 WAS BEING FED WITH F80 DESIGNATION AND IT SHOULD HAVE A 4… |
| Mod SA100· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-30 | −$6,300 | $37,607,081 | DEFINITIZE CO-02H FOR INSTALLATION OF LOW VOLTAGE WIRING INSIDE CONDUITS. |
| Mod SA105· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-30 | +$5,409 | $37,612,490 | CHANGES WERE DUE TO DESIGN ERRORS AND OMISSIONS. THIS SA COVERS MISCELLANEOUS CHANGES RESULTING FROM THE RFI P… |
| Mod SA107· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-30 | +$1,473 | $37,613,963 | DESIGN ERROR. IN 1/AS7.02 THE SIZE OF THE GUTTERS WAS DETERMINED TO BE SMALL AND WOULD NOT WORK AS DESIGNED. |
| Mod SA087· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-01 | +$13,003 | $37,626,966 | REVISE DOOR FRAME TYPE TO ACCOMODATE DESIGN ERROR. SPECIFIED FRAME WOULD NOT WORK AS INTENDED IN THE DESIGN. |
| Mod SA101· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-01 | +$15,129 | $37,642,095 | CHANGES WERE DUE TO DESIGN ERRORS AND OMISSIONS. THIS SA COVERS MISCELLANEOUS CHANGES RESULTING FROM THE RFI P… |
| Mod SA097· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-21 | +$5,258 | $37,647,353 | DESIGN OMISSION. IN RFI A-0157, THE CONTTRACTOR REQUESTED LOCATIONS FOR THE TELEVISIONS THAT WOULD REQUIRE MOU… |
| Mod SA104· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-21 | +$16,341 | $37,663,694 | THIS SUPPLEMENTAL AGREEMENT IS TO CONSOLIDATE CHANGE PROPOSAL REQUEST 107, SOIL CONDITIONS PUMPING UNDER BASKE… |
| Mod SA106· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-21 | −$3,356 | $37,660,338 | THIS SUPPLEMENTAL AGREEMENT CONSOLIDATES FIVE CHANGE PROPOSAL REQUESTS: 74, 84, 101, 148, 162. |
| Mod SA108· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-21 | +$14,300 | $37,674,638 | RFI E-0049 STATED THAT MECHANICAL DUCT WORK WAS RELOCATED OUT OF ELECTRICAL ROOM D EC1 BUT WITH THIS RELOCATIO… |
| Mod SA109· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-21 | +$19,031 | $37,693,669 | RFI M-0001 WAS SUBMITTED ON 9/11/2009 TO GET GUIDANCE ON A CONFLICT WITH THE LOW ROOF SHOWN ON DRAWING MH 2.14… |
| Mod SA110· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-21 | +$14,300 | $37,707,969 | RFI S 0141 REQUIRED THE RB5 TO BE MOVED TO THE SAME LOCATION AS EXISTING DUCTWORK CAUSING THE DUCTWORK TO BE M… |
| Mod SA111· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-21 | +$20,393 | $37,728,362 | THIS SUPPLEMENTAL AGREEMENT IS TO COMBINE THE WORK FROM FOUR PROPOSALS INTO ONE AGREEMENT. |
| Mod SA112· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-21 | −$4,210 | $37,724,152 | THE CONTRACT REQUIRED TRAINING FOR TELECOMMUNICATION, NURSE CALL, SECURITY DURESS ALARM, CCTV, AND MATV TRAINI… |
| Mod SA113· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-21 | +$1,751 | $37,725,903 | PATIENT BATHROOMS REQUIRE 20"X36" SECURITY MIRRORS, RATHER THAN 4"X6", SO THAT PATIENTS CONFINED TO A WHEEL C… |
| Mod SA114· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-21 | +$8,500 | $37,734,403 | DESIGN OMISSION. CONTRACT DRAWINGS DID NOT SHOW CONTINUATION OF THE REVEAL ON TOP OF THE WINDOWS. AS DRAWN, WA… |
| Mod SA117· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-21 | +$10,850 | $37,745,253 | DESIGN OMISSION. BLOCKING IN SHEAR WALLS FOR ELECTRICAL OUTLET OPENINGS WERE NOT INCORPORATED IN THE DESIGN. D… |
| Mod SA093· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-27 | +$8,500 | $37,753,753 | EQUIPMENT IN ROOMS F 140, 107, 123, 201, AND 247 CONTAIN EQUIPMENT THAT REQUIRED COORDINATION WITH AV SUPPLIER… |
| Mod SA102· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-27 | +$11,714 | $37,765,467 | CHANGES CAUSED BY SEVERAL RFI'S DUE TO VARIOUS DESIGN ERRORS AND OMISSIONS |
| Mod SA103· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-27 | +$16,867 | $37,782,334 | CHANGES WERE DUE TO DESIGN ERRORS AND OMISSIONS. THIS SA COVERS MISCELLANEOUS CHANGES RESULTING FROM THE RFI P… |
| Mod SA115· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-27 | +$2,318 | $37,784,652 | IN RESPONSE TO RFI 0247 THAT REQUIRED ADDITIONAL INFILL FRAMING, JOINT SEALANT, AND WINDOW TRIM AT SILL TO TWO… |
| Mod SA082· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-30 | +$8,535 | $37,793,187 | USER REQUESTED CHANGE. THE CLEAN STORAGE ROOMS A160&D160 WILL HAVE 3 OMNICELL TOWERS WHICH REQUIRE POWER AND… |
| Mod SA086· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-30 | +$2,016 | $37,795,203 | DESIGN CHANGES RESULTING FROM STRUCTURAL AND ARCHITECTURAL RFI'S. CHANGES WERE NECESSARY FOR CONSTRUCTABILITY… |
| Mod SA094· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-30 | +$1,231 | $37,796,434 | DESIGN ERROR. PER SHEET ES 3.10 THERE IS ONLY ONE J-BOX IN ROOM E ME1 FOR WH 1 EQUIPMENT. PER PS2.10, THERE AR… |
| Mod SA095· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-30 | +$1,332 | $37,797,766 | RFP D-0016 DATED 4/26/2010 REQUESTED THE ADDITION OF A J-BOX TO DOOR C-WL1 AND DC-050. THIS IS A LUMP SUM REQU… |
| Mod SA098· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-30 | −$30,000 | $37,767,766 | THE SECTION OF THE ACCESS ROAD WILL BE USED FOR THE FUTURE PROJECT TO DEMO BUILDING 2. DELETION OF THIS WORK A… |
| Mod SA121· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-30 | +$26,007 | $37,793,773 | CHANGES WERE DUE TO DESIGN ERRORS AND OMISSIONS. THIS SA COVERS MISCELLANEOUS CHANGES RESULTING FROM THE RFI P… |
| Mod SA118· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-13 | +$13,111 | $37,806,884 | 1. AT DATA ROOMS F124 AND F226 THERE WAS A NEED TO EXTEND THE PARTIAL HEIGHT WALL TO FULL HEIGHT TO PREVENT C… |
| Mod SA122· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-14 | +$7,160 | $37,814,044 | A RFI 0151 AND A RFI 0151 R1 REQUIRED THE MECHANICAL UNIT CURBS TO BE ADJUSTED IN HEIGHT AND PROVIDE ADDITIONA… |
| Mod SA123· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-14 | +$13,714 | $37,827,758 | S RFI 0180, 0199, 0205, AND 0208 R1 REQUIRED REWORK TO UNITS A AND B AT 11 LOCATIONS WHERE THE KINGSTUD NEEDED… |
| Mod SA124· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-14 | +$8,752 | $37,836,510 | S RFI 204 REQUIRED ADDITIONAL MECHANICAL HEADOUTS FOR DUCTWORK CHANGES TO SHEAR WALL PENETRATIONS AND ADDITION… |
| Mod SA125· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-14 | +$4,833 | $37,841,343 | S RFI 0122 AND A RFI 0078 REQUIRED SHEAR WALLS TO BE MOVED, WALLS TO BE EXPANDED, AND HEADOUTS TO BE PROVIDED… |
| Mod SA126· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-14 | +$7,131 | $37,848,474 | IN RESPONSE TO ASI #25 AND S RFI 0218, THE CONTRACTOR WAS REQUIRED TO ADD FRAMING AND SHIFTING THE LOCATIONS O… |
| Mod SA127· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-24 | +$12,000 | $37,860,474 | DESIGN OMISSION. |
| Mod SA128· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-24 | −$7,681 | $37,852,793 | DEFINITIZE CHANGE ORDER CO-02A FOR ANALYTICAL SOIL TESTING. |
| Mod SA060· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-27 | +$344 | $37,853,137 | ROOF VENTING MONITORS REQUIRED WOOD FRAMING MEMBERS TO BE UPGRADED FROM 2X4'S TO 2X6'S PER THE RESPONSE TO RFI… |
| Mod SA130· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-27 | +$85,000 | $37,938,137 | DESIGN CHANGES DUE TO ERRORS AND OMISSIONS. |
| Mod SA129· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-28 | +$49,295 | $37,987,432 | CRITICAL FUNCTION: RELOCATE THE FIRE MAIN TO THE EXTERIOR ROOF WALL. |
| Mod SA133· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-31 | +$61,069 | $38,048,501 | DESIGN CHANGES DUE TO ERRORS AND OMISSIONS. |
| Mod SA137· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-01 | +$94,641 | $38,143,142 | USER REQUESTED CHANGE. CURRENT MH DESIGN GUIDE REQUIRED ANTI-LIGATURE DOOR SENSORS WHICH WERE NOT INCLUDED IN… |
| Mod CO02Z· CHANGE ORDER | 2011-11-09 | +$92,000 | $38,235,142 | CRITICAL FUNCTION: DESIGN CHANGE. ORIGINAL ROUTE FOR THE CONDUITS IS UNDER BUILDING 2, WHICH WAS SUPPOSED TO B… |
| Mod CO03A· CHANGE ORDER | 2011-11-17 | +$12,000 | $38,247,142 | PROVIDE FOR THE FABRICATION AND INSTALLATION OF DRYER VENTS IN ROOMS A-128, B-128, C-128,&D-128 DUE TO ERRORS… |
| Mod CO03B· CHANGE ORDER | 2011-11-17 | +$5,300 | $38,252,442 | SPECIFICATION 16781, REQUIRES THE CONTRACTOR TO RUN THE COAX FEEDER TO THE NEAREST BUILDING, WHICH IS BUILDING… |
| Mod SA134· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-29 | +$8,529 | $38,260,971 | SEAL GAPS BELOW ALUMINUM PLATES IN WINDOWS. |
| Mod SA136· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-29 | +$27,253 | $38,288,224 | PROVIDE MODIFICATION TO THE CONTRACT TO ACCOUNT FOR SEVERAL DESIGN CHANGES RESULTING FROM ERRORS AND OMISSIONS… |
| Mod SA139· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-29 | +$784 | $38,289,008 | PER RFI A 488, AT THE ADMINISTRATION BUILDING, THERE WAS A NEED TO EITHER RAISE THE CEILING HEIGHT OR LOWER TH… |
| Mod SA140· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-29 | −$8,500 | $38,280,508 | MOST OFFICE WINDOWS ARE INCLUDED WITH INTERIOR VENETIAN BLINDS. THE MEDICAL CENTER WILL PROVIDE THE OTHER WIN… |
| Mod SA141· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-29 | +$3,898 | $38,284,406 | DESIGN ERROR. DESIGNED DOOR LOCK FUNCTION DOES NOT MEET THE USER'S REQUIREMENTS. |
| Mod SA142· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-29 | +$28,988 | $38,313,394 | CRITICAL FUNCTION: DESIGN ERRORS AND OMISSIONS. ABOVE CEILING ELECTRICAL ROUTING NEEDED TO BE CHANGED PER ASI… |
| Mod SA143· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-29 | +$1,268 | $38,314,662 | USER REQUESTED CHANGES. DESIGN WILL NOT WORK FOR THE ROOMS INTENDED USE. |
| Mod SA145· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-29 | +$17,598 | $38,332,260 | CRITICAL FUNCTION: DESIGN CHANGES DUE TO CONFLICT WITH EXISTING FIRE WATER LINE. |
| Mod SA146· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-29 | +$28,782 | $38,361,042 | CRITICAL FUNCTION: RELOCATE THE FIRE HYDRANT IMPACTED BY THE LOOP ROAD RE-ALIGNMENT. |
| Mod SA147· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-29 | +$30,941 | $38,391,983 | CRITICAL FUNCTION: DESIGN CHANGE. THE ORIGINAL SIDEWALK ONLY SHOWED A SLAB ON GRADE CONCRETE PAVEMENT WHICH WO… |
| Mod SA135· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-30 | −$713 | $38,391,270 | PER ASI 050, AT DOORS F104D&F200C THERE WAS A NEED TO CLARIFY AND MODIFY THE DOOR JAMBS, AND THERE WAS ALSO A… |
| Mod SA138· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-30 | +$6,366 | $38,397,636 | PER RFI A 452, AT THE ADMINISTRATION BUILDING, THERE WAS A NEED TO CHANGE THE LAYOUT OF THE CEILING TILES TO P… |
| Mod SA144· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-30 | +$11,207 | $38,408,843 | TO PROVIDE AND INSTALL TANKLESS WATERHEATERS PER RFI 043 RESPONSE. |
| Mod SA148· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-30 | +$3,099 | $38,411,942 | THE DESIGNED CEILING HEIGHT IS TOO HIGH FOR THE DRINKING FOUNTAIN CHILLER. THERE IS NOT ENOUGH CEILING SPACE F… |
| Mod SA149· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-30 | +$10,000 | $38,421,942 | CRITICAL FUNCTION: CHANGE DUE TO DESIGN ERRORS AND OMISSIONS. IN CLARIFYING THE CURB DIMENSIONS, WOOD FRAMING… |
| Mod SA152· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-30 | +$5,938 | $38,427,880 | HARDWIRE CONNECTION FOR THE FIRE MONITORING SYSTEM IS NOT AVAILABLE UNTIL AFTER THE BUILDING IS NEAR COMPLETIO… |
| Mod SA154· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-30 | +$5,453 | $38,433,333 | WIRE GUARDS FOR THE SERVICE FIXTURES ARE NEEDED TO PROTECT MAINTENANCE WORKERS, WORKING UNDERNEATH THE FLUORE… |
| Mod SA155· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-30 | +$6,368 | $38,439,701 | PER RFI A 154&A 167, THERE WAS A NEED TO CLARIFY THE TYPE OF FOUNDATION SUPPORT FOR THE GARDEN COURTYARD CLOSE… |
| Mod SA156· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-30 | −$686 | $38,439,015 | SPECIFICATION 16781, REQUIRES THE CONTRACTOR TO RUN THE COAX FEEDER TO THE NEAREST BUILDING, WHICH IS BUILDING… |
| Mod SA157· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-30 | +$46,154 | $38,485,169 | CRITICAL FUNCTION: DESIGN CHANGE. ARCHITECTURAL SUPPLEMENTAL INFORMATION WAS ISSUED TO PROVIDE FIRE WALL AND S… |
| Mod SA158· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-30 | +$3,235 | $38,488,404 | DESIGN CHANGE. ASI 46 WAS ISSUED TO CORRECT DIMENSION OF SPLICE LENGTH/BAR ON CMU WALL FOUNDATION. |
| Mod SA159· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-30 | +$13,645 | $38,502,049 | PROVIDE FOR THE FABRICATION AND INSTALLATION OF DRYER VENTS IN ROOMS A-128, B-128, C-128,&D-128 DUE TO ERRORS… |
| Mod SA160· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-30 | +$10,204 | $38,512,253 | ADJUST MECHANICAL SCREEN SUPPORTS TO AVOID THE RB5 SPLICE PLATE CONNECTIONS PER RFI 0210. DELETE PARAPET WALL… |
| Mod SA161· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-30 | +$17,265 | $38,529,518 | TO PROVIDE FOR ERRORS AND OMISSIONS IN THE DRAWINGS REGARDING CONCRETE PLACEMENT AND SEVERAL ARCHITECTURAL INS… |
| Mod CO03C· CHANGE ORDER | 2011-12-02 | +$4,869 | $38,534,387 | DIFFERING SITE AND DESIGN OMISSION. |
| Mod SA163· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-02 | +$94,642 | $38,629,029 | CRITICAL FUNCTION: USER REQUESTED CHANGE. ANTI-LIGATURE SENSORS WERE NOT INCLUDED IN THE ORIGINAL CONTRACT. CU… |
| Mod SA151· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-06 | +$93,941 | $38,722,970 | DESIGN OMISSION. ALL THE NECESSARY/REQUIRED CEILING ACCESS PANELS WERE NOT IDENTIFIED IN THE DRAWINGS. |
| Mod CO03D· CHANGE ORDER | 2011-12-14 | +$99,000 | $38,821,970 | THE CONTRACTING OFFICER IS ISSUING A CHANGE ORDER TO PROVIDE PARTIAL FUNDING PENDING THE DEFINITIZATION OF THE… |
| Mod SA162· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-16 | +$3,729 | $38,825,699 | SPECIFIED LIGHT FIXTURES AS INSTALLED ARE INSUFFICIENT TO PROVIDE THE REQUIRED 10 FT CANDLES ILLUMINATION IN T… |
| Mod SA168· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-30 | +$4,328 | $38,830,027 | DETAILS FOR THE INSTALLATION OF THE SHADE POCKET WERE NOT PROVIDED IN THE DRAWINGS. INSTALLATION CAN NOT BE AC… |
| Mod SA169· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-30 | +$3,243 | $38,833,270 | USER REQUESTED CHANGE. USER REQUESTED TO MATCH THE CURRENT PAHCS STANDARD FOR BUILDING SIGNS. |
| Mod SA170· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-30 | +$6,140 | $38,839,410 | USER REQUESTED CHANGE. DUE TO HEIGHT OF THE BAMBOO SPECIES (TALLER THAN THE BUILDING) AND MAINTENANCE CONCERNS… |
| Mod SA175· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-30 | +$60,483 | $38,899,893 | DIFFERING SITE CONDITIONS. MORE OF THE EXCESS SOIL REMOVED ON SITE WERE CONTAMINATED BUT NOT HAZARDOUS. |
| Mod SA176· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-30 | +$10,433 | $38,910,326 | DEFINITIZE CO-01W ADDITIONAL COURTYARD DRAINS |
| Mod SA116· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-02 | +$4,154 | $38,914,480 | DIFFERING SITE CONDITIONS. CONTAMINATED SOIL DISPOSAL GENERATED BY THE TRENCHING. CONTRACT DID NOT HAVE PROVIS… |
| Mod CO03E· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-10 | +$4,038 | $38,918,518 | ADDED WORK TO INSTALL AN ADDED DATA LINE FOR A-LA CART ROOMS A-176 AND D-176. ADDED WORK TO INSTALL 1 EA NOTI… |
| Mod CO03F· CHANGE ORDER | 2012-01-12 | +$1,719 | $38,920,237 | THE FIRE ALARM TIE IN FROM BLD 520 TO BUILDINGS 100 AND BLD 40 REQUIRES PROGRAMMING AND CONNECTIVITY INFORMATI… |
| Mod SA171· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-16 | +$16,741 | $38,936,978 | AHU PENETRATION ON ROOF AND MISCELLANEOUS CHANGES AS REFLECTED IN THE ATTACHED ARCHITECTURAL SUPPLEMENTAL INST… |
| Mod SA172· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-16 | +$40,485 | $38,977,463 | AHU PENETRATION ON ROOF AND MISCELLANEOUS CHANGES AS REFLECTED IN THE ATTACHED ARCHITECTURAL SUPPLEMENTAL INST… |
| Mod SA173· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-16 | +$49,950 | $39,027,413 | AHU PENETRATION ON ROOF AND MISCELLANEOUS CHANGES AS REFLECTED IN THE ATTACHED ARCHITECTURAL SUPPLEMENTAL INST… |
| Mod SA174· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-16 | +$71,357 | $39,098,770 | CRITICAL FUNCTION: DESIGN OMISSION AND USER REQUESTED CHANGES. DESIGN CHANGES TO VENT AND PREVENT WATER INFIL… |
| Mod SA119· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-17 | +$43,081 | $39,141,851 | RELOCATE 12.47 KV 3 PHASE 750 KVA EMERGENCY POWER TRANSFORMER. INSTALL 4.16 KV PRIMARY 480/277 V SECONDARY 3… |
| Mod SA120· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-17 | +$16,941 | $39,158,792 | THIS INCLUDES DEMOLITION OF (E) SHEARWALLS/FRYWALL, SHEARWALL REPAIR AND DRYWALL REPAIR IN ACCORDANCE WITH ASI… |
| Mod SA131· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-17 | +$73,349 | $39,232,141 | A PORTABLE GENERATOR IS REQUIRED TO PROVIDE TEMPORARY POWER TO BUILDING 520, UNTIL THE POLYTRAUMA PROJECT INST… |
| Mod SA167· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-30 | +$78,747 | $39,310,888 | AHU PENETRATION ON ROOF AND MISCELLANEOUS CHANGES AS REFLECTED IN THE ATTACHED ARCHITECTURAL SUPPLEMENTAL INST… |
| Mod SA178· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-02-14 | +$6,054 | $39,316,942 | USER REQUESTED CHANGE. FAUCETS IN THE DINING ROOMS AND DAY ROOMS ARE NOT ANTI-LIGATURE. USER REQUESTED TO CHA… |
| Mod SA179· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-02-14 | +$7,484 | $39,324,426 | DESIGN OMISSION. POWER FOR GOVERNMENT FURNISHED TRASH COMPACTOR WAS NOT INCLUDED IN THE CONTRACT. |
| Mod SA180· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-02-14 | +$58,388 | $39,382,814 | DESIGN OMISSION. ORIGINAL CONTRACT ONLY REQUIRED THE THIN BRICK TO BE INSTALLED OVER CEMENT BOARD. DUE TO WATE… |
| Mod SA181· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-02-14 | +$56,350 | $39,439,164 | DESIGN ERROR/OMISSION. CHANGE IN THE LAYOUT OF THE FIRE SPRINKLER WAS NECESSARY DUE TO CONFLICTS WITH OTHER UT… |
| Mod SA132· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-05 | +$28,714 | $39,467,878 | DUE TO ADA CONCERNS, REMOVE AND RECESS THE TOP DOOR AND THE TROL CABINET PANELS IN WIINGS B,C AND D. |
| Mod SA062· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-06 | +$46,778 | $39,514,656 | 120 VAC EMERGENCY POWER IS NEEDED TO POWER 12 EACH SMOKE DAMPERS PER WING. THE ELECTRICAL DRAWINGS DID NOT SHO… |
| Mod SA150· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-06 | +$5,315 | $39,519,971 | THE CONSTRUCTION DRAWINGS SHOWED METAL ACCESS PANELS INSTALL LOCATIONS BUT DID NOT SHOW WOOD ACCESS PANEL LOCA… |
| Mod SA166· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-06 | +$4,303 | $39,524,274 | TO PROVIDE FOR THE OMISSION OF AUTOMATIC MECHANICAL CONTROL VALVES AT THE BOILERS. |
| Mod SA182· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-06 | +$2,851 | $39,527,125 | CORRECT A DESIGN OMISSION THAT DID NOT PROVIDE A DETAIL TO COVER GAP BETWEEN THE EDGE OF SLAB AND FACE OF GYPS… |
| Mod SA183· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-06 | +$2,043 | $39,529,168 | PER RFI A 0462, AT THE ADMINISTRATION BUILDING ROTUNDA, THERE WAS A NEED TO CONSTRUCT A CONTINUOUS RECESS UNDE… |
| Mod SA184· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-06 | +$4,688 | $39,533,856 | RESPONSE ISSUED IN RFI A 498, RESULTED IN CONFLICT WITH THE THRESHOLD AND DOOR DIMENSION. DOORS ALREADY ON SIT… |
| Mod SA185· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-06 | +$1,912 | $39,535,768 | PER RFI P 0004, IN THE AREA BOUNDED BY GRIDS Y1.5, Y1.0, D6&D2, THERE WAS A NEED TO REROUTE RWL&OFD DRAINAGE P… |
| Mod SA186· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-06 | +$63,303 | $39,599,071 | DESIGN OMISSION. DETAILS WERE MISSING IN THE DESIGN FOR ATTACHING (STRUCTURAL) THE CEILING AND LIGHT ALCOVES T… |
| Mod SA187· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-06 | +$3,285 | $39,602,356 | PATIENT SAFETY. THE CONTRACT SPECIFIED STRIKE PLATE PROTRUDES 1/2INCH BEYOND THE FACE OF THE DOOR FRAME. THE O… |
| Mod CO03H· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-16 | +$3,000 | $39,605,356 | TO PROVIDE FOR THE REDESIGN OF THE HOT WATER RECIRCULATION LINE DUE TO DESIGN ERROR. |
| Mod SA193· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-21 | +$14,067 | $39,619,423 | CRITICAL FUNCTION: TO PROVIDE FOR OMISSIONS IN THE DRAWINGS RELATED TO THE FIRE-RATED FRAMES COLOR AND FASTENE… |
| Mod SA085· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-27 | −$3,462 | $39,615,961 | CRITICAL FUNCTION: PER REQUEST BY VAPA MADICAL CENTER: DELETE INSTALL OF NCA-2 FOR BLD 40 AND BLD 100. ADD O… |
| Mod SA190· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-27 | +$9,900 | $39,625,861 | CRITICAL FUNCTION: TO ACCOUNT FOR THE RELOCATION OF WASTE&VENT PIPING, AND INSTALLATION OF AN ADDITIONAL TOILE… |
| Mod SA191· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-27 | +$5,991 | $39,631,852 | CRITICAL FUNCTION: DUE TO THE FOLLOWING DESIGN OVERSIGHTS AND OMISSION, ADDITIONAL CARPENTRY WORK IS REQUIRED:… |
| Mod SA195· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-27 | +$9,880 | $39,641,732 | CRITICAL FUNCTION: CORRECT A DESIGN OMISSION THAT DID NOT PROVIDE ACCURATE ELEVATIONS OF AN EXISTING CURB INLE… |
| Mod SA196· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-27 | +$1,290 | $39,643,022 | CRITICAL FUNCTION: THIS CHANGE IS DUE TO AN AE DESIGN ERROR, NOTED ON SHEET ES5.00. THE CONTRACT DOCUMENTS C… |
| Mod SA197· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-27 | +$7,612 | $39,650,634 | CRITICAL FUNCTION: A CANE RAIL IS NEEDED BELOW THE ADMINISTRATION BUILDING CIRCULAR STAIR TO ALLOW SIGHT IMPAI… |
| Mod SA198· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-27 | +$3,798 | $39,654,432 | TO PROVIDE FOR THE INSTALLATION OF 3 ADDITIONAL HELP BUTTONS IN THE ADMINISTRATION BUILDING, ROOMS F-117, F-11… |
| Mod SA189· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-25 | +$2,401 | $39,656,833 | PER ASI 058R1, RFI'S A 425, A 425R1, L 020, A 496&A 496R1, AT THE BUILDING SITE, THERE WAS A NEED TO ADJUST T… |
| Mod SA192· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-25 | +$27,109 | $39,683,942 | CONTRACT DRAWING HAD MATV RUNNING TO THE FLOOR OF 4 EACH CONFERENCE ROOMS. THE MEDICAL CENTER WOULD LIKE THE… |
| Mod SA200· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-25 | +$8,691 | $39,692,633 | TO PROVIDE FOR THE REDESIGN OF THE HOT WATER RECIRCULATION LINE DUE TO DESIGN ERROR. |
| Mod SA201· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-25 | +$4,290 | $39,696,923 | THIS CHANGE IS DUE TO A DESIGN ERROR. THE LIGHTS SPECIFIED IN THE CONTRACT DOCUMENTS DO NOT PROVIDE SUFFICIENT… |
| Mod SA202· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-25 | +$22,748 | $39,719,671 | USER REQUESTED. USER PREVIOUSLY REQUESTED TO DELETE THE LANDSCAPING (TREES AND GROUND COVER) FROM THE MAIN COU… |
| Mod SA203· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-25 | +$7,500 | $39,727,171 | TO ACCOUNT FOR THE NEED TO INCREASE THE MOTOR SIZE&CHANGE THE FILTER TYPE ON TWO EXHAUST FANS TO MEET THE DESI… |
| Mod SA204· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-25 | +$5,570 | $39,732,741 | TO ALLOW FOR THE INSTALLATION OF AN MSB-M AND R-CIRCULATION PUMP DUE TO A/E OMISSION AND ERROR. |
| Mod SA207· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-25 | +$2,021 | $39,734,762 | SUMP PIT COVER FOR THE ELEVATOR PIT WAS NOT CLEARLY INDICATED IN THE DRAWINGS. RESPONSE TO A RFI 0359 PROVIDE… |
| Mod SA208· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-25 | +$29,235 | $39,763,997 | CONTRACT STATED 12 X 12 ACCESS PANELS FOR PLUMBING ACCESS. USER REQUESTED 24 X 24 PANELS SINCE THE 12 X 12 IS… |
| Mod SA194· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-27 | +$24,456 | $39,788,453 | REQUIRED MOISTURE LEVEL CONTENT ON THE CONCRETE FLOOR COULD NOT BE ACHIEVED WITH THE SPECIFIED HYDROSEAL PRODU… |
| Mod SA210· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-08-14 | +$2,000 | $39,790,453 | THE MEDICAL CENTER NEEDED TO USE THE SOUTH LOOP ROAD TO ACCESS BUILDINGS 4, 48 AND 101. THE SOUTH LOOP ROAD WA… |
| Mod SA211· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-08-14 | +$3,430 | $39,793,883 | DEFINITIZE CO-03F FOR INTREPID FIRE ALARM TIE-IN. INTREPID IS THE MED CENTERS FIRE ALARM CONTRACTOR AND IS REQ… |
| Mod SA212· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-08-14 | +$4,533 | $39,798,416 | THIS SA IS TO DEFINITIZE CO-03E. |
| Mod SA213· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-08-14 | +$4,478 | $39,802,894 | DEFINITIZE CO-03C - ADDED ELECTRICAL WORK. |
| Mod SA214· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-08-14 | +$39,209 | $39,842,103 | DEFINITIZE CO-02L FOR THE ANTI-LIGATURE DOOR SENSORS. |
| Mod SA215· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-08-14 | +$4,389 | $39,846,492 | THE SHOWER FLOORS WERE STAYING WET AFTER RUNNING THE SHOWER. MOCK UPS WERE NEEDED TO DETERMINE POSSIBLE SOLUTI… |
| Mod SA216· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-08-14 | +$38,000 | $39,884,492 | DESIGN OMISSION. REQUIREMENTS FOR THE DEPRESSED FOOTINGS WERE NOT SHOWN NOR DETAILED IN THE CONTRACT DRAWINGS.… |
| Mod SA206· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-09-06 | +$8,031 | $39,892,523 | THE 12KV TIE-IN TO CONNECT TO THE EXISTING F2&F6 CIRCUIT CONNECTION COULD ONLY BE PERFORMED DURING THE WEEKEND… |
| Mod SA177· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-09-07 | +$2,795,003 | $42,687,526 | THE MENTAL HEALTH SERVICE HAS EXPANDED AND EVOLVED, PROVIDING STATE OF THE ART EVIDENCE-BASED MODERN PSYCHIATR… |
| Mod SA217· OTHER ADMINISTRATIVE ACTION | 2017-10-23 | +$825,000 | $43,512,526 | ADMINISTRATIVE MODIFICATION TO FUND THE SETTLEMENT AGREEMENT MADE UNDER CIVILIAN BOARD OF CONTRACT APPEALS CBC… |
Related awards · 5
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI GZH9ED5FL2V3)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| VA101F12C0039 | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) · Y1DB · CONSTRUCTION OF LABORATORIES AND CLINICS | $58,590,140 | FY2012 |
| VA701C0171 | PCAC (36C776) · Y249 · CONSTRUCTION OF OTHER UTILITIES | $25,360,242 | FY2011 |
Other recipients under Y111 from OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA101CFMC0139 | ARCHER WESTERN-DEMARIA JV 11 | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | $109,327,964 | FY2011 |
| VA101CFMC0080 | INTEGRATED PRO SERVICES, LLC | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | $12,513,790 | FY2010 |