Description
SETTLEMENT OF BONDING AND PCI 5588 CREDIT
Base award description: CONSTRUCTION OF BAY PINES INPATIENT OUTPATIENT IMPROVEMENTS, MENTAL HEALTH ADDITION AT BAY PINE, VAMC, PROJECT NO. 516-005 OBLI# CO 516X10518
Modification chain · 382 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2011-03-31+$91,989,000= $91,989,000
- Mod CO01B2011-08-29+$10,000= $91,999,000
- Mod CO01A2011-09-23+$0= $91,999,000
- Mod SA0012011-12-08+$0= $91,999,000
- Mod CO01D2011-12-30+$25,000= $92,024,000
- Mod CO01E2012-02-15+$25,000= $92,049,000
- Mod CO01F2012-02-28+$0= $92,049,000
- Mod SA0022012-03-26+$0= $92,049,000
- Mod CO01G2012-04-10+$0= $92,049,000
- Mod CO01H2012-04-12+$0= $92,049,000
- Mod SA0032012-05-03+$20,267= $92,069,267
- Mod SA0042012-06-05+$63,185= $92,132,452
- Mod SA0052012-06-05+$1,317= $92,133,769
- Mod SA0062012-06-05+$3,986= $92,137,755
- Mod SA0072012-06-06+$2,751= $92,140,506
- Mod SA0112012-07-17+$2,871= $92,143,377
- Mod 22012-08-07+$9,090= $92,152,467
- Mod SA0082012-08-08+$833= $92,153,300
- Mod SA0092012-08-08+$4,385= $92,157,685
- Mod SA0102012-08-08+$6,321= $92,164,006
- Mod SA0122012-08-08+$1,475= $92,165,481
- Mod SA0132012-08-08+$9,090= $92,174,571
- Mod SA0142012-08-21+$23,241= $92,197,812
- Mod SA0152012-08-21+$27,871= $92,225,683
- Mod CO01K2012-09-27+$60,000= $92,285,683
- Mod SA0192012-09-27+$20,202= $92,305,885
- Mod SA0202012-09-27+$34,448= $92,340,333
- Mod SA0212012-09-27+$9,602= $92,349,935
- Mod SA0222012-09-27+$5,504= $92,355,439
- Mod SA0242012-09-27+$11,908= $92,367,347
- Mod CO01N2012-12-06+$3,000= $92,370,347
- Mod SA0252012-12-10+$30,316= $92,400,663
- Mod SA0272013-01-02+$6,349= $92,407,012
- Mod SA0282013-01-02+$3,045= $92,410,057
- Mod SA0292013-01-02+$1,748= $92,411,805
- Mod SA0262013-01-15+$29,513= $92,441,318
- Mod CO01O2013-01-21+$2,000= $92,443,318
- Mod P000052013-01-25+$717,876= $93,161,194
- Mod P000072013-02-05+$10,000= $93,171,194
- Mod P000082013-02-05+$6,349= $93,177,543
- Mod SA0302013-02-07+$8,417= $93,185,960
- Mod P000062013-02-12+$10,000= $93,195,960
- Mod P000112013-02-12+$2,365= $93,198,325
- Mod P000152013-02-13+$12,928= $93,211,253
- Mod P000092013-02-21+$58,016= $93,269,269
- Mod P000102013-02-21+$2,703= $93,271,972
- Mod P000122013-02-21+$2,479= $93,274,451
- Mod P000132013-02-21+$3,571= $93,278,022
- Mod P000182013-02-25+$2,145= $93,280,167
- Mod CO01L2013-03-05+$26,092= $93,306,259
- Mod CO01M2013-03-05+$26,092= $93,332,351
- Mod P000192013-03-07+$14,655= $93,347,006
- Mod P000202013-03-07+$26,092= $93,373,098
- Mod P000222013-03-07+$4,420= $93,377,518
- Mod P000232013-03-07+$0= $93,377,518
- Mod P000162013-03-11+$2,145= $93,379,663
- Mod P000212013-03-11+$15,000= $93,394,663
- Mod P000242013-03-11+$5,000= $93,399,663
- Mod P000252013-03-11+$5,000= $93,404,663
- Mod SA0162013-03-11+$14,064= $93,418,727
- Mod P000262013-03-13+$25,000= $93,443,727
- Mod P000272013-03-26+$63,103= $93,506,830
- Mod P000282013-04-01+$6,122= $93,512,952
- Mod P000322013-04-09+$15,581= $93,528,533
- Mod P000292013-04-19+$3,850= $93,532,383
- Mod PO00332013-04-23+$59,050= $93,591,433
- Mod P000342013-04-25+$5,000= $93,596,433
- Mod P000362013-05-02+$30,478= $93,626,911
- Mod P00382013-05-02+$95,000= $93,721,911
- Mod P000302013-05-06+$2,036= $93,723,947
- Mod P000352013-05-06+$4,219= $93,728,166
- Mod P000372013-05-08+$8,536= $93,736,702
- Mod P00412013-05-10+$23,615= $93,760,317
- Mod P000432013-05-22+$6,081= $93,766,398
- Mod P000312013-05-23+$878= $93,767,276
- Mod P000452013-05-23+$2,846= $93,770,122
- Mod P000462013-05-23+$2,192= $93,772,314
- Mod P000512013-05-23+$19,243= $93,791,557
- Mod P000522013-05-23+$37,386= $93,828,943
- Mod P000532013-05-23+$20,594= $93,849,537
- Mod P000482013-05-28+$11,600= $93,861,137
- Mod P000542013-05-28+$42,135= $93,903,272
- Mod P000562013-05-28+$30,215= $93,933,487
- Mod P000572013-05-28+$49,617= $93,983,104
- Mod P000492013-05-29+$6,094= $93,989,198
- Mod P000142013-06-03+$1,869= $93,991,067
- Mod P000592013-06-04+$11,224= $94,002,291
- Mod P000582013-06-05+$1,262= $94,003,553
- Mod PO0602013-06-05+$500= $94,004,053
- Mod P000392013-06-13+$6,736= $94,010,789
- Mod P000612013-06-13+$3,568= $94,014,357
- Mod P000442013-06-17+$3,565= $94,017,922
- Mod P000632013-06-17+$1,735= $94,019,657
- Mod P000652013-06-17+$2,865= $94,022,522
- Mod P000682013-06-25+$1,536= $94,024,058
- Mod P000692013-06-28+$1,000= $94,025,058
- Mod P000702013-06-28+$5,443= $94,030,501
- Mod P000712013-07-09+$41,615= $94,072,116
- Mod P000722013-07-09+$3,427= $94,075,543
- Mod P000552013-07-12+$12,160= $94,087,703
- Mod P000662013-07-12+$19,759= $94,107,462
- Mod PO0622013-07-12+$0= $94,107,462
- Mod P000732013-07-17+$0= $94,107,462
- Mod P000752013-07-22+$1,935= $94,109,397
- Mod P000762013-07-22+$23,961= $94,133,358
- Mod P000782013-07-22+$524= $94,133,882
- Mod P000792013-07-22+$47,421= $94,181,303
- Mod P000802013-07-24+$1,042= $94,182,345
- Mod P000812013-07-25+$2,020= $94,184,365
- Mod P000822013-07-25+$1,249= $94,185,614
- Mod P000832013-07-25+$991= $94,186,605
- Mod P000842013-07-25+$991= $94,187,596
- Mod P000852013-07-30+$16,546= $94,204,142
- Mod P00672013-07-30+$0= $94,204,142
- Mod P000862013-08-01+$7,286= $94,211,428
- Mod P000882013-08-01+$3,282= $94,214,710
- Mod P000902013-08-01+$63,027= $94,277,737
- Mod P000912013-08-01+$4,981= $94,282,718
- Mod P000922013-08-01+$3,749= $94,286,467
- Mod P000942013-08-02+$12,160= $94,298,627
- Mod P001002013-08-05+$12,160= $94,310,787
- Mod P000952013-08-06+$96,266= $94,407,053
- Mod P000962013-08-06+$18,070= $94,425,123
- Mod P000982013-08-06+$12,160= $94,437,283
- Mod P000992013-08-06+$64,217= $94,501,500
- Mod P001012013-08-06+$1,899= $94,503,399
- Mod P001022013-08-07+$34,893= $94,538,292
- Mod P000932013-08-13+$1,719= $94,540,011
- Mod P001032013-08-13+$10,000= $94,550,011
- Mod P001042013-08-15+$10,000= $94,560,011
- Mod P001052013-08-16+$3,023= $94,563,034
- Mod P001072013-08-22+$40,000= $94,603,034
- Mod P001092013-08-28+$8,292= $94,611,326
- Mod P001112013-08-28+$2,130= $94,613,456
- Mod P001162013-08-30+$17,605= $94,631,061
- Mod P000972013-09-03+$118,698= $94,749,759
- Mod P000382013-09-05-$4,458= $94,745,301
- Mod P001192013-09-05+$27,286= $94,772,587
- Mod P000402013-09-10+$8,656= $94,781,243
- Mod P001132013-09-10+$7,663= $94,788,906
- Mod P000422013-09-12-$4,458= $94,784,448
- Mod P001182013-09-16+$120= $94,784,568
- Mod P001222013-09-16+$500= $94,785,068
- Mod P001212013-09-17-$936= $94,784,132
- Mod P001232013-09-17+$2,941= $94,787,073
- Mod P001262013-09-25+$95,000= $94,882,073
- Mod PO01242013-09-26-$264= $94,881,809
- Mod P001252013-09-27+$77,785= $94,959,594
- Mod P001272013-10-23+$37,260= $94,996,854
- Mod P001292013-10-25+$20,253= $95,017,107
- Mod P001302013-10-25+$0= $95,017,107
- Mod P001412014-01-03+$5,866= $95,022,973
- Mod P001452014-01-03+$17,757= $95,040,730
- Mod P001322014-01-09+$15,340= $95,056,070
- Mod P001382014-01-10+$9,354= $95,065,424
- Mod P001392014-01-15+$1,667= $95,067,091
- Mod P000472014-01-16+$6,425= $95,073,516
- Mod P001572014-01-21+$50,000= $95,123,516
- Mod P001352014-01-22+$5,586= $95,129,102
- Mod P001462014-01-23-$18,475= $95,110,627
- Mod P000872014-01-29-$29,796= $95,080,831
- Mod P001432014-01-29+$8= $95,080,839
- Mod P001312014-02-11+$6,830= $95,087,669
- Mod P001442014-02-11+$12,557= $95,100,226
- Mod P001622014-02-11+$25,000= $95,125,226
- Mod P001632014-02-11+$2,444= $95,127,670
- Mod P001602014-02-12-$5,547= $95,122,123
- Mod P001662014-02-12+$2,262= $95,124,385
- Mod P001672014-02-12+$6,805= $95,131,190
- Mod P001732014-02-13+$30,000= $95,161,190
- Mod P000502014-02-20-$919= $95,160,271
- Mod P000892014-02-20-$1,920= $95,158,351
- Mod P001362014-02-20+$2,345= $95,160,696
- Mod P001402014-02-20+$3,867= $95,164,563
- Mod P001422014-02-20+$3,359= $95,167,922
- Mod P001522014-02-20+$7,339= $95,175,261
- Mod P001532014-02-20+$903= $95,176,164
- Mod P001542014-02-20+$1,504= $95,177,668
- Mod P001582014-02-20-$78,665= $95,099,003
- Mod P001642014-02-20+$1,316= $95,100,319
- Mod P001742014-02-20+$14,344= $95,114,663
- Mod P001782014-02-20+$3,482= $95,118,145
- Mod P001342014-02-21+$2,068= $95,120,213
- Mod P001752014-02-21+$4,455= $95,124,668
- Mod P001772014-02-21+$7,003= $95,131,671
- Mod P001282014-02-24+$12,214= $95,143,885
- Mod P001712014-02-24+$3,798= $95,147,683
- Mod P001502014-02-25+$2,394= $95,150,077
- Mod P001512014-02-25+$789= $95,150,866
- Mod P001482014-02-27+$969= $95,151,835
- Mod P001592014-02-27+$5,196= $95,157,031
- Mod P001792014-02-28+$648= $95,157,679
- Mod P001992014-02-28-$1,127= $95,156,552
- Mod P001722014-03-04+$24,980= $95,181,532
- Mod P001842014-03-04+$1,383= $95,182,915
- Mod P001652014-03-06+$2,275= $95,185,190
- Mod P001702014-03-06+$16,438= $95,201,628
- Mod P001892014-03-11+$350= $95,201,978
- Mod P001902014-03-12+$12,056= $95,214,034
- Mod P001852014-03-17+$5,891= $95,219,925
- Mod P001862014-03-17+$1,998= $95,221,923
- Mod P001872014-03-17+$4,612= $95,226,535
- Mod P001682014-04-11+$3,951= $95,230,486
- Mod P001932014-04-11+$1,249= $95,231,735
- Mod P001942014-04-11+$6,499= $95,238,234
- Mod P001822014-04-18+$7,676= $95,245,910
- Mod P001492014-05-13+$0= $95,245,910
- Mod P002042014-05-19+$0= $95,245,910
- Mod P002022014-05-20+$3,266= $95,249,176
- Mod P001882014-05-27+$7,350= $95,256,526
- Mod P001952014-05-27+$16,000= $95,272,526
- Mod P001762014-05-28+$18,818= $95,291,344
- Mod P001832014-05-28+$1,248= $95,292,592
- Mod P001972014-05-28+$12,367= $95,304,959
- Mod P002002014-05-28+$14,007= $95,318,966
- Mod P002012014-05-28+$11,982= $95,330,948
- Mod P002162014-07-09+$3,623= $95,334,571
- Mod P001332014-07-10+$4,958= $95,339,529
- Mod P002032014-07-11+$5,178= $95,344,707
- Mod P002072014-07-24+$8,041= $95,352,748
- Mod P002082014-07-24+$3,000= $95,355,748
- Mod P001922014-08-01+$7,682= $95,363,430
- Mod P002092014-08-01+$3,000= $95,366,430
- Mod P002102014-08-01+$5,413= $95,371,843
- Mod P002172014-11-05+$23,565= $95,395,408
- Mod P002242014-11-24+$28,215= $95,423,623
- Mod P002252014-11-24+$1,587= $95,425,210
- Mod P001982014-12-14-$1,173= $95,424,037
- Mod P002282014-12-15+$8,218= $95,432,255
- Mod P002262014-12-17+$3,688= $95,435,943
- Mod P002332014-12-21+$0= $95,435,943
- Mod P002112014-12-30+$1,400= $95,437,343
- Mod P002132014-12-30+$24,576= $95,461,919
- Mod P002192014-12-30-$3,793= $95,458,126
- Mod P002212014-12-30+$1,563= $95,459,689
- Mod P002272014-12-30-$33,932= $95,425,757
- Mod P002292014-12-30+$2,564= $95,428,321
- Mod P002382015-01-05+$4,723= $95,433,044
- Mod P002442015-01-30+$7,874= $95,440,918
- Mod P002452015-01-30+$7,445= $95,448,363
- Mod P002352015-02-03+$36,195= $95,484,558
- Mod P002312015-02-04+$19,180= $95,503,738
- Mod P002372015-02-04+$10,867= $95,514,605
- Mod P002392015-02-04+$29,699= $95,544,304
- Mod P002432015-02-04+$9,087= $95,553,391
- Mod P002462015-05-06+$15,454= $95,568,845
- Mod P002472015-05-11+$39,450= $95,608,295
- Mod P002502015-05-13+$935= $95,609,230
- Mod P002522015-06-06+$63,928= $95,673,158
- Mod P002492015-06-08+$99,000= $95,772,158
- Mod P002542015-06-09+$22,323= $95,794,481
- Mod P002532015-06-16+$75,000= $95,869,481
- Mod P002552015-06-16+$2,000= $95,871,481
- Mod P002512015-06-30+$29,072= $95,900,553
- Mod P002582015-07-13+$40,000= $95,940,553
- Mod P002592015-08-04+$34,302= $95,974,855
- Mod P002602015-08-05+$20,000= $95,994,855
- Mod P002612015-08-09+$1,654= $95,996,509
- Mod P002622015-08-09+$39,883= $96,036,392
- Mod P002692015-09-09+$56,000= $96,092,392
- Mod P002642015-09-22+$343,601= $96,435,993
- Mod P002562015-09-24+$4,416= $96,440,409
- Mod P002632015-09-24+$5,415= $96,445,824
- Mod P002722015-09-30+$2,354= $96,448,178
- Mod P002732015-10-06+$11,251= $96,459,429
- Mod P002662015-10-21-$12,972= $96,446,457
- Mod P002302015-10-22+$2,800= $96,449,257
- Mod P002362015-10-22+$0= $96,449,257
- Mod P002742015-12-04+$1,859= $96,451,116
- Mod P002792015-12-04+$20,500= $96,471,616
- Mod P002832015-12-04+$7,672= $96,479,288
- Mod P002862015-12-04+$2,926= $96,482,214
- Mod P002872015-12-04+$1,720= $96,483,934
- Mod P002762015-12-15+$147,036= $96,630,970
- Mod P002842015-12-21+$5,425= $96,636,395
- Mod P002852015-12-21-$9,000= $96,627,395
- Mod P002892016-01-21+$12,957= $96,640,352
- Mod P002952016-01-26+$0= $96,640,352
- Mod P002672016-02-02+$39,136= $96,679,488
- Mod P002992016-02-21+$7,000= $96,686,488
- Mod P003002016-03-07+$0= $96,686,488
- Mod P003012016-03-07+$7,630= $96,694,118
- Mod P002222016-03-10+$50,455= $96,744,573
- Mod P003022016-03-10+$15,000= $96,759,573
- Mod P002902016-03-14+$12,200= $96,771,773
- Mod P003042016-03-14+$1,414= $96,773,187
- Mod P002972016-03-17+$5,905= $96,779,092
- Mod P002772016-03-21+$93,882= $96,872,974
- Mod P003062016-03-21+$3,800= $96,876,774
- Mod P002782016-03-22+$2,020= $96,878,794
- Mod P003072016-03-22+$26,578= $96,905,372
- Mod P003092016-03-22+$22,954= $96,928,326
- Mod P002882016-03-30+$37,000= $96,965,326
- Mod P002922016-03-31+$15,795= $96,981,121
- Mod P003032016-04-05+$11,238= $96,992,359
- Mod P003122016-04-05+$11,540= $97,003,899
- Mod P002982016-04-07+$3,913= $97,007,812
- Mod P003132016-04-07+$3,606= $97,011,418
- Mod P002962016-04-11+$0= $97,011,418
- Mod P003112016-04-11+$56,663= $97,068,081
- Mod P003142016-04-13+$99,610= $97,167,691
- Mod P003162016-04-13+$1,400= $97,169,091
- Mod P003102016-04-19+$1,051= $97,170,142
- Mod P003152016-04-19+$10,366= $97,180,508
- Mod P003172016-04-19+$16,719= $97,197,227
- Mod P003182016-04-20+$79,210= $97,276,437
- Mod P003192016-05-04+$4,299= $97,280,736
- Mod P003202016-05-04+$1,000= $97,281,736
- Mod P002822016-05-18+$4,409= $97,286,145
- Mod P003212016-05-18+$3,695= $97,289,840
- Mod P003232016-05-18+$24,069= $97,313,909
- Mod P003242016-05-18+$17,822= $97,331,731
- Mod P003222016-05-20+$16,405= $97,348,136
- Mod P003252016-05-23-$768= $97,347,368
- Mod P002702016-05-24+$8,273= $97,355,641
- Mod P002942016-05-24+$16,500= $97,372,141
- Mod P003272016-05-24+$8,198= $97,380,339
- Mod P002932016-05-25+$43,493= $97,423,832
- Mod P003262016-05-25+$38,662= $97,462,494
- Mod P003282016-05-25+$26,138= $97,488,632
- Mod P003302016-05-31+$88,475= $97,577,107
- Mod P003292016-06-13+$20,914= $97,598,021
- Mod P003342016-06-13+$4,350= $97,602,371
- Mod P003362016-06-13+$12,500= $97,614,871
- Mod P003052016-06-14+$2,178= $97,617,049
- Mod P003372016-06-14+$530= $97,617,579
- Mod P003382016-06-14+$7,664= $97,625,243
- Mod P003392016-06-14+$3,974= $97,629,217
- Mod P003322016-06-15+$43,734= $97,672,951
- Mod P003312016-06-20+$2,322= $97,675,273
- Mod P003352016-06-20+$1,330= $97,676,603
- Mod P003402016-06-21+$4,967= $97,681,570
- Mod P003412016-06-23+$3,055= $97,684,625
- Mod P003422016-06-24+$9,096= $97,693,721
- Mod P003432016-06-30+$28,516= $97,722,237
- Mod P003442016-06-30+$6,203= $97,728,440
- Mod P003462016-07-07+$1,578= $97,730,018
- Mod P003452016-07-11+$57,521= $97,787,539
- Mod P003472016-07-11+$2,000= $97,789,539
- Mod P003332016-07-18+$33,994= $97,823,533
- Mod P003492016-07-20+$80,264= $97,903,797
- Mod P003502016-07-29+$11,327= $97,915,124
- Mod P003522016-07-29+$14,660= $97,929,784
- Mod P003532016-07-29+$0= $97,929,784
- Mod P003542016-07-29-$137= $97,929,647
- Mod P003562016-08-16+$44,714= $97,974,361
- Mod P003482016-08-17+$2,509= $97,976,870
- Mod P003552016-08-17+$0= $97,976,870
- Mod P003572016-08-19+$0= $97,976,870
- Mod P003582016-08-23+$923= $97,977,793
- Mod P003592016-08-26+$44,464= $98,022,257
- Mod P003602016-09-07+$72,502= $98,094,759
- Mod P003612016-09-08+$1,934= $98,096,693
- Mod P003642016-09-20+$2,163= $98,098,856
- Mod P003622016-09-26+$53,557= $98,152,413
- Mod P003662016-09-27+$1,068= $98,153,481
- Mod P003082016-10-05+$21,073= $98,174,554
- Mod P003652016-10-12+$4,130= $98,178,684
- Mod P003672016-10-12-$583= $98,178,101
- Mod P003632016-10-14+$1,982= $98,180,083
- Mod P003712016-10-15+$210,902= $98,390,985
- Mod P003682016-10-17+$3,268= $98,394,253
- Mod P003692016-10-17+$2,736= $98,396,989
- Mod P003702016-10-20+$26,035= $98,423,024
- Mod P003742016-10-28+$0= $98,423,024
- Mod P003752016-11-21+$45,640= $98,468,664
- Mod P003762016-11-22-$7,700= $98,460,964
- Mod P003772016-12-01+$3,506= $98,464,470
- Mod P003782016-12-01+$665= $98,465,135
- Mod P003802016-12-08+$22,757= $98,487,892
- Mod P003792016-12-19+$78,542= $98,566,434
- Mod P003722016-12-21+$5,000= $98,571,434
- Mod P003822016-12-21+$1,400= $98,572,834
- Mod P003732017-01-09+$30,783= $98,603,617
- Mod P003812017-01-09+$50,687= $98,654,304
- Mod P003832017-01-11+$33,302= $98,687,606
- Mod P003852017-01-24+$30,000= $98,717,606
- Mod P003862017-01-24+$15,094= $98,732,700
- Mod P003872017-01-26+$12,885= $98,745,585
- Mod P003882017-06-05+$3,525,000= $102,270,585
- Mod P003892017-12-12+$6,975,000= $109,245,585
- Mod P003902018-03-08+$82,379= $109,327,964
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2011-03-31 | +$91,989,000 | $91,989,000 | CONSTRUCTION OF BAY PINES INPATIENT OUTPATIENT IMPROVEMENTS, MENTAL HEALTH ADDITION AT BAY PINE, VAMC, PROJECT… |
| Mod CO01B· CHANGE ORDER | 2011-08-29 | +$10,000 | $91,999,000 | TO COMPENSATE CONTRACTOR FOR PROVIDING A NEW PERMANENT POWER FEED FOR STREET LIGHTS AFFECTED BY DEMOLITION INS… |
| Mod CO01A· CHANGE ORDER | 2011-09-23 | +$0 | $91,999,000 | TO COMPENSATE CONTRACTOR FOR PROVIDING TWO CRUSHED CONCRETE PARKING LOTS IN LIEU OF THE CONTRACT REQUIRED B1 T… |
| Mod SA001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-08 | +$0 | $91,999,000 | TO PERMIT THE CONTRACTOR TO HAVE STEEL STRUCTURAL ELEMENTS MANUFACTURED AND STORED IN AN APPROVED OFF-SITE LOC… |
| Mod CO01D· CHANGE ORDER | 2011-12-30 | +$25,000 | $92,024,000 | TO COMPENSATE THE CONTRACTOR FOR THE REMOVAL AND RELOCATION OF EXISTING CHILLED WATER PIPING TO A HIGHER ELEVA… |
| Mod CO01E· CHANGE ORDER | 2012-02-15 | +$25,000 | $92,049,000 | TO COMPENSATE THE CONTRACTOR FOR PROVIDING AND INSTALLING ADDITIONAL REINFORCING STEEL IN GRADE BEAMS AND COLU… |
| Mod CO01F· CHANGE ORDER | 2012-02-28 | +$0 | $92,049,000 | TO PROVIDE DIRECTION TO AND COMPENSATION FOR THE INSTALLATION OF TWO (2) MICRO PILES IN LIEU OF CAISSONS LOCA… |
| Mod SA002· CHANGE ORDER | 2012-03-26 | +$0 | $92,049,000 | TO PERMIT THE CONTRACTOR TO HAVE ALL CAST IRON PLUMBING PIPE AND ASSOCIATED FITTINGS MANUFACTURED AND STORED I… |
| Mod CO01G· CHANGE ORDER | 2012-04-10 | +$0 | $92,049,000 | REROUTE NEW EXTERIOR MEDICAL OXYGEN SUPPLY LINE FROM THAT ROUTE SHOWN IN THE CONTRACT TO AVOID RUNNING THROUGH… |
| Mod CO01H· CHANGE ORDER | 2012-04-12 | +$0 | $92,049,000 | TO PROVIDE DIRECTION TO THE CONTRACTOR INVOLVING A CHANGE IN SPECIFIED MATERIALS AND TO AVOID DELAYS IN THE IN… |
| Mod SA003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-05-03 | +$20,267 | $92,069,267 | TO COMPENSATE THE CONTRACTOR FOR THE ADDITIONAL WORK REQUIRED TO STABILIZE THE SOIL AT THE CONTRACTOR'S LAYDOW… |
| Mod SA004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-05 | +$63,185 | $92,132,452 | THE ORIGINAL CONTRACT DOCUMENTS SHOWED CHILLED WATER PIPE CONNECTIONS FOR FUTURE IN THE STREET WHERE THE CHILL… |
| Mod SA005· CHANGE ORDER | 2012-06-05 | +$1,317 | $92,133,769 | DUE TO CONSTRUCTION ADDITIONAL LIGHTING WAS NEEDED IN SOME OF THE ROADWAY AREAS OUTSIDE BUILDING 20. THIS SA… |
| Mod SA006· CHANGE ORDER | 2012-06-05 | +$3,986 | $92,137,755 | THE ORIGINAL CONTRACT DOCUMENTS SHOWED A POWER SCISSOR LIFT AT THE LOADING DOC OF THE CEP. HOWEVER THE ELECTR… |
| Mod SA007· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-06 | +$2,751 | $92,140,506 | DURING CONSTRUCTION IT WAS DISCOVERED THAT THERE WAS A LARGE SOIL VOID BENEATH ONE OF THE EXISTING ELECTRICAL… |
| Mod SA011· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-07-17 | +$2,871 | $92,143,377 | TO COMPENSATE THE CONTRACTOR FOR LOWERING FIVE (5) EXISTING CONDUITS, TO A NEW LOWER ELEVATION, TO ENABLE THE… |
| Mod 2· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-08-07 | +$9,090 | $92,152,467 | TO COMPENSATE THE CONTRACTOR FOR THE REMOVAL AND RELOCATION OF EXISTING CHILLED WATER PIPING TO A HIGHER ELEVA… |
| Mod SA008· CHANGE ORDER | 2012-08-08 | +$833 | $92,153,300 | DELETE THE MANHOLE LADDERS IN ALL MANHOLES LESS THAN FOUR (4) FEET DEEP AND DELETE THE METALIC RACK AND ARMS I… |
| Mod SA009· CHANGE ORDER | 2012-08-08 | +$4,385 | $92,157,685 | TO COMPENSATE THE CONTRACTOR FOR MODIFYING THE TEMPORARY RAMP TO PERMIT THE USE OF GURNEYS ON THE RAMP. |
| Mod SA010· CHANGE ORDER | 2012-08-08 | +$6,321 | $92,164,006 | TO COMPENSATE THE CONTRACTOR FOR THE INSTALLATION OF 2 ADDITIONAL 6' PVC ELECTRICAL CONDUITS FOR FUTURE CONNEC… |
| Mod SA012· CHANGE ORDER | 2012-08-08 | +$1,475 | $92,165,481 | IN REVIEWING THE CONTRACT DOCUMENTS, THE CONTRACTOR SUGGESTED A WAY OF REROUTING SOME DRAIN PIPING UNDERGROUND… |
| Mod SA013· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-08-08 | +$9,090 | $92,174,571 | TO COMPENSATE THE CONTRACTOR FOR THE REMOVAL AND RELOCATION OF EXISTING CHILLED WATER PIPING TO A HIGHER ELEVA… |
| Mod SA014· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-08-21 | +$23,241 | $92,197,812 | TO COMPENSATE THE CONTRACTOR FOR THE REMOVAL AND RELOCATION OF EXISTING CHILLED WATER PIPING TO A HIGHER ELEVA… |
| Mod SA015· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-08-21 | +$27,871 | $92,225,683 | TO COMPENSATE THE CONTRACTOR FOR THE REMOVAL AND RELOCATION OF EXISTING CHILLED WATER PIPING TO A HIGHER ELEVA… |
| Mod CO01K· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-09-27 | +$60,000 | $92,285,683 | TO COMPENSATE CONTRACTOR FOR RENTING TWO 18,000 GALLON STORAGE TANKS TO HOLD CONTAMINATED GROUNDWATER UNTIL WA… |
| Mod SA019· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-09-27 | +$20,202 | $92,305,885 | IN PREPARING TO RUN A NEW STORM DRAIN ON THE SITE IT WAS DISCOVERED THAT BOTH AND EXISTING FORCED SEWER MAIN… |
| Mod SA020· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-09-27 | +$34,448 | $92,340,333 | ON APRIL 26, 2012 IT WAS DISCOVERED THAT ABOUT 260 FEET OF 12" WATER MAIN THAT HAD BEEN SHOWN AS EXISTING HAD… |
| Mod SA021· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-09-27 | +$9,602 | $92,349,935 | THE CONTRACTOR ASKED WHERE TO LOCATE THE FIRE DEPARTMENT CONNECTION FOR THE WAREHOUSE FIRE SPRINKLER SYSTEM.… |
| Mod SA022· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-09-27 | +$5,504 | $92,355,439 | THE SUBMITTAL FOR IRRIGATION PIPE WAS APPROVED BY BOTH THE A/E AND RE OFFICES DESPITE HAVING PLAINLY WRITTEN… |
| Mod SA024· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-09-27 | +$11,908 | $92,367,347 | THE ORIGINAL CONTRACT DOCUMENTS SHOWED WHAT APPEARED TO BE A DOCK LEVELER ON THE EAST SIDE OF THE NEW WAREHOU… |
| Mod CO01N· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-12-06 | +$3,000 | $92,370,347 | THE CURRENT CONFIGURATION OF THE SECURITY FENCE AROUND THE WAREHOUSE MADE IT DIFFICULT TO SERVICE AND ENGINEER… |
| Mod SA025· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-12-10 | +$30,316 | $92,400,663 | THE ORIGINAL CONTRACT DOCUMENTS SHOWED WHAT APPEARED TO BE A DOCK LEVELER ON THE EAST SIDE OF THE NEW WAREHOU… |
| Mod SA027· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-01-02 | +$6,349 | $92,407,012 | TO COMPENSATE CONTRACTOR FOR DEMOLITION OF A THICKENED CONCRETE SLAB THAT CONTRACT DOCUMENTS REFERRED TO AS A… |
| Mod SA028· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-01-02 | +$3,045 | $92,410,057 | TO COMPENSATE CONTRACTOR FOR PROVIDING A NEW PERMANENT POWER FEED FOR STREET LIGHTS AFFECTED BY DEMOLITION INS… |
| Mod SA029· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-01-02 | +$1,748 | $92,411,805 | TO COMPENSATE CONTRACTOR FOR MODIFYING NEW STORM STRUCTURE STC 7 TO MATCH EXISTING GRADE OF 8.9 |
| Mod SA026· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-01-15 | +$29,513 | $92,441,318 | DURING INSTALLATION OF THE 18" UNDERGROUND PIPING A STORM SEWER PIPE WAS DISCOVERED THAT MADE THE INSTALLATION… |
| Mod CO01O· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-01-21 | +$2,000 | $92,443,318 | THE CONTRACT DOCUMENTS SHOWED A CEILING EXHAUST IN THE TWO MEDICAL GAS ROOMS ON THE PROJECT. NFPA 99 INDICAT… |
| Mod P00005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-01-25 | +$717,876 | $93,161,194 | THE ORIGINAL CONTRACT DOCUMENTS SHOWED WHAT APPEARED TO BE A DOCK LEVELER ON THE EAST SIDE OF THE NEW WAREHOU… |
| Mod P00007· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-02-05 | +$10,000 | $93,171,194 | TO COMPENSATE CONTRACTOR FOR ADDING LIGHTWEIGHT CONCRETE REINFORCEMENT TO BLG 101 ROOF SO STEAM SUPPORTS CAN B… |
| Mod P00008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-02-05 | +$6,349 | $93,177,543 | THE ORIGINAL CONTRACT DOCUMENTS SHOWED WHAT APPEARED TO BE A DOCK LEVELER ON THE EAST SIDE OF THE NEW WAREHOU… |
| Mod SA030· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-02-07 | +$8,417 | $93,185,960 | TO COMPENSATE CONTRACTOR FOR DOWNTIME CAUSED BY VAMC NOT BEING ABLE TO SHUTDOWN A WATER MAIN. |
| Mod P00006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-02-12 | +$10,000 | $93,195,960 | TO COMPENSATE CONTRACTOR FOR RELOCATING IRRIGATION MAIN AND CONTROLS TO OUTSIDE THE POND EXPANSION'S FOOTPRINT… |
| Mod P00011· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-02-12 | +$2,365 | $93,198,325 | THE ORIGINAL CONTRACT DOCUMENTS DID NOT HAVE A TAMPER SWITCH ON THE VALVE ON THE FIRE PROTECTION WATER MAIN FO… |
| Mod P00015· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-02-13 | +$12,928 | $93,211,253 | IT WAS DETERMINED THAT THE WAREHOUSE SITE LIGHTING FOOT CANDLE REQUIREMENT COULD NOT BE MET WITH THE TYPE OF… |
| Mod P00009· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-02-21 | +$58,016 | $93,269,269 | TO COMPENSATE THE CONTRACTOR FOR INSTALLING BUCKETS, RELAYS, METERING AND CT'S AND LIGHTNING PROTECTION TO MAK… |
| Mod P00010· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-02-21 | +$2,703 | $93,271,972 | THE ORIGINAL CONTRACT DOCUMENTS OMITTED ELECTRICAL POWER FOR 2 OVERHEAD DOORS. THIS MODIFICATION AUTHORIZES… |
| Mod P00012· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-02-21 | +$2,479 | $93,274,451 | THE ORIGINAL CONTRACT DOCUMENTS DID NOT SHOW ANY ELECTRICAL POWER FOR THE TRAP PRIMERS AND THE NITROUS OXIDE M… |
| Mod P00013· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-02-21 | +$3,571 | $93,278,022 | WHEN COORDINATION DRAWINGS FOR AHU-14 THERE WERE COMPLETED 5 EXISTING LIGHT FIXTURES CONFLICTED WITH THE NEW D… |
| Mod P00018· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-02-25 | +$2,145 | $93,280,167 | THE ORIGINAL CONTRACT DOCUMENTS DID NOT SHOW ANY ELECTRICAL POWER FOR THE BAS PANELS OR THE SHUNT TRIP RELAY I… |
| Mod CO01L· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-03-05 | +$26,092 | $93,306,259 | THE ORIGINAL CONTRACT SPECIFICATIONS CALLED FOR P-107 TO BE ASME A 112.9.2M TYPE TOILET FIXTURE. THE DRAWINGS… |
| Mod CO01M· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-03-05 | +$26,092 | $93,332,351 | THE ORIGINAL CONTRACT SPECIFICATIONS CALLED FOR P-107 TO BE ASME A 112.9.2M TYPE TOILET FIXTURE. THE DRAWINGS… |
| Mod P00019· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-03-07 | +$14,655 | $93,347,006 | THE ORIGINAL CONTRACT DOCUMENTS DID NOT SHOW ANY ELECTRICAL POWER FOR THE BAS PANELS OR THE SHUNT TRIP RELAY I… |
| Mod P00020· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-03-07 | +$26,092 | $93,373,098 | THE ORIGINAL CONTRACT SPECIFICATIONS CALLED FOR P-107 TO BE ASME A 112.9.2M TYPE TOILET FIXTURE. THE DRAWINGS… |
| Mod P00022· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-03-07 | +$4,420 | $93,377,518 | TO COMPENSATE CONTRACTOR FOR DEMOLISHING AN EXISTING PILE CAP TO ALLOW FOR NEW GRADE BEAMS TO BE INSTALLED PER… |
| Mod P00023· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-03-07 | +$0 | $93,377,518 | TO COMPENSATE CONTRACTOR FOR DEMOLISHING AN EXISTING PILE CAP TO ALLOW FOR NEW GRADE BEAMS TO BE INSTALLED PER… |
| Mod P00016· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-03-11 | +$2,145 | $93,379,663 | THE ORIGINAL CONTRACT DOCUMENTS DID NOT SHOW ANY ELECTRICAL POWER FOR THE BAS PANELS OR THE SHUNT TRIP RELAY I… |
| Mod P00021· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-03-11 | +$15,000 | $93,394,663 | TO COMPENSATE CONTRACTOR FOR ADDITIONAL OFFICE SUPPORT REQUIRED BY UTILIZING TRIRIGA, THE COMPUTER SOFTWARE PR… |
| Mod P00024· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-03-11 | +$5,000 | $93,399,663 | TO COMPENSATE THE CONTRACTOR FOR A PARTIAL SELECTIVE DEMOLITION OF THE WEST CEP RAMP, IN ORDER TO CONNECT DOME… |
| Mod P00025· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-03-11 | +$5,000 | $93,404,663 | TO COMPENSATE CONTRACTOR FOR INSTALLING A RETAINING WALL AND GUARDRAIL NOT SHOWN IN THE CONTRACT. |
| Mod SA016· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-03-11 | +$14,064 | $93,418,727 | TO COMPENSATE CONTRACTOR FOR INSTALLING #5 TEMPERATURE BARS IN ALL 12 INCH SLABS WITHIN THE WAREHOUSE AND CEP… |
| Mod P00026· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-03-13 | +$25,000 | $93,443,727 | TO COMPENSATE CONTRACTOR FOR PROCURING AND INSTALLING STEAM VALVES AT THE EXISTING VAMC BOILER ROOM HEADER DUE… |
| Mod P00027· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-03-26 | +$63,103 | $93,506,830 | TO COMPENSATE CONTRACTOR FOR ADDING AN ADDITIONAL 3 PHASE FEED TO EACH CHILLER PER RFI 440&460. |
| Mod P00028· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-04-01 | +$6,122 | $93,512,952 | AFTER THE START OF THIS PROJECT THE MEDICAL CENTER ISSUED A CONTRACT TO UPGRADE THE SECURITY CARD READER SYSTE… |
| Mod P00032· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-04-09 | +$15,581 | $93,528,533 | THE CONTRACT DOCUMENTS DID NOT SHOW ELECTRICAL POWER OR HAD THE WRONG TYPE OF ELECTRICAL RUNNING TO SEVERAL PI… |
| Mod P00029· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-04-19 | +$3,850 | $93,532,383 | DURING REVIEW OF THE CONTRACT DOCUMENTS IT WAS DISCOVERED THAT NO ELECTRICAL POWER CIRCUITS WERE SHOWN TO POWE… |
| Mod PO0033· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-04-23 | +$59,050 | $93,591,433 | TO COMPENSATE THE CONTRACTOR FOR INSTALLING MICRO-PILES IN LIEU OF DRILLED SHAFTS. |
| Mod P00034· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-04-25 | +$5,000 | $93,596,433 | TO COMPENSATE CONTRACTOR FOR PROPERLY HANDLING AND DISPOSING OF TRANSITE PIPE THAT WAS DISCOVERED WHILE EXCAVA… |
| Mod P00036· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-05-02 | +$30,478 | $93,626,911 | THERE ARE FOUR (4) INDEPENDENT COOLING WER MODULES ON THE PROJECT. IT WAS THE MANUFACTURER'S RECOMMENDATION TH… |
| Mod P0038· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-05-02 | +$95,000 | $93,721,911 | TO COMPENSATE CONTRACTOR FOR ADDITIONAL COMMUNICATION CABLING TO ELIMINATE SPLICES IN THE MANHOLES AND PROVIDE… |
| Mod P00030· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-05-06 | +$2,036 | $93,723,947 | THE CONTRACT DOCUMENTS SHOWED A CEILING EXHAUST IN THE TWO MEDICAL GAS ROOMS ON THE PROJECT. NFPA 99 INDICAT… |
| Mod P00035· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-05-06 | +$4,219 | $93,728,166 | THE ORIGINAL CONTRACT DOCUMENTS DID NOT SHOW ELECTRIC POWER CIRCUITS FOR THE FIRE PROTECTION AIR COMPRESSOR I… |
| Mod P00037· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-05-08 | +$8,536 | $93,736,702 | THE REQUIRED FIRE RATED CEILING WAS NOT SHOWN ON THE CONTRACT DOCUMENTS FOR SOILED WASTE ROOM 1A-119 IN THE WA… |
| Mod P0041· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-05-10 | +$23,615 | $93,760,317 | TO COMPENSATE CONTRACTOR FOR RENTING TWO (2) 18,000 GALLON STORAGE TANKS TO HOLD CONTAMINATED GROUNDWATER UNTI… |
| Mod P00043· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-05-22 | +$6,081 | $93,766,398 | THE EXISTING NATURAL GAS LINE NEEDED TO BE RELOCATED TO GO AROUND THE NEW MHA. MOST OF THE RELOCATION WAS HAN… |
| Mod P00031· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-05-23 | +$878 | $93,767,276 | THERE WAS A CONFLICT IN THE CONTRACT DOCUMENTS OVER WHICH TYPE OF INSULATION FINISH WAS TO BE INSTALLED ON EXP… |
| Mod P00045· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-05-23 | +$2,846 | $93,770,122 | THE ORIGINAL CONTRACT DOCUMENTS SHOWED A DETAIL FOR THE STUCCO AT THE 02 FARM THAT PRESENTED PROBLEMS WITH WAT… |
| Mod P00046· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-05-23 | +$2,192 | $93,772,314 | THE ORIGINAL CONTRACT DOCUMENTS DID NOT SHOW REMOVAL OF AN EXISTING UNDERGROUND FLAMMABLE WASTE STORAGE TANK… |
| Mod P00051· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-05-23 | +$19,243 | $93,791,557 | TO COMPENSATE CONTRACTOR FOR REROUTING STORM AND WATER LINES DUE TO EXISTING ELECTRICAL LINES PER RFI 108. |
| Mod P00052· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-05-23 | +$37,386 | $93,828,943 | TO COMPENSATE CONTRACTOR FOR RELOCATING A FIRE HYDRANT, REPLACING CLAY SEWER PIPE WITH DUCTIL IRON, REROUTING… |
| Mod P00053· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-05-23 | +$20,594 | $93,849,537 | TO COMPENSATE CONTRACTOR FOR INSTALLING AN ADDITIONAL CONCRETE ENCASED CONDUIT FROM MH 15A TO T-71 PER RFI 316… |
| Mod P00048· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-05-28 | +$11,600 | $93,861,137 | HE ORIGINAL CONTRACT DOCUMENTS SHOWED THE ENGINE GENERATOR EXHAUST EXITING THE BUILDING AT A HORIZONTAL ANGLE… |
| Mod P00054· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-05-28 | +$42,135 | $93,903,272 | TO COMPENSATE CONTRACTOR FOR ADDING A 260 AMP ATS AND ALL ASSOCIATED CONNECTIONS PER RFI 196A. |
| Mod P00056· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-05-28 | +$30,215 | $93,933,487 | TO COMPENSATE CONTRACTOR FOR ADDING EXTRA ELECTRICAL PROVISIONS PER RFI-00141 FOR GATE #6 |
| Mod P00057· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-05-28 | +$49,617 | $93,983,104 | TO COMPENSATE CONTRACTOR FOR CONNECTING THE EAST LOOP FEEDERS TO THE CORRECT SWITCHGEAR AS CLARIFIED IN RFI 00… |
| Mod P00049· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-05-29 | +$6,094 | $93,989,198 | THE ORIGINAL CONTRACT DOCUMENTS SHOWED SOME FUTURE PIPING ENDING IN A SHAFT IN THE PENTHOUSE. IT WAS DECIDED… |
| Mod P00014· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-06-03 | +$1,869 | $93,991,067 | WHEN COORDINATION DRAWINGS FOR AHU-14 THERE WERE COMPLETED 5 EXISTING LIGHT FIXTURES CONFLICTED WITH THE NEW D… |
| Mod P00059· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-06-04 | +$11,224 | $94,002,291 | TO COMPENSATE THE CONTRACTOR FOR THE INSTALLATION OF A NEW FIBER RUN FROM THE TWTC PULL BOX OUTSIDE OG BLDG. 2… |
| Mod P00058· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-06-05 | +$1,262 | $94,003,553 | TO COMPENSATE CONTRACTOR FOR AN ADDITIONAL STRUCTURAL BEAM PER RFI 282. |
| Mod PO060· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-06-05 | +$500 | $94,004,053 | TO COMPENSATE THE CONTRACTOR FOR THE FORMING, POURING AND FINISHING OF A CONCRETE PAD (4'X9'X4") TO SUPPORT TH… |
| Mod P00039· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-06-13 | +$6,736 | $94,010,789 | THE ORIGINAL CONTRACT DOCUMENTS DID NOT SHOW A HAND RAIL ALONG THE HANDICAP RAMP ON THE EAST END OF THE WAREH… |
| Mod P00061· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-06-13 | +$3,568 | $94,014,357 | THE ORIGINAL CONTRACT DOCUMENTS DID NOT SHOW PROTECTIVE BOLLARDS AT THE CARD READERS AT THE WAREHOUSE. THIS P… |
| Mod P00044· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-06-17 | +$3,565 | $94,017,922 | THE ASI-003G REVISION TO THE CONTRACT DRAWINGS ADDED A BUILDING EXPANSION JOINT AT COLUMN LINE 22.8 BETWEEN… |
| Mod P00063· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-06-17 | +$1,735 | $94,019,657 | THE ORIGINAL CONTRACT DOCUMENTS DID NOT SHOW ELECTRICAL POWER FOR SEVERAL BATHROOM FIXTURES. THE DEVICES WON'T… |
| Mod P00065· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-06-17 | +$2,865 | $94,022,522 | TO COMPENSATE CONTRACTOR FOR CONNECTING THE EAST LOOP FEEDERS TO THE CORRECT SWITCHGEAR AS CLARIFIED IN RFI 00… |
| Mod P00068· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-06-25 | +$1,536 | $94,024,058 | THE ORIGINAL CONTRACT DOCUMENTS WERE UNCLEAR ON SEVERAL DIMENSIONS AND RFI-253 CLARIFIED MOST. HOWEVER PER RF… |
| Mod P00069· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-06-28 | +$1,000 | $94,025,058 | AN ABANDONED STEAM AND CONDENSATE PIPE WAS FOUND ON THE SITE UNDER THE FUTURE MHA. THE PIPE DOES SHOW ON THE… |
| Mod P00070· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-06-28 | +$5,443 | $94,030,501 | THE ORIGINAL CONTRACT DOCUMENTS SHOWED A LOCATION OF AHU-14 WHICH CONFLICTS WITH THE LOCATION OF A N EXISTING… |
| Mod P00071· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-07-09 | +$41,615 | $94,072,116 | TO COMPENSATE CONTRACTOR FOR RELOCATING CONTROL WIRING TO 4 GENERATORS FEEDING BLG 101, 71, 1 AND 22. THIS CO… |
| Mod P00072· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-07-09 | +$3,427 | $94,075,543 | WHILE INSTALLING THE NEW IRRIGATION PIPING SEVERAL ITEMS WERE DISCOVERED THAT WERE NOT WHAT WAS DEPICTED ON TH… |
| Mod P00055· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-07-12 | +$12,160 | $94,087,703 | TO COMPENSATE CONTRACTOR FOR ADDING DOOR HARDWARE, AS DIRECTED BY THE GOVERNMENT'S ARCHITECT IN RFI-00522. A… |
| Mod P00066· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-07-12 | +$19,759 | $94,107,462 | TO COMPENSATE CONTRACTOR FOR ADDING DOOR HARDWARE TO FOUR DOORS AS DIRECTED BY THE GOVERNMENT'S ARCHITECT IN R… |
| Mod PO062· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-07-12 | +$0 | $94,107,462 | THE CONTRACT DOCUMENTS SHOWED THAT THE GAS LINE FEED TO THE HOSPITAL WOULD BE RELOCATED BY THE LOCAL UTILITY (… |
| Mod P00073· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-07-17 | +$0 | $94,107,462 | THE CONTRACT DOCUMENTS SHOWED THAT THE GAS LINE FEED TO THE HOSPITAL WOULD BE RELOCATED BY THE LOCAL UTILITY (… |
| Mod P00075· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-07-22 | +$1,935 | $94,109,397 | THE ORIGINAL PLAN FOR THE MHA BUILDING PRESCRIBED A GRAVEL WALK WAY FROM THE REAR EMERGENCY EXIT TO THE STREET… |
| Mod P00076· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-07-22 | +$23,961 | $94,133,358 | THE CONTRACTOR WILL MAKE THE ARC FLASH STUDY AND WILL INSTALL LABELS ON ALL NEW EQUIPMENTS FOR THIS PROJECT. |
| Mod P00078· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-07-22 | +$524 | $94,133,882 | THE SOUTH RAMP TO THE WAREHOUSE HAD TO BE ADJUSTED TO MATCH THE ADJACENT ASPHALT. ALSO, THE ELEVATION OF STOR… |
| Mod P00079· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-07-22 | +$47,421 | $94,181,303 | TO COMPENSATE CONTRACTOR FOR ADDITIONAL WORK DETAILED IN THE ARCHITECTUAL SUPPLEMENTAL INFORMATION 003A. ADDI… |
| Mod P00080· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-07-24 | +$1,042 | $94,182,345 | THIS CHANGE IS FOR ADDING SUPPORT STEEL TO A SECTION OF SLAB, WHERE NONE WAS SHOWN PREVIOUSLY, ABOVE THE SOUTH… |
| Mod P00081· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-07-25 | +$2,020 | $94,184,365 | TO COMPENSATE CONTRACTOR FOR DESIGNING AND BUILDING A FLASHING AND COUNTER-FLASHING DETAIL, AS DIRECTED BY THE… |
| Mod P00082· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-07-25 | +$1,249 | $94,185,614 | TO COMPENSATE THE CONTRACTOR FOR RESURVEYING THE BENCHMARKS AND DOCUMENTING THE OUTSIDE CORNERS OF THE MHA BUI… |
| Mod P00083· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-07-25 | +$991 | $94,186,605 | THE PURPOSE OF THIS CHANGE IS TO TIE IN GRADE BEAMS TO THE EXSISTING STRUCTURE. THEY WERE PREVIOUSLY SHOWN AS… |
| Mod P00084· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-07-25 | +$991 | $94,187,596 | THE PURPOSE OF THIS CHANGE IS TO TIE IN GRADE BEAMS TO THE EXSISTING STRUCTURE. THEY WERE PREVIOUSLY SHOWN AS… |
| Mod P00085· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-07-30 | +$16,546 | $94,204,142 | TO COMPENSATE CONTRACTOR FOR ADDING/CHANGING/DELETING DOORS, FRAMES AND DOOR HARDWARE, INCLUDING ADDED FIRE RA… |
| Mod P0067· CHANGE ORDER | 2013-07-30 | +$0 | $94,204,142 | P0067 ISSUED TO EXTEND THE CONTRACT POP 53 DAYS FOR DIFFERING SITE CONDITIONS RELATED TO ASI-001&ASI-002. |
| Mod P00086· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-08-01 | +$7,286 | $94,211,428 | THE ORIGINAL CONTRACT DOCUMENTS SHOWED THE REFRIGERANT RELIEF PIPING AS BEING MANIFOLDED INTO ONE DRIP LEG.… |
| Mod P00088· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-08-01 | +$3,282 | $94,214,710 | THE ORIGINAL CONTRACT DOCUMENTS SHOWED AN UNDERGROUND TIE-IN TO AN EXISTING 8 INCH ROOF DRAIN LINE. WHEN THE… |
| Mod P00090· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-08-01 | +$63,027 | $94,277,737 | THE ORIGINAL CONTRACT DOCUMENTS SHOWED THE REFRIGERANT RELIEF PIPING AS BEING MANIFOLDED INTO ONE DRIP LEG.… |
| Mod P00091· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-08-01 | +$4,981 | $94,282,718 | THE ORIGINAL CONTRACT DOCUMENTS SHOWED THE REFRIGERANT RELIEF PIPING AS BEING MANIFOLDED INTO ONE DRIP LEG.… |
| Mod P00092· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-08-01 | +$3,749 | $94,286,467 | THE ORIGINAL CONTRACT DOCUMENTS SHOWED THE REFRIGERANT RELIEF PIPING AS BEING MANIFOLDED INTO ONE DRIP LEG.… |
| Mod P00094· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-08-02 | +$12,160 | $94,298,627 | THE ORIGINAL CONTRACT DOCUMENTS SHOWED THE REFRIGERANT RELIEF PIPING AS BEING MANIFOLDED INTO ONE DRIP LEG.… |
| Mod P00100· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-08-05 | +$12,160 | $94,310,787 | THE ORIGINAL CONTRACT DOCUMENTS SHOWED THE REFRIGERANT RELIEF PIPING AS BEING MANIFOLDED INTO ONE DRIP LEG.… |
| Mod P00095· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-08-06 | +$96,266 | $94,407,053 | TO COMPENSATE CONTRACTOR FOR INSTALLING ALL ADDITIONAL WORK ASSOCIATED WITH ASI-003B. |
| Mod P00096· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-08-06 | +$18,070 | $94,425,123 | THE ORIGINAL CONTRACT DOCUMENTS SHOWED THE REFRIGERANT RELIEF PIPING AS BEING MANIFOLDED INTO ONE DRIP LEG.… |
| Mod P00098· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-08-06 | +$12,160 | $94,437,283 | THE ORIGINAL CONTRACT DOCUMENTS SHOWED THE REFRIGERANT RELIEF PIPING AS BEING MANIFOLDED INTO ONE DRIP LEG.… |
| Mod P00099· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-08-06 | +$64,217 | $94,501,500 | THE ORIGINAL CONTRACT DOCUMENTS SHOWED THE REFRIGERANT RELIEF PIPING AS BEING MANIFOLDED INTO ONE DRIP LEG.… |
| Mod P00101· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-08-06 | +$1,899 | $94,503,399 | THE ORIGINAL CONTRACT DOCUMENTS SHOWED THE REFRIGERANT RELIEF PIPING AS BEING MANIFOLDED INTO ONE DRIP LEG.… |
| Mod P00102· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-08-07 | +$34,893 | $94,538,292 | THE ORIGINAL CONTRACT DOCUMENTS SHOWED THE FUEL OIL PIPES ENTERING THE GENERATOR ROOM IN FIBERGLASS LINE PITS.… |
| Mod P00093· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED) | 2013-08-13 | +$1,719 | $94,540,011 | MECHANIC DESIGN DRAWINGS SHOW BOTH E F BUT ELECTRICAL DRAWING DO NOT SHOW ANY INFORMATION FOR POWER OR CONNECT… |
| Mod P00103· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED) | 2013-08-13 | +$10,000 | $94,550,011 | THE REMOVAL OF ABANDONED DIESEL FUEL OIL TANKS AND THE SUBSEQUENT SOILS TESTING REVEALED THAT THERE WAS HIGH L… |
| Mod P00104· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED) | 2013-08-15 | +$10,000 | $94,560,011 | THE REMOVAL OF ABANDONED DIESEL FUEL OIL TANKS AND THE SUBSEQUENT SOILS TESTING REVEALED THAT THERE WAS HIGH L… |
| Mod P00105· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED) | 2013-08-16 | +$3,023 | $94,563,034 | TO COMPENSATE THE CONTRACTOR FOR CUTTING REBAR AT BASE PLATES AND FURNISHING AND INSTALLING WELDABLE REBAR PER… |
| Mod P00107· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED) | 2013-08-22 | +$40,000 | $94,603,034 | TO COMPENSATE THE CONTRACTOR FOR REMOVING CONTAMINATED SOIL FROM THE SITE TO AN APPROVED LANDFILL. |
| Mod P00109· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED) | 2013-08-28 | +$8,292 | $94,611,326 | TO COMPENSATE THE CONTRACTOR FOR PROVIDING A (STATION REQUEST) BY-PASS ON THE NEW OXYGEN MAIN PIPING SYSTEM T… |
| Mod P00111· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED) | 2013-08-28 | +$2,130 | $94,613,456 | TO COMPENSATE THE CONTRACTOR FOR PROVIDING FLEXIBLE DUCT TO PROVIDE TEMPORARY AIR CONDITIONING TO ROOM 1F-109… |
| Mod P00116· CHANGE ORDER | 2013-08-30 | +$17,605 | $94,631,061 | TO COMPENSATE THE CONTRACTOR FOR THE CONSTRUCTION OF A RAMP AT THE LOADING DOCK OF THE MHA. |
| Mod P00097· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-09-03 | +$118,698 | $94,749,759 | THE ORIGINAL CONTRACT DOCUMENTS SHOWED THE REFRIGERANT RELIEF PIPING AS BEING MANIFOLDED INTO ONE DRIP LEG.… |
| Mod P00038· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-09-05 | −$4,458 | $94,745,301 | TO COMPENSATE THE CONTRACTOR FOR INSTALLING A NEW STEAM VALVE ON THE EXISTING HEADER IN THE BOILER PLANT. |
| Mod P00119· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-09-05 | +$27,286 | $94,772,587 | TO COMPENSATE CONTRACTOR FOR ADDING ADDITIONAL SHIFTS TO THE COMMUNICATION CABLE TERMINATIONS, CUTOVERS AND DE… |
| Mod P00040· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-09-10 | +$8,656 | $94,781,243 | THE ORIGINAL CONTRACT DOCUMENTS SHOWED THE PUMPED COLD CONDENSATE (PCC) FROM THE NEW MHA TO BE DUMPED INTO TH… |
| Mod P00113· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-09-10 | +$7,663 | $94,788,906 | THE ORIGINAL CONTRACT DOCUMENTS SHOWED THE PUMPED COLD CONDENSATE (PCC) FROM THE NEW MHA TO BE DUMPED INTO TH… |
| Mod P00042· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-09-12 | −$4,458 | $94,784,448 | ADD A 6" 300LB FORGED STEEL GLOBE VALVE WITH REPLACEABLE 1" BYPASS VALVES, FLEXITAULIC GASKETS, BOLT KITS AND… |
| Mod P00118· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-09-16 | +$120 | $94,784,568 | WHILE CUTTING THE CONCRETE SLAB FOR THE INSTALLATION OF THE MICROPILES, A STEEL BARREL WAS DISCOVERED UNDER TH… |
| Mod P00122· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-09-16 | +$500 | $94,785,068 | WHILE CUTTING THE CONCRETE SLAB FOR THE INSTALLATION OF THE MICROPILES, A STEEL BARREL WAS DISCOVERED UNDER TH… |
| Mod P00121· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-09-17 | −$936 | $94,784,132 | DELETE STORM LINE UPGRADE REFERENCED IN ZONE 5E OF DRAWING CG2.03. ADD REROUTE OF STORM LINE IN ACCORDANCE WIT… |
| Mod P00123· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-09-17 | +$2,941 | $94,787,073 | INSTALL A TYPE FD-7 DRAIN AT THE SCISSOR LIFT AS SHOWN IN THE RESPONSE TO RFI-5057. |
| Mod P00126· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-09-25 | +$95,000 | $94,882,073 | TO COMPENSATE CONTRACTOR FOR ADDITIONAL WORK ASSOCIATED WITH DESIGN AE'S REVISIONS INCLUDED IN ASI-003H. THIS… |
| Mod PO0124· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-09-26 | −$264 | $94,881,809 | INSTALL A TYPE FD-7 DRAIN AT THE SCISSOR LIFT AS SHOWN IN THE RESPONSE TO RFI-5057. |
| Mod P00125· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-09-27 | +$77,785 | $94,959,594 | INSTALL A TYPE FD-7 DRAIN AT THE SCISSOR LIFT AS SHOWN IN THE RESPONSE TO RFI-5057. |
| Mod P00127· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-10-23 | +$37,260 | $94,996,854 | CONNECT EXISTING 6" AND 8" SANITARY SEWER PIPES FROM THE MEDICAL CENTER, THAT WERE NOT SHOWN ON CONTRACT DOCUM… |
| Mod P00129· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-10-25 | +$20,253 | $95,017,107 | PER A CONTRACTOR REQUEST THE ABOVE GROUND STEAM PIPING THAT WAS CURRENTLY LOCATED ON THE EXISTING PEDWAY, AND… |
| Mod P00130· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-10-25 | +$0 | $95,017,107 | PER A CONTRACTOR REQUEST THE ABOVE GROUND STEAM PIPING THAT WAS CURRENTLY LOCATED ON THE EXISTING PEDWAY, AND… |
| Mod P00141· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-01-03 | +$5,866 | $95,022,973 | PROVIDE ALL MATERIALS, EQUIPMENT AND LABOR TO CHANGE PLUMBING FIXTURE P-514 FROM A WALL TO A FLOOR MOUNT, P-71… |
| Mod P00145· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-01-03 | +$17,757 | $95,040,730 | PROVIDE ADDITIONAL REBAR IN MHA BEAMS IN LIEU OF THE CAMBER ADDED IN ASI-003H. |
| Mod P00132· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-01-09 | +$15,340 | $95,056,070 | PROVIDE ADDITIONAL MED GAS PIPING IN THE CEP IN ORDER TO CONNECT TO THE CORRECT LOCATION OF THE GAS SOURCE. |
| Mod P00138· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-01-10 | +$9,354 | $95,065,424 | PROVIDE ADDITIONAL LOUVERS FOR THE CEP PAINT BOOTH. |
| Mod P00139· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-01-15 | +$1,667 | $95,067,091 | TO COMPENSATE CONTRACTOR FOR RAISING AN EXISTING ROOF DRAIN TO ACCOMODATE BUILDOUT CEILING HEIGHTS IN THE CEP. |
| Mod P00047· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-01-16 | +$6,425 | $95,073,516 | TO COMPENSATE CONTRACTOR FOR PROVIDING ADDITIONAL COOLING TOWER STEEL |
| Mod P00157· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-01-21 | +$50,000 | $95,123,516 | PROVIDE ALL MATERIALS, EQUIPMENT AND LABOR TO PERFORM THE FOLLOWING: 1) ON THE 1ST FLOOR OF THE CEP, BIOMED SH… |
| Mod P00135· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-01-22 | +$5,586 | $95,129,102 | PROVIDE RETAINING WALL AT WAREHOUSE/ELECTRICAL VAULT |
| Mod P00146· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-01-23 | −$18,475 | $95,110,627 | INSTALL UL FIRE RATED SHAFT LINER IN LIEU OF CMU BLOCK IN THE CEP CHILLER AND GENERATOR ROOMS |
| Mod P00087· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-01-29 | −$29,796 | $95,080,831 | TO TAKE A CREDIT FOR NOT INSTALLING BOLLARDS AT THE CEP. |
| Mod P00143· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-01-29 | +$8 | $95,080,839 | REMOVE UNFORESEEN UNDERGROUND BARREL FILLED WITH CONCRETE SO BRIDGE FOUNDATIONS COULD PROCEED. |
| Mod P00131· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-02-11 | +$6,830 | $95,087,669 | PROVIDE ADDITIONAL SITE LIGHTING THAT WAS MISSED IN THE DESIGN DOCUMENTS. |
| Mod P00144· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-02-11 | +$12,557 | $95,100,226 | PROVIDE THE BRIDGE REVISIONS ASSOCIATED WITH RE-RFI-003-ASI |
| Mod P00162· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-02-11 | +$25,000 | $95,125,226 | RECONNECT 3 EXISTING ROOF DRAINS NOT SHOWN IN CONTRACT AS WELL AS CONNECTING THE MHA LOADING DOCK'S SCISSOR LI… |
| Mod P00163· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-02-11 | +$2,444 | $95,127,670 | PROVIDE DOOR CHANGES IN THE CEP PER PAGE 2'S DESCRIPTION OF WORK |
| Mod P00160· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-02-12 | −$5,547 | $95,122,123 | PROVIDE A CREDIT FOR NOT TIE-ING IN THE PUMP CONDENSATE LINE IN THE CEP CHILLER AREA. |
| Mod P00166· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-02-12 | +$2,262 | $95,124,385 | THE ORIGINAL AE SITE PLAN FOR THE NEW MHA BUILDING REQUIRED THE REMOVAL OF MOST OF THE OAK TREES ON SITE. SEV… |
| Mod P00167· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-02-12 | +$6,805 | $95,131,190 | PROVIDE ADDITIONAL ROOF FLASHING AT MHA NOT SHOWN IN THE DOCUMENTS. |
| Mod P00173· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-02-13 | +$30,000 | $95,161,190 | PROVIDE CONNECTIONS FOR BLG 100 SANITARY PIPES NOT SHOWN IN THE CONTRACT DWGS. |
| Mod P00050· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2014-02-20 | −$919 | $95,160,271 | TO TAKE A CREDIT FOR DELETING 2 AIR GRILLS AT THE CEP. |
| Mod P00089· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-02-20 | −$1,920 | $95,158,351 | TO TAKE A CREDIT FOR NOT INSTALLING A FLASH TANK. |
| Mod P00136· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-02-20 | +$2,345 | $95,160,696 | REMOVE UNFORESEEN UNDERGROUND ASBESTOS PIPING IN ACCORDANCE WITH DEP, STATE AND LOCAL LAWS. |
| Mod P00140· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-02-20 | +$3,867 | $95,164,563 | TO COMPENSATE CONTRACTOR FOR MODIFYING THE MHA STACK SIZE. |
| Mod P00142· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-02-20 | +$3,359 | $95,167,922 | PROVIDE ALL MATERIALS, EQUIPMENT AND LABOR TO CHANGE PLUMBING FIXTURE P-514 FROM A WALL TO A FLOOR MOUNT, P-71… |
| Mod P00152· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-02-20 | +$7,339 | $95,175,261 | INSTALL DRAINAGE PIT AT CEP SCISSOR LIFT. |
| Mod P00153· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-02-20 | +$903 | $95,176,164 | PROVIDE SCHEDULE 40 SPRINKLER PIPE IN LIEU OF THE CONTRACT REQUIRED SCHEDULE 10. |
| Mod P00154· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-02-20 | +$1,504 | $95,177,668 | INSTALL STEEL PLATFORM FOR CEP EQUIPMENT IN LIEU OF CONCRETE. |
| Mod P00158· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-02-20 | −$78,665 | $95,099,003 | PROVIDE ALL MATERIALS, EQUIPMENT AND LABOR TO PERFORM THE FOLLOWING: 1) ON THE 1ST FLOOR OF THE CEP, BIOMED SH… |
| Mod P00164· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-02-20 | +$1,316 | $95,100,319 | PROVIDE ALL MATERIALS, EQUIPMENT AND LABOR TO PERFORM THE FOLLOWING: 1) ON THE 1ST FLOOR OF THE CEP, BIOMED SH… |
| Mod P00174· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-02-20 | +$14,344 | $95,114,663 | PROVIDE PROVISIONS FOR TEMPORARY CHILLED WATER DURING THE TIE-IN DUE TO BLG 101 NOT BEING SHOWN ON THE DOCUMEN… |
| Mod P00178· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-02-20 | +$3,482 | $95,118,145 | PROVIDE GALVANIZED FITTINGS ON THE SPRINKLER PIPE IN THE WAREHOUSE. |
| Mod P00134· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-02-21 | +$2,068 | $95,120,213 | PROVIDE THICKENED SLAB IN THE MHA PER AS S-66 AND S-69 |
| Mod P00175· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-02-21 | +$4,455 | $95,124,668 | PROVIDE INCREASED SIZED CONCRETE BEAMS TO MATCH THE REST CONTAINED WITHIN THE MHA. |
| Mod P00177· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-02-21 | +$7,003 | $95,131,671 | RELOCATE THE FIRE DEPARTMENT CONNECTION AT THE MHA. |
| Mod P00128· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-02-24 | +$12,214 | $95,143,885 | PROVIDE ARC FLASH STUDY FOR THE EXISTING GEAR DIRECTLY DOWNRANGE FROM THE MODIFIED ASCO PARALLELING GEAR. |
| Mod P00171· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-02-24 | +$3,798 | $95,147,683 | PURCHASE 18 MONTHS OF LICENSE FEES FOR TRIRIGA. |
| Mod P00150· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-02-25 | +$2,394 | $95,150,077 | ADD CURBS IN THE SWITCHGEAR ROOM LEFT OUT OF THE CONTRACT AS OIL CONTAINMENT FOR THE TRANSFORMERS. |
| Mod P00151· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-02-25 | +$789 | $95,150,866 | PROVIDE 6" CONCRETE WALL UNDER TG2 TO CLOSE THE GAP AT THE MHA SIDEWALK/WALL. |
| Mod P00148· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-02-27 | +$969 | $95,151,835 | RELOCATE EXISTING ROOF DRAIN IN CEP EXPANSION SO IT DOES NOT INTERFERE WITH NEW WORK |
| Mod P00159· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-02-27 | +$5,196 | $95,157,031 | PROVIDE LABOR AND EQUIPMENT TO EXCAVATE LEAKING CHILLED WATER PIPE ON THE MHA CONSTRUCTION SITE. |
| Mod P00179· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-02-28 | +$648 | $95,157,679 | TO COMPENSATE CONTRACTOR FOR ADDING DRAINAGE PIPING FOR THE SECURITY WEDGE TRAFFIC BARRIERS |
| Mod P00199· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-02-28 | −$1,127 | $95,156,552 | TO TAKE A CREDIT BACK FOR NOT PAINTING GALVANIZED STEEL ANGLES AT THE DOORS AND WINDOW HEADS. |
| Mod P00172· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-03-04 | +$24,980 | $95,181,532 | PROVIDE TEMPORARY MEDGAS CONTROL WIRING. |
| Mod P00184· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-03-04 | +$1,383 | $95,182,915 | THE ORIGINAL DE-WATERING CONTRACT CALLED FOR TESTING THE RUNOFF MONTHLY FOR CONTAMINATION. ON AUG 8, 2013 THE… |
| Mod P00165· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-03-06 | +$2,275 | $95,185,190 | REMOVE STEAM PIPE IN THE WAY OF THE MHA'S CAISSONS. |
| Mod P00170· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-03-06 | +$16,438 | $95,201,628 | PROVIDE MISSING SLAB IN THE ELEVATOR MACHINE ROOM. |
| Mod P00189· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-03-11 | +$350 | $95,201,978 | TO COMPENSATE CONTRACTOR FOR SURVEYING THE TOWER CRANE HEIGHT FOR REPORTING TO THE FAA. |
| Mod P00190· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-03-12 | +$12,056 | $95,214,034 | TO COMPENSATE CONTRACTOR FOR ADDING PRV VALVES TO THE GENERATOR FUEL OIL SYSTEM. |
| Mod P00185· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-03-17 | +$5,891 | $95,219,925 | TO COMPENSATE CONTRACTOR FOR ADDITIONAL REBAR AND ANGLE STEEL AT THE WAREHOUSE DECK |
| Mod P00186· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-03-17 | +$1,998 | $95,221,923 | TO COMPENSATE CONTRACTOR FOR ADDING DW VALVES IN THE CEP CORRIDOR. |
| Mod P00187· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-03-17 | +$4,612 | $95,226,535 | TO COMPENSATE CONTRACTOR FOR INSTALLING DRAINAGE SYSTEM FOR A ROOF DRAIN IN BLG 100. |
| Mod P00168· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-04-11 | +$3,951 | $95,230,486 | PROVIDE ALTERNATE SIZED FLOOR HATCH IN THE CEP CARPENTRY SHOP. |
| Mod P00193· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-04-11 | +$1,249 | $95,231,735 | TO COMPENSATE CONTRACTOR FOR REVISING THE SLAB THICKNESS AT STAIR #2. |
| Mod P00194· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-04-11 | +$6,499 | $95,238,234 | TO COMPENSATE CONTRACTOR FOR EXTENDING DOMESTIC WATER AND FIRE PROTECTION OUTSIDE THE FIRE PUMP ROOM. |
| Mod P00182· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-04-18 | +$7,676 | $95,245,910 | TO CREDIT THE GOVERNMENT FOR RATED FLOOR EXPANSION JOINTS AT THE CEP NOT CONSTRUCTED BY CONTRACTOR AND TO COMP… |
| Mod P00149· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-05-13 | +$0 | $95,245,910 | PROVIDE ALL MATERIALS, EQUIPMENT AND LABOR TO CHANGE PLUMBING FIXTURE P-514 FROM A WALL TO A FLOOR MOUNT, P-71… |
| Mod P00204· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-05-19 | +$0 | $95,245,910 | TO DIRECT CONTRACTOR TO SUBMIT SAFETY RECORDS ON A MONTHLY BASIS PER VACO DIRECTION. |
| Mod P00202· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-05-20 | +$3,266 | $95,249,176 | TO COMPENSATE CONTRACTOR FOR UPGRADING FIRE SPRINKLER MAINS FROM SCH 10 TO SCH 40 IN THE FIRE PUMP ROOM. |
| Mod P00188· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-05-27 | +$7,350 | $95,256,526 | TO COMPENSATE CONTRACTOR FOR RAISING PNEUMATIC TUBE IN THE NEW WAREHOUSE TO ACCOMODATE THE VAMC'S RACK SYSTEM. |
| Mod P00195· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-05-27 | +$16,000 | $95,272,526 | TO COMPENSATE CONTRACTOR FOR ADDING DEDICATED LIGHTING CIRCUITS TO EACH AHU IN THE PROJECT. |
| Mod P00176· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-05-28 | +$18,818 | $95,291,344 | PROVIDE SCISSOR LIFT DRAIN AND CONNECT EXISTING ROOF DRAINS AS DESCRIBED IN RFI-5145. |
| Mod P00183· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-05-28 | +$1,248 | $95,292,592 | TO COMPENSATE CONTRACTOR FOR ASI-003K. |
| Mod P00197· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-05-28 | +$12,367 | $95,304,959 | TO COMPENSATE CONTRACTOR FOR MODIFYING PAINT BOOTH ALCOVE TO ACCOMODATE THEIR EXISTING PAINT BOOTH. |
| Mod P00200· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-05-28 | +$14,007 | $95,318,966 | TO COMPENSATE CONTRACTOR FOR ADDING ADDITIONAL REBAR PER AE'S SUBMITTAL COMMENTS |
| Mod P00201· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-05-28 | +$11,982 | $95,330,948 | TO COMPENSATE CONTRACTOR FOR INSTALLING RELIEF AIR DUCT FOR AHU'S 8, 8A&14 |
| Mod P00216· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-07-09 | +$3,623 | $95,334,571 | TO COMPENSATE CONTRACTOR FOR ADDING CMU AND EXPANSION JOINT COVERS TO THE PARAPET WALLS. |
| Mod P00133· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-07-10 | +$4,958 | $95,339,529 | TO COMPENSATE CONTRACTOR FOR REROUTING THE MHA SANITARY PIPING |
| Mod P00203· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-07-11 | +$5,178 | $95,344,707 | TO COMPENSATE CONTRACTOR FOR PROVIDING STRUCTURAL SUPPORT FOR THE MHA ART GLASS WALL. |
| Mod P00207· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-07-24 | +$8,041 | $95,352,748 | TO COMPENSATE CONTRACTOR FOR ADDING A CIRCUIT TO POWER THE NEW FIRE JOCKEY PUMP |
| Mod P00208· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-07-24 | +$3,000 | $95,355,748 | TO COMPENSATE CONTRACTOR FOR ADDING CIRCUITS FOR CHEMICAL AND REFRIGERANT MONITORING. |
| Mod P00192· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-08-01 | +$7,682 | $95,363,430 | TO COMPENSATE CONTRACTOR FOR UPGRADING AHU14 FEEDERS PER AE DIRECTION. |
| Mod P00209· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-08-01 | +$3,000 | $95,366,430 | TO COMPENSATE CONTRACTOR FOR ADDING ELECTRICAL CIRCUITS FOR FUEL OIL QUALITY FEEDS. |
| Mod P00210· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-08-01 | +$5,413 | $95,371,843 | TO COMPENSATE CONTRACTOR FOR ADDING CIRCUITS FOR FANS IN THE NEW SUBSTATIONS. |
| Mod P00217· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-11-05 | +$23,565 | $95,395,408 | TO COMPENSATE CONTRACTOR FOR MODIFYING THE LAYOUT OF SEVERAL ROOMS IN THE MENTAL HEALTH. IT ALSO ADDS POWER A… |
| Mod P00224· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-11-24 | +$28,215 | $95,423,623 | TO COMPENSATE CONTRACTOR FOR PROVIDING ADDITIONAL STEEL ROOF REINFORCEMENT IN THE EXISTING CHILLER PLANT TO SU… |
| Mod P00225· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-11-24 | +$1,587 | $95,425,210 | TO COMPENSATE CONTRACTOR FOR PROVIDING A NEW COMPUTER WORKSTATION HEAD END FOR THEIR CHILLER CONTROLS. THE EX… |
| Mod P00198· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-12-14 | −$1,173 | $95,424,037 | PROVIDE ALL MATERIALS, EQUIPMENT AND LABOR TO PERFORM THE FOLLOWING: 1) ON THE 1ST FLOOR OF THE CEP, BIOMED SH… |
| Mod P00228· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-12-15 | +$8,218 | $95,432,255 | TO COMPENSATE CONTRACTOR FOR PERFORMING ADDITIONAL CALCULATIONS ON THE BRIDGE MOMENT CONNECTION DUE TO THE AE… |
| Mod P00226· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-12-17 | +$3,688 | $95,435,943 | PROVIDE ALL MATERIALS, EQUIPMENT AND LABOR TO PERFORM THE FOLLOWING: 1) ON THE 1ST FLOOR OF THE CEP, BIOMED SH… |
| Mod P00233· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-12-21 | +$0 | $95,435,943 | AFTER THE START OF THIS PROJECT THE MEDICAL CENTER ISSUED A CONTRACT TO UPGRADE THE SECURITY CARD READER SYSTE… |
| Mod P00211· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-12-30 | +$1,400 | $95,437,343 | PROVIDE ALL MATERIALS, EQUIPMENT AND LABOR TO CHANGE PLUMBING FIXTURE P-514 FROM A WALL TO A FLOOR MOUNT, P-71… |
| Mod P00213· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-12-30 | +$24,576 | $95,461,919 | PROVIDE ALL MATERIALS, EQUIPMENT AND LABOR TO CHANGE PLUMBING FIXTURE P-514 FROM A WALL TO A FLOOR MOUNT, P-71… |
| Mod P00219· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-12-30 | −$3,793 | $95,458,126 | PROVIDE ALL MATERIALS, EQUIPMENT AND LABOR TO CHANGE PLUMBING FIXTURE P-514 FROM A WALL TO A FLOOR MOUNT, P-71… |
| Mod P00221· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-12-30 | +$1,563 | $95,459,689 | PROVIDE ALL MATERIALS, EQUIPMENT AND LABOR TO PERFORM THE FOLLOWING: 1) ON THE 1ST FLOOR OF THE CEP, BIOMED SH… |
| Mod P00227· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-12-30 | −$33,932 | $95,425,757 | PROVIDE ALL MATERIALS, EQUIPMENT AND LABOR TO PERFORM THE FOLLOWING: 1) ON THE 1ST FLOOR OF THE CEP, BIOMED SH… |
| Mod P00229· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-12-30 | +$2,564 | $95,428,321 | AFTER THE START OF THIS PROJECT THE MEDICAL CENTER ISSUED A CONTRACT TO UPGRADE THE SECURITY CARD READER SYSTE… |
| Mod P00238· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-01-05 | +$4,723 | $95,433,044 | FURNISH AND INSTALL COMMUNICATIONS CABLES BETWEEN EXISTING COMM CLOSET 1F-111 AND NEW CEP EXPANSION COMM CLOSE… |
| Mod P00244· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-01-30 | +$7,874 | $95,440,918 | AFTER THE START OF THIS PROJECT THE MEDICAL CENTER ISSUED A CONTRACT TO UPGRADE THE SECURITY CARD READER SYSTE… |
| Mod P00245· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-01-30 | +$7,445 | $95,448,363 | AFTER THE START OF THIS PROJECT THE MEDICAL CENTER ISSUED A CONTRACT TO UPGRADE THE SECURITY CARD READER SYSTE… |
| Mod P00235· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-02-03 | +$36,195 | $95,484,558 | AFTER THE START OF THIS PROJECT THE MEDICAL CENTER ISSUED A CONTRACT TO UPGRADE THE SECURITY CARD READER SYSTE… |
| Mod P00231· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-02-04 | +$19,180 | $95,503,738 | AFTER THE START OF THIS PROJECT THE MEDICAL CENTER ISSUED A CONTRACT TO UPGRADE THE SECURITY CARD READER SYSTE… |
| Mod P00237· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-02-04 | +$10,867 | $95,514,605 | AFTER THE START OF THIS PROJECT THE MEDICAL CENTER ISSUED A CONTRACT TO UPGRADE THE SECURITY CARD READER SYSTE… |
| Mod P00239· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-02-04 | +$29,699 | $95,544,304 | AFTER THE START OF THIS PROJECT THE MEDICAL CENTER ISSUED A CONTRACT TO UPGRADE THE SECURITY CARD READER SYSTE… |
| Mod P00243· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-02-04 | +$9,087 | $95,553,391 | AFTER THE START OF THIS PROJECT THE MEDICAL CENTER ISSUED A CONTRACT TO UPGRADE THE SECURITY CARD READER SYSTE… |
| Mod P00246· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-05-06 | +$15,454 | $95,568,845 | P00246, A BILATERAL CONTRACT MODIFICATION WITH 0 DAYS DELAY, WAS ISSUED TO COMPENSATE THE CONTRACTOR FOR ADDIN… |
| Mod P00247· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-05-11 | +$39,450 | $95,608,295 | UNILATERAL CONTRACT MODIFICATION P00247 WITH 0 DAYS DELAY WAS ISSUED TO RESOLVE A DISPUTE IN CONTRACT LANGUAGE… |
| Mod P00250· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-05-13 | +$935 | $95,609,230 | A UNILATERAL CONTRACT MODIFICATION, P00250 WITH 0 DAYS DELAY, WAS ISSUED TO COMPENSATE THE CONTRACTOR FOR ADDI… |
| Mod P00252· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-06-06 | +$63,928 | $95,673,158 | AFTER THE START OF THIS PROJECT THE MEDICAL CENTER ISSUED A CONTRACT TO UPGRADE THE SECURITY CARD READER SYSTE… |
| Mod P00249· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-06-08 | +$99,000 | $95,772,158 | AFTER THE START OF THIS PROJECT THE MEDICAL CENTER ISSUED A CONTRACT TO UPGRADE THE SECURITY CARD READER SYSTE… |
| Mod P00254· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-06-09 | +$22,323 | $95,794,481 | A UNILATERAL CHANGE ORDER, P00254 WITH 0 DAYS DELAY, WAS ISSUED TO COMPENSATE THE CONTRACTOR FOR ADDING A 2 HO… |
| Mod P00253· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-06-16 | +$75,000 | $95,869,481 | AFTER THE START OF THIS PROJECT THE MEDICAL CENTER ISSUED A CONTRACT TO UPGRADE THE SECURITY CARD READER SYSTE… |
| Mod P00255· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-06-16 | +$2,000 | $95,871,481 | AFTER THE START OF THIS PROJECT THE MEDICAL CENTER ISSUED A CONTRACT TO UPGRADE THE SECURITY CARD READER SYSTE… |
| Mod P00251· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-06-30 | +$29,072 | $95,900,553 | A BILATERAL CONTRACT MODIFICATION, P00251 WITH 0 DAYS DELAY, WAS ISSUED TO COMPENSATE THE CONTRACTOR FOR PROVI… |
| Mod P00258· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-07-13 | +$40,000 | $95,940,553 | AFTER THE START OF THIS PROJECT THE MEDICAL CENTER ISSUED A CONTRACT TO UPGRADE THE SECURITY CARD READER SYSTE… |
| Mod P00259· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-08-04 | +$34,302 | $95,974,855 | BILATERAL SUPPLEMENTAL AGREEMENT P00259 INCLUDES TWO ADDITIONS OF INTERIOR STEEL TO BRACE CURTAIN WALL, MHA, A… |
| Mod P00260· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-08-05 | +$20,000 | $95,994,855 | AFTER THE START OF THIS PROJECT THE MEDICAL CENTER ISSUED A CONTRACT TO UPGRADE THE SECURITY CARD READER SYSTE… |
| Mod P00261· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-08-09 | +$1,654 | $95,996,509 | P00261, A BILATERAL CONTRACT MODIFICATION WITH 0 DAYS DELAY, WAS ISSUED TO COMPENSATE THE CONTRACTOR FOR ADDIN… |
| Mod P00262· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-08-09 | +$39,883 | $96,036,392 | P00262, A BILATERAL CONTRACT MODIFICATION WITH 0 DAYS DELAY, WAS ISSUED TO COMPENSATE THE CONTRACTOR FOR ADDIN… |
| Mod P00269· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-09 | +$56,000 | $96,092,392 | AFTER THE START OF THIS PROJECT THE MEDICAL CENTER ISSUED A CONTRACT TO UPGRADE THE SECURITY CARD READER SYSTE… |
| Mod P00264· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-22 | +$343,601 | $96,435,993 | AFTER THE START OF THIS PROJECT THE MEDICAL CENTER ISSUED A CONTRACT TO UPGRADE THE SECURITY CARD READER SYSTE… |
| Mod P00256· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-24 | +$4,416 | $96,440,409 | A BILATERAL SUPPLEMENTAL AGREEMENT WITH 0 DAYS DELAY WAS ISSUED TO COMPENSATE THE CONTRACTOR FOR MODIFYING FLU… |
| Mod P00263· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-24 | +$5,415 | $96,445,824 | A BILATERAL SUPPLEMENTAL AGREEMENT P00263 WAS ISSUED TO DEFINITIZE A UNILATERAL CONTRACT MODIFICATION P00247 W… |
| Mod P00272· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-30 | +$2,354 | $96,448,178 | P00272, A BILATERAL SUPPLEMENTAL AGREEMENT WITH 0 DAYS DELAY, WAS ISSUED TO COMPENSATE THE CONTRACTOR FOR PROV… |
| Mod P00273· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-06 | +$11,251 | $96,459,429 | TO COMPENSATE THE CONTRACTOR FOR PROVIDING THE SAME IMMEDIATE SIMPLE AUDIO AND VISUAL REMOTE MONITORING CAPABI… |
| Mod P00266· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-21 | −$12,972 | $96,446,457 | A CREDIT BILATERAL SUPPLEMENTAL AGREEMENT WITH 0 DAYS DELAY WAS ISSUED TO RECEIVE A CREDIT FROM THE CONTRACTOR… |
| Mod P00230· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-22 | +$2,800 | $96,449,257 | AFTER THE START OF THIS PROJECT THE MEDICAL CENTER ISSUED A CONTRACT TO UPGRADE THE SECURITY CARD READER SYSTE… |
| Mod P00236· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-22 | +$0 | $96,449,257 | AFTER THE START OF THIS PROJECT THE MEDICAL CENTER ISSUED A CONTRACT TO UPGRADE THE SECURITY CARD READER SYSTE… |
| Mod P00274· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-04 | +$1,859 | $96,451,116 | AFTER THE START OF THIS PROJECT THE MEDICAL CENTER ISSUED A CONTRACT TO UPGRADE THE SECURITY CARD READER SYSTE… |
| Mod P00279· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-04 | +$20,500 | $96,471,616 | A BILATERAL SUPPLEMENTAL AGREEMENT P00279 WITH 0 DAYS DELAY WAS ISSUED TO COMPENSATE THE CONTRACTOR FOR INSTAL… |
| Mod P00283· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-04 | +$7,672 | $96,479,288 | DEFINITIZES CO P00254 RFQ 5104 PCI 5482.1 RFI 5661 ADD RATED SHAFT WALL AND CMU VENEER MHA LOADING DOCK |
| Mod P00286· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-04 | +$2,926 | $96,482,214 | PROVIDE AND INSTALL ADDITIONAL FRAMING AND DRYWALL TO COVER WINDOW SILL AND HEAD BLAST ANGLES FOR MHA |
| Mod P00287· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-04 | +$1,720 | $96,483,934 | RELOCATE PREVIOUSLY INSTALLED DOMESTIC WATER LINE IN BIOMED ROOM 1E-122 OF MHA |
| Mod P00276· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-15 | +$147,036 | $96,630,970 | A BILATERAL SUPPLEMENTAL AGREEMENT P00263 WAS ISSUED TO DEFINITIZE A UNILATERAL CONTRACT MODIFICATION P00247 W… |
| Mod P00284· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-21 | +$5,425 | $96,636,395 | PROVIDE SHAFT WALL AT SW CORNER OF INTERSTITIAL LEVELS 2 AND 3 |
| Mod P00285· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-21 | −$9,000 | $96,627,395 | CREDIT TO GOVERNMENT FOR DEDUCTING THE RELOCATION OF THE RE TRAILER. |
| Mod P00289· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-21 | +$12,957 | $96,640,352 | REROUTE EXISTING STORM AND WATER LIES PER RFI-108 LOCATE DOMESTIC WATER LINE |
| Mod P00295· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-26 | +$0 | $96,640,352 | A CREDIT BILATERAL SUPPLEMENTAL AGREEMENT WITH 0 DAYS DELAY WAS ISSUED TO RECEIVE A CREDIT FROM THE CONTRACTOR… |
| Mod P00267· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-02 | +$39,136 | $96,679,488 | AFTER THE START OF THIS PROJECT THE MEDICAL CENTER ISSUED A CONTRACT TO UPGRADE THE SECURITY CARD READER SYSTE… |
| Mod P00299· CHANGE ORDER | 2016-02-21 | +$7,000 | $96,686,488 | MODIFYING CHILLER AND TOWERS SEQUENCING AT CEP BUILDING, BAY PINES, FL. |
| Mod P00300· CHANGE ORDER | 2016-03-07 | +$0 | $96,686,488 | TO CORRECT A DESIGN AND CONSTRUCTIVE ISSUE WITH THE BRIDGE ROOF DRAINS. |
| Mod P00301· CHANGE ORDER | 2016-03-07 | +$7,630 | $96,694,118 | THIS MODIFICATION DIRECTS THE CONTRACTOR TO MATCH THE MANUFACTURER/MODEL OF THE EXISTING CEP DATACOM LIGHTNING… |
| Mod P00222· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-10 | +$50,455 | $96,744,573 | PROVIDE ALL MATERIALS, EQUIPMENT AND LABOR TO PERFORM THE FOLLOWING: 1) ON THE 1ST FLOOR OF THE CEP, BIOMED SH… |
| Mod P00302· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-10 | +$15,000 | $96,759,573 | TO PROVIDE ACCESS DOORS AT THE MHA THIRD FLOOR MENTAL HEALTH UNIT PLUMBING FIXTURES, AND TO PROVIDE ACCESS DOO… |
| Mod P00290· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-14 | +$12,200 | $96,771,773 | THIS SUPPLEMENTAL AGREEMENT IS TO INSTALL LOW VOLTAGE PROVISIONS FOR PROJECTOR SPEAKERS ON THE MHA 3RD FLR. |
| Mod P00304· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-14 | +$1,414 | $96,773,187 | A CREDIT BILATERAL SUPPLEMENTAL AGREEMENT WITH 0 DAYS DELAY WAS ISSUED TO RECEIVE A CREDIT FROM THE CONTRACTOR… |
| Mod P00297· CHANGE ORDER | 2016-03-17 | +$5,905 | $96,779,092 | AN EXISTING BACKFLOW PREVENTER IN THE NEW PAVED MHA PARKING LOT AREA WAS NOT ADDRESSED BY CONTRACT DOCUMENTS,… |
| Mod P00277· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-21 | +$93,882 | $96,872,974 | TO PROVIDE COMPENSATION TO THE CONTRACTOR FOR HAZARDOUS CLEANUP OF A SANITARY SEWER OVERFLOW IN THE BASEMENT O… |
| Mod P00306· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-21 | +$3,800 | $96,876,774 | THIS MODIFICATION CORRECTS DESIGN OMISSION OF NECESSARY POWER AND DATA ROUGH-INS FOR VA PROVIDED SYSTEMS FURNI… |
| Mod P00278· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-22 | +$2,020 | $96,878,794 | THIS IS TO DEFINITIZE CO P00172: A TEMPORARY MEDICAL GAS ALARM SYSTEM FOR BUILDINGS 71 AND 101, NURSING HOME C… |
| Mod P00307· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-22 | +$26,578 | $96,905,372 | THIS MODIFICATION PROVIDES AN ACCEPTABLE TERMINATION DETAIL FOR THE INTERIOR WALLS THAT TERMINATE AT EXTERIOR… |
| Mod P00309· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-22 | +$22,954 | $96,928,326 | THIS MODIFICATION IS NECESSARY FOR ADDITIONAL SUPPORT STEEL FOR THE TOWER AS A RESULT OF RFI 5827. |
| Mod P00288· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-30 | +$37,000 | $96,965,326 | THIS MODIFICATION REVISES THE BOLLARD REQUIREMENTS FOR THE WAREHOUSE AND CEP AS A RESULT OF USER REQUESTED REV… |
| Mod P00292· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-31 | +$15,795 | $96,981,121 | THIS MODIFICATION PROVIDES PROTECTION OF UNDERGROUND STEAM PIPE WHERE THE MINIMUM COVER COULD NOT BE PROVIDED… |
| Mod P00303· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-05 | +$11,238 | $96,992,359 | OMITTED CODE REQUIRED PULL STATIONS WERE IDENTIFIED DURING THE REVIEW OF FIRE ALARM SUBMITTAL 28 31 00-07R2, T… |
| Mod P00312· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-05 | +$11,540 | $97,003,899 | THIS MODIFICATION ADDRESSES DRAIN PANS FOR THE OA PLENUMS IN THE NEW WAREHOUSE BUILDING, THEY ARE NECESSARY TO… |
| Mod P00298· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-07 | +$3,913 | $97,007,812 | POWER AND SWITCHES FOR COILING DOORS WERE OMITTED BY THE CONTRACT ELECTRICAL DRAWINGS. |
| Mod P00313· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-07 | +$3,606 | $97,011,418 | TO INSTALL A REMOTE ALARM PANEL FOR THE NEW FIRE PUMP. |
| Mod P00296· CHANGE ORDER | 2016-04-11 | +$0 | $97,011,418 | THIS MODIFICATION ADDRESSES THE PERMANENT REROUTING OF THE MEDICAL GAS ALARM WIRING TO BUILDING 71 FROM BUILDI… |
| Mod P00311· CHANGE ORDER | 2016-04-11 | +$56,663 | $97,068,081 | THIS MODIFICATION SUPPLEMENTS THE FUNDING OF P00144 WHICH PARTIALLY COMPENSATED THE CONTRACTOR FOR REVISING AR… |
| Mod P00314· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-13 | +$99,610 | $97,167,691 | TO PROVIDE ADDED FLOOR PROTECTION OVER THE RESILIENT SHEET FLOORING (RSF) TO ALLOW THE RSF FINISHED FLOORING T… |
| Mod P00316· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-13 | +$1,400 | $97,169,091 | THIS MODIFICATION IS FOR FIRE-RATED POKE THROUGH DEVICES IN LIEU OF ELECTRICAL DEVICES SHOWN IN THE CURTAIN WA… |
| Mod P00310· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-19 | +$1,051 | $97,170,142 | TO REMOVE VCT FROM THE EXISTING CEP FLOOR WHICH WAS INADVERTENTLY OMITTED FROM THE CEP DEMOLITION DRAWINGS. |
| Mod P00315· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-19 | +$10,366 | $97,180,508 | THE SOLATUBE NATURAL LIGHTING TUBES FAILED TO INDICATE FIRE DAMPERS THROUGH RATED CONSTRUCTION. THIS DESIGN ER… |
| Mod P00317· CHANGE ORDER | 2016-04-19 | +$16,719 | $97,197,227 | THIS MODIFICATION ADDRESSES THE MAIN BREAKER FOR THE PANEL NHCL FEED, AND THE 208V POWER REQUIREMENT FOR THE N… |
| Mod P00318· CHANGE ORDER | 2016-04-20 | +$79,210 | $97,276,437 | THIS MODIFICATION IS TO PROVIDE A FIRE WATCH DURING THE SUBMISSION, REVIEW, APPROVAL, INSTALLATION, AND TESTIN… |
| Mod P00319· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-04 | +$4,299 | $97,280,736 | THIS MODIFICATION PROVIDES POWER CIRCUITS FOR THE PNEUMATIC TUBE SYSTEM THAT WERE OMITTED FROM THE CONTRACT DR… |
| Mod P00320· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-04 | +$1,000 | $97,281,736 | TO COMPENSATE THE CONTRACTOR FOR THE INSTALLATION OF PIPE DRAINAGE LINE WORK COMPLETED BEFORE DELETION OF THE… |
| Mod P00282· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-18 | +$4,409 | $97,286,145 | TO DELETE METAL LATH UNDER CEMENT PLASTER AT THE WAREHOUSE, OXYGEN TANK FARM, AND CENTRAL ENERGY PLANT (CEP). |
| Mod P00321· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-18 | +$3,695 | $97,289,840 | THIS MODIFICATION ADDRESSES A CONSTRUCTIVE DESIGN ERROR ASSOCIATED WITH THE MHA TOWER ROOFING DETAILS. |
| Mod P00323· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-18 | +$24,069 | $97,313,909 | THIS MODIFICATION REVISES MHA AND PEDWAY LIGHTNING PROTECTION PROVISIONS RESULTANT FROM CONSTRUCTIVE CHANGES. |
| Mod P00324· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-18 | +$17,822 | $97,331,731 | THIS MODIFICATION ADDRESSES THE REVISION OF NURSE CALL DEVICE TYPES IN THE MHA SECLUSION SPACES TO BE SECURITY… |
| Mod P00322· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-20 | +$16,405 | $97,348,136 | THE UPDATED SECURITY FENCE AND GATE DRAWINGS AND SPECIFICATIONS ISSUED WITH ARCHITECTURAL SUPPLEMENTAL INFORMA… |
| Mod P00325· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-23 | −$768 | $97,347,368 | THIS MODIFICATION CORRECTS DESIGN DISCREPANCIES BETWEEN THE SITE CIVIL DRAWINGS AND THE SITE ELECTRICAL DRAWIN… |
| Mod P00270· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-24 | +$8,273 | $97,355,641 | THIS MODIFICATION ADDRESSES HVAC PROVISIONS FOR THE CENTRAL ENERGY PLANT (CEP) IT ROOM ADDED BY CHANGE ORDER P… |
| Mod P00294· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-24 | +$16,500 | $97,372,141 | TO PROVIDE 2-HOUR RATED SHAFT WALL ABOVE CEILING IN THE CENTRAL ENERGY PLANT (CEP) TO PROVIDE LIFE SAFETY CODE… |
| Mod P00327· CHANGE ORDER | 2016-05-24 | +$8,198 | $97,380,339 | THIS MODIFICATION IS FOR ADDITIONAL FIRE PUMP RELATED WORK ONLY PREVIOUSLY ADDRESSED BY VA LETTER DATED 5/15/1… |
| Mod P00293· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-25 | +$43,493 | $97,423,832 | ADD ADDITIONAL ELECTRONIC HARDWARE FOR THREE DOORS AT THE BRIDGE OMITTED FROM CONTRACT DRAWINGS. |
| Mod P00326· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-25 | +$38,662 | $97,462,494 | PROVIDE ALL MATERIAL AND LABOR REQUIRED FOR THE MODIFICATION OF THE INTEGRAL BLINDS FRAMING AND TEMPERED GLASS… |
| Mod P00328· CHANGE ORDER | 2016-05-25 | +$26,138 | $97,488,632 | AS A RESULT OF THE RESPONSE TO RFI 5657, OMITTED AV PROVISIONS ARE BEING ADDED TO THE CONSTRUCTIVE REQUIREMENT… |
| Mod P00330· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-31 | +$88,475 | $97,577,107 | THIS MODIFICATION IS FOR ALL CEP WALL REVISIONS RESULTANT FROM THE FOLLOWING: 1. ASL-003B, PCL-5037, WALL CHAN… |
| Mod P00329· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-13 | +$20,914 | $97,598,021 | NECESSARY POWER PROVISIONS FOR THE WEDGE BARRIER WERE ADDED PREVIOUSLY, BUT A TECHNICAL DECISION WAS MADE TO R… |
| Mod P00334· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-13 | +$4,350 | $97,602,371 | THIS MODIFICATION PROVIDES OMITTED HVAC TO THE MHA PENTHOUSE ELECTRICAL ATS ROOM. |
| Mod P00336· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-13 | +$12,500 | $97,614,871 | TO PROVIDE AND INSTALL ROOFING SYSTEM EXPANSION JOINTS AT NEW CEP CANOPY WHERE IT CONNECTS TO EXISTING CEP PRE… |
| Mod P00305· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-14 | +$2,178 | $97,617,049 | TO PROVIDE ROOM 1G-203 TELECOM OUTLETS SHOWN ON KITCHEN EQUIPMENT SCHEMATIC DRAWINGS BUT NOT ON TELECOM PLANS. |
| Mod P00337· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-14 | +$530 | $97,617,579 | AN EXISTING BACKFLOW PREVENTER IN THE NEW PAVED MHA PARKING LOT AREA WAS NOT ADDRESSED BY CONTRACT DOCUMENTS,… |
| Mod P00338· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-14 | +$7,664 | $97,625,243 | TO IMPLEMENT VARIOUS FACILITY REQUESTED REVISIONS AS SUMMARIZED BY THE RE OFFICE 12/18/13 AND REVISED 1/9/14.… |
| Mod P00339· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-14 | +$3,974 | $97,629,217 | THIS MODIFICATION IS FOR DEMOLITION OF GWB CEILINGS IN LIEU OF ACT INDICATED, AND DEMOLITION OF ADDITIONAL WAL… |
| Mod P00332· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-15 | +$43,734 | $97,672,951 | TO COMPENSATE CONTRACTOR FOR ADDITIONAL WORK ASSOCIATED WITH DESIGN AE REVISIONS INCLUDED IN ASI-003B AND DEFI… |
| Mod P00331· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-20 | +$2,322 | $97,675,273 | THIS MODIFICATION RESOLVES OF PCI 5127.1 (CO P00047) FOR COOLING TOWER SUPPORT STEEL REVISIONS, 5522.1 (CO P00… |
| Mod P00335· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-20 | +$1,330 | $97,676,603 | MODIFICATION TO ADDRESS RELOCATION OF CONDENSING UNIT RESULTANT FROM RESPONSE TO RFI 5818. |
| Mod P00340· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-21 | +$4,967 | $97,681,570 | PEDESTRIAN RAMP FOR VAMC ACCESS THROUGH THE CONSTRUCTION AREA FROM BLDG. 2 TO BLDG. 71 |
| Mod P00341· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-23 | +$3,055 | $97,684,625 | THIS MODIFICATION ADDRESSES REVISED TELECOM PROVISIONS RESULTANT FROM ADDING A TELECOM ROOM IN THE 2ND FLOOR O… |
| Mod P00342· CHANGE ORDER | 2016-06-24 | +$9,096 | $97,693,721 | THIS MODIFICATION IMPLEMENTS ADDITIONAL ELECTRICAL COMMISSIONING REQUIREMENTS RESULTANT FROM SCOPE REVISIONS T… |
| Mod P00343· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-30 | +$28,516 | $97,722,237 | THIS MODIFICATION ADDRESSES THE INSTALLATION OF ADDITIONAL SUPPORT STEEL FOR CEP PIPING RESULTANT FROM RFIS 51… |
| Mod P00344· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-30 | +$6,203 | $97,728,440 | THIS MODIFICATION IS FOR SEVERAL CHANGES TO THE MHA COURTYARDS INCLUDING STUCCO AND DELETION OF A FOUNTAIN AND… |
| Mod P00346· CHANGE ORDER | 2016-07-07 | +$1,578 | $97,730,018 | THIS MODIFICATION ADDRESSES REVISED FIRE SPRINKLER MONITORING REQUIREMENTS RESULTANT FROM SUBMITTAL REVISIONS. |
| Mod P00345· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-11 | +$57,521 | $97,787,539 | AS A RESULT OF AE MARKUPS OF THE CONTRACTOR'S CEP REBAR SUBMITTALS, ADDITIONAL REBAR REQUIREMENTS WERE ADDED. |
| Mod P00347· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-11 | +$2,000 | $97,789,539 | THIS MODIFICATION IS TO ADD A CONCRETE CURB FOR THE OMITTED CODE PROVISION OF TRANSFORMER OIL CONTAINMENT. |
| Mod P00333· CHANGE ORDER | 2016-07-18 | +$33,994 | $97,823,533 | THIS MODIFICATION PROVIDES FURTHER PACS AND CCTV MODIFICATION RELATED TO THE PREVIOUS SA P00268 ASI 003L REVIS… |
| Mod P00349· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-20 | +$80,264 | $97,903,797 | THERE WERE NUMEROUS REVISIONS OF THE WAREHOUSE AND CEP CMU CONTROL JOINT LOCATIONS RESULTANT FROM CORRECTION O… |
| Mod P00350· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-29 | +$11,327 | $97,915,124 | THIS MODIFICATION REPLACES TWO SETS OF DOUBLE DOORS THAT WERE SPECIFIED TO BE 6'-6" TALL WHICH DOES NOT MEET L… |
| Mod P00352· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-29 | +$14,660 | $97,929,784 | THIS MODIFICATION ADDS PRECAST ARCHITECTURAL CONCRETE (PAC) SILLS AT THE CEP AND THE WAREHOUSE, AND REVISED WA… |
| Mod P00353· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-29 | +$0 | $97,929,784 | THIS MODIFICATION ADDS SIX ADDITIONAL LED LIGHT FIXTURES TO INCREASE THE WAREHOUSE SITE LIGHTING TO MEET THE R… |
| Mod P00354· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-29 | −$137 | $97,929,647 | THIS MODIFICATION ADDRESSES THE PERMANENT REROUTING OF THE MEDICAL GAS ALARM WIRING TO BUILDING 71 FROM BUILDI… |
| Mod P00356· CHANGE ORDER | 2016-08-16 | +$44,714 | $97,974,361 | THIS MODIFICATION IS TO REMOVE SIXTEEN (16) ORIFICE PLATES AND FOUR (4) CHECK VALVES FROM TWENTY LOCATIONS IN… |
| Mod P00348· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-17 | +$2,509 | $97,976,870 | THIS MODIFICATION ADDRESSES REVISED TELECOM PROVISIONS RESULTANT FROM ADDING A TELECOM ROOM IN THE 2ND FLOOR O… |
| Mod P00355· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-17 | +$0 | $97,976,870 | THIS MODIFICATION ADDRESSES REVISIONS TO FUEL OIL PIT TO FACILITATE THE INSTALLATION OF THE DOUBLE WALL UNDERG… |
| Mod P00357· CHANGE ORDER | 2016-08-19 | +$0 | $97,976,870 | THIS MODIFICATION IS TO REVISE THE MHA 480V LIFE SAFETY BRANCH CONDUIT RISER PROTECTION ORIGINALLY SHOWN AS CO… |
| Mod P00358· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-23 | +$923 | $97,977,793 | THIS MODIFICATION IS TO BLANK OFF WASHER DRYER PLUMBING FIXTURE RECEPTACLE OPENINGS DUE TO LACK OF COORDINATIO… |
| Mod P00359· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-26 | +$44,464 | $98,022,257 | THIS MODIFICATION RESOLVES 22 ELECTRICAL-RELATED MODIFICATIONS AND CONTRACTOR PCI PROPOSALS FOR VARIOUS ELECTR… |
| Mod P00360· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-07 | +$72,502 | $98,094,759 | THIS MODIFICATION RESOLVES 11 DRYWALL AND FRAMING-RELATED MODIFICATIONS AND CONTRACTOR PCI PROPOSALS FOR VARIO… |
| Mod P00361· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-08 | +$1,934 | $98,096,693 | AN ENCLOSURE AROUND THE PNEUMATIC TUBE RISER IS REQUIRED TO PREVENT POTENTIAL HAZARD TO PATIENTS ON THE 3RD FL… |
| Mod P00364· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-20 | +$2,163 | $98,098,856 | SA P00364 DEFINITIZES CO P00139 PCI 5351R1 TO RAISE EXISTING PIPING TO CLEAR CEILING AT CEP IN ROOM 1F-223 |
| Mod P00362· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-26 | +$53,557 | $98,152,413 | P00362 DEFINITIZES CO P00007 FOR THE REINFORCING BLDG 101 ROOF FOR SUPPORT OF STEAM PIPE. |
| Mod P00366· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-27 | +$1,068 | $98,153,481 | TO COMPENSATE CONTRACTOR FOR ADDITIONAL WORK ASSOCIATED WITH DESIGN AE REVISIONS INCLUDED IN ASI-003C AND DEFI… |
| Mod P00308· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-05 | +$21,073 | $98,174,554 | SETTLEMENT OF VARIOUS PCIS. |
| Mod P00365· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-12 | +$4,130 | $98,178,684 | ADD PHONE LINE FOR MHA SERVICE AND PASSENGER ELEVATORS WHICH WERE OMITTED FROM THE CONTRACT DRAWINGS.. |
| Mod P00367· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-12 | −$583 | $98,178,101 | DELETE ALL WORK NECESSARY TO TIE-IN THE NEW MHA NURSE CALL HEAD END TO THE EXISTING BUILDING 100 NURSE CALL SY… |
| Mod P00363· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-14 | +$1,982 | $98,180,083 | ADJUST THE CASEWORK IN ROOM 1G-405 DUE TO THE EXPANSION OF A FAUX COLUMN TO COVER ADDITIONAL IN WALL PLUMBING. |
| Mod P00371· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-15 | +$210,902 | $98,390,985 | INSTALLATION OF BAHAMA SHUTTERS AT MHA |
| Mod P00368· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-17 | +$3,268 | $98,394,253 | THE LOCATION FOR THE TERMINAL CABINET D-TC1 FOR GROUNDING AND CONTROL WIRING WAS NOT SPECIFIED FOR CONNECTING… |
| Mod P00369· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-17 | +$2,736 | $98,396,989 | REROUTE AND EXTEND EXISTING 6-INCH STEAM SAFETY RELIEF VALVE VENT PIPING LOCATED ABOVE THE EXISTING BUILDING 1… |
| Mod P00370· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-20 | +$26,035 | $98,423,024 | THIS SUPPLEMENTAL AGREEMENT DEFINITIZES UNILATERAL MODIFICATION P00342. TO COMPENSATE CONTRACTOR FOR THE ADDIT… |
| Mod P00374· CHANGE ORDER | 2016-10-28 | +$0 | $98,423,024 | RFQ-012 WAS ISSUED FOR THE DELETION OF EIGHT BALANCING VALVE PER RFI-0669 AND PCI 5592 IS TO PROVIDE POWER FOR… |
| Mod P00375· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-21 | +$45,640 | $98,468,664 | THE FOLLOWING PCIS HAVE BEEN NEGOTIATED, SOME DEFINITIZED FROM UNILATERAL TO INCLUDED IN THIS MODIFICATION PCI… |
| Mod P00376· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-22 | −$7,700 | $98,460,964 | PROVIDE ADDITIONAL FIRE PUMP CHURN TESTS REQUESTED BY SEM AS NOTED IN PCI-5541R2 AND DELETE FIRE PUMP TESTING… |
| Mod P00377· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-12-01 | +$3,506 | $98,464,470 | THIS SUPPLEMENTAL AGREEMENT DEFINITIZES P00182 TO COVER THE REMAINING COST OF $3,506 FOR CHANGES TO THE EJ AT… |
| Mod P00378· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-12-01 | +$665 | $98,465,135 | THIS BILATERAL AGREEMENT DEFINITIZES P00189 WITH THE REMAINING AMOUNT OF $665 FOR PROVIDING SURVEYING SERVICE… |
| Mod P00380· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-12-08 | +$22,757 | $98,487,892 | PROVIDE IT TRIRIGA SUPPORT FROM CONTRACTOR TO THE SRE OFFICE DUE TO THE VA CHANGE IN ONLINE SYSTEMS NOT PROVID… |
| Mod P00379· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-12-19 | +$78,542 | $98,566,434 | THIS MODIFICATION IS FOR THE RESOLUTION OF PCIS 5382, 5452, 5512, 5564 AND 5591. THE WORK INCLUDES -CONCRETE P… |
| Mod P00372· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-12-21 | +$5,000 | $98,571,434 | ALTERATION AND MODIFICATION TO STORM DRAIN SYSTEM AND ROOFING SYSTEM DIRECTED BY RFI 5698. THIS MODIFICATION D… |
| Mod P00382· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-12-21 | +$1,400 | $98,572,834 | THE ORIGINAL CONTRACT DOCUMENTS SHOWED 2 SEPARATE STEAM CONDENSATE PIPES GOING FROM THE NEW MHA TO THE EXISTIN… |
| Mod P00373· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-01-09 | +$30,783 | $98,603,617 | CHANGES PER ASI-003G WHICH INCLUDED DEMO EXISTING CEP PRECAST. A UNILATERAL CHANGE ORDER P00099 WAS ISSUED SO… |
| Mod P00381· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-01-09 | +$50,687 | $98,654,304 | ADD RAMP AT CEP GENERATOR BUILDING, AT DINING COURTYARD. INSTALL POWDER COATED HANDRAILS. |
| Mod P00383· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-01-11 | +$33,302 | $98,687,606 | THIS MODIFICATION P00383 DEFINITIZES P00097 FOR THE CEILING HEIGHT REVISIONS IN THE CEP AS DETAILED IN ASI-003… |
| Mod P00385· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-01-24 | +$30,000 | $98,717,606 | ADD POWER FOR DOCK LEVELER AND SCISSOR LIFT AT MHA LOADING DOCK AND LIGHTING ON THE LOADING DOCK ASSOCIATED WI… |
| Mod P00386· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-01-24 | +$15,094 | $98,732,700 | MISC. SMALL CHANGES ARE BUNDLED THAT RESOLVES PCI 5374.1, PCI 5416, PCI 5223, PCI5211, PCI 5428. FOR PCI 5374… |
| Mod P00387· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-01-26 | +$12,885 | $98,745,585 | MISC MASONRY CHANGES WITH THREE PCIS ARE BUNDLED TO RESOLVE IN THIS MODIFICATION ACTION. PCIS 5168, 5353,5462… |
| Mod P00388· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-06-05 | +$3,525,000 | $102,270,585 | MISC MASONRY CHANGES WITH THREE PCIS ARE BUNDLED TO RESOLVE IN THIS MODIFICATION ACTION. SEE SF30 FOR FURTHER… |
| Mod P00389· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-12-12 | +$6,975,000 | $109,245,585 | SETTLEMENT OF CLAIM NUMBERS 6 AND 7 |
| Mod P00390· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-03-08 | +$82,379 | $109,327,964 | SETTLEMENT OF BONDING AND PCI 5588 CREDIT |
Related awards · 3
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other recipients under Y111 from OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA101CFMC0080 | INTEGRATED PRO SERVICES, LLC | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | $12,513,790 | FY2010 |
| VA101CFMC0064 | CLARK MCCARTHY HEALTHCARE PARTNERS, A JOINT VENTURE | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | $1,055,767,844 | FY2009 |
| VA101CFMC0039 | MCCARTHY BUILDING COMPANIES, INC. | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | $43,512,526 | FY2009 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA101CFMC0139_3600_-NONE-_-NONE- · retrieved 2026-09-26.