Description
ADMINISTRATIVE MOD DEOBLIGATION DUE TO FISCAL ACCOUNTING ERROR
Base award description: SOUTHEAST LOUISIANA VETERANS HEALTHCARE SYSTEM REPLACEMENT MEDICAL CENTER, NEW ORLEANS, LA
Modification chain · 2086 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2009-09-30+$3,319,000= $3,319,000
- Mod SA00012010-03-09+$0= $3,319,000
- Mod CO0012010-03-11+$50,000= $3,369,000
- Mod CO0022010-04-29+$41,000= $3,410,000
- Mod SA0022010-05-26+$10,923= $3,420,923
- Mod SA0032010-05-26+$15,421= $3,436,344
- Mod SA0042010-07-30+$24,690= $3,461,034
- Mod SA0052010-08-04+$0= $3,461,034
- Mod SA0072010-09-08+$31,692= $3,492,726
- Mod SA0062010-09-14+$0= $3,492,726
- Mod SA0092010-09-23+$30,020= $3,522,746
- Mod SA0082010-09-30+$2,161,883= $5,684,629
- Mod SA0102011-01-31+$13,398= $5,698,027
- Mod SA0112011-01-31+$13,010= $5,711,037
- Mod SA0122011-02-10+$3,061,733= $8,772,770
- Mod CO0032011-03-03+$25,000= $8,797,770
- Mod SA0142011-03-04+$12,051= $8,809,821
- Mod SA0162011-03-23+$96,350= $8,906,171
- Mod SA0172011-03-24-$137,028= $8,769,143
- Mod SA0182011-03-30+$28,768= $8,797,911
- Mod SA0152011-04-08+$67,997= $8,865,908
- Mod SA0202011-04-29+$22,056= $8,887,964
- Mod CO0042011-05-04+$15,000= $8,902,964
- Mod CO0052011-05-11+$0= $8,902,964
- Mod CO01E2011-05-12+$12,838,839= $21,741,803
- Mod CO0062011-05-25-$15,000= $21,726,803
- Mod SA0212011-05-25+$33,626= $21,760,429
- Mod CO0072011-06-14+$15,459= $21,775,888
- Mod CO01G2011-06-14+$15,459= $21,791,347
- Mod SA0242011-08-02+$2,013= $21,793,360
- Mod SA0262011-08-03+$63,976= $21,857,336
- Mod SA0132011-08-12+$0= $21,857,336
- Mod SA0252011-08-23+$77,453= $21,934,789
- Mod SA0272011-08-24-$115,080= $21,819,709
- Mod SA0282011-08-24+$47,679= $21,867,388
- Mod SA0222011-09-27-$7,606= $21,859,782
- Mod CO0082011-09-30+$0= $21,859,782
- Mod CO0092011-09-30+$0= $21,859,782
- Mod CO0102011-09-30+$0= $21,859,782
- Mod CO0122011-09-30+$0= $21,859,782
- Mod CO01H2011-09-30+$19,498,989= $41,358,771
- Mod CO01I2011-09-30+$55,643,888= $97,002,659
- Mod CO01J2011-09-30+$24,710,152= $121,712,811
- Mod CO01L2011-09-30+$147,416,894= $269,129,705
- Mod SA0292011-10-04+$3,055= $269,132,760
- Mod SA0312011-10-24+$95,353= $269,228,113
- Mod SA0302011-11-08+$5,312= $269,233,425
- Mod CO01K2011-11-10+$87,136= $269,320,561
- Mod SA0322011-11-17+$73,560= $269,394,121
- Mod CO01O2011-12-07+$95,000= $269,489,121
- Mod SA0332011-12-08-$195,042= $269,294,079
- Mod CO01R2011-12-13+$95,000= $269,389,079
- Mod SA0342012-01-26+$195,042= $269,584,121
- Mod CO01S2012-02-10+$1,068,853= $270,652,974
- Mod CO01T2012-02-29+$95,000= $270,747,974
- Mod SA0352012-03-06-$4,322= $270,743,652
- Mod SA0382012-03-06+$77,936= $270,821,588
- Mod SA0362012-03-09+$15,409= $270,836,997
- Mod SA0372012-03-13+$1,252= $270,838,249
- Mod SA0392012-03-15+$0= $270,838,249
- Mod SA0402012-03-16+$0= $270,838,249
- Mod CO01N2012-03-30+$60,264,881= $331,103,130
- Mod SA0422012-03-30+$7,570= $331,110,700
- Mod SA0432012-03-30+$1,905= $331,112,605
- Mod SA0442012-04-12+$8,473= $331,121,078
- Mod SA0452012-04-12+$44,440= $331,165,518
- Mod SA0462012-04-20+$47,031= $331,212,549
- Mod CO01V2012-04-27+$95,000= $331,307,549
- Mod SA0472012-04-30+$1,900= $331,309,449
- Mod CO01W2012-05-02+$90,000= $331,399,449
- Mod SA0482012-05-02+$0= $331,399,449
- Mod SA0512012-05-11+$99,669= $331,499,118
- Mod SA0492012-06-04-$6,018= $331,493,100
- Mod SA0502012-06-04+$11,576= $331,504,676
- Mod SA0522012-06-04+$11,939= $331,516,615
- Mod SA0412012-07-09+$287,557= $331,804,172
- Mod SA0552012-07-11+$0= $331,804,172
- Mod SA0532012-07-27+$241,150= $332,045,322
- Mod SA0572012-07-27+$0= $332,045,322
- Mod SA0582012-07-30+$0= $332,045,322
- Mod SA0592012-07-30+$0= $332,045,322
- Mod SA0602012-07-31+$2,105= $332,047,427
- Mod SA0622012-08-01+$4,856= $332,052,283
- Mod CO01U2012-08-02+$81,997= $332,134,280
- Mod CO01X2012-08-02+$95,000= $332,229,280
- Mod SA0562012-08-13+$37,520= $332,266,800
- Mod SA0632012-08-14+$2,147= $332,268,947
- Mod CO01M2012-08-17+$106,276,036= $438,544,983
- Mod SA0542012-08-27+$211,787= $438,756,770
- Mod SA0642012-08-27+$4,744= $438,761,514
- Mod SA0742012-08-30-$24,878= $438,736,636
- Mod SA0612012-09-12+$33,377= $438,770,013
- Mod SA0652012-09-12+$17,323= $438,787,336
- Mod CO01Z2012-09-17+$50,000= $438,837,336
- Mod CO02A2012-09-20+$1,203= $438,838,539
- Mod SA0662012-09-24+$15,912= $438,854,451
- Mod SA0682012-09-24-$13,912= $438,840,539
- Mod SA0692012-09-24+$1,227= $438,841,766
- Mod SA0702012-09-24-$5,651= $438,836,115
- Mod SA0712012-09-24+$10,438= $438,846,553
- Mod SA0772012-09-28-$225,849= $438,620,704
- Mod SA0672012-10-01+$3,011= $438,623,715
- Mod SA0732012-10-01-$1,676= $438,622,039
- Mod SA0752012-10-02+$174,715= $438,796,754
- Mod SA0762012-10-02+$22,872= $438,819,626
- Mod SA0782012-10-05+$2,822= $438,822,448
- Mod CO02B2012-10-08+$200,000= $439,022,448
- Mod SA0792012-10-09+$98,495= $439,120,943
- Mod SA0722012-10-11+$0= $439,120,943
- Mod SA0832012-10-12+$8,269= $439,129,212
- Mod SA0812012-10-17+$8,852= $439,138,064
- Mod SA0822012-10-17+$1,442= $439,139,506
- Mod SA0862012-11-02+$174,715= $439,314,221
- Mod SA0892012-11-02+$3,318= $439,317,539
- Mod CO02C2012-11-10-$10,000= $439,307,539
- Mod CO02D2012-11-10-$10,000= $439,297,539
- Mod CO02E2012-11-10-$10,000= $439,287,539
- Mod CO02F2012-11-10-$10,000= $439,277,539
- Mod SA0842012-11-12+$1,506= $439,279,045
- Mod SA0912012-11-12+$24,599= $439,303,644
- Mod SA0802012-11-13+$178,817= $439,482,461
- Mod SA0852012-11-13-$12,000= $439,470,461
- Mod SA0872012-11-13-$174,715= $439,295,746
- Mod SA0882012-11-13+$174,715= $439,470,461
- Mod SA0902012-11-13+$1,991= $439,472,452
- Mod CO02G2012-11-15+$25,000= $439,497,452
- Mod CO02I2012-11-15+$30,000= $439,527,452
- Mod CO02J2012-11-16+$95,000= $439,622,452
- Mod SA0962012-11-19+$784= $439,623,236
- Mod CO02K2012-11-21+$200,000= $439,823,236
- Mod CO02M2012-11-21-$10,000= $439,813,236
- Mod CO02N2012-11-21-$10,000= $439,803,236
- Mod SA0952012-11-21+$2,106= $439,805,342
- Mod CO02H2012-11-28+$75,000= $439,880,342
- Mod CO02O2012-11-29+$17,762= $439,898,104
- Mod CO02P2012-11-29+$7,816= $439,905,920
- Mod CO02Q2012-11-29+$3,517= $439,909,437
- Mod SA0972012-11-29+$4,829= $439,914,266
- Mod SA0982012-11-29+$5,029= $439,919,295
- Mod SA1012012-11-30+$153,929= $440,073,224
- Mod CO02R2012-12-03+$6,367= $440,079,591
- Mod CO02S2012-12-03+$2,815= $440,082,406
- Mod CO02T2012-12-03+$4,575= $440,086,981
- Mod CO02L2012-12-04-$10,000= $440,076,981
- Mod CO02U2012-12-05+$50,000= $440,126,981
- Mod CO02W2012-12-05-$10,000= $440,116,981
- Mod SA1022012-12-05+$5,288= $440,122,269
- Mod CO02X2012-12-06-$10,000= $440,112,269
- Mod SA1032012-12-06+$0= $440,112,269
- Mod SA1042012-12-06+$0= $440,112,269
- Mod SA0992012-12-13+$846= $440,113,115
- Mod CO02Y2012-12-14+$6,844= $440,119,959
- Mod CO02Z2012-12-14+$14,881= $440,134,840
- Mod CO03A2012-12-14+$20,000= $440,154,840
- Mod SA1002012-12-14+$7,061= $440,161,901
- Mod SA1062012-12-14+$4,440= $440,166,341
- Mod SA1072012-12-19+$4,471= $440,170,812
- Mod SA1082012-12-19+$3,953= $440,174,765
- Mod CO03B2012-12-20+$5,000= $440,179,765
- Mod SA1102012-12-20+$35,200= $440,214,965
- Mod CO01P2012-12-27+$42,447,502= $482,662,467
- Mod SA1092013-01-03+$164,187= $482,826,654
- Mod SA1122013-01-03+$21,372= $482,848,026
- Mod SA1132013-01-03+$979= $482,849,005
- Mod SA1142013-01-03+$1,687= $482,850,692
- Mod SA1112013-01-04+$4,947= $482,855,639
- Mod CO03D2013-01-07-$10,000= $482,845,639
- Mod SA1152013-01-07+$2,671= $482,848,310
- Mod CO03E2013-01-11+$10,000= $482,858,310
- Mod CO03F2013-01-18+$6,000= $482,864,310
- Mod SA1182013-01-24+$2,127= $482,866,437
- Mod SA1192013-01-24-$8,687= $482,857,750
- Mod SA1202013-01-24+$8,183= $482,865,933
- Mod SA1212013-01-24+$5,880= $482,871,813
- Mod SA1222013-01-24+$7,293= $482,879,106
- Mod SA1162013-01-30+$3,900= $482,883,006
- Mod SA1232013-01-30+$26,277= $482,909,283
- Mod SA1252013-01-30+$9,866= $482,919,149
- Mod CO03H2013-01-31+$6,000= $482,925,149
- Mod SA1262013-01-31+$7,424= $482,932,573
- Mod SA1272013-01-31+$182,057= $483,114,630
- Mod SA1292013-02-06-$901= $483,113,729
- Mod SA1322013-02-13+$23,488= $483,137,217
- Mod SA1312013-02-15+$4,581= $483,141,798
- Mod SA1242013-02-19+$0= $483,141,798
- Mod SA1302013-02-19+$2,007= $483,143,805
- Mod SA1332013-02-19+$5,245= $483,149,050
- Mod SA1342013-02-19+$6,666= $483,155,716
- Mod SA1352013-02-20+$17,727= $483,173,443
- Mod SA1362013-02-20+$27,505= $483,200,948
- Mod CO03J2013-02-21+$50,000= $483,250,948
- Mod SA1172013-02-21+$286= $483,251,234
- Mod CO03K2013-02-26+$5,000= $483,256,234
- Mod SA1372013-02-26+$7,745= $483,263,979
- Mod SA1382013-02-26+$1,918= $483,265,897
- Mod CO03C2013-02-28+$13,137,371= $496,403,268
- Mod CO03I2013-02-28-$200,000= $496,203,268
- Mod SA1392013-02-28+$158,215= $496,361,483
- Mod SA1422013-03-05+$2,743= $496,364,226
- Mod SA0932013-03-06+$5,298= $496,369,524
- Mod SA1402013-03-06+$1,925= $496,371,449
- Mod SA0942013-03-18+$5,431= $496,376,880
- Mod SA1412013-03-18+$194,298= $496,571,178
- Mod SA1432013-03-18+$30,846= $496,602,024
- Mod SA1442013-03-18+$1,909= $496,603,933
- Mod SA1462013-03-18+$94,862= $496,698,795
- Mod SA1482013-03-25+$10,314= $496,709,109
- Mod SA1452013-03-27-$41,080= $496,668,029
- Mod SA1472013-03-29+$3,810= $496,671,839
- Mod SA1502013-03-29+$1,107= $496,672,946
- Mod SA1512013-04-02+$45,188= $496,718,134
- Mod SA1532013-04-02+$4,266= $496,722,400
- Mod SA1522013-04-04-$2,221= $496,720,179
- Mod SA1542013-04-10+$24,755= $496,744,934
- Mod SA1572013-04-12-$22,496= $496,722,438
- Mod SA1582013-04-15-$4,042= $496,718,396
- Mod CO03L2013-04-16+$100,000= $496,818,396
- Mod CO03M2013-04-16+$30,000= $496,848,396
- Mod SA1552013-04-16+$64,787= $496,913,183
- Mod SA1592013-04-16+$31,943= $496,945,126
- Mod SA1602013-04-16+$1,744= $496,946,870
- Mod SA1622013-04-18+$48,847= $496,995,717
- Mod SA1632013-04-18+$156,977= $497,152,694
- Mod CO03N2013-04-19+$19,665= $497,172,359
- Mod SA1652013-04-24-$23,203= $497,149,156
- Mod SA1642013-04-25-$3,004= $497,146,152
- Mod SA1662013-04-26+$12,325= $497,158,477
- Mod SA1672013-04-26+$0= $497,158,477
- Mod SA1682013-04-26+$0= $497,158,477
- Mod SA1722013-04-26+$0= $497,158,477
- Mod SA1712013-04-29+$2,940= $497,161,417
- Mod SA1732013-04-30-$44,799= $497,116,618
- Mod SA1742013-05-01-$95,000= $497,021,618
- Mod CO03Q2013-05-02-$40,000= $496,981,618
- Mod CO03G2013-05-03+$2,508,862= $499,490,480
- Mod SA1752013-05-03+$2,677= $499,493,157
- Mod SA1762013-05-03+$415= $499,493,572
- Mod SA1772013-05-03+$634= $499,494,206
- Mod SA1792013-05-06+$30,546= $499,524,752
- Mod SA1782013-05-09+$15,472= $499,540,224
- Mod SA1812013-05-09+$2,709= $499,542,933
- Mod CO03P2013-05-13+$218,731,887= $718,274,820
- Mod SA1822013-05-14+$40,000= $718,314,820
- Mod SA1842013-05-14+$0= $718,314,820
- Mod SA1802013-05-15+$207,351= $718,522,171
- Mod SA1962013-05-15+$0= $718,522,171
- Mod CO03R2013-05-17+$115,000= $718,637,171
- Mod CO03S2013-05-17+$10,000= $718,647,171
- Mod SA1852013-05-17+$9,000= $718,656,171
- Mod SA1862013-05-21+$7,510= $718,663,681
- Mod SA1872013-05-21+$51,225= $718,714,906
- Mod SA1882013-05-21+$3,020= $718,717,926
- Mod SA1832013-05-23+$8,888= $718,726,814
- Mod SA1892013-05-23+$13,037= $718,739,851
- Mod SA1902013-05-23+$23,188= $718,763,039
- Mod SA1922013-05-23+$9,905= $718,772,944
- Mod SA1932013-05-23+$7,988= $718,780,932
- Mod CO03T2013-05-24+$10,000= $718,790,932
- Mod SA1952013-05-30+$50,763= $718,841,695
- Mod SA1912013-06-03-$4,775= $718,836,920
- Mod SA1972013-06-03+$8,776= $718,845,696
- Mod SA1982013-06-03+$76,283= $718,921,979
- Mod SA1992013-06-04-$81,997= $718,839,982
- Mod SA2002013-06-04+$6,984= $718,846,966
- Mod SA2012013-06-04+$5,097= $718,852,063
- Mod SA2022013-06-06+$5,988= $718,858,051
- Mod SA2032013-06-06+$7,180= $718,865,231
- Mod SA2042013-06-06+$4,717= $718,869,948
- Mod SA2052013-06-06+$6,637= $718,876,585
- Mod SA1942013-06-12+$20,898= $718,897,483
- Mod SA2072013-06-12+$2,316= $718,899,799
- Mod SA2062013-06-13+$14,961= $718,914,760
- Mod SA2082013-06-13+$21,297= $718,936,057
- Mod CO03U2013-06-14+$94,351= $719,030,408
- Mod SA2112013-06-19+$6,910= $719,037,318
- Mod SA2102013-06-20+$26,242= $719,063,560
- Mod CO03V2013-06-25+$50,000= $719,113,560
- Mod CO03X2013-06-28+$30,000= $719,143,560
- Mod SA2132013-07-03+$10,000= $719,153,560
- Mod SA2122013-07-08+$6,433= $719,159,993
- Mod SA2142013-07-08+$25,509= $719,185,502
- Mod SA2152013-07-08+$0= $719,185,502
- Mod SA2162013-07-08+$0= $719,185,502
- Mod SA2182013-07-10+$19,592= $719,205,094
- Mod CO03W2013-07-11+$9,393,474= $728,598,568
- Mod SA2172013-07-11+$0= $728,598,568
- Mod CO03Y2013-07-15-$200,000= $728,398,568
- Mod SA2242013-07-15+$4,718= $728,403,286
- Mod SA2212013-07-17+$4,566= $728,407,852
- Mod SA2222013-07-18+$2,346= $728,410,198
- Mod SA2292013-07-23-$8,110= $728,402,088
- Mod SA2272013-07-24+$900= $728,402,988
- Mod SA2282013-07-24+$631= $728,403,619
- Mod SA2332013-07-25+$0= $728,403,619
- Mod SA2312013-07-29+$0= $728,403,619
- Mod CO03Z2013-07-30-$10,000= $728,393,619
- Mod SA2302013-07-30-$72,414= $728,321,205
- Mod SA2362013-07-31+$32,893= $728,354,098
- Mod SA2372013-07-31+$12,047= $728,366,145
- Mod SA2382013-07-31+$71,851= $728,437,996
- Mod SA2252013-08-06+$0= $728,437,996
- Mod SA2392013-08-06+$18,797= $728,456,793
- Mod SA2402013-08-06+$35,307= $728,492,100
- Mod SA2342013-08-07+$3,376= $728,495,476
- Mod SA2352013-08-07+$16,400= $728,511,876
- Mod SA2412013-08-07-$917= $728,510,959
- Mod SA2432013-08-07+$1,728= $728,512,687
- Mod SA2442013-08-07-$3,263= $728,509,424
- Mod SA2232013-08-08+$15,957= $728,525,381
- Mod SA2422013-08-08-$146,066= $728,379,315
- Mod SA2452013-08-08-$4,447= $728,374,868
- Mod SA2462013-08-08+$3,620= $728,378,488
- Mod CO04C2013-08-09+$100,000= $728,478,488
- Mod SA1562013-08-09+$131,009= $728,609,497
- Mod SA2472013-08-09+$5,914= $728,615,411
- Mod SA2482013-08-09-$938= $728,614,473
- Mod SA2492013-08-14+$14,221= $728,628,694
- Mod SA1692013-08-19-$315,482= $728,313,212
- Mod SA2202013-08-21+$106,144= $728,419,356
- Mod SA2502013-08-21+$17,611= $728,436,967
- Mod SA2532013-08-22+$0= $728,436,967
- Mod CO04E2013-08-23+$10,000= $728,446,967
- Mod SA2262013-08-23+$96,429= $728,543,396
- Mod SA2522013-08-27+$8,079= $728,551,475
- Mod SA2322013-08-28+$15,997= $728,567,472
- Mod CO04A2013-08-30+$22,752,701= $751,320,173
- Mod CO04B2013-08-30+$8,877,359= $760,197,532
- Mod SA2562013-09-05+$10,915= $760,208,447
- Mod SA2572013-09-05+$9,889= $760,218,336
- Mod CO04F2013-09-06+$30,000= $760,248,336
- Mod CO04G2013-09-11-$10,000= $760,238,336
- Mod SA2542013-09-12+$191,150= $760,429,486
- Mod SA2552013-09-12+$0= $760,429,486
- Mod SA2582013-09-12+$5,188= $760,434,674
- Mod SA2592013-09-12+$12,703= $760,447,377
- Mod SA2602013-09-12+$7,084= $760,454,461
- Mod SA2612013-09-12+$1,084= $760,455,545
- Mod SA2622013-09-12+$3,682= $760,459,227
- Mod SA2632013-09-12-$269= $760,458,958
- Mod SA2642013-09-12+$9,300= $760,468,258
- Mod CO04H2013-09-13+$100,000= $760,568,258
- Mod SA2652013-09-16+$7,910= $760,576,168
- Mod CO04I2013-09-24+$40,000= $760,616,168
- Mod SA2712013-09-24+$84,693= $760,700,861
- Mod SA2692013-09-25+$32,371= $760,733,232
- Mod CO04D2013-09-30+$7,584,460= $768,317,692
- Mod SA2192013-09-30+$265,649= $768,583,341
- Mod SA2662013-09-30+$46,208= $768,629,549
- Mod SA2672013-09-30+$22,900= $768,652,449
- Mod SA2512013-10-01+$1,429,745= $770,082,194
- Mod SA2702013-10-01+$616= $770,082,810
- Mod SA2722013-10-01+$13,148= $770,095,958
- Mod SA2732013-10-01+$2,003= $770,097,961
- Mod SA1492013-10-04+$12,785= $770,110,746
- Mod SA2752013-10-04+$2,296= $770,113,042
- Mod CO04J2013-10-07+$1,000= $770,114,042
- Mod CO04K2013-10-07+$10,000= $770,124,042
- Mod CO04L2013-10-07+$10,000= $770,134,042
- Mod SA2742013-10-07+$717= $770,134,759
- Mod SA2762013-10-08+$11,822= $770,146,581
- Mod SA2682013-10-10+$243,482= $770,390,063
- Mod SA2772013-10-10+$23,886= $770,413,949
- Mod SA2782013-10-10+$0= $770,413,949
- Mod SA2792013-10-10+$0= $770,413,949
- Mod SA2812013-10-10-$68,542= $770,345,407
- Mod SA2802013-10-15+$32,442= $770,377,849
- Mod SA2822013-10-15+$1,471= $770,379,320
- Mod SA2832013-10-15+$4,090= $770,383,410
- Mod SA2842013-10-17+$12,936= $770,396,346
- Mod SA2852013-10-22+$0= $770,396,346
- Mod SA2862013-10-22+$0= $770,396,346
- Mod SA2882013-10-24+$2,606= $770,398,952
- Mod SA2892013-10-24-$1,491= $770,397,461
- Mod SA1702013-10-28-$259,818= $770,137,643
- Mod SA2872013-10-28+$1,811= $770,139,454
- Mod CO04M2013-11-03+$95,000= $770,234,454
- Mod CO04N2013-11-03+$30,000= $770,264,454
- Mod SA2932013-11-03+$84,718= $770,349,172
- Mod SA2902013-11-08-$44,000= $770,305,172
- Mod SA2972013-11-08+$24,255= $770,329,427
- Mod SA2912013-11-12+$219= $770,329,646
- Mod SA2982013-11-12+$70,831= $770,400,477
- Mod SA2992013-11-12+$0= $770,400,477
- Mod SA3002013-11-12+$28,656= $770,429,133
- Mod SA3022013-11-12+$2,579= $770,431,712
- Mod SA3032013-11-12+$3,397= $770,435,109
- Mod SA3052013-11-18+$1,302= $770,436,411
- Mod SA3042013-11-20+$1,375= $770,437,786
- Mod CO04P2013-11-21+$24,000= $770,461,786
- Mod SA3082013-11-21+$6,940= $770,468,726
- Mod SA2962013-12-03+$5,115= $770,473,841
- Mod SA3132013-12-10-$2,912= $770,470,929
- Mod SA3142013-12-11-$1,962= $770,468,967
- Mod SA3112013-12-17+$2,497= $770,471,464
- Mod CO04R2013-12-31+$37,227,939= $807,699,403
- Mod SA3182014-01-08+$48,658= $807,748,061
- Mod SA3152014-01-09+$552= $807,748,613
- Mod SA2942014-01-15-$266,839= $807,481,774
- Mod SA3242014-01-21-$1,200= $807,480,574
- Mod SA3252014-01-23+$2,427= $807,483,001
- Mod SA3262014-01-31+$24,354= $807,507,355
- Mod SA3292014-01-31+$0= $807,507,355
- Mod SA3312014-02-05+$3,427= $807,510,782
- Mod SA3322014-02-06+$0= $807,510,782
- Mod SA3342014-02-14+$31,349= $807,542,131
- Mod SA3352014-02-14+$74,881= $807,617,012
- Mod CO04W2014-02-19+$250,000= $807,867,012
- Mod SA3362014-02-20+$0= $807,867,012
- Mod SA3382014-02-20+$0= $807,867,012
- Mod CO04U2014-02-24+$12,000= $807,879,012
- Mod CO04T2014-02-26+$31,079,870= $838,958,882
- Mod SA3072014-02-26+$24,107= $838,982,989
- Mod SA3102014-02-26+$10,687= $838,993,676
- Mod SA3452014-02-28-$42= $838,993,634
- Mod SA3442014-03-03+$0= $838,993,634
- Mod CO04X2014-03-05+$100,000= $839,093,634
- Mod SA3432014-03-05+$600= $839,094,234
- Mod SA3492014-03-05+$5,638= $839,099,872
- Mod CO05A2014-03-06+$50,000= $839,149,872
- Mod SA3282014-03-06-$6,502= $839,143,370
- Mod SA3372014-03-06+$930= $839,144,300
- Mod SA3392014-03-06+$25,464= $839,169,764
- Mod SA3482014-03-10+$3,247= $839,173,011
- Mod CO04Z2014-03-11+$19,500= $839,192,511
- Mod SA3422014-03-13-$180= $839,192,331
- Mod SA3532014-03-13+$3,628= $839,195,959
- Mod SA3462014-03-17+$3,649= $839,199,608
- Mod SA3472014-03-17+$9,000= $839,208,608
- Mod SA3512014-03-18+$2,514= $839,211,122
- Mod SA3522014-03-19-$132= $839,210,990
- Mod SA3552014-03-19-$2,473= $839,208,517
- Mod SA3572014-03-19-$856= $839,207,661
- Mod SA3542014-03-20+$208,431= $839,416,092
- Mod SA3592014-03-20+$52,000= $839,468,092
- Mod SA3622014-03-25-$163,682= $839,304,410
- Mod SA3122014-03-31+$1,628= $839,306,038
- Mod CO04V2014-04-02+$100,000= $839,406,038
- Mod CO05B2014-04-02+$2,000= $839,408,038
- Mod CO05C2014-04-02+$25,000= $839,433,038
- Mod SA3272014-04-03-$2,887= $839,430,151
- Mod SA3842014-04-17+$1,845= $839,431,996
- Mod SA3232014-04-21+$284,111= $839,716,107
- Mod SA3652014-04-25+$40,263= $839,756,370
- Mod SA3612014-04-28+$2,859= $839,759,229
- Mod SA3662014-04-28+$906= $839,760,135
- Mod SA3722014-04-28+$34,034= $839,794,169
- Mod SA3852014-04-28+$2,287= $839,796,456
- Mod CO05G2014-04-29+$50,000= $839,846,456
- Mod SA3682014-04-29+$25,590= $839,872,046
- Mod SA3692014-04-29+$31,593= $839,903,639
- Mod SA3732014-04-29+$1,799= $839,905,438
- Mod SA3742014-04-29+$4,578= $839,910,016
- Mod SA3762014-04-29-$782= $839,909,234
- Mod SA3782014-04-29+$1,747= $839,910,981
- Mod SA3802014-04-29-$1,308= $839,909,673
- Mod SA3822014-04-29+$32,601= $839,942,274
- Mod SA3872014-04-29-$598= $839,941,676
- Mod SA3892014-04-29+$34,225= $839,975,901
- Mod CO05E2014-05-01+$1,000= $839,976,901
- Mod CO05F2014-05-01+$150,000= $840,126,901
- Mod SA3332014-05-01+$67,375= $840,194,276
- Mod SA3412014-05-01+$7,384= $840,201,660
- Mod SA3582014-05-01+$4,393= $840,206,053
- Mod SA3752014-05-01+$15,240= $840,221,293
- Mod SA3862014-05-01+$186= $840,221,479
- Mod SA3912014-05-01+$0= $840,221,479
- Mod SA3602014-05-06-$10,720= $840,210,759
- Mod SA3632014-05-06+$201,264= $840,412,023
- Mod SA3642014-05-06-$9,249= $840,402,774
- Mod SA3672014-05-06+$7,905= $840,410,679
- Mod SA3712014-05-06+$6,734= $840,417,413
- Mod SA3772014-05-06+$2,500= $840,419,913
- Mod SA3792014-05-07+$8,346= $840,428,259
- Mod CO05H2014-05-09+$100,000= $840,528,259
- Mod SA3832014-05-09+$4,191= $840,532,450
- Mod SA3932014-05-09+$36,385= $840,568,835
- Mod SA3812014-05-12+$13,919= $840,582,754
- Mod CO05D2014-05-15+$800= $840,583,554
- Mod SA3402014-05-15+$2,478= $840,586,032
- Mod SA2952014-05-21+$4,576= $840,590,608
- Mod SA3092014-05-21+$28,956= $840,619,564
- Mod SA3562014-05-21-$96,237= $840,523,327
- Mod SA3972014-05-21+$7,894= $840,531,221
- Mod SA4002014-05-21+$114,663= $840,645,884
- Mod SA3942014-05-23+$10,435= $840,656,319
- Mod CO05L2014-06-02+$0= $840,656,319
- Mod SA3982014-06-02+$6,015= $840,662,334
- Mod SA3992014-06-02+$859= $840,663,193
- Mod SA3962014-06-03+$39,293= $840,702,486
- Mod SA4042014-06-03+$3,681= $840,706,167
- Mod CO04S2014-06-18+$15,000= $840,721,167
- Mod CO05J2014-06-18+$190,000= $840,911,167
- Mod CO05O2014-06-18+$600= $840,911,767
- Mod CO05P2014-06-18+$34,000= $840,945,767
- Mod SA3952014-06-20+$10,913= $840,956,680
- Mod CO05Q2014-06-23+$10,000= $840,966,680
- Mod SA3172014-06-26-$3,966= $840,962,714
- Mod SA4032014-06-26+$1,335= $840,964,049
- Mod SA4012014-06-30+$5,278= $840,969,327
- Mod CO05I2014-07-01+$34,880,875= $875,850,202
- Mod CO05M2014-07-01+$800= $875,851,002
- Mod SA3882014-07-01-$225,546= $875,625,456
- Mod SA3922014-07-01+$0= $875,625,456
- Mod SA4082014-07-08+$68,455= $875,693,911
- Mod SA4072014-07-18+$30,479,198= $906,173,109
- Mod CO05S2014-07-21+$100,000= $906,273,109
- Mod CO05R2014-07-24+$25,000= $906,298,109
- Mod CO05T2014-07-24+$3,000= $906,301,109
- Mod CO05U2014-07-24+$0= $906,301,109
- Mod SA4062014-07-28-$22,819= $906,278,290
- Mod CO05V2014-08-28+$50,000= $906,328,290
- Mod CO05X2014-08-28+$3,339= $906,331,629
- Mod CO05Y2014-08-28+$8,900= $906,340,529
- Mod SA4092014-08-28+$0= $906,340,529
- Mod SA4112014-08-28+$70,659= $906,411,188
- Mod SA4122014-08-28+$34,047= $906,445,235
- Mod SA4132014-08-28+$42,119= $906,487,354
- Mod SA4142014-08-28+$4,540= $906,491,894
- Mod SA4152014-08-28+$5,327= $906,497,221
- Mod CO05Z2014-08-29+$8,147= $906,505,368
- Mod CO06A2014-09-02-$25,000= $906,480,368
- Mod SA4182014-09-03+$104,431= $906,584,799
- Mod SA4162014-09-08+$1,595= $906,586,394
- Mod SA4192014-09-08+$0= $906,586,394
- Mod CO05W2014-09-10+$20,000= $906,606,394
- Mod CO06C2014-09-10+$76,986= $906,683,380
- Mod SA4242014-09-10-$3,706= $906,679,674
- Mod SA4202014-09-11+$3,986= $906,683,660
- Mod CO06B2014-09-12+$173,500= $906,857,160
- Mod SA4212014-09-12+$811= $906,857,971
- Mod SA4102014-09-15+$182,995= $907,040,966
- Mod SA4232014-09-18+$4,032= $907,044,998
- Mod SA4252014-09-25+$10,659= $907,055,657
- Mod CO06E2014-09-30+$90,000= $907,145,657
- Mod SA4262014-10-06+$100,000= $907,245,657
- Mod SA4272014-10-06+$27,307= $907,272,964
- Mod SA4312014-10-06+$75,749= $907,348,713
- Mod SA4322014-10-06-$14,261= $907,334,452
- Mod CO06F2014-10-08+$99,000= $907,433,452
- Mod CO06G2014-10-16+$80,000= $907,513,452
- Mod SA4292014-10-16+$3,375= $907,516,827
- Mod SA4302014-10-16+$2,070= $907,518,897
- Mod CO06H2014-10-17+$91,000= $907,609,897
- Mod CO06I2014-10-22+$2,958= $907,612,855
- Mod CO06K2014-10-27+$15,000= $907,627,855
- Mod SA4332014-10-27+$59,223= $907,687,078
- Mod CO06J2014-10-29+$0= $907,687,078
- Mod CO06L2014-10-29-$10,000= $907,677,078
- Mod SA4342014-10-30+$1,644= $907,678,722
- Mod CO06N2014-11-03+$87,927= $907,766,649
- Mod SA4282014-11-03+$3,837= $907,770,486
- Mod CO06M2014-11-04-$2,000= $907,768,486
- Mod SA4362014-11-05+$3,351= $907,771,837
- Mod CO06P2014-11-06+$2,989= $907,774,826
- Mod SA4382014-11-06-$1,815= $907,773,011
- Mod CO06O2014-11-07+$2,322= $907,775,333
- Mod SA4352014-11-07+$10,193= $907,785,526
- Mod SA4372014-11-07+$16,181= $907,801,707
- Mod SA4392014-11-13+$41,287= $907,842,994
- Mod SA4402014-11-19+$11,364= $907,854,358
- Mod SA4412014-11-19+$70,221= $907,924,579
- Mod SA4422014-11-19+$11,494= $907,936,073
- Mod SA4432014-12-01-$6,970= $907,929,103
- Mod CO06S2014-12-02+$75,000= $908,004,103
- Mod CO06R2014-12-03+$15,000= $908,019,103
- Mod CO06T2014-12-08+$99,000= $908,118,103
- Mod SA4472014-12-11-$2,801= $908,115,302
- Mod CO06U2014-12-15+$195,000= $908,310,302
- Mod SA4452014-12-15+$501= $908,310,803
- Mod SA4502014-12-16+$2,232= $908,313,035
- Mod SA4492015-01-06+$6,791= $908,319,826
- Mod SA4512015-01-06-$3,641= $908,316,185
- Mod CO06Y2015-01-08+$95,000= $908,411,185
- Mod SA4532015-01-08+$4,115= $908,415,300
- Mod SA4552015-01-08+$103,936= $908,519,236
- Mod SA4562015-01-13+$6,938= $908,526,174
- Mod CO06X2015-01-14+$150,000= $908,676,174
- Mod SA4572015-01-15+$9,726= $908,685,900
- Mod CO06Z2015-01-27+$46,500= $908,732,400
- Mod CO07B2015-01-27+$42,609= $908,775,009
- Mod CO07C2015-02-02+$50,000= $908,825,009
- Mod SA4582015-02-02+$38,213= $908,863,222
- Mod SA4612015-02-02+$6,302= $908,869,524
- Mod SA4632015-02-02+$1,544= $908,871,068
- Mod SA4642015-02-02+$11,381= $908,882,449
- Mod SA4652015-02-04+$1,237= $908,883,686
- Mod CO07D2015-02-05+$100,000= $908,983,686
- Mod CO07E2015-02-09+$100,000= $909,083,686
- Mod SA4542015-02-09+$10,300= $909,093,986
- Mod SA4672015-02-09+$18,000= $909,111,986
- Mod SA4682015-02-09+$1,621= $909,113,607
- Mod SA4692015-02-09+$5,402= $909,119,009
- Mod SA4712015-02-10+$5,635= $909,124,644
- Mod SA4462015-02-11+$697= $909,125,341
- Mod CO07F2015-02-13+$35,000= $909,160,341
- Mod SA4602015-02-13+$614= $909,160,955
- Mod SA4662015-02-13+$57,771= $909,218,726
- Mod SA4732015-02-13+$42,000= $909,260,726
- Mod SA4752015-02-18+$7,500= $909,268,226
- Mod CO06V2015-02-19+$1,552,437= $910,820,663
- Mod CO06W2015-02-19+$591,823= $911,412,486
- Mod SA4482015-02-19+$20,809= $911,433,295
- Mod SA4782015-02-19+$42,184= $911,475,479
- Mod SA4792015-02-23-$21,750= $911,453,729
- Mod SA4742015-02-24+$15,198= $911,468,927
- Mod SA4772015-02-24+$8,189= $911,477,116
- Mod SA4802015-02-24+$1,448= $911,478,564
- Mod SA4592015-02-25+$21,609= $911,500,173
- Mod SA4722015-02-25+$16,000= $911,516,173
- Mod CO07G2015-02-26+$6,900= $911,523,073
- Mod CO07I2015-02-26+$11,707= $911,534,780
- Mod SA4812015-03-10+$57,218= $911,591,998
- Mod SA4832015-03-10+$12,924= $911,604,922
- Mod CO07K2015-03-13+$96,000= $911,700,922
- Mod SA4842015-03-16+$2,000= $911,702,922
- Mod SA4852015-03-16+$4,865= $911,707,787
- Mod SA4862015-03-16+$29,578= $911,737,365
- Mod SA4882015-03-16+$2,637= $911,740,002
- Mod SA4872015-03-17+$49,835= $911,789,837
- Mod SA4702015-03-18+$5,492= $911,795,329
- Mod SA4892015-03-18+$22,090= $911,817,419
- Mod SA4912015-03-24+$50,939= $911,868,358
- Mod CO07H2015-03-26+$460,000= $912,328,358
- Mod CO07J2015-03-26+$208,888= $912,537,246
- Mod SA4622015-03-26+$250,000= $912,787,246
- Mod SA4922015-03-26+$0= $912,787,246
- Mod SA4932015-03-26+$0= $912,787,246
- Mod SA4942015-03-30+$13,711= $912,800,957
- Mod SA4952015-03-30+$8,104= $912,809,061
- Mod SA4972015-03-30+$835= $912,809,896
- Mod SA4822015-03-31-$4,132= $912,805,764
- Mod CO07L2015-04-01+$100,000= $912,905,764
- Mod SA4982015-04-01+$82,238= $912,988,002
- Mod CO07M2015-04-02+$0= $912,988,002
- Mod CO07N2015-04-03+$31,374= $913,019,376
- Mod CO07O2015-04-03+$45,000= $913,064,376
- Mod SA4992015-04-06+$87,710= $913,152,086
- Mod SA5002015-04-08-$7,796= $913,144,290
- Mod SA5012015-04-08+$539= $913,144,829
- Mod SA5022015-04-14+$0= $913,144,829
- Mod SA5032015-04-21+$3,582= $913,148,411
- Mod SA5042015-04-21+$1,984= $913,150,395
- Mod CO07P2015-04-23+$1,500= $913,151,895
- Mod CO07R2015-04-27+$38,000= $913,189,895
- Mod SA5062015-04-27+$2,313= $913,192,208
- Mod SA5082015-04-27+$45,000= $913,237,208
- Mod SA5092015-04-28+$9,450= $913,246,658
- Mod CO07Q2015-04-29-$27,715= $913,218,943
- Mod CO07T2015-04-29+$50,000= $913,268,943
- Mod SA5072015-04-29+$9,586= $913,278,529
- Mod SA5102015-04-29+$36,439= $913,314,968
- Mod SA5142015-05-05+$2,069= $913,317,037
- Mod SA5152015-05-06+$6,007= $913,323,044
- Mod SA5162015-05-06+$40,000= $913,363,044
- Mod SA5182015-05-06+$40,857= $913,403,901
- Mod SA5192015-05-06+$1,535= $913,405,436
- Mod SA5202015-05-07+$74,193= $913,479,629
- Mod SA5232015-05-08+$21,787= $913,501,416
- Mod SA5212015-05-11+$66,157= $913,567,573
- Mod SA5222015-05-11+$29,669= $913,597,242
- Mod SA5242015-05-14+$9,509= $913,606,751
- Mod SA5262015-05-14-$24,390= $913,582,361
- Mod SA5112015-05-19+$598,384= $914,180,745
- Mod SA5132015-05-19+$56,555= $914,237,300
- Mod SA5172015-05-19+$65,695= $914,302,995
- Mod SA5282015-05-19+$2,808= $914,305,803
- Mod SA5302015-05-19+$2,496= $914,308,299
- Mod SA5312015-05-19+$21,512= $914,329,811
- Mod SA4762015-05-20+$255,429= $914,585,240
- Mod SA5292015-05-20+$86,948= $914,672,188
- Mod SA5332015-05-20-$7,340= $914,664,848
- Mod SA5342015-05-20+$7,524= $914,672,372
- Mod SA5322015-05-21+$18,166= $914,690,538
- Mod SA5352015-05-21+$6,633= $914,697,171
- Mod SA5122015-05-26+$47,029= $914,744,200
- Mod SA5372015-05-26+$81,194= $914,825,394
- Mod SA5382015-05-26+$1,620= $914,827,014
- Mod SA4222015-05-27+$29,208= $914,856,222
- Mod SA4442015-05-27+$49,512= $914,905,734
- Mod SA5392015-05-27+$17,122= $914,922,856
- Mod CO07S2015-05-28+$14,000= $914,936,856
- Mod SA5362015-05-28+$21,591= $914,958,447
- Mod SA5412015-05-28+$198,012= $915,156,459
- Mod SA5252015-06-02+$3,167,571= $918,324,030
- Mod SA5422015-06-02+$82,953= $918,406,983
- Mod SA5432015-06-02+$16,479= $918,423,462
- Mod SA5442015-06-02+$2,880= $918,426,342
- Mod SA5452015-06-02+$8,209= $918,434,551
- Mod CO07W2015-06-03+$80,000= $918,514,551
- Mod SA5462015-06-03+$895= $918,515,446
- Mod CO07V2015-06-04+$12,000= $918,527,446
- Mod SA4962015-06-04+$6,316= $918,533,762
- Mod SA5472015-06-04+$3,413= $918,537,175
- Mod SA5502015-06-05+$3,160= $918,540,335
- Mod SA5482015-06-09+$838= $918,541,173
- Mod SA5492015-06-09+$17,640= $918,558,813
- Mod SA5522015-06-09+$4,695= $918,563,508
- Mod SA5542015-06-09+$4,196= $918,567,704
- Mod SA5552015-06-11+$75,159= $918,642,863
- Mod SA5562015-06-11+$37,778= $918,680,641
- Mod CO07X2015-06-17+$33,000= $918,713,641
- Mod SA4522015-06-17+$32,989= $918,746,630
- Mod SA5572015-06-17+$11,510= $918,758,140
- Mod SA5402015-06-22+$33,027= $918,791,167
- Mod SA5582015-06-22+$19,287= $918,810,454
- Mod SA5612015-06-22+$11,000= $918,821,454
- Mod SA5642015-06-22+$11,759= $918,833,213
- Mod CO07Y2015-06-25+$5,000= $918,838,213
- Mod SA5662015-06-26+$9,581= $918,847,794
- Mod SA5672015-06-26+$3,410= $918,851,204
- Mod SA5682015-06-29+$27,518= $918,878,722
- Mod SA5692015-06-29+$2,370= $918,881,092
- Mod SA5702015-06-29+$16,912= $918,898,004
- Mod SA5712015-06-29+$10,903= $918,908,907
- Mod SA5722015-06-29+$13,648= $918,922,555
- Mod SA5732015-07-01+$2,611= $918,925,166
- Mod SA5742015-07-02+$3,942= $918,929,108
- Mod SA5602015-07-06+$25,523= $918,954,631
- Mod SA5622015-07-06+$2,121= $918,956,752
- Mod SA5632015-07-06+$4,916= $918,961,668
- Mod SA5652015-07-14+$11,296= $918,972,964
- Mod SA5762015-07-14+$7,216= $918,980,180
- Mod SA5782015-07-14+$4,572= $918,984,752
- Mod SA5802015-07-14+$16,664= $919,001,416
- Mod SA5822015-07-14+$6,339= $919,007,755
- Mod SA5832015-07-14+$18,574= $919,026,329
- Mod SA5752015-07-16+$125,365= $919,151,694
- Mod SA5842015-07-16+$57,490= $919,209,184
- Mod SA5862015-07-17+$63,159= $919,272,343
- Mod CO08A2015-07-20+$4,000= $919,276,343
- Mod SA5592015-07-20+$9,071= $919,285,414
- Mod SA5812015-07-20+$53,649= $919,339,063
- Mod SA5882015-07-20-$17,062= $919,322,001
- Mod SA5902015-07-20+$2,138= $919,324,139
- Mod SA5872015-07-21+$73,688= $919,397,827
- Mod SA5912015-07-21+$12,084= $919,409,911
- Mod SA5922015-07-21+$2,041= $919,411,952
- Mod SA5932015-07-21+$3,815= $919,415,767
- Mod CO07Z2015-07-22+$1,305,213= $920,720,980
- Mod CO08C2015-07-22+$8,000= $920,728,980
- Mod SA5892015-07-22+$12,093= $920,741,073
- Mod SA5942015-07-22+$43,332= $920,784,405
- Mod SA5952015-07-22+$5,576= $920,789,981
- Mod CO08D2015-07-23+$200,000= $920,989,981
- Mod SA5532015-07-24+$21,193= $921,011,174
- Mod SA5992015-07-27-$23,987= $920,987,187
- Mod CO08E2015-07-28+$35,000= $921,022,187
- Mod CO08F2015-07-28+$30,000= $921,052,187
- Mod CO08H2015-07-28+$2,500= $921,054,687
- Mod SA5972015-07-28+$13,081= $921,067,768
- Mod CO08I2015-07-31+$300,000= $921,367,768
- Mod CO08J2015-08-03+$53,791= $921,421,559
- Mod CO08B2015-08-06+$950,000= $922,371,559
- Mod CO08K2015-08-12+$145,000= $922,516,559
- Mod SA6342015-08-12+$0= $922,516,559
- Mod SA5852015-08-14+$4,719= $922,521,278
- Mod CO08M2015-08-17+$20,000= $922,541,278
- Mod SA6032015-08-17+$4,680= $922,545,958
- Mod SA6052015-08-17+$28,236= $922,574,194
- Mod SA6092015-08-17+$13,453= $922,587,647
- Mod SA6122015-08-17+$77,480= $922,665,127
- Mod SA6192015-08-17+$10,743= $922,675,870
- Mod SA6252015-08-17+$68,796= $922,744,666
- Mod SA6292015-08-17+$33,167= $922,777,833
- Mod SA6432015-08-18+$0= $922,777,833
- Mod SA6562015-08-26-$9,795= $922,768,038
- Mod CO08N2015-08-28+$170,000= $922,938,038
- Mod CO08O2015-08-28+$95,000= $923,033,038
- Mod CO08L2015-09-08+$850,000= $923,883,038
- Mod CO08Q2015-09-10+$71,000= $923,954,038
- Mod CO08R2015-09-11+$105,000= $924,059,038
- Mod CO08S2015-09-11+$140,000= $924,199,038
- Mod SA6062015-09-14+$20,152= $924,219,190
- Mod SA6072015-09-14+$4,211= $924,223,401
- Mod SA6142015-09-14+$1,359= $924,224,760
- Mod SA6262015-09-14+$5,662= $924,230,422
- Mod SA6302015-09-14+$5,774= $924,236,196
- Mod SA6362015-09-14+$8,244= $924,244,440
- Mod SA6442015-09-14+$32= $924,244,472
- Mod SA6452015-09-14-$6,968= $924,237,504
- Mod SA6462015-09-14+$14,589= $924,252,093
- Mod SA6492015-09-14+$2,313= $924,254,406
- Mod SA6572015-09-14+$19,324= $924,273,730
- Mod SA6592015-09-14+$62,758= $924,336,488
- Mod SA6682015-09-14+$128,474= $924,464,962
- Mod SA6732015-09-14+$9,596= $924,474,558
- Mod SA6792015-09-14+$3,628= $924,478,186
- Mod SA6352015-09-16+$7,701= $924,485,887
- Mod SA6822015-09-16+$28,010= $924,513,897
- Mod CO08P2015-09-17+$448,707= $924,962,604
- Mod SA6372015-09-17+$13,600= $924,976,204
- Mod SA6692015-09-17+$7,173= $924,983,377
- Mod SA6812015-09-17+$13,062= $924,996,439
- Mod SA6832015-09-17+$10,456= $925,006,895
- Mod SA6842015-09-17+$4,006= $925,010,901
- Mod SA6852015-09-17+$1,235= $925,012,136
- Mod SA6862015-09-17+$12,015= $925,024,151
- Mod CO08U2015-09-22+$5,500= $925,029,651
- Mod CO08V2015-09-24+$0= $925,029,651
- Mod CO08W2015-09-24+$8,700= $925,038,351
- Mod SA6802015-09-24+$17,413= $925,055,764
- Mod SA6872015-09-24+$5,428= $925,061,192
- Mod SA6882015-09-24+$7,991= $925,069,183
- Mod CO08T2015-09-25+$250,000= $925,319,183
- Mod SA5962015-09-25+$47,909= $925,367,092
- Mod SA5982015-09-25+$32,299= $925,399,391
- Mod SA6002015-09-25+$6,069= $925,405,460
- Mod SA6012015-09-25+$22,138= $925,427,598
- Mod SA6022015-09-25+$5,044= $925,432,642
- Mod SA6042015-09-25+$211,781= $925,644,423
- Mod SA6782015-09-25+$82,510= $925,726,933
- Mod SA6582015-09-28+$10,088= $925,737,021
- Mod SA6932015-09-28+$5,385= $925,742,406
- Mod SA7052015-09-28-$13,293= $925,729,113
- Mod CO08Z2015-09-30+$40,000= $925,769,113
- Mod SA6212015-09-30+$29,861= $925,798,974
- Mod SA6662015-09-30+$5,171= $925,804,145
- Mod SA6912015-09-30+$7,261= $925,811,406
- Mod SA6942015-09-30+$3,309= $925,814,715
- Mod SA5772015-10-01+$2,146= $925,816,861
- Mod SA6082015-10-01+$49,990= $925,866,851
- Mod SA6102015-10-01+$32,299= $925,899,150
- Mod SA6112015-10-01+$8,958= $925,908,108
- Mod SA6382015-10-01+$41,958= $925,950,066
- Mod SA6482015-10-01+$42,616= $925,992,682
- Mod SA6502015-10-01+$23,617= $926,016,299
- Mod SA6532015-10-01+$6,074= $926,022,373
- Mod SA6542015-10-01+$7,329= $926,029,702
- Mod SA6602015-10-01+$17,267= $926,046,969
- Mod SA6652015-10-01+$189,070= $926,236,039
- Mod SA6722015-10-01+$15,888= $926,251,927
- Mod SA6742015-10-01+$4,041= $926,255,968
- Mod SA6752015-10-01+$6,201= $926,262,169
- Mod SA6972015-10-01+$2,602= $926,264,771
- Mod SA6992015-10-01+$13,397= $926,278,168
- Mod SA7002015-10-01+$2,853= $926,281,021
- Mod SA7022015-10-01+$19,908= $926,300,929
- Mod SA7072015-10-01+$11,919= $926,312,848
- Mod SA7532015-10-01+$3,251= $926,316,099
- Mod SA6132015-10-05+$209,184= $926,525,283
- Mod SA6152015-10-05+$5,228= $926,530,511
- Mod SA6172015-10-05+$42,817= $926,573,328
- Mod SA6182015-10-05+$12,930= $926,586,258
- Mod SA6202015-10-05+$3,655= $926,589,913
- Mod SA6222015-10-05+$14,286= $926,604,199
- Mod SA6242015-10-05+$12,432= $926,616,631
- Mod SA6272015-10-05+$5,188= $926,621,819
- Mod SA6312015-10-05+$19,732= $926,641,551
- Mod SA6322015-10-05+$87,000= $926,728,551
- Mod SA6332015-10-05+$3,229= $926,731,780
- Mod SA6392015-10-05+$54,459= $926,786,239
- Mod SA6402015-10-05+$59,132= $926,845,371
- Mod SA6412015-10-05+$50,374= $926,895,745
- Mod SA6422015-10-05+$90,798= $926,986,543
- Mod SA6472015-10-05+$66,501= $927,053,044
- Mod SA6512015-10-05+$53,457= $927,106,501
- Mod SA6552015-10-05+$61,056= $927,167,557
- Mod SA6612015-10-05+$139,557= $927,307,114
- Mod SA6622015-10-05+$2,365= $927,309,479
- Mod SA7062015-10-05+$2,065= $927,311,544
- Mod CO09A2015-10-07+$40,000= $927,351,544
- Mod CO09C2015-10-07+$9,500= $927,361,044
- Mod CO09D2015-10-07+$50,000= $927,411,044
- Mod SA6232015-10-07+$47,087= $927,458,131
- Mod SA6712015-10-07+$13,719= $927,471,850
- Mod SA6902015-10-07+$2,510= $927,474,360
- Mod SA7272015-10-07+$26,570= $927,500,930
- Mod CO09E2015-10-08+$10,100= $927,511,030
- Mod SA7012015-10-08+$9,166= $927,520,196
- Mod SA7202015-10-08+$3,418= $927,523,614
- Mod SA7242015-10-08+$3,452= $927,527,066
- Mod SA6642015-10-09+$7,870= $927,534,936
- Mod SA6762015-10-09+$7,676= $927,542,612
- Mod SA6962015-10-09+$270,191= $927,812,803
- Mod SA6982015-10-09+$184,734= $927,997,537
- Mod SA7262015-10-09+$2,347= $927,999,884
- Mod SA7282015-10-09+$9,461= $928,009,345
- Mod SA6702015-10-14+$330,000= $928,339,345
- Mod SA6892015-10-15+$24,938= $928,364,283
- Mod SA7302015-10-15-$45,610= $928,318,673
- Mod SA7312015-10-15+$3,758= $928,322,431
- Mod SA6162015-10-16+$83,042= $928,405,473
- Mod SA6522015-10-16+$3,964= $928,409,437
- Mod SA7132015-10-16+$3,256= $928,412,693
- Mod SA7142015-10-16+$3,882= $928,416,575
- Mod SA7152015-10-16+$17,604= $928,434,179
- Mod SA7162015-10-16+$7,516= $928,441,695
- Mod SA7182015-10-16+$3,323= $928,445,018
- Mod SA7192015-10-16+$64,303= $928,509,321
- Mod SA7292015-10-16+$11,239= $928,520,560
- Mod SA6282015-10-19+$5,724= $928,526,284
- Mod CO09F2015-10-20+$4,800= $928,531,084
- Mod SA7082015-10-22+$13,409= $928,544,493
- Mod SA7342015-10-22+$949= $928,545,442
- Mod SA7362015-10-22+$1,759= $928,547,201
- Mod SA7372015-10-22+$9,452= $928,556,653
- Mod SA7092015-10-23+$83,719= $928,640,372
- Mod SA7482015-10-23+$100,000= $928,740,372
- Mod SA7492015-10-23+$30,116= $928,770,488
- Mod SA7542015-10-23+$3,660= $928,774,148
- Mod SA7562015-10-23+$6,496= $928,780,644
- Mod CO09G2015-10-27+$137,203= $928,917,847
- Mod CO09B2015-10-28+$143,554= $929,061,401
- Mod SA7172015-10-28+$62,843= $929,124,244
- Mod SA7212015-10-28+$9,656= $929,133,900
- Mod SA7332015-10-28+$5,053= $929,138,953
- Mod SA7462015-10-28+$13,000= $929,151,953
- Mod SA7522015-10-28+$4,269= $929,156,222
- Mod SA7382015-10-29+$4,202= $929,160,424
- Mod SA7392015-10-29+$1,955= $929,162,379
- Mod SA7402015-10-29+$1,171= $929,163,550
- Mod SA7412015-10-29+$1,531= $929,165,081
- Mod SA7422015-10-29+$35,528= $929,200,609
- Mod SA7432015-10-29+$50,500= $929,251,109
- Mod SA7442015-10-29+$3,230= $929,254,339
- Mod SA7452015-10-29-$6,236= $929,248,103
- Mod SA7502015-10-29+$1,571= $929,249,674
- Mod SA7552015-10-29+$5,255= $929,254,929
- Mod SA7592015-10-29+$78,469= $929,333,398
- Mod SA7582015-11-02+$3,380= $929,336,778
- Mod SA7602015-11-02+$2,424= $929,339,202
- Mod SA7642015-11-02+$1,586= $929,340,788
- Mod CO09H2015-11-03+$52,000= $929,392,788
- Mod CO09I2015-11-03+$4,500= $929,397,288
- Mod SA7652015-11-03+$7,861= $929,405,149
- Mod SA7662015-11-03+$931= $929,406,080
- Mod SA7672015-11-03-$9,949= $929,396,131
- Mod SA7692015-11-03+$1,235= $929,397,366
- Mod SA7702015-11-03+$3,556= $929,400,922
- Mod SA7712015-11-03+$1,901= $929,402,823
- Mod SA7722015-11-03+$7,908= $929,410,731
- Mod CO09J2015-11-04+$6,000= $929,416,731
- Mod CO09K2015-11-04+$59,000= $929,475,731
- Mod SA7622015-11-04+$2,860= $929,478,591
- Mod SA7682015-11-04+$1,323= $929,479,914
- Mod SA7732015-11-04+$19,187= $929,499,101
- Mod SA7742015-11-04+$23,425= $929,522,526
- Mod SA7032015-11-05+$1,888= $929,524,414
- Mod SA7042015-11-05+$9,912= $929,534,326
- Mod SA7352015-11-05+$125,751= $929,660,077
- Mod SA7572015-11-05+$11,018= $929,671,095
- Mod SA7772015-11-05+$13,324= $929,684,419
- Mod SA7632015-11-06+$41,577= $929,725,996
- Mod SA7752015-11-06+$78,826= $929,804,822
- Mod SA7762015-11-06+$1,683= $929,806,505
- Mod SA7782015-11-06+$45,464= $929,851,969
- Mod SA7852015-11-06-$54,637= $929,797,332
- Mod CO09M2015-11-09+$6,500= $929,803,832
- Mod SA7842015-11-09+$6,403= $929,810,235
- Mod CO09O2015-11-10+$8,000= $929,818,235
- Mod SA7322015-11-10+$23,351= $929,841,586
- Mod SA7792015-11-10+$9,466= $929,851,052
- Mod SA7832015-11-10+$13,200= $929,864,252
- Mod SA7862015-11-10+$12,182= $929,876,434
- Mod SA7882015-11-10+$12,471= $929,888,905
- Mod SA7252015-11-16+$8,775= $929,897,680
- Mod SA7822015-11-16+$40,766= $929,938,446
- Mod SA7902015-11-17+$0= $929,938,446
- Mod SA7912015-11-17+$9,524= $929,947,970
- Mod SA8002015-11-17-$7,788= $929,940,182
- Mod SA7802015-11-18+$13,081= $929,953,263
- Mod SA7922015-11-18+$1,337= $929,954,600
- Mod SA7932015-11-18+$63,345= $930,017,945
- Mod SA7972015-11-18+$5,443= $930,023,388
- Mod SA7992015-11-18+$20,102= $930,043,490
- Mod SA8052015-11-18+$1,602= $930,045,092
- Mod SA8062015-11-18+$1,710= $930,046,802
- Mod SA8012015-11-19+$67,270= $930,114,072
- Mod SA8032015-11-19+$2,034= $930,116,106
- Mod SA8042015-11-19+$8,056= $930,124,162
- Mod SA8082015-11-19+$70,217= $930,194,379
- Mod SA8102015-11-19+$76,849= $930,271,228
- Mod SA8132015-11-19+$42,502= $930,313,730
- Mod SA8182015-11-19+$2,614= $930,316,344
- Mod CO09Q2015-11-20+$7,500= $930,323,844
- Mod SA7892015-11-20+$16,676= $930,340,520
- Mod SA7962015-11-20+$14,001= $930,354,521
- Mod SA8222015-11-20+$1,249= $930,355,770
- Mod SA7612015-11-24+$52,000= $930,407,770
- Mod CO09N2015-11-25+$4,500,000= $934,907,770
- Mod SA7812015-11-30+$16,072= $934,923,842
- Mod SA8112015-11-30+$3,322= $934,927,164
- Mod SA8122015-11-30-$17,576= $934,909,588
- Mod SA8142015-11-30+$8,084= $934,917,672
- Mod SA8162015-11-30+$14,670= $934,932,342
- Mod SA8172015-11-30+$10,986= $934,943,328
- Mod SA8242015-11-30+$36,123= $934,979,451
- Mod CO09R2015-12-01+$7,000= $934,986,451
- Mod SA8152015-12-01+$10,577= $934,997,028
- Mod SA8192015-12-01+$44,955= $935,041,983
- Mod SA7942015-12-02+$304,965= $935,346,948
- Mod SA8022015-12-02+$1,339= $935,348,287
- Mod SA8232015-12-02+$1,570= $935,349,857
- Mod SA8252015-12-02+$992= $935,350,849
- Mod SA8262015-12-02+$983= $935,351,832
- Mod SA6952015-12-03+$8,120= $935,359,952
- Mod SA8492015-12-03-$94,156= $935,265,796
- Mod CO09L2015-12-04+$475,000= $935,740,796
- Mod CO09S2015-12-04+$35,000= $935,775,796
- Mod SA7472015-12-04+$12,538= $935,788,334
- Mod SA8272015-12-04+$6,082= $935,794,416
- Mod SA8462015-12-04+$1,284= $935,795,700
- Mod SA8472015-12-04+$15,145= $935,810,845
- Mod SA8482015-12-04+$23,507= $935,834,352
- Mod SA8502015-12-04+$51,019= $935,885,371
- Mod SA8512015-12-04+$2,960= $935,888,331
- Mod SA8072015-12-07+$2,362= $935,890,693
- Mod SA8202015-12-07+$3,175= $935,893,868
- Mod SA8292015-12-07+$132,706= $936,026,574
- Mod SA8302015-12-07+$7,459= $936,034,033
- Mod SA8452015-12-07+$6,487= $936,040,520
- Mod SA8592015-12-07+$3,979= $936,044,499
- Mod SA8602015-12-07+$2,790= $936,047,289
- Mod SA8632015-12-07+$9,484= $936,056,773
- Mod SA8662015-12-07-$2,002= $936,054,771
- Mod SA7952015-12-08+$869= $936,055,640
- Mod SA8422015-12-08+$308,955= $936,364,595
- Mod SA8432015-12-08+$11,569= $936,376,164
- Mod SA8532015-12-08+$51,853= $936,428,017
- Mod SA8572015-12-08+$11,673= $936,439,690
- Mod SA8612015-12-08+$3,868= $936,443,558
- Mod SA8622015-12-08+$25,016= $936,468,574
- Mod SA8642015-12-08+$4,357= $936,472,931
- Mod SA8702015-12-08+$78,000= $936,550,931
- Mod SA8732015-12-08+$8,723= $936,559,654
- Mod SA8742015-12-08+$18,860= $936,578,514
- Mod SA8752015-12-08+$2,421= $936,580,935
- Mod CO09P2015-12-09+$438,460= $937,019,395
- Mod SA8682015-12-09+$24,230= $937,043,625
- Mod SA8722015-12-09+$17,068= $937,060,693
- Mod SA8762015-12-09+$11,017= $937,071,710
- Mod SA8792015-12-09+$6,682= $937,078,392
- Mod SA8802015-12-09+$2,007= $937,080,399
- Mod SA7122015-12-10+$152,687= $937,233,086
- Mod SA8212015-12-10+$128,653= $937,361,739
- Mod SA8442015-12-10+$3,884= $937,365,623
- Mod SA8522015-12-10+$6,067= $937,371,690
- Mod SA8542015-12-10+$22,975= $937,394,665
- Mod SA8552015-12-10+$2,584= $937,397,249
- Mod SA8562015-12-10+$28,137= $937,425,386
- Mod SA8582015-12-10+$71,531= $937,496,917
- Mod SA8672015-12-10+$10,996= $937,507,913
- Mod SA8842015-12-10+$3,163= $937,511,076
- Mod SA8312015-12-14+$223,260= $937,734,336
- Mod SA8812015-12-14+$41,850= $937,776,186
- Mod SA8822015-12-14+$20,653= $937,796,839
- Mod SA8832015-12-14+$24,802= $937,821,641
- Mod SA8862015-12-14+$9,290= $937,830,931
- Mod SA8872015-12-14+$12,059= $937,842,990
- Mod SA8892015-12-14+$11,695= $937,854,685
- Mod SA8332015-12-16+$21,740= $937,876,425
- Mod SA8342015-12-16+$25,141= $937,901,566
- Mod SA8902015-12-16+$32,407= $937,933,973
- Mod SA8932015-12-16+$19,789= $937,953,762
- Mod SA8952015-12-16-$96,143= $937,857,619
- Mod SA8962015-12-16+$8,590= $937,866,209
- Mod SA8982015-12-16+$5,001= $937,871,210
- Mod SA8992015-12-16+$14,228= $937,885,438
- Mod CO09T2015-12-18+$7,500= $937,892,938
- Mod CO09U2015-12-18+$100,000= $937,992,938
- Mod SA7512015-12-18+$22,678= $938,015,616
- Mod SA7872015-12-18+$163,813= $938,179,429
- Mod SA8322015-12-18+$13,227= $938,192,656
- Mod SA8352015-12-18+$13,490= $938,206,146
- Mod SA8362015-12-18+$1,284= $938,207,430
- Mod SA8372015-12-18+$14,079= $938,221,509
- Mod SA8382015-12-18+$4,572= $938,226,081
- Mod SA8392015-12-18+$15,342= $938,241,423
- Mod SA8402015-12-18+$8,848= $938,250,271
- Mod SA8652015-12-18+$11,611= $938,261,882
- Mod SA8692015-12-18+$4,164= $938,266,046
- Mod SA8712015-12-18+$34,709= $938,300,755
- Mod SA8772015-12-18-$14,270= $938,286,485
- Mod SA8782015-12-18+$7,513= $938,293,998
- Mod SA8882015-12-18+$4,171= $938,298,169
- Mod SA8912015-12-18+$23,004= $938,321,173
- Mod SA8922015-12-18+$3,938= $938,325,111
- Mod SA8942015-12-18+$51,958= $938,377,069
- Mod SA8972015-12-18+$31,968= $938,409,037
- Mod SA9022015-12-18+$50,854= $938,459,891
- Mod SA9032015-12-18+$1,846= $938,461,737
- Mod SA9052015-12-18+$20,586= $938,482,323
- Mod SA9102015-12-18+$52,174= $938,534,497
- Mod CO09V2015-12-29+$68,000= $938,602,497
- Mod SA8852015-12-29+$25,045= $938,627,542
- Mod SA9062015-12-29+$5,808= $938,633,350
- Mod SA9082015-12-29-$6,352= $938,626,998
- Mod SA9092015-12-29+$7,890= $938,634,888
- Mod CO09W2015-12-30+$0= $938,634,888
- Mod SA9002016-01-04+$2,936= $938,637,824
- Mod SA9012016-01-04+$19,051= $938,656,875
- Mod SA9042016-01-04+$4,146= $938,661,021
- Mod SA9072016-01-04+$159,292= $938,820,313
- Mod SA9122016-01-04+$5,065= $938,825,378
- Mod SA9132016-01-04+$10,753= $938,836,131
- Mod SA9142016-01-04+$37,831= $938,873,962
- Mod SA9152016-01-04-$801= $938,873,161
- Mod SA9162016-01-04+$5,651= $938,878,812
- Mod SA9172016-01-04+$27,759= $938,906,571
- Mod SA9192016-01-04+$3,691= $938,910,262
- Mod SA9212016-01-04+$792= $938,911,054
- Mod SA9252016-01-04+$18,312= $938,929,366
- Mod CO09X2016-01-05+$5,100= $938,934,466
- Mod CO09Z2016-01-07+$1,700= $938,936,166
- Mod SA9222016-01-11+$20,463= $938,956,629
- Mod SA9232016-01-11+$41,066= $938,997,695
- Mod SA9282016-01-11+$7,967= $939,005,662
- Mod SA9292016-01-11+$10,528= $939,016,190
- Mod SA9302016-01-11+$7,198= $939,023,388
- Mod SA9322016-01-11+$6,207= $939,029,595
- Mod SA9342016-01-11+$3,987= $939,033,582
- Mod SA9352016-01-11+$14,429= $939,048,011
- Mod SA9112016-01-12+$13,250= $939,061,261
- Mod SA9182016-01-13+$22,870= $939,084,131
- Mod SA9202016-01-13+$168,000= $939,252,131
- Mod SA9262016-01-13+$2,232= $939,254,363
- Mod SA9312016-01-13+$5,462= $939,259,825
- Mod SA9332016-01-13+$58,634= $939,318,459
- Mod SA9362016-01-13+$52,851= $939,371,310
- Mod SA9372016-01-13+$5,572= $939,376,882
- Mod SA9382016-01-13+$17,078= $939,393,960
- Mod SA9402016-01-13-$16,466= $939,377,494
- Mod SA9242016-01-15+$47,500= $939,424,994
- Mod SA9272016-01-15+$30,100= $939,455,094
- Mod SA9412016-01-15+$3,398= $939,458,492
- Mod SA9422016-01-15+$7,679= $939,466,171
- Mod SA9432016-01-15+$7,503= $939,473,674
- Mod SA9442016-01-15+$1,997= $939,475,671
- Mod SA9452016-01-15+$6,865= $939,482,536
- Mod SA9462016-01-15+$4,892= $939,487,428
- Mod SA9472016-01-15+$4,142= $939,491,570
- Mod SA9482016-01-15+$6,892= $939,498,462
- Mod SA9502016-01-15+$42,031= $939,540,493
- Mod SA9512016-01-15+$6,637= $939,547,130
- Mod SA9532016-01-15+$2,585= $939,549,715
- Mod SA9542016-01-15+$17,327= $939,567,042
- Mod SA9492016-01-19+$6,577= $939,573,619
- Mod SA9552016-01-19+$54,618= $939,628,237
- Mod SA9562016-01-19+$2,564= $939,630,801
- Mod SA9592016-01-19+$7,343= $939,638,144
- Mod SA9602016-01-19+$3,550= $939,641,694
- Mod SA7102016-01-25+$3,476= $939,645,170
- Mod SA9392016-01-25+$240,000= $939,885,170
- Mod SA9572016-01-25+$17,881= $939,903,051
- Mod SA9582016-01-25+$8,135= $939,911,186
- Mod SA9632016-01-25+$11,087= $939,922,273
- Mod SA9642016-01-25+$5,797= $939,928,070
- Mod SA9652016-01-25+$1,132= $939,929,202
- Mod SA9672016-01-25+$5,359= $939,934,561
- Mod SA9702016-01-25+$2,180= $939,936,741
- Mod SA9612016-01-26+$24,086= $939,960,827
- Mod SA9622016-01-26+$24,086= $939,984,913
- Mod SA9662016-01-26+$2,804= $939,987,717
- Mod CO10A2016-01-29+$10,000= $939,997,717
- Mod CO10B2016-01-29+$20,000= $940,017,717
- Mod SA9682016-01-29+$14,108= $940,031,825
- Mod SA9692016-01-29+$2,790= $940,034,615
- Mod SA9712016-01-29+$4,516= $940,039,131
- Mod SA9722016-01-29-$2,936= $940,036,195
- Mod SA9732016-01-29+$5,651= $940,041,846
- Mod SA9752016-01-29+$1,627= $940,043,473
- Mod SA9762016-01-29+$7,200= $940,050,673
- Mod SA9772016-01-29+$11,903= $940,062,576
- Mod SA9802016-01-29+$22,783= $940,085,359
- Mod CO10C2016-02-02+$26,000= $940,111,359
- Mod CO10D2016-02-02+$18,800= $940,130,159
- Mod SA9812016-02-02+$10,615= $940,140,774
- Mod CO10E2016-02-04+$197,000= $940,337,774
- Mod CO10G2016-02-04+$74,000= $940,411,774
- Mod SA9522016-02-04+$1,025= $940,412,799
- Mod SA9742016-02-04+$2,555= $940,415,354
- Mod SA9782016-02-04+$2,181= $940,417,535
- Mod SA9822016-02-04+$24,796= $940,442,331
- Mod SA9832016-02-04+$8,744= $940,451,075
- Mod SA9842016-02-04+$2,159= $940,453,234
- Mod SA9852016-02-04+$12,719= $940,465,953
- Mod SA9872016-02-04+$20,476= $940,486,429
- Mod SA9882016-02-04+$42,401= $940,528,830
- Mod SA10002016-02-10+$1,727= $940,530,557
- Mod SA10012016-02-10+$34,502= $940,565,059
- Mod SA10022016-02-10+$1,339= $940,566,398
- Mod SA10032016-02-10+$3,600= $940,569,998
- Mod SA9902016-02-10+$6,774= $940,576,772
- Mod SA9912016-02-10+$4,747= $940,581,519
- Mod SA9922016-02-10+$1,354= $940,582,873
- Mod SA9932016-02-10+$11,665= $940,594,538
- Mod SA9952016-02-10+$4,816= $940,599,354
- Mod SA9962016-02-10+$18,236= $940,617,590
- Mod SA9972016-02-10+$3,231= $940,620,821
- Mod SA9982016-02-10+$11,837= $940,632,658
- Mod SA9992016-02-10+$9,854= $940,642,512
- Mod CO10F2016-02-11+$254,000= $940,896,512
- Mod SA10092016-02-11+$32,103= $940,928,615
- Mod SA10102016-02-11+$4,320= $940,932,935
- Mod SA10112016-02-11+$2,645= $940,935,580
- Mod SA10042016-02-16+$84,451= $941,020,031
- Mod SA10082016-02-16+$1,216= $941,021,247
- Mod SA9892016-02-16+$33,803= $941,055,050
- Mod SA9942016-02-16+$57,600= $941,112,650
- Mod SA10062016-02-22+$42,546= $941,155,196
- Mod SA10122016-02-22+$32,500= $941,187,696
- Mod SA10132016-02-22+$8,170= $941,195,866
- Mod SA10142016-02-22+$30,796= $941,226,662
- Mod SA10152016-02-22+$9,957= $941,236,619
- Mod SA10162016-02-22+$3,513= $941,240,132
- Mod SA10172016-02-22+$14,571= $941,254,703
- Mod SA9862016-02-22+$842= $941,255,545
- Mod CO10H2016-02-23+$16,000= $941,271,545
- Mod CO10I2016-02-23+$9,500= $941,281,045
- Mod SA10192016-02-23+$24,612= $941,305,657
- Mod SA10202016-02-24+$49,579= $941,355,236
- Mod SA10222016-02-24+$16,308= $941,371,544
- Mod SA10232016-02-24+$12,210= $941,383,754
- Mod SA10272016-02-24+$6,585= $941,390,339
- Mod SA10282016-02-24+$6,332= $941,396,671
- Mod SA10292016-02-24+$2,878= $941,399,549
- Mod SA10212016-02-29+$8,115= $941,407,664
- Mod SA10302016-02-29+$4,854= $941,412,518
- Mod SA10312016-02-29+$4,265= $941,416,783
- Mod SA10322016-02-29+$21,056= $941,437,839
- Mod SA10332016-02-29+$49,930= $941,487,769
- Mod SA10362016-02-29+$1,139= $941,488,908
- Mod SA10372016-02-29+$26,993= $941,515,901
- Mod SA10382016-02-29+$1,054= $941,516,955
- Mod SA10402016-02-29+$3,350= $941,520,305
- Mod SA10432016-02-29+$21,201= $941,541,506
- Mod SA10452016-02-29+$48,216= $941,589,722
- Mod SA10482016-02-29+$175,000= $941,764,722
- Mod SA10502016-02-29+$16,465= $941,781,187
- Mod SA10512016-02-29+$0= $941,781,187
- Mod SA10242016-03-01+$18,604= $941,799,791
- Mod SA10262016-03-01+$4,429= $941,804,220
- Mod SA10412016-03-01+$63,119= $941,867,339
- Mod SA10422016-03-01+$1,290= $941,868,629
- Mod SA10442016-03-01+$1,010= $941,869,639
- Mod SA10462016-03-01+$5,866= $941,875,505
- Mod SA10532016-03-01+$2,966= $941,878,471
- Mod SA10182016-03-02+$38,096= $941,916,567
- Mod SA10342016-03-02+$189,073= $942,105,640
- Mod SA10522016-03-02+$220,000= $942,325,640
- Mod SA10492016-03-07+$21,585= $942,347,225
- Mod SA10542016-03-07+$2,623= $942,349,848
- Mod SA10552016-03-07+$2,598= $942,352,446
- Mod SA10562016-03-07+$2,207= $942,354,653
- Mod SA10632016-03-07+$870= $942,355,523
- Mod SA10642016-03-07+$3,340= $942,358,863
- Mod SA10652016-03-07+$2,000= $942,360,863
- Mod SA10472016-03-08+$1,471= $942,362,334
- Mod SA10572016-03-08+$8,005= $942,370,339
- Mod SA10582016-03-08+$7,118= $942,377,457
- Mod SA10592016-03-08+$6,000= $942,383,457
- Mod SA10602016-03-08+$8,545= $942,392,002
- Mod SA10612016-03-08+$52,092= $942,444,094
- Mod CO10J2016-03-14+$13,500= $942,457,594
- Mod SA10392016-03-14+$18,069= $942,475,663
- Mod SA10672016-03-14+$3,046= $942,478,709
- Mod SA10682016-03-14+$9,923= $942,488,632
- Mod SA10722016-03-14+$3,895= $942,492,527
- Mod SA10732016-03-14+$1,600= $942,494,127
- Mod SA10752016-03-14-$6,684= $942,487,443
- Mod SA10762016-03-14-$3,030= $942,484,413
- Mod SA10772016-03-14+$1,604= $942,486,017
- Mod SA10782016-03-14+$8,702= $942,494,719
- Mod SA10802016-03-14+$11,371= $942,506,090
- Mod SA10812016-03-14+$5,107= $942,511,197
- Mod SA10832016-03-14+$2,615= $942,513,812
- Mod SA10842016-03-14+$2,142= $942,515,954
- Mod SA10852016-03-14+$13,627= $942,529,581
- Mod SA10892016-03-14+$914= $942,530,495
- Mod SA10902016-03-14+$1,150= $942,531,645
- Mod SA10912016-03-14+$2,793= $942,534,438
- Mod SA9792016-03-14+$26,026= $942,560,464
- Mod SA10662016-03-15+$980= $942,561,444
- Mod SA10872016-03-15+$55,536= $942,616,980
- Mod SA10742016-03-16+$724= $942,617,704
- Mod SA10822016-03-16+$11,940= $942,629,644
- Mod SA10862016-03-16+$11,903= $942,641,547
- Mod SA10882016-03-16+$2,204= $942,643,751
- Mod SA10972016-03-16+$45,333= $942,689,084
- Mod SA10982016-03-16+$8,357= $942,697,441
- Mod SA11002016-03-16+$5,791= $942,703,232
- Mod SA11012016-03-16+$2,842= $942,706,074
- Mod SA10792016-03-17+$9,062= $942,715,136
- Mod SA10922016-03-17+$5,219= $942,720,355
- Mod SA10932016-03-17+$3,794= $942,724,149
- Mod SA10942016-03-17+$7,612= $942,731,761
- Mod SA10952016-03-17+$1,189= $942,732,950
- Mod SA10962016-03-17+$6,692= $942,739,642
- Mod SA10712016-03-21+$7,706= $942,747,348
- Mod SA11022016-03-21+$2,714= $942,750,062
- Mod SA11052016-03-21+$27,548= $942,777,610
- Mod SA11062016-03-21+$2,501= $942,780,111
- Mod SA11082016-03-21+$3,000= $942,783,111
- Mod SA11092016-03-21+$34,396= $942,817,507
- Mod SA11102016-03-21+$1,986= $942,819,493
- Mod SA11112016-03-21+$4,812= $942,824,305
- Mod SA11132016-03-21+$8,045= $942,832,350
- Mod SA10692016-03-22+$2,881= $942,835,231
- Mod SA11152016-03-22+$5,805= $942,841,036
- Mod SA10252016-03-23+$60,447= $942,901,483
- Mod CO10L2016-03-24+$60,000= $942,961,483
- Mod SA11032016-03-24+$5,550= $942,967,033
- Mod SA11042016-03-24+$5,195= $942,972,228
- Mod SA11122016-03-24+$3,459= $942,975,687
- Mod SA11142016-03-24+$4,317= $942,980,004
- Mod SA11162016-03-24+$2,167= $942,982,171
- Mod SA11172016-03-24+$2,120= $942,984,291
- Mod SA11182016-03-24+$1,446= $942,985,737
- Mod SA11192016-03-24+$43,356= $943,029,093
- Mod SA11202016-03-24+$4,320= $943,033,413
- Mod SA11212016-03-24+$5,089= $943,038,502
- Mod SA11222016-03-24+$1,336= $943,039,838
- Mod SA11242016-03-24+$3,356= $943,043,194
- Mod CO10M2016-03-25+$14,000= $943,057,194
- Mod SA11252016-03-25+$17,406= $943,074,600
- Mod SA11272016-03-25+$26,471= $943,101,071
- Mod SA11282016-03-25+$5,111= $943,106,182
- Mod SA11292016-03-25+$3,492= $943,109,674
- Mod SA8282016-03-25+$43,119= $943,152,793
- Mod SA11262016-03-28+$18,414= $943,171,207
- Mod SA11342016-03-28+$3,296= $943,174,503
- Mod SA11352016-03-29+$31,252= $943,205,755
- Mod CO10N2016-03-31+$11,000= $943,216,755
- Mod SA11232016-03-31+$6,202= $943,222,957
- Mod SA11302016-03-31+$9,789= $943,232,746
- Mod SA11312016-03-31+$4,048= $943,236,794
- Mod SA11372016-03-31+$33,992= $943,270,786
- Mod SA11382016-03-31+$9,479= $943,280,265
- Mod SA11402016-03-31+$13,080= $943,293,345
- Mod SA11412016-03-31+$4,886= $943,298,231
- Mod SA11422016-03-31+$2,170= $943,300,401
- Mod SA11432016-03-31+$14,469= $943,314,870
- Mod SA11442016-03-31+$5,988= $943,320,858
- Mod SA11452016-03-31+$15,187= $943,336,045
- Mod SA11462016-03-31+$2,188= $943,338,233
- Mod SA11482016-03-31+$2,506= $943,340,739
- Mod SA11522016-03-31+$4,409= $943,345,148
- Mod SA11532016-03-31+$3,991= $943,349,139
- Mod CO10K2016-04-04+$850,000= $944,199,139
- Mod SA11542016-04-04+$5,180= $944,204,319
- Mod SA11332016-04-05+$360,420= $944,564,739
- Mod SA11502016-04-05+$6,728= $944,571,467
- Mod SA11572016-04-05-$3,192= $944,568,275
- Mod SA11602016-04-05+$32,625= $944,600,900
- Mod SA11612016-04-05+$18,398= $944,619,298
- Mod SA11622016-04-05+$2,708= $944,622,006
- Mod SA11632016-04-05+$28,075= $944,650,081
- Mod CO10O2016-04-06+$110,000= $944,760,081
- Mod SA11392016-04-06+$11,696= $944,771,777
- Mod SA11562016-04-06+$2,850= $944,774,627
- Mod SA11592016-04-06+$0= $944,774,627
- Mod CO10P2016-04-07+$0= $944,774,627
- Mod SA11652016-04-07-$2,161= $944,772,466
- Mod SA11662016-04-07+$2,255= $944,774,721
- Mod SA11072016-04-08+$10,648= $944,785,369
- Mod SA11512016-04-08+$18,337= $944,803,706
- Mod SA11582016-04-08+$3,897= $944,807,603
- Mod SA11682016-04-08+$815= $944,808,418
- Mod SA11472016-04-11+$6,793= $944,815,211
- Mod SA11642016-04-11+$1,410= $944,816,621
- Mod SA11672016-04-11+$27,827= $944,844,448
- Mod SA11692016-04-11+$1,920= $944,846,368
- Mod SA11702016-04-11+$741= $944,847,109
- Mod SA11712016-04-11+$4,423= $944,851,532
- Mod SA11722016-04-11+$35,800= $944,887,332
- Mod SA11732016-04-11+$3,579= $944,890,911
- Mod SA11742016-04-11+$9,823= $944,900,734
- Mod SA11752016-04-11+$2,736= $944,903,470
- Mod SA11762016-04-11+$31,398= $944,934,868
- Mod SA11772016-04-14+$13,884= $944,948,752
- Mod SA11782016-04-14+$8,709= $944,957,461
- Mod SA11792016-04-14+$2,511= $944,959,972
- Mod SA11802016-04-14+$1,563= $944,961,535
- Mod SA11822016-04-14+$1,262= $944,962,797
- Mod SA11852016-04-14+$15,320= $944,978,117
- Mod SA11362016-04-18+$225,800= $945,203,917
- Mod SA11872016-04-18+$2,860= $945,206,777
- Mod SA11882016-04-18+$2,062= $945,208,839
- Mod SA11902016-04-18+$55,821= $945,264,660
- Mod CO10Q2016-04-21+$44,500= $945,309,160
- Mod SA11812016-04-21+$5,492= $945,314,652
- Mod SA11832016-04-21+$7,800= $945,322,452
- Mod SA11842016-04-21+$2,236= $945,324,688
- Mod SA11912016-04-21+$945= $945,325,633
- Mod SA11922016-04-21+$5,300= $945,330,933
- Mod SA11942016-04-21+$4,474= $945,335,407
- Mod SA11952016-04-21+$4,098= $945,339,505
- Mod SA11972016-04-21+$3,583= $945,343,088
- Mod SA11982016-04-21+$2,192= $945,345,280
- Mod SA11992016-04-21+$6,294= $945,351,574
- Mod SA12002016-04-21+$8,445= $945,360,019
- Mod SA12012016-04-21+$3,538= $945,363,557
- Mod SA12032016-04-21+$3,196= $945,366,753
- Mod SA12042016-04-21+$2,175= $945,368,928
- Mod CO10R2016-04-22+$86,000= $945,454,928
- Mod CO10S2016-04-22+$35,000= $945,489,928
- Mod CO10T2016-04-26+$10,000= $945,499,928
- Mod CO10U2016-04-29+$566,370= $946,066,298
- Mod SA11892016-05-03+$171,721= $946,238,019
- Mod SA12022016-05-03+$130,011= $946,368,030
- Mod SA12092016-05-03+$16,971= $946,385,001
- Mod SA12112016-05-03+$2,538= $946,387,539
- Mod SA12122016-05-03+$23,110= $946,410,649
- Mod SA12142016-05-03+$64,198= $946,474,847
- Mod SA10992016-05-04+$51,000= $946,525,847
- Mod SA11932016-05-04+$115,685= $946,641,532
- Mod SA12052016-05-04+$77,661= $946,719,193
- Mod SA12072016-05-04+$941= $946,720,134
- Mod SA12082016-05-04-$86= $946,720,048
- Mod SA12102016-05-04+$966= $946,721,014
- Mod SA12132016-05-04+$3,726= $946,724,740
- Mod SA12152016-05-04-$75,049= $946,649,691
- Mod SA12162016-05-04+$1,499= $946,651,190
- Mod SA12172016-05-04+$75,947= $946,727,137
- Mod SA12252016-05-04+$16,327= $946,743,464
- Mod SA12212016-05-05+$1,086= $946,744,550
- Mod SA12222016-05-05+$1,362= $946,745,912
- Mod SA12232016-05-05+$43,340= $946,789,252
- Mod SA12242016-05-05+$2,166= $946,791,418
- Mod SA12272016-05-05+$23,320= $946,814,738
- Mod SA12282016-05-05+$1,027= $946,815,765
- Mod SA12292016-05-05+$30,738= $946,846,503
- Mod SA12302016-05-05+$5,838= $946,852,341
- Mod SA12312016-05-05+$1,552= $946,853,893
- Mod SA12322016-05-05+$13,571= $946,867,464
- Mod SA12332016-05-05+$1,027= $946,868,491
- Mod SA12342016-05-05+$12,070= $946,880,561
- Mod SA12352016-05-05+$17,898= $946,898,459
- Mod SA12362016-05-05+$67,700= $946,966,159
- Mod SA12372016-05-05+$4,221= $946,970,380
- Mod SA12382016-05-05+$682= $946,971,062
- Mod SA12392016-05-05+$6,545= $946,977,607
- Mod SA12402016-05-05+$8,210= $946,985,817
- Mod SA12422016-05-05-$721= $946,985,096
- Mod CO10V2016-05-06+$11,500= $946,996,596
- Mod SA12182016-05-06+$776= $946,997,372
- Mod SA12192016-05-06+$5,719= $947,003,091
- Mod SA12432016-05-06+$2,793= $947,005,884
- Mod SA12442016-05-06+$538= $947,006,422
- Mod SA12452016-05-06-$707= $947,005,715
- Mod SA12472016-05-06+$2,507= $947,008,222
- Mod SA12482016-05-06+$2,869= $947,011,091
- Mod CO10X2016-05-09+$12,000= $947,023,091
- Mod SA11322016-05-09+$6,159= $947,029,250
- Mod SA11492016-05-09+$14,000= $947,043,250
- Mod SA12522016-05-09-$1,298= $947,041,952
- Mod SA12542016-05-09+$883= $947,042,835
- Mod SA11862016-05-11+$26,737= $947,069,572
- Mod SA12062016-05-11+$1,985= $947,071,557
- Mod SA12202016-05-11+$236,033= $947,307,590
- Mod SA12412016-05-11+$1,020= $947,308,610
- Mod SA12562016-05-11+$1,509= $947,310,119
- Mod SA12572016-05-11+$870= $947,310,989
- Mod SA12582016-05-11+$4,129= $947,315,118
- Mod SA12622016-05-11+$23,000= $947,338,118
- Mod SA12642016-05-11-$576= $947,337,542
- Mod SA12462016-05-16+$27,030= $947,364,572
- Mod SA12492016-05-16+$17,476= $947,382,048
- Mod SA12592016-05-16+$33,956= $947,416,004
- Mod CO10W2016-05-17+$430,100= $947,846,104
- Mod SA12502016-05-17+$3,421= $947,849,525
- Mod SA12512016-05-17+$2,800= $947,852,325
- Mod SA12602016-05-17-$938= $947,851,387
- Mod SA12612016-05-17+$12,187= $947,863,574
- Mod SA12632016-05-17+$5,070= $947,868,644
- Mod SA12662016-05-17+$38,791= $947,907,435
- Mod SA12702016-05-17+$3,296= $947,910,731
- Mod SA12712016-05-17+$18,012= $947,928,743
- Mod SA12722016-05-17+$3,334= $947,932,077
- Mod SA12732016-05-17+$7,036= $947,939,113
- Mod SA11962016-05-19+$180,500= $948,119,613
- Mod SA12652016-05-19+$101,384= $948,220,997
- Mod SA12692016-05-19+$1,934= $948,222,931
- Mod SA12752016-05-19+$56,202= $948,279,133
- Mod SA12762016-05-19+$11,449= $948,290,582
- Mod SA12782016-05-19+$7,872= $948,298,454
- Mod SA12742016-05-23+$7,557= $948,306,011
- Mod SA12812016-05-23+$7,300= $948,313,311
- Mod SA6922016-05-23-$16,843= $948,296,468
- Mod SA12552016-05-24+$110,503= $948,406,971
- Mod SA12682016-05-24+$21,530= $948,428,501
- Mod SA12792016-05-24+$8,068= $948,436,569
- Mod SA12842016-05-24+$25,883= $948,462,452
- Mod SA12872016-05-24+$33,427= $948,495,879
- Mod SA12882016-05-24-$61,368= $948,434,511
- Mod SA12902016-05-26+$42,000= $948,476,511
- Mod SA12922016-05-26+$6,119= $948,482,630
- Mod SA12942016-05-26+$35,991= $948,518,621
- Mod SA12532016-06-01+$68,826= $948,587,447
- Mod SA12832016-06-01+$10,401= $948,597,848
- Mod SA12852016-06-01+$9,200= $948,607,048
- Mod SA12892016-06-01+$3,857= $948,610,905
- Mod SA12912016-06-01+$17,134= $948,628,039
- Mod SA12862016-06-02+$6,054= $948,634,093
- Mod SA12932016-06-02+$3,270= $948,637,363
- Mod SA12952016-06-03+$3,000= $948,640,363
- Mod SA12982016-06-03+$6,456= $948,646,819
- Mod SA12992016-06-07+$7,326= $948,654,145
- Mod SA13002016-06-07+$690= $948,654,835
- Mod SA13012016-06-07+$15,961= $948,670,796
- Mod SA12972016-06-08+$7,347= $948,678,143
- Mod SA13022016-06-08+$3,862= $948,682,005
- Mod SA13032016-06-08+$6,014= $948,688,019
- Mod SA13062016-06-08+$7,223= $948,695,242
- Mod CO11A2016-06-09+$10,000= $948,705,242
- Mod SA13042016-06-09+$3,345= $948,708,587
- Mod SA13052016-06-09+$4,714= $948,713,301
- Mod SA13082016-06-09+$4,617= $948,717,918
- Mod SA13092016-06-09+$5,696= $948,723,614
- Mod CO11B2016-06-20+$3,000= $948,726,614
- Mod SA13102016-06-20+$1,721= $948,728,335
- Mod SA13112016-06-20+$6,715= $948,735,050
- Mod SA13122016-06-20+$256,362= $948,991,412
- Mod SA13132016-06-20-$72,000= $948,919,412
- Mod SA13172016-06-20+$1,100= $948,920,512
- Mod SA13182016-06-20+$2,685= $948,923,197
- Mod SA13202016-06-20+$6,536= $948,929,733
- Mod SA13212016-06-20+$2,872= $948,932,605
- Mod SA13222016-06-20+$2,460= $948,935,065
- Mod SA13232016-06-20+$1,445= $948,936,510
- Mod CO11C2016-06-21+$50,000= $948,986,510
- Mod SA13142016-06-21+$4,855= $948,991,365
- Mod SA13152016-06-21+$2,996= $948,994,361
- Mod SA13162016-06-21+$3,379= $948,997,740
- Mod SA13252016-06-21+$2,336= $949,000,076
- Mod SA13262016-06-23+$3,832= $949,003,908
- Mod SA13312016-06-23+$18,355= $949,022,263
- Mod SA13192016-06-27+$5,482= $949,027,745
- Mod SA13272016-06-27+$5,087= $949,032,832
- Mod SA13282016-06-27+$46,433= $949,079,265
- Mod SA13292016-06-27+$1,596= $949,080,861
- Mod SA13302016-06-28+$15,000= $949,095,861
- Mod SA13242016-06-29+$106,833= $949,202,694
- Mod SA13332016-06-29+$128,420= $949,331,114
- Mod SA13342016-06-29+$3,419= $949,334,533
- Mod SA13352016-06-29+$89,000= $949,423,533
- Mod SA13362016-06-29+$1,529= $949,425,062
- Mod SA13372016-06-29+$10,528= $949,435,590
- Mod SA13382016-06-29+$131,792= $949,567,382
- Mod CO11D2016-07-01+$70,000= $949,637,382
- Mod SA13392016-07-01+$2,917= $949,640,299
- Mod SA13402016-07-01+$4,882= $949,645,181
- Mod SA13422016-07-01+$5,574= $949,650,755
- Mod SA13432016-07-01+$1,959= $949,652,714
- Mod SA13442016-07-01+$1,258= $949,653,972
- Mod SA13452016-07-01+$22,191= $949,676,163
- Mod SA13462016-07-01+$38,523= $949,714,686
- Mod SA13472016-07-01+$20,902= $949,735,588
- Mod SA13492016-07-01+$22,000= $949,757,588
- Mod SA13502016-07-01+$16,026= $949,773,614
- Mod SA13512016-07-01+$7,458= $949,781,072
- Mod SA13522016-07-01+$8,968= $949,790,040
- Mod SA13532016-07-01+$19,616= $949,809,656
- Mod SA13322016-07-11+$3,000= $949,812,656
- Mod SA13412016-07-11+$116,548= $949,929,204
- Mod SA13482016-07-11+$26,508= $949,955,712
- Mod SA13542016-07-11+$7,654= $949,963,366
- Mod SA13572016-07-11+$3,740= $949,967,106
- Mod SA13582016-07-11+$3,810= $949,970,916
- Mod SA13612016-07-11-$19,445= $949,951,471
- Mod SA13072016-07-12+$0= $949,951,471
- Mod SA13622016-07-12+$2,301= $949,953,772
- Mod SA13632016-07-12+$14,627= $949,968,399
- Mod SA13592016-07-13+$584= $949,968,983
- Mod SA13602016-07-13+$7,000= $949,975,983
- Mod SA13652016-07-14+$6,174= $949,982,157
- Mod SA13672016-07-14+$3,646= $949,985,803
- Mod SA13692016-07-14+$19,486= $950,005,289
- Mod SA13702016-07-14+$2,171= $950,007,460
- Mod SA13562016-07-15+$3,737= $950,011,197
- Mod SA13642016-07-20+$2,503= $950,013,700
- Mod SA13662016-07-20-$1,172= $950,012,528
- Mod SA13682016-07-20+$3,432= $950,015,960
- Mod SA13712016-07-20+$13,775= $950,029,735
- Mod SA13742016-07-20+$1,453= $950,031,188
- Mod SA13842016-07-22+$23,231= $950,054,419
- Mod SA13852016-07-22+$1,207= $950,055,626
- Mod SA13862016-07-22+$3,553= $950,059,179
- Mod SA13732016-07-25+$11,958= $950,071,137
- Mod SA13772016-07-26+$11,750= $950,082,887
- Mod SA13812016-07-26+$5,503= $950,088,390
- Mod SA13822016-07-26+$1,271= $950,089,661
- Mod SA13832016-07-26+$2,451= $950,092,112
- Mod SA13872016-07-26+$2,758= $950,094,870
- Mod SA13882016-07-26+$3,190= $950,098,060
- Mod SA13892016-07-26+$9,900= $950,107,960
- Mod SA13902016-07-27+$18,500= $950,126,460
- Mod SA13912016-07-27+$8,945= $950,135,405
- Mod SA13922016-07-27+$2,377= $950,137,782
- Mod SA13932016-07-27+$9,000= $950,146,782
- Mod SA13952016-07-27+$33,846= $950,180,628
- Mod SA14002016-07-27+$9,111= $950,189,739
- Mod SA14012016-07-27+$23,978= $950,213,717
- Mod SA13722016-07-28+$36,959= $950,250,676
- Mod SA13942016-07-28+$20,222= $950,270,898
- Mod SA13962016-07-28+$16,306= $950,287,204
- Mod SA13982016-07-28+$33,630= $950,320,834
- Mod SA13782016-07-29+$4,349= $950,325,183
- Mod SA13802016-07-29+$199,639= $950,524,822
- Mod SA14022016-07-29+$10,645= $950,535,467
- Mod SA14032016-07-29+$56,178= $950,591,645
- Mod SA14042016-07-29+$1,235= $950,592,880
- Mod SA14052016-07-29+$2,165= $950,595,045
- Mod SA14082016-07-29+$5,407= $950,600,452
- Mod SA13972016-08-01+$3,524= $950,603,976
- Mod SA13992016-08-01+$1,539= $950,605,515
- Mod SA14062016-08-01-$3,911= $950,601,604
- Mod SA14092016-08-01+$3,603= $950,605,207
- Mod SA14102016-08-01+$6,000= $950,611,207
- Mod SA14112016-08-01+$5,605= $950,616,812
- Mod SA14122016-08-01-$38,095= $950,578,717
- Mod SA14132016-08-01+$4,288= $950,583,005
- Mod CO11E2016-08-03+$100,000= $950,683,005
- Mod SA14142016-08-04+$3,441= $950,686,446
- Mod SA14152016-08-04-$2,139= $950,684,307
- Mod SA14162016-08-04+$6,045= $950,690,352
- Mod SA14172016-08-04+$4,191= $950,694,543
- Mod CO11F2016-08-05+$131,552= $950,826,095
- Mod SA14192016-08-08+$15,299= $950,841,394
- Mod SA14212016-08-08+$3,229= $950,844,623
- Mod SA14222016-08-08+$5,118= $950,849,741
- Mod SA14232016-08-08+$1,682= $950,851,423
- Mod SA14242016-08-08+$3,031= $950,854,454
- Mod SA14282016-08-08+$25,000= $950,879,454
- Mod CO11G2016-08-09+$20,000= $950,899,454
- Mod CO11H2016-08-09+$3,000= $950,902,454
- Mod SA14072016-08-10+$10,860= $950,913,314
- Mod SA14182016-08-10+$47,636= $950,960,950
- Mod SA14202016-08-10+$8,047= $950,968,997
- Mod SA14312016-08-10+$27,121= $950,996,118
- Mod SA14322016-08-10+$36,575= $951,032,693
- Mod SA14342016-08-10+$65,740= $951,098,433
- Mod SA14352016-08-10+$30,084= $951,128,517
- Mod SA14272016-08-16+$3,858= $951,132,375
- Mod SA14292016-08-16-$1,186= $951,131,189
- Mod SA14332016-08-16+$6,720= $951,137,909
- Mod SA14362016-08-16+$4,923= $951,142,832
- Mod SA14372016-08-16+$23,581= $951,166,413
- Mod SA14392016-08-16-$12,683= $951,153,730
- Mod SA14402016-08-16+$3,319= $951,157,049
- Mod SA14412016-08-16+$3,164= $951,160,213
- Mod SA14432016-08-16+$3,989= $951,164,202
- Mod SA14442016-08-16+$1,211= $951,165,413
- Mod SA14502016-08-16+$3,634= $951,169,047
- Mod SA14462016-08-17+$8,244= $951,177,291
- Mod SA13552016-08-18+$19,440= $951,196,731
- Mod SA14522016-08-18+$2,544= $951,199,275
- Mod SA14532016-08-18+$7,407= $951,206,682
- Mod SA14552016-08-18+$1,209= $951,207,891
- Mod CO11I2016-08-19+$101,433= $951,309,324
- Mod CO11J2016-08-19+$78,000= $951,387,324
- Mod SA14472016-08-22+$15,984= $951,403,308
- Mod SA14482016-08-22+$2,726= $951,406,034
- Mod SA14572016-08-22+$2,777= $951,408,811
- Mod SA14382016-08-23+$16,338= $951,425,149
- Mod SA14512016-08-23+$13,362= $951,438,511
- Mod SA14542016-08-23+$13,296= $951,451,807
- Mod SA14562016-08-23+$1,385= $951,453,192
- Mod SA14592016-08-23+$19,321= $951,472,513
- Mod SA14652016-08-23+$12,993= $951,485,506
- Mod SA13762016-08-24+$4,977= $951,490,483
- Mod SA14612016-08-24+$10,659= $951,501,142
- Mod SA14632016-08-24+$2,324= $951,503,466
- Mod SA14672016-08-24+$4,216= $951,507,682
- Mod SA14682016-08-24+$1,112= $951,508,794
- Mod CO11L2016-08-25+$30,000= $951,538,794
- Mod SA14452016-08-25+$15,653= $951,554,447
- Mod SA14582016-08-25+$45,820= $951,600,267
- Mod SA14602016-08-25+$4,702= $951,604,969
- Mod SA14642016-08-25+$9,128= $951,614,097
- Mod SA14732016-08-25+$1,412= $951,615,509
- Mod SA14742016-08-25-$2,556= $951,612,953
- Mod SA14752016-08-25+$5,270= $951,618,223
- Mod SA14762016-08-25+$2,547= $951,620,770
- Mod CO11M2016-08-29+$50,000= $951,670,770
- Mod SA14662016-08-29+$18,270= $951,689,040
- Mod SA14702016-08-29+$7,434= $951,696,474
- Mod SA14722016-08-29+$3,792= $951,700,266
- Mod SA14782016-08-29+$1,237= $951,701,503
- Mod SA14802016-08-29+$11,973= $951,713,476
- Mod SA14822016-08-29+$9,002= $951,722,478
- Mod SA14832016-08-29+$7,500= $951,729,978
- Mod SA14842016-08-29+$950= $951,730,928
- Mod SA14892016-08-30+$165,001= $951,895,929
- Mod CO11N2016-08-31+$4,341,692= $956,237,621
- Mod CO11O2016-08-31+$675,000= $956,912,621
- Mod CO11P2016-08-31+$675,000= $957,587,621
- Mod CO11Q2016-08-31+$675,000= $958,262,621
- Mod CO11R2016-08-31+$675,000= $958,937,621
- Mod SA13752016-08-31+$384,770= $959,322,391
- Mod SA14252016-08-31+$29,518= $959,351,909
- Mod SA14262016-08-31+$249,184= $959,601,093
- Mod SA14692016-08-31+$6,646= $959,607,739
- Mod SA14792016-08-31+$14,648= $959,622,387
- Mod SA14812016-08-31-$1,428= $959,620,959
- Mod SA14852016-08-31+$753= $959,621,712
- Mod SA14862016-08-31+$6,530= $959,628,242
- Mod SA14872016-08-31+$18,378= $959,646,620
- Mod SA14912016-08-31+$445,636= $960,092,256
- Mod CO11S2016-09-01+$30,000= $960,122,256
- Mod CO11T2016-09-01+$121,800= $960,244,056
- Mod SA14302016-09-01+$1,397,211= $961,641,267
- Mod SA14422016-09-01+$58,674= $961,699,941
- Mod SA14622016-09-01+$631= $961,700,572
- Mod SA14712016-09-01+$4,094= $961,704,666
- Mod SA14952016-09-01+$38,000= $961,742,666
- Mod SA14962016-09-01+$16,787= $961,759,453
- Mod SA14972016-09-01+$13,319= $961,772,772
- Mod SA14772016-09-07+$2,309= $961,775,081
- Mod SA14982016-09-07+$24,138= $961,799,219
- Mod SA14992016-09-07+$2,050= $961,801,269
- Mod SA15012016-09-07+$56,022= $961,857,291
- Mod SA15032016-09-08+$14,036= $961,871,327
- Mod SA15042016-09-08+$17,894= $961,889,221
- Mod SA15052016-09-08+$6,791= $961,896,012
- Mod SA15062016-09-08+$16,757= $961,912,769
- Mod SA15072016-09-08+$16,814= $961,929,583
- Mod CO11U2016-09-09+$0= $961,929,583
- Mod SA14902016-09-12+$2,118= $961,931,701
- Mod SA15002016-09-12+$9,847= $961,941,548
- Mod SA15022016-09-12+$8,478= $961,950,026
- Mod SA15082016-09-12+$5,000= $961,955,026
- Mod SA15092016-09-12+$2,305= $961,957,331
- Mod SA15112016-09-12+$16,900= $961,974,231
- Mod SA15122016-09-12+$2,782= $961,977,013
- Mod SA15132016-09-12+$4,000= $961,981,013
- Mod SA15142016-09-12+$69,000= $962,050,013
- Mod CO11V2016-09-13+$68,000= $962,118,013
- Mod SA15102016-09-13+$3,000= $962,121,013
- Mod SA15172016-09-15+$5,373= $962,126,386
- Mod SA15192016-09-15+$3,238= $962,129,624
- Mod SA15202016-09-15+$2,861= $962,132,485
- Mod SA15212016-09-15+$2,519= $962,135,004
- Mod SA15222016-09-15+$34,956= $962,169,960
- Mod SA15232016-09-15+$5,500= $962,175,460
- Mod SA15242016-09-15+$850= $962,176,310
- Mod SA15252016-09-15+$2,358= $962,178,668
- Mod SA15262016-09-15+$1,163= $962,179,831
- Mod SA15272016-09-15+$11,300= $962,191,131
- Mod SA15282016-09-15+$4,049= $962,195,180
- Mod SA15322016-09-15+$586= $962,195,766
- Mod SA15152016-09-19+$11,417= $962,207,183
- Mod SA15372016-09-19+$67,568= $962,274,751
- Mod SA15462016-09-19+$3,489= $962,278,240
- Mod SA15302016-09-20+$14,000= $962,292,240
- Mod SA15162016-09-21+$2,523= $962,294,763
- Mod SA15182016-09-21+$1,709= $962,296,472
- Mod SA15512016-09-28-$953= $962,295,519
- Mod SA14882016-09-30+$731,842= $963,027,361
- Mod SA15472016-09-30+$51,000,000= $1,014,027,361
- Mod SA15292016-10-06+$9,000= $1,014,036,361
- Mod SA15332016-10-06+$50,346= $1,014,086,707
- Mod SA15552016-10-06+$651= $1,014,087,358
- Mod SA15692016-10-06+$278= $1,014,087,636
- Mod SA15762016-10-07-$1,208= $1,014,086,428
- Mod SA15312016-10-12+$7,542= $1,014,093,970
- Mod SA15482016-10-12+$2,312= $1,014,096,282
- Mod SA15492016-10-12+$6,808= $1,014,103,090
- Mod SA15502016-10-12+$9,598= $1,014,112,688
- Mod SA15522016-10-12+$5,650= $1,014,118,338
- Mod SA15532016-10-12+$5,614= $1,014,123,952
- Mod SA15542016-10-12+$40,217= $1,014,164,169
- Mod SA15562016-10-12+$3,146= $1,014,167,315
- Mod SA15572016-10-12+$2,454= $1,014,169,769
- Mod SA15592016-10-12+$5,734= $1,014,175,503
- Mod SA15622016-10-12+$5,188= $1,014,180,691
- Mod SA15642016-10-12+$741= $1,014,181,432
- Mod SA15652016-10-12+$721= $1,014,182,153
- Mod SA15662016-10-12+$638= $1,014,182,791
- Mod SA15672016-10-12+$3,109= $1,014,185,900
- Mod SA15752016-10-12+$581= $1,014,186,481
- Mod CO11X2016-10-13+$10,000= $1,014,196,481
- Mod SA15732016-10-13+$2,098= $1,014,198,579
- Mod SA15742016-10-13+$83,587= $1,014,282,166
- Mod SA15772016-10-13+$3,850= $1,014,286,016
- Mod SA15782016-10-13+$1,994= $1,014,288,010
- Mod SA15792016-10-13+$4,300= $1,014,292,310
- Mod SA15802016-10-13+$9,625= $1,014,301,935
- Mod SA15862016-10-13+$16,972= $1,014,318,907
- Mod SA15872016-10-13+$6,817= $1,014,325,724
- Mod SA15882016-10-13+$3,662= $1,014,329,386
- Mod SA15892016-10-13+$22,448= $1,014,351,834
- Mod CO11Z2016-10-20+$0= $1,014,351,834
- Mod SA15902016-10-20+$19,939= $1,014,371,773
- Mod SA15602016-10-21+$40,131= $1,014,411,904
- Mod SA15712016-10-21+$3,850= $1,014,415,754
- Mod SA15812016-10-21+$2,667= $1,014,418,421
- Mod SA15822016-10-21+$492= $1,014,418,913
- Mod SA15832016-10-21+$4,300= $1,014,423,213
- Mod SA15842016-10-21+$29,248= $1,014,452,461
- Mod SA15852016-10-21+$11,721= $1,014,464,182
- Mod SA15912016-10-21+$44,571= $1,014,508,753
- Mod SA15922016-10-21+$171,764= $1,014,680,517
- Mod SA15932016-10-21+$1,042= $1,014,681,559
- Mod SA15942016-10-21+$31,329= $1,014,712,888
- Mod SA15972016-10-21+$29,841= $1,014,742,729
- Mod SA15432016-10-25+$362,721= $1,015,105,450
- Mod SA15612016-10-25+$6,718= $1,015,112,168
- Mod SA15632016-10-25+$2,177= $1,015,114,345
- Mod SA16012016-10-25+$1,581= $1,015,115,926
- Mod SA16032016-10-25+$22,982= $1,015,138,908
- Mod CO12B2016-10-26+$106,700= $1,015,245,608
- Mod CO12C2016-10-26+$13,000= $1,015,258,608
- Mod CO12D2016-10-26+$120,000= $1,015,378,608
- Mod CO12E2016-10-26+$15,000= $1,015,393,608
- Mod CO12F2016-10-26+$10,000= $1,015,403,608
- Mod CO12G2016-10-26+$5,000= $1,015,408,608
- Mod CO12H2016-10-26+$14,500= $1,015,423,108
- Mod SA14932016-10-26+$399,166= $1,015,822,274
- Mod SA15412016-10-26+$435,675= $1,016,257,949
- Mod SA15442016-10-26+$42,216= $1,016,300,165
- Mod SA15582016-10-26+$718= $1,016,300,883
- Mod SA15952016-10-26+$5,499= $1,016,306,382
- Mod SA15962016-10-26+$2,475= $1,016,308,857
- Mod SA15982016-10-26+$11,242= $1,016,320,099
- Mod SA15992016-10-26+$1,844= $1,016,321,943
- Mod SA16002016-10-26+$78= $1,016,322,021
- Mod SA16022016-10-26+$12,363= $1,016,334,384
- Mod SA16042016-10-26+$6,590= $1,016,340,974
- Mod SA16052016-10-26+$2,350= $1,016,343,324
- Mod SA16062016-10-26+$27,745= $1,016,371,069
- Mod SA16072016-10-26+$5,090= $1,016,376,159
- Mod SA16082016-10-26+$1,828= $1,016,377,987
- Mod SA16092016-10-26-$10,880= $1,016,367,107
- Mod SA16102016-10-26+$54,875= $1,016,421,982
- Mod SA16112016-10-26+$4,670= $1,016,426,652
- Mod SA16142016-10-27+$3,110= $1,016,429,762
- Mod SA16152016-10-27+$8,684= $1,016,438,446
- Mod SA14922016-10-31+$136,124= $1,016,574,570
- Mod SA14942016-10-31+$392,431= $1,016,967,001
- Mod SA15342016-10-31+$2,330,600= $1,019,297,601
- Mod SA15362016-10-31+$570,217= $1,019,867,818
- Mod SA15382016-10-31+$96,339= $1,019,964,157
- Mod SA15392016-10-31+$564,388= $1,020,528,545
- Mod SA15402016-10-31+$0= $1,020,528,545
- Mod SA15422016-10-31+$5,281,618= $1,025,810,163
- Mod SA15722016-11-03+$349,915= $1,026,160,078
- Mod SA16122016-11-03+$12,117= $1,026,172,195
- Mod SA16162016-11-03+$4,100= $1,026,176,295
- Mod SA16172016-11-03+$17,566= $1,026,193,861
- Mod SA16182016-11-03+$5,014= $1,026,198,875
- Mod SA16202016-11-03+$14,346= $1,026,213,221
- Mod CO12M2016-11-07+$53,336= $1,026,266,557
- Mod CO12I2016-11-08+$0= $1,026,266,557
- Mod SA16132016-11-08+$27,714= $1,026,294,271
- Mod SA16212016-11-08+$514= $1,026,294,785
- Mod SA16222016-11-08+$2,188= $1,026,296,973
- Mod SA16232016-11-08+$13,907= $1,026,310,880
- Mod SA16252016-11-08+$14,112= $1,026,324,992
- Mod SA16262016-11-08+$7,060= $1,026,332,052
- Mod CO12J2016-11-09+$3,200= $1,026,335,252
- Mod CO12K2016-11-09+$80,000= $1,026,415,252
- Mod SA16242016-11-09+$6,616= $1,026,421,868
- Mod SA16282016-11-09+$3,511= $1,026,425,379
- Mod SA16312016-11-09+$2,029= $1,026,427,408
- Mod SA15352016-11-10+$330,818= $1,026,758,226
- Mod SA16462016-11-10+$38,844= $1,026,797,070
- Mod SA16272016-11-16+$1,350= $1,026,798,420
- Mod SA16292016-11-16+$28,920= $1,026,827,340
- Mod SA16302016-11-16+$976= $1,026,828,316
- Mod SA16322016-11-16+$7,679= $1,026,835,995
- Mod SA16342016-11-16+$7,591= $1,026,843,586
- Mod SA16352016-11-16+$26,493= $1,026,870,079
- Mod SA16362016-11-16+$1,575= $1,026,871,654
- Mod SA16372016-11-16+$2,700= $1,026,874,354
- Mod SA16382016-11-16+$3,676= $1,026,878,030
- Mod SA16392016-11-16+$1,648= $1,026,879,678
- Mod SA16402016-11-16+$3,029= $1,026,882,707
- Mod SA16412016-11-16+$10,190= $1,026,892,897
- Mod SA16422016-11-16+$11,791= $1,026,904,688
- Mod SA16442016-11-16+$2,980= $1,026,907,668
- Mod SA16452016-11-16+$1,706= $1,026,909,374
- Mod SA16472016-11-16+$2,476= $1,026,911,850
- Mod CO12L2016-11-17+$79,700= $1,026,991,550
- Mod CO12N2016-11-17+$3,500= $1,026,995,050
- Mod SA16332016-11-17+$4,790= $1,026,999,840
- Mod CO12O2016-11-30+$8,000= $1,027,007,840
- Mod CO12P2016-11-30+$9,500= $1,027,017,340
- Mod SA16492016-11-30+$110,000= $1,027,127,340
- Mod SA16482016-12-06+$4,417= $1,027,131,757
- Mod SA16502016-12-06+$13,342= $1,027,145,099
- Mod SA16512016-12-06+$2,320= $1,027,147,419
- Mod SA16522016-12-06+$2,282= $1,027,149,701
- Mod SA16532016-12-06+$1,400= $1,027,151,101
- Mod SA16542016-12-06+$8,810= $1,027,159,911
- Mod SA16552016-12-06+$1,894= $1,027,161,805
- Mod SA16572016-12-06+$20,590= $1,027,182,395
- Mod SA16582016-12-06+$5,136= $1,027,187,531
- Mod SA16592016-12-06+$4,870= $1,027,192,401
- Mod SA16602016-12-06+$8,792= $1,027,201,193
- Mod SA16612016-12-06+$7,400= $1,027,208,593
- Mod SA16622016-12-07+$18,984= $1,027,227,577
- Mod SA16632016-12-07+$15,169= $1,027,242,746
- Mod SA16652016-12-12+$1,900= $1,027,244,646
- Mod SA16562016-12-14+$23,914= $1,027,268,560
- Mod SA16682016-12-14+$5,064= $1,027,273,624
- Mod SA16662016-12-15+$6,210= $1,027,279,834
- Mod SA16702016-12-15+$8,232= $1,027,288,066
- Mod SA16712016-12-15+$10,964= $1,027,299,030
- Mod SA16722016-12-15+$7,427= $1,027,306,457
- Mod SA16692016-12-20+$9,283= $1,027,315,740
- Mod SA16732016-12-20+$4,500= $1,027,320,240
- Mod SA16742016-12-20+$3,582= $1,027,323,822
- Mod SA16752016-12-20+$6,492= $1,027,330,314
- Mod SA16772016-12-20+$2,700= $1,027,333,014
- Mod SA16802016-12-20+$4,345= $1,027,337,359
- Mod SA16192016-12-21+$3,098,535= $1,030,435,894
- Mod SA16642016-12-21+$1,161= $1,030,437,055
- Mod SA16762016-12-21+$525,483= $1,030,962,538
- Mod SA16782016-12-21+$6,721= $1,030,969,259
- Mod SA16812016-12-21+$7,044= $1,030,976,303
- Mod SA16832016-12-22-$24,880= $1,030,951,423
- Mod CO12S2017-01-04+$18,000= $1,030,969,423
- Mod SA16822017-01-04+$37,000= $1,031,006,423
- Mod SA16852017-01-04+$8,332= $1,031,014,755
- Mod SA16862017-01-04-$1,295= $1,031,013,460
- Mod CO12R2017-01-06+$4,300= $1,031,017,760
- Mod SA16842017-01-06+$4,765= $1,031,022,525
- Mod SA16872017-01-06+$46,224= $1,031,068,749
- Mod SA16882017-01-09-$80,571= $1,030,988,178
- Mod SA16892017-01-10+$8,401= $1,030,996,579
- Mod SA16912017-01-10+$8,911= $1,031,005,490
- Mod SA16902017-01-18+$16,589= $1,031,022,079
- Mod CO12T2017-01-23+$109,508= $1,031,131,587
- Mod SA16932017-01-24+$13,375= $1,031,144,962
- Mod SA16952017-01-24+$4,200= $1,031,149,162
- Mod SA16962017-01-26+$950= $1,031,150,112
- Mod SA16672017-01-27+$5,100= $1,031,155,212
- Mod SA16942017-01-27+$820= $1,031,156,032
- Mod SA16972017-01-27+$11,000= $1,031,167,032
- Mod SA16992017-01-27+$4,200= $1,031,171,232
- Mod SA16982017-01-30+$47,500= $1,031,218,732
- Mod CO12U2017-02-02+$17,800= $1,031,236,532
- Mod CO12V2017-02-02+$2,100= $1,031,238,632
- Mod SA16922017-02-02+$11,028= $1,031,249,660
- Mod SA17012017-02-02+$85,000= $1,031,334,660
- Mod SA17092017-02-02+$1,631= $1,031,336,291
- Mod SA17102017-02-02+$1,750= $1,031,338,041
- Mod CO12W2017-02-07+$2,000= $1,031,340,041
- Mod CO12X2017-02-07+$32,000= $1,031,372,041
- Mod CO12Y2017-02-07+$2,000= $1,031,374,041
- Mod SA17002017-02-10+$623,437= $1,031,997,478
- Mod SA17022017-02-10+$0= $1,031,997,478
- Mod SA17032017-02-10+$532,962= $1,032,530,440
- Mod SA17042017-02-10+$0= $1,032,530,440
- Mod SA17052017-02-10+$495,383= $1,033,025,823
- Mod SA17062017-02-10+$0= $1,033,025,823
- Mod SA17072017-02-10+$425,810= $1,033,451,633
- Mod SA17082017-02-10+$0= $1,033,451,633
- Mod CO13A2017-02-15+$60,000= $1,033,511,633
- Mod CO13B2017-02-15+$59,000= $1,033,570,633
- Mod SA17122017-02-15+$24,000= $1,033,594,633
- Mod SA17132017-02-15+$1,241= $1,033,595,874
- Mod SA17112017-02-16+$145,714= $1,033,741,588
- Mod SA17142017-02-16+$41,803= $1,033,783,391
- Mod SA16792017-03-01+$1,618= $1,033,785,009
- Mod SA17152017-03-14+$4,262= $1,033,789,271
- Mod SA17212017-03-22-$22,387= $1,033,766,884
- Mod SA17222017-03-22-$8,166= $1,033,758,718
- Mod SA17232017-03-31+$18,167= $1,033,776,885
- Mod CO13G2017-04-05+$6,000= $1,033,782,885
- Mod CO13H2017-04-06+$1,300= $1,033,784,185
- Mod CO13J2017-04-12-$500,000= $1,033,284,185
- Mod SA17172017-04-12+$17,339= $1,033,301,524
- Mod SA17192017-04-12+$4,728= $1,033,306,252
- Mod SA17202017-04-12+$9,341= $1,033,315,593
- Mod CO13C2017-04-13+$7,500= $1,033,323,093
- Mod CO13D2017-04-13+$500= $1,033,323,593
- Mod SA12672017-04-13+$27,666= $1,033,351,259
- Mod SA17162017-04-13+$1,660= $1,033,352,919
- Mod SA17182017-04-13+$165,619= $1,033,518,538
- Mod SA17242017-04-13+$425,000= $1,033,943,538
- Mod SA17252017-04-14+$40,985= $1,033,984,523
- Mod SA17262017-04-14+$1,918= $1,033,986,441
- Mod SA17272017-04-14+$15,532= $1,034,001,973
- Mod SA17282017-04-14+$31,970= $1,034,033,943
- Mod SA17292017-04-14+$9,647= $1,034,043,590
- Mod SA17302017-04-19+$175,000= $1,034,218,590
- Mod SA17392017-04-20-$9,827= $1,034,208,763
- Mod SA17322017-04-21+$4,177= $1,034,212,940
- Mod SA17332017-04-24+$2,142= $1,034,215,082
- Mod SA17352017-04-24-$1,191= $1,034,213,891
- Mod SA17362017-04-24+$590= $1,034,214,481
- Mod SA17372017-04-24+$2,033= $1,034,216,514
- Mod SA17382017-04-24+$1,580= $1,034,218,094
- Mod SA17402017-04-24+$4,606= $1,034,222,700
- Mod SA17412017-04-24+$3,512= $1,034,226,212
- Mod SA17422017-04-24+$5,947= $1,034,232,159
- Mod SA17432017-04-24+$16,562= $1,034,248,721
- Mod SA17442017-04-24+$33,675= $1,034,282,396
- Mod SA17462017-04-24-$7,443= $1,034,274,953
- Mod SA17502017-04-24+$7,547= $1,034,282,500
- Mod SA17472017-04-25+$29,000= $1,034,311,500
- Mod SA17482017-04-25+$10,287= $1,034,321,787
- Mod SA17492017-04-25+$6,680= $1,034,328,467
- Mod SA17342017-04-26-$17,767= $1,034,310,700
- Mod SA17532017-04-26+$13,201= $1,034,323,901
- Mod SA17542017-04-26+$17,622= $1,034,341,523
- Mod SA17512017-04-27+$29,203= $1,034,370,726
- Mod SA17522017-04-27+$4,257= $1,034,374,983
- Mod SA17572017-05-01+$20,376= $1,034,395,359
- Mod SA17582017-05-01+$4,400= $1,034,399,759
- Mod SA17552017-05-02+$36,502= $1,034,436,261
- Mod SA17562017-05-02+$1,450= $1,034,437,711
- Mod SA17592017-05-02+$32,577= $1,034,470,288
- Mod CO13K2017-05-03+$18,000= $1,034,488,288
- Mod SA17312017-05-03+$492,302= $1,034,980,590
- Mod SA17452017-05-03+$80,564= $1,035,061,154
- Mod SA17602017-05-10+$3,251= $1,035,064,405
- Mod SA17612017-05-10+$55,578= $1,035,119,983
- Mod SA17652017-05-18+$9,882= $1,035,129,865
- Mod SA17662017-05-18+$14,483= $1,035,144,348
- Mod SA17672017-05-18+$46,090= $1,035,190,438
- Mod SA17682017-05-18+$6,942= $1,035,197,380
- Mod SA17692017-05-18+$19,150= $1,035,216,530
- Mod SA17702017-05-18+$4,793= $1,035,221,323
- Mod SA17712017-05-18+$7,151= $1,035,228,474
- Mod SA17722017-05-18+$992= $1,035,229,466
- Mod SA17732017-05-18+$1,911= $1,035,231,377
- Mod SA17742017-05-18-$5,911= $1,035,225,466
- Mod CO13L2017-05-24+$5,000= $1,035,230,466
- Mod SA17622017-05-25+$48,155= $1,035,278,621
- Mod SA17632017-05-25+$46,915= $1,035,325,536
- Mod SA17642017-05-25+$3,297= $1,035,328,833
- Mod SA17752017-05-31+$1,793= $1,035,330,626
- Mod SA17772017-05-31+$11,555= $1,035,342,181
- Mod SA17762017-06-01+$2,676= $1,035,344,857
- Mod SA17802017-06-01+$7,434= $1,035,352,291
- Mod SA17822017-06-05+$4,157= $1,035,356,448
- Mod SA17782017-06-06+$20,538= $1,035,376,986
- Mod SA17792017-06-07+$3,626= $1,035,380,612
- Mod SA17812017-06-07+$6,071= $1,035,386,683
- Mod SA17842017-06-13-$36,449= $1,035,350,234
- Mod SA16432017-06-14+$40,893= $1,035,391,127
- Mod SA17832017-06-15+$25,458= $1,035,416,585
- Mod SA17852017-06-15+$8,372= $1,035,424,957
- Mod SA17862017-06-23+$28,574= $1,035,453,531
- Mod SA17872017-06-29+$9,270= $1,035,462,801
- Mod SA17932017-07-07+$4,098= $1,035,466,899
- Mod SA17942017-07-07+$2,190= $1,035,469,089
- Mod SA17952017-07-07+$5,531= $1,035,474,620
- Mod SA17882017-07-11+$10,951= $1,035,485,571
- Mod SA17892017-07-11+$6,844= $1,035,492,415
- Mod SA17902017-07-11+$3,639= $1,035,496,054
- Mod SA17912017-07-11+$1,340= $1,035,497,394
- Mod SA17922017-07-11+$11,910= $1,035,509,304
- Mod SA17962017-07-12+$7,915= $1,035,517,219
- Mod SA17972017-07-12+$5,174= $1,035,522,393
- Mod SA17982017-08-09+$61,404= $1,035,583,797
- Mod SA17992017-08-09+$8,271= $1,035,592,068
- Mod SA18002017-08-09+$6,895= $1,035,598,963
- Mod SA18012017-08-14+$2,401= $1,035,601,364
- Mod SA18032017-08-15+$5,753= $1,035,607,117
- Mod SA18042017-08-15+$3,315= $1,035,610,432
- Mod SA18022017-08-30+$16,416= $1,035,626,848
- Mod SA18052017-09-08+$12,215= $1,035,639,063
- Mod SA18062017-09-08+$1,381= $1,035,640,444
- Mod SA18072017-09-13+$1,602= $1,035,642,046
- Mod SA18082017-09-13+$2,731= $1,035,644,777
- Mod SA18092017-09-20+$11,516= $1,035,656,293
- Mod SA18102017-09-20+$5,162= $1,035,661,455
- Mod SA18112017-09-21+$3,748= $1,035,665,203
- Mod SA18122017-09-21+$5,616= $1,035,670,819
- Mod SA18132017-09-28+$38,877= $1,035,709,696
- Mod SA18142017-10-19-$7,500= $1,035,702,196
- Mod SA18172017-10-27+$26,492= $1,035,728,688
- Mod SA18152017-10-30+$64,283= $1,035,792,971
- Mod SA18162017-10-30+$1,900= $1,035,794,871
- Mod SA18182017-10-31-$53,000= $1,035,741,871
- Mod SA18222017-11-02+$9,027= $1,035,750,898
- Mod SA18232017-11-02+$7,194= $1,035,758,092
- Mod CO13N2017-11-03+$6,000,000= $1,041,758,092
- Mod SA18242017-11-06+$9,573= $1,041,767,665
- Mod SA18252017-11-06+$13,000= $1,041,780,665
- Mod SA18262017-11-06+$14,041= $1,041,794,706
- Mod SA18282017-11-13+$4,128= $1,041,798,834
- Mod SA18272017-11-15+$113,840= $1,041,912,674
- Mod SA18202017-11-16+$9,350= $1,041,922,024
- Mod SA18192017-11-22+$13,028= $1,041,935,052
- Mod SA18292017-11-22+$35,411= $1,041,970,463
- Mod SA18302017-11-22+$19,616= $1,041,990,079
- Mod SA18312017-11-29+$13,450,000= $1,055,440,079
- Mod SA18322017-12-18+$0= $1,055,440,079
- Mod SA18332017-12-18+$0= $1,055,440,079
- Mod SA18342018-06-21+$425,000= $1,055,865,079
- Mod SA18352019-01-18-$97,236= $1,055,767,844
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2009-09-30 | +$3,319,000 | $3,319,000 | SOUTHEAST LOUISIANA VETERANS HEALTHCARE SYSTEM REPLACEMENT MEDICAL CENTER, NEW ORLEANS, LA |
| Mod SA0001· OTHER ADMINISTRATIVE ACTION | 2010-03-09 | +$0 | $3,319,000 | CHANGE DUE DATE OF COST ESTIMATE |
| Mod CO001· CHANGE ORDER | 2010-03-11 | +$50,000 | $3,369,000 | PRE-CONSTRUCTION SERVICES |
| Mod CO002· CHANGE ORDER | 2010-04-29 | +$41,000 | $3,410,000 | SITE INVESTIGATION |
| Mod SA002· DEFINITIZE CHANGE ORDER | 2010-05-26 | +$10,923 | $3,420,923 | DEFINITIZE CHANGE ORDER 001 |
| Mod SA003· DEFINITIZE CHANGE ORDER | 2010-05-26 | +$15,421 | $3,436,344 | DEFINITIZE CHANGE ORDER 002; PRE-CONSTRUCTION SITE INVESTIGATION |
| Mod SA004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-07-30 | +$24,690 | $3,461,034 | EXTENSION OF CONSTRUCTION SITE SERCURITY GUARD SERVICES |
| Mod SA005· OTHER ADMINISTRATIVE ACTION | 2010-08-04 | +$0 | $3,461,034 | ADMINSTRATION CHANGE TO ADD PAN AM BUILDING |
| Mod SA007· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-08 | +$31,692 | $3,492,726 | TEMPORARY ELECTRICAL CONNECTION FOR PAN AM BUILDING |
| Mod SA006· OTHER ADMINISTRATIVE ACTION | 2010-09-14 | +$0 | $3,492,726 | ADMINSTRATION CHANGE TO ADD ADDENDUM FOR PAN AM BUILDING |
| Mod SA009· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-23 | +$30,020 | $3,522,746 | PAN AMERICAN BUILDING EXTERIOR ENCLOSURE PANEL SUPPORT TESTING |
| Mod SA008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-30 | +$2,161,883 | $5,684,629 | PAN AMERICAN BUILDING ABATEMENT |
| Mod SA010· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-31 | +$13,398 | $5,698,027 | PAN AMERICAN BUILDING SAFE DOOR REMOVAL AND DISPOSAL |
| Mod SA011· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-31 | +$13,010 | $5,711,037 | PAN AMERICAN BUILDING CLEARSTORY WINDOWS |
| Mod SA012· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-02-10 | +$3,061,733 | $8,772,770 | EXT PRE-CON SERVICES AND OPTION PERIOD |
| Mod CO003· CHANGE ORDER | 2011-03-03 | +$25,000 | $8,797,770 | BUILD ACCESS ROAD FOR DEBRIS REMOVAL |
| Mod SA014· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-03-04 | +$12,051 | $8,809,821 | SECURITY FOR DIXIE BREWERY |
| Mod SA016· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-03-23 | +$96,350 | $8,906,171 | INCREASE DIXIE SECURITY AND HOUSE ASSESSMENTS |
| Mod SA017· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-03-24 | −$137,028 | $8,769,143 | DEDUCT WINDOW OPTION WORK FROM ABATEMENT MODIFICATION. |
| Mod SA018· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-03-30 | +$28,768 | $8,797,911 | EXTENSION OF SERCURITY GUARD SERVICE |
| Mod SA015· DEFINITIZE CHANGE ORDER | 2011-04-08 | +$67,997 | $8,865,908 | BUILD TEMPORARY ROAD ACCESS TO REMOVE DEBRIS AT SITE. |
| Mod SA020· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-29 | +$22,056 | $8,887,964 | EXTENSION OF SERCURITY GUARD SERVICE |
| Mod CO004· CHANGE ORDER | 2011-05-04 | +$15,000 | $8,902,964 | PROVIDE DUST SCREEN FABRIC FOR SITE FENCE |
| Mod CO005· CHANGE ORDER | 2011-05-11 | +$0 | $8,902,964 | PROVIDE ALL LABOR EQUIPMENT, MATERIAL, TOOLS AND SUPPORT FOR SURCHARGE OF THE NEW ORLEANS NEW VA MEDICAL CENTE… |
| Mod CO01E· OTHER ADMINISTRATIVE ACTION | 2011-05-12 | +$12,838,839 | $21,741,803 | ISSUANCE OF THE EWP 01 "SURCHANGE" WORK PACKAGE. CHANGE ORDER WAS ISSUED ON CLIN 0002 IN ANTICIPATION OF THE F… |
| Mod CO006· CHANGE ORDER | 2011-05-25 | −$15,000 | $21,726,803 | CORRECT LINE OF ACCOUNTING |
| Mod SA021· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-25 | +$33,626 | $21,760,429 | PROVIDE DUST SCREEN FABRIC FOR SITE FENCE AND SITE WATERING |
| Mod CO007· CHANGE ORDER | 2011-06-14 | +$15,459 | $21,775,888 | ADD FOOTING FOR EXCAVATION AT DIXIE BREWERY BUILDING |
| Mod CO01G· CHANGE ORDER | 2011-06-14 | +$15,459 | $21,791,347 | EXCAVATE OUT TWO (2) FOOTINGS AT THE DIXIE BREWERY. EXCAVATIONS REQUIRED TO PERFORM STRUCTURAL ASSESSMENT AND… |
| Mod SA024· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-02 | +$2,013 | $21,793,360 | DIXIE BREWERY SITE FENCE RELOCATION |
| Mod SA026· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-03 | +$63,976 | $21,857,336 | ADDED SECURITY GUARD |
| Mod SA013· OTHER ADMINISTRATIVE ACTION | 2011-08-12 | +$0 | $21,857,336 | ADMINISTRATIVE CHANGE TO INCREASE CEILING AND TARGET |
| Mod SA025· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-23 | +$77,453 | $21,934,789 | REPAIR OF PAN AM BUILDING STONE PANEL |
| Mod SA027· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-24 | −$115,080 | $21,819,709 | PARTIAL DELETION OF SCOPE OF WORK FOR SITE SURCHARGE. |
| Mod SA028· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-24 | +$47,679 | $21,867,388 | ADDED SECURITY GUARD |
| Mod SA022· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-27 | −$7,606 | $21,859,782 | CREDIT FOR HAUL ROAD |
| Mod CO008· CHANGE ORDER | 2011-09-30 | +$0 | $21,859,782 | AWARD OF EWP FOR ELEVATORS |
| Mod CO009· OTHER ADMINISTRATIVE ACTION | 2011-09-30 | +$0 | $21,859,782 | AWARD OF EWP PILE AND GARAGES |
| Mod CO010· OTHER ADMINISTRATIVE ACTION | 2011-09-30 | +$0 | $21,859,782 | RENOVATION OF PAN AM BUILDING REPORTED ON CO-01J |
| Mod CO012· OTHER ADMINISTRATIVE ACTION | 2011-09-30 | +$0 | $21,859,782 | PROVIDE ALL LABOR, MATERIALS, EQUIPMENT, TOOLS, AND SERVICES REQUIRED FOR CONSTRUCTION OF STEEL, PILE CAPS AND… |
| Mod CO01H· OTHER ADMINISTRATIVE ACTION | 2011-09-30 | +$19,498,989 | $41,358,771 | EWP 02 "ELEVATORS" WORK PACKAGE |
| Mod CO01I· CHANGE ORDER | 2011-09-30 | +$55,643,888 | $97,002,659 | ISSUANCE OF THE EWP 04A "PILES" WORK PACKAGE; |
| Mod CO01J· CHANGE ORDER | 2011-09-30 | +$24,710,152 | $121,712,811 | ISSUANCE OF THE EWP 03 "PAN-AM RENOVATION" WORK PACKAGE (TO BE AWARDED UNDER A CHANGE ORDER AND DEFINITIZED BY… |
| Mod CO01L· CHANGE ORDER | 2011-09-30 | +$147,416,894 | $269,129,705 | "PLACEHOLDER CHANGE" ISSUANCE OF THE EWP 05 "PILE CAPS, STEEL AND CEP STRUCTURE" WORK PACKAGE (TO BE AWARDED U… |
| Mod SA029· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-04 | +$3,055 | $269,132,760 | PROVIDE ALL LABOR, EQUIPMENT FOR REMOBILIZATION AND DEMOBOLIZATION FOR PILES, COORDINATE ENTERGY TRANSFORMER R… |
| Mod SA031· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-24 | +$95,353 | $269,228,113 | CONSTRUCTION OF MOCK UP ROOMS |
| Mod SA030· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-08 | +$5,312 | $269,233,425 | PAN AM BUILDING REMOVAL OF ADDITIONAL DUCTBANKS |
| Mod CO01K· CHANGE ORDER | 2011-11-10 | +$87,136 | $269,320,561 | EXCAVATE AND REMOVE OBSTRUCTIONS FROM SITE AS IDENTIFIED BY GPR MAPPING (PERFORMED BY AECOM) |
| Mod SA032· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-17 | +$73,560 | $269,394,121 | TEMPORARY TRAILER AT SITE |
| Mod CO01O· CHANGE ORDER | 2011-12-07 | +$95,000 | $269,489,121 | TO PROVIDE FOR ADDITIONAL SAND FILL FOR EXCAVATION AND REMOVAL OF UNSUITABLE MATERIAL OR AREAS DISTURBED BY AR… |
| Mod SA033· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-08 | −$195,042 | $269,294,079 | FUNDING ADMINSTRATIVE CHANGE |
| Mod CO01R· CHANGE ORDER | 2011-12-13 | +$95,000 | $269,389,079 | TO PROVIDE FOR THE REMOVAL AND DISPOSAL OF UNSUITABLE SOIL, STUMPS, AND BUILDING DEBRIS FROM THE SITE. |
| Mod SA034· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-26 | +$195,042 | $269,584,121 | FUNDING CHANGE (ADMINISTRATIVE) |
| Mod CO01S· CHANGE ORDER | 2012-02-10 | +$1,068,853 | $270,652,974 | THE PURPOSE OF THIS CHANGE IS TO AUTHORIZE THE CONTRACTOR TO PROVIDE ALL MATERIAL, EQUIPMENT, AND LABOR ASSOCI… |
| Mod CO01T· CHANGE ORDER | 2012-02-29 | +$95,000 | $270,747,974 | CHANGE ORDER TO BEGIN ADJUSTMENTS FOR ADDITIONAL PILE CAPS |
| Mod SA035· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-06 | −$4,322 | $270,743,652 | TEMPORARY TRAILER AT SITE |
| Mod SA038· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-06 | +$77,936 | $270,821,588 | HOUSE MOVE |
| Mod SA036· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-09 | +$15,409 | $270,836,997 | FINAL NEGOTIATED CHANGES ON PAN AM ABATEMENT |
| Mod SA037· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-13 | +$1,252 | $270,838,249 | TEMPORARY INTERNET SERVICE AT TEMPORARY TRAILER SITE |
| Mod SA039· OTHER ADMINISTRATIVE ACTION | 2012-03-15 | +$0 | $270,838,249 | LINE OF ACCOUNTING CHANGE |
| Mod SA040· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-16 | +$0 | $270,838,249 | CHANGE THE LINE OF ACCOUNTING FOR CMHP'S INDIRECT COSTS (GENERAL CONDITIONS, GENERAL REQUIREMENTS AND LOGISTIC… |
| Mod CO01N· CHANGE ORDER | 2012-03-30 | +$60,264,881 | $331,103,130 | "PLACEHOLDER CHANGE" ISSUANCE OF THE EWP 05 "PILE CAPS, STEEL AND CEP STRUCTURE" WORK PACKAGE (TO BE AWARDED U… |
| Mod SA042· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-30 | +$7,570 | $331,110,700 | AN EXISTING OAK TREE #14 IS SHOWN ON THE CONTRACT DRAWING LT102 TO REMAIN BUT MUST BE REMOVED TO INSTALL THE S… |
| Mod SA043· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-30 | +$1,905 | $331,112,605 | THE SWPPP PIPE IS SHOWN TO BE INSTALLED INTO A EXISTING STORM DRAIN PIPE, BUT IT HAS BEEN DISCOVERED THAT A PL… |
| Mod SA044· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-12 | +$8,473 | $331,121,078 | THE CONTRACT DRAWINGS SHOW INCORRECT STRUCTURAL STEEL SIZES AT THE PENTHOUSE OF THE PAN AM BUILDING TO BE INST… |
| Mod SA045· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-12 | +$44,440 | $331,165,518 | TO PROVIDE FOR A SECURE STEEL WINDOW SILL TO ATTACH THE NEW EXTERIOR CURTAIN WALLS SINCE THE EXISTING CONDITIO… |
| Mod SA046· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-20 | +$47,031 | $331,212,549 | PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO SUPPLY REMOVE AND DISPOSE OF ASBESTOS-CONTAINING MAST… |
| Mod CO01V· CHANGE ORDER | 2012-04-27 | +$95,000 | $331,307,549 | TO PROVIDE FOR FALL PROTECTION CLEATS AT THE PAN AM BUILDING. |
| Mod SA047· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-30 | +$1,900 | $331,309,449 | PROVIDE ALL LABOR, MATERIALS, EQUIPMENT AND SUPPORT TO SUPPLY REPLACE ROTATED W12X35 BEAM WITH AN HHS 12X12X5/… |
| Mod CO01W· CHANGE ORDER | 2012-05-02 | +$90,000 | $331,399,449 | TO PROVIDE FOR TEMPORARY TESTING FOR THE NEW ORLEANS PROJECT |
| Mod SA048· CHANGE ORDER | 2012-05-02 | +$0 | $331,399,449 | TO PERMIT PROGRESS PAYMENTS TO THE PRIME CONTRACTOR FOR STRUCTURAL PRECAST. |
| Mod SA051· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-05-11 | +$99,669 | $331,499,118 | PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO REMOVE THE LEAD BASED PAINT ON ALL STAIRS INCLUDING L… |
| Mod SA049· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-04 | −$6,018 | $331,493,100 | PROVIDE ALL LABOR, MATERIALS, EQUIPMENT AND SUPPORT TO SUPPLY REPLACE ROTATED W12X35 BEAM WITH AN HHS 12X12X5/… |
| Mod SA050· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-04 | +$11,576 | $331,504,676 | PROVIDE ALL LABOR, MATERIALS, EQUIPMENT AND SUPPORT FOR THE EXTENSION OF THE EXISTING STEEL NEWEL POSTS IN THE… |
| Mod SA052· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-04 | +$11,939 | $331,516,615 | PROVIDE ALL LABOR, MATERIALS, EQUIPMENT AND SUPPORT TO SUPPLY REPLACE ROTATED W12X35 BEAM WITH AN HHS 12X12X5/… |
| Mod SA041· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-07-09 | +$287,557 | $331,804,172 | SUPPLEMENTAL AGREEMENT TO DEFINITIZE CO-01T ADDITIONAL PILE CAPS |
| Mod SA055· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-07-11 | +$0 | $331,804,172 | ALLOW FOR THE BILLING OF STORED STEEL MATERIAL IN ACCORDANCE WITH THE VAAR 852.236-83(D). |
| Mod SA053· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-07-27 | +$241,150 | $332,045,322 | PROVIDE ALL LABOR, MATERIALS, EQUIPMENT AND SUPPORT FOR THE EXTENSION OF THE EXISTING STEEL NEWEL POSTS IN THE… |
| Mod SA057· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-07-27 | +$0 | $332,045,322 | PROVIDE ALL LABOR, MATERIALS, EQUIPMENT AND SUPPORT TO SUPPLY REPLACE ROTATED W12X35 BEAM WITH AN HHS 12X12X5/… |
| Mod SA058· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-07-30 | +$0 | $332,045,322 | PROGRESS PAYMENTS FOR STORED MATERIAL |
| Mod SA059· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-07-30 | +$0 | $332,045,322 | PROGRESS PAYMENTS FOR STORED MATERIALS |
| Mod SA060· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-07-31 | +$2,105 | $332,047,427 | PROVIDE INTERNET SERVICES TO TEMPORARY TRAILER FOR JULY 1, 2012 THROUGH DECEMBER 31, 2012 |
| Mod SA062· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-08-01 | +$4,856 | $332,052,283 | WATER CONNECTION TO TEMPORARY RE TRAILER. |
| Mod CO01U· CHANGE ORDER | 2012-08-02 | +$81,997 | $332,134,280 | CHANGE ORDER TO BEGIN EMBEDS AT CEP |
| Mod CO01X· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-08-02 | +$95,000 | $332,229,280 | SPRAY INSULATION AT PAN AM BUILDING |
| Mod SA056· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-08-13 | +$37,520 | $332,266,800 | PROVIDE ALL LABOR, MATERIALS, EQUIPMENT AND SUPPORT FOR THE DEMOLITION OF LOCKERS AND ABATEMENT OF LEAD PAINT… |
| Mod SA063· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-08-14 | +$2,147 | $332,268,947 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT AND MATERIAL NECESSARY TO REMOVE THE EXISTING CURBS AT THE PENETRATIONS… |
| Mod CO01M· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-08-17 | +$106,276,036 | $438,544,983 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT, MATERIALS, TOOLS AND SERVICES REQUIRED FOR THE CONSTRUCTION OF EXTERIOR… |
| Mod SA054· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-08-27 | +$211,787 | $438,756,770 | PROVIDE ALL LABOR, MATERIALS, EQUIPMENT AND SUPPORT FOR TESTING SERVICES REQUIRED THROUGH SEPTEMBER 2012 |
| Mod SA064· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-08-27 | +$4,744 | $438,761,514 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT AND MATERIAL NECESSARY TO INSTALL WATERPROOFING AT THE WALLS AND FLOOR O… |
| Mod SA074· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-08-30 | −$24,878 | $438,736,636 | SLVCHS - CREDIT MODIFICATION TO REDUCE FUNDING FOR ASSESSMENT OF NEIGHBORHOOD HOUSES AROUND THE NEW ORLEANS ME… |
| Mod SA061· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-09-12 | +$33,377 | $438,770,013 | FALL PROTECTION CLEATS FOR WINDOW WASHING AT PAN AM BUILDING. |
| Mod SA065· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-09-12 | +$17,323 | $438,787,336 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT AND MATERIAL NECESSARY TO REMOVE THE MASONRY MORTAR AND INSTALLED SEALAN… |
| Mod CO01Z· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-09-17 | +$50,000 | $438,837,336 | SLVCHS - LABOR, EQUIPMENT AND MATERIAL NECESSARY EXTEND PILES AND PILE CAPS PER EWP#5 ADDENDUM 5 AND BULLETIN… |
| Mod CO02A· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-09-20 | +$1,203 | $438,838,539 | SLVCHS - PROVIDE WORK ASSOCIATED WITH MINOR STEEL CHANGES AT THE COURTYARD PATIO AT PAN AM REGARDING A TRELLIS… |
| Mod SA066· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-09-24 | +$15,912 | $438,854,451 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT AND MATERIAL NECESSARY TO DEMOLISH CURB ON FINISH FACE OF SOUTH WALL AT… |
| Mod SA068· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-09-24 | −$13,912 | $438,840,539 | SLVCHS - DELETE TRENCH SAW CUTTING THAT WAS DUPLICATED IN BID DOCUMENTS. |
| Mod SA069· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-09-24 | +$1,227 | $438,841,766 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT AND MATERIAL NECESSARY TO PROVIDE SLAB PENETRATIONS FOR SIMMAN COMPRESSO… |
| Mod SA070· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-09-24 | −$5,651 | $438,836,115 | SLVCHS - DELETE PILE AND PC-2 AT CEP PER RFI-107 |
| Mod SA071· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-09-24 | +$10,438 | $438,846,553 | SLVCHS - LABOR, EQUIPMENT AND MATERIAL NECESSARY TO ADD A GRADE BEAM AND CONNECTION DETAIL FOR STRUCTURAL STEE… |
| Mod SA077· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-09-28 | −$225,849 | $438,620,704 | SLVCHS - CREDIT TO REMOVE INTUMESCENT FIREPROOFING AT BUILDINGS 1, 2, AND 3 AND ADD SPRAY ON FIREPROOFING WHER… |
| Mod SA067· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-10-01 | +$3,011 | $438,623,715 | SLVCHS - LABOR, EQUIPMENT AND MATERIAL NECESSARY AT CEP TO MODIFY THE PILE HOOK DOWELS |
| Mod SA073· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-10-01 | −$1,676 | $438,622,039 | SLVCHS - DELETE ALL TOILET PAPER DISPENSERS AND PAPER TOWEL AND WASTE RECEPTACLE DISPENSERS. |
| Mod SA075· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-10-02 | +$174,715 | $438,796,754 | SLVCHS - LABOR, EQUIPMENT AND MATERIAL NECESSARY TO PROVIDE TEMPORARY TESTING FOR THE SLVHCS SITE DURING OCTOB… |
| Mod SA076· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-10-02 | +$22,872 | $438,819,626 | SLVCHS - LABOR, EQUIPMENT AND MATERIAL NECESSARY TO LOWER THE TOP ELEVATION OF THE PILE CAP PER SKETCHES AND S… |
| Mod SA078· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-10-05 | +$2,822 | $438,822,448 | SLVCHS - LABOR, EQUIPMENT AND MATERIAL NECESSARY TO CUT A NEW REGLET TO RECEIVE THE FLASHING ON TOP OF EXISTIN… |
| Mod CO02B· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-10-08 | +$200,000 | $439,022,448 | SLVCHS - LABOR, EQUIPMENT AND MATERIAL NECESSARY TO ADD EARTHWORK AND CONCRETE PER CHANGES IN EWP05 ADDENDUM 3… |
| Mod SA079· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-10-09 | +$98,495 | $439,120,943 | SLVCHS - LABOR, EQUIPMENT AND MATERIAL NECESSARY FOR EARTHWORK AND CONCRETE FOR EWP#5 BULLETIN 4, 4.1 AND 4.1R… |
| Mod SA072· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-10-11 | +$0 | $439,120,943 | SLVCHS - SUPPLEMENTAL AGREEMENT TO ALLOW FOR PAYMENT OF STORED MATERIAL - BOOSTER PUMP FOR THE CEP IN NEW ORLE… |
| Mod SA083· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-10-12 | +$8,269 | $439,129,212 | SLVCHS - LABOR, EQUIPMENT AND MATERIAL NECESSARY TO INSTALL ADDITIONAL REINFORCING STEEL IN THE EXISTING CONCR… |
| Mod SA081· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-10-17 | +$8,852 | $439,138,064 | SLVCHS - LABOR, EQUIPMENT AND MATERIAL NECESSARY TO INSTALL EIGHT PNEUMATIC PIEZOMETERS IN THE SURCHARGE AREA. |
| Mod SA082· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-10-17 | +$1,442 | $439,139,506 | SLVCHS - LABOR, EQUIPMENT AND MATERIAL NECESSARY TO BLOCK OUT AND INSTALL ADDITIONAL TOP REINFORCING BARS AT T… |
| Mod SA086· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-11-02 | +$174,715 | $439,314,221 | SLVCHS - LABOR, EQUIPMENT AND MATERIAL NECESSARY TO PROVIDE TEMPORARY TESTING FOR THE NEW ORLEANS REPLACEMENT… |
| Mod SA089· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-11-02 | +$3,318 | $439,317,539 | SLVCHS - LABOR, EQUIPMENT AND MATERIAL NECESSARY TO INSTALL PRECAST COLUMNS WITH CORRECT LENGTH AT GRID LINES… |
| Mod CO02C· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-11-10 | −$10,000 | $439,307,539 | SLVCHS - LABOR, EQUIPMENT AND MATERIAL NECESSARY TO REWORK FRONT STEPS AND PILES AT THE PAN AM BUILDING - CRED… |
| Mod CO02D· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-11-10 | −$10,000 | $439,297,539 | SLVCHS - LABOR, EQUIPMENT AND MATERIAL NECESSARY TO CHANGE THE PAN AM FRONT STEPS WORKING WITH STUDIO NOVA TO… |
| Mod CO02E· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-11-10 | −$10,000 | $439,287,539 | SLVCHS - REUSE OF NATIE SOILS BACKFILLING UNDER BUILDING FOOTPRINT. |
| Mod CO02F· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-11-10 | −$10,000 | $439,277,539 | SLVCHS - DELETION OF TWO FUEL OIL TANKS AT CEP. |
| Mod SA084· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-11-12 | +$1,506 | $439,279,045 | SLVCHS - WATER USAGE DURING PAN AM DEMOLITION AND ABATEMENT. |
| Mod SA091· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-11-12 | +$24,599 | $439,303,644 | SLVCHS - LABOR, EQUIPMENT AND MATERIAL NECESSARY TO INSTALL CONDUIT FOR THERMOSTATS AND HUMIDISTATS IN PAN AM. |
| Mod SA080· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-11-13 | +$178,817 | $439,482,461 | SLVCHS - LABOR, EQUIPMENT AND MATERIAL NECESSARY TO DEMOLISH CONCRETE CURB AND REPLACE PER STATEMENT OF WORK. |
| Mod SA085· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-11-13 | −$12,000 | $439,470,461 | SLVCHS - DEDUCT TEMPORARY ELECTRIC |
| Mod SA087· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-11-13 | −$174,715 | $439,295,746 | SLVCHS - CORRECT LINE OF ACCOUNTING |
| Mod SA088· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-11-13 | +$174,715 | $439,470,461 | SLVCHS - CORRECT LINE OF ACCOUNTING |
| Mod SA090· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-11-13 | +$1,991 | $439,472,452 | SLVCHS - LABOR, EQUIPMENT AND MATERIAL NECESSARY TO INSTALL FIRE RATED SHAFT WALLS AT PAN AM. |
| Mod CO02G· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-11-15 | +$25,000 | $439,497,452 | SLVCHS - LABOR, EQUIPMENT AND MATERIAL NECESSARY TO REVISE TEMPORARY TRANSFORPER PAD AND DELETE PILES, AND EXT… |
| Mod CO02I· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-11-15 | +$30,000 | $439,527,452 | SLVCHS - LABOR, EQUIPMENT AND MATERIAL FOR BULLETIN 7 TO ADD ELEVATOR PIT SUMP PUMP. |
| Mod CO02J· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-11-16 | +$95,000 | $439,622,452 | SLVCHS - BULLETIN 5 NTP FOR EXTENSION OF PILES AND CONCRETE AT GARAGES. |
| Mod SA096· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-11-19 | +$784 | $439,623,236 | SLVCHS - LABOR, EQUIPMENT AND MATERIAL NECESSARY TO PERFORM LABORATORY MOISTURE DENSITY TESTS (PROCTOR) |
| Mod CO02K· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-11-21 | +$200,000 | $439,823,236 | SLVCHS - BULLETIN 3 FOR EWP#7 - BRANCH CIRCUITS, OXYGEN TANK FARM, MASTER GAS ALARM CONTROLLER, GATE CONTROL,… |
| Mod CO02M· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-11-21 | −$10,000 | $439,813,236 | SLVCHS - ELIMINATE METAL PANEL SCOPE OF WORK IN GARAGES. |
| Mod CO02N· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-11-21 | −$10,000 | $439,803,236 | SLVCHS - REDUCE SIZE OF SANITARY STORAGE TANK AND PROCESS TANK. |
| Mod SA095· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-11-21 | +$2,106 | $439,805,342 | SLVCHS - LABOR, EQUIPMENT AND MATERIAL NECESSARY TO REPAIR CONCRETE SLAB AT SOUTH SIDE OF ANNEX IN PAN AM BUIL… |
| Mod CO02H· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-11-28 | +$75,000 | $439,880,342 | SLVCHS - STRUCTURAL DETAIL CHANGES FOR EWP#6 IN ACCORDANCE WITH BULLETIN 9A |
| Mod CO02O· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-11-29 | +$17,762 | $439,898,104 | SLVCHS - PILE CAP CHANGES DUE TO PILE LOCATION MOVES PER RFIS 00806, 00808, 00811, 00812, 00813. |
| Mod CO02P· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-11-29 | +$7,816 | $439,905,920 | SLVCHS - PILE CAP CHANGES DUE TO PILE LOCATION MOVES PER RFIS 00814 AND 00815. |
| Mod CO02Q· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-11-29 | +$3,517 | $439,909,437 | SLVCHS - PILE CAP CHANGES DUE TO PILE LOCATION MOVES PER RFI 00823. |
| Mod SA097· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-11-29 | +$4,829 | $439,914,266 | SLVCHS - LABOR, EQUIPMENT AND MATERIAL NECESSARY TO ADD BOND BREAKER AT PAN AM PENTHOUSE. |
| Mod SA098· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-11-29 | +$5,029 | $439,919,295 | SLVCHS - LABOR, EQUIPMENT AND MATERIAL NECESSARY TO INSTALL CONDUIT FOR CO2 SENSORS. |
| Mod SA101· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-11-30 | +$153,929 | $440,073,224 | SLVCHS - INDEPENDENT AGENCY REQUIRED FOR ONSITE TESTING ACTIVITIES TO COVER ALL CONSTRUCTION ACTIVITIES DURING… |
| Mod CO02R· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-12-03 | +$6,367 | $440,079,591 | SLVCHS - PILE CAP CHANGES PER RFI'S 00714, 00748, AND 00749. |
| Mod CO02S· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-12-03 | +$2,815 | $440,082,406 | SLVCHS - PILE CAP CHANGES PER RFI'S 0751, 0765, AND 0778. |
| Mod CO02T· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-12-03 | +$4,575 | $440,086,981 | SLVCHS - PILE CAP CHANGES PER RFI 00715. |
| Mod CO02L· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-12-04 | −$10,000 | $440,076,981 | SLVCHS - DELETE GRANITE ROCKS AND BOLLARDS AT ENTRY, MODIFY HARDWARE AND ADD DOOR CLOSURES,MODIFY GRILLES AND… |
| Mod CO02U· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-12-05 | +$50,000 | $440,126,981 | SLVCHS - EXCAVATION AND MODIFICATION OF CUT OFF PILES PER RFI'S 00753 AND 00796. |
| Mod CO02W· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-12-05 | −$10,000 | $440,116,981 | SLVCHS - EARLY WORK PACKAGE 06; BULLETIN 10A. |
| Mod SA102· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-12-05 | +$5,288 | $440,122,269 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT, AND MATERIALS FOR NOTCHING EXTERIOR STUDS AT PAN AM PENTHOUSE WEST AND… |
| Mod CO02X· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-12-06 | −$10,000 | $440,112,269 | SLVCHS - EARLY WORK PACKAGE 05; BULLETIN 09B. |
| Mod SA103· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-12-06 | +$0 | $440,112,269 | SLVCHS - SA TO ALLOW FOR PROGRESS PAYMENTS FOR REFINISHED ALUMINUM FINS AT AN OFF-SITE STORAGE LOCATION. |
| Mod SA104· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-12-06 | +$0 | $440,112,269 | SLVCHS - SA TO ALLOW FOR PROGRESS PAYMENTS FOR SEVEN DIESEL ENGINE GENERATORS AT AN OFF-SITE STORAGE LOCATION. |
| Mod SA099· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-12-13 | +$846 | $440,113,115 | SLVCHS - LABOR,EQUIPMENT,MATERIALS REQUIRED TO ENLARGE THE PILE CAP AT PC2 ALONG GRID LINE 07L, 07 8 AT PILE #… |
| Mod CO02Y· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-12-14 | +$6,844 | $440,119,959 | SLVCHS - PROVIDE ALL LABOR AND MATERIALS FOR REQUIRED PILE CAP MODIFICATIONS PER RFI 0853, 0861, AND 0862. |
| Mod CO02Z· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-12-14 | +$14,881 | $440,134,840 | SLVCHS - PROVIDE ALL LABOR AND MATERIALS REQUIRED FOR PILE CAP MODIFICATIONS PER RFI 0829, 0831, 0832, 0836, 0… |
| Mod CO03A· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-12-14 | +$20,000 | $440,154,840 | SLVCHS - TO PROVIDE ALL LABOR, EQUIPMENT, MATERIAL REQUIRED TO PROVIDE POWER TO 4 (25HP) VFD'S FOR SUPPLY FANS… |
| Mod SA100· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-12-14 | +$7,061 | $440,161,901 | SLVCHS - LABOR, EQUIPMENT AND MATERIAL NECESSARY FOR PILE CAP MODIFICATIONS PER RFI 00703, 00707, AND 00713. |
| Mod SA106· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-12-14 | +$4,440 | $440,166,341 | SLVCHS - PROVIDE ALL LABOR AND MATERIALS REQUIRED FOR PILE CAP MODIDIFICATION PER RFI 0670. |
| Mod SA107· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-12-19 | +$4,471 | $440,170,812 | SLVHCS - PROVIDE ALL LABOR AND MATERIALS REQUIRED TO ENLARGE THE MARBLE COLUMN COVER TO ACCOMMODATE PIPING AND… |
| Mod SA108· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-12-19 | +$3,953 | $440,174,765 | SLVHCS - PROVIDE ALL LABOR AND MATERIALS REQUIRED TO REMOVE, REPAIR, AND REINSTALL THE LIMESTONE PANEL AS NECE… |
| Mod CO03B· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-12-20 | +$5,000 | $440,179,765 | SLVHCS - PROVIDE ALL LABOR AND MATERIALS REQUIRED FOR SAW CUTS AT BOTH SIDES OF THE CONCTRETE RETAINING WALLS… |
| Mod SA110· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-12-20 | +$35,200 | $440,214,965 | SLVHCS - PROVIDE BRANCH CIRCUITS SHOWN IN EWP08 FROM PANEL BOARD TO GATE CONTROLLER FOR THE TULANE GATE PER RF… |
| Mod CO01P· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-12-27 | +$42,447,502 | $482,662,467 | SLVCHS - CHANGE ORDER FOR FULL BUILDOUT FOR PLUMBING, MED GAS, FOOD SERVICE, AND FIRE SUPPRESSION. |
| Mod SA109· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-01-03 | +$164,187 | $482,826,654 | SLVCHS - TEMPORARY TESTING FOR THE MONTH OF JANUARY 2013. |
| Mod SA112· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-01-03 | +$21,372 | $482,848,026 | SLVCHS - DEFINITIZE CO-03A FOR ADDITIONAL VFD'S AT PAN AM. CONTRACTOR TO PROVIDE POWER TO 4(25HP) VFD'S FOR SU… |
| Mod SA113· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-01-03 | +$979 | $482,849,005 | SLVCHS - PROVIDE ALL LABOR, MATERIAL, AND EPUIPMENT AS REQUIRED TO ADD METAL STUDS AT 24" OC AND 5/8" FIRE RAT… |
| Mod SA114· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-01-03 | +$1,687 | $482,850,692 | SLVCHS - PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO REVISE THE WALL AT ROOM 1Q110 IN PAN AM. ROO… |
| Mod SA111· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-01-04 | +$4,947 | $482,855,639 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT, AND MATERIALS NECESAARY RO REPLACE MISSING CLAY TILE UNITS WITH SMALL I… |
| Mod CO03D· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-01-07 | −$10,000 | $482,845,639 | SLVCHS - EWP05 BULLETIN 9C. THIS MODIFICATION INCORPORATES THE CHANGES AS OUTLINED IN EWP05 BULLETIN9C. CHANGE… |
| Mod SA115· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-01-07 | +$2,671 | $482,848,310 | SLVCHS - PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT AS REQUIRED TO COMPLY WITH PILE CAP CHANGES PER RFI 0794. |
| Mod CO03E· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-01-11 | +$10,000 | $482,858,310 | SLVCHS - PROVIDE ALL LABOR, MATERAILS, AND EQUIPMENT REQUIRED TO ADD LIMESTONE AT THE BRIDGE TIE-INS AT PAN AM… |
| Mod CO03F· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-01-18 | +$6,000 | $482,864,310 | SLVCHS - PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT REQUIRED TO INSTALL NEW DRAINS AT THE 1ST FLOOR TERRACE A… |
| Mod SA118· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-01-24 | +$2,127 | $482,866,437 | SLVCHS - PROVIDE ALL LABOR, MATERIALS AND EQUIPMENT NECESSARY TO INCREASE THE SIZE OF ANCHOR BOLTS FROM 1 1/2"… |
| Mod SA119· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-01-24 | −$8,687 | $482,857,750 | SLVCHS - PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO DELETE THE SEISMIC REQUIREMENT FOR THE LIGHT… |
| Mod SA120· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-01-24 | +$8,183 | $482,865,933 | SLVCHS - PROVIDE ALL ENGINEERING, LABOR, MATERIALS, AND EQUIPMENT REQUIRED TO EXTEND THE WEST END OF THE BUILD… |
| Mod SA121· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-01-24 | +$5,880 | $482,871,813 | SLVCHS - REPAIR EXISTING CONCRETE STAIR TREADS AND NOSINGS AT PAN AM BUILDING PER RFI-0219. |
| Mod SA122· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-01-24 | +$7,293 | $482,879,106 | SLVCHS - PROVIDE ALL LABOR, MATERAILS, AND EQUIPMENT REQUIRED TO ADD LIMESTONE AT THE BRIDGE TIE-INS AT PAN AM… |
| Mod SA116· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-01-30 | +$3,900 | $482,883,006 | SLVCHS - PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO BACKFILL THE EXISTING TRANSFORMER VAULT PIT… |
| Mod SA123· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-01-30 | +$26,277 | $482,909,283 | SLVCHS - PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT REQUIRED TO ADD HEADER CHANNEL FRAMING AT EXISTING JOINT… |
| Mod SA125· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-01-30 | +$9,866 | $482,919,149 | SLVCHS - PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO REVISE WINDOW FLASHING AT TYPE S WINDOWS IN… |
| Mod CO03H· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-01-31 | +$6,000 | $482,925,149 | SLVCHS - PROVIDE ALL LABOR, MATERAILS, AND EQUIPMENT REQUIRED TO RECTIFY THE OUT-OF-PLANE CONCRETE BEAM AT THE… |
| Mod SA126· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-01-31 | +$7,424 | $482,932,573 | SLVCHS - PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT REQUIRED TO CONTINUE THE SURCHARGE WATER CONSUMPTION COST… |
| Mod SA127· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-01-31 | +$182,057 | $483,114,630 | SLVCHS - PROVIDE ALL LABOR, MATERAILS, AND EQUIPMENT REQUIRED PROVIDE THIRD PARTY TESTING/INSPECTION SERVICES… |
| Mod SA129· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-02-06 | −$901 | $483,113,729 | SLVCHS - DEFINITIZE CO-03B. CHANGE ORDER CO-03B WAS ISSUED IN THE AMOUNT OF $5,000 SAW CUT AT BOTH SIDES OF TH… |
| Mod SA132· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-02-13 | +$23,488 | $483,137,217 | SLVCHS - PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT REQUIRED TO ADD REVISE COPING DETAIL AT 5TH FLOOR OF PAN… |
| Mod SA131· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-02-15 | +$4,581 | $483,141,798 | SLVCHS - PROVIDE ALL LABOR, MATERAILS, AND EQUIPMENT NECESSARY TO INSTALL REINFORCING STEEL DOWELS AT CMU WALL… |
| Mod SA124· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-02-19 | +$0 | $483,141,798 | SLVCHS - STORED MATERIAL AUTHORIZATION FOR ALUMINUM STOREFRONTS FOR PAN AM AT NO COST. |
| Mod SA130· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-02-19 | +$2,007 | $483,143,805 | SLVCHS - PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT REQUIRED TO ADD CONNECTION OF EXISTING LIMESTONE PANELS A… |
| Mod SA133· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-02-19 | +$5,245 | $483,149,050 | SLVCHS - PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT REQUIRED TO APPLY WATER REPELLENT PROTECTIVE COAT TO LIME… |
| Mod SA134· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-02-19 | +$6,666 | $483,155,716 | SLVCHS - PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT REQUIRED TO ADD REVISE COPING DETAIL AT 5TH FLOOR OF PAN… |
| Mod SA135· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-02-20 | +$17,727 | $483,173,443 | SLVCHS - PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT REQUIRED TO PROVIDE JANITORIAL SERVICES FOR THE TEMPORARY… |
| Mod SA136· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-02-20 | +$27,505 | $483,200,948 | SLVCHS - PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT REQUIRED TO MODIFY THE FLUID APPLIED ROOFING DETAIL PER R… |
| Mod CO03J· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-02-21 | +$50,000 | $483,250,948 | SLVCHS - PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT REQUIRED TO LEVEL FLOOR AT PAN AM WITH UNDERLAYMENT USING… |
| Mod SA117· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-02-21 | +$286 | $483,251,234 | SLVCHS - PROVIDE ALL LABOR AND MATERIALS REQUIRED TO MODIFY THE WALLS IN PAN AM ROOMS 4Q114&3Q120 TO ALLOW FOR… |
| Mod CO03K· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-02-26 | +$5,000 | $483,256,234 | SLVCHS - PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT REQUIRED TO REMOVE THE EXISTING COOPER LINER AT THE EXTER… |
| Mod SA137· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-02-26 | +$7,745 | $483,263,979 | SLVCHS - PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT REQUIRED TO MODIFY THE FRAMING SUPPORT FOR CLAY TILE WALL… |
| Mod SA138· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-02-26 | +$1,918 | $483,265,897 | SLVCHS - PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT REQUIRED TO CHANGE THE SIZE OF THE DIVIDER BEAMS AT ELEVA… |
| Mod CO03C· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-02-28 | +$13,137,371 | $496,403,268 | SLVCHS - PROVIDE ALL LABOR AND MATERIALS REQUIRED FOR UTILITY EARTHWORK AND LANDSCAPING PER PLANS AND SPECIFIC… |
| Mod CO03I· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-02-28 | −$200,000 | $496,203,268 | SLVCHS - DELETE TOPPING SLAB REVISING BASE VAPOR BARRIER. |
| Mod SA139· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-02-28 | +$158,215 | $496,361,483 | SLVCHS - PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT REQUIRED TO PROVIDE INDEPENDENT TESTING AGENCY FOR ONSITE… |
| Mod SA142· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-03-05 | +$2,743 | $496,364,226 | SLVCHS - PROVIDE ALL LABOR AND MATERIALS AND EQUIPMENT NECESSARY TO INSTALL TWO ADDITIONAL DOOR FRAMES (OPENIN… |
| Mod SA093· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-03-06 | +$5,298 | $496,369,524 | SLVCHS - LABOR, EQUIPMENT AND MATERIAL NECESSARY TO INSTALL MISSING STAINLESS STEEL ANCHORS AT EXISTING LIMEST… |
| Mod SA140· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-03-06 | +$1,925 | $496,371,449 | SLVCHS - PROVIDE ALL LABOR AND MATERIALS REQUIRED TO REINFORCE AND ENCASE STRUCTUAL STEEL COLUMN 01_5 AND 01_B… |
| Mod SA094· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-03-18 | +$5,431 | $496,376,880 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT AND MATERIAL NECESSARY TO ROTATE THE PILE CAP AND PILES IN CONFLICT WITH… |
| Mod SA141· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-03-18 | +$194,298 | $496,571,178 | SLVCHS - PROVIDE ALL LABOR AND MATERIALS REQUIRED TO IMPLEMENT THE CHANGES REFLECTED IN BULLETIN 08A. |
| Mod SA143· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-03-18 | +$30,846 | $496,602,024 | SLVCHS - PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO PREPARE THE EXISTING CONCRETE SLAB ON THE 1S… |
| Mod SA144· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-03-18 | +$1,909 | $496,603,933 | SLVCHS - PROVIDE ALL LABOR AND MATERIALS REQUIRED TO RE-DETAIL THE ELEVATOR SHOP DRAWINGS DUE TO DIMENSION CHA… |
| Mod SA146· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-03-18 | +$94,862 | $496,698,795 | SLVCHS - PROVIDE ALL LABOR AND MATERIALS REQUIRED TO ADD ANGLES TO ALL ELEVATOR MACHINE BEAMS. |
| Mod SA148· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-03-25 | +$10,314 | $496,709,109 | SLVCHS - PROVIDE ALL LABOR AND MATERIALS REQUIRED TO INCREASE STEEL BASE PLATE THICKNESS IN BUILDINGS 2&3 PER… |
| Mod SA145· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-03-27 | −$41,080 | $496,668,029 | SLVCHS - SA-145 ISSUED TO DEFINITIZE CO-03I TO PROVIDE ALL LABOR, MATERIAL, AND EQUIPMENT TO REMOVE TOPPING SL… |
| Mod SA147· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-03-29 | +$3,810 | $496,671,839 | SLVCHS - PROVIDE ALL LABOR AND MATERIALS REQUIRED TO CHANGE RECEPTACLE COVER COLORS, PER RFIS-852C1, 852R1, AN… |
| Mod SA150· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-03-29 | +$1,107 | $496,672,946 | SLVCHS - PROVIDE ALL LABOR AND MATERIALS REQUIRED TO RELOCATE STEAM VENT PIPE IN PENTHOUSE OF PAN AM |
| Mod SA151· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-04-02 | +$45,188 | $496,718,134 | SLVCHS - PROVIDE ALL LABOR AND MATERIALS REQUIRED TO TO INCREASE THE SIZE OF THE FIRE PUMP CIRCUIT BREAKER CAB… |
| Mod SA153· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-04-02 | +$4,266 | $496,722,400 | SLVCHS - PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO CORE DRILL A 6" AND A 10" HOLE FOR PROCESS W… |
| Mod SA152· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-04-04 | −$2,221 | $496,720,179 | SLVCHS - PAN AM BUILDING, MISCELLANEOUS HARDWARE CHANGES. |
| Mod SA154· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-04-10 | +$24,755 | $496,744,934 | SLVHCS 1) PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY MODIFY SPECIFICATION SECTION 22 40 00 2.6.C TO R… |
| Mod SA157· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-04-12 | −$22,496 | $496,722,438 | SLVCHS - PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO ADD ONE VALVE PIT TO BUILDING SIX (6) PER RE… |
| Mod SA158· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-04-15 | −$4,042 | $496,718,396 | SLVCHS - DELETE THE SST BASE AT THE BASEMENT ELEVATOR LOBBY ALONG WITH 2ND THROUGH 5TH FLOOR ELEVATOR LOBBIES.… |
| Mod CO03L· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-04-16 | +$100,000 | $496,818,396 | SLVCHS - THIS CHANGE ORDER AUTHORIZES THE CONTRACTOR TO BEGIN THE RELEASE AND FABRICATION OF THE CDS MANHOLES… |
| Mod CO03M· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-04-16 | +$30,000 | $496,848,396 | SLVCHS - PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO PROCEED WITH THE CHANGES CONTAINED IN BULLET… |
| Mod SA155· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-04-16 | +$64,787 | $496,913,183 | SLVCHS - PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO INCREASE THE FIREPROOFING WORK ASSOCIATED WI… |
| Mod SA159· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-04-16 | +$31,943 | $496,945,126 | SLVCHS - SUPPLEMENTAL AGREEMENT ISSUED IN THE AMOUNT OF $31,943.00 TO DEFINITIZE CO-03K ISSUED IN THE AMOUNT O… |
| Mod SA160· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-04-16 | +$1,744 | $496,946,870 | SLVCHS - PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO ADD A 3 IN DRAIN PIPE TO THE TERRACE OF THE… |
| Mod SA162· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-04-18 | +$48,847 | $496,995,717 | SLVCHS - PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY FOR PILE CHANGES AS REFERENCED IN BULLETIN 4.1,… |
| Mod SA163· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-04-18 | +$156,977 | $497,152,694 | SLVCHS - DEFINITIZE CO-01Z FOR PILE CHANGES CONTAINED IN EWP-05, ADDENDUM 03. THIS SA COMPLETES ALL PILE WORK… |
| Mod CO03N· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-04-19 | +$19,665 | $497,172,359 | SLVCHS - PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT, AS REQUIRED TO REPLACE DAMAGED ROOF INSULATION DUE TO MO… |
| Mod SA165· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-04-24 | −$23,203 | $497,149,156 | SLVCHS - MODIFY SHOTGUN HOUSES DESIGN - INCREASE SLAB DEPTH, ADD GEO-FOAM, RE-FRAME THE CHIMNEY OPENINGS, ADD… |
| Mod SA164· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-04-25 | −$3,004 | $497,146,152 | SLVCHS - PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO DELETE LOUVER QQ AND ASSOCIATED SUPPORTING S… |
| Mod SA166· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-04-26 | +$12,325 | $497,158,477 | SLVCHS - PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO ADD A HPS VALVE TO THE HPS LOOP IN THE BOILE… |
| Mod SA167· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-04-26 | +$0 | $497,158,477 | SLVCHS - THIS SUPPLEMENTAL AGREEMENT IS TO ALLOW PROGRESS PAYMENTS FOR PVC PIPE AND FITTINGS STORED AT AN OFF-… |
| Mod SA168· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-04-26 | +$0 | $497,158,477 | SLVCHS - SUPPLEMENTAL AGREEMENT TO ALLOW PROGRESS PAYMENTS FOR STORM PVC PIPE AND FITTING AT AN OFFSITE LOCATI… |
| Mod SA172· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-04-26 | +$0 | $497,158,477 | SLVCHS - ALLOWS PROGRESS PAYMENTS FOR STORED MATERIAL FOR PVC PIPE AND FITTINGS OFF SITE. REFERENCE PCO: 81045… |
| Mod SA171· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-04-29 | +$2,940 | $497,161,417 | SLVCHS - PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO ADD TWO REINFORCED 4'X4'X1' PEDESTALS ABOVE… |
| Mod SA173· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-04-30 | −$44,799 | $497,116,618 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO DELETE ONE FUEL OIL SKID, LEAK SENSORS, PRIMA… |
| Mod SA174· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-05-01 | −$95,000 | $497,021,618 | SLVCHS - THIS SUPPLEMENTAL AGREEMENT DEFINITIZES CO-01X. PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY… |
| Mod CO03Q· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-05-02 | −$40,000 | $496,981,618 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO DELETE REQUIREMENT FOR SOUND ATTENUATORS AT A… |
| Mod CO03G· CHANGE ORDER | 2013-05-03 | +$2,508,862 | $499,490,480 | SLVCHS - CHANGE ORDER ISSUED ON CLIN 0008 AS EWP 8C CEP MASONRY, DOORS, FRAMES, HARDWARE, AND PHASE 3 TEMP ELE… |
| Mod SA175· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-05-03 | +$2,677 | $499,493,157 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO PROVIDE ADDITIONAL CONCRETE MATERIALS FOR ENL… |
| Mod SA176· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-05-03 | +$415 | $499,493,572 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO ENCLOSE TWO COLUMNS ALONG THE SOUTH WALL WITH… |
| Mod SA177· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-05-03 | +$634 | $499,494,206 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO CHIP OUT AND REMOVE 12" X 12" X 1-1/2" DEPRES… |
| Mod SA179· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-05-06 | +$30,546 | $499,524,752 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO PROVIDE CLIP ANGLES AT TOP OF CMU FOR CEP ONL… |
| Mod SA178· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-05-09 | +$15,472 | $499,540,224 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO DEFINITIZE CO-02I AND PERFORM ELECTRICAL, FIR… |
| Mod SA181· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-05-09 | +$2,709 | $499,542,933 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO REPAIR HOLES IN THE EXISTING MASONRY WALLS AT… |
| Mod CO03P· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-05-13 | +$218,731,887 | $718,274,820 | SLVCHS - CHANGE ORDER ISSUED AS EWP 08D FOR MECHANICAL, ELECTRICAL, LOW VOLTAGE, DRYWALL, CEILINGS, SITE LIGHT… |
| Mod SA182· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-05-14 | +$40,000 | $718,314,820 | SLVCHS - THIS SUPPLEMENTAL AGREEMENT IS ISSUED IN THE AMOUNT OF $40,000.00 TO DEFINITIZE CO-03Q ISSUED IN THE… |
| Mod SA184· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-05-14 | +$0 | $718,314,820 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO PERFORM ALL WORK ASSOCIATED WITH BULLETIN 4.1… |
| Mod SA180· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-05-15 | +$207,351 | $718,522,171 | SLVCHS - THIS MODIFICATION IS TO ADMINISTRATIVELY REVISE BLOCK 12 OF CO-03L TO CHANGE FROM 629CA2401M.11 36X01… |
| Mod SA196· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-05-15 | +$0 | $718,522,171 | SLVCHS - ADMINISTRATIVE MODIFICATION TO CHANGE THE LINE OF ACCOUNTING. |
| Mod CO03R· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-05-17 | +$115,000 | $718,637,171 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO PERFORM ALL WORK ASSOCIATED WITH BULLETIN 9D. |
| Mod CO03S· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-05-17 | +$10,000 | $718,647,171 | SLVCHS - PROVIDE EXCAVATION AND REMOVAL OF UNFORESEEN CONDITIONS ON CONSTRUCTION SITE. |
| Mod SA185· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-05-17 | +$9,000 | $718,656,171 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO DEFINITIZE TERRACE DRAINS AT PAN AM, CO-03F |
| Mod SA186· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-05-21 | +$7,510 | $718,663,681 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO ADD BUILDING 7 (CEP) CATWALK SUPPORTS, GRATIN… |
| Mod SA187· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-05-21 | +$51,225 | $718,714,906 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO PERFORM CHANGES IN EWP-03 AS AGREED TO FOR NI… |
| Mod SA188· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-05-21 | +$3,020 | $718,717,926 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO MODIFY THE SHEAR PLATE CONNECTIONS APPROPRIAT… |
| Mod SA183· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-05-23 | +$8,888 | $718,726,814 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO INSTALL ADDITIONAL BRICK AND PIER MODIFICATIO… |
| Mod SA189· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-05-23 | +$13,037 | $718,739,851 | SLVCHS - THIS SUPPLEMENTAL AGREEMENT IS BEING ISSUED IN THE AMOUNT OF $13,037.00 TO DEFINITIZE CO-03N ISSUED I… |
| Mod SA190· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-05-23 | +$23,188 | $718,763,039 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO INSTALL A 2HP SUMP PUMP AND OIL MINDER CONTRO… |
| Mod SA192· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-05-23 | +$9,905 | $718,772,944 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO SPRAY FIRE PROOFING ON THE EXPOSED REINFORCIN… |
| Mod SA193· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-05-23 | +$7,988 | $718,780,932 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO REBID SCOPE OF WORK FOR THE DEMOLITION ASSOCI… |
| Mod CO03T· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-05-24 | +$10,000 | $718,790,932 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO PERFORM CHANGES AS STATED IN BULLETIN 12B (BU… |
| Mod SA195· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-05-30 | +$50,763 | $718,841,695 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO PERFORM CHANGES FOR WORK TO THE DOMESTIC WATE… |
| Mod SA191· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-06-03 | −$4,775 | $718,836,920 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO DELETE THE METAL STUDS, SHEATHING, AND AIR WE… |
| Mod SA197· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-06-03 | +$8,776 | $718,845,696 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO PROVIDE ROOF DRAINS ADN SEAL PENETRATIONS AT… |
| Mod SA198· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-06-03 | +$76,283 | $718,921,979 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO AWARD THE PREVIOUSLY UN-AWARDED EWP-08 ELECTR… |
| Mod SA199· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-06-04 | −$81,997 | $718,839,982 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO DELETE THE FABRICATION OF THE EMBEDS FROM THE… |
| Mod SA200· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-06-04 | +$6,984 | $718,846,966 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY FOR WATER METER REMOBILIZATION COSTS AT PAN AM |
| Mod SA201· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-06-04 | +$5,097 | $718,852,063 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO PROVIDE SAW CUT JOINTS AT THE DOMESTIC WATER… |
| Mod SA202· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-06-06 | +$5,988 | $718,858,051 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO EXTEND MECHANICAL AND PLUMBING SLEEVES TO ENS… |
| Mod SA203· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-06-06 | +$7,180 | $718,865,231 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO PROVIDE MODIFICATION TO CEP SLAB EDGES IN ACC… |
| Mod SA204· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-06-06 | +$4,717 | $718,869,948 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO MODIFY PAN AM STOREFRONTS FLOORS 2-5 ADDITION… |
| Mod SA205· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-06-06 | +$6,637 | $718,876,585 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO PROVIDE BLANK OFF PANELS TO TWO SUPPLY DUCTS… |
| Mod SA194· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-06-12 | +$20,898 | $718,897,483 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO REVISE SEWER UTILITY SITE INVERTS IN REPSONSE… |
| Mod SA207· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-06-12 | +$2,316 | $718,899,799 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO ADD DOOR 2N128.6 AND ASSOCIATED HARDWARE AT C… |
| Mod SA206· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-06-13 | +$14,961 | $718,914,760 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO PROVIDE COLUMN ENCASEMENT AT ELEVATOR WALLS. |
| Mod SA208· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-06-13 | +$21,297 | $718,936,057 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO INSTALL TWO FLOOR DRAINSAND ASSOCIATED PIPING… |
| Mod CO03U· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-06-14 | +$94,351 | $719,030,408 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO PROVIDE 89 STAINLESS STEEL ELEVATOR DOOR FRAM… |
| Mod SA211· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-06-19 | +$6,910 | $719,037,318 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO PROVIDE A STEEL STAIR LANDING AND OPENING IN… |
| Mod SA210· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-06-20 | +$26,242 | $719,063,560 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO INSTALL WATERPROOFING ON TNE TANK LID AT CEP. |
| Mod CO03V· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-06-25 | +$50,000 | $719,113,560 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO PROVIDE ALL WORK ASSOCIATED WITH BULLETIN 12C… |
| Mod CO03X· CHANGE ORDER | 2013-06-28 | +$30,000 | $719,143,560 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO PROVIDE CHANGES ASSOCIATED WITH EDGE SLAB CON… |
| Mod SA213· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-07-03 | +$10,000 | $719,153,560 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO RETRACT PROPOSED CHANGE IN SCOPE TO UTILIZE N… |
| Mod SA212· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-07-08 | +$6,433 | $719,159,993 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO PROVIDE INSTALL RETANGULAR TUBE STEEL MEMBERS… |
| Mod SA214· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-07-08 | +$25,509 | $719,185,502 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO PROVIDE INSTALL AND REMOVE TEMPORRY DRAINAGE… |
| Mod SA215· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-07-08 | +$0 | $719,185,502 | THIS SUPPLEMENTAL AGREEMENT IS TO ALLOW PROGRESS PAYMENTS FOR PVC PIPE HANGING MATERIALS FOR EWP-08 WHICH IS B… |
| Mod SA216· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-07-08 | +$0 | $719,185,502 | THIS SUPPLEMENTAL AGREEMENT IS TO ALLOW PROGRESS PAYMENTS FOR ROOF DRAINS AND DOWNSPOUT COVERS FOR EWP-08, WHI… |
| Mod SA218· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-07-10 | +$19,592 | $719,205,094 | PROVIDE ALL LABOR, EQUIPMENT AND MATERIAL NECESSARY TO INSTALL FUEL OIL FLOW METERS TO THE BOILERS, FUEL OIL S… |
| Mod CO03W· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-07-11 | +$9,393,474 | $728,598,568 | SLVCHS - PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY FOR EWP#8E MISCELLANEOUS METALS, INTERIOR DOORS/… |
| Mod SA217· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-07-11 | +$0 | $728,598,568 | SLVCHS - THIS SUPPLEMENTAL AGREEMENT IS TO ALLOW FOR PRGORESS PAYMENTS FOR MEDICAL GAS CLEANED ANDD BAGGED FIT… |
| Mod CO03Y· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-07-15 | −$200,000 | $728,398,568 | TO PROVIDE ALL WORK ASSOCIATED WITH PCO 810178 (REVISION 1), DATED 9/12/2012.A. ALL STRUCTURAL STEEL SCOPE CHA… |
| Mod SA224· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-07-15 | +$4,718 | $728,403,286 | REVISE PRECAST PANEL JOINT LOCATIONS AND ADD FALSE JOINTS AS PER RFI 1262 RESPONSE DATES 5/3/13. |
| Mod SA221· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-07-17 | +$4,566 | $728,407,852 | PROVIDE ELECTRICAL POWER TO OVERHEAD COILING DOOR AT CEP STAIR 2. |
| Mod SA222· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-07-18 | +$2,346 | $728,410,198 | EXEPEDITE DELIVERY OF EXTERIOR DOOR FRAMES FOR CEP STAIR 2. |
| Mod SA229· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-07-23 | −$8,110 | $728,402,088 | THE CONTRACT DRAWINGS FOR EWP-7 PRESCRIBED SEPARATE AIR-CONTROL AND SMOKE DAMPERS AND AN UNNEEDED SOUND ATTENU… |
| Mod SA227· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-07-24 | +$900 | $728,402,988 | TO PROVIDE ALL LABOR, EQUIPMENT AND MATERIALS TO PROVIDE AND INSTALL FUNNEL GRATES ON PENTHOUSE FLOOR DRAINS A… |
| Mod SA228· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-07-24 | +$631 | $728,403,619 | TO PROVIDE ALL WORK ASSOCIATED WITH MODIFYING THE CANOPY DECK REQUIREMENTS AS PER THE RESPONSE TO RFI 1446. |
| Mod SA233· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-07-25 | +$0 | $728,403,619 | THIS SUPPLEMENTAL AGREEMENT IS TO ALLOW MONTHLY PROGRESS PAYMENTS FOR STORED MATERIAL AT AN OFFSITE LOCATION.… |
| Mod SA231· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-07-29 | +$0 | $728,403,619 | TO ALLOW PROGRESS PAYMENTS FOR BWS FABRICATED CURTAIN WALL AND INSULATED GLASS STORED MATERIALS. MATERIALS WIL… |
| Mod CO03Z· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-07-30 | −$10,000 | $728,393,619 | THIS CHANGE ORDER IS TO INDCORPORATE THE CHANGES AS OUTLINED IN EARLY WORK PACKAGE 07, BULLETIN 11C. |
| Mod SA230· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-07-30 | −$72,414 | $728,321,205 | THIS SUPPLEMENTAL AGREEMENT IS BEING ISSUED IN THE DECREASE AMOUNT OF (-$72,414.00) TO DEFINITIZE CO-02D ISSUE… |
| Mod SA236· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-07-31 | +$32,893 | $728,354,098 | SLVHCS- IN LIEU OF INSTALLING THE FINAL TOPCOAT OF PAINT FOR THE FUEL OIL TANKS IN THE CEP IS TO BE FIELD APPL… |
| Mod SA237· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-07-31 | +$12,047 | $728,366,145 | SLVHCS- PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO RE-ROUTE THE 6" SEWER LINE SCEDULED TO BE TIED… |
| Mod SA238· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-07-31 | +$71,851 | $728,437,996 | PROVIDE ALL LABOR, EQUIPMENT AND MATERIAL NECESSARY TO REVISE THE FOLLOWING: 1. THE UTILITIES TO INCORPORATE R… |
| Mod SA225· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-08-06 | +$0 | $728,437,996 | THIS SUPPLEMENTAL AGREEMENT IS TO ALLOW THE RELOCATION OF THE PARKING GARAGE AND TRANSISTION LIVING AT CMHP'S… |
| Mod SA239· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-08-06 | +$18,797 | $728,456,793 | 1. TO MODIFY THE HEAD DETAIL AT THE COURTYARD WITH STEEL L5X3-1/2X1/4 DETAIL WITH THE FULL DEPTH SHIMS WILL BE… |
| Mod SA240· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-08-06 | +$35,307 | $728,492,100 | PROVIDE ALL LABOR, EQUIPMENT AND MATERIAL NECESSARY TO CHANGE THE WALLS AT ROOMS 1N110 AND 1N119 OF BUILDING 7… |
| Mod SA234· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-08-07 | +$3,376 | $728,495,476 | PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL TO PROVIDE INTUMESCENT FIREPROOFING ON BEAMS AT CEP. |
| Mod SA235· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-08-07 | +$16,400 | $728,511,876 | ADDITIONAL STEEL FOR ROOF PENETRATIONS |
| Mod SA241· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-08-07 | −$917 | $728,510,959 | PROVIDE ALL LABOR, EQUIPMENT AND MATERIAL NECESSARY TO REDUCED THE GYPSUM WALL BOARD SYSTEM SHAFT WALL AND ADD… |
| Mod SA243· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-08-07 | +$1,728 | $728,512,687 | PROVIDE ALL LABOR, EQUIPMENT, AND MATERIALS NECESSARY TO INSTALL THE CONCRETE CURBS IN THE CEP PER THE RESPONS… |
| Mod SA244· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-08-07 | −$3,263 | $728,509,424 | PROVIDE ALL LABOR, EQUIPMENT, AND MATERIALS TO DELETE SOUTH GALVEZ DRAIN INLETS AND MANHOLE. |
| Mod SA223· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-08-08 | +$15,957 | $728,525,381 | PROVIDE ALL LABOR, MATERIAL, AND EQUIPMENT TO INSTALL GYPSUM WALL BOARD AT THE STAIRS FOR THE PAN AM BUILDING. |
| Mod SA242· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-08-08 | −$146,066 | $728,379,315 | PROVIDE ALL LABOR, EQUIPMENT, AND MATERIALS NECESSARY TO MODIFY BUILDING 9 NORTH ENTRANCE PER BULLETIN 11A. |
| Mod SA245· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-08-08 | −$4,447 | $728,374,868 | PROVIDE ALL LABOR, EQUIPMENT, AND MATERIALS TO DELETE GLASS DOOR 5QC01 AND ALL ASSOCIATED HARDWARE AND ADJACEN… |
| Mod SA246· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-08-08 | +$3,620 | $728,378,488 | EWP 08 CEP POST BID ADDENDUM 6 AND 6R1 |
| Mod CO04C· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-08-09 | +$100,000 | $728,478,488 | PROVIDE ALL LABOR, EQUIPMENT AND MATERIAL NECESSARY TO DELETE THE INSTALLATON OF RHW AND INSTALL MI CABLE IN T… |
| Mod SA156· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-08-09 | +$131,009 | $728,609,497 | SLVCHS - PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO INSTALL ADDITIONAL FLOOR LEVELING IN THE PAN… |
| Mod SA247· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-08-09 | +$5,914 | $728,615,411 | EWP 05 CEP STRUCTURAL OPENINGS FOR MEP ON LEVEL 3.5 |
| Mod SA248· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-08-09 | −$938 | $728,614,473 | EWP 05 CEP STRUCTURAL OPENINGS FOR MEP ON LEVEL 3.5 |
| Mod SA249· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-08-14 | +$14,221 | $728,628,694 | SEWER CONNECTIONS FOR SHOTGUN HOUSES. |
| Mod SA169· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-08-19 | −$315,482 | $728,313,212 | SLVCHS - PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO REVISE PARKING GARAGES AS SHOWN IN EWP 04. |
| Mod SA220· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-08-21 | +$106,144 | $728,419,356 | THIS SUPPLEMENTAL AGREEMENT IS TO ALLOW ALL WORK ASSOCIATED WITH POST BID ADDENDUM NUMBER THREE, FIREPROOFING… |
| Mod SA250· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-08-21 | +$17,611 | $728,436,967 | CEP PRE-CAST AND CMU LINTELS AT OPENINGS |
| Mod SA253· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-08-22 | +$0 | $728,436,967 | STORED MATERIAL FOR PLUMING AND MEDICAL GAS MATERIALS |
| Mod CO04E· CHANGE ORDER | 2013-08-23 | +$10,000 | $728,446,967 | PROVIDE ALL LABOR, EQUIPMENT AND MATERIAL NECESSARY TO PERFORM THE FOLLOWING CHANGES IN WORK AS SHOWN IN THE B… |
| Mod SA226· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-08-23 | +$96,429 | $728,543,396 | PROVIDE ALL LABOR, EQUIPMENT AND MATERIAL NECESSARY TO PERFORM THE FOLLOWING CHANGES IN WORK IN THE PAN AM BUI… |
| Mod SA252· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-08-27 | +$8,079 | $728,551,475 | PROVIDE ALL LABOR, EQUIPMENT AND MATERIAL NECESSARY TO PROVIDE FOR 1 X 1 REGLET AT CONSTRUCTION JOINTS IN THE… |
| Mod SA232· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-08-28 | +$15,997 | $728,567,472 | PROVIDE ALL LABOR, EQUIPMENT AND MATERIAL NECESSARY TO MODIFY THE TEMPORARY TRANSFORMER PAD FOR THE PAN AM BUI… |
| Mod CO04A· CHANGE ORDER | 2013-08-30 | +$22,752,701 | $751,320,173 | CHANGE ORDER ISSUED ON CLIN 0008 AS EWP #8F,MILLWORK, CEP PAINTING, SPECIALTIES, MEDICAL EQUIPMENT, LAB CASEWO… |
| Mod CO04B· CHANGE ORDER | 2013-08-30 | +$8,877,359 | $760,197,532 | DIXIE DEMOLITION AND STABILIZATION, AT THE VA MEDICAL CENTER SITE IN NEW ORLEANS, LA |
| Mod SA256· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-09-05 | +$10,915 | $760,208,447 | PROVIDE ALL LABOR, EQUIPMENT AND MATERIAL NECESSARY TO PROVIDE 89 STAINLESS STEEL BULL-NOSE FRAMES FOR E1 ELEV… |
| Mod SA257· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-09-05 | +$9,889 | $760,218,336 | TO ADD CARD READERS AND CHANGE CONFIGURATION OF THE GLASS ENTRANCE DOORS ON 3RD AND 5TH FLOORS OF THE PAN AM B… |
| Mod CO04F· CHANGE ORDER | 2013-09-06 | +$30,000 | $760,248,336 | ADDED STEEL FOR CURTAIN WALL ENTRANCE VESTIBULES TO MEET BLAST LOAD REQUIREMENTS. |
| Mod CO04G· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-09-11 | −$10,000 | $760,238,336 | FIRE SUPPRESSION SYSTEM IN LIEU OF MI CABLE IN CONCOURSE |
| Mod SA254· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-09-12 | +$191,150 | $760,429,486 | PROVIDE ALL LABOR, EQUIPMENT AND MATERIAL NECESSARY TO COMPLETE THE CONCRETE SCOPE OF WORK AT THE BUILDING 1 C… |
| Mod SA255· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-09-12 | +$0 | $760,429,486 | ALLOW FOR STORED ARCHITECTURAL AND GATE PRECAST CONCRETE |
| Mod SA258· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-09-12 | +$5,188 | $760,434,674 | DELETE BACKFLOW PREVENTER IN CEP AND REPLACE WITH EXTENDED COPPER PIPING. |
| Mod SA259· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-09-12 | +$12,703 | $760,447,377 | PROVIDE ALL LABOR, EQUIPMENT AND MATERIAL NEEDED TO INSTALL STRUCTURAL STEEL MEMBERS SO AS TO SECURELY SUPPORT… |
| Mod SA260· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-09-12 | +$7,084 | $760,454,461 | PROVIDE PROXIMITY SENSOR FAUCETS TO ALL P-417 LAVATORIES IN PAN AM. |
| Mod SA261· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-09-12 | +$1,084 | $760,455,545 | PAVEMENT SUPPORT LEDGES BUILDING 1 |
| Mod SA262· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-09-12 | +$3,682 | $760,459,227 | CRAC PUMP AND CONDENSATE PIPE AT CEP |
| Mod SA263· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-09-12 | −$269 | $760,458,958 | CREDIT TO CHANGE CANTEEN EQUIPMENT FROM VC TO VV. |
| Mod SA264· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-09-12 | +$9,300 | $760,468,258 | DEFINITIZE CO-03H; REVISE LIMESTONE ATTACHMENT AT NORTH WALL OF PAN AM ANNEX PATIO. |
| Mod CO04H· CHANGE ORDER | 2013-09-13 | +$100,000 | $760,568,258 | PAN AM HARDWARE LOCKSETS REPLACEMENT. |
| Mod SA265· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-09-16 | +$7,910 | $760,576,168 | SIM LAB PIE AND COMPRESSOR ROUGH-IN, PAN AM BUILDING |
| Mod CO04I· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-09-24 | +$40,000 | $760,616,168 | CHANGES TO ENTERGY VAULT PER RFI 0771. |
| Mod SA271· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-09-24 | +$84,693 | $760,700,861 | TO PROVIDE FOR CONTINUATION OF VIBRATION, NOISE AND DUST MONITORING FOR 24 MONTHS. |
| Mod SA269· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-09-25 | +$32,371 | $760,733,232 | TO PROVIDE AN EXTRA COURSE BOND BEAM AT THE RATED WALLS AND A BOND BEAM AT NON RATED WALLS IN THE CEP. |
| Mod CO04D· CHANGE ORDER | 2013-09-30 | +$7,584,460 | $768,317,692 | EWP 8G SITE PILES, SITE CONCRETE AT PANAM, MEDICAL EQUIPMENT SUPPORTS, RESINOUS FLOORING, TEST AND BALANCE AT… |
| Mod SA219· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-09-30 | +$265,649 | $768,583,341 | DEFINITIZE CO-02B FOR EARTHWORK AND CONCRETE CHANGES. |
| Mod SA266· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-09-30 | +$46,208 | $768,629,549 | TO INCLUDE ALL WORK ASSIGNED WITH CEP (EWP07) CHANGES ONLY, AS OUTLINED IN BULLETIN #3, BASE PRICING AND ALTER… |
| Mod SA267· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-09-30 | +$22,900 | $768,652,449 | SEALANT UNDER ALUMINUM FRAMES PAN AM |
| Mod SA251· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-10-01 | +$1,429,745 | $770,082,194 | DEFINITIZE CO-04C - MI CABLE |
| Mod SA270· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-10-01 | +$616 | $770,082,810 | NOLA: TO REMOVE ABANDONED UNDERGROUND EXISTING PIPES. |
| Mod SA272· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-10-01 | +$13,148 | $770,095,958 | MODIFY AND REPLACE LIMESTONE PANELS ON THE PAN AM BLDG. |
| Mod SA273· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-10-01 | +$2,003 | $770,097,961 | FLOOR DRAINS ROOMS 4D167 AND 4D168 |
| Mod SA149· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-10-04 | +$12,785 | $770,110,746 | TO PROVIDE STRAINER ASSEMBLIES IN THE PAN AM BUILDING. |
| Mod SA275· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-10-04 | +$2,296 | $770,113,042 | NOLA: TO REPLACE TWO INCORRECTLY-SIZED HVAC VAV AIR-TERMINAL UNITS IN CEP BUILDING. |
| Mod CO04J· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-10-07 | +$1,000 | $770,114,042 | BACKFILL AT SITE OF UNDERGROUND STORAGE TANK |
| Mod CO04K· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-10-07 | +$10,000 | $770,124,042 | WORK ASSOCIATED WITH BULLETIN 15A |
| Mod CO04L· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-10-07 | +$10,000 | $770,134,042 | WORK ASSOCIATED WITH BULLETIN 15B |
| Mod SA274· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-10-07 | +$717 | $770,134,759 | DOOR HARDWARE FOR CEP EXTERIOR DOORS |
| Mod SA276· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-10-08 | +$11,822 | $770,146,581 | DOOR HARDWARE FOR CEP EXTERIOR DOORS |
| Mod SA268· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-10-10 | +$243,482 | $770,390,063 | SURCHARGE - EWP-1 CONTAMINATED SOIL |
| Mod SA277· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-10-10 | +$23,886 | $770,413,949 | TO CHANGE HARDWARE AND FRAMES IN THE CEP DUE TO SECURITY CHANGES. |
| Mod SA278· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-10-10 | +$0 | $770,413,949 | TO ALLOW MONTHLY PROGRESS PAYMENTS FOR STORED MATERIALS (BALL VALVES) AT AN OFFSITE LOCATION. |
| Mod SA279· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-10-10 | +$0 | $770,413,949 | TO ALLOW MONTHLY PROGRESS PAYMENTS FOR SOTRED MATERIALS (GRADING MATERIALS)AT AN OFFSITE LOCATION. |
| Mod SA281· DEFINITIZE CHANGE ORDER | 2013-10-10 | −$68,542 | $770,345,407 | THIS ACTION DEFINITIZES CO-04H ISSUED IN THE INCREASE AMOUNT OF $100,000. TO CHANGE THE CORES IN THE PAN AM BU… |
| Mod SA280· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-10-15 | +$32,442 | $770,377,849 | INSTALL CONDUITS FOR BAS CONTROL SYSTEM WIRING FOR THE PAN AM |
| Mod SA282· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-10-15 | +$1,471 | $770,379,320 | TO INSTALL VA PURCHASED MILLWORK AND COUNTER IN THE PAN AMERICAN BUILDING. |
| Mod SA283· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-10-15 | +$4,090 | $770,383,410 | PROVIDE 11 CONCEALED CARRIERS IN THE CEP. |
| Mod SA284· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-10-17 | +$12,936 | $770,396,346 | WOOD BLOCKING FOR WINDOW SILLS AT PAN AM BLDG |
| Mod SA285· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-10-22 | +$0 | $770,396,346 | TO ALLOW MONTHLY PROGRESS PAYMENTS FOR STORED MATERIALS (METAL PANEL MATERIALS) AT AN OFFSITE LOCATION. |
| Mod SA286· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-10-22 | +$0 | $770,396,346 | TO ALLOW MONTHLY PROGRESS PAYMENTS FOR STORED MATERIALS (PIPE FABRICATIONS MATERIALS) AT AN OFFSITE LOCATION. |
| Mod SA288· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-10-24 | +$2,606 | $770,398,952 | NOLA: PROVIDE ALL LABOR, MATERIAL, AND EQUIPMENT NECESSARY TO ADD W8X10 BEAM ALONG THE SOUTH SIDE OF ELEVATOR… |
| Mod SA289· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-10-24 | −$1,491 | $770,397,461 | NOLA: TO DELETE STORM DRAIN BASINS AT THE SHOTGUN HOUSES. |
| Mod SA170· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-10-28 | −$259,818 | $770,137,643 | TO DELETE THE TEMPORARY STAIRS NO LONGER REQUIRED FROM EWP-05 (CO-01L), WHICH INCLUDES AN ALTERNATE FOR FURNIS… |
| Mod SA287· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-10-28 | +$1,811 | $770,139,454 | LIMESTONE SEALER ON THE STAIRS AT NORTH ENTRY PAN AM BLDG. |
| Mod CO04M· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-11-03 | +$95,000 | $770,234,454 | #7 REINFORCING SIDE BARS AT TYPICAL PILE CAPS IN BLDGS. 1, 2, 3 AND 6. |
| Mod CO04N· CHANGE ORDER | 2013-11-03 | +$30,000 | $770,264,454 | TO REMOVE THE EXISTING TERRAZZO AT THE ANNEX COURTYARD IN THE PAN AM BUILDING. |
| Mod SA293· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-11-03 | +$84,718 | $770,349,172 | TO PROVIDE MEDICAL GAS PIPE INSTALLATION OF THE INTERSTITIAL SPACES OF DNT. |
| Mod SA290· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-11-08 | −$44,000 | $770,305,172 | PROVIDE ALL LABOR, MATERIAL, AND EQUIPMENT NECESSARY TO MODIFY THE COOLING TOWER SPRING ISOLATOR PADS AS SPECI… |
| Mod SA297· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-11-08 | +$24,255 | $770,329,427 | REMOVE GRAFFITTI FROM LIMESTONE PANELS AT PAN AM BUILDING. |
| Mod SA291· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-11-12 | +$219 | $770,329,646 | TO PROVIDE ALL MATERIALS, LABOR, AND EQUIPMENT TO INSTALL FIRE RATINGS TO THE DOORS AT OPENINGS 6Q101, 6Q101-1… |
| Mod SA298· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-11-12 | +$70,831 | $770,400,477 | TO INSTALL CONTROL VALVES, METERS AND RELATED APPARATUS IN THE PAN AM BUILDING. |
| Mod SA299· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-11-12 | +$0 | $770,400,477 | TO ALLOW MONTHLY PROGRESS PAYMENTS FOR STORED MATERIALS (ADDITIONAL STRUCTURAL PRECAST TINDALL) AT AN OFFSITE… |
| Mod SA300· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-11-12 | +$28,656 | $770,429,133 | TO INCORPORATE EARLY WORK PACKAGE 04, BULLETIN 5 |
| Mod SA302· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-11-12 | +$2,579 | $770,431,712 | PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL TO PROVIDE SURFACE MOUNTED TOILET PAPER DISPENSERS FOR MARKED TPD-3… |
| Mod SA303· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-11-12 | +$3,397 | $770,435,109 | TO PROVIDE MOISTURE VAPOR PRIMER FOR THE TERRAZZO UNDERCOATING IN THE PAN AM BUILDING. |
| Mod SA305· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-11-18 | +$1,302 | $770,436,411 | REPAIR DOOR SLAB IN THE BASEMENT BQ11OB. |
| Mod SA304· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-11-20 | +$1,375 | $770,437,786 | DELETION OF PAN AM DRAIN INLET, REVISED MANHOLE AT DMH-2. |
| Mod CO04P· CHANGE ORDER | 2013-11-21 | +$24,000 | $770,461,786 | PROVIDE ALL LABOR, MATERIAL, AND EQUIPMENT TO PERFORM WORK FOR ADDITIONAL DATA OUTLETS IN PAN AM BUILDING. |
| Mod SA308· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-11-21 | +$6,940 | $770,468,726 | TO PROVIDE TO FABRICATE AND INSTALL CANTILEVERED FIN SUPPORT ON THE PAN AM BUILDING. |
| Mod SA296· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-12-03 | +$5,115 | $770,473,841 | TO INSTALL UTILITY METER AND ASSOCIATED EQUIPMENT. |
| Mod SA313· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-12-10 | −$2,912 | $770,470,929 | PROVIDE ALL MATERIAL, LABOR, AND EQUIPMENT NECESSARY TO DELETE THE INSTALLATION OF TWO LIGHT FIXTURES FTW5A IN… |
| Mod SA314· DEFINITIZE CHANGE ORDER | 2013-12-11 | −$1,962 | $770,468,967 | PROVIDE ALL LABOR, EQUIPMENT, AND MATERIALS NECESSARY TO COMPLETE RE-DESIGN OF ENTRANCE VESTIBULES AND DOORES… |
| Mod SA311· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-12-17 | +$2,497 | $770,471,464 | TO CORRECT THE UNEVEN CONCRETE FLOOR AT THE SOUTH SIDE OF THE PAN AM ANNEX. |
| Mod CO04R· CHANGE ORDER | 2013-12-31 | +$37,227,939 | $807,699,403 | WORK PACKAGE 8H - FULL BUILDOUT. NEW ORLEANS LA. |
| Mod SA318· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-01-08 | +$48,658 | $807,748,061 | PROVIDE ALL LABOR, EQUIPMENT, AND MATERIALS NECESSARY TO PROVIDE PENDANT SUSPENDED CAMERAS INSTEAD OF CEILING… |
| Mod SA315· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-01-09 | +$552 | $807,748,613 | PROVIDE ALL LABOR, MATERIAL, AND EQUIPMENT NEEDED TO DEMO AND REINSTALL APPROX 64 SQ.FT OF GYPSUM WALL BOARD A… |
| Mod SA294· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-01-15 | −$266,839 | $807,481,774 | THIS ACTION DEFINITIZES CO-02F TO PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT NECESSARY TO DELETE TWO 40,000 G… |
| Mod SA324· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-01-21 | −$1,200 | $807,480,574 | PROVIDE ALL LABOR, MATERIAL, AND EQUIPMENT NECESSARY TO DELETE THE OVERHEAD COILING GRILLE HOOD IN THE PAN AM… |
| Mod SA325· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-01-23 | +$2,427 | $807,483,001 | CHANGE TO REMOVABLE BOLLARDS IN THE PAN AM BLDG. |
| Mod SA326· CHANGE ORDER | 2014-01-31 | +$24,354 | $807,507,355 | WORK PACKAGE 8H - FULL BUILDOUT. NEW ORLEANS LA. |
| Mod SA329· CHANGE ORDER | 2014-01-31 | +$0 | $807,507,355 | TO ALLOW MONTHLY PROGRESS PAYMENTS FOR OFFSITE STORE MATERIAL - SUBMERSIBLE MIXER. |
| Mod SA331· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-02-05 | +$3,427 | $807,510,782 | REINFORCING DOWELS FOR BLDG. 1 |
| Mod SA332· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-02-06 | +$0 | $807,510,782 | STORED MATERIAL FOR GATE WATER VALVES |
| Mod SA334· DEFINITIZE CHANGE ORDER | 2014-02-14 | +$31,349 | $807,542,131 | DEFINITIZE CO-04P FOR ADDITIONAL DATA DROPS IN THE PAN AM BUILDING, NOLA |
| Mod SA335· DEFINITIZE CHANGE ORDER | 2014-02-14 | +$74,881 | $807,617,012 | DEFINITIZE CO-04S FOR IT LABELING DUE TO ROOM RENUMBERING IN THE PAN AM BUILDING, NOLA. |
| Mod CO04W· CHANGE ORDER | 2014-02-19 | +$250,000 | $807,867,012 | CHANGE ORDER FOR ADDITIONAL ABATEMENT OF ACM IN DIXIE BUILDINGS. UNKNOWN QUANTITIES. NOLA |
| Mod SA336· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-02-20 | +$0 | $807,867,012 | MOS MEDGAS COPPER TUBING TO ALLOW MONTHLY PROGRESS PAYMENTS FOR STORED MATERIALS (MEDGAS COPPER TUBING) AT AN… |
| Mod SA338· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-02-20 | +$0 | $807,867,012 | MOS HANGING MATERIAL FOR PLUMBING SYSTEM TO ALLOW MONTHLY PROGRESS PAYEMENTS FOR HANGING MATERIALS FOR PLUMBIN… |
| Mod CO04U· CHANGE ORDER | 2014-02-24 | +$12,000 | $807,879,012 | STORED MATERIAL FOR GATE WATER VALVES |
| Mod CO04T· CHANGE ORDER | 2014-02-26 | +$31,079,870 | $838,958,882 | WORK PACKAGE 8I (9) FOR MASONRY, WATERPROOFING, PAINTING, PRECAST, CONCRETE PILES, CONCRETE PRECAST, CONCRETE… |
| Mod SA307· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-02-26 | +$24,107 | $838,982,989 | PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT TO FABRICATE AND INSTALL STEEL GATES AT LANDINGS FOR ALTERNATING T… |
| Mod SA310· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-02-26 | +$10,687 | $838,993,676 | PROVIDE ALL LABOR, EQUIPMENT, AND MATERIALS NECESSARY TO REPLACE 5 DAMAGED OR MISSING LIMESTONE CAP STONES ON… |
| Mod SA345· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-02-28 | −$42 | $838,993,634 | DEOBLIGATE SA-307 |
| Mod SA344· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-03-03 | +$0 | $838,993,634 | MOS HANGING MATERIAL FOR PLUMBING SYSTEM TO ALLOW MONTHLY PROGRESS PAYEMENTS FOR HANGING MATERIALS FOR PLUMBIN… |
| Mod CO04X· CHANGE ORDER | 2014-03-05 | +$100,000 | $839,093,634 | ALL WORK DESCRIBED IN BULLETIN 22 FOR THE STEEL CHANGES. |
| Mod SA343· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-03-05 | +$600 | $839,094,234 | RELOCATION OF THERMOSTAT |
| Mod SA349· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-03-05 | +$5,638 | $839,099,872 | CHANGE TO DOORS IN PAN AM 5TH FLOOR |
| Mod CO05A· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-03-06 | +$50,000 | $839,149,872 | TEMPORARY SECURITY ELEMENTS FOR PAN AM BLDG. |
| Mod SA328· CHANGE ORDER | 2014-03-06 | −$6,502 | $839,143,370 | DELETED CRYSTALINE WATERPROOFING IN BASEMENT PAN AM. |
| Mod SA337· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-03-06 | +$930 | $839,144,300 | SOFFIT IN FEMALE SHOWER AT PAN AM BLDG. |
| Mod SA339· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-03-06 | +$25,464 | $839,169,764 | INSTALL KINGS STUDS IN ALL OPENINGS IN BLDG 1. |
| Mod SA348· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-03-10 | +$3,247 | $839,173,011 | TO REMOVE THE TEMPORARY ELECTRICAL SERVICE FOR THE PAN AM BUILDING. |
| Mod CO04Z· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-03-11 | +$19,500 | $839,192,511 | UTILITY POLES FOR SECURITY CAMERAS |
| Mod SA342· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-03-13 | −$180 | $839,192,331 | DESIGN, PROVIDE, AND INSTALL SUITABLE COLD-FORMED METAL FRAMING FOR THE CONCRETE COLUMN THAT WAS NOT SHOWN ON… |
| Mod SA353· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-03-13 | +$3,628 | $839,195,959 | TO PROVIDE STRUCTURAL STEEL ABOVE THE CONCRETE MASONRY UNIT WALL OF STAIR 2 OF THE CENTRAL ENERGY PLANT. |
| Mod SA346· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-03-17 | +$3,649 | $839,199,608 | PRECAST PANELS FOR VA LOGO SIGN |
| Mod SA347· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-03-17 | +$9,000 | $839,208,608 | HARDWARE AND SECURITY SCREENS AT THE PAN AM BLDG |
| Mod SA351· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-03-18 | +$2,514 | $839,211,122 | INSTALL ADDITIONAL WALL FRAMING, DRYWALL, AND FINISHING OF EXPOSED STEEL COVERED IN SPRAY INSULATION AT ANNEX… |
| Mod SA352· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-03-19 | −$132 | $839,210,990 | CEP MODIFY CMU PARTIAL HEIGHT |
| Mod SA355· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-03-19 | −$2,473 | $839,208,517 | CHANGE SALVAGE REQUIREMENTS AT DIXIE BUILDING |
| Mod SA357· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-03-19 | −$856 | $839,207,661 | TO REDUCE THE LINEAR FEET OF CURB REQUIRED AROUND THE FUEL OIL TANK IN THE CEP. |
| Mod SA354· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-03-20 | +$208,431 | $839,416,092 | TO PROVIDE SIX SETS OF CATWALKS, LADDERS, AND CAGES FOR THE FUEL TANKS IN THE CENTRAL ENERGY PLANT. |
| Mod SA359· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-03-20 | +$52,000 | $839,468,092 | TO INSTALL THREE (3) ADDITIONAL HVAC EXHAUST FANS IN D&T. |
| Mod SA362· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-03-25 | −$163,682 | $839,304,410 | CEP DELETE DOUBLE WYTHE WALLS TYPE SS AND ST. |
| Mod SA312· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-03-31 | +$1,628 | $839,306,038 | PROVIDE ALL LABOR, EQUIPMENT, AND MATERIALS NECESSARY TO PROVIDE PENDANT SUSPENDED CAMERAS INSTEAD OF CEILING… |
| Mod CO04V· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-04-02 | +$100,000 | $839,406,038 | CHANGES FOR BULLETIN 15C EIT PANELS AND MI CABLE |
| Mod CO05B· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-04-02 | +$2,000 | $839,408,038 | EROSION CONTROL MEASURERS AT MAIN ENTRANCE OF PAN AM BLDG. |
| Mod CO05C· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-04-02 | +$25,000 | $839,433,038 | IT FIBER FOR PAN AM |
| Mod SA327· CHANGE ORDER | 2014-04-03 | −$2,887 | $839,430,151 | CREDIT FOR LANDSCAPING COORDINATION |
| Mod SA384· CHANGE ORDER | 2014-04-17 | +$1,845 | $839,431,996 | TO INSTALL TWO (2) 24 X 24 STAINLESS STEEL ACCESS PANELS IN THE CEP. |
| Mod SA323· CHANGE ORDER | 2014-04-21 | +$284,111 | $839,716,107 | TO PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT NEEDED TO BUILD CONCRETE FORMS AND POUR CONCRETE AS REQUIRED RO… |
| Mod SA365· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-04-25 | +$40,263 | $839,756,370 | EWP 08 - INP DIALYSIS WASTE BOX RELOCATION |
| Mod SA361· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-04-28 | +$2,859 | $839,759,229 | TO MODIFY THE TERRAZZO AT STQ-2 EXIT DOOR OF THE PAN AM BUILDING. |
| Mod SA366· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-04-28 | +$906 | $839,760,135 | TO PROVIDE RELOCATE THE FLOOR BOX IN ROOM 5QC02 OF THE PAN AM BUILDING. |
| Mod SA372· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-04-28 | +$34,034 | $839,794,169 | UNFORESEEN SITE CONDITIONS - INSTALL TEMPORARY LIGHTING AT DIXIE ALONG TULANE AVENUE. |
| Mod SA385· CHANGE ORDER | 2014-04-28 | +$2,287 | $839,796,456 | TO INSTALL ADDITIONAL SOD NORTH OF THE PROPERTY LINE OF THE PAN AM BUILDING. |
| Mod CO05G· CHANGE ORDER | 2014-04-29 | +$50,000 | $839,846,456 | PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO PERFORM THE CHANGES IN WORK IN OBSERVATION ROOMS IN TH… |
| Mod SA368· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-04-29 | +$25,590 | $839,872,046 | TO MODIFY THE STRUCTURAL STEEL, CONCRETE AND ANY OTHER ASSOCIATED WORK CONTAINED IN THE BULLETIN 9C CONTRACT D… |
| Mod SA369· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-04-29 | +$31,593 | $839,903,639 | TO MODIFY DOOR FRAME DETAIL FOR PATIENT ROOMS IN BUILDINGS 1, 2 AND 6. |
| Mod SA373· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-04-29 | +$1,799 | $839,905,438 | TO CONCEAL EXPOSED PIPES IN A HOUSEKEEPING CLOSET AND A STORAGE ROOM OF THE INPATIENT BUILDING. |
| Mod SA374· CHANGE ORDER | 2014-04-29 | +$4,578 | $839,910,016 | PROVIDE ADDITIONAL EXCAVATION WORK ASSOCIATED WITH LOWERING THE OIL/SAND INTERCEPTOR PADS AT THE GARAGES. |
| Mod SA376· CHANGE ORDER | 2014-04-29 | −$782 | $839,909,234 | TO DELETE TWO (2) TYPE W2 LIGHT FIXTURES AT STAIR 1, LEVEL 4.5 IN THE CEP. |
| Mod SA378· CHANGE ORDER | 2014-04-29 | +$1,747 | $839,910,981 | CREDIT FOR LANDSCAPING COORDINATION |
| Mod SA380· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-04-29 | −$1,308 | $839,909,673 | TO ELIMINATE A PORTION OF INTERSTITIAL SLAB NORTH ON LEVEL 2, AREA D SERVICE BAY 2D227. |
| Mod SA382· CHANGE ORDER | 2014-04-29 | +$32,601 | $839,942,274 | CREDIT FOR LANDSCAPING COORDINATION |
| Mod SA387· CHANGE ORDER | 2014-04-29 | −$598 | $839,941,676 | PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO ELIMINATE CASEWORK SHOWN IN CONFLICT WITH THE BIO SAFE… |
| Mod SA389· CHANGE ORDER | 2014-04-29 | +$34,225 | $839,975,901 | TO CORRECT THE DEFLECTION IN THE COOLING TOWER SUPPORT STEEL AT THE CENTRAL ENERGY PLANT (CEP). |
| Mod CO05E· CHANGE ORDER | 2014-05-01 | +$1,000 | $839,976,901 | PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO REKEY THE LOCK SETS FOR DOORS 2N137, 2N137.1, AND 2N13… |
| Mod CO05F· CHANGE ORDER | 2014-05-01 | +$150,000 | $840,126,901 | PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO MODIFY ROOM CHANGES DUE TO PURCHASED MEDICAL EQUIPMENT… |
| Mod SA333· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-05-01 | +$67,375 | $840,194,276 | PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL TO INSTALL 265 BAGS OF CAST UNDERLAYMENT AND 75 BAGS OF FEATHER EDG… |
| Mod SA341· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-05-01 | +$7,384 | $840,201,660 | PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECCESARY TO INFILL THE AREA BEHIND THE EXISTING STEEL STAIRS AT TH… |
| Mod SA358· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-05-01 | +$4,393 | $840,206,053 | CEP REROUTING OF ELECTRICAL DUCTBANKS. |
| Mod SA375· CHANGE ORDER | 2014-05-01 | +$15,240 | $840,221,293 | CEP INSTALL EYE WASH UNIT IN ROOM 1N1227 |
| Mod SA386· CHANGE ORDER | 2014-05-01 | +$186 | $840,221,479 | PAR EROSION CONTROL MEASURES AT MAIN ENTRANCE |
| Mod SA391· CHANGE ORDER | 2014-05-01 | +$0 | $840,221,479 | TO ALLOW MONTHLY PROGRESS PAYMENTS FOR STORED MATERIALS (AIR HANDLING UNITS FOR TRANSITIONAL LIVING BUILDING). |
| Mod SA360· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-05-06 | −$10,720 | $840,210,759 | DNT MODIFY TRAINING&LICENSURE FOR ANALYZERS |
| Mod SA363· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-05-06 | +$201,264 | $840,412,023 | EWP 05, BULLETIN 9B |
| Mod SA364· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-05-06 | −$9,249 | $840,402,774 | DNT DELETE WARMING CABINET IN ROOM 7J115A. |
| Mod SA367· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-05-06 | +$7,905 | $840,410,679 | UNFORESEEN SITE CONDITION: REMOVE AND DISPOSE OF EXISTING ABANDONED MANHOLE |
| Mod SA371· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-05-06 | +$6,734 | $840,417,413 | SUBGRADE FAILURE AT CDS MANHOLE #2 |
| Mod SA377· CHANGE ORDER | 2014-05-06 | +$2,500 | $840,419,913 | CEP LEVEL 4.5 MEP OPENINGS INFILL |
| Mod SA379· CHANGE ORDER | 2014-05-07 | +$8,346 | $840,428,259 | IN-WALL BLOCKING FOR LIFESPAN HEADWALLS |
| Mod CO05H· CHANGE ORDER | 2014-05-09 | +$100,000 | $840,528,259 | CEP LEVEL 4.5 MEP OPENINGS INFILL |
| Mod SA383· CHANGE ORDER | 2014-05-09 | +$4,191 | $840,532,450 | PROVIDE ALL LABOR, MATERIALS, AND EQUIPMENT TO MODIFY TOILET ACCESSORIES FOR ALL BUILDINGS. |
| Mod SA393· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-05-09 | +$36,385 | $840,568,835 | PROVIDE ALL LABOR, MATERIAL, AND EQUIPMENT NECESSARY TO PROVIDE AND INSTALL A 54" EVOLUTION STEAM STERILIZER I… |
| Mod SA381· CHANGE ORDER | 2014-05-12 | +$13,919 | $840,582,754 | CEP SECURITY DOOR DETAIL UPGRADES - BULLETIN 14. |
| Mod CO05D· CHANGE ORDER | 2014-05-15 | +$800 | $840,583,554 | CEP ADDITIONAL CONCRETE CURB AT ENTERGY VAULT |
| Mod SA340· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-05-15 | +$2,478 | $840,586,032 | PAR INSTALLING PIPING TO IRRIGATION CONTROLLER. PROVIDE ALL LABOR, EQUIPMENT AND MATERIAL NECESSARY TO PENETRA… |
| Mod SA295· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-05-21 | +$4,576 | $840,590,608 | EWOP 5 ELEVATORS KS01 AND KS02 DIVIDER BEAM |
| Mod SA309· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-05-21 | +$28,956 | $840,619,564 | ROCHEBLAVE SEWER MANHOLE ELEVATION CHANGES |
| Mod SA356· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-05-21 | −$96,237 | $840,523,327 | BULLETIN 9A INP AND CEP STRUCTUREAL MODIFICATIONS |
| Mod SA397· CHANGE ORDER | 2014-05-21 | +$7,894 | $840,531,221 | PAR ADDITIONAL FLOOR LEVELING |
| Mod SA400· CHANGE ORDER | 2014-05-21 | +$114,663 | $840,645,884 | PROVIDE ALL LABOR, EQUIPMENT, MATERIAL NECESSARY TO PERFORM THE FOLLOWING CHANGES IN WORK TO EACH CLOSET (TR O… |
| Mod SA394· CHANGE ORDER | 2014-05-23 | +$10,435 | $840,656,319 | TEMPORARY POWER TO ELEVATORS IN PAN AM BLDG |
| Mod CO05L· CHANGE ORDER | 2014-06-02 | +$0 | $840,656,319 | NO COST MODIFICATION FOR SAFETY DATA REPORTING |
| Mod SA398· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-06-02 | +$6,015 | $840,662,334 | CEP INSTALL SHAFT WALLS IN ROOM 1N135 |
| Mod SA399· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-06-02 | +$859 | $840,663,193 | PAR ADDITIONAL ACCESS DOOR |
| Mod SA396· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-06-03 | +$39,293 | $840,702,486 | TO PROVIDE ADDITIONAL UNDERLAYMENT FOR THE FIRST FLOOR PATIO OF THE PAN AM BUILDING. |
| Mod SA404· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-06-03 | +$3,681 | $840,706,167 | TO PROVIDE ADDITIONAL FACE STONE ON THE PAN AM BUILDING. |
| Mod CO04S· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-06-18 | +$15,000 | $840,721,167 | PROVIDE ALL LABOR, EQUIPMENT, AND MATERIALS NECESSARY TO RENUMBER IT DROPS OF ALL PAN AM IT CLOSETS. |
| Mod CO05J· CHANGE ORDER | 2014-06-18 | +$190,000 | $840,911,167 | PROVIDE ALL LABOR, MATERIAL, AND EQUIPMENT NECESSARY TO CHANGE ALL EMERGENCY FEEDERS IN THE TWO PARKING GARAGE… |
| Mod CO05O· CHANGE ORDER | 2014-06-18 | +$600 | $840,911,767 | TO MODIFY THE LIGHTS AND PROJECTOR SCREEN ELEVATION IN IT CLASSROOM AT PAN AM BUILDING 9. |
| Mod CO05P· CHANGE ORDER | 2014-06-18 | +$34,000 | $840,945,767 | PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO INSTALL A LEVEL 5 WALL BOARD FINISH (SINGLE SKIM COAT)… |
| Mod SA395· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-06-20 | +$10,913 | $840,956,680 | PROVIDE ALL LABOR, MATERIAL, AND EQUIPMENT NECESSARY TO PROVIDE ADDITIONAL POWER CIRCUITS IN THE PAN AM BUILDI… |
| Mod CO05Q· CHANGE ORDER | 2014-06-23 | +$10,000 | $840,966,680 | TO REVISE THE CHANGE WALL AND CASEWORK LAYOUTS TO THE VARIOUS PRE-OP/RECOVERY ROOMS IN THE DNT BUILDING 2, LEV… |
| Mod SA317· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-06-26 | −$3,966 | $840,962,714 | DEFINITIZE CO-01S - REMOVE UNDERGROUND OBSTRUCTIONS, HAUL OFF DEBRIS. REMOVE CONTAMINATED SOIL, BACKFILL |
| Mod SA403· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-06-26 | +$1,335 | $840,964,049 | INP - PROVIDE POWER FOR SUYS0601 KARDEX FILING EQUIPMENT. |
| Mod SA401· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-06-30 | +$5,278 | $840,969,327 | TO PROVIDE PAYMENT FOR CALMAR CORPORATION BONDING REQUIREMENTS FOR THE RENOVATION OF THE PAN AM BUILDING. |
| Mod CO05I· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-07-01 | +$34,880,875 | $875,850,202 | PROVIDE ALL LABOR AND MATERIAL FOR EWP 8J/9B TO INCLUDE 27 SPECIFIC WORK TRADES AS PART OF THE FULL BUILD-OUT… |
| Mod CO05M· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-07-01 | +$800 | $875,851,002 | TO PROVIDE ADDITIONAL FACE STONE ON THE PAN AM BUILDING. |
| Mod SA388· CHANGE ORDER | 2014-07-01 | −$225,546 | $875,625,456 | CREDIT FOR LANDSCAPING COORDINATION |
| Mod SA392· CHANGE ORDER | 2014-07-01 | +$0 | $875,625,456 | TO ALLOW MONTHLY PROGRESS PAYMENTS FOR STORED MATERIALS (MISC. SPECIALTIES EWP-08) AT AN OFFSITE LOCATION. |
| Mod SA408· CHANGE ORDER | 2014-07-08 | +$68,455 | $875,693,911 | MODIFY OPERABLE PARTITIONS TO ELECTRIC FROM MANUAL. |
| Mod SA407· CHANGE ORDER | 2014-07-18 | +$30,479,198 | $906,173,109 | FIRM FIXED PRICE AGREEMENT TO DEFINITIZE IDC CONTRACT. |
| Mod CO05S· CHANGE ORDER | 2014-07-21 | +$100,000 | $906,273,109 | PERFORM ADDITIONAL LEAD ABATEMENT DIXIE BLDG. #8. |
| Mod CO05R· CHANGE ORDER | 2014-07-24 | +$25,000 | $906,298,109 | PERFORM REVISIONS CHANGES TO THE DENTAL AREA (VARIOUS ROOMS) OF OUTPATIENT BUILDING 3. |
| Mod CO05T· CHANGE ORDER | 2014-07-24 | +$3,000 | $906,301,109 | PERRFORM REVISIONS/CHANGES TO THE CLINICAL EXAM AREAS (VARIOUS ROOMS) OF OUTPATIENT BUILDING 3 |
| Mod CO05U· CHANGE ORDER | 2014-07-24 | +$0 | $906,301,109 | INPATIENT AND TRL FINISH CHANGES. |
| Mod SA406· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-07-28 | −$22,819 | $906,278,290 | PROVIDE ALL LABOR, EQUIPMENT, MATERIAL FOR PNEUMATIC TUBES WITH ITEMIZED LIST OF CREDIT ITEMS. |
| Mod CO05V· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-08-28 | +$50,000 | $906,328,290 | PROVIDE ALL LABOR, EQUIPMENT, MATERIAL TO DEMO UNIDENTIFIED SECTION (NOW BEING DESIGNED AS A4) OF THE DIXIE BU… |
| Mod CO05X· CHANGE ORDER | 2014-08-28 | +$3,339 | $906,331,629 | INSTALL ALL DATA OUTLETS DENOTED AS WL AS SHOWN IN THE EWP07 CEP DRAWINGS AND AS RESPONDED TO ON RFI NO. 03217… |
| Mod CO05Y· CHANGE ORDER | 2014-08-28 | +$8,900 | $906,340,529 | CEP - EXTEND FIRE PROTECTION AT STAIRS 1&2 |
| Mod SA409· CHANGE ORDER | 2014-08-28 | +$0 | $906,340,529 | TO ALLOW MONTHLY PROGRESS PAYMENTS FOR STORED MATERIALS (MISC. DOORS, FRAMES, ACCESSORIES) AT AN OFFSITE LOCAT… |
| Mod SA411· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-08-28 | +$70,659 | $906,411,188 | INP PROVIDE MECHANICAL PENETRATION IN L6 ROOF |
| Mod SA412· CHANGE ORDER | 2014-08-28 | +$34,047 | $906,445,235 | PLUG EXISTING ABANDONED WELL AT THE DIXIE BUILDING. |
| Mod SA413· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-08-28 | +$42,119 | $906,487,354 | TO INSTALL 24 INCH DIAMETER CHILLED WATER SUPPLY AND RETURN PIPING ALONG THE CONCOURSE FROM THE CENTRAL ENERGY… |
| Mod SA414· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-08-28 | +$4,540 | $906,491,894 | TLR MODIFY STEEL FRAMING FOR SHOWER SLAB DEPRESSION |
| Mod SA415· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-08-28 | +$5,327 | $906,497,221 | PROVIDE ALL LABOR, EQUIPMENT, MATERIAL TO MODIFY THE MRI LAB DEPRESSIONS IN DNT. |
| Mod CO05Z· CHANGE ORDER | 2014-08-29 | +$8,147 | $906,505,368 | SLVHCS- PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO INSTALL A 2-HOUR SHAFT WALL ENCASING THE GENER… |
| Mod CO06A· CHANGE ORDER | 2014-09-02 | −$25,000 | $906,480,368 | TO MODIFY CLINICAL EXAM AREAS OF OUTPATIENT BUILDING 3. |
| Mod SA418· CHANGE ORDER | 2014-09-03 | +$104,431 | $906,584,799 | PROVIDE ALL MATERIAL, LABOR, AND EQUIPMENT NECESSARY TO PERFORM ADDITIONAL LEAD ABATEMENT AT DIXIE (BUILDING 8… |
| Mod SA416· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-09-08 | +$1,595 | $906,586,394 | TLR FRAMING FOR CURTAIN WALL ON N&S WALL |
| Mod SA419· CHANGE ORDER | 2014-09-08 | +$0 | $906,586,394 | TO ALLOW MONTHLY PAYMENTS FOR STORED MATERIAL (CARPET, RESILIENT FLOORING, WOOD, AESTHETIC FLOORING, PAD UNDER… |
| Mod CO05W· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-09-10 | +$20,000 | $906,606,394 | PROVIDE ALL LABOR, EQUIPMENT, MATERIAL FOR PNEUMATIC TUBES WITH ITEMIZED LIST OF CREDIT ITEMS. |
| Mod CO06C· CHANGE ORDER | 2014-09-10 | +$76,986 | $906,683,380 | STOP WORK AT DIXIE BUILDING 8 AS PER THE TEMPORARY RESTRAINING ORDER (TRO) ISSUED TO THE VA. THE PERIOD OF WOR… |
| Mod SA424· CHANGE ORDER | 2014-09-10 | −$3,706 | $906,679,674 | TO DELETE TYVEK WALL WRAP FROM ALL OPERATING ROOMS IN DNT BUILDING 2. |
| Mod SA420· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-09-11 | +$3,986 | $906,683,660 | PROVIDE ALL MATERIAL, LABOR, AND EQUIPMENT NECESSARY TO INSTALL GYPSUM BOARD PARTITION ALONG THE SOUTH WALL, D… |
| Mod CO06B· CHANGE ORDER | 2014-09-12 | +$173,500 | $906,857,160 | IN PATIENT ROOM CHANGES RESULTING FROM MOCK-UP INSPECTION. |
| Mod SA421· CHANGE ORDER | 2014-09-12 | +$811 | $906,857,971 | PROVIDE RATED PARTITION IN STAIR M1 OF TRANSITIONAL LIVING. |
| Mod SA410· CHANGE ORDER | 2014-09-15 | +$182,995 | $907,040,966 | TO PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO PERFORM 100% TUCK POINTING (EXTERIOR) OF THE DIXIE… |
| Mod SA423· CHANGE ORDER | 2014-09-18 | +$4,032 | $907,044,998 | INSTALL SINK IN THE SOILED CAGE WASH ROOM IN DIXIE BUILDING. |
| Mod SA425· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-09-25 | +$10,659 | $907,055,657 | PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO INSTALL BACKER AND DRAIN BOARD AT THE SHOTGUN HOUSES. |
| Mod CO06E· CHANGE ORDER | 2014-09-30 | +$90,000 | $907,145,657 | PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO COMPLETE INSTALLATION OF ADDITIONAL STEEL FRAMING IN T… |
| Mod SA426· FUNDING ONLY ACTION | 2014-10-06 | +$100,000 | $907,245,657 | SLVHCS-PARTIAL PAYMENT THE AMOUNT OF ASBESOTS CONTAINING MATERIAL (ACM) IS IN EXCESS OF THE QUANTITIES ORIGINA… |
| Mod SA427· CHANGE ORDER | 2014-10-06 | +$27,307 | $907,272,964 | INSTALL SINK IN THE SOILED CAGE WASH ROOM IN DIXIE BUILDING. |
| Mod SA431· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-10-06 | +$75,749 | $907,348,713 | PROVIDE ALL LABOR, EQUIPMENT, AND MATERIAL NECESSARY TO INSTALL BACKER AND DRAIN BOARD AT THE SHOTGUN HOUSES. |
| Mod SA432· CHANGE ORDER | 2014-10-06 | −$14,261 | $907,334,452 | SLVHCS- AIR COMPRESSOR AT DIXIE |
| Mod CO06F· CHANGE ORDER | 2014-10-08 | +$99,000 | $907,433,452 | SLVHCS- INSTALL ADDITIONAL STEEL TRUSS AT TRUSS CONNECTIONS TO ANCHOR THE TRUSS TO THE EXISTING WEST FACADE AN… |
| Mod CO06G· CHANGE ORDER | 2014-10-16 | +$80,000 | $907,513,452 | SLVHCS- PROVIDE ALL LABOR, EQUIPMENT AND MATERIAL TO PERFORM VAMC REQUESTED CHANGES IN THE LAB AREAS OF THE DN… |
| Mod SA429· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-10-16 | +$3,375 | $907,516,827 | SLVHCS- PROVIDE ALL LABOR, EQUIPMENT,AND MATERIAL NECESSARY TO REMOVE AND ROTATE THE STEEL SUPPORT FOR CURTAIN… |
| Mod SA430· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-10-16 | +$2,070 | $907,518,897 | SLVHCS- PROVIDE ALL LABOR, EQUIPMENT AND MATERIAL TO RESET TEMP SEQUENCE FOR AHU'S AT PAN AM. |
| Mod CO06H· CHANGE ORDER | 2014-10-17 | +$91,000 | $907,609,897 | SLVHCS- TO INSTALL AN AIR COMPRESSOR AND ASSOCIATED PLUMBING AND ELECTRICAL CONNECTIONS AT THE CENTRAL ENERGY… |
| Mod CO06I· CHANGE ORDER | 2014-10-22 | +$2,958 | $907,612,855 | SLVHCS- PROVIDE ALL LABOR, MATERIAL AND EQUIPMENT NECESSARY TO INSTALL A P24 SHAFT WALL AT THE SOUTH AND NORTH… |
| Mod CO06K· CHANGE ORDER | 2014-10-27 | +$15,000 | $907,627,855 | SLVHCS- TO EDIT LAYOUT AND ACCESSORIES TO THE MENTAL HEALTH PATIENT ROOMS IN THE DNT BUILDING. |
| Mod SA433· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-10-27 | +$59,223 | $907,687,078 | SLVHCS- PROVIDE ALL LABOR, EQUIPMENT AND MATERIAL NECESSARY TO PERFORM THE CHANGES IN THE WORK TO THE OXYGEN S… |
| Mod CO06J· CHANGE ORDER | 2014-10-29 | +$0 | $907,687,078 | SLVHCS- TO PROVIDE ALL LABOR, EQUIPMENT AND MATERIAL TO ADD/DELETE SCOPE IN THE MAIN COMPUTER ROOM OF THE DNT… |
| Mod CO06L· CHANGE ORDER | 2014-10-29 | −$10,000 | $907,677,078 | SLVHCS- DECREASED AMOUNT FOR OPERATING ROOM CHANGES - DELETION OF MILLWORKS AND CABINETS |
| Mod SA434· CHANGE ORDER | 2014-10-30 | +$1,644 | $907,678,722 | SLVHCS- INSTALL CONCRETE AROUND 4 COLUMNS AT THE CHAPEL BLDG |
| Mod CO06N· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-11-03 | +$87,927 | $907,766,649 | SLVHCS- TLR ENCLOSE EXPOSED DUCT PENETRATION ROOF |
| Mod SA428· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-11-03 | +$3,837 | $907,770,486 | TLR-MODIFY EMBEDMENT DETAIL AREA M3 |
| Mod CO06M· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-11-04 | −$2,000 | $907,768,486 | SLVHCS- DUCT BANK TO EMH 4 ELEVATION CHANGES |
| Mod SA436· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-11-05 | +$3,351 | $907,771,837 | SLVHCS- DNT CART WASH SLAB DEPRESSION |
| Mod CO06P· CHANGE ORDER | 2014-11-06 | +$2,989 | $907,774,826 | SLVHCS-RENUMBER AND EDIT MESSAGING SIGNAGE FOR BLDGS. 1, 7, 4, AND 5. |
| Mod SA438· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-11-06 | −$1,815 | $907,773,011 | SLVHCS- DELETE SECTION OF BLAST WALL ABOVE STOREFRON IN TRANSITIONAL LIVING. |
| Mod CO06O· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-11-07 | +$2,322 | $907,775,333 | SLVHCS- PROVIDE ALL LABOR, EQUIPMENT AND MATERIAL NECESSARY TO INSTALL CAST INPLACE BEAM |
| Mod SA435· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-11-07 | +$10,193 | $907,785,526 | SLVHCS- TLR INSTALL MISSING DAMPERS ON LEVEL 4 |
| Mod SA437· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-11-07 | +$16,181 | $907,801,707 | SLVHCS- DUCTBANK TO EMH 4 ELEVATION CHANGES |
| Mod SA439· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-11-13 | +$41,287 | $907,842,994 | SLVHCS- ADDITIONAL CONCRETE REINFORCEMENT AT PAITENT GARAGE. |
| Mod SA440· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-11-19 | +$11,364 | $907,854,358 | SLVHCS- PROVIDE ALL LABOR, EQUIPMENT AND MATERIAL NECESSARY TO ADD ONE INTERIOR EXPANSION JOINT AT COLUMN 02J. |
| Mod SA441· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-11-19 | +$70,221 | $907,924,579 | SLVHCS- DEFINITIZATION OF CHANGE ORDER CO-05P, FOR LEVEL 5 WALL FINISH IN INP BLDG. |
| Mod SA442· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-11-19 | +$11,494 | $907,936,073 | TO DEEPEN THE ED RAMP CONCRETE EDGE BEAM TO CAPTURE THE TRIANGLE EDGE PROFILE THEREBY ELIMINATING FROM VIEW AN… |
| Mod SA443· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-12-01 | −$6,970 | $907,929,103 | SLVHCS- CREDIT FOR CHANGING FIRE RETARDENT PLYWOOD FOR AC TO BC GRADE. |
| Mod CO06S· CHANGE ORDER | 2014-12-02 | +$75,000 | $908,004,103 | TO PROVIDE NATURAL GAS OUTLETS AT DENTAL TREATMENT ROOMS IN THE OUTPATIENT BUILDING 3 INCLUDING PIPING/VALVING… |
| Mod CO06R· CHANGE ORDER | 2014-12-03 | +$15,000 | $908,019,103 | SLVHCS- PROVIDE ALL LABOR, EQUIPMENT AND MATERIAL NECESSARY TO PERFORM THE CHANGES IN DENTAL AREA ORAL SURGERY… |
| Mod CO06T· CHANGE ORDER | 2014-12-08 | +$99,000 | $908,118,103 | DNT - RELOCATE SECURITY NETWORK AND SERVER HARDWARE |
| Mod SA447· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-12-11 | −$2,801 | $908,115,302 | TO DELETE THE DOORS AND ARMOR PLATES IN THE INPATIENT BUILDING. |
| Mod CO06U· CHANGE ORDER | 2014-12-15 | +$195,000 | $908,310,302 | TO PROVIDE GROUP 1 VOICE AND DATA CABLING CAMPUS WIDE. |
| Mod SA445· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-12-15 | +$501 | $908,310,803 | TO PROVIDE PLUMBING FIXTURE TYPE P-414 LAVATORIES AND CARRIERS IN THE INPATIENT BUILDING |
| Mod SA450· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-12-16 | +$2,232 | $908,313,035 | TO MODIFY THE CONCRETE CURBS AT LEVEL 4 AND 5 OF TRANSITIONAL LIVING BUILDING. |
| Mod SA449· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-01-06 | +$6,791 | $908,319,826 | TO PROVIDE LIGHTS AND SWITCHES IN THE POS ISOLATION ROOMS IN THE INPATIENT BUILDING. |
| Mod SA451· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-01-06 | −$3,641 | $908,316,185 | TO DELETE THE MULLION MATES AND ADD ALUMINUM CLOSURES IN THE INPATIENT BUILDING. |
| Mod CO06Y· CHANGE ORDER | 2015-01-08 | +$95,000 | $908,411,185 | TO PURCHASE MATERIALS FOR MI CABLE FOR THE GENERATORS IN THE CEP BLDG. |
| Mod SA453· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-01-08 | +$4,115 | $908,415,300 | TLR SLAB DEPRESSION |
| Mod SA455· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-01-08 | +$103,936 | $908,519,236 | TO PROVIDE CMU SHAFT WALLS FOR ELECTRICAL RISERS IN TLR, INP, DNT, AND OUT BUILDINGS. |
| Mod SA456· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-01-13 | +$6,938 | $908,526,174 | INP PROVIDE POWER FOR ELEVATOR SECONDARY SELECTOR PANEL 2ND FLOOR. |
| Mod CO06X· CHANGE ORDER | 2015-01-14 | +$150,000 | $908,676,174 | PERFORM THE DEMOLITION, CUTTING, REMOVAL AND DISPOSAL OF EXITING TIMBER PILES AT THE DIXIE BUILDING 8. |
| Mod SA457· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-01-15 | +$9,726 | $908,685,900 | TO RELOCATE THE POWER FEED OF SUMP PUMPS IN THE INPATIENT BUILDING. |
| Mod CO06Z· CHANGE ORDER | 2015-01-27 | +$46,500 | $908,732,400 | TO INSTALL AN AFTER COOLER AND ALL ASSOCIATED PIPING FOR THE SURGE AND DE-AREATOR TANK DRAIN LINES IN THE CEP. |
| Mod CO07B· CHANGE ORDER | 2015-01-27 | +$42,609 | $908,775,009 | TO INSTALL ADDITIONAL BOILER GAS VENT PIPING AT THE CEP. |
| Mod CO07C· CHANGE ORDER | 2015-02-02 | +$50,000 | $908,825,009 | TO RE-ROUTE SANITARY SEWER AND SANITARY VENT RISER CURRENTLY LOCATED INSIDE THE STEEL COLUMN ENCLOSURE/CHASE I… |
| Mod SA458· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-02-02 | +$38,213 | $908,863,222 | TO CONNECT RATED COILING COUNTER DOORS TO THE EMERGENCY LIFE SAFETY. |
| Mod SA461· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-02-02 | +$6,302 | $908,869,524 | ENLARGE GREASE INTERCEPTOR HATCH IN ROOM 1C101A - INP |
| Mod SA463· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-02-02 | +$1,544 | $908,871,068 | INP - RELOCATE PATIENT LIFTS |
| Mod SA464· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-02-02 | +$11,381 | $908,882,449 | INPATIENT TO MODIFY CASEWORK MATERIALS |
| Mod SA465· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-02-04 | +$1,237 | $908,883,686 | INP ADD OVERHEAD DRAIN PAN |
| Mod CO07D· CHANGE ORDER | 2015-02-05 | +$100,000 | $908,983,686 | TO CHANGE PAINT COLORS IN INP AND CEP. |
| Mod CO07E· CHANGE ORDER | 2015-02-09 | +$100,000 | $909,083,686 | TO REPROGRAM/RENUMBER VARIOUS SYSTEMS, NURSE CALL, FIRE ALARM, ELECTRICAL IN MULTIPLE BUILDINGS. |
| Mod SA454· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-02-09 | +$10,300 | $909,093,986 | TO PROVIDE INSTALL ELECTRICAL FLOOR BOXES IN CONCRETE SLAB IN DNT BLDG 2. |
| Mod SA467· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-02-09 | +$18,000 | $909,111,986 | TO RESLOPE THE PATIENT BATHROOM FLOORING IN THE INP BUILDING. |
| Mod SA468· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-02-09 | +$1,621 | $909,113,607 | TO INSTALL VINYL BACKING FOR SIGNS MOUNTED ON GLASS AT BLDG. 9. |
| Mod SA469· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-02-09 | +$5,402 | $909,119,009 | TO ADD OVERHEAD COILING GRILLE POWER IN THE INP AND OUP BLDGS. |
| Mod SA471· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-02-10 | +$5,635 | $909,124,644 | TO CHANGE DOOR HARDWARE SET AT DNT BLDG 2. |
| Mod SA446· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-02-11 | +$697 | $909,125,341 | TO PROVIDE INP AND DNT BUILDING TRANSITIONAL FLASHING SADDLE AT THE PARAPET WALL, PRECAST PANEL, TO METAL PANE… |
| Mod CO07F· CHANGE ORDER | 2015-02-13 | +$35,000 | $909,160,341 | BULLETIN 37 AND VARIOUS RFI CHANGES |
| Mod SA460· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-02-13 | +$614 | $909,160,955 | TO MODIFY THE LIGHTS AND PROJECTOR SCREEN ELEVATION IN IT CLASSROOM IN PAN AM BUILDING 9. |
| Mod SA466· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-02-13 | +$57,771 | $909,218,726 | SLVHCS- TO ADD STAINLESS STEEL JAMBS AND HEADER EXTENSIONS AT PUBLIC ELEVATORS IN INP BUILDING. |
| Mod SA473· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-02-13 | +$42,000 | $909,260,726 | SLVHCS- TO ADD RACEWAYS FOR CUBICLES ON THE 1ST FLOOR OF THE INP BUILDING. |
| Mod SA475· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-02-18 | +$7,500 | $909,268,226 | TO PROVIDE METAL STUD WALL FURRING AT THE INTERIOR FACE OF THE NORTH EXTERIOR WALL AT DNT BUILDING 2. |
| Mod CO06V· CHANGE ORDER | 2015-02-19 | +$1,552,437 | $910,820,663 | TO RELOCATE SECURITY NETWORK AND SERVER HARDWARE IN BLDG 2, FUNDING TO PROVIDE THE MATERIAL FOR GROUP 2 AND GR… |
| Mod CO06W· CHANGE ORDER | 2015-02-19 | +$591,823 | $911,412,486 | TO PROVIDE MATERIAL/DATA CABLING CAMPUS WIDE FOR GROUP 1 VOICE AND DATA SYSTEMS. |
| Mod SA448· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-02-19 | +$20,809 | $911,433,295 | TO INSTALL LINTELS FOR ADDITIONAL SHEET METAL COPING AS SPECIFIED PER RESPONSE TO RFI. |
| Mod SA478· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-02-19 | +$42,184 | $911,475,479 | TO PROVIDE AUTO DOOR OPENORS AND REVISED METAL FRAMES IN DNT BLDG. |
| Mod SA479· CHANGE ORDER | 2015-02-23 | −$21,750 | $911,453,729 | DELETE ONE ELECTRICAL MANHOLE IN CEP |
| Mod SA474· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-02-24 | +$15,198 | $911,468,927 | TO PROVIDE MISSING HSS STEEL ABOVE DOOR E-M1-151.1 IN THE TRANSITIONAL LIVING BUILDING. |
| Mod SA477· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-02-24 | +$8,189 | $911,477,116 | TO INCREASE THE SIZE OF THE STAINLESS STEEL FLOOD GATE JAMB COVERS AND ADD STAINLESS STEEL CAPS IN THE INP, DN… |
| Mod SA480· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-02-24 | +$1,448 | $911,478,564 | SLVHCS- TO ADD METAL FLASHING AT THE METAL PANEL TRANSITION TO THE CURTAIN WALL IN THE INP BUILDING. |
| Mod SA459· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-02-25 | +$21,609 | $911,500,173 | SLVHCS- PROVIDE ALL LABOR, MATERIAL AND EQUIPMENT NECESSARY TO REPLACE FIVE STEEL LINTELS ABOVE LEVEL 5 ARCHED… |
| Mod SA472· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-02-25 | +$16,000 | $911,516,173 | SLVHCS- PROVIDE ALL LABOR, EQUIPMENT AND MATERIAL TO INSTALL INSULATION ON FLEXIBLE CONNECTIONS FOR THE GENERA… |
| Mod CO07G· CHANGE ORDER | 2015-02-26 | +$6,900 | $911,523,073 | SLVHCS- TO INCREASE THE SIZE OF THE FLOOR ACCESS HATCH AND INSTALL AN ACCESS LADDER AT STAIR 3 AT THE CENTRAL… |
| Mod CO07I· CHANGE ORDER | 2015-02-26 | +$11,707 | $911,534,780 | SLVHCS- TO INSTALL FLOOR COVERING TC-1 IN LIEU OF VCT-1 IN ROOM 4N106 OF CEP. |
| Mod SA481· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-03-10 | +$57,218 | $911,591,998 | TO INCREASE PIPING FROM 4 TO 6 INCHES TO ACCOMDATE THE REQUIRED PSI. |
| Mod SA483· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-03-10 | +$12,924 | $911,604,922 | SLVHCS- TO DELETE ALL PLATED STEEL WITHIN THE PROCESS TANK (BLDG 5)AND REPLACE WITH STAINLESS STEEL. |
| Mod CO07K· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-03-13 | +$96,000 | $911,700,922 | SLVHCS- ADDITIONAL COMMON BRICK INTERIOR OPENNINGS DIXIE |
| Mod SA484· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-03-16 | +$2,000 | $911,702,922 | SLVHCS- CEP - RELOCATE FIRE PROTECTION |
| Mod SA485· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-03-16 | +$4,865 | $911,707,787 | SLVHCS- CHAPEL - WATERSTOPS&RUSITIFCATION STRIPS |
| Mod SA486· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-03-16 | +$29,578 | $911,737,365 | SLVHCS- INP - RELOCATE NURSE CALL IN PATIENT BATHROOMS |
| Mod SA488· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-03-16 | +$2,637 | $911,740,002 | SLVHCS- INP - MODIFY CURB TRANSITION AT METAL PANELS |
| Mod SA487· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-03-17 | +$49,835 | $911,789,837 | TO MODIFY THE SLAB EDGE AT EXPANSION JOINTS IN INP BUILDING. |
| Mod SA470· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-03-18 | +$5,492 | $911,795,329 | TO ENCASE THE STEEL KICKER IN STAIR STB-2 AT LEVEL 1.5 IN THE INP BUILDING. |
| Mod SA489· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-03-18 | +$22,090 | $911,817,419 | SLVHCS- TLR - PROVIDE 6 EXTERIOR PUSH BUTTONS FOR DOORS |
| Mod SA491· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-03-24 | +$50,939 | $911,868,358 | SLVHCS- CHANGES TO CONCRETE CURB, CMU CLIP ANGES AND ROOF PARAPET AT D&T |
| Mod CO07H· CHANGE ORDER | 2015-03-26 | +$460,000 | $912,328,358 | DUE TO A DESIGN ERROR, THE ROOF FOR ALL BUILDINGS WITH THE EXCEPTION OF PAN AM, DIXIE AND GARAGES HAD TO BE CH… |
| Mod CO07J· CHANGE ORDER | 2015-03-26 | +$208,888 | $912,537,246 | TO INSTALL AN EMPTY CONDUIT SYSTEM FOR THE OPERATING ROOMS IN DNT. |
| Mod SA462· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-03-26 | +$250,000 | $912,787,246 | SLVHCS- TO ACKOWLEDGE THE AMOUNT OF ASBESTOS CONTAINING MATERIAL TO BE ABATED IS IN EXCESS OF THE QUANTITIES S… |
| Mod SA492· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-03-26 | +$0 | $912,787,246 | SLVHCS- TO DEFINITIZE CO-04J, PROVIDE BACKFILL AT THE SITE OF UNDERGROUND STORAGE TANK. |
| Mod SA493· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-03-26 | +$0 | $912,787,246 | SLVHCS- TO DEFINITIZE CO-05M. REPAIR ACOUSTICAL PLASTER CEILING IN ROOM !Q136, BLDG. 9. |
| Mod SA494· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-03-30 | +$13,711 | $912,800,957 | PERFORM ADDITIONAL STRUCTURAL CONCRETE WORK AT DIXIE BREWERY (BUILDING 8). |
| Mod SA495· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-03-30 | +$8,104 | $912,809,061 | SLVHCS- TO ADD ADDITIONAL STEEL SUPPORT CANOPY AS OUTLINED IN RFI 3259 AND SUBMITTAL PACKAGE 03 41 33 00 1R2. |
| Mod SA497· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-03-30 | +$835 | $912,809,896 | SLVHCS- TO MODIFY CHAPEL SLAB AT DOOR 1B115A WITHIN THE INP BLDG. |
| Mod SA482· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-03-31 | −$4,132 | $912,805,764 | SLVHCS- PROVIDE CREDIT FOR LABOR, EQUIPMENT AND MATERIAL NECESSARY FOR THE DELETED WORK OUTLINED IN RFI 03569… |
| Mod CO07L· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-04-01 | +$100,000 | $912,905,764 | SLVHCS- TO PERFORM CHANGES IN THE MAIN COMPUTER ROOM OF DNT (BLDG 2) AS DESCRIBED IN BULLETIN 40. |
| Mod SA498· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-04-01 | +$82,238 | $912,988,002 | SLVHCS- PROVIDE ALL LABOR, MATERILS AND MATERIALS NECESSARY TO INTALL STOREFRONT CONTINUOUS ANGLE, EXTEND SOFF… |
| Mod CO07M· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-04-02 | +$0 | $912,988,002 | SLVHCS- TO PERFORM REVISIONS OF CHANGES AS DESCRIBED UNDER BULLETIN 41. |
| Mod CO07N· CHANGE ORDER | 2015-04-03 | +$31,374 | $913,019,376 | SLVHCS- PROVIDE ALL LABOR, MATERILS AND MATERIALS NECESSARY TO MAKE CHANGES IN PHARMACY IN DNT BLDG. |
| Mod CO07O· CHANGE ORDER | 2015-04-03 | +$45,000 | $913,064,376 | SLVHCS- TO REVISE THE DENTAL AREAS ORAL SURGERY LAYOUT IN THE OUTPATIENT BUILDING. BULLETIN 34R1. |
| Mod SA499· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-04-06 | +$87,710 | $913,152,086 | SLVHCS- TO PROVIDE FABRICATION AND INSTALLATION OF THE LARGE EXTERIOR VA LOGO SIGN ON THE EAST SIDE OF THE OUT… |
| Mod SA500· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-04-08 | −$7,796 | $913,144,290 | SLVHCS- CREDIT FOR DAMAGED WORK (FACIA) ON PAN AM BLDG. |
| Mod SA501· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-04-08 | +$539 | $913,144,829 | SLVHCS- PROVIDE ALL LABOR, MATERILS AND MATERIALS NECESSARY TO PERFORM VARIOUS REVISIONS TO THE LABRATORY CABI… |
| Mod SA502· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-04-14 | +$0 | $913,144,829 | SLVHCS- PROVIDE A BASELINE SCHEDULE FOR THE CONSTRUCTION COMPLETION AT THE DIXIE BLDG 8 ON OR BEFORE APRIL 26,… |
| Mod SA503· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-04-21 | +$3,582 | $913,148,411 | TO FINISH SCHEDULE MILLWORK CONFLICTS AT OUTPATIENT BUILDING 3. |
| Mod SA504· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-04-21 | +$1,984 | $913,150,395 | TO DEMOLISH, REMOVE AND DISPOSE OF EXISTING TIMBER PILES AND PILE CAP REVISION AT DIXIE BUILDING 8 SITE (DEFIN… |
| Mod CO07P· CHANGE ORDER | 2015-04-23 | +$1,500 | $913,151,895 | TO ADD A GATE AT THE SANITARY TANK AREA OF THE STAFF GARAGE (BUILDING 4). |
| Mod CO07R· CHANGE ORDER | 2015-04-27 | +$38,000 | $913,189,895 | TO ADD A GATE AT THE SANITARY TANK AREA OF THE STAFF GARAGE (BUILDING 4). |
| Mod SA506· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-04-27 | +$2,313 | $913,192,208 | SLVHCS- TO PROVIDE ALL LABOR, EQUIPMENT AND MATERIAL TO INSTALL ONE ADDITIONAL BOLLARD AT THE END OF THE EMERG… |
| Mod SA508· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-04-27 | +$45,000 | $913,237,208 | SLVHCS- TO PROVIDE ALL LABOR, EQUIPMENT AND MATERIAL NECESSARY TO REMOVE AND ADD METAL PANELS AND CORRECT AIR… |
| Mod SA509· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-04-28 | +$9,450 | $913,246,658 | PERFORM VARIOUS CONCRETE FOUNDATION CHANGES AT DIXIE BREWERY (BUILDING 8). |
| Mod CO07Q· CHANGE ORDER | 2015-04-29 | −$27,715 | $913,218,943 | SLVHCS- TO CHANGE MOUNTED MONITOR BRACKETS, CHEMICAL DISPENSERS, GLOVE BOX DISPENSERS AND SPHYGMOMANOMETERS FR… |
| Mod CO07T· CHANGE ORDER | 2015-04-29 | +$50,000 | $913,268,943 | TO ADD A GATE AT THE SANITARY TANK AREA OF THE STAFF GARAGE (BUILDING 4). |
| Mod SA507· DEFINITIZE CHANGE ORDER | 2015-04-29 | +$9,586 | $913,278,529 | SLVHCS-DEFINITIZE CHANGE ORDER (CO-06G) TO PROVIDE VARIOUS MEDICAL CENTER REQUESTED CHANGES/REVISIONS TO THE L… |
| Mod SA510· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-04-29 | +$36,439 | $913,314,968 | SLVHCS- TO ADD FIRE-STOPPING TO BOTH PATIENT AND STAFF GARAGES. |
| Mod SA514· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-05-05 | +$2,069 | $913,317,037 | SLVHCS- TO DEFINITIZE CO-06M FOR TOILET REVISIONS FOR STAFF AND PARKING GARAGES. |
| Mod SA515· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-05-06 | +$6,007 | $913,323,044 | PROVIDE MODIFICATIONS TO THE LEVEL 1 AND LEVEL 4 EXPANSION JOINTS IN INPATIENT BUILDING. |
| Mod SA516· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-05-06 | +$40,000 | $913,363,044 | SLVHCS- ADD EYEWASH STATION, RELOCATE EYEWASH STATION,MEZZANINE AND BOILER ROOM. |
| Mod SA518· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-05-06 | +$40,857 | $913,403,901 | SLVHCS- PROVIDE BULLETIN 30 PLUMBING REVISIONS, DIXIE BLDG 8. |
| Mod SA519· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-05-06 | +$1,535 | $913,405,436 | SLVHCS- PROVIDE A BASELINE SCHEDULE FOR THE CONSTRUCTION COMPLETION AT THE DIXIE BLDG 8 ON OR BEFORE APRIL 26,… |
| Mod SA520· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-05-07 | +$74,193 | $913,479,629 | SLVHCS- REVISE AND UPDATE THE DNT BLDG. 2 HARDWARE SCHEDULE PER VA SUBMITTAL REVIEW. |
| Mod SA523· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-05-08 | +$21,787 | $913,501,416 | SLVHCS- LEVEL 5 MISSING STEEL ANGLE AT DNT BLDG 2 |
| Mod SA521· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-05-11 | +$66,157 | $913,567,573 | DUE TO VALUE ENGINEERING AND WORK PACKAGE (WP) CHANGES, DRYWALL/PAINTED INTERIOR WAS OMITTED FROM STAIR WELL T… |
| Mod SA522· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-05-11 | +$29,669 | $913,597,242 | TO BACKFILL AND COMPACT THE EXCAVATED AREA ON THE DIXIE SITE CREATED BY THE REMOVAL OF THE LARGE UST AS PER RF… |
| Mod SA524· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-05-14 | +$9,509 | $913,606,751 | SLVHCS- ADD 2 EXTERIOR LIGHTS AT STAFF GARAGE |
| Mod SA526· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-05-14 | −$24,390 | $913,582,361 | SLVHCS- INP - PATIENT ROOM PAINT CHANGES |
| Mod SA511· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-05-19 | +$598,384 | $914,180,745 | SLVHCS- PROVIDE ELECTRICAL DISTRIBUTION SYSTEM - ALUM VS COPPER |
| Mod SA513· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-05-19 | +$56,555 | $914,237,300 | SLVHCS- PROVIDE A REVERSE OSMOSIS STORAGE TANK WITH ASSOCIATED PIPING AND CONTROLS IN CPU PER RFI-03393.1 |
| Mod SA517· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-05-19 | +$65,695 | $914,302,995 | SLVHCS- INSTALL 1/16" CAST IN PLACE RESINOUS FLOORING - PCO 811164 |
| Mod SA528· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-05-19 | +$2,808 | $914,305,803 | SLVHCS- RE-SPRAY FIREPROOFING ON STEEL BEAMS AT CONCRETE ENCASEMENT FOR ELECTRICAL FEEDERS IN INP BLDG. PER RF… |
| Mod SA530· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-05-19 | +$2,496 | $914,308,299 | SLVHCS- PROVIDE ALL LABOR AND MATERIAL NECESSARY TO RE-SPRAY FIREPROOFING ON EXTERIOR COLUMNS DUE TO THE ATTAC… |
| Mod SA531· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-05-19 | +$21,512 | $914,329,811 | SLVHCS- RE-ROUTE DRAIN LINE AROUND OAK TREES AT DIXIE |
| Mod SA476· CHANGE ORDER | 2015-05-20 | +$255,429 | $914,585,240 | INSTALL MI CABLE - BULLETIN 8C |
| Mod SA529· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-05-20 | +$86,948 | $914,672,188 | SLVHCS- PROVIDE ALL LABOR, EQUIPMENT AND MATERIAL NECESSARY TO FINISH DRYWALL, PRIME, BLOCK FILL AND PAINT MAI… |
| Mod SA533· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-05-20 | −$7,340 | $914,664,848 | SLVHCS- CREDIT FOR CAPPING AND DECOMMISSIONING WORK NOT PERFORMED/DELETED AT THE ABANDONED WATER WELL AT DIXIE… |
| Mod SA534· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-05-20 | +$7,524 | $914,672,372 | SLVHCS- PROVIDE ALL LABOR, EQUIPMENT AND MATERIAL NECESSARY TO PERFORM THE CHANGES/REVISIONS TO THE MEDICAL AC… |
| Mod SA532· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-05-21 | +$18,166 | $914,690,538 | SLVHCS- DOMESTIC PUMP ACCESS REVISION |
| Mod SA535· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-05-21 | +$6,633 | $914,697,171 | SLVHCS- TLR M3 STAIR SHAFT LEVEL 3 RATED CEILING |
| Mod SA512· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-05-26 | +$47,029 | $914,744,200 | SLVHCS- TL LEVEL I NORTH ELEVATION BLAST WALL DELETION/ADD WORK |
| Mod SA537· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-05-26 | +$81,194 | $914,825,394 | SLVHCS- PROVIDE LIGHTED HANDRAIL AT MONUMENTAL STAIRS IN OUTPATIENT BLDG. |
| Mod SA538· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-05-26 | +$1,620 | $914,827,014 | SLVHCS- PROVIDE AND INSTALL FIVE FIRE EXTINGUISHER CABINETS AT PATIENT PARKING GARAGE LOBBIES. |
| Mod SA422· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-05-27 | +$29,208 | $914,856,222 | PROVIDE LOW AND HIGH VOLTAGE ELECTRICAL AND COMMUNICATION/DATA CONDUITS AND PULL BOXES FOR USE BY SHOTGUN HOUS… |
| Mod SA444· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-05-27 | +$49,512 | $914,905,734 | SLVHCS- ELEVATOR FLOOD GATE RECALL OPERATION |
| Mod SA539· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-05-27 | +$17,122 | $914,922,856 | SLVHCS- ADDED BACKWATER VALVE&PIPING AT TL |
| Mod CO07S· CHANGE ORDER | 2015-05-28 | +$14,000 | $914,936,856 | DOOR ACCESS FOR TEMPORARY ENTRANCE/EXIT LOCATIONS AT TURNOVER IN INP. |
| Mod SA536· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-05-28 | +$21,591 | $914,958,447 | SLVHCS-PROVIDE ALL LABOR, EQUIPMENT AND MATERIAL NECESSARY TO RELOCATE THE NURSE CALL TO THE OPPOSITE WALL IN… |
| Mod SA541· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-05-28 | +$198,012 | $915,156,459 | SLVHCS-PROVIDE ALL LABOR, EQUIPMENT AND MATERIAL NECESSARY TO MODIFY CONCRETE CURB, CHANGE ROOF INSULATION FRO… |
| Mod SA525· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-06-02 | +$3,167,571 | $918,324,030 | SLVHCS- CAMPUS WIDE ROOF REVISION PER BULLETIN 36 |
| Mod SA542· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-06-02 | +$82,953 | $918,406,983 | SLVHCS- PROVIDE ALL LABOR, EQUIPMENT AND MATERIAL AS NECESSARY TO ADD SOLID SURFACE PANELS ON THE WALLS OF ISO… |
| Mod SA543· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-06-02 | +$16,479 | $918,423,462 | SLVHCS- PROVIDE ALL LABOR, EQUIPMENT AND MATERIAL AS NECESSARY TO REROUTE WATER AROUND TOILET PAD TO FLOOR DRA… |
| Mod SA544· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-06-02 | +$2,880 | $918,426,342 | SLVHCS- PROVIDE ALL LABOR, EQUIPMENT AND MATERIAL NECESSARY TO ADD SIX (6) CAN LIGHTS (FIXTURE TYPE FCD2B), AS… |
| Mod SA545· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-06-02 | +$8,209 | $918,434,551 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO SHIFT ALCOVE WINDOW NICHE ON THE EAST SIDE OF B… |
| Mod CO07W· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-06-03 | +$80,000 | $918,514,551 | SLVHCS- VARIOUS MCR REVISIONS AT DNT - BLDG 2 |
| Mod SA546· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-06-03 | +$895 | $918,515,446 | SLVHCS- DEFINITIZES CHANGE ORDER MODIFICATIONS CO-05W, CO-06E, AND CO-06FG ISSUED ON 1 AUG 2014, 30 SEP 2014 A… |
| Mod CO07V· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-06-04 | +$12,000 | $918,527,446 | SLVHCS- PROVIDING AND INSTALLING A HOIST LIFT IN DNT. |
| Mod SA496· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-06-04 | +$6,316 | $918,533,762 | SLVHCS- ADD PLATES AND EXPANSION BOLTS IN ACCORDANCE WITH RFI 3979.1. INSTALL METAL CAP AND INSULATION RFI 363… |
| Mod SA547· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-06-04 | +$3,413 | $918,537,175 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO RELOCATE PATIENT LIFT TRACK SUPPORT IN THE INPA… |
| Mod SA550· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-06-05 | +$3,160 | $918,540,335 | SLVHCS- ELEVATOR SUMP INPATIENT |
| Mod SA548· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-06-09 | +$838 | $918,541,173 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO ADD LIGHT SWITCHES TO CONTROL LIGHTS IN SHOWERS… |
| Mod SA549· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-06-09 | +$17,640 | $918,558,813 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO MODIFY HARDWARE SET FOR THE CHAPEL IN THE INP B… |
| Mod SA552· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-06-09 | +$4,695 | $918,563,508 | SLVHCS- ADDED TUBE STEEL AT WING WALLS IN RADIOLOGY ROOMS |
| Mod SA554· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-06-09 | +$4,196 | $918,567,704 | SLVHCS- CEP STAIR 3 TERMINATION AT ELEVATOR MACHINE ROOM. |
| Mod SA555· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-06-11 | +$75,159 | $918,642,863 | SLVHCS- LEVEL 2 INTERIOR COURTYARD ROOF DRAIN OVERFLOW PIPING IN TL |
| Mod SA556· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-06-11 | +$37,778 | $918,680,641 | SLVHCS- CEP OVERHEAD COILING DOOR REVISION CONNECTION |
| Mod CO07X· CHANGE ORDER | 2015-06-17 | +$33,000 | $918,713,641 | SLVHCS- 1. PROVIDE ALL LABOR, EQUIPMENT AND MATERIAL NECESSARY TO INSTALL 9 GAUGE SECURITY MESH IN-FILLS, AND… |
| Mod SA452· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-06-17 | +$32,989 | $918,746,630 | SLVHCS - INPATIENT ISOLATION BATH ROOM WALL FINISH |
| Mod SA557· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-06-17 | +$11,510 | $918,758,140 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO FRAME AN 18 GA GALVANIZED METAL DRIP PAN AROUND… |
| Mod SA540· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-06-22 | +$33,027 | $918,791,167 | SLVHCS- ADDITIONAL STEEL FRAMING FOR COIL UP DOORS IN CEP |
| Mod SA558· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-06-22 | +$19,287 | $918,810,454 | SLVHCS- PROVIDE ALL LABOR MATERIALS ASSOCIATED WITH REVISING UV EQUIPMENT AND CONTROLS. |
| Mod SA561· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-06-22 | +$11,000 | $918,821,454 | SLVHCS- PROVIDE ALL LABOR AND MATERIALS FOR INSTALLATION OF TWO ELECTRICAL RECEPTACLE FLOOR POKE THROUGH ROOM… |
| Mod SA564· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-06-22 | +$11,759 | $918,833,213 | SLVHCS- PROVIDE ADDITIONAL CONCRETE TO INFILL THE REDUCTION IN SIZE OF PLANTERS IN DNT |
| Mod CO07Y· CHANGE ORDER | 2015-06-25 | +$5,000 | $918,838,213 | SLVHCS- 1. PROVIDE ALL LABOR, EQUIPMENT AND MATERIAL NECESSARY TO INSTALL SECURITY SERVER AT PAN AM BUILDING. |
| Mod SA566· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-06-26 | +$9,581 | $918,847,794 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO INSTALL AN ADDITIONAL NURSE CALL AND ASSOCIATED… |
| Mod SA567· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-06-26 | +$3,410 | $918,851,204 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO INSTALL SUPPORT STEEL ABOVE DOOR E-M1-151.1 REQ… |
| Mod SA568· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-06-29 | +$27,518 | $918,878,722 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO PROVIDE AND INSTALL TWELVE ISOLATION VALVES IN… |
| Mod SA569· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-06-29 | +$2,370 | $918,881,092 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO PROVIDE POWER TO MASTER MEDICAL GAS ALARM FROM… |
| Mod SA570· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-06-29 | +$16,912 | $918,898,004 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO FURNISH AND INSTALL CONDUIT AND ASSOCIATED MATE… |
| Mod SA571· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-06-29 | +$10,903 | $918,908,907 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO INSTALL 5 FIRE DAMPERS IN ROOM 2M176, AREA M3 O… |
| Mod SA572· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-06-29 | +$13,648 | $918,922,555 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO MODIFY DOOR FRAMES IN TLR |
| Mod SA573· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-07-01 | +$2,611 | $918,925,166 | SLVHCS- TELECOM PLUMBING RUN OH PROTECTION AT INP |
| Mod SA574· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-07-02 | +$3,942 | $918,929,108 | SLVHCS- INP FUR OUT WALLS |
| Mod SA560· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-07-06 | +$25,523 | $918,954,631 | SLVHCS- EXTERIOR LIGHTING AT 2ND AND 3RD FLOOR TERRACES IN TL. |
| Mod SA562· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-07-06 | +$2,121 | $918,956,752 | SLVHCS- ADDITIONAL ROOF DRAIN AT COLUMN LINE 3L IN STAFF GARAGE. |
| Mod SA563· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-07-06 | +$4,916 | $918,961,668 | SLVHCS- ADD SEPARATE ROOF DRAINS AT THE STAFF PARKING GARAGE - BUILDING 4. |
| Mod SA565· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-07-14 | +$11,296 | $918,972,964 | DIXIE DINING FACILITIES REVISIONS AT THE NEW ORLEANS REPLACEMENT MEDICAL CENTER HOSPITAL |
| Mod SA576· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-07-14 | +$7,216 | $918,980,180 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO PROVIDE A TEMPORARY 2 HOUR DOOR FROM 1C133 TO 1… |
| Mod SA578· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-07-14 | +$4,572 | $918,984,752 | SLVHCS- PROVIDE AND INSTALL TUBE STEEL FOR CURTAIN WALL SUPPORT AT TLR BUILDING 6 |
| Mod SA580· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-07-14 | +$16,664 | $919,001,416 | SLVHCS- CEP LEVEL 4 ACCESS TO CEP FROM CONCOURSE |
| Mod SA582· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-07-14 | +$6,339 | $919,007,755 | SLVHCS- TO REVISE PARTITION WALLS FOR THE SOUTHEAST DUCT RISER SHAFT IN TL. |
| Mod SA583· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-07-14 | +$18,574 | $919,026,329 | SLVHCS- ACCENT WALL TILE - PRODUCT CHANGE BY THE MEDICAL CENTER |
| Mod SA575· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-07-16 | +$125,365 | $919,151,694 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO ADD FRAMING/FURRING AT INTERIOR AND EXTERIOR LO… |
| Mod SA584· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-07-16 | +$57,490 | $919,209,184 | SLVHCS- TLR MILLWORK CHANGES. |
| Mod SA586· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-07-17 | +$63,159 | $919,272,343 | SLVHCS- REVISED CW DETAIL BRICK AT DIXIE |
| Mod CO08A· CHANGE ORDER | 2015-07-20 | +$4,000 | $919,276,343 | SLVHCS - ADD DATA, TELECOM, POWER, HVAC AND FINISHES TO ROOM 1H113B IN OUTPATIENT |
| Mod SA559· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-07-20 | +$9,071 | $919,285,414 | SLVHCS- CIRCUIT FOR FREON RECOVERY AT CEP |
| Mod SA581· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-07-20 | +$53,649 | $919,339,063 | SLVHCS- ADDED CIRCUITS FOR GENERATOR INTAKE/EXHAUST DAMPERS CEP |
| Mod SA588· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-07-20 | −$17,062 | $919,322,001 | SLVHCS- PERFORM THE SIGNAGE REVISIONS IN 2, 3 AND 6 IN TLR. |
| Mod SA590· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-07-20 | +$2,138 | $919,324,139 | SLVHCS- INP CEILING HEIGHT&FINISH DOOR E-C4-CO1 |
| Mod SA587· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-07-21 | +$73,688 | $919,397,827 | SLVHCS- VARIOUS ELECTRICAL CHANGES (6 PCOS) FOR OUTPATIENT |
| Mod SA591· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-07-21 | +$12,084 | $919,409,911 | SLVHCS- DELETE LIGHT FIXTURES AND ADD WALL PROTECTION AT TLR |
| Mod SA592· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-07-21 | +$2,041 | $919,411,952 | SLVHCS- BRICK SHELF ANGLE AT TLR |
| Mod SA593· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-07-21 | +$3,815 | $919,415,767 | SLVHCS- OVERFLOW DRAIN DOWNSPOUTS AT TLR |
| Mod CO07Z· CHANGE ORDER | 2015-07-22 | +$1,305,213 | $920,720,980 | SLVHCS- 1. RELOCATION OF SECURITY NETWORK&SERVER |
| Mod CO08C· CHANGE ORDER | 2015-07-22 | +$8,000 | $920,728,980 | SLVHCS - FIRE SAFING FIREWALL AT CEP |
| Mod SA589· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-07-22 | +$12,093 | $920,741,073 | SLVHCS- STEEL SUPPORT OF ENCASEMENT AT ELECTRICAL RISE CONCOURSE |
| Mod SA594· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-07-22 | +$43,332 | $920,784,405 | SLVHCS- MED GAS ZONE VALVE BOX TLR |
| Mod SA595· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-07-22 | +$5,576 | $920,789,981 | SLVHCS- WALL-OFF MAT AT TLR |
| Mod CO08D· CHANGE ORDER | 2015-07-23 | +$200,000 | $920,989,981 | SLVHCS - PROVIDE AND INSTALL SECURITY HARDWARE REVISIONS LISTED IN BULLETIN 021 FOR BLDGS 1, 2&3 |
| Mod SA553· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-07-24 | +$21,193 | $921,011,174 | SLVHCS-REMOVE AND REINSTALL 2 FTR2A LIGHT FIXTURES, DEMO EXISTING 4" DRAIN LINE AND REINSTALL AT A LOWER ELEVA… |
| Mod SA599· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-07-27 | −$23,987 | $920,987,187 | SLVHCS- DEFINITIZE CO-07E SYSTEM RE-MAPPING |
| Mod CO08E· CHANGE ORDER | 2015-07-28 | +$35,000 | $921,022,187 | SLVHCS - RE-SEQUENCING MASONARY DEMO AT DIXIE |
| Mod CO08F· CHANGE ORDER | 2015-07-28 | +$30,000 | $921,052,187 | SLVHCS-ADDITIONAL SINKS TO OUTPATIENT BLOOD DRAW ROOMS |
| Mod CO08H· CHANGE ORDER | 2015-07-28 | +$2,500 | $921,054,687 | SLVHCS- 1. DNT INTEGRAL BLINDS |
| Mod SA597· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-07-28 | +$13,081 | $921,067,768 | SLVHCS- AUDIO STROBES ON 5TH FLOOR OUTPATIENT |
| Mod CO08I· CHANGE ORDER | 2015-07-31 | +$300,000 | $921,367,768 | SLVHCS- 1. BULLETIN 10J |
| Mod CO08J· CHANGE ORDER | 2015-08-03 | +$53,791 | $921,421,559 | SLVHCS- 1. PROVIDE ADDITIONAL SALVAGE BRICK AT DIXIE |
| Mod CO08B· CHANGE ORDER | 2015-08-06 | +$950,000 | $922,371,559 | SLVHCS - GROUP ONE VOICE DATA |
| Mod CO08K· CHANGE ORDER | 2015-08-12 | +$145,000 | $922,516,559 | SLVHCS- 1. ADD MISSING DATA/TELE DROPS FOR MEDICAL EQUIPMENT |
| Mod SA634· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-08-12 | +$0 | $922,516,559 | SLVHCS- MOS FOR STORED MATERIAL |
| Mod SA585· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-08-14 | +$4,719 | $922,521,278 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO PROVIDE PLUMBING CHANGES AT DIXIE BREWERY, BLDG… |
| Mod CO08M· CHANGE ORDER | 2015-08-17 | +$20,000 | $922,541,278 | SLVHCS- 1. WALK-IN COOLER DNT |
| Mod SA603· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-08-17 | +$4,680 | $922,545,958 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO FURNISH AND INSTALL CONDUIT AND ASSOCIATED MATE… |
| Mod SA605· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-08-17 | +$28,236 | $922,574,194 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO MODIFY DOOR FRAMES IN TLR |
| Mod SA609· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-08-17 | +$13,453 | $922,587,647 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO MODIFY DOOR FRAMES IN TLR |
| Mod SA612· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-08-17 | +$77,480 | $922,665,127 | SLVHCS- PULL BOXES FOR 15KV FEEDERS |
| Mod SA619· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-08-17 | +$10,743 | $922,675,870 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO MODIFY DOOR FRAMES IN TLR |
| Mod SA625· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-08-17 | +$68,796 | $922,744,666 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO MODIFY DOOR FRAMES IN TLR |
| Mod SA629· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-08-17 | +$33,167 | $922,777,833 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO MODIFY DOOR FRAMES IN TLR |
| Mod SA643· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-08-18 | +$0 | $922,777,833 | SLVHCS- OFFSITE STORED MATERIAL - MOS |
| Mod SA656· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-08-26 | −$9,795 | $922,768,038 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO MODIFY DOOR FRAMES IN TLR |
| Mod CO08N· CHANGE ORDER | 2015-08-28 | +$170,000 | $922,938,038 | SLVHCS- 1. DOOR HARDWARE CHANGES CARD READER/ADO DNT |
| Mod CO08O· CHANGE ORDER | 2015-08-28 | +$95,000 | $923,033,038 | SLVHCS- 1. ADDED OPERATOR'S ROOM IN D&T |
| Mod CO08L· CHANGE ORDER | 2015-09-08 | +$850,000 | $923,883,038 | SLVHCS- 1. PROVIDE ALL LABOR AND MATERIAL TO COMPLETE BULLETIN 29 AT DNT |
| Mod CO08Q· CHANGE ORDER | 2015-09-10 | +$71,000 | $923,954,038 | SLVHCS- 1. MENTAL HEALTH ROOM CHANGES IN DNT |
| Mod CO08R· CHANGE ORDER | 2015-09-11 | +$105,000 | $924,059,038 | SLVHCS- 1. VARIOUS MAIN COMPUTER ROOM CHANGES IN DNT |
| Mod CO08S· CHANGE ORDER | 2015-09-11 | +$140,000 | $924,199,038 | SLVHCS- 1. RECONFIGURE OP ORAL SURGERY ROOMS |
| Mod SA606· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-14 | +$20,152 | $924,219,190 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO MODIFY DOOR FRAMES IN TLR |
| Mod SA607· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-14 | +$4,211 | $924,223,401 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO INSTALL GRILL IN RM 1M055 |
| Mod SA614· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-14 | +$1,359 | $924,224,760 | SLVHCS- SECONDARY PARTITION REQUIREMENTS |
| Mod SA626· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-14 | +$5,662 | $924,230,422 | SLVHCS- INSTALL ADDITIONAL SECTION OF 4" ROOF DRAIN PIPING TO PICK UP A SECOND TLR ROOF DRAIN PER VA RESPONSE… |
| Mod SA630· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-14 | +$5,774 | $924,236,196 | SLVHCS- SALVAGE BRICK FROM EXISTING BRICK FOR RE-USE AT DIXIE |
| Mod SA636· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-14 | +$8,244 | $924,244,440 | SLVHCS- INTUMESCENT PAINT ON GIRDER AT THE ATRIUM TLR |
| Mod SA644· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-14 | +$32 | $924,244,472 | SLVHCS- SETTLEMENT OF VARIOUS SMALL PCOS |
| Mod SA645· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-14 | −$6,968 | $924,237,504 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO MODIFY DOOR FRAMES IN TLR |
| Mod SA646· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-14 | +$14,589 | $924,252,093 | SLVHCS- CONCOURSE ELECTRICAL RISER AT ELEVATOR LOBBY "L" |
| Mod SA649· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-14 | +$2,313 | $924,254,406 | SLVHCS- SOFFIT CURTAIN WALL INP |
| Mod SA657· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-14 | +$19,324 | $924,273,730 | SLVHCS- FIREPROOFING AT PATIENT GARAGE |
| Mod SA659· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-14 | +$62,758 | $924,336,488 | SLVHCS- MISSING TUBE STEEL |
| Mod SA668· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-14 | +$128,474 | $924,464,962 | SLVHCS- BRICK RESTORATION AT DIXIE |
| Mod SA673· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-14 | +$9,596 | $924,474,558 | SLVHCS- VERTICAL METAL FLASHING SHELF ANGLE TLR |
| Mod SA679· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-14 | +$3,628 | $924,478,186 | SLVHCS- CHIP EXISTING FOUNDATION AT DIXIE |
| Mod SA635· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-16 | +$7,701 | $924,485,887 | SLVHCS- TYPICAL PATIENT ROOM CHANGES - SHIFT OF LIFT TRACK |
| Mod SA682· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-16 | +$28,010 | $924,513,897 | SLVHCS- REVISIONS TO ROUGH-IN HEADWALLS - OUTPATIENT |
| Mod CO08P· CHANGE ORDER | 2015-09-17 | +$448,707 | $924,962,604 | SLVHCS- 1. VARIOUS CHANGES IN THE MCR |
| Mod SA637· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-17 | +$13,600 | $924,976,204 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO MODIFY DOOR FRAMES IN TLR |
| Mod SA669· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-17 | +$7,173 | $924,983,377 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO MODIFY DOOR FRAMES IN TLR |
| Mod SA681· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-17 | +$13,062 | $924,996,439 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO INSTALL 5 FIRE DAMPERS IN ROOM 2M176, AREA M3 O… |
| Mod SA683· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-17 | +$10,456 | $925,006,895 | SLVHCS- PARKING GARAGE PROCESS TANK HOLLOW CORE BEARING PLATE |
| Mod SA684· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-17 | +$4,006 | $925,010,901 | SLVHCS- TO RELOCATE TWO MEDICAL GAS VALVE BOXES INP |
| Mod SA685· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-17 | +$1,235 | $925,012,136 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO INSTALL 5 FIRE DAMPERS IN ROOM 2M176, AREA M3 O… |
| Mod SA686· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-17 | +$12,015 | $925,024,151 | SLVHCS- EMERGENCY ACCESS DOOR LEVEL 2 AND 3 IN BLDG 2 |
| Mod CO08U· CHANGE ORDER | 2015-09-22 | +$5,500 | $925,029,651 | SLVHCS- 1. ADDED SINK IN FROZEN LAB |
| Mod CO08V· CHANGE ORDER | 2015-09-24 | +$0 | $925,029,651 | FLOOR SLAB CHANGES REQUIRED FOR VIVARIUM REFRIGERATOR AND FREEZER |
| Mod CO08W· CHANGE ORDER | 2015-09-24 | +$8,700 | $925,038,351 | SLVHCS- 1. RELOCATE PROSTHETIC OVEN |
| Mod SA680· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-24 | +$17,413 | $925,055,764 | SLVHCS- ADDED POWER AND DATA TO NURSE STATIONS DNT |
| Mod SA687· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-24 | +$5,428 | $925,061,192 | SLVHCS- CHAPEL CONNECTORS IN INP |
| Mod SA688· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-24 | +$7,991 | $925,069,183 | SLVHCS- DEFLECTION JOINT A1 COURTYARD |
| Mod CO08T· CHANGE ORDER | 2015-09-25 | +$250,000 | $925,319,183 | SLVHCS- 1. MMA AT COURTYARD IN THE PAN AM BLDG. |
| Mod SA596· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-25 | +$47,909 | $925,367,092 | SLVHCS- ADD INTERSTITIAL STEEL AT STAFF PARKING GARAGE |
| Mod SA598· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-25 | +$32,299 | $925,399,391 | SLVHCS- LINTEL REPLACEMENTS AT DIXIE |
| Mod SA600· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-25 | +$6,069 | $925,405,460 | SLVHCS- OUTPATIENT LEVEL 6 ADDED FIRE DOOR |
| Mod SA601· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-25 | +$22,138 | $925,427,598 | SLVHCS- PROVIDE STEEL AND FRAMING TO SUPPORT TLR NORTH CURTAIN WALL |
| Mod SA602· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-25 | +$5,044 | $925,432,642 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO FURNISH AND INSTALL AN ELECTRICAL FLOOR BOX REQ… |
| Mod SA604· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-25 | +$211,781 | $925,644,423 | SLVHCS- MENTAL HEALTH COURTYARD WIRE WALL CURB |
| Mod SA678· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-25 | +$82,510 | $925,726,933 | SLVHCS- ADD DEADLOCKS TO TELECOM ROOMS |
| Mod SA658· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-28 | +$10,088 | $925,737,021 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO MODIFY DOOR FRAMES IN TLR |
| Mod SA693· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-28 | +$5,385 | $925,742,406 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO UPGRADE WALL FINISH TO LEVEL 5 IN 22 ROOM IN OU… |
| Mod SA705· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-28 | −$13,293 | $925,729,113 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO INSTALL 5 FIRE DAMPERS IN ROOM 2M176, AREA M3 O… |
| Mod CO08Z· CHANGE ORDER | 2015-09-30 | +$40,000 | $925,769,113 | SLVHCS- 1. VIBRATION MONITORING EXTENDED FOR THE SITE WORK |
| Mod SA621· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-30 | +$29,861 | $925,798,974 | SLVHCS- ADD ADDITIONAL STIFFENERS TO EXISTING BEAMS SUPPORTING EXISTING ROOF DAVITS. |
| Mod SA666· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-30 | +$5,171 | $925,804,145 | SLVHCS- FILL GAP WITH CUSTOM WOOD SUBSTRATE AND PLAM-3 FINISH AT EACH PPE CABINET OUTSIDE OF THE PATIENT ROOMS… |
| Mod SA691· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-30 | +$7,261 | $925,811,406 | SLVHCS- CONCOURSE LOBBY "L" LEVEL 7 |
| Mod SA694· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-30 | +$3,309 | $925,814,715 | SLVHCS- TO ADD OUTLETS, MOVE AND DELETE OUTLETS FOR FOOD PRE EQUIPMENT IN THE TLR BUILDING. |
| Mod SA577· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-01 | +$2,146 | $925,816,861 | SLVHCS- PROVIDE AND INSTALL ANGLE STEEL TO THE W18 AND W12 STEEL MEMBERS FOR THE LOW WRAPPER CANOPY AT THE TLR… |
| Mod SA608· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-01 | +$49,990 | $925,866,851 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO PROVIDE LEVEL 05 CONNECTOR TO CONCOURSE ACCESS&… |
| Mod SA610· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-01 | +$32,299 | $925,899,150 | SLVHCS- INTERIOR EXPANSION JOINT COVER |
| Mod SA611· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-01 | +$8,958 | $925,908,108 | SLVHCS- RECONFIGURE WASTE PIPING FOR WALL HUNG UNITS |
| Mod SA638· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-01 | +$41,958 | $925,950,066 | SLVHCS- RE-ROUTING PRIMARY FEEDER CONDUIT TLR |
| Mod SA648· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-01 | +$42,616 | $925,992,682 | SLVHCS- AREA G EXTENSION CURB CLARIFICATIONS |
| Mod SA650· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-01 | +$23,617 | $926,016,299 | SLVHCS- METAL PANEL TRANSITIONS CURTAIN TAIL WALL |
| Mod SA653· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-01 | +$6,074 | $926,022,373 | SLVHCS- PROVIDE ELECTRICAL RECEPTACLE FLOOR BOX ROOM 4J110 |
| Mod SA654· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-01 | +$7,329 | $926,029,702 | SLVHCS- REMOVE AND DISPOSE OF S15 BEAMS |
| Mod SA660· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-01 | +$17,267 | $926,046,969 | SLVHCS- EXPANDABLE JOINT MATERIAL IN CON LOBBY "L" |
| Mod SA665· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-01 | +$189,070 | $926,236,039 | SLVHCS- DENTAL ROOM CHANGES RFP D-070 |
| Mod SA672· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-01 | +$15,888 | $926,251,927 | SLVHCS- ATRIUM STEEL TLR |
| Mod SA674· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-01 | +$4,041 | $926,255,968 | SLVHCS- LIGHT COVE DETAILS ALONG CORRIDORS AT TL DINING |
| Mod SA675· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-01 | +$6,201 | $926,262,169 | SLVHCS- INSTALL FIRE RATED GLAZING DIXIE BLDG |
| Mod SA697· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-01 | +$2,602 | $926,264,771 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO ADD FTU1E FIXTURES |
| Mod SA699· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-01 | +$13,397 | $926,278,168 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO INSTALL 5 FIRE DAMPERS IN ROOM 2M176, AREA M3 O… |
| Mod SA700· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-01 | +$2,853 | $926,281,021 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO INSTALL 5 FIRE DAMPERS IN ROOM 2M176, AREA M3 O… |
| Mod SA702· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-01 | +$19,908 | $926,300,929 | SLVHCS- SIGNAGE IN STAFF GARAGE REVISED |
| Mod SA707· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-01 | +$11,919 | $926,312,848 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO INSTALL 5 FIRE DAMPERS IN ROOM 2M176, AREA M3 O… |
| Mod SA753· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-01 | +$3,251 | $926,316,099 | SLVHCS- PROVIDE ELECTRICAL RECEPTACLE FLOOR BOX RM 4J110 |
| Mod SA613· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-05 | +$209,184 | $926,525,283 | SLVHCS- FIRE PROOF STEEL FRAMING FOR A5 AND A6 CONNECTOR TO SUPPORT CURTAIN WALL |
| Mod SA615· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-05 | +$5,228 | $926,530,511 | SLVHCS- ADD 6 LIGHTING FIXTURES IN INP |
| Mod SA617· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-05 | +$42,817 | $926,573,328 | SLVHCS- INSTALL CARD READER SECURITY LOCKING DEVICE TLR |
| Mod SA618· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-05 | +$12,930 | $926,586,258 | SLVHCS- TO ADD POWER CIRCUITS TO FIRE ALARM PANELS / FIRE ALARM TERMINATION PANELS WITHIN INP BUILDING. |
| Mod SA620· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-05 | +$3,655 | $926,589,913 | SLVHCS- INCREASE SOUTH COURTYARD PARAPET WALL HEIGHT 10 INCHES TO PROVIDE SUFFICIENT HEIGHT TO INSTALL ROOF FL… |
| Mod SA622· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-05 | +$14,286 | $926,604,199 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO INSTALL EMERGENCY SHOWERS AND FLOOR DRAINS IN R… |
| Mod SA624· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-05 | +$12,432 | $926,616,631 | SLVHCS- FABRICATE AND INSTALL STEEL STAIRS EXTERIOR ROOF ACCESS TLR |
| Mod SA627· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-05 | +$5,188 | $926,621,819 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO PROVIDE CHANGES TO WEIGHT LOADING UNISTRUT IN R… |
| Mod SA631· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-05 | +$19,732 | $926,641,551 | SLVHCS- STRUCTURAL SUPPORT AT INTERSTITIAL DECK AT BLAST WALL DNT |
| Mod SA632· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-05 | +$87,000 | $926,728,551 | SLVHCS- LINTELS AT DIXIE WINDOWS |
| Mod SA633· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-05 | +$3,229 | $926,731,780 | SLVHCS- MODIFY CEILING HEIGHT IN ROOM 4B155E IN INP |
| Mod SA639· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-05 | +$54,459 | $926,786,239 | SLVHCS- "M" TYPE PARTITIONS AT EXTERIOR WALL - TLR |
| Mod SA640· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-05 | +$59,132 | $926,845,371 | SLVHCS- PROVE WOOD CASEWORK IN VARIOUS LOCATION IN THE TLR BLDG. |
| Mod SA641· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-05 | +$50,374 | $926,895,745 | SLVHCS- LEAD ABATEMENT AT DIXIE |
| Mod SA642· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-05 | +$90,798 | $926,986,543 | SLVHCS- TUBE STEEL MISSING IN OUTPATIENT |
| Mod SA647· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-05 | +$66,501 | $927,053,044 | SLVHCS- BULLETIN 27 PANT MATERIAL&EDUCATION COURTYARD FENCING |
| Mod SA651· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-05 | +$53,457 | $927,106,501 | SLVHCS- HORIZONTAL STEEL MISSING FROM 03-D.8 LINE OUTPATIENT |
| Mod SA655· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-05 | +$61,056 | $927,167,557 | SLVHCS- ED RAMP/DECK GUARDRAIL |
| Mod SA661· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-05 | +$139,557 | $927,307,114 | SLVHCS- PRELIMINARY DOG HOUSE DESIGN |
| Mod SA662· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-05 | +$2,365 | $927,309,479 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO REVISE PHARMACY CACHE WALL TO TERMINATE INTO EX… |
| Mod SA706· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-05 | +$2,065 | $927,311,544 | SLVHCS- PROVIDE POWER FOR HAND DRYERS 4A100A&4A100B RFIS 5905.1, 4895 |
| Mod CO09A· CHANGE ORDER | 2015-10-07 | +$40,000 | $927,351,544 | SLVHCS- 1. BOIL OUT SINK |
| Mod CO09C· CHANGE ORDER | 2015-10-07 | +$9,500 | $927,361,044 | SLVHCS- 1.POWER FOR B2 AND B2 CUBICLES IN INP |
| Mod CO09D· CHANGE ORDER | 2015-10-07 | +$50,000 | $927,411,044 | SLVHCS- 1. LAB UTILITY CHANGES |
| Mod SA623· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-07 | +$47,087 | $927,458,131 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO INCREASE FINISH TO LEVEL 5 AT INPATIENT ROOMS A… |
| Mod SA671· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-07 | +$13,719 | $927,471,850 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO MODIFY DOOR FRAMES IN TLR |
| Mod SA690· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-07 | +$2,510 | $927,474,360 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO INSTALL 5 FIRE DAMPERS IN ROOM 2M176, AREA M3 O… |
| Mod SA727· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-07 | +$26,570 | $927,500,930 | SLVHCS- MAKE ADJUSTMENTS TO SHAFT&RAILING AT M3 STAIR RFI 5285 |
| Mod CO09E· CHANGE ORDER | 2015-10-08 | +$10,100 | $927,511,030 | SLVHCS- 1.INSTAL EIGHT 4" ISO VALVES |
| Mod SA701· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-08 | +$9,166 | $927,520,196 | SLVHCS- CHANGING FROM MANUAL TO AUTO DOOR SLIDING IN CONCOURS |
| Mod SA720· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-08 | +$3,418 | $927,523,614 | SLVHCS- INSTALL MISSING LIGHT FIXTURES IN ROOM 2M016 IN TLR |
| Mod SA724· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-08 | +$3,452 | $927,527,066 | SLVHCS- REVISE HARDWARE AND FRAME FOR DOOR 1M115 IN TLR |
| Mod SA664· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-09 | +$7,870 | $927,534,936 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO ADD BRICK LEDGE STEEL ON 5 LINE IN TLR |
| Mod SA676· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-09 | +$7,676 | $927,542,612 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO PROVIDE ELECTRICAL CIRCUITS FOR THE VERTICAL CO… |
| Mod SA696· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-09 | +$270,191 | $927,812,803 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO MAKE REVISIONS TO THE CURTAIN WALL SILL IN THE… |
| Mod SA698· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-09 | +$184,734 | $927,997,537 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO DEMOLISH AND RECONSTRUCT THE PARAPET ABOVE THE… |
| Mod SA726· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-09 | +$2,347 | $927,999,884 | SLVHCS- MODIFY PATIENT LIFT SUPPORT IN D&T |
| Mod SA728· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-09 | +$9,461 | $928,009,345 | SLVHCS- PROVIDE AND INSTALL ADDITIONAL STORM WATER OVERFLOW PIPIN GIN DNT BLDG 2 |
| Mod SA670· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-14 | +$330,000 | $928,339,345 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO PERFORM MASONRY AND BLAST STEEL REVISIONS IN AR… |
| Mod SA689· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-15 | +$24,938 | $928,364,283 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO INSTALL STRUCTURAL STEEL WELDS IN ATRIUM TO BE… |
| Mod SA730· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-15 | −$45,610 | $928,318,673 | SLVHCS- REMOVAL OF THE INSTALLATION OF FINAL CORES THROUGHOUT THE CAMPUS. |
| Mod SA731· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-15 | +$3,758 | $928,322,431 | SLVHCS- INSTALL SHEET METAL FLASHING AT LOUVERS WHERE STEEL WAS NOT REQUIRED FOR SUPPORT. |
| Mod SA616· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-16 | +$83,042 | $928,405,473 | SLVHCS- PROVIDE ALL LABOR; EQUIPMENT AND MATERIAL NECESSARY TO PROVIDE FOR ADDITIONAL FALL PROTECTION ANCHORS… |
| Mod SA652· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-16 | +$3,964 | $928,409,437 | SLVHCS- REMOVE CONCRETE ENCASEMENT AT WEB OF EXISTING BEAM AND PROVIDE WELDED CONNECTIONS OF NEW STRUCTURAL BE… |
| Mod SA713· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-16 | +$3,256 | $928,412,693 | SLVHCS- PROVIDE JOINT SEALANT AT EXTERIOR WALL LOCATIONS THAT LEAD TO INTERIOR SPACES RFI -5778 |
| Mod SA714· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-16 | +$3,882 | $928,416,575 | SLVHCS- ADD GUARD ATTACHMENT FOR THE MONUMENTAL STAIR IN THE OUTPATIENT BUILDING |
| Mod SA715· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-16 | +$17,604 | $928,434,179 | SLVHCS- REVISE PATIENT LIFT DISTANCE FROM HEADWALLS IN NON-TYPICAL ROOMS IN THE TLR BUILDING |
| Mod SA716· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-16 | +$7,516 | $928,441,695 | SLVHCS- LEVEL FLOOR FINISH FOR ALL BATHROOMS WITH NO SHOWERS |
| Mod SA718· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-16 | +$3,323 | $928,445,018 | SLVHCS- ADD CONCRETE SEALER TO THE FLOOR IN MECHANICAL ROOM 6D100 IN DNT BUILDING |
| Mod SA719· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-16 | +$64,303 | $928,509,321 | SLVHCS- DOOR LOCATION BULLETIN 15C AND ADDED STEEL SUPPORT |
| Mod SA729· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-16 | +$11,239 | $928,520,560 | SLVHCS- REVISE THE GARAGE BOLLARD ANGLES OVER PRECAST PANEL JOINTS |
| Mod SA628· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-19 | +$5,724 | $928,526,284 | SLVHCS- MODIFY ELECTRICAL OUTLETS WITH EXTERIOR CURTAIN WALL - TLR |
| Mod CO09F· CHANGE ORDER | 2015-10-20 | +$4,800 | $928,531,084 | SLVHCS- VIVARIUM FREEZER AND REFRIGERATOR REVISIONS |
| Mod SA708· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-22 | +$13,409 | $928,544,493 | SLVHCS- PROVIDE ALL SUPERVISION, LABOR, EQUIPMENT AND MATERIALS NEEDED TO PERFORM WORK IN THE MAIN COMPUTER RO… |
| Mod SA734· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-22 | +$949 | $928,545,442 | SLVHCS- DELETION OF FIRE DAMPERS ON LEVEL 1 AREA M2 IN BUILDING 6 |
| Mod SA736· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-22 | +$1,759 | $928,547,201 | SLVHCS- INSTALLATION OF CORRECTLY SIZED AND POSITIONED CONCRETE CURBS AT LEVELS 3 AND 4 OF THE OUTPATIENT BUIL… |
| Mod SA737· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-22 | +$9,452 | $928,556,653 | SLVHCS- 6 LINE BRICK LEDGE ELEVATION |
| Mod SA709· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-23 | +$83,719 | $928,640,372 | SLVHCS- PROVIDE LABOR, EQUIPMENT AND MATERIALS TO PERFORM REVISIONS TO FLOOR RECEPTACLES&BOXES CAMPUS WIDE RFI… |
| Mod SA748· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-23 | +$100,000 | $928,740,372 | SLVHCS- ELEVATOR TUBE STEEL SUPPORT |
| Mod SA749· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-23 | +$30,116 | $928,770,488 | SLVHCS- FIRE DAMPERS IN ELECTRICAL ROOMS OUTPATIENT |
| Mod SA754· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-23 | +$3,660 | $928,774,148 | SLVHCS- PROVIDE POWER TO SUMP IT IN THERAPY POOL. |
| Mod SA756· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-23 | +$6,496 | $928,780,644 | SLVHCS- ADD NURSE CALL STATION |
| Mod CO09G· CHANGE ORDER | 2015-10-27 | +$137,203 | $928,917,847 | SLVHCS- TEMPORARY POWER AT DIXIE |
| Mod CO09B· CHANGE ORDER | 2015-10-28 | +$143,554 | $929,061,401 | SLVHCS-REPAIR VERTICAL CRACK IN EXISTING BRICK AT DIXIE BREWERY |
| Mod SA717· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-28 | +$62,843 | $929,124,244 | SLVHCS- ADD STEEL SUPPORT AND CONNECTIONS AT OUTPATIENT (BUILDING 4) LEVEL 1 TO CORRECT CURTAIN WALL CONFLICTS |
| Mod SA721· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-28 | +$9,656 | $929,133,900 | SLVHCS- INSTALL CLOSURE AT COPING BETWEEN THE MP-1 AND PC-1 AT LEVEL 8, AREA J2 AT THE OUT BUILDING |
| Mod SA733· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-28 | +$5,053 | $929,138,953 | SLVHCS-ADD A COVER TO THE SUMP PIT IN POOL EQUIPMENT ROOM |
| Mod SA746· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-28 | +$13,000 | $929,151,953 | SLVHCS- ADDITIONAL CURTAINWALL STEEL SUPPORT |
| Mod SA752· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-28 | +$4,269 | $929,156,222 | SLVHCS- PARTITION AND MOISTURE BARRIER AT CEP |
| Mod SA738· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-29 | +$4,202 | $929,160,424 | SLVHCS- INSTALL CEILING MOUNTED LIGHT SUPPORTS AT DNT AND OUTPATIENT BLDGS RFI-3987&3988 |
| Mod SA739· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-29 | +$1,955 | $929,162,379 | SLVHCS- PROVIDE REQUIRED REVISINOS TO THE SLAB ATTACHMENT TO STAIR 8M02 DIXIE BLDG PER RFI DIXL03 SKETCH |
| Mod SA740· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-29 | +$1,171 | $929,163,550 | SLVHCS- PROVIDE REQUIRED REVISIONS TO DOOR 4P313A&4P320.2 DIXIE BLDG PER RFI 6636 |
| Mod SA741· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-29 | +$1,531 | $929,165,081 | SLVHCS- PROVIDE FLOOR BOXES FOR METAL DETECTORS DNT |
| Mod SA742· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-29 | +$35,528 | $929,200,609 | SLVHCS- ADJUST CURTAIN WALL SUPPORT STEEL ELEVATIONS AND CONNECTINS AT OUTPATIENT BLDG 4 LEVEL 4 THRU 8 PER RF… |
| Mod SA743· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-29 | +$50,500 | $929,251,109 | SLVHCS- PROVIDE ADDITIONAL SIGNAGE AND POWER REQUIREMENTS PER RFI 5134 |
| Mod SA744· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-29 | +$3,230 | $929,254,339 | SLVHCS- ADDITION OF DP SENSORS AT HEAT EXCHANGERS PER RFI 4964 |
| Mod SA745· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-29 | −$6,236 | $929,248,103 | SLVHCS- DELETE WORKSPACE TVS AND OUTLETS DUE TO SPACE DISCREPANCIES IDENTIFIED AT FLOORS 2-7 OF OUTPATIENT BUI… |
| Mod SA750· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-29 | +$1,571 | $929,249,674 | SLVHCS- PERFORM REQUIRED REVISIONS TO THE SLAB AT THE NORTH ENTRANCE OF THE DIXIE BUILDING 8 PER THE VA'S RESP… |
| Mod SA755· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-29 | +$5,255 | $929,254,929 | SLVHCS- WOOD PANELS AT DNT ROOMS 1E117A AND 1E117B |
| Mod SA759· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-29 | +$78,469 | $929,333,398 | SLVHCS- ADDITION OF METAL STUD WALL OUTPATIENT |
| Mod SA758· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-02 | +$3,380 | $929,336,778 | SLVHCS- LOCATION OF EXTERIOR DOOR AND ADD BREAK METAL |
| Mod SA760· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-02 | +$2,424 | $929,339,202 | SLVHCS- INSTALL SCUPPER, DOWNSPOUT, AND CONDUCTOR HEAD AT DNT |
| Mod SA764· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-02 | +$1,586 | $929,340,788 | SLVHCS- ADDED POWER CIRCUITS FOR THE AUTO-SINKS IN ROOMS 5D125 AND 5D137C IN THE DNT BUILDING |
| Mod CO09H· CHANGE ORDER | 2015-11-03 | +$52,000 | $929,392,788 | SLVHCS- AREA "B" IN DIXIE STRUCTURAL ANALYSIS |
| Mod CO09I· CHANGE ORDER | 2015-11-03 | +$4,500 | $929,397,288 | SLVHCS- WIRING TO SHUT DOWN POWER TO MCR |
| Mod SA765· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-03 | +$7,861 | $929,405,149 | SLVHCS- INSTALL ALL DATA OUTLETS DENOTED AS "WL" AS SHOWN IN THE EWP07 CEP DRAWINGS AND AS RESPONDED TO ON RFI… |
| Mod SA766· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-03 | +$931 | $929,406,080 | SLVHCS- CO-06P ROOM NUMBERING REVISION |
| Mod SA767· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-03 | −$9,949 | $929,396,131 | SLVHCS- DELETE DIMMER SWITCHES IN PATIENTS ROOM |
| Mod SA769· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-03 | +$1,235 | $929,397,366 | SLVHCS- SUPPORT STEEL KICKER IN MENTAL HEALTH DNT |
| Mod SA770· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-03 | +$3,556 | $929,400,922 | SLVHCS- COURTYARD AUTO OPERATOR BOLLARD MOUNT TLR |
| Mod SA771· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-03 | +$1,901 | $929,402,823 | SLVHCS- RADIOLOGY RM 2D162 INTERIOR WINDOW _ DNT _ EWP08 |
| Mod SA772· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-03 | +$7,908 | $929,410,731 | SLVHCS- FLOOR DEPRESSION POUR BACK IN AREA 4G KITCHEN _ DNT _ EWP05 _ RFI 4904 |
| Mod CO09J· CHANGE ORDER | 2015-11-04 | +$6,000 | $929,416,731 | SLVHCS- RADIO ROOM IN OUTPATIENT |
| Mod CO09K· CHANGE ORDER | 2015-11-04 | +$59,000 | $929,475,731 | SLVHCS- ADDED PANELS FOR TOSHIBA CT SCANS |
| Mod SA762· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-04 | +$2,860 | $929,478,591 | SLVHCS- PROVIDE MODIFICATIN TO DOOR ACCESS CONTROL FOR TEMPORARY ENTRANCE/EXIT LOCATIONS AT TURNOVER IN INPATI… |
| Mod SA768· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-04 | +$1,323 | $929,479,914 | SLVHCS- CHANGE CIRCUITS IN LOW VOLTAGE ROOMS TO 60A/2P PER RFI 6757 |
| Mod SA773· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-04 | +$19,187 | $929,499,101 | SLVHCS- BULLETIN 27 FENCE GATE CARD READER |
| Mod SA774· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-04 | +$23,425 | $929,522,526 | SLVHCS- PROVIDE CURTAIN WALL STEEL SUPPORT DNT |
| Mod SA703· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-05 | +$1,888 | $929,524,414 | SLVHCS- PROVIDE ELECTRICAL&LOW VOLTAGE OUTLETS RM 1M015 TLR RFI 6046 |
| Mod SA704· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-05 | +$9,912 | $929,534,326 | SLVHCS- PROVIDE REVISION FOR LIGHTS @ EXTERIOR CEP EIFS CANOPIES RFI 6079 |
| Mod SA735· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-05 | +$125,751 | $929,660,077 | SLVHCS- BULLETIN 33 ALL SIGNAGE CHANGES |
| Mod SA757· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-05 | +$11,018 | $929,671,095 | SLVHCS- TUBE STEEL AND CURB PLACEMENT |
| Mod SA777· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-05 | +$13,324 | $929,684,419 | SLVHCS- 2M20 STAIRS ADDED PEDESTALS DNT |
| Mod SA763· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-06 | +$41,577 | $929,725,996 | SLVHCS- DRAIN AND PIPING CHANGES DNT |
| Mod SA775· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-06 | +$78,826 | $929,804,822 | SLVHCS- MISC STEEL |
| Mod SA776· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-06 | +$1,683 | $929,806,505 | SLVHCS- INSTALL TWO RECESSED RECEPTACLES TLR SUNDRY SHOP RFI 4464.1 |
| Mod SA778· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-06 | +$45,464 | $929,851,969 | SLVHCS- MOD TO OBSERVATION ROOMS |
| Mod SA785· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-06 | −$54,637 | $929,797,332 | SLVHCS- THREE EXAM ROOM CHANGES IN OUTPATIENT |
| Mod CO09M· CHANGE ORDER | 2015-11-09 | +$6,500 | $929,803,832 | SLVHCS- SINK DELETION AND RELOCATION IN MRIS |
| Mod SA784· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-09 | +$6,403 | $929,810,235 | SLVHCS- ADD SUPPORT STEEL FOR DOOR AT NORTH ELEVATION - DNT |
| Mod CO09O· CHANGE ORDER | 2015-11-10 | +$8,000 | $929,818,235 | SLVHCS- GALVEZ DRAIN CONNECTION |
| Mod SA732· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-10 | +$23,351 | $929,841,586 | SLVHCS-RELOCATE ANCHOR BOLTS IN AREAS K&L IN OUTPATIENT BUILDING |
| Mod SA779· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-10 | +$9,466 | $929,851,052 | SLVHCS- FLOOR DEPRESSIONS POUR BACK LEVEL 4 DNT |
| Mod SA783· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-10 | +$13,200 | $929,864,252 | SLVHCS- STRUCTURAL STEEL AND CONCRETE CHANGES TO LEVEL 3 DNT |
| Mod SA786· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-10 | +$12,182 | $929,876,434 | SLVHCS- ELECTRICAL AND DATA OUTLETS TLR |
| Mod SA788· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-10 | +$12,471 | $929,888,905 | SLVHCS- FIRE ALARM PENTHOUSE DNT |
| Mod SA725· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-16 | +$8,775 | $929,897,680 | SLVHCS- ADDITION OF PERMANENT DOORS BETWEEN 5B100 AND 5BC02 |
| Mod SA782· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-16 | +$40,766 | $929,938,446 | SLVHCS- CEP VERTICAL EXPANSION JOINT COVERS |
| Mod SA790· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-17 | +$0 | $929,938,446 | SLVHCS- STORED MATERIAL PAYMENT REQUEST |
| Mod SA791· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-17 | +$9,524 | $929,947,970 | SLVHCS- DRAINAGE FOR SITE LIGHT FIXTURE |
| Mod SA800· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-17 | −$7,788 | $929,940,182 | SLVHCS- DELETE 12 MOUNTED CEILING EXAMINATION LIGHTS IN THE DNT BUILDING. |
| Mod SA780· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-18 | +$13,081 | $929,953,263 | SLVHCS- DELETE INSTALLATION OF UNDER CABINET LIGHTS RFI 6108 |
| Mod SA792· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-18 | +$1,337 | $929,954,600 | SLVHCS- PROVIDE PAVING AND CREDIT LANDSCAPING ACTIVITIES RFI 6461 |
| Mod SA793· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-18 | +$63,345 | $930,017,945 | SLVHCS- PAINT EXPOSED DUCTWORK AND AHUS ON TLR ROOF RFI 2810 |
| Mod SA797· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-18 | +$5,443 | $930,023,388 | SLVHCS-SHAFT WALL AT PATIENT GARAGE CONCOURSE LOBBY CONNECTION |
| Mod SA799· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-18 | +$20,102 | $930,043,490 | SLVHCS- EXHAUST LINE FOR DRYER OUT |
| Mod SA805· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-18 | +$1,602 | $930,045,092 | SLVHCS-ADD RUBBER BASE IN DESIGNATED ROOMS PER RFI |
| Mod SA806· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-18 | +$1,710 | $930,046,802 | SLVHCS-REMOVE AND REPLACE TALL CABINET IN ROOM 3D172 IN DNT |
| Mod SA801· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-19 | +$67,270 | $930,114,072 | SLVHCS- MENTAL HEALTH ROOM CHANGES - DEFINITIZE CO-08Q |
| Mod SA803· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-19 | +$2,034 | $930,116,106 | SLVHCS- INSTALL FLASHING AND AIR WEATHER BARRIER AND TRANSITION MEMBRANE FOR REVISED JAMB DETAIL IN THE CEP BU… |
| Mod SA804· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-19 | +$8,056 | $930,124,162 | SLVHCS- PROVIDE ADDITIONAL PLUG MOLDS&MDF BOARD IN PROSTHETICS RFI 6737 |
| Mod SA808· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-19 | +$70,217 | $930,194,379 | SLVHCS- EMERGENCY POWER FOR PHONE IN GARAGE |
| Mod SA810· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-19 | +$76,849 | $930,271,228 | SLVHCS- PROVIDE CURTAINWALL SUPPORTS IN DNT |
| Mod SA813· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-19 | +$42,502 | $930,313,730 | SLVHCS- CLIPS LANDING AT CONTROL JOINTS DNT |
| Mod SA818· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-19 | +$2,614 | $930,316,344 | SLVHCS- ADDED LIGHT FIXTURE DNT |
| Mod CO09Q· CHANGE ORDER | 2015-11-20 | +$7,500 | $930,323,844 | SLVHCS- FIRE ALARM PANEL |
| Mod SA789· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-20 | +$16,676 | $930,340,520 | SLVHCS- SCRUB SINKS IN DNT |
| Mod SA796· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-20 | +$14,001 | $930,354,521 | SLVHCS- MISSING DIMENSIONS TO AUTO DOORS AT CANOPY RFI 2299 |
| Mod SA822· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-20 | +$1,249 | $930,355,770 | SLVHCS- PROVIDE RELOCATION FOR CARD READER AT DOOR 2H-CO8 THAT IS LOCATED ON THE SECOND FLOOR OF OUTPATIENT IN… |
| Mod SA761· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-24 | +$52,000 | $930,407,770 | SLVHCS- PROVIDE ALTERNATE ROOFING PENETRATION RFI 3369 |
| Mod CO09N· CHANGE ORDER | 2015-11-25 | +$4,500,000 | $934,907,770 | SLVHCS- ELECTRICAL CHANGES TO ORAL SURGERY, MCR AND BULLETIN 29 |
| Mod SA781· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-30 | +$16,072 | $934,923,842 | SLVHCS- CORNER GUARDS MULTIPLE BUILDINGS |
| Mod SA811· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-30 | +$3,322 | $934,927,164 | SLVHCS- ADD J2 PARTITION ROOM 2E137 AT THE ELECTRICAL PANEL DNT BUILDING. |
| Mod SA812· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-30 | −$17,576 | $934,909,588 | SLVHCS- REVISION TO DIX BLDG PER BULLETIN 19 DECREASE IN CONTRACT PRICE |
| Mod SA814· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-30 | +$8,084 | $934,917,672 | SLVHCS- PROVIDE SIGNAGE CHANGES IN INPATIENT BLDG 1 BLDG 4&BLDG 5 AND CEP BLDG 7 RFP 174 |
| Mod SA816· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-30 | +$14,670 | $934,932,342 | SLVHCS- ADD RESINOUS BASE IN LIEU OF RUBBER BASE TO LOCATIONS PER RESPONSE TO RFI 6137. |
| Mod SA817· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-30 | +$10,986 | $934,943,328 | SLVHCS- REPLACE LINTEL AND INFILL BRICK AT ELEVATOR SHAFT A1 LEVEL 3 OF DIXIE BUILDING. |
| Mod SA824· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-30 | +$36,123 | $934,979,451 | SLVHCS- METAL FINS PAN AM |
| Mod CO09R· CHANGE ORDER | 2015-12-01 | +$7,000 | $934,986,451 | SLVHCS- SWITCHES FOR GARAGES |
| Mod SA815· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-01 | +$10,577 | $934,997,028 | SLVHCS- DEFINITIZATION MODIFICATION TO PURCHASE ADDITIONAL REPLACEMENT BRICKS AT DIXIE BUILDING 8 |
| Mod SA819· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-01 | +$44,955 | $935,041,983 | SLVHCS- ADDITION OF POWER AND LOW VOLTAGE DEVICES TO ACCOMMODATE ROOM CHANGE. |
| Mod SA794· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-02 | +$304,965 | $935,346,948 | SLVHCS- PROVIDE REVISIONS TO CARRIAGE WAY DIXIE BLDG. |
| Mod SA802· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-02 | +$1,339 | $935,348,287 | SLVHCS- PROVIDE FOR A DRAIN AS INDICATED IN DETAIL 2L525G THAT WAS OMITTED IN THE CIVIL ENGINEERING DRAWINGS. |
| Mod SA823· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-02 | +$1,570 | $935,349,857 | SLVHCS- PROVIDE REVISIONS TO CORRIDOR OUTPATIENT BLDG |
| Mod SA825· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-02 | +$992 | $935,350,849 | SLVHCS- RELOCATE ELECTRICAL OUTLET ROOM 2E182 DNT |
| Mod SA826· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-02 | +$983 | $935,351,832 | SLVHCS- INSTALL HVAC/HEATERS IN GAR BUILDING |
| Mod SA695· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-03 | +$8,120 | $935,359,952 | SLVHCS- PROVIDE AUTOMATIC SLIDING DOORS FOR DOOR 4D131.2&2 PUSH PLATES |
| Mod SA849· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-03 | −$94,156 | $935,265,796 | SLVHCS- REVISED PAINT COLORS |
| Mod CO09L· CHANGE ORDER | 2015-12-04 | +$475,000 | $935,740,796 | DNT MODIFY OPERATING ROOM INTEGRATED CONDUIT |
| Mod CO09S· CHANGE ORDER | 2015-12-04 | +$35,000 | $935,775,796 | SLVHCS- FIRE STOPPING AT DIXIE |
| Mod SA747· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-04 | +$12,538 | $935,788,334 | SLVHCS- REFABRICATE AND INSTALL PAN AM CONNECTOR STEEL. |
| Mod SA827· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-04 | +$6,082 | $935,794,416 | SLVHCS- PROVIDE FLOOR FINISH CHANGES CEP- SA827 DEFINITIZES CO-07I |
| Mod SA846· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-04 | +$1,284 | $935,795,700 | SLVHCS- PROVIDE ADDITIONAL LIGHT SWITCH TO RETAIL ROOM 1E129B DNT |
| Mod SA847· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-04 | +$15,145 | $935,810,845 | SLVHCS- PROVIDE ELECTRICAL CIRCUITS AT DOOR HARDWARE CHANGES |
| Mod SA848· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-04 | +$23,507 | $935,834,352 | SLVHCS- PROVIDE A DUPLEX AIR COMPRESSOR WITH STORAGE TANK |
| Mod SA850· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-04 | +$51,019 | $935,885,371 | SLVHCS- REVISIONS TO PANELS IN CEP |
| Mod SA851· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-04 | +$2,960 | $935,888,331 | SLVHCS- ADDED FTG2C LIGHT FIXTURE |
| Mod SA807· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-07 | +$2,362 | $935,890,693 | SLVHCS- INSTALL COLUMN WRAP AT H/3 LINE IN THE INP BUILDING. |
| Mod SA820· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-07 | +$3,175 | $935,893,868 | SLVHCS- PROVIDE BLOCKING AT CURTAIN WALL IN THE OUTPATIENT BLDG. |
| Mod SA829· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-07 | +$132,706 | $936,026,574 | SLVHCS- INSTALL PARGE COAT AND CRYSTALLINE WATERPROOFING AT EXISTING MASONRY WALLS BEHIND BLAST STEEL OF THE D… |
| Mod SA830· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-07 | +$7,459 | $936,034,033 | SLVHCS- ADDITION OF 22 GA SHEET METAL TO APPLY THE APPROPRIATE SUBSTRATE FOR THE AIR WEATHER BARRIER AS PER RE… |
| Mod SA845· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-07 | +$6,487 | $936,040,520 | SLVHCS- ADD BREAK METAL COVER AT CURTAIN WALL OF THREE OPENINGS AT DIXIE BUILDING. |
| Mod SA859· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-07 | +$3,979 | $936,044,499 | SLVHCS- PROVIDE TELECOM REQUIREMENTS FOR 2 ROOMS IN THE DNT BUILDING. |
| Mod SA860· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-07 | +$2,790 | $936,047,289 | SLVHCS- IPTV CABLE ROUTING |
| Mod SA863· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-07 | +$9,484 | $936,056,773 | SLVHCS- REVISE DOOR HARDWARE FOR OPENINGS IN DNT BUILDING. |
| Mod SA866· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-07 | −$2,002 | $936,054,771 | SLVHCS- DELETE OUTLETS DNT |
| Mod SA795· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-08 | +$869 | $936,055,640 | SLVHCS- RELOCATE WALL PHONE IN 2E130 AND 2E132 WITHIN THE DNT BUILDING |
| Mod SA842· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-08 | +$308,955 | $936,364,595 | SLVHCS- STOREFRONT LOCATION ADJUSTMENT |
| Mod SA843· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-08 | +$11,569 | $936,376,164 | SLVHCS- ADDITIONAL STEEL FOR CONNECTOR CONCOURSE K AND L |
| Mod SA853· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-08 | +$51,853 | $936,428,017 | SLVHCS- PROVIDE A SHAFT WALL SHAFT 3.5N145 CENTRAL ENERGY PLANT |
| Mod SA857· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-08 | +$11,673 | $936,439,690 | SLVHCS- INTERIOR COILING DOOR POWER REVISIONS |
| Mod SA861· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-08 | +$3,868 | $936,443,558 | SLVHCS- ADDED FIXTURE AND CONTROL FOR ELEVATOR MACHINE ROOM L 8/9 OUT |
| Mod SA862· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-08 | +$25,016 | $936,468,574 | SLVHCS- ADD WATER SUPPLY AND POWER SUPPLY TO 14 WATER PURIFICATION UNITS ON 2ND AND 3RD FLOOR LABS AT DIXIE BU… |
| Mod SA864· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-08 | +$4,357 | $936,472,931 | SLVHCS- ADDITIONAL STANDARD OUTLETS DNT |
| Mod SA870· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-08 | +$78,000 | $936,550,931 | SLVHCS- ADD STEEL PLATES AT WINDOWS AT DIXIE BUILDING 8 |
| Mod SA873· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-08 | +$8,723 | $936,559,654 | SLVHCS- FURNITURE FEEDS DNT |
| Mod SA874· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-08 | +$18,860 | $936,578,514 | SLVHCS- ADDITION OF DRYWALL RETURNS AT WINDOWS |
| Mod SA875· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-08 | +$2,421 | $936,580,935 | SLVHCS- ADDITION OF SADDLE BY THE PARAPET AND CURTAIN WALL |
| Mod CO09P· CHANGE ORDER | 2015-12-09 | +$438,460 | $937,019,395 | SLVHCS- BULLETIN 15C - VARIOUS ELECTRICAL CHANGES |
| Mod SA868· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-09 | +$24,230 | $937,043,625 | SLVHCS- SURGICAL LIFT BOOM SUPPORT - BULLETIN 29 |
| Mod SA872· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-09 | +$17,068 | $937,060,693 | SLVHCS- NATURAL GAS OUTLETS IN DENTAL TREATMENT ROOMS |
| Mod SA876· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-09 | +$11,017 | $937,071,710 | SLVHCS- ROUTE CHILLED WATER RETURN AND SUPPLY TO SIEMENS BIOGRAPH MCT-S PET SCANNER |
| Mod SA879· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-09 | +$6,682 | $937,078,392 | SLVHCS- ADD FIRE SAFING SHAFT WALL FOR 1N102, STN-1 AND STN-2, CEP BUILDING 7 |
| Mod SA880· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-09 | +$2,007 | $937,080,399 | SLVHCS- INSTALL BACKING FOR EXERCISE PULLEY SYSTEM. |
| Mod SA712· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-10 | +$152,687 | $937,233,086 | SLVHCS- METAL PANEL SUBCONTRACTOR REPLACEMENT AT DIXIE BUILDING 8 |
| Mod SA821· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-10 | +$128,653 | $937,361,739 | SLVHCS- CURTAIN WALL STEEL |
| Mod SA844· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-10 | +$3,884 | $937,365,623 | SLVHCS- RELOCATE STAIR STJ-2 IN THE OUTPATIENT BUILDING. |
| Mod SA852· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-10 | +$6,067 | $937,371,690 | SLVHCS- PROVIDE ADDITIONAL SECURITY CAMERA DIXIE BLDG 8 |
| Mod SA854· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-10 | +$22,975 | $937,394,665 | SLVHCS- INCORPORATE RAMP DETAILS PER RFI 2609&2609.1 |
| Mod SA855· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-10 | +$2,584 | $937,397,249 | SLVHCS- PARKING GARAGE PROCESS TANK HOLLOW CORE BEARING PLATE |
| Mod SA856· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-10 | +$28,137 | $937,425,386 | SLVHCS- PROVIDE POWER REQUIREMENTS FOR BUBBLE DAMPERS DNT MCR |
| Mod SA858· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-10 | +$71,531 | $937,496,917 | SLVHCS- PROVIDE CURTAIN WALL STEEL SUPPROTS DNT 02-A5, 02-XA, 02-12&02-13 |
| Mod SA867· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-10 | +$10,996 | $937,507,913 | SLVHCS- INCORPORATE DETAILS PROVIDED IN NOURISHMENT ROOMS 2M091,2M117&3M065 |
| Mod SA884· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-10 | +$3,163 | $937,511,076 | SLVHCS- SUPPORT ANGLE AND STIFFENER TO SUPPORT FEEDER |
| Mod SA831· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-14 | +$223,260 | $937,734,336 | SLVHCS- DOOR HARDWARE CHANGES CARD READER |
| Mod SA881· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-14 | +$41,850 | $937,776,186 | SLVHCS- INSTALL ANCHORS FOR THE PHILIPS FLOOR PLATES |
| Mod SA882· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-14 | +$20,653 | $937,796,839 | SLVHCS- POWER TO PNEUMATIC TUBE |
| Mod SA883· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-14 | +$24,802 | $937,821,641 | SLVHCS- BULLETIN 29 PATCHING AND GROUTING OF OLD DUCT - DNT |
| Mod SA886· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-14 | +$9,290 | $937,830,931 | SLVHCS- SITE LIGHTING FEED FROM CEP |
| Mod SA887· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-14 | +$12,059 | $937,842,990 | SLVHCS- WINDOW OPENING REVISIONS @ DIXIE |
| Mod SA889· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-14 | +$11,695 | $937,854,685 | SLVHCS- ISO VALVES TO DEFINITIZE CO-09E |
| Mod SA833· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-16 | +$21,740 | $937,876,425 | SLVHCS- PANELS FOR SCREEN WALLS - TLR |
| Mod SA834· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-16 | +$25,141 | $937,901,566 | SLVHCS- PROVIDE ALL LABOR AND EQUIPMENT TO ADD MISSING CHANNEL SCREED, BENT PLATE AND STUD WALL - DNT |
| Mod SA890· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-16 | +$32,407 | $937,933,973 | SLVHCS- CURB DETAIL&UNDER SLAB BARRIER - DNT |
| Mod SA893· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-16 | +$19,789 | $937,953,762 | SLVHCS- PROVIDE LOW VOLTAGE CHANGE PER RFI 3340&3340.1 |
| Mod SA895· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-16 | −$96,143 | $937,857,619 | SLVHCS- CREDIT FOR ARCHITECTURAL FINISHES |
| Mod SA896· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-16 | +$8,590 | $937,866,209 | SLVHCS- ADDED CORNER GUARDS AT SQUARE COLUMNS |
| Mod SA898· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-16 | +$5,001 | $937,871,210 | SLVHCS- ADDITION OF WALL AND FLOOR EXPANSION JOINT AT CONCOURSE |
| Mod SA899· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-16 | +$14,228 | $937,885,438 | SLVHCS- ADDITION OF ALL HYDRANTS ON ROOF LEVELS OF TLR |
| Mod CO09T· CHANGE ORDER | 2015-12-18 | +$7,500 | $937,892,938 | SLVHCS- EXPANSION JOINTS IN GARAGE |
| Mod CO09U· CHANGE ORDER | 2015-12-18 | +$100,000 | $937,992,938 | SLVHCS- ADDITIONAL FUEL VALVES AND CONTROLS |
| Mod SA751· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-18 | +$22,678 | $938,015,616 | SLVHCS- CEP INCREASED BOILER NATURAL GAS VENT |
| Mod SA787· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-18 | +$163,813 | $938,179,429 | SLVHCS- FIRE SPRINKLER IN GARAGE ELEVATOR |
| Mod SA832· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-18 | +$13,227 | $938,192,656 | SLVHCS- WELD BRICK SHELF TO BE CONTINUOUS ABOVE CURTAINWALL TLR |
| Mod SA835· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-18 | +$13,490 | $938,206,146 | SLVHCS- ADDITIONAL POWER&LIGHTING IN AREA D OF DNT |
| Mod SA836· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-18 | +$1,284 | $938,207,430 | SLVHCS- RELOCATE WIRELESS WALL PHONE DNT |
| Mod SA837· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-18 | +$14,079 | $938,221,509 | SLVHCS- FLASHING AROUND EXTERIOR DOORS DNT |
| Mod SA838· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-18 | +$4,572 | $938,226,081 | SLVHCS- FURR WALLS IN DNT ROOMS |
| Mod SA839· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-18 | +$15,342 | $938,241,423 | SLVHCS- MODIFICATION TO ACCOMMODATE TRANSITION DRAWERS |
| Mod SA840· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-18 | +$8,848 | $938,250,271 | SLVHCS- SECURITY MESH IN TELECOM ROOMS |
| Mod SA865· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-18 | +$11,611 | $938,261,882 | SLVHCS- CUT AND ADD CONCRETE SLABS AT THE SLAB EDGE IN THE ELEVATED COURTYARDS TO ALLOW FOR UNIFORMED FINISH A… |
| Mod SA869· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-18 | +$4,164 | $938,266,046 | SLVHCS- PROVIDE AFTER COOLING PIPING FROM EITHER WATER SOURCE, THE PROCESS WATER SERVING THE COOLING TOWER OR… |
| Mod SA871· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-18 | +$34,709 | $938,300,755 | SLVHCS- ADDITION OF DATA ROUGH-IN |
| Mod SA877· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-18 | −$14,270 | $938,286,485 | SLVHCS- PRE-OP- RECOVERY ROOM CASEWORK AND LAYOUT CHANGES |
| Mod SA878· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-18 | +$7,513 | $938,293,998 | SLVHCS- ADDITION OF HANDRAIL POSTS PER THE RESPONSE TO RFI 6843. |
| Mod SA888· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-18 | +$4,171 | $938,298,169 | SLVHCS- ADDITION OF OUTLETS THAT WERE OMITTED FROM THE CONTRACT DOCUMENTS. |
| Mod SA891· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-18 | +$23,004 | $938,321,173 | SLVHCS- ADD VERTICAL BRAKE METAL CLOSURE AND JAMBS AT EAST AND WEST ELEVATIONS. |
| Mod SA892· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-18 | +$3,938 | $938,325,111 | SLVHCS- DUE TO SECURITY AND SAFETY ISSUES, ADDITIONAL RAILING AND GATE SHALL BE ADDED TO MENTAL HEALTH COURTYA… |
| Mod SA894· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-18 | +$51,958 | $938,377,069 | SLVHCS- VARIOUS VE&ELECTRICAL CHANGES BULLETIN 15C - DEFINITIZES CO-04V&CO-09P |
| Mod SA897· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-18 | +$31,968 | $938,409,037 | SLVHCS- PROVIDE ADDITIONAL MEP COMPONENTS FOR STERILIZERS |
| Mod SA902· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-18 | +$50,854 | $938,459,891 | SLVHCS- PHARMACY PNEUMATIC TUBE RELOCATION |
| Mod SA903· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-18 | +$1,846 | $938,461,737 | SLVHCS- WALL REPAIR&PAINT PER VA FFP D-129 |
| Mod SA905· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-18 | +$20,586 | $938,482,323 | SLVHCS- UTILITY DUCT BANK - SITE WORK |
| Mod SA910· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-18 | +$52,174 | $938,534,497 | SLVHCS- ADDED POWER CIRCUITS TO 13 DAMPERS - CEP |
| Mod CO09V· CHANGE ORDER | 2015-12-29 | +$68,000 | $938,602,497 | SLVHCS- DEMO EXISTING MMA |
| Mod SA885· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-29 | +$25,045 | $938,627,542 | SLVHCS- CHANGE THE SWING OF THE CASHIER DOOR. |
| Mod SA906· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-29 | +$5,808 | $938,633,350 | SLVHCS- ADDITION OF 16 GAUGE METAL SLEEVES. |
| Mod SA908· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-29 | −$6,352 | $938,626,998 | SLVHCS- REDUCTION OF COPPER SHEATHING IN MRI ROOM FROM 7OZ TO 3OZ. |
| Mod SA909· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-29 | +$7,890 | $938,634,888 | SLVHCS- PROVIDE CIRCUITS FOR PANEL OUTPATIENT BUILDING. |
| Mod CO09W· CHANGE ORDER | 2015-12-30 | +$0 | $938,634,888 | SLVHCS- DIXIE TIME EXTENSION |
| Mod SA900· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-04 | +$2,936 | $938,637,824 | SLVHCS- PARKING GARAGE PROCESS TANK HOLLOW CORE BEARING PLATE |
| Mod SA901· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-04 | +$19,051 | $938,656,875 | SLVHCS- INCREASE SIZE OF THE FLOOR HATCH AND INSTALL AN ACCESS LADDER IN CEP |
| Mod SA904· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-04 | +$4,146 | $938,661,021 | SLVHCS- PROVIDE WALL PHONES AT DNT |
| Mod SA907· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-04 | +$159,292 | $938,820,313 | SLVHCS- MODIFY WINDOW JAMBS OF DIXIE BLDG |
| Mod SA912· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-04 | +$5,065 | $938,825,378 | SLVHCS- REVISE ELECTRICAL FLOOR BOXES DIXIE BLDG 8 |
| Mod SA913· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-04 | +$10,753 | $938,836,131 | SLVHCS- DEFLECTION CLIP ADDED AT CONCOURSE/TLR SKIN METAL PANEL |
| Mod SA914· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-04 | +$37,831 | $938,873,962 | SLVHCS- PROVIDE SECURITY HARDWARE REVISIONS, SHAFT WALL CORRECTIONS AND CHAPEL ROOF ADDITIONS BASED ON BULLETI… |
| Mod SA915· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-04 | −$801 | $938,873,161 | SLVHCS- DELETE FIRE ALARM PULL STATIONS IN TLR COURTYARD. |
| Mod SA916· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-04 | +$5,651 | $938,878,812 | SLVHCS- EDGE OF CURB TRANSITION MODIFICATION AT METAL PANEL DNT |
| Mod SA917· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-04 | +$27,759 | $938,906,571 | SLVHCS- RELOCATE OUTLETS IN ROOM 4F109 AND CATHETER CABINETS CHANGES IN DNT |
| Mod SA919· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-04 | +$3,691 | $938,910,262 | SLVHCS- MODIFY THE KICKER HEIGHT IN A1 TO AVOID CONFLICT WITH THE WOOD CEILING. |
| Mod SA921· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-04 | +$792 | $938,911,054 | SLVHCS- REVISION OF ELECTRICAL PANELS AT DIXIE |
| Mod SA925· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-04 | +$18,312 | $938,929,366 | SLVHCS- ADD SLAB EDGE THAT'S PROTRUDING - DNT |
| Mod CO09X· CHANGE ORDER | 2016-01-05 | +$5,100 | $938,934,466 | SLVHCS- DIXIE VIRTUAL MOCKUP CHANGES |
| Mod CO09Z· CHANGE ORDER | 2016-01-07 | +$1,700 | $938,936,166 | SLVHCS- DNT FLOOR SLOPPING |
| Mod SA922· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-11 | +$20,463 | $938,956,629 | SLVHCS- ADD FLOOR DRAINS FOR REFRIGERATORS CONDENSATE LINES |
| Mod SA923· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-11 | +$41,066 | $938,997,695 | SLVHCS- CHANGE TIMBER PILES TO PIPE AT CANAL STREET |
| Mod SA928· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-11 | +$7,967 | $939,005,662 | SLVHCS- INSTALL ADDITIONAL OUTLETS&PVC CONDUITIN ROOM 4D147 |
| Mod SA929· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-11 | +$10,528 | $939,016,190 | SLVHCS- MODIFY COMPONENTS&CABINETS TLR |
| Mod SA930· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-11 | +$7,198 | $939,023,388 | SLVHCS- ADD DRYWALL TO ACCOMMODATE DOOR FRAMES TLR |
| Mod SA932· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-11 | +$6,207 | $939,029,595 | SLVHCS- RELOCATE OUTLET, CHANGE DOOR SIZE, AND HARDWARE IN MRI ROOMS PER THE RESPONSE TO RFI 5644 |
| Mod SA934· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-11 | +$3,987 | $939,033,582 | SLVHCS- PROVIDE INTERIOR GYPSUM BOARD AT CORRIDOR B 3M001, 3M041 AND 3M078, TLR (BUILDING 6), AS PER THE VAS R… |
| Mod SA935· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-11 | +$14,429 | $939,048,011 | SLVHCS- BUILDING 2 KITCHEN PANEL SIZE DNT |
| Mod SA911· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-12 | +$13,250 | $939,061,261 | SLVHCS- ELEVATOR HOISTWAY IN OUT |
| Mod SA918· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-13 | +$22,870 | $939,084,131 | SLVHCS- DUE TO ISSUE WITH FLOOR MATERIAL TRANSITIONING, PROVIDE ANODIZED ALUMINUM STRIP AT INP. |
| Mod SA920· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-13 | +$168,000 | $939,252,131 | SLVHCS- PROVIDE ADDITIONAL MISCELLANEOUS ANGLE STEEL FOR STABILITY FOR EQUIPMENT ALONG THE MONORAIL |
| Mod SA926· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-13 | +$2,232 | $939,254,363 | SLVHCS- MODIFY WIRELESS ROUTER IN ROOM 2D162 |
| Mod SA931· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-13 | +$5,462 | $939,259,825 | SLVHCS- PROVIDE WATER TO VV EQUIPMENT ANL0904 |
| Mod SA933· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-13 | +$58,634 | $939,318,459 | SLVHCS- PROVIDE REVISED FLOOR SLOPING FOR THE TYPICAL AND NON TYPICAL TLR PATIENT RESTROOMS. |
| Mod SA936· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-13 | +$52,851 | $939,371,310 | SLVHCS- PROVIDE ALL ELECTRICAL&MECHANICAL TO SWAP TLR RMS 3M007A WITH 3M008 |
| Mod SA937· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-13 | +$5,572 | $939,376,882 | SLVHCS- TRANSITIONS FOR ELEVATORS JAMBS @ PUBLIC ELEVATOR LOBBIES TLR |
| Mod SA938· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-13 | +$17,078 | $939,393,960 | SLVHCS- PROVIDE J_4 PARTITION TO CONCEAL THE EXPOSED FIRE SAFING TO COVER EXPOSED FIRE SAFING BETWEEN THE SLAB… |
| Mod SA940· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-13 | −$16,466 | $939,377,494 | SLVHCS- PROVIDE COLD FORMED FRAMING FROM BUILDING 1 AND BUILDING 2. |
| Mod SA924· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-15 | +$47,500 | $939,424,994 | SLVHCS- BIO FUME HOOD FILTER DNT |
| Mod SA927· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-15 | +$30,100 | $939,455,094 | SLVHCS- INSTALL SUPPORT STEEL @ NORTH&SOUTH WALLS OF LOADING DOCK ROOF |
| Mod SA941· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-15 | +$3,398 | $939,458,492 | SLVHCS- RELOCATE FLUSH VALVE SENSOR TO MEET ADA REQUIREMENTS AND NOT TO CONFLICT WITH PLUMBING AND TUBE STEEL. |
| Mod SA942· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-15 | +$7,679 | $939,466,171 | SLVHCS- REVISED EXHAUST DUCTWORK FOR FUME HOOD IN ROOM 2P152B AT SECOND FLOORS OF DIXIE BUILDING 8 |
| Mod SA943· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-15 | +$7,503 | $939,473,674 | SLVHCS- REFRAME CHASE WALL LVLS 3H&4H |
| Mod SA944· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-15 | +$1,997 | $939,475,671 | SLVHCS- RELOCATION OF FIRE ALARM ANNUNCIATION PANEL ON LEVEL 1 AREA H OUT |
| Mod SA945· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-15 | +$6,865 | $939,482,536 | SLVHCS- ADDED CONCRETE CURB AT EAST SIDE LEVEL 2 |
| Mod SA946· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-15 | +$4,892 | $939,487,428 | SLVHCS- REWORK WOOD PANEL SOFFIT TRANSITION TO WINDOW MULLION LEVEL 2 |
| Mod SA947· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-15 | +$4,142 | $939,491,570 | SLVHCS- RELOCATE LIGHT SWITCHES AT CAREGIVER DESK ON LEVEL 2 AND 3 TO AVOID CONFLICT WITH CASEWORK |
| Mod SA948· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-15 | +$6,892 | $939,498,462 | SLVHCS- FROZEN LAB SINK IN ROOM 3D166 DNT |
| Mod SA950· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-15 | +$42,031 | $939,540,493 | SLVHCS- PROVIDE AN ENCLOSED SPACE AT OUTPATIENT LVL 1 SERVICE BAY FOR RADIO CONTROL EQUIPMENT. |
| Mod SA951· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-15 | +$6,637 | $939,547,130 | SLVHCS- PARKING POWER, DATA, BACKING&CABLE TO STAFF LOUNGE |
| Mod SA953· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-15 | +$2,585 | $939,549,715 | SLVHCS- AREA H MECHANICAL SHAFT CHANGES |
| Mod SA954· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-15 | +$17,327 | $939,567,042 | SLVHCS- ADD LIGHT FIXTURES AND OUTLETS TLR |
| Mod SA949· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-19 | +$6,577 | $939,573,619 | SLVHCS- DELETE CABINETS, REROUTE VENT, ADD WALL FURRING LAUNDRY RMS IN TLR |
| Mod SA955· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-19 | +$54,618 | $939,628,237 | SLVHCS- INCORPORATE STEEL CHANGES |
| Mod SA956· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-19 | +$2,564 | $939,630,801 | SLVHCS- ADD LIGHT FIXTURES&SWITCHING |
| Mod SA959· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-19 | +$7,343 | $939,638,144 | SLVHCS- INCORPORATE FLOOD WALL SHAFT AROUND AT ELEVATOR MS-03 |
| Mod SA960· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-19 | +$3,550 | $939,641,694 | SLVHCS- INSTALL METAL PANEL OVER SW GRADE BEAM OF TLR |
| Mod SA710· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-25 | +$3,476 | $939,645,170 | SLVHCS- PROVIDE CUSTOM FLASHING PIECE NEEDED TO EXTEND PAST THE CONDUIT HOUSING IN THE CEP BUILDING. |
| Mod SA939· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-25 | +$240,000 | $939,885,170 | SLVHCS- DEMO LINE REBUILD, UNITED, DIX, EWP 9A |
| Mod SA957· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-25 | +$17,881 | $939,903,051 | SLVHCS- INSTALL NEW AND REWORK EXISTING DUCT TO REPLACE CONTROL DAMPERS/MONITORS THAT WERE ADDED TO THE CONTRA… |
| Mod SA958· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-25 | +$8,135 | $939,911,186 | SLVHCS- REMOVE STEEL KICKERS AND REPLACE WITH STEEL PLATES TO AVOID CONFLICT WITH SOFFIT INSTALLATION. |
| Mod SA963· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-25 | +$11,087 | $939,922,273 | SLVHCS- RELOCATE FIRE ALARM DEVICES TLR |
| Mod SA964· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-25 | +$5,797 | $939,928,070 | SLVHCS- ADD SINGLE LEAF DOOR&ASSOCIATED HARDWARE TO SHAFT TLR |
| Mod SA965· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-25 | +$1,132 | $939,929,202 | SLVHCS- SLOPE FLOOR @ DNT RM 3D150B SHOWER |
| Mod SA967· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-25 | +$5,359 | $939,934,561 | SLVHCS- INSTALL REVISED RAIL DESIGN TLR |
| Mod SA970· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-25 | +$2,180 | $939,936,741 | SLVHCS- ADD 2 LIGHT FIXTURES RM 3M031 |
| Mod SA961· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-26 | +$24,086 | $939,960,827 | SLVHCS- RE-FLOOR FLOOR JOIST AND BEAM AT DIXIE |
| Mod SA962· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-26 | +$24,086 | $939,984,913 | SLVHCS- INSTALLATION OF CONTROL DAMPERS DNT |
| Mod SA966· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-26 | +$2,804 | $939,987,717 | SLVHCS- LIGHTING REQUIREMENTS FOR SE RISER - TLR |
| Mod CO10A· CHANGE ORDER | 2016-01-29 | +$10,000 | $939,997,717 | SLVHCS- DNT MENTAL HEALTH SEALANT IN BEDROOMS AND BATHROOMS |
| Mod CO10B· CHANGE ORDER | 2016-01-29 | +$20,000 | $940,017,717 | SLVHCS- DENTAL EQUIPMENT UTILITY REVISIONS OUT |
| Mod SA968· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-29 | +$14,108 | $940,031,825 | SLVHCS- ADDITION OF STUDS&DRYWALL LEVEL 3 OUT |
| Mod SA969· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-29 | +$2,790 | $940,034,615 | SLVHCS- LIGHTING REQUIREMENTS IN LEVEL 2 NORTHEAST SHAFT TLR |
| Mod SA971· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-29 | +$4,516 | $940,039,131 | SLVHCS- FIXTURE COUNT DISCREPANCY DNT |
| Mod SA972· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-29 | −$2,936 | $940,036,195 | SLVHCS- DEOBLIGATION OF SA-900/CO-07Q |
| Mod SA973· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-29 | +$5,651 | $940,041,846 | SLVHCS- DEFINITIZE CO-07Q |
| Mod SA975· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-29 | +$1,627 | $940,043,473 | SLVHCS- PROSTHETIC OVEN MOTION TLR |
| Mod SA976· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-29 | +$7,200 | $940,050,673 | SLVHCS- PROVIDE SUPPORT STEEL FOR CURTAIN WALL HEADER AS PER RFI 7072 AT TLR |
| Mod SA977· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-29 | +$11,903 | $940,062,576 | SLVHCS- FURNISH AND INSTALL 60 (277) VOLT TO 24 VOLT LIGHTING CONTROL RELAYS AS PER THE RESPONSE TO RFI 7060 |
| Mod SA980· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-29 | +$22,783 | $940,085,359 | SLVHCS- TRANSITION CEILING TRIM DNT |
| Mod CO10C· CHANGE ORDER | 2016-02-02 | +$26,000 | $940,111,359 | SLVHCS- 4TH FLOOR KITCHEN GREASE TRAP |
| Mod CO10D· CHANGE ORDER | 2016-02-02 | +$18,800 | $940,130,159 | SLVHCS- LEAD PAINT ABATEMENT FROM STEEL BEAMS |
| Mod SA981· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-02 | +$10,615 | $940,140,774 | SLVHCS- OUTPAITIENT MOCK-UP ROOM CHANGES |
| Mod CO10E· CHANGE ORDER | 2016-02-04 | +$197,000 | $940,337,774 | SLVHCS- REPAIR OF VERTICAL CRACK IN WALL AT DIXIE |
| Mod CO10G· CHANGE ORDER | 2016-02-04 | +$74,000 | $940,411,774 | SLVHCS- HVAC UPGRADE COMMAND CENTER DNT |
| Mod SA952· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-04 | +$1,025 | $940,412,799 | SLVHCS- PROVIDE CEILING GRID AT DNT TO ACCOMMODATE OVERHEAD LIGHTS. |
| Mod SA974· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-04 | +$2,555 | $940,415,354 | CHANGE SOURTH SURFACE MOUNT LIGHT FIXTURE FCZ2B TO FCD2D REROUTE PHOTOCELL CONTROL |
| Mod SA978· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-04 | +$2,181 | $940,417,535 | SLVHCS- NOTCH WINDOW SILLS LEVEL 2. |
| Mod SA982· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-04 | +$24,796 | $940,442,331 | SLVHCS- PROVIDE PAINTED STRUCTURE ABOVE LINEAR WOOD GRILLS, ADDITIONAL BREAK METAL AND COLOR CODED TO THE MULL… |
| Mod SA983· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-04 | +$8,744 | $940,451,075 | SLVHCS- RELOCATE THE 4 FIRE ALARMS STROBES AND ONE PULL STATION IN ROOM 1M168, TLR GYM |
| Mod SA984· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-04 | +$2,159 | $940,453,234 | SLVHCS- CHANGE STORE FRONT FLOOR STOPS TO OH FLOOR STOPS. |
| Mod SA985· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-04 | +$12,719 | $940,465,953 | SLVHCS- RELOCATE DUCTWORK AT DNT SCR ROOMS NOT TO INTERFERE WITH CABLE TRAYS. |
| Mod SA987· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-04 | +$20,476 | $940,486,429 | PROVIDE PARTITION TYPE P24A RATED SHAFT WALL @ M3 INTERSECTION TLR WATER TANK |
| Mod SA988· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-04 | +$42,401 | $940,528,830 | PROVIDE SLAB PENETRATIONS @ DNT LEVEL 5&6 |
| Mod SA1000· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-10 | +$1,727 | $940,530,557 | SLVCHS - PROVIDE 2 HOUR SHAFT WALL FROM 3A302 AND 4L100 |
| Mod SA1001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-10 | +$34,502 | $940,565,059 | SLVCHS - LAB AIR SYSTEM CHANGES |
| Mod SA1002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-10 | +$1,339 | $940,566,398 | SLVCHS - PROVIDE METAL BREAK AT L4 PARAPET SECTION ON WEST ELEVATION WINDOWS |
| Mod SA1003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-10 | +$3,600 | $940,569,998 | SLVCHS - PROVIDING AND INSTALLING MISCELLANEOUS STEEL SUPPORT FOR HOIST LIFT IN ROOM 1D116 BED REPAIR WITHIN D… |
| Mod SA990· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-10 | +$6,774 | $940,576,772 | DELETE RETAINING WALL , ADD SECURITY STONES PLACEMENT TREE #12 |
| Mod SA991· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-10 | +$4,747 | $940,581,519 | SLVHCS- INSTALL TREMCO ETA ASSEMBLY |
| Mod SA992· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-10 | +$1,354 | $940,582,873 | PROVIDE 18INCH STARS IN LIEU OF 14INCH |
| Mod SA993· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-10 | +$11,665 | $940,594,538 | REVISE DOORS, FRAMES&HARDWARE |
| Mod SA995· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-10 | +$4,816 | $940,599,354 | ADD A CMU WALL AT THE TLR CONNECTOR TO THE CONCOURSE |
| Mod SA996· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-10 | +$18,236 | $940,617,590 | SLVCHS - RELOCATE STEAM SHUTOFF VALVES FOR THE MPR AND LPR AT DNT. |
| Mod SA997· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-10 | +$3,231 | $940,620,821 | SLVCHS - PROVIDE DATA DROP FOR POOL CHEMICAL CONTROLLER AT TLR POOL EQUIPMENT ROOM. |
| Mod SA998· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-10 | +$11,837 | $940,632,658 | SLVCHS - ADD OPEN HOLD DEVICES THAT WERE OMITTED. |
| Mod SA999· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-10 | +$9,854 | $940,642,512 | SLVCHS - REMOVE EXISTING PAVEMENT AND MANHOLES THAT WERE DESCRIBED IN AS-BUILTS AS REMOVED. |
| Mod CO10F· CHANGE ORDER | 2016-02-11 | +$254,000 | $940,896,512 | SLVHCS- TEMPORARY SHORING AND BRACING AT DIXIE |
| Mod SA1009· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-11 | +$32,103 | $940,928,615 | SLVCHS - PROVIDE FIRE PROTECTION OF THE TLR INTERIOR ATRIUM WINDOW. |
| Mod SA1010· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-11 | +$4,320 | $940,932,935 | SLVCHS - ADD FIRE DAMPERS TO CRAC UNIT ASSEMBLY IN DNT. |
| Mod SA1011· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-11 | +$2,645 | $940,935,580 | SLVCHS - RELOCATE THE PUSH PLATES AT 2B-CO1A. |
| Mod SA1004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-16 | +$84,451 | $941,020,031 | NOTCH STUDS FOR STRUCTURAL SLABS |
| Mod SA1008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-16 | +$1,216 | $941,021,247 | PROVIDE RECEPTACLE IN ROOM 2J280 |
| Mod SA989· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-16 | +$33,803 | $941,055,050 | SLVHCS- RELOCATE/SHIFT THE EXPANSION JOINTS - DNT |
| Mod SA994· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-16 | +$57,600 | $941,112,650 | SLVCHS - ADD SINKS TO BLOOD DRAW ROOMS IN OUTPATIENT |
| Mod SA1006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-22 | +$42,546 | $941,155,196 | SLVCHS - PROVIDE TLR CONCOURSE CONNECTOR OVERFLOW DRAIN AND REPLACE RD-A DRAIN WITH RD-I DRAIN. |
| Mod SA1012· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-22 | +$32,500 | $941,187,696 | SLVCHS - RELOCATE AT DNT THE FCU-7 TO LEVEL 6 OUTSIDE THE ELEVATOR MACHINE ROOM |
| Mod SA1013· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-22 | +$8,170 | $941,195,866 | SLVCHS - POWER TO THE CIRCULATION PUMPS ON LEVEL 5 IN INPATIENT |
| Mod SA1014· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-22 | +$30,796 | $941,226,662 | SLVCHS - PROVIDE MODIFICATIONS TO STAIR M1 DUE TO VERTICAL HEIGHT CLEARANCE ISSUES |
| Mod SA1015· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-22 | +$9,957 | $941,236,619 | SLVCHS - PROVIDE 12" CLEARANCE ON THE PUSH, LATCH SIDE OF THE DOOR AT TLR DOORS 2M007, 2M009, 3M009, AND 3M011 |
| Mod SA1016· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-22 | +$3,513 | $941,240,132 | SLVCHS - PROVIDE A D2/6A PARTITION AT TLR ATRIUM ROOM 1M019 |
| Mod SA1017· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-22 | +$14,571 | $941,254,703 | SLVCHS - INCREASE POWER FEEDS TO THE REFRIGERATORS |
| Mod SA986· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-22 | +$842 | $941,255,545 | SLVHCS- ADD J-4 PARTITION IN ROOM 1M156 IN ORDER FOR WASTE LINE TO STAY CONCEALED IN THE WALL. |
| Mod CO10H· CHANGE ORDER | 2016-02-23 | +$16,000 | $941,271,545 | SLVHCS- LOW PROFILE AUTOMATIC DOOR OPENER |
| Mod CO10I· CHANGE ORDER | 2016-02-23 | +$9,500 | $941,281,045 | SLVHCS- MECHANICAL CHANGES IN POOL EQUIPMENT ROOM TLR |
| Mod SA1019· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-23 | +$24,612 | $941,305,657 | SLVCHS - PROVIDE LIGHT CONTROLS AT THE HEADWALL UNITS FOR CEILING MOUNTED LIGHTS. |
| Mod SA1020· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-24 | +$49,579 | $941,355,236 | SLVCHS - TEMPORARY POWER AT DIXIE BUILDING 8 |
| Mod SA1022· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-24 | +$16,308 | $941,371,544 | PROVIDE CARD READER @ TLR 4TH FLOOR |
| Mod SA1023· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-24 | +$12,210 | $941,383,754 | SLVCHS - POWER SUPPLY FOR LAB HOOD IN DIXIE |
| Mod SA1027· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-24 | +$6,585 | $941,390,339 | CHANGE HARDWARE FOR DOORS |
| Mod SA1028· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-24 | +$6,332 | $941,396,671 | SLVCHS - LEVEL 1 H OPERABLE PARTITION POCKET DIMENSIONS |
| Mod SA1029· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-24 | +$2,878 | $941,399,549 | SLVCHS - ADD NEW POWER CIRCUITS AND RELOCATE EXISTING POWER CIRCUITS TO LOCATIONS IDENTIFIED IN RFI 3270R3 |
| Mod SA1021· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-29 | +$8,115 | $941,407,664 | SLVCHS - ADD BRICK SILL TO THE OLD DIXIE BUILDING 8 AS PER THE DESIGN |
| Mod SA1030· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-29 | +$4,854 | $941,412,518 | SLVCHS - REVISE STOREFRONT AT LEVEL 2 AISLE AND LOBBY OUTPATIENT BLDG. |
| Mod SA1031· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-29 | +$4,265 | $941,416,783 | SLVCHS - REWORK PARAPET WATERPROOFING |
| Mod SA1032· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-29 | +$21,056 | $941,437,839 | SLVCHS - PROVIDE POWER OUTLETS. |
| Mod SA1033· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-29 | +$49,930 | $941,487,769 | SLVCHS - PROVIDE DATA AND OUTLET CHANGES IN OUTPATIENT BLDG. |
| Mod SA1036· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-29 | +$1,139 | $941,488,908 | SLVCHS - PROVIDE MODIFIED BACKSPLASHES AT DNT SELECT LOCATIONS TO AVOID SCRIBING THE BACKSPLASH AROUND THE OUT… |
| Mod SA1037· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-29 | +$26,993 | $941,515,901 | SLVCHS - INCORPORATE CHANGES MADE TO TLR DESKS INCLUDED BUT NOT LIMITED TO ADDED/RELOCATED DATA, ADDED/RELOCAT… |
| Mod SA1038· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-29 | +$1,054 | $941,516,955 | SLVCHS - PROVIDE 120 VOLT POWER TO HOT WATER RECIRCULATION PUMP. |
| Mod SA1040· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-29 | +$3,350 | $941,520,305 | MODIFY THE SHADE POCKET LEVEL 1B INP |
| Mod SA1043· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-29 | +$21,201 | $941,541,506 | SLVCHS - PROVIDE CARD READERS AT SITE ORNAMENTAL FENCE GATES |
| Mod SA1045· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-29 | +$48,216 | $941,589,722 | SLVCHS - WHEELCHAIR STORAGE ROOM |
| Mod SA1048· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-29 | +$175,000 | $941,764,722 | SLVCHS - TERRACOTTA WALL COVERING DEMO AT DIXIE |
| Mod SA1050· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-29 | +$16,465 | $941,781,187 | SLVCHS - CONCOURSE PLASTER WALL REVEAL TRIM |
| Mod SA1051· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-29 | +$0 | $941,781,187 | SLVCHS - EXTEND PERIOD OF PERFORMANCE |
| Mod SA1024· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-01 | +$18,604 | $941,799,791 | PROVIDE METAL PANELS MP-2 DNT/PAN AM |
| Mod SA1026· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-01 | +$4,429 | $941,804,220 | SLVCHS - MODIFY SILL EXTENSIONS AROUND THE COURTYARD TLR LEVEL 2 AND 3. |
| Mod SA1041· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-01 | +$63,119 | $941,867,339 | SLVCHS - PROVIDE METAL PANS AT EXTERIOR SKIN HOSE BIBS AND OUTLETS |
| Mod SA1042· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-01 | +$1,290 | $941,868,629 | PROVIDE SE3COND DRYWALL BULKHEAD BLDG 5 GARAGE LOBBY LEVEL 2 |
| Mod SA1044· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-01 | +$1,010 | $941,869,639 | PROVIDE TWO 18" KV 70 STANDARDS&2 SHELF 12" 170E BRACKETS DNT |
| Mod SA1046· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-01 | +$5,866 | $941,875,505 | INSTALL SECONDARY PANEL FOR INPATIENT SERVICE ELEVATORS |
| Mod SA1053· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-01 | +$2,966 | $941,878,471 | SLVCHS - FILL IN MICROSCOPE PIT WITH GEOFOAM |
| Mod SA1018· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-02 | +$38,096 | $941,916,567 | SLVCHS - RE-ROUTE DOMESTIC WATER PIPING CEP |
| Mod SA1034· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-02 | +$189,073 | $942,105,640 | SLVCHS - T-STATS IN FIRE RATED WALLS. |
| Mod SA1052· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-02 | +$220,000 | $942,325,640 | SLVCHS - GRANDMASTER KEYING SYSTEM CAMPUS WIDE |
| Mod SA1049· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-07 | +$21,585 | $942,347,225 | SLVCHS - PROVIDE AND INSTALL A NEW SECURITY SYSTEM SERVER P2000 IN THE PAN AM |
| Mod SA1054· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-07 | +$2,623 | $942,349,848 | SLVCHS - PROVIDE DRYWALL BULKHEAD TO FILL THE GAP AT REFRIGERATOR DNT ROOM 4E108 |
| Mod SA1055· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-07 | +$2,598 | $942,352,446 | SLVCHS - BUILD WINDOW POCKETS TO DNT BUILDING 2 ROOMS 4E103A AND 5D136 |
| Mod SA1056· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-07 | +$2,207 | $942,354,653 | SLVCHS - PASS THROUGH WINDOW WITH COUNTERTOP |
| Mod SA1063· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-07 | +$870 | $942,355,523 | SLVCHS - ADDITION OF FURRED WALL TO RESOLVE CONFLICT OF WASTE PIPE IN STUD WALL. |
| Mod SA1064· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-07 | +$3,340 | $942,358,863 | SLVCHS - PROVIDE A CUSTOM TRIM PLATE AT THE FIRE VALVE CABINET INSTALLED AT LEVEL 1 PASSENGER ELEVATOR LOBBY I… |
| Mod SA1065· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-07 | +$2,000 | $942,360,863 | SLVCHS - PROVIDE ELECTRICAL, CASEWORK, PLUMBING AND WALL FINISH MODIFICATIONS TLR. |
| Mod SA1047· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-08 | +$1,471 | $942,362,334 | PROVIDE CAN LIGHTS PER LIGHTING PLAN 2DL104-E2 DNT |
| Mod SA1057· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-08 | +$8,005 | $942,370,339 | SLVCHS - SPRINKLER HEADS TO SIDEWALL WINDOW -INP |
| Mod SA1058· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-08 | +$7,118 | $942,377,457 | PROVIDE ACOUSTICAL CEILING&HARD CEILING MODIFICATIONS |
| Mod SA1059· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-08 | +$6,000 | $942,383,457 | ADD A CAST INPLACE SLAB IN ELEVATOR MACHINE ROOM DIXIE BLDG 8 |
| Mod SA1060· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-08 | +$8,545 | $942,392,002 | SLVCHS - PROVIDE ELECTRICAL LOW VOLTAGE AND CEILING MODIFICATION IN TLR |
| Mod SA1061· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-08 | +$52,092 | $942,444,094 | SLVCHS - PROVIDE POWER FOR AUTOMATIC DOOR OPENER |
| Mod CO10J· CHANGE ORDER | 2016-03-14 | +$13,500 | $942,457,594 | SLVHCS- 2 STAINLESS STEEL SINK DRAINS DNT |
| Mod SA1039· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-14 | +$18,069 | $942,475,663 | SLVCHS - CONNECT THE DRAIN ON GALVEZ STREET |
| Mod SA1067· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-14 | +$3,046 | $942,478,709 | SLVCHS - RELOCATE TLR DAMPER TO THE EXTERIOR AND MOUNT TO THE LOUVER WITH WEATHER HOOD AND PROVIDE 3R ENCLOSUR… |
| Mod SA1068· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-14 | +$9,923 | $942,488,632 | SLVCHS - PROVIDE POWER REQUIREMENTS FOR DNT AUTOMATIC DOOR OPENERS |
| Mod SA1072· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-14 | +$3,895 | $942,492,527 | SLVCHS - ADD FRAMING AND DRYWALL AROUND TUBE STEEL ON THE NORTH END PER THE RESPONSE TO RFI 6503 |
| Mod SA1073· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-14 | +$1,600 | $942,494,127 | SLVCHS - RAISE THE CEILING HEIGHTS IN ROOMS 1E106B AND 1E107 |
| Mod SA1075· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-14 | −$6,684 | $942,487,443 | SLVCHS - PROVIDE INDIVIDUAL DUST COLLECTOR UNITS IN LIEU OF CENTRALIZED DUST COLLECTION SYSTEM FOR THE TLR PRO… |
| Mod SA1076· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-14 | −$3,030 | $942,484,413 | SLVCHS - CREDIT FOR DELETION OF STOREFRONT 1N-C02 LOCATED IN THE NORTHWEST CORNER OF THE CEP |
| Mod SA1077· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-14 | +$1,604 | $942,486,017 | SLVCHS - INSTALL AN OVERHEAD STOP AT DOOR 1DC05.1 |
| Mod SA1078· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-14 | +$8,702 | $942,494,719 | SLVCHS - PROVIDE LOUVER FOR DISHWASHER EXHAUST VENT AT DNT LVL 5 AREA F |
| Mod SA1080· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-14 | +$11,371 | $942,506,090 | PROVIDE FLOOR DRAIN&PIPING TLR RM 3M081 |
| Mod SA1081· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-14 | +$5,107 | $942,511,197 | SLVCHS - PROVIDE WATERPROOFING UNDER TILE AREA IN POOL ROOM TLR. |
| Mod SA1083· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-14 | +$2,615 | $942,513,812 | SLVCHS - RELOCATE OUTLETS FROM CURTAIN WALL TO ADJACENT KNEE WALL. |
| Mod SA1084· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-14 | +$2,142 | $942,515,954 | SLVCHS - INSTALL A BULKHEAD IN RM4G106A TO ACCOMMODATE UTILITY ROUGHIN |
| Mod SA1085· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-14 | +$13,627 | $942,529,581 | PROVIDE RPZ BACKFLOW PREVENTOR&PRV INCOMING SERVICES |
| Mod SA1089· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-14 | +$914 | $942,530,495 | PROVIDE PEDSTALS, CARD READERS&INTERCOME @ PATIENT GARAGE |
| Mod SA1090· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-14 | +$1,150 | $942,531,645 | INSTALL ACCESS PANEL ON THE NW CORNER OF THE CABLE VAULT MCR |
| Mod SA1091· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-14 | +$2,793 | $942,534,438 | CONSTRUCT A FLASE COLUMN @ THE CORNER CORRIDORS 3EC10&3EC05 |
| Mod SA979· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-14 | +$26,026 | $942,560,464 | SLVHCS- RELOCATE SKYTRON SUPPORTS, RCP AND MEP TO RELOCATE SKYTRON LIGHTS TO FOOT OF BED LOCATION, FOR DNT ROO… |
| Mod SA1066· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-15 | +$980 | $942,561,444 | PROVIDE FINISHED WALLS @ TLR RMS 2M062&2M065 |
| Mod SA1087· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-15 | +$55,536 | $942,616,980 | PROVIDE PIPING, ROOF DRAINS, SCUPPERS&EXPANSION JOINT CORRECTIONS DNT/PAN AM BRIDGE CONNECTOR |
| Mod SA1074· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-16 | +$724 | $942,617,704 | SLVCHS - CASEWORK CHANGE IN TLR LAB AREA |
| Mod SA1082· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-16 | +$11,940 | $942,629,644 | SLVCHS - PROVIDE POWER FOR FIRE ALARM DOOR HOLDERS - DNT |
| Mod SA1086· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-16 | +$11,903 | $942,641,547 | CHANGE GROUND HYDRANTS TO WALL FAUCETS |
| Mod SA1088· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-16 | +$2,204 | $942,643,751 | INSTALL FLASHING @ THE K CONNECTOR STAFF GARAGE EXPANSION JOINT |
| Mod SA1097· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-16 | +$45,333 | $942,689,084 | SLVCHS - ISOLATION VALVES FOR DIXIE |
| Mod SA1098· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-16 | +$8,357 | $942,697,441 | SLVCHS - POWER TO PATIENT LIFTS OUT |
| Mod SA1100· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-16 | +$5,791 | $942,703,232 | SLVCHS - RELOCATE HVC CORRIDOR DNT |
| Mod SA1101· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-16 | +$2,842 | $942,706,074 | SLVCHS - FRAMING ABOVE EXTERIOR DOOR DNT |
| Mod SA1079· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-17 | +$9,062 | $942,715,136 | SLVCHS - PROVIDE CAFE LIGHTING AT DIXIE |
| Mod SA1092· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-17 | +$5,219 | $942,720,355 | SLVCHS - REINSTALL HEADWALLS INP |
| Mod SA1093· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-17 | +$3,794 | $942,724,149 | SLVCHS - INSTALL 6 FOOT FIXTURE IN LIEU OF 8 FOOT - OUT |
| Mod SA1094· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-17 | +$7,612 | $942,731,761 | SLVCHS - PROVIDE A HEDGE AND PINE MULCH |
| Mod SA1095· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-17 | +$1,189 | $942,732,950 | SLVCHS - PATCH AND REPLACE COUNTERTOP WHERE A SINK WAS CUT OUT - OUT |
| Mod SA1096· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-17 | +$6,692 | $942,739,642 | SLVCHS - PROVIDE AND RELOCATE ELECTRICAL RACEWAYS FOR ADDED SUPPORT FOR MEDICAL EQUIPMENT |
| Mod SA1071· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-21 | +$7,706 | $942,747,348 | SLVCHS - SKYTRON LIGHT FOR OUTPATIENT |
| Mod SA1102· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-21 | +$2,714 | $942,750,062 | SLVCHS - DROP CEILING EXTENSION |
| Mod SA1105· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-21 | +$27,548 | $942,777,610 | SLVCHS - ROOF DRAIN CON/GAR LOBBY L |
| Mod SA1106· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-21 | +$2,501 | $942,780,111 | SLVCHS - INSTALL A BULKHEAD AT 1E128 WALK-IN COOLER |
| Mod SA1108· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-21 | +$3,000 | $942,783,111 | SLVCHS - REMOVE 2 GRILLS FROM DNT ROOM 4D130 |
| Mod SA1109· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-21 | +$34,396 | $942,817,507 | SLVCHS - PROVIDE AND INSTALL A WALK IN COOLER AT DNT 1ST FLOOR RETAIL AREA ROOM 1E128 |
| Mod SA1110· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-21 | +$1,986 | $942,819,493 | SLVCHS - CASEWORK CHANGES DNT |
| Mod SA1111· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-21 | +$4,812 | $942,824,305 | SLVCHS - REFRAMING OF DOOR - DNT |
| Mod SA1113· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-21 | +$8,045 | $942,832,350 | SLVCHS - PAINT FRAMES FOR DOOR HARDWARE - DNT |
| Mod SA1069· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-22 | +$2,881 | $942,835,231 | SLVCHS -CEILING SHIFT FOR PATIENT LIFT DNT |
| Mod SA1115· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-22 | +$5,805 | $942,841,036 | SLVCHS - INSTALL FIRE RATING MEASURES |
| Mod SA1025· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-23 | +$60,447 | $942,901,483 | ADDITION OF CIRCUITS&BREAKER CHANGES |
| Mod CO10L· CHANGE ORDER | 2016-03-24 | +$60,000 | $942,961,483 | SLVHCS- MESH DUCTWORK |
| Mod SA1103· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-24 | +$5,550 | $942,967,033 | INSTALL SHAFT WALL @ INTERSTITIAL LEVEL 3I @ THE F1 ATRIUM |
| Mod SA1104· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-24 | +$5,195 | $942,972,228 | INSTALL ADDED LAYER OF GWB IN CORRIDOR 4G-C05 |
| Mod SA1112· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-24 | +$3,459 | $942,975,687 | INSTALL 20' FTWA FIXTURE SHOWN ON RCP IN 1D201 ELEVATOR LOBBY |
| Mod SA1114· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-24 | +$4,317 | $942,980,004 | SLVCHS - INSTALL METAL FLASHING AT DEFS EXPANSION JOINTS |
| Mod SA1116· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-24 | +$2,167 | $942,982,171 | SLVCHS - EXPOSED SPANDREL GLASS - TLR |
| Mod SA1117· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-24 | +$2,120 | $942,984,291 | SLVCHS - MAIN ENTRY CANOPY SOUTH WALL - DNT |
| Mod SA1118· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-24 | +$1,446 | $942,985,737 | SLVCHS - LEVEL 2&3 TRANSITION DETAILS TLR |
| Mod SA1119· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-24 | +$43,356 | $943,029,093 | SLVCHS - BULLETIN 102&104 CHANGES FOR PANELS IN GAR |
| Mod SA1120· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-24 | +$4,320 | $943,033,413 | PROVIDE POWER&CARD READER @ E-E2-178 DNT |
| Mod SA1121· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-24 | +$5,089 | $943,038,502 | PROVIDE POWER TO DOMESTIC WATER HEATER&RECIRCULATION PUMP |
| Mod SA1122· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-24 | +$1,336 | $943,039,838 | PROVIDE POWER FOR PATIENT LIFTS IN 1M118 LEVEL 1 TLR |
| Mod SA1124· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-24 | +$3,356 | $943,043,194 | INSTALL AGGREGATE MULCH BED AROUND THE CEP CRASH GATE STANCHIONS |
| Mod CO10M· CHANGE ORDER | 2016-03-25 | +$14,000 | $943,057,194 | SLVHCS- WALL FURR OUT TO ENCLOSE PERIMETER HORIZONTAL STEEL BEAM |
| Mod SA1125· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-25 | +$17,406 | $943,074,600 | SLVCHS - ADD SINKS AND POWER FOR MC EQUIPMENT - DEFINITIZE CO-09D |
| Mod SA1127· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-25 | +$26,471 | $943,101,071 | SLVCHS - CUP SINK FOR FUME HOODS DIXIE |
| Mod SA1128· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-25 | +$5,111 | $943,106,182 | SLVCHS - ADDED RECEPTACLES TLR |
| Mod SA1129· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-25 | +$3,492 | $943,109,674 | SLVCHS - PATIENT GARAGE LOBBY SPRINKLER ENCLOSURE |
| Mod SA828· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-25 | +$43,119 | $943,152,793 | PROVIDE ADDITION OF CIRCUITS AND BREAKER CHANGES |
| Mod SA1126· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-28 | +$18,414 | $943,171,207 | DUT PILES, DEWATER&EXCATATION TO LOWER SAND/OIL/WATER SEPARATOR |
| Mod SA1134· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-28 | +$3,296 | $943,174,503 | SLVCHS - POWER ADDED FOR SECURITY PANELS |
| Mod SA1135· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-29 | +$31,252 | $943,205,755 | SLVCHS - MENTAL HEALTH COURTYARD DNT |
| Mod CO10N· CHANGE ORDER | 2016-03-31 | +$11,000 | $943,216,755 | SLVHCS- PROVIDE POWER TO REVERSE OSMOSIS |
| Mod SA1123· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-31 | +$6,202 | $943,222,957 | SA-1123 MODIFY DOOR THRESHOLD |
| Mod SA1130· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-31 | +$9,789 | $943,232,746 | SA-1130 INSTALL SPANDREL GLASS LEVEL 1 A2 IN LIEU OF VISION GLASS |
| Mod SA1131· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-31 | +$4,048 | $943,236,794 | SA-1131 CONSTRUCT A PARTITION BETWEEN RM 3G187&3G228 ROOF |
| Mod SA1137· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-31 | +$33,992 | $943,270,786 | SLVCHS - ADDITIONAL COST FOR TRANSFORMERS FOR DIXIE |
| Mod SA1138· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-31 | +$9,479 | $943,280,265 | SLVCHS - RELOCATE EMERGENCY OXYGEN FILL STATIONS. |
| Mod SA1140· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-31 | +$13,080 | $943,293,345 | SA-1140 POWER FOR METER DEVICES RM 2N126 CEP |
| Mod SA1141· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-31 | +$4,886 | $943,298,231 | SA-1141 INSTALL SUPPORT 16GA STEEL SLEEVES |
| Mod SA1142· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-31 | +$2,170 | $943,300,401 | SLVCHS - BEAM CONFLICT W/WINDOW LINTEL DIXIE |
| Mod SA1143· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-31 | +$14,469 | $943,314,870 | SA-1143 PROVIDE 2*2 LIGHTS FIXTURES IN LIE OF 2*4 |
| Mod SA1144· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-31 | +$5,988 | $943,320,858 | SA-1144 INSTALL BREAK METAL AT TWO-STAGE SEALANT JOINTS ALL BUILDINGS |
| Mod SA1145· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-31 | +$15,187 | $943,336,045 | SLVCHS - STAIRS TO MACHINE ROOM DIXIE |
| Mod SA1146· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-31 | +$2,188 | $943,338,233 | SA-1146 RELOCATE MED GAS IN RM 2F122 DNT |
| Mod SA1148· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-31 | +$2,506 | $943,340,739 | SLVCHS - INCORPORATE FLOOD WALL SHAFT AROUND AT ELEVATOR MS-03 |
| Mod SA1152· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-31 | +$4,409 | $943,345,148 | SLVCHS - SHIFT DOOR FRAME IN 3F113 FOR EXPANSION JOINT INSTALLATION |
| Mod SA1153· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-31 | +$3,991 | $943,349,139 | SLVCHS - WATER CONSUMPTION - CYCLE CONSTRUCTION |
| Mod CO10K· CHANGE ORDER | 2016-04-04 | +$850,000 | $944,199,139 | SLVHCS- CO-08K ADDITIONAL DATA/TELE DROPS ALL WP08 |
| Mod SA1154· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-04 | +$5,180 | $944,204,319 | SLVCHS - PROVIDE PLYWOOD COVERED WINDOWS AT ALL IT/TELECOM ROOMS - OUT |
| Mod SA1133· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-05 | +$360,420 | $944,564,739 | SLVCHS - INSULATE GENERAL EXHAUST DUCT |
| Mod SA1150· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-05 | +$6,728 | $944,571,467 | SLVCHS - GENERAL EXTENSION OF MONITORING SERVICES |
| Mod SA1157· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-05 | −$3,192 | $944,568,275 | SLVCHS - MRI RF SHIELDING SUBSTRATE CHANGE DNT |
| Mod SA1160· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-05 | +$32,625 | $944,600,900 | SLVCHS - REVISIONS TO THE UTILITIES FOR SPECIFIC REQUIREMENTS FOR DENTAL EQUIPMENT. |
| Mod SA1161· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-05 | +$18,398 | $944,619,298 | SLVCHS - ADD IT-1 TO PARKING GARAGE ELEVATORS |
| Mod SA1162· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-05 | +$2,708 | $944,622,006 | SLVCHS - DNT STERILIZER |
| Mod SA1163· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-05 | +$28,075 | $944,650,081 | SLVCHS - INSULATE RETURN DUCT |
| Mod CO10O· CHANGE ORDER | 2016-04-06 | +$110,000 | $944,760,081 | SLVHCS- MEDICAL EMERGENCY CARD READERS CAMPUS WIDE |
| Mod SA1139· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-06 | +$11,696 | $944,771,777 | SLVCHS - INSTALL ADDITIONAL FRAMING AND NOTCH STUDS AS NECESSARY AT LEVEL 8 PENTHOUSE TO ACCOMMODATE INSTALLAT… |
| Mod SA1156· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-06 | +$2,850 | $944,774,627 | SLVCHS - CHANGE HARDWARE SETS FROM 94L TO A 94P ON ALL SLIDING DOORS IN BUILDING 3 AND 6 PER THE RESPONSE TO R… |
| Mod SA1159· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-06 | +$0 | $944,774,627 | SLVCHS - CORRECT LINE OF ACCOUNTING TO MOVE FUNDS |
| Mod CO10P· CHANGE ORDER | 2016-04-07 | +$0 | $944,774,627 | SLVHCS- ADMIN MOD ONLY TO CORRECT LINE OF ACCOUNTING |
| Mod SA1165· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-07 | −$2,161 | $944,772,466 | SLVCHS - CREDIT - THIS DEFINITIZES CO-10D |
| Mod SA1166· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-07 | +$2,255 | $944,774,721 | SLVCHS - DIXIE ROOM RENUMBERING |
| Mod SA1107· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-08 | +$10,648 | $944,785,369 | SLVCHS - APPLY FINISHER FOR FLOOR IN DNT |
| Mod SA1151· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-08 | +$18,337 | $944,803,706 | SLVCHS - PROVIDE SWITCHES AT GARAGE ATTENDANCE OFFICES BUILDING 4 AND 5 FOR LANE ENTRY POINTS |
| Mod SA1158· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-08 | +$3,897 | $944,807,603 | SLVCHS - OPERATING ROOM CHANGES RFP-D-104 AND 104R1 AND AS DIRECTED BY CHANGE ORDER CO-06L |
| Mod SA1168· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-08 | +$815 | $944,808,418 | SLVCHS - ADDITIONAL OUTLETS ON CONFERENCE ROOM - DIXIE |
| Mod SA1147· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-11 | +$6,793 | $944,815,211 | SA-1147 DELETE&RELOCATE SINKS MRK- DEFINITIZE CO-09M |
| Mod SA1164· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-11 | +$1,410 | $944,816,621 | SA-11647 EXTEND 120V IN ROOM 4P314 DIXIE BLDG 8 |
| Mod SA1167· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-11 | +$27,827 | $944,844,448 | SA-1167 ADD FIRE ALARM PANEL PATIENT GARAGE- DEFINITIZE CO-09Q |
| Mod SA1169· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-11 | +$1,920 | $944,846,368 | SA-1169 ADD J4 ALL ROOM 5D225 DNT |
| Mod SA1170· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-11 | +$741 | $944,847,109 | SA-1170 PATCH COVE OUTSIDE 4D170 DNT |
| Mod SA1171· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-11 | +$4,423 | $944,851,532 | SA-1171 INSTALL 2 SINKS 4E127&4E129A DNT |
| Mod SA1172· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-11 | +$35,800 | $944,887,332 | SLVCHS - ADDED FIRE SUPPRESSION LEVEL 5 LOBBY INP |
| Mod SA1173· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-11 | +$3,579 | $944,890,911 | SLVCHS - MODIFY WALL AND CEILING ON LVL 1, 3, 5 AT DIXIE BUILDING |
| Mod SA1174· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-11 | +$9,823 | $944,900,734 | SLVCHS - PROVIDE SURFACE JAMBS AT INSIDE OF THE WINDOW MULLION AND SOFT SEAM WITH COLOR MATCH CAULKING |
| Mod SA1175· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-11 | +$2,736 | $944,903,470 | SLVCHS - PROVIDE A STAINLESS STEEL ACCESS PANEL AT INPATIENT PER THE RESPONSE TO RFI 2214.1 |
| Mod SA1176· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-11 | +$31,398 | $944,934,868 | SLVCHS - PROVIDE POWER TO ADO'S AND PUSH PADS AT EXTERIOR DOORS ON 5D PER THE RESPONSE TO RFI 3827.1 |
| Mod SA1177· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-14 | +$13,884 | $944,948,752 | SLVCHS - REPAIR THE VERTICAL CRACK IN EXISTING BRICK AT DIXIE BUILDING 8 |
| Mod SA1178· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-14 | +$8,709 | $944,957,461 | SLVCHS - STOP WORK AT DIXIE BUILDING 8 |
| Mod SA1179· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-14 | +$2,511 | $944,959,972 | SLVCHS - SHIFT LIGHTS IN DNT |
| Mod SA1180· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-14 | +$1,563 | $944,961,535 | SA-1180 PROVIDE 6" BASE AROUND ENTERTAINMENT CENTERS TLR |
| Mod SA1182· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-14 | +$1,262 | $944,962,797 | SA-1182 ADD OUTLET FOR ELECTRICAL POWER AUTOPSY DISHWASHER RM 4F109 |
| Mod SA1185· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-14 | +$15,320 | $944,978,117 | SA-1185 INSTALL SPECSEAL FIRESTOP PILLOWS DNT |
| Mod SA1136· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-18 | +$225,800 | $945,203,917 | SLVCHS - LA TAX LIABILITY |
| Mod SA1187· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-18 | +$2,860 | $945,206,777 | SLVCHS - WALL CONFLICT WITH DRINKING FOUNTAIN TLR |
| Mod SA1188· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-18 | +$2,062 | $945,208,839 | SLVCHS - COLUMN CONFLICT OUT |
| Mod SA1190· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-18 | +$55,821 | $945,264,660 | SLVCHS - ADDITIONAL CONTROLS FOR EXHAUST FANS - CEP |
| Mod CO10Q· CHANGE ORDER | 2016-04-21 | +$44,500 | $945,309,160 | SLVHCS- REGRADE AND ADD DRAINAGE AROUND OAK TREES |
| Mod SA1181· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-21 | +$5,492 | $945,314,652 | SLVCHS - PROVIDE EXPANSION JOINTS AT GARAGE ENTRY RAMPS, BUILDING 4 AND BUILDING 5, AS PER RFI 4603 AND 4603C1… |
| Mod SA1183· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-21 | +$7,800 | $945,322,452 | SLVCHS - PROVIDE ADDITIONAL STEEL TO THE CANOPY SKYLIGHT AT THE MAIN ENTRY PER THE RESPONSE TO RFI 5703 |
| Mod SA1184· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-21 | +$2,236 | $945,324,688 | SLVCHS - ADD AN EXTERIOR INTERCOM AND PEDESTAL PER THE RESPONSE TO RFI 6061.3 |
| Mod SA1191· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-21 | +$945 | $945,325,633 | SLVCHS - INSTALL FIRE CAULK AND MINERAL WOOL AROUND THE COLUMN ON THE WEST WALL OF 3M077A PER THE RESPONSE TO… |
| Mod SA1192· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-21 | +$5,300 | $945,330,933 | SLVCHS - PAINT THE REVEALS IN THE PLASTER WALL PER THE RESPONSE TO RFI 7285 |
| Mod SA1194· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-21 | +$4,474 | $945,335,407 | SLVCHS - ACOUSTICAL CEILING GRID - OUT |
| Mod SA1195· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-21 | +$4,098 | $945,339,505 | SLVCHS - CHANGE CERAMIC TILE IN DIXIE |
| Mod SA1197· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-21 | +$3,583 | $945,343,088 | SLVCHS - ADD WALL JACKS AS PER THE VA'S RESPONSES TO RFI'S 7446 AND 7446C1 |
| Mod SA1198· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-21 | +$2,192 | $945,345,280 | PROVIDE A RISER/TRIM PIECE CORRIDOR E TLR |
| Mod SA1199· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-21 | +$6,294 | $945,351,574 | INSTALL PARTITION TYPE M ON W WALLS OF 1M019&1M025 |
| Mod SA1200· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-21 | +$8,445 | $945,360,019 | MODIFY METAL WALL, ADD CMU CURB&METAL STEPS DIXIE BLDG 8 |
| Mod SA1201· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-21 | +$3,538 | $945,363,557 | ADD WATER HAMMER ARRESTOR&DATA DROP TO RM 2P163 DIXIE BLDG 8 |
| Mod SA1203· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-21 | +$3,196 | $945,366,753 | SLVCHS - MODIFY THE ELECTRICAL LAYOUT ADDING OUTLETS TO LEVELS 2 AND 3. |
| Mod SA1204· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-21 | +$2,175 | $945,368,928 | SLVCHS - INCREASE THE SIZE OF THE COLUMN WRAPS PER THE RESPONSE TO RFI 7529 |
| Mod CO10R· CHANGE ORDER | 2016-04-22 | +$86,000 | $945,454,928 | SLVHCS- INSTALL FIRE DAMPERS IN EQUIPMENT ROOM - TLR |
| Mod CO10S· CHANGE ORDER | 2016-04-22 | +$35,000 | $945,489,928 | SLVHCS- ADDED POWER TO RADIO ROOM |
| Mod CO10T· CHANGE ORDER | 2016-04-26 | +$10,000 | $945,499,928 | MODIFY SLAB FOR PRECAST PANELS |
| Mod CO10U· CHANGE ORDER | 2016-04-29 | +$566,370 | $946,066,298 | SLVHCS CO-10U ISSUED FOR ASSOCIATED CHANGES WITH MAIN COMPUTER ROOM, ORAL SURGERY AND BULLETIN 29 |
| Mod SA1189· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-03 | +$171,721 | $946,238,019 | DEFINITIZE CO-04W |
| Mod SA1202· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-03 | +$130,011 | $946,368,030 | MODIFY ELECTRICAL FEEDERS FOR 24E @ DIXIE BLDG 8 |
| Mod SA1209· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-03 | +$16,971 | $946,385,001 | INSTALL STIFFENER PLATES DNT |
| Mod SA1211· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-03 | +$2,538 | $946,387,539 | ADD BLANK PLATES @ TYPICAL REAGENT RACKS DNT |
| Mod SA1212· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-03 | +$23,110 | $946,410,649 | ADD OUTLETS ON LEVEL 2 L1770 DIXIE BLDG 8 |
| Mod SA1214· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-03 | +$64,198 | $946,474,847 | ADD POWER&CONTROLS TO INTERFACE WITH PROCESS&SANITARY TANK SYSTEM |
| Mod SA1099· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-04 | +$51,000 | $946,525,847 | SLVCHS - ATS LAYOUT FOR SCADA - CEP |
| Mod SA1193· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-04 | +$115,685 | $946,641,532 | SLVCHS - ADD POWER FOR THE FIRE ALARM PANELS IN THE DNT, OUT, AND TL PER THE RESPONSE TO RFIS 7188, 7188.1, 75… |
| Mod SA1205· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-04 | +$77,661 | $946,719,193 | SLVCHS - DEFNITIZATION OF CO-09S |
| Mod SA1207· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-04 | +$941 | $946,720,134 | SLVCHS - INSTALL ADDITIONAL SOFFIT IN CORRIDOR 1M120 PER THE RESPONSE TO RFI 7243 |
| Mod SA1208· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-04 | −$86 | $946,720,048 | SLVCHS - FLOOD BARRIER AT TLR AT SERVICE ELEVATOR AND CREDIT FOR DELETION OF STAINLESS STEEL ANGLES FROM 12 SE… |
| Mod SA1210· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-04 | +$966 | $946,721,014 | SLVCHS - REPAINT THE WALL TO ALLOW INSTALLATION OF THE ELEVATOR REMOTE SELECTOR PANEL PER THE RESPONSE TO RFI… |
| Mod SA1213· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-04 | +$3,726 | $946,724,740 | SLVCHS - DOOR E-H 140 HARDWARE |
| Mod SA1215· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-04 | −$75,049 | $946,649,691 | SLVCHS - REVISE ELECTRICAL WIRING FOR THE INSTALLATION OF EMT CONDUIT AND WIRE FEEDERS IN LIEU OF MI FEEDERS F… |
| Mod SA1216· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-04 | +$1,499 | $946,651,190 | SLVCHS - INSTALL A GWB TO CONCEAL SPANDREL GLASS IN THE POOL ROOM PER THE RESPONSE TO RFI 7260 |
| Mod SA1217· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-04 | +$75,947 | $946,727,137 | SLVCHS - PROVIDE ADDITIONAL FUEL VALVES AND CONTROLS TO PREVENT TANK OVERFLOW AT CEP, AS PER THE RESPONSE TO R… |
| Mod SA1225· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-04 | +$16,327 | $946,743,464 | SLVCHS - PROVIDE AND INSTALL FLOOR DRAINS, DRAINAGE PIPING AND FLOOR SLOPING FOR DNT ROOM 2E178 PER THE RESPON… |
| Mod SA1221· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-05 | +$1,086 | $946,744,550 | SLVCHS - CONCRETE PADS FOR STAFF GARAGE DX UNITS |
| Mod SA1222· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-05 | +$1,362 | $946,745,912 | SLVCHS - ADD AN EXPANSION JOINT ASSEMBLY IN ROOM 2N143 PER THE RESPONSE TO RFI 7561 |
| Mod SA1223· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-05 | +$43,340 | $946,789,252 | SLVCHS - PROVIDE SUPPORT PLATES AT DECK UNDER ROOM 3F168 |
| Mod SA1224· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-05 | +$2,166 | $946,791,418 | SLVCHS - PROVIDE J-4 WALL AT DNT HOUSEKEEPING ROOM 3F178 TO PROTECT MI CABLE RISER FROM DAMAGE, AS PER THE VA'… |
| Mod SA1227· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-05 | +$23,320 | $946,814,738 | SLVCHS - INSTALL FIRE DAMPERS IN ROOMS 1M164 AND 1M162 |
| Mod SA1228· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-05 | +$1,027 | $946,815,765 | SLVCHS - PROVIDE TV CONNECTION AT DNT ROOM 4E145 |
| Mod SA1229· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-05 | +$30,738 | $946,846,503 | SLVCHS - DELETE OEDS, CAPPING AND GROUTING FD-BS, PAINTING MANHOLES, ADDING TWO DRAIN BACK IN ROOMS 2D227 AND… |
| Mod SA1230· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-05 | +$5,838 | $946,852,341 | SLVCHS - REPLACE WD-5 MATERIAL AT MAIN DESKS IN OUTPATIENT AND CONCOURSE WITH WD-3 |
| Mod SA1231· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-05 | +$1,552 | $946,853,893 | SLVCHS - INSTALL TILE ON EXPOSED PORTION OF CURB IN ROOM 6J100 |
| Mod SA1232· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-05 | +$13,571 | $946,867,464 | SLVCHS - COMPENSATION FOR RESTRICTED SITE ACCESS DUE TO GALVEZ ST ROAD IMPROVEMENTS PERFORMED BY CITY OF NEW O… |
| Mod SA1233· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-05 | +$1,027 | $946,868,491 | SLVCHS - PROVIDE FTP4M LIGHT FIXTURE AT OUTPATIENT ROOM 7J216 |
| Mod SA1234· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-05 | +$12,070 | $946,880,561 | SLVCHS - INSTALL FLASHING AROUND HOSE BIB ON THE MP-1 PANELS |
| Mod SA1235· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-05 | +$17,898 | $946,898,459 | SLVCHS - REVISE ELECTRICAL TO ADD CONTROL WIRING TO SHUT DOWN POWER TO MASTER COMPUTER ROOM (MCR OF DNT |
| Mod SA1236· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-05 | +$67,700 | $946,966,159 | SLVCHS - ADD SUPPORT STEEL AS INDICATED IN BULLETINS 10E AND 10J |
| Mod SA1237· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-05 | +$4,221 | $946,970,380 | SLVCHS - BUILD A WALL TO SUPPORT THE SPRAY NOZZLE ON 4D146 |
| Mod SA1238· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-05 | +$682 | $946,971,062 | SLVCHS - INSTALL A J-2 PARTITION AROUND THE RAIN LEADER IN 3F-C01B |
| Mod SA1239· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-05 | +$6,545 | $946,977,607 | SLVCHS - INSTALL A ROOF OVERFLOW DRAIN AT THE LOADING DOCK |
| Mod SA1240· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-05 | +$8,210 | $946,985,817 | SLVCHS - CHANGE SEALANT AT PATIENT ROOMS, BATHROOMS AND MEETING AREAS TO AN ABUSE RESISTANT SEALANT |
| Mod SA1242· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-05 | −$721 | $946,985,096 | SLVCHS - PROVIDE CREDIT FOR DELETING WOOD WALL |
| Mod CO10V· CHANGE ORDER | 2016-05-06 | +$11,500 | $946,996,596 | CHG EXISTING FEEDERS RM 4J441, 4J443, 4J445, 4J447&4J449 FROM 277 TO 120VOLTS SINGLE PHASE |
| Mod SA1218· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-06 | +$776 | $946,997,372 | INSTALL BREAK METAL WALL |
| Mod SA1219· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-06 | +$5,719 | $947,003,091 | ADD EXPANSION JOINTS @ LEVELS 3-4A&LEVEL 2 STOREFRONG |
| Mod SA1243· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-06 | +$2,793 | $947,005,884 | SLVCHS - PROVIDE RATED EXPANSION JOINTS IN THE INTERSTITIAL |
| Mod SA1244· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-06 | +$538 | $947,006,422 | SLVCHS - PAINT AND PATCH AS NEEDED IN ROOM 2M016 |
| Mod SA1245· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-06 | −$707 | $947,005,715 | FLOORING CTF-1 IN LIEU OF FG-1 DNT |
| Mod SA1247· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-06 | +$2,507 | $947,008,222 | PROVIDE COVER PLATES TO HEADWALL UNITS @ TLR |
| Mod SA1248· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-06 | +$2,869 | $947,011,091 | PROVIDE SLOPPED LOCKER TOPS @ DNT RM 2D101C |
| Mod CO10X· CHANGE ORDER | 2016-05-09 | +$12,000 | $947,023,091 | SLVHCS- PROVIDE GFCI MULTIPLE LOCATIONS OUT |
| Mod SA1132· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-09 | +$6,159 | $947,029,250 | SLVCHS - ATRIUM CEILING AND WALL LAYOUT CON |
| Mod SA1149· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-09 | +$14,000 | $947,043,250 | SLVCHS - ISOLATION VALVE CEP |
| Mod SA1252· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-09 | −$1,298 | $947,041,952 | SLVCHS - CABINETS 1507 SHALL BE CHANGED FROM VC TO VV |
| Mod SA1254· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-09 | +$883 | $947,042,835 | SLVCHS - MOVE LIGHT SWITCH |
| Mod SA1186· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-11 | +$26,737 | $947,069,572 | SLVCHS - PROVIDE LOUVERS @ CONCOURSE LVL 4I FOR EXHAUST FANS DNT |
| Mod SA1206· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-11 | +$1,985 | $947,071,557 | SLVCHS - NW CANOPY ROOF SLOPING TLR |
| Mod SA1220· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-11 | +$236,033 | $947,307,590 | SLVCHS - DOOR AND HARDWARE CHANGES PER RFI 3419 AND 3419.1 |
| Mod SA1241· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-11 | +$1,020 | $947,308,610 | SLVCHS - RELOCATE ELECTRICAL OUTLETS IN ROOMS 1E110, 1E121 AND 1F101 |
| Mod SA1256· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-11 | +$1,509 | $947,310,119 | SLVCHS - ADDED COLD WATER LINE TO ROOM IN DNT |
| Mod SA1257· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-11 | +$870 | $947,310,989 | SLVCHS - INCORPORATE ARCHITECTURAL CHANGES ASSOCIATED WITH BULLETIN 24 |
| Mod SA1258· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-11 | +$4,129 | $947,315,118 | SLVCHS - INSTALL J4 TYPE WALL IN KITCHEN |
| Mod SA1262· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-11 | +$23,000 | $947,338,118 | SLVCHS - ADDED FIRE DAMPERS IN LOBBY AT PATIENT GARAGE |
| Mod SA1264· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-11 | −$576 | $947,337,542 | SLVCHS - DELETE LIGHT FIXTURE - CREDIT |
| Mod SA1246· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-16 | +$27,030 | $947,364,572 | SLVCHS - ADD DATA, TELECOM, POWER, HVAC,&FINISHES TO RM 1H13B IN OUTPATIENT BUILDING. |
| Mod SA1249· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-16 | +$17,476 | $947,382,048 | SLVCHS - PROVIDE ADDITIONAL MED GAS IN ROOM 3F168. |
| Mod SA1259· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-16 | +$33,956 | $947,416,004 | SLVCHS - INSTALL A WALL AND DOOR INTO A SEPARATE ROOM |
| Mod CO10W· CHANGE ORDER | 2016-05-17 | +$430,100 | $947,846,104 | SLVHCS-PERFORM REQUIRED TEMPORARY SHORING AND BRACING FOR THE AREA B WALL SECTIONS AT THE DIXIE BUILDING 8 |
| Mod SA1250· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-17 | +$3,421 | $947,849,525 | SLVCHS - PROVIDE ADDITIONAL STEEL ANGLE AT DNT ELEVATOR SHAFT FOR SLAB EDGES OF THE NEW OPENINGS ON BOTH FLOOR… |
| Mod SA1251· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-17 | +$2,800 | $947,852,325 | SLVCHS - PROVIDE SLIDING WOOD DOOR AT 2E191. |
| Mod SA1260· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-17 | −$938 | $947,851,387 | SLVCHS - DELETE 5IN GALVANIZED CURBING FOR TLR 1M025 |
| Mod SA1261· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-17 | +$12,187 | $947,863,574 | SLVCHS - CONCEAL THE 10" RAIN LEADER ON LEVEL 4 AREA 7 PER THE RESPONSE TO RFI 3543.3 |
| Mod SA1263· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-17 | +$5,070 | $947,868,644 | SLVCHS - GREASE TRAP ACCESS PANEL AT DNT 4TH FLOOR KITCHEN |
| Mod SA1266· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-17 | +$38,791 | $947,907,435 | SLVCHS - ATRIUM DOORS - PROVIDE HOLD BACK CON |
| Mod SA1270· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-17 | +$3,296 | $947,910,731 | SLVCHS - INSTALL A J4 WALL ON THE EAST SIDE OF ROOM 1M142 PER THE RESPONSE TO RFI 7665 |
| Mod SA1271· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-17 | +$18,012 | $947,928,743 | SLVCHS - PROVIDE 2 STAINLESS STEEL FLOOR SINK DRAINS AND TAP PRIMER AT DNT PATHOLOGY LABORATORY, LEVEL 4 AREA… |
| Mod SA1272· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-17 | +$3,334 | $947,932,077 | SLVCHS - CONSTRUCT A J4 PARTITION ON THE SOUTH SIDE OF ROOM 1M081 PER THE RESPONSE TO RFI 7735 |
| Mod SA1273· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-17 | +$7,036 | $947,939,113 | SLVCHS - RELOCATE THE DOOR AND ALL SUPPORTING SYSTEMS AT DOOR 4M001 PER THE RESPONSE TO RFI 7740 |
| Mod SA1196· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-19 | +$180,500 | $948,119,613 | SLVCHS - 18 VS 20 GAUGE IBS METAL DECK |
| Mod SA1265· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-19 | +$101,384 | $948,220,997 | SLVCHS - ADDED AIR FLOW MEASURING STATIONS |
| Mod SA1269· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-19 | +$1,934 | $948,222,931 | SLVCHS - INSTALL A CEILING BULKHEAD IN ROOM 1M119A PER THE RESPONSE TO RFI 7664 |
| Mod SA1275· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-19 | +$56,202 | $948,279,133 | SLVCHS - EXPAND SLAB EDGE DNT&OUT |
| Mod SA1276· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-19 | +$11,449 | $948,290,582 | SLVCHS - PROVIDE THERMOSTAT TO SERVE BOTH FCUS |
| Mod SA1278· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-19 | +$7,872 | $948,298,454 | SLVCHS - ADDED STEEL PLATES AT SOUTH ELEVATION OF RESEARCH LEVEL 5 |
| Mod SA1274· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-23 | +$7,557 | $948,306,011 | SLVCHS - ADD ADDITIONAL DOOR HARDWARE. |
| Mod SA1281· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-23 | +$7,300 | $948,313,311 | SLVCHS - DATA DROPS AND PHONE JACKS IN DIXIE |
| Mod SA692· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-23 | −$16,843 | $948,296,468 | SLVHCS- CREDIT FOR EFFORTS TO RE-DESIGN PILE CAPS BY STUDIO NOVA |
| Mod SA1255· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-24 | +$110,503 | $948,406,971 | SLVCHS - REMOVE EXISTING SCREENS&INSTALL SECURITY MESH - DEFINITIZE CO-07X |
| Mod SA1268· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-24 | +$21,530 | $948,428,501 | SLVCHS - PROVIDE ELECTRICAL AND LOW VOLTAGE FOR OUTPATIENT DOORS. |
| Mod SA1279· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-24 | +$8,068 | $948,436,569 | SLVCHS - PROVIDE ELECTRIFIED HARDWARE AND CONNECTION TO SECURITY SYSTEMS FOR PERMANENT DOUBLE DOOR BETWEEN B51… |
| Mod SA1284· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-24 | +$25,883 | $948,462,452 | SLVCHS - REMOVE AND REPLACE EXISTING DRIVE APRON ON GALVEZ TO ALIGN WITH THE CONTRACT DOCS PER THE RESPONSE TO… |
| Mod SA1287· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-24 | +$33,427 | $948,495,879 | SLVCHS - LEVEL 5 RO SYSTEM POWER REMOTE PANEL |
| Mod SA1288· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-24 | −$61,368 | $948,434,511 | SLVCHS - DIXIE CURTAIN WALL CHANGES |
| Mod SA1290· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-26 | +$42,000 | $948,476,511 | SLVCHS - PROVIDE EMERGENCY POWER 120V POWER CIRCUITS FOR SCADA AND GENERATOR START PANELS PER THE RESPONSE TO… |
| Mod SA1292· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-26 | +$6,119 | $948,482,630 | PROVIDE TEMPERED WATER RECIRCULATION PUMP LEVEL 5 DIX |
| Mod SA1294· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-05-26 | +$35,991 | $948,518,621 | PROVIDE INTEGRAL BLINDS @ 3RD FLOOR WINDOWS/LITES&GLAZING THICKNESS DNT |
| Mod SA1253· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-01 | +$68,826 | $948,587,447 | SLVCHS - SCADA SYSTEM TO RESEARCH BLDG - CEP |
| Mod SA1283· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-01 | +$10,401 | $948,597,848 | SLVCHS - ELIMINATE MINERAL WOOL INSULATION AND PROVIDE SPRAY FOAM INSULATION ALSO PROVIDE CONTINUOUS PERIMETER… |
| Mod SA1285· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-01 | +$9,200 | $948,607,048 | SLVCHS - CHANGE WALL FRAMING FROM 18 GAUGE TO 20 GAUGE STUD WALL FOR DIX ROOMS, ALSO ADD 6IN 18 GAUGE JOISTS A… |
| Mod SA1289· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-01 | +$3,857 | $948,610,905 | SLVCHS - CORE NEW HOLES AND ABANDON THE EXISTING |
| Mod SA1291· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-01 | +$17,134 | $948,628,039 | SLVCHS - STEEL PLATES AT SOUTH ELEVATION RESEARCH - TLR/DIX |
| Mod SA1286· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-02 | +$6,054 | $948,634,093 | SLVCHS - SHIFT THE WALL TO TERMINATE WITH THE ROOM WINDOW MULLIONS. |
| Mod SA1293· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-02 | +$3,270 | $948,637,363 | SLVCHS - INSTALL ADDITIONAL FRAMING TO THE PARAPET ON THE PAN AM CONNECTOR BRIDGE. |
| Mod SA1295· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-03 | +$3,000 | $948,640,363 | SLVCHS - CHANGE THE FIXTURE TYPES IN THE CONCOURSE AT A1L3 PER THE RESPONSE TO RFI 7384 |
| Mod SA1298· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-03 | +$6,456 | $948,646,819 | SLVCHS - PROVIDE WALL FURR OUT TO ENCLOSE PERIMETER HORIZONTAL STEEL BEAM AND CURTAIN WALL JOINTS/ATTACHMENTS… |
| Mod SA1299· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-07 | +$7,326 | $948,654,145 | GROUT SEALER AT ALL ISO BATHROOMS RFP D-182 |
| Mod SA1300· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-07 | +$690 | $948,654,835 | SLVCHS - PATCH RETURN GRILLS IN DNT |
| Mod SA1301· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-07 | +$15,961 | $948,670,796 | SLVCHS - 2 HOUR RATED PARTITIONS IN CONCOURSE |
| Mod SA1297· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-08 | +$7,347 | $948,678,143 | SLVCHS - HIGH WATER DOMESTIC TANK ALARM |
| Mod SA1302· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-08 | +$3,862 | $948,682,005 | SLVCHS - PAINT EXPOSED MEP SYSTEMS IN ATRIUM TLR |
| Mod SA1303· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-08 | +$6,014 | $948,688,019 | SLVCHS - SHADE POCKET DETAIL AT WEST WALL TLR |
| Mod SA1306· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-08 | +$7,223 | $948,695,242 | SLVCHS - SHAFT WALL REQUIREMENTS IN TLR |
| Mod CO11A· CHANGE ORDER | 2016-06-09 | +$10,000 | $948,705,242 | SLVHCS- INTERIM FUNDING FOR PRE-CAST FOUNDATION DIXIE |
| Mod SA1304· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-09 | +$3,345 | $948,708,587 | SLVCHS - MODIFY DOOR OPENINGS AND SURROUNDING AREAS TO ACCOMMODATE DOORS AND PROPER OPENINGS FOR DOORS 1M151.2… |
| Mod SA1305· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-09 | +$4,714 | $948,713,301 | SLVCHS - INCORPORATE ALL REVISIONS INCLUDED ON THE PET CT SCAN DRAWINGS FOR ROOM 2G167 |
| Mod SA1308· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-09 | +$4,617 | $948,717,918 | SLVCHS - INSTALL STAINLESS STEEL RETURNS AT ELEVATORS. |
| Mod SA1309· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-09 | +$5,696 | $948,723,614 | SLVCHS - PAINT THE FOOTWALL REVEAL IN ALL PATIENT ROOMS. |
| Mod CO11B· CHANGE ORDER | 2016-06-20 | +$3,000 | $948,726,614 | SLVHCS CO-11B REPAIR DAMAGED OXYGEN LINE IN OUT BLDG. 3 |
| Mod SA1310· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-20 | +$1,721 | $948,728,335 | SLVCHS - OUTLET FOR OVEN IN DEMO KITCHEN - OUT |
| Mod SA1311· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-20 | +$6,715 | $948,735,050 | SLVCHS - PROVIDE PLYWOOD BACKING FOR LIGHT COVES ON LEVELS 2 AND 3. |
| Mod SA1312· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-20 | +$256,362 | $948,991,412 | SLVCHS - ADD AN OPERATOR'S ROOM TO AREA F1, LEVEL 4 DNT |
| Mod SA1313· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-20 | −$72,000 | $948,919,412 | SLVCHS - REVISE LIGHTWEIGHT INSULATED CONCRETE TO TAPERED INSULATION |
| Mod SA1317· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-20 | +$1,100 | $948,920,512 | SLVCHS - APPLY FACTORY FINISH TO THE WOOD FRAME CONSISTENT WITH THE DOOR AT 1M023A PER THE RESPONSE TO RFI 767… |
| Mod SA1318· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-20 | +$2,685 | $948,923,197 | SLVCHS - MODIFY TYPE-C GLASS SLIDERS TO ENSURE ADA CLEARANCES ARE MET. |
| Mod SA1320· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-20 | +$6,536 | $948,929,733 | SLVCHS - INSTALL 4 ACCESS PANELS TO ACCESS HOOD LIGHTING IN ROOM 1F102 PER THE RESPONSE TO RFI 7851 |
| Mod SA1321· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-20 | +$2,872 | $948,932,605 | SLVCHS - ADD FLASHING AT HEAD AND SILL OF WINDOW ON PAN AM CONNECTOR PER THE RESPONSE TO RFI 7376 |
| Mod SA1322· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-20 | +$2,460 | $948,935,065 | SLVCHS - INSTALL A SOLID SURFACE CAP WING WALLS PER THE RESPONSE TO RFI 7962.1 |
| Mod SA1323· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-20 | +$1,445 | $948,936,510 | SLVCHS -INSTALL TWO CG8 STAINLESS STEEL PANELS AT VERTICAL REVEAL OUT |
| Mod CO11C· CHANGE ORDER | 2016-06-21 | +$50,000 | $948,986,510 | SLVHCS PROVISIONS FOR BOIL OUT SINK |
| Mod SA1314· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-21 | +$4,855 | $948,991,365 | INSTALL SHAFT WALL @ LEVEL 4I DNT |
| Mod SA1315· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-21 | +$2,996 | $948,994,361 | MODIFY N ATRIUM SOFFIT @ STOREFRONT TLR |
| Mod SA1316· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-21 | +$3,379 | $948,997,740 | SLVCHS - PROVIDE SINGLE VALVE FAUCET @ CS-1 DNT |
| Mod SA1325· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-21 | +$2,336 | $949,000,076 | SLVCHS - ADJUST THE PARAPET @ THE CONNECTOR TO PAM AM EXPANSION JOINT |
| Mod SA1326· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-23 | +$3,832 | $949,003,908 | SLVCHS - ADD A BULKHEAD AT THE ALCOVE ENTRY 3G-C04 PER THE RESPONSE TO RFI 7875 |
| Mod SA1331· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-23 | +$18,355 | $949,022,263 | SLVCHS - INSTALL TIE OFFS ON ROOF |
| Mod SA1319· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-27 | +$5,482 | $949,027,745 | SLVCHS - ADD WATER/DRAINAGE LINE TO DEHUMIDIFIER IN ROOM 2D162. |
| Mod SA1327· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-27 | +$5,087 | $949,032,832 | SLVCHS - RAISE THE FTP4 FIXTURES IN THE PT/OT GYM OF TLR. |
| Mod SA1328· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-27 | +$46,433 | $949,079,265 | SLVCHS - CHANGE THE TWO-WAY RADIO PAGING FREQUENCY BY PROVIDING 2 NEW PAGING TRANSMITTERS AND 2 NEW IM PANELS. |
| Mod SA1329· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-27 | +$1,596 | $949,080,861 | SLVCHS - PROVIDE TLR POOL EQUIPMENT RM1M65 MECHANICAL CHANGES. |
| Mod SA1330· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-28 | +$15,000 | $949,095,861 | SLVCHS - DOORS MISSING CONTACTS IN TLR |
| Mod SA1324· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-29 | +$106,833 | $949,202,694 | SLVCHS - INSTALL EXPANSION LOOPS NOT SHOWN ON THE CONTRACT DRAWINGS |
| Mod SA1333· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-29 | +$128,420 | $949,331,114 | SLVCHS VIVARIUM REFRIGERATOR&FREEZER REVISIONS DIXIE BLDG 8 |
| Mod SA1334· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-29 | +$3,419 | $949,334,533 | SLVCHS -REVISE THE ROLLER SHADE POCKET RM 3E105, 106, 108,109,110&111 |
| Mod SA1335· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-29 | +$89,000 | $949,423,533 | SLVCHS - UPGRADES TO POLICE SECURITY COMMAND CENTER |
| Mod SA1336· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-29 | +$1,529 | $949,425,062 | MODIFY SILL EXTENSION IN CORRIDOR B 3M001 |
| Mod SA1337· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-29 | +$10,528 | $949,435,590 | SLVCHS - ADJUST THE PARAPET @ THE CONNECTOR TO PAM AM EXPANSION JOINT |
| Mod SA1338· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-29 | +$131,792 | $949,567,382 | SLVCHS - PROVIDE LEAD SHIELDING IN DNT ROOMS |
| Mod CO11D· CHANGE ORDER | 2016-07-01 | +$70,000 | $949,637,382 | SLVHCS PHARMACY DOOR SECURITY REVISIONS |
| Mod SA1339· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-01 | +$2,917 | $949,640,299 | SLVCHS - ADD 2 FTU1E FIXTURES TO CAREGIVER STATION 3M052 PER THE RESPONSE TO RFI 8105 |
| Mod SA1340· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-01 | +$4,882 | $949,645,181 | SLVCHS - REWORK THE LIGHT FIXTURES IN THE 5 GROUP THERAPY ROOMS OF LEVEL 1 PER THE RESPONSE TO RFI 7935 |
| Mod SA1342· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-01 | +$5,574 | $949,650,755 | ADD THERMOSTATS TO PAN AM CONNECTOR |
| Mod SA1343· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-01 | +$1,959 | $949,652,714 | SLVCHS - RETURN GRILL DNT |
| Mod SA1344· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-01 | +$1,258 | $949,653,972 | ADD BULKHEAD ADJACENT TO RM 1M121 |
| Mod SA1345· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-01 | +$22,191 | $949,676,163 | SLVCHS - MAIN ENTRY CANOPY - METAL SOFFIT PANEL |
| Mod SA1346· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-01 | +$38,523 | $949,714,686 | INSTALL ETA CONTROL JOINT @ CMU WALL PARAPETS |
| Mod SA1347· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-01 | +$20,902 | $949,735,588 | ADD ADDITIONAL LIGHT FIXTURES IN STAIR SHAFTS M1&M2 |
| Mod SA1349· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-01 | +$22,000 | $949,757,588 | SLVCHS - FIREPROOFING TO EXPOSED TRUSS |
| Mod SA1350· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-01 | +$16,026 | $949,773,614 | SLVCHS - METAL PANEL SOFFIT VENT TLR |
| Mod SA1351· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-01 | +$7,458 | $949,781,072 | SLVCHS - GYM DOOR HARDWARE TLR |
| Mod SA1352· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-01 | +$8,968 | $949,790,040 | SLVCHS - DNT RATING GAP |
| Mod SA1353· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-01 | +$19,616 | $949,809,656 | SLVCHS - 2 HOUR FIRE WALL |
| Mod SA1332· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-11 | +$3,000 | $949,812,656 | SLVCHS - ADD HAT CHANNEL, SHEETROCK, AND PAINT AT THE DP-9 AND DP-10 ELEVATOR PER THE RESPONSE TO RFI 7617.1 |
| Mod SA1341· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-11 | +$116,548 | $949,929,204 | SLVCHS - PROVIDE PRE-CAST PLANTERS, SOIL AND PLANTS PER THE RESPONSE TO RFI 7833, 7833.1 AND 8121. |
| Mod SA1348· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-11 | +$26,508 | $949,955,712 | SLVCHS - MODIFY THE FRAMING, DRYWALL, AND RAILING AS NEEDED TO CONCEAL ALL EXPOSED SLAB EDGES AND STEEL THAT P… |
| Mod SA1354· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-11 | +$7,654 | $949,963,366 | SLVCHS - EXTERIOR DOOR |
| Mod SA1357· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-11 | +$3,740 | $949,967,106 | SLVCHS - CHANGE THE FIXTURE TYPE IN ROOMS 3J206 AND 5J206 TO FTG3B IN LIEU OF FTG10B. |
| Mod SA1358· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-11 | +$3,810 | $949,970,916 | SLVCHS - MODIFY THE EXISTING PARAPET AT THE K CONNECTOR. |
| Mod SA1361· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-11 | −$19,445 | $949,951,471 | SLVCHS - PROVIDE CREDIT FOR WALLS DELETED FROM INTERSTITIAL SPACE. |
| Mod SA1307· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-12 | +$0 | $949,951,471 | SLVCHS - REMOVED NAMED STORM INSURANCE COVERAGE FOR REMAINDER OF NEW ORLEANS PROJECT |
| Mod SA1362· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-12 | +$2,301 | $949,953,772 | SLVCHS - INSTALL FIRE WRAP AROUND THE DUCT IN SE RISER. |
| Mod SA1363· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-12 | +$14,627 | $949,968,399 | SLVCHS - INCREASE THE FRAMING AND METAL PANELS AT LEVEL 2 OF ED RAMP. |
| Mod SA1359· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-13 | +$584 | $949,968,983 | SLVCHS - PROVIDE ROUGH-IN AND SWITCH FOR MOTORIZED PROJECTOR IN ROOM 3G187 PER THE RESPONSE TO RFI 7965 |
| Mod SA1360· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-13 | +$7,000 | $949,975,983 | SLVCHS - PROVIDE TLR POOL EQUIPMENT RM1M65 MECHANICAL CHANGES. |
| Mod SA1365· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-14 | +$6,174 | $949,982,157 | SLVCHS - OUTLETS |
| Mod SA1367· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-14 | +$3,646 | $949,985,803 | SLVCHS - FRAMING FOR CANOPY |
| Mod SA1369· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-14 | +$19,486 | $950,005,289 | SLVCHS - LADDER KNIFE PLATE TLR |
| Mod SA1370· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-14 | +$2,171 | $950,007,460 | SLVCHS - BREAK METAL AT PAN AM CONNECTOR |
| Mod SA1356· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-15 | +$3,737 | $950,011,197 | SLVCHS - CANOPY LIGHTS |
| Mod SA1364· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-20 | +$2,503 | $950,013,700 | LOWER THE CEILING&BUILD BULKHEAD IN ROOM 1E-C06 |
| Mod SA1366· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-20 | −$1,172 | $950,012,528 | DELETE HOSE VALVE CABINET&PROVIDE CREDIT |
| Mod SA1368· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-20 | +$3,432 | $950,015,960 | RELOCATE DRAIN IN ROOM 2E109 DNT |
| Mod SA1371· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-20 | +$13,775 | $950,029,735 | INSTALL 8FT FTP6E IN LIEU OF 12FT FTP63 @ A3/A4 |
| Mod SA1374· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-20 | +$1,453 | $950,031,188 | MODIFY CEILINGS IN ROOMS 5D166&5D167 DNT |
| Mod SA1384· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-22 | +$23,231 | $950,054,419 | SLVCHS - WATERPROOFING PAN AM PATIO |
| Mod SA1385· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-22 | +$1,207 | $950,055,626 | SLVCHS - LIGHT FIXTURE |
| Mod SA1386· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-22 | +$3,553 | $950,059,179 | SLVCHS - SUNDRY SHOP CEILING REPAIRS |
| Mod SA1373· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-25 | +$11,958 | $950,071,137 | PROVIDE OVERFLOW DRAINS ON LEVEL 4&6 |
| Mod SA1377· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-26 | +$11,750 | $950,082,887 | SLVCHS - ADDED 2 HOUR RATING IN INTERSTITIAL ELEVATOR SHAFTS |
| Mod SA1381· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-26 | +$5,503 | $950,088,390 | PROVIDE POWER FROM LEVEL 8 TO SMOKE DAMPERS ON LEVEL 7 |
| Mod SA1382· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-26 | +$1,271 | $950,089,661 | ADD SG-2 GLAZING 15 1M004 STOREFRONT |
| Mod SA1383· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-26 | +$2,451 | $950,092,112 | FUR AROUND EXPOSED STEEL KICKER RM 3M001 |
| Mod SA1387· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-26 | +$2,758 | $950,094,870 | SLVCHS - INSTALL TILE AROUND THE WALK OFF MATD |
| Mod SA1388· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-26 | +$3,190 | $950,098,060 | SLVCHS - ORNAMENTAL FENCE POST |
| Mod SA1389· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-26 | +$9,900 | $950,107,960 | SLVCHS - RELOCATE MED GAS MANIFOLD |
| Mod SA1390· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-27 | +$18,500 | $950,126,460 | SLVCHS - INTERSTITUAL FIRE RATING |
| Mod SA1391· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-27 | +$8,945 | $950,135,405 | SLVCHS - MAIN ENTRY CANOPY WHEELCHAIR STORAGE AREA |
| Mod SA1392· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-27 | +$2,377 | $950,137,782 | SLVCHS - UNDERCASE LIGHT FIXTURES TLR |
| Mod SA1393· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-27 | +$9,000 | $950,146,782 | SLVCHS - ADDITIONAL SHRUBS IN THE EDUCATION COURTYARD |
| Mod SA1395· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-27 | +$33,846 | $950,180,628 | SLVCHS - CARD READERS TO DEFINITIZE CO-10O |
| Mod SA1400· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-27 | +$9,111 | $950,189,739 | SLVCHS - INSTALL A GUARDRAIL ON THE STAIR LEADING TO LEVEL 6F1 ELEVATOR MACHINE ROOM. |
| Mod SA1401· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-27 | +$23,978 | $950,213,717 | SLVCHS - INSTALL NAE PANEL ON 3RD FLOOR TO ALLOW INTEGRATION OF THE MED GAS ALARM PANEL WITH THE BAS. |
| Mod SA1372· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-28 | +$36,959 | $950,250,676 | SLVCHS - POWER FOR HEAT TRACE SYSTEMS CONTROLS |
| Mod SA1394· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-28 | +$20,222 | $950,270,898 | EXPEDITE DELIVERY AND INSTALLATION OF ADDED LEAD LINED DRYWALL MRI ROOMS DNT |
| Mod SA1396· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-28 | +$16,306 | $950,287,204 | SLVCHS - FLOOR OUTLET/DATA BOX |
| Mod SA1398· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-28 | +$33,630 | $950,320,834 | SLVCHS - PARKING CONTROL EQUIPMENT |
| Mod SA1378· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-29 | +$4,349 | $950,325,183 | SLVCHS - INSTALL KNEE WALL IN THE SERVICE ELEVATOR MACHINE ROOM LEVEL 9 6J318. |
| Mod SA1380· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-29 | +$199,639 | $950,524,822 | SLVCHS - PROVIDE TLR POOL EQUIPMENT RM1M65 MECHANICAL CHANGES. |
| Mod SA1402· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-29 | +$10,645 | $950,535,467 | SLVCHS - INSTALL ADDITIONAL LIGHT FIXTURES AROUND THE DA TANK COURTYARD PER THE RESPONSE TO RFI 7426.1 |
| Mod SA1403· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-29 | +$56,178 | $950,591,645 | SLVCHS - FIRE PROTECTION |
| Mod SA1404· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-29 | +$1,235 | $950,592,880 | SLVCHS - PATCHING DUE TO RELOCATING DEVICES |
| Mod SA1405· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-29 | +$2,165 | $950,595,045 | SLVCHS - IN ROOM 1M162 SEAL ALL PENETRATIONS NOT REQUIRED AND PAINT FIRE CAULK TO MATCH THE REST OF THE CEILIN… |
| Mod SA1408· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-07-29 | +$5,407 | $950,600,452 | SLVCHS - METAL PANEL TRANSITION |
| Mod SA1397· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-01 | +$3,524 | $950,603,976 | SLVCHS - PROVIDE SPECIAL PLASTER SPF-1 FOR THE CONCOURSE ALCOVE OUTSIDE FIRE COMMAND CENTER. |
| Mod SA1399· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-01 | +$1,539 | $950,605,515 | SLVCHS - DNT MENTAL HEALTH, CHANGE THE SEALANT AT PATIENT ROOM WINDOWS TO ABUSE RESISTANT SEALANT. |
| Mod SA1406· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-01 | −$3,911 | $950,601,604 | SLVCHS - CREDIT FOR DELETING THE REQUIREMENT TO RECESS THE FRAMING TO ALLOW TACT BOARDS TO BE INSTALLED FLUSH… |
| Mod SA1409· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-01 | +$3,603 | $950,605,207 | SLVCHS - RELOCATE NETWORK PORTS |
| Mod SA1410· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-01 | +$6,000 | $950,611,207 | SLVCHS - STAIR CLOSURE RAILING TLR |
| Mod SA1411· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-01 | +$5,605 | $950,616,812 | SLVCHS - AUTOMATIC SLIDING DOOR POWER |
| Mod SA1412· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-01 | −$38,095 | $950,578,717 | SLVCHS - EXTERIOR DUCT PAINTING TLR |
| Mod SA1413· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-01 | +$4,288 | $950,583,005 | SLVCHS - TAPERING STAINLESS STEEL TLR CORRIDOR |
| Mod CO11E· CHANGE ORDER | 2016-08-03 | +$100,000 | $950,683,005 | SLVHCS - DNT AND OP PHARMACY SECURITY REVISIONS |
| Mod SA1414· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-04 | +$3,441 | $950,686,446 | PROVIDE ADDITION EXIT SIGNS AT 3A201 DOORS |
| Mod SA1415· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-04 | −$2,139 | $950,684,307 | CREDIT FOR WALL TYPE BEING CHANGED FROM K4 TO J4 PARTITION |
| Mod SA1416· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-04 | +$6,045 | $950,690,352 | PROVIDE POWER CIRCUITS FOR DNT ROOM 3F168 SKYTRON BOOMS |
| Mod SA1417· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-04 | +$4,191 | $950,694,543 | INSTALL P24 PARTITION @ LEVEL 8 MACHINE ROOM |
| Mod CO11F· CHANGE ORDER | 2016-08-05 | +$131,552 | $950,826,095 | SLVHCS RESEARCH EQUIPMENT ESCALATION |
| Mod SA1419· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-08 | +$15,299 | $950,841,394 | PROVIDE&INSTALL HOOD ROUGH-IN DIX |
| Mod SA1421· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-08 | +$3,229 | $950,844,623 | SLVCHS - INFILL DAVIT BLOCK OUTS AS A RESULT OF THEM BEING RELOCATED PER PCO 811203 AND ISSUED UNDER SA-621 |
| Mod SA1422· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-08 | +$5,118 | $950,849,741 | SLVCHS - FINISHES CHANGES BULLETIN 48 |
| Mod SA1423· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-08 | +$1,682 | $950,851,423 | SLVCHS - PROVIDE AN AUDIOVISUAL UTILITY OUTLET, LOCATED ALONG WITH WING WALL JUST RIGHT OF THE SINK, FOR DNT W… |
| Mod SA1424· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-08 | +$3,031 | $950,854,454 | SLVCHS - INSTALL THE COLUMN WRAP AT THE NE RISER TO ENSURE THE 2 HOUR RATING IS MAINTAINED PER THE RESPONSE TO… |
| Mod SA1428· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-08 | +$25,000 | $950,879,454 | SLVCHS - ADDED SOFFIT AT A6 RAMP FIRE RATING |
| Mod CO11G· CHANGE ORDER | 2016-08-09 | +$20,000 | $950,899,454 | SLVHCS - INSTALL EXIT DEVICES ON SITE GATES DIXIE |
| Mod CO11H· CHANGE ORDER | 2016-08-09 | +$3,000 | $950,902,454 | SLVHCS - PHILLIPS MEP CABINETS TO BE RELOCATED IN DNT |
| Mod SA1407· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-10 | +$10,860 | $950,913,314 | ADD DATA DROPS @ THE F2 CASHIER STATIONS |
| Mod SA1418· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-10 | +$47,636 | $950,960,950 | SLVCHS - CURTAINWALL DETAILS IN FACADE AT DIXIE |
| Mod SA1420· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-10 | +$8,047 | $950,968,997 | INSTALL ADDITIONAL FRAMING , ADD DOOR IN 4D150&MODIFY CEILING |
| Mod SA1431· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-10 | +$27,121 | $950,996,118 | SLVCHS - REMOVAL/PAINTING OF EXISTING BLACK MASTIC DIXIE |
| Mod SA1432· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-10 | +$36,575 | $951,032,693 | SLVCHS - VARIOUS PLUMBING REVISIONS AT DIXIE |
| Mod SA1434· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-10 | +$65,740 | $951,098,433 | SLVCHS - ADDED 1/2" AESS AT SLIDING DOORS |
| Mod SA1435· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-10 | +$30,084 | $951,128,517 | SLVCHS - ADDED POWER TO RADIO ROOM OUTPATIENT |
| Mod SA1427· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-16 | +$3,858 | $951,132,375 | SLVCHS - ADDED EXHAUST DUCTWORK FOR ROOM 4P320B AT DIXIE BUILDING 8 |
| Mod SA1429· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-16 | −$1,186 | $951,131,189 | SLVCHS - PROVIDE AND INSTALL MEMBRANE FLASHING IN LIEU OF METAL PANEL AT THE LEVEL 5 ROOF OF DIXIE BUILDING 8 |
| Mod SA1433· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-16 | +$6,720 | $951,137,909 | SLVCHS - PROVIDE PARTITION ON CON LEVEL 1 A5 TO CONCEAL SPANDREL GLASS AND CONCEAL EXPOSED SLAB EDGE FIRE SAFI… |
| Mod SA1436· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-16 | +$4,923 | $951,142,832 | SLVCHS - PERFORM THE LANDSCAPING AND SITE REVISIONS AT DIXIE BUILDING 8 PER BULLETIN 38 |
| Mod SA1437· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-16 | +$23,581 | $951,166,413 | SLVCHS - ADD STAINLESS STEEL DUCT FOR EATING PLACE IN DIXIE |
| Mod SA1439· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-16 | −$12,683 | $951,153,730 | SLVCHS - DELETE THE EXHAUST HOODS IN DIXIE BUILDING 8 PER THE RESPONSE TO RFIS 7657 AND 7742 |
| Mod SA1440· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-16 | +$3,319 | $951,157,049 | SLVCHS - PROVIDE AND INSTALL ADDITIONAL FRAMING UNDER THE STOREFRONT AT THE A4 ATRIUM TO CONCEAL THE EXPOSED F… |
| Mod SA1441· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-16 | +$3,164 | $951,160,213 | PROVIDE&INSTALL 3 ADDITIONAL FTR2A FIXTURES IN THE ELEVATOR MACHINE ROOM 8L101 |
| Mod SA1443· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-16 | +$3,989 | $951,164,202 | INSTALL A CEILING IN ROOM 1F132 DNT |
| Mod SA1444· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-16 | +$1,211 | $951,165,413 | PROVIDE 480V CIRCUIT TO POWER RO SYSTEM DNT, DEFINITIZE CO-10N |
| Mod SA1450· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-16 | +$3,634 | $951,169,047 | PROVIDE POWER TO DNT 2G151 FOR SHUT TRIP BREAKER, DNT 2G164 INSTALLATION OF EPO BUTTON&PROVIDE CONDUIT AND WIR… |
| Mod SA1446· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-17 | +$8,244 | $951,177,291 | SLVCHS - CONCRETE WALL |
| Mod SA1355· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-18 | +$19,440 | $951,196,731 | SLVCHS - ELEVATOR FRONT JAMBS DNT |
| Mod SA1452· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-18 | +$2,544 | $951,199,275 | PROVIDE TLR SANCTUARY CHANGES TO GLASS, ELECTRICAL AND WALL BASE |
| Mod SA1453· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-18 | +$7,407 | $951,206,682 | SLVCHS - MRI CRYOGEN BYPASS SUPPLY |
| Mod SA1455· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-18 | +$1,209 | $951,207,891 | SLVCHS - EXPOSED WINDOW SPRINKLER DNT |
| Mod CO11I· CHANGE ORDER | 2016-08-19 | +$101,433 | $951,309,324 | SLVHCS - COVER COSTS OF LIGHTING AND LIGHTING CONTROLS ESCALATION |
| Mod CO11J· CHANGE ORDER | 2016-08-19 | +$78,000 | $951,387,324 | SLVHCS -ESCALATION CHARGES MADISON HEIGHTS GLASS COMPANY |
| Mod SA1447· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-22 | +$15,984 | $951,403,308 | SLVCHS - PROVIDE COMPRESSED AIR INTERLOCK SWITCH ON THE CEP PLANT CONTROL AIR SYSTEM |
| Mod SA1448· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-22 | +$2,726 | $951,406,034 | SLVCHS - POWER FOR CO2 MANIFOLD AND PANEL AT DNT LEVEL 4 AREA F2 IN ROOM 4F129 |
| Mod SA1457· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-22 | +$2,777 | $951,408,811 | SLVCHS - HEADWALL UNIT TEMPLATE |
| Mod SA1438· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-23 | +$16,338 | $951,425,149 | SLVCHS - PROVIDE AND INSTALL TEST PORTS AND VIEW OF PORTS ON THE BOILER ECONOMIZER PIPING PER THE RESPONSE TO… |
| Mod SA1451· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-23 | +$13,362 | $951,438,511 | PROVIDE ELECTRICAL FOR EXTERIOR LIGHTS 6 EACH |
| Mod SA1454· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-23 | +$13,296 | $951,451,807 | SLVCHS - PROVIDE LATERAL STEEL SUPPORTS AT THE NORTH SIDE OF THE VERTICAL EXPANSION JOINT AT THE CONCOURSE/TAN… |
| Mod SA1456· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-23 | +$1,385 | $951,453,192 | SLVCHS - PROVIDE A 6 INCH BULKHEAD AT TLR LEVEL 3 WEST ELEVATOR LOBBY TO CONCEAL SPRINKLER PIPING |
| Mod SA1459· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-23 | +$19,321 | $951,472,513 | PROVIDE&INSTALL ADDITIONAL POWER FEEDS TO TIE IN METERING PUMP IN THE POOL EQUIP ROOM 1M165 |
| Mod SA1465· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-23 | +$12,993 | $951,485,506 | SLVCHS - BREAK METAL AT DIXIE |
| Mod SA1376· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-24 | +$4,977 | $951,490,483 | SLVCHS - PNEUMATIC TUBE SYSTEM |
| Mod SA1461· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-24 | +$10,659 | $951,501,142 | SLVCHS - PROVIDE AND INSTALL TAMPER SWITCH AS IDENTIFIED ON THE OUTPATIENT PUNCH LIST |
| Mod SA1463· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-24 | +$2,324 | $951,503,466 | SLVCHS - PROVIDE AND INSTALL PONY WALL IN ROOM 1P113C PER THE RESPONSE TO RFI 7887 |
| Mod SA1467· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-24 | +$4,216 | $951,507,682 | SLVCHS - REVISED SKYTRON - DNT |
| Mod SA1468· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-24 | +$1,112 | $951,508,794 | SLVCHS - PROVIDE AND INSTALL A 12" X 12" 10" IN-LINE IN LIEU OF THE 10" BASINS AT THE SERPENTINE COURTYARD PER… |
| Mod CO11L· CHANGE ORDER | 2016-08-25 | +$30,000 | $951,538,794 | SLVHCS - DATA DROP RELOCATIONS IN TV ROOMS OUTPATIENT |
| Mod SA1445· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-25 | +$15,653 | $951,554,447 | SLVCHS - TRANSPLANT LANDSCAPING |
| Mod SA1458· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-25 | +$45,820 | $951,600,267 | SLVCHS - ADDED COST BULLETIN 29 CHW LINES |
| Mod SA1460· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-25 | +$4,702 | $951,604,969 | PROVIDE EXPANSION JOINT AT CON MAIN ENTRY |
| Mod SA1464· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-25 | +$9,128 | $951,614,097 | SLVCHS - LANDSCAPE IRRIGATION SYSTEM |
| Mod SA1473· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-25 | +$1,412 | $951,615,509 | SLVCHS - ART GLASS |
| Mod SA1474· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-25 | −$2,556 | $951,612,953 | SLVCHS - REMOVE/CHIP OUT SECTION OF PROTRUDING SLAB AS REQUIRED TO MAKE PRECAST PANELS FIT AS ADDRESSED IN THE… |
| Mod SA1475· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-25 | +$5,270 | $951,618,223 | SLVCHS - PROVIDE AND INSTALL ADDITIONAL THE HANDRAIL ON THE DEEP END OF THE POOL PER THE RESPONSE TO RFI 8352 |
| Mod SA1476· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-25 | +$2,547 | $951,620,770 | SLVCHS - MODIFY THE HARDWARE AT DOORS 5G103.2 AND 5G102.2 PER THE RESPONSE TO RFI 8131 |
| Mod CO11M· CHANGE ORDER | 2016-08-29 | +$50,000 | $951,670,770 | SLVHCS - AREA A3 NORTH PARAPET CRACK DIXIE |
| Mod SA1466· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-29 | +$18,270 | $951,689,040 | PROVIDE&INSTALL ADDITIONAL STEEL SUPPORT AROUND DUCT OPENINGS ON LEVEL 5.5&6 DIX |
| Mod SA1470· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-29 | +$7,434 | $951,696,474 | PROVIDE&INSTALL ADDITIONAL POWER&DATA @ 1M003 TLR |
| Mod SA1472· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-29 | +$3,792 | $951,700,266 | PROVIDE DEMO SLAB FOR TEST MICRO PILE |
| Mod SA1478· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-29 | +$1,237 | $951,701,503 | SLVCHS - PROVIDE TLR POOL EQUIPMENT RM1M65 MECHANICAL CHANGES. |
| Mod SA1480· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-29 | +$11,973 | $951,713,476 | REMOVE AND OR CHIP OUT SECTIONS OF FOUNDATION REQUIRED TO INSTALL MICRO PILES, DEFINITIZE CO-11A |
| Mod SA1482· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-29 | +$9,002 | $951,722,478 | PROVIDE&INSTALL ADDITIONAL TELECOMMUNICATION OUTLETS DNT |
| Mod SA1483· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-29 | +$7,500 | $951,729,978 | REMOVE POUR STOPS&INSTALL TEMP STOPS |
| Mod SA1484· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-29 | +$950 | $951,730,928 | PROVIDE&INSTALL A PARALLEL CLOSER IN LIEU OF A REGULAR CLOSER DOOR 3D149 DNT |
| Mod SA1489· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-30 | +$165,001 | $951,895,929 | SLVCHS - NASH UTILITY WORK ASSOCIATED WITH CEP AND DIXIE |
| Mod CO11N· CHANGE ORDER | 2016-08-31 | +$4,341,692 | $956,237,621 | SLVHCS - INSURANCE PAYMENT #1 OF 2 FOR INSURANCE THROUGH COMPLETION OF PROJECT |
| Mod CO11O· CHANGE ORDER | 2016-08-31 | +$675,000 | $956,912,621 | SLVHCS - INTERIM PAYMENT FOR HUEN ELECTRIC WORK ON MAIN CAMPUS FOR 4 PCOS 811269, 811240, 811327 AND 811025 |
| Mod CO11P· CHANGE ORDER | 2016-08-31 | +$675,000 | $957,587,621 | SLVHCS - DIXIE TIME EXTENSION, CMHP GRS GCS |
| Mod CO11Q· CHANGE ORDER | 2016-08-31 | +$675,000 | $958,262,621 | SLVHCS - NASH MECHANICAL EXTENDED TIME DIXIE RESEARCH FACILITY |
| Mod CO11R· CHANGE ORDER | 2016-08-31 | +$675,000 | $958,937,621 | SLVHCS - DIXIE TIME EXTENSION COSTS FOR CONTI ELECTRIC |
| Mod SA1375· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-31 | +$384,770 | $959,322,391 | SLVCHS - SECURITY NETWORK AND SERVER HARDWARE |
| Mod SA1425· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-31 | +$29,518 | $959,351,909 | SLVCHS - GROUTING OF EXISTING WINDOW SILLS |
| Mod SA1426· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-31 | +$249,184 | $959,601,093 | SLVCHS - GROUP 1 VOICE AND DATA CAMPUS WIDE |
| Mod SA1469· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-31 | +$6,646 | $959,607,739 | SLVCHS - PROVIDE FIRE PROOFING AT 4 BEAMS AROUND COLUMN C11 AND INTERSTITIAL PIPE HANGERS AT DNT LEVEL. |
| Mod SA1479· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-31 | +$14,648 | $959,622,387 | SLVCHS - REMOVE ADDITIONAL BRICK, LINTEL AND REPLACE LINTEL IN AREA A1 EAST CARRIAGEWAY DOOR. |
| Mod SA1481· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-31 | −$1,428 | $959,620,959 | SLVCHS - PROVIDE A CREDIT FOR ALLOWING INSTALLATION OF STAINLESS STEEL IN LIEU OF ZINC-ALLOY FLASHING. |
| Mod SA1485· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-31 | +$753 | $959,621,712 | SLVCHS - REMOVE AND REINSTALL LIGHT FIXTURES |
| Mod SA1486· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-31 | +$6,530 | $959,628,242 | SLVCHS - RELOCATED THE CARD READERS IN STAIR STJ-3 PER THE RESPONSE TO RFI 8207 |
| Mod SA1487· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-31 | +$18,378 | $959,646,620 | SLVCHS - K-CONNECTOR TO CONCOURSE FIRE RATING |
| Mod SA1491· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-31 | +$445,636 | $960,092,256 | SLVCHS - FINAL WORK ON PCOS 811269, 811240 AND 811327 FOR SUBS OTHER THAN HUEN |
| Mod CO11S· CHANGE ORDER | 2016-09-01 | +$30,000 | $960,122,256 | SLVHCS - REVISE ROOF ACCESS DOORS LOCKS |
| Mod CO11T· CHANGE ORDER | 2016-09-01 | +$121,800 | $960,244,056 | SLVHCS - ADDITIONAL BRICK FOR DIXIE |
| Mod SA1430· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-01 | +$1,397,211 | $961,641,267 | SLVCHS - PERFORM THE STRUCTURAL SHORING, ANALYSIS AND RE-SEQUENCING OF WORK AT DIXIE BUILDING 8. |
| Mod SA1442· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-01 | +$58,674 | $961,699,941 | SLVCHS - FIRE PROOFING |
| Mod SA1462· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-01 | +$631 | $961,700,572 | SLVCHS - RELOCATE THE POWER FOR THE STERILIZER TO THE SE CORNER FROM THE SW CORNER AT DNT ROOM 3E142; AS PER R… |
| Mod SA1471· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-01 | +$4,094 | $961,704,666 | SLVCHS - MOCKUP FOR TL PATIENT ROOM |
| Mod SA1495· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-01 | +$38,000 | $961,742,666 | SLVCHS - DAMPERS |
| Mod SA1496· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-01 | +$16,787 | $961,759,453 | SLVCHS - STEEL SUPPORT FOR LEAD LINED DOORS DNT |
| Mod SA1497· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-01 | +$13,319 | $961,772,772 | SLVCHS - MISSING FIRE ALARMS - DNT |
| Mod SA1477· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-07 | +$2,309 | $961,775,081 | SLVCHS - ELECTRICAL CONDUIT RELOCATION DNT |
| Mod SA1498· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-07 | +$24,138 | $961,799,219 | SLVCHS - DRILL 24 1/2" HOLES AT EACH SUMP PIT COVER IN EVERY ELEVATOR PIT AND PER THE RESPONSE TO RFI 7865C1 |
| Mod SA1499· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-07 | +$2,050 | $961,801,269 | SLVCHS - METAL GARE |
| Mod SA1501· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-07 | +$56,022 | $961,857,291 | SLVCHS - DETAIL FOR ROOF STAIRS |
| Mod SA1503· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-08 | +$14,036 | $961,871,327 | SLVCHS - FIRE SUPPRESSION |
| Mod SA1504· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-08 | +$17,894 | $961,889,221 | SLVCHS - PROVIDE AND INSTALL 2 SD-14 SUPPLY DIFFUSERS AND 1 RG-14 RETURN GRILL ON LEVEL 1 OF PAN AM PER THE RE… |
| Mod SA1505· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-08 | +$6,791 | $961,896,012 | SLVCHS - ALTER THE FRAMING DETAIL AT THE NW ENTRANCE CANOPY AT BUILDING 6 PER THE RESPONSE TO RFI 8238 |
| Mod SA1506· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-08 | +$16,757 | $961,912,769 | SLVCHS - PROVIDE AND INSTALL A FIRE SUPPRESSION SYSTEM IN ROOM 3M178 PER THE RESPONSE TO RFI 6294 |
| Mod SA1507· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-08 | +$16,814 | $961,929,583 | SLVCHS - KITCHEN EQUIPMENT DNT |
| Mod CO11U· CHANGE ORDER | 2016-09-09 | +$0 | $961,929,583 | SLVHCS - ADD AND CHANGE DOOR SECURITY IN OUTPATIENT PHARMACY - NO COST MODIFICATION |
| Mod SA1490· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-12 | +$2,118 | $961,931,701 | PROVIDE&INSTALL A STAINLESS STEEL COILING DOOR @ 5J111E.2 OUT |
| Mod SA1500· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-12 | +$9,847 | $961,941,548 | PROVIDE&INSTALL LIGHTWEIGHT CONCRETE IN STAIR STF-04 TLR |
| Mod SA1502· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-12 | +$8,478 | $961,950,026 | PROVIDE&INSTALL A FIRE SUPPRESSION SYSTEM IN THE PAN AM CONNECTOR&ADJACENT ELEVATOR LOBBY |
| Mod SA1508· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-12 | +$5,000 | $961,955,026 | PROVIDE FIRE DAMPERS @ TLR 3RD FLOOR |
| Mod SA1509· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-12 | +$2,305 | $961,957,331 | RELOCATE THE SND-01 IN ROOM 1M016 TLR |
| Mod SA1511· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-12 | +$16,900 | $961,974,231 | SLVCHS - INTERSTITUAL STEEL THAT WAS EXPOSED NEEDS FIREPROOFING DNT |
| Mod SA1512· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-12 | +$2,782 | $961,977,013 | SLVCHS - LIGHT FIXTURE CONFLICT TLR |
| Mod SA1513· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-12 | +$4,000 | $961,981,013 | SLVCHS - METAL TRIM |
| Mod SA1514· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-12 | +$69,000 | $962,050,013 | SLVCHS - REVISED TOSHIBA EQUIPMENT CEP |
| Mod CO11V· CHANGE ORDER | 2016-09-13 | +$68,000 | $962,118,013 | SLVHCS - REPAIR STEEL AT CARRIAGEWAY DEMO LINES |
| Mod SA1510· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-13 | +$3,000 | $962,121,013 | SLVCHS - GAP LEVEL 5I - INSTALL WALL |
| Mod SA1517· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-15 | +$5,373 | $962,126,386 | SLVCHS - ADDED WING WALL DNT |
| Mod SA1519· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-15 | +$3,238 | $962,129,624 | SLVCHS - SMOKE DAMPER MODIFICATION TLR |
| Mod SA1520· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-15 | +$2,861 | $962,132,485 | SLVCHS - TILE AT POOL RAMP TLR |
| Mod SA1521· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-15 | +$2,519 | $962,135,004 | SLVCHS - RELOCATE AN EXIST SIGN |
| Mod SA1522· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-15 | +$34,956 | $962,169,960 | SLVCHS - BOILER SAFETY VALVES - CEP |
| Mod SA1523· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-15 | +$5,500 | $962,175,460 | SLVCHS - EXTERIOR DOOR HARDWARE |
| Mod SA1524· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-15 | +$850 | $962,176,310 | SLVCHS - PROVIDE AND INSTALL A POWER SUPPLY TO DOOR E-MS-037.2 PER THE RESPONSE TO RFI 8351. |
| Mod SA1525· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-15 | +$2,358 | $962,178,668 | SLVCHS - PROVIDE AND INSTALL PLYWOOD BEHIND THE WOOD GRILL SYSTEM PER THE RESPONSE TO RFI 8400 |
| Mod SA1526· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-15 | +$1,163 | $962,179,831 | SLVCHS - MODIFY THE FRAMING AT THE COLUMNS IN THE TLR GYM TO ALLOW SHEETROCK RETURN TO THE EXTERIOR PER THE RE… |
| Mod SA1527· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-15 | +$11,300 | $962,191,131 | SLVCHS - PROVIDE AND INSTALL FRAMING AND DRYWALL ON EXPOSED STEEL |
| Mod SA1528· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-15 | +$4,049 | $962,195,180 | SLVCHS - MAIL ROOM CLARIFICATION - 2 HOUR FIRE WALL RATING ON COLUMNS |
| Mod SA1532· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-15 | +$586 | $962,195,766 | SLVCHS - INSTALL STAFF ASSIST BUTTON AND RELOCATE LIGHT FIXTURE IN TLR ROOM |
| Mod SA1515· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-19 | +$11,417 | $962,207,183 | SLVCHS - INSTALL PANELS IN PATIENT GARAGE LOBBY |
| Mod SA1537· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-19 | +$67,568 | $962,274,751 | SLVCHS - REPLACE DEAD TREE AND ADD DRAINAGE |
| Mod SA1546· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-19 | +$3,489 | $962,278,240 | SLVCHS - PROVIDE AND INSTALL A TRANSOM PANEL IN CONCOURSE SLIDING DOOR |
| Mod SA1530· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-20 | +$14,000 | $962,292,240 | SLVCHS - RELOCATE SWITCHES UNDER KITCHEN HOODS |
| Mod SA1516· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-21 | +$2,523 | $962,294,763 | PROVIDE&INSTALL A DRIP PAN IN THE ELEVATOR MACHINE ROOM 1M015 |
| Mod SA1518· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-21 | +$1,709 | $962,296,472 | PROVIDE&INSTALL 2 ADDITIONAL OUTLETS IN MP-01 ELEVATOR SHAFTS |
| Mod SA1551· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-28 | −$953 | $962,295,519 | SLVCHS - SHIFT ME CABINET IN DNT CREDIT |
| Mod SA1488· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-30 | +$731,842 | $963,027,361 | SLVCHS - HUEN FINAL FOR CHANGES ON PCOS 811327, 811240, 811025, 811269 |
| Mod SA1547· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-30 | +$51,000,000 | $1,014,027,361 | SLVCHS - TIME DELAY COSTS FOR MAIN CAMPUS, PRIME AND SUBCONTRACTORS |
| Mod SA1529· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-06 | +$9,000 | $1,014,036,361 | SLVCHS - PROVIDE AND CRANE AND OPERATOR TO LIFT MATERIAL REQUIRED TO COMPLETE WORK DIRECTED IN SA-1341 ISSUED… |
| Mod SA1533· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-06 | +$50,346 | $1,014,086,707 | SLVCHS - PROVIDE GROUND FAULT CIRCUIT INTERRUPTERS AT MULTIPLE LOCATIONS THROUGHOUT THE OUTPATIENT BUILDING |
| Mod SA1555· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-06 | +$651 | $1,014,087,358 | SLVCHS - RELOCATE HVAC GRILL DUE TO ADDED J4 WALL AT DNT CHUTE ROOM 5D225 AS PER RFI 8117 |
| Mod SA1569· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-06 | +$278 | $1,014,087,636 | SLVCHS - DELETE/REMOVE GLOVE BOX AND PAINT/PATCH WALL. |
| Mod SA1576· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-07 | −$1,208 | $1,014,086,428 | SLVCHS -REPLACE TRAP PRIMERS WITH TRAP GUARDS AT LEVEL 1 DIX. |
| Mod SA1531· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-12 | +$7,542 | $1,014,093,970 | SLVCHS - ELECTRICAL CHANGES IN KITCHEN FOR CANTEEN EQUIPMENT |
| Mod SA1548· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-12 | +$2,312 | $1,014,096,282 | SLVCHS - MODIFY CEILING IN LEVEL 6 PARKING GARAGE |
| Mod SA1549· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-12 | +$6,808 | $1,014,103,090 | SLVCHS - PROVIDE AND INSTALL ALUMINUM CLADDING ABOVE DOORS |
| Mod SA1550· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-12 | +$9,598 | $1,014,112,688 | SLVCHS - COLD WATER LINES IN SERVICE BAY DNT |
| Mod SA1552· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-12 | +$5,650 | $1,014,118,338 | SLVCHS - PROVIDE AND INSTALL A HORIZONTAL SHAFT WALL ON THE 3I INTERSTITIAL PER THE RESPONSE TO RFI 8282 |
| Mod SA1553· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-12 | +$5,614 | $1,014,123,952 | SLVCHS - ADDITIONAL SCOPE TO BULLETIN 42 |
| Mod SA1554· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-12 | +$40,217 | $1,014,164,169 | SLVCHS - PROVIDE AND INSTALL NECESSARY MEASURES TO ENSURE PROPER FIRE RATING IS MAINTAINED WITH THE PROVISIONS… |
| Mod SA1556· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-12 | +$3,146 | $1,014,167,315 | SLVCHS - COMPLETE THE FIRE RATING BETWEEN LEVEL 1/1I AND THE LOADING DOCK PER THE RESPONSE TO RFI 8381 |
| Mod SA1557· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-12 | +$2,454 | $1,014,169,769 | SLVCHS - PROVIDE DRYWALL AND FINISHED TO EXPOSED FIRE PROOFED COLUMN AT DNT STORAGE ROOM 5D118 |
| Mod SA1559· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-12 | +$5,734 | $1,014,175,503 | SLVCHS - ADDITIONAL CONCRETE CURBS A DNT |
| Mod SA1562· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-12 | +$5,188 | $1,014,180,691 | SLVCHS - PROVIDE AND INSTALL A SPECIAL SEAL IN WALL INTERSECTS |
| Mod SA1564· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-12 | +$741 | $1,014,181,432 | SLVCHS - INSTALL SCON FLOORING |
| Mod SA1565· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-12 | +$721 | $1,014,182,153 | SLVCHS - ADD A CHASE WALL AROUND STEAM DRIP LEG |
| Mod SA1566· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-12 | +$638 | $1,014,182,791 | SLVCHS - LOWER EXIT SIGN TO BELOW CEILING GRID ELEVATION AT DNT ROOM 4F226B, AS PER RFI 8416 |
| Mod SA1567· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-12 | +$3,109 | $1,014,185,900 | SLVCHS - FIELD MODIFY THE EXTERIOR CANOPY TO MITIGATE THE CONFLICT WITH CONCOURSE COLUMN FUR OUT. |
| Mod SA1575· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-12 | +$581 | $1,014,186,481 | SLVCHS - REWORK THE CEILING GRID AT DNT WEST CORNER IN ORDER TO ALLOW ENOUGH ROOM FOR THE CEILING VENT GRILL. |
| Mod CO11X· CHANGE ORDER | 2016-10-13 | +$10,000 | $1,014,196,481 | SLVHCS - FIRE PUMP SUPPORT SYSTEM CEP |
| Mod SA1573· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-13 | +$2,098 | $1,014,198,579 | SLVCHS - EMERGENCY GAS VALVE |
| Mod SA1574· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-13 | +$83,587 | $1,014,282,166 | SLVCHS - INSTUMENT PAINT LEVEL 1 DIXIE |
| Mod SA1577· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-13 | +$3,850 | $1,014,286,016 | SLVCHS - PROVIDE AND INSTALL A SOFFIT AT MONUMENTAL STAIRS |
| Mod SA1578· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-13 | +$1,994 | $1,014,288,010 | SLVCHS - PROVIDE AND INSTALL 2 SHADOW BOXES FOR EXTERIOR HOSE BIB AND OUTLETS THAT WERE NOT CAPTURED IN PCO 81… |
| Mod SA1579· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-13 | +$4,300 | $1,014,292,310 | SLVCHS - RELOCATED THE CONTROLS FOR THE FCU IN STAIR 5 PER THE RESPONSE TO RFI 6945.1 |
| Mod SA1580· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-13 | +$9,625 | $1,014,301,935 | SLVCHS - REMOVE/DELETE VAV 00-4IA7 S-3 FROM THE SOUTH SIDE OF THE CEP L4I PIPING CONCOURSE AND REPLACED WITH A… |
| Mod SA1586· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-13 | +$16,972 | $1,014,318,907 | PROVIDE THE ADDED 480V/3 PHASE/3 WIRE TO 480V/2 PHASE/4 WIRE TRANSFORMER AND A SUBPANEL TO FEED THOSE LOADS TO… |
| Mod SA1587· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-13 | +$6,817 | $1,014,325,724 | PROVIDE AN EXPANSION JOINT TO SPAN THE METAL PANEL AND PRECAST CONNECTION AT CEP CONCOURSE |
| Mod SA1588· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-13 | +$3,662 | $1,014,329,386 | PROVIDE BREAK METAL TO CONCEAL VOIDS |
| Mod SA1589· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-13 | +$22,448 | $1,014,351,834 | ACTUATORS TIE TO BAS CONCOURSE |
| Mod CO11Z· CHANGE ORDER | 2016-10-20 | +$0 | $1,014,351,834 | SLVHCS - ROOF ACCESS - REFER TO CO-11S |
| Mod SA1590· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-20 | +$19,939 | $1,014,371,773 | PROVIDE CARD READERS AT EXTERIOR STAFF GARAGE LOBBY DOORS |
| Mod SA1560· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-21 | +$40,131 | $1,014,411,904 | SLVCHS - STEAM CONTROL VALVES |
| Mod SA1571· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-21 | +$3,850 | $1,014,415,754 | SLVCHS - INSTALL A SHAFT LID IN ROOM 5G228. |
| Mod SA1581· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-21 | +$2,667 | $1,014,418,421 | PROVIDE A MATCH COLOR ALUMINUM EXTRUSION TO ENCLOSE AT DOOR E-A1-100.2 CON |
| Mod SA1582· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-21 | +$492 | $1,014,418,913 | PROVIDE EMBED 3/4" ANCHORS FOR SIEMENS MEDICAL EQUIPMENT PLATES |
| Mod SA1583· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-21 | +$4,300 | $1,014,423,213 | ADD FRAMING/DRYWALL, EXPANSION JOINT COVER&CORNER GUARD AT ENTRANCE TO 1H-C01 |
| Mod SA1584· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-21 | +$29,248 | $1,014,452,461 | REMOVE BLACK MASTIC DIX |
| Mod SA1585· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-21 | +$11,721 | $1,014,464,182 | INSTALL POWER FOR P-609 WATER COOLERS |
| Mod SA1591· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-21 | +$44,571 | $1,014,508,753 | IN-FILL AT EXISTING FLOOR OPENINGS DIXIE |
| Mod SA1592· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-21 | +$171,764 | $1,014,680,517 | PROVIDE ADDED POWER FOR VAVS THAT WERE NOT SHOWN ON THE DRAWINGS THROUGHOUT BUILDINGS 2,3,6 AND 00 |
| Mod SA1593· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-21 | +$1,042 | $1,014,681,559 | PROVIDE A PAINTED FINISH FOR TLR ROOM 1M165 SUMP PIT COVER AND FOR TLR LADDER FROM 4 TO 4I AS PER RFIS 8509 AN… |
| Mod SA1594· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-21 | +$31,329 | $1,014,712,888 | PROVIDE BLOW OUT SINK ROOM 4J129A PER QUALITY REVIEW PL0002/DEFINITIZE CO-09A&CO-11C |
| Mod SA1597· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-21 | +$29,841 | $1,014,742,729 | HARDWARE CHANGES |
| Mod SA1543· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-25 | +$362,721 | $1,015,105,450 | SLVCHS - NATIONAL FIRE PROTECTION COSTS FOR DIXIE TIME EXTENSION |
| Mod SA1561· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-25 | +$6,718 | $1,015,112,168 | SLVCHS - MAIN ENTRY CANOPY CHANGES |
| Mod SA1563· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-25 | +$2,177 | $1,015,114,345 | SLVCHS - SIGNAGE FOR PATIENT GARAGE |
| Mod SA1601· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-25 | +$1,581 | $1,015,115,926 | SUMP PUMP CONTROL PANEL POWER |
| Mod SA1603· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-25 | +$22,982 | $1,015,138,908 | RAISE BEAM THAT IS IN CONFLICT WITH SKIN |
| Mod CO12B· CHANGE ORDER | 2016-10-26 | +$106,700 | $1,015,245,608 | SLVHCS - AREA A3 FLOORS DIXIE |
| Mod CO12C· CHANGE ORDER | 2016-10-26 | +$13,000 | $1,015,258,608 | SLVHCS - PROVIDE EMERGENCY SHUTOFF VALVE TO THE MAIN NATURAL GAS FEED TIED INTO CURRENT EPO BUTTONS, VALVE SHA… |
| Mod CO12D· CHANGE ORDER | 2016-10-26 | +$120,000 | $1,015,378,608 | SLVHCS - MISSING KITCHEN CONNECTORS FOR EXHAUST HOODS DNT |
| Mod CO12E· CHANGE ORDER | 2016-10-26 | +$15,000 | $1,015,393,608 | SLVHCS - PROVIDE MECHANICAL EQUIPMENT CONTROL TRANSFORMER AT DIXIE BUILDING 8 |
| Mod CO12F· CHANGE ORDER | 2016-10-26 | +$10,000 | $1,015,403,608 | SLVHCS - INSTALL COPPER FEEDERS AT DIXIE BUILDING 8 |
| Mod CO12G· CHANGE ORDER | 2016-10-26 | +$5,000 | $1,015,408,608 | SLVHCS - INSTALLATION OF AIR RELIEF VALVES IN FIRE SUPPRESSION SYSTEM |
| Mod CO12H· CHANGE ORDER | 2016-10-26 | +$14,500 | $1,015,423,108 | SLVHCS - PROVIDE AND INSTALL SOD AROUND PROPERTY |
| Mod SA1493· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-26 | +$399,166 | $1,015,822,274 | SLVCHS - KONE COSTS ASSOCIATED WITH DIXIE TIME EXTENSION |
| Mod SA1541· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-26 | +$435,675 | $1,016,257,949 | SLVCHS - ADDITIONAL COSTS ASSOCIATED WITH DIXIE TIME EXTENSION FOR QUALITY IRON |
| Mod SA1544· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-26 | +$42,216 | $1,016,300,165 | SLVCHS - ADDITIONAL COSTS ASSOCIATED WITH DIXIE TIME EXTENSION FOR STABIL |
| Mod SA1558· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-26 | +$718 | $1,016,300,883 | SLVCHS - CHANGE SIGNAGE LETTERS |
| Mod SA1595· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-26 | +$5,499 | $1,016,306,382 | PROVIDE A CEILING MOUNTED EXIT FIXTURES INSTEAD OF A WALL MOUNTED |
| Mod SA1596· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-26 | +$2,475 | $1,016,308,857 | REMOVE THE 13 ROOF DAVITS |
| Mod SA1598· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-26 | +$11,242 | $1,016,320,099 | PROVIDE STEEL PLATES AND SILL PANS FOR DIX DOORS |
| Mod SA1599· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-26 | +$1,844 | $1,016,321,943 | PROVIDE FIRE RATED DUCT WRAP @ TLR ROOM 4M001 |
| Mod SA1600· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-26 | +$78 | $1,016,322,021 | REPAIR DAMAGED OXYGEN LINE (DONE BY VAMC VENDOR) |
| Mod SA1602· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-26 | +$12,363 | $1,016,334,384 | REMOVED INSTALLED ADO&INSTALL A MAGNETIC HOLD OPEN AT DOOR 1DC10 DNT |
| Mod SA1604· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-26 | +$6,590 | $1,016,340,974 | PROVIDE 1 PHASE POWER FOR MAGNET RUNDOWN UNIT DNT |
| Mod SA1605· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-26 | +$2,350 | $1,016,343,324 | FRAMING AROUND COLUMNS IN GARAGE |
| Mod SA1606· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-26 | +$27,745 | $1,016,371,069 | SLVHCS - PROVIDE AND INSTALL REQUEST TO EXIT DEVICES ON THE 10 SITE GATES THAT ARE PART OF THE CAMPUS EMERGENC… |
| Mod SA1607· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-26 | +$5,090 | $1,016,376,159 | PROVIDE BOLTS AND STEEL PLATES FOR TOSHIBA MEDICAL EQUIPMENT AT DNT ROOMS 2E108, 2E110, AND 2E129 AS PER RFI 8… |
| Mod SA1608· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-26 | +$1,828 | $1,016,377,987 | SLVHCS - LIGHT FIXTURE LAYOUT |
| Mod SA1609· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-26 | −$10,880 | $1,016,367,107 | DELETE THE ROOF DIVIDERS CAMPUS WIDE/CONTRACT CREDIT |
| Mod SA1610· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-26 | +$54,875 | $1,016,421,982 | RE-PROGRAMMING OF ELEVATORS |
| Mod SA1611· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-26 | +$4,670 | $1,016,426,652 | RE-PROGRAMMING THE ELEVATORS |
| Mod SA1614· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-27 | +$3,110 | $1,016,429,762 | PROVIDE&INSTALL 2 ADDITIONAL OUTLETS IN MP-01 ELEVATOR SHAFTS |
| Mod SA1615· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-27 | +$8,684 | $1,016,438,446 | PROVIDE&INSTALL TEST PORTS AND VIEW PORTS ON THE BOILER FUEL OIL PUMP SET RELIEF VALVE |
| Mod SA1492· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-31 | +$136,124 | $1,016,574,570 | SLVCHS - DIXIE TIME EXTENSION ISEC |
| Mod SA1494· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-31 | +$392,431 | $1,016,967,001 | SLVCHS - DIXIE TIME EXTENSION BAKER CONCRETE |
| Mod SA1534· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-31 | +$2,330,600 | $1,019,297,601 | SLVCHS - DIXIE TIME EXTENSION CMHP GRS AND GCS |
| Mod SA1536· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-31 | +$570,217 | $1,019,867,818 | SLVCHS - TIME EXTENSION DIXIE FOR NASH MECHANICAL |
| Mod SA1538· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-31 | +$96,339 | $1,019,964,157 | SLVCHS - DIXIE TIME EXTENSION FOR ROTOLO AND CYCLE |
| Mod SA1539· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-31 | +$564,388 | $1,020,528,545 | SLVCHS - DIXIE TIME EXTENSION FOR MADISON HEIGHTS GLASS |
| Mod SA1540· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-31 | +$0 | $1,020,528,545 | SLVCHS - 3 PCO CHANGES LOA CORRECTION - ADMIN MOD |
| Mod SA1542· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-31 | +$5,281,618 | $1,025,810,163 | SLVCHS - DIXIE TIME EXTENSION - JCI COSTS |
| Mod SA1572· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-03 | +$349,915 | $1,026,160,078 | SLVCHS - PROVIDE AND INSTALL ADDITIONAL CABLE TRAYS REQUIRED TO COMPLETE THE INSTALLATION OF THE LOW VOLTAGE S… |
| Mod SA1612· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-03 | +$12,117 | $1,026,172,195 | PROVIDE DOOR HOLD OPENS&90MIN FIRE RATING AT THE MONUMENTAL STAIRS |
| Mod SA1616· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-03 | +$4,100 | $1,026,176,295 | SLVHCS - PROVIDE TWO HOUR FIRE RATED WALL TO ENCASE STRUCTURAL BEAM AT DNT LEVEL 2I AREA F AT COLUMN LINE A.5… |
| Mod SA1617· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-03 | +$17,566 | $1,026,193,861 | SLVHCS PROVIDE OUTLETS ON THE COLUMN ENCLOSURE AT DNT LEVEL 1 AREA E2 AND F2 COURTYARDS |
| Mod SA1618· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-03 | +$5,014 | $1,026,198,875 | SLVHCS: MODIFYING EXISTING DOORS ON LEVEL 4 OF THE PAN AM BUILDING TO RESOLVE CONFLICTS WITH THE FLOOR POURED… |
| Mod SA1620· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-03 | +$14,346 | $1,026,213,221 | SLVHCS - CHANGE THE EXISTING FEEDERS FOR THE OPERATING LIGHTS IN OUTPATIENT ROOMS 4J441, 4J443, 4J445, 4J447 A… |
| Mod CO12M· CHANGE ORDER | 2016-11-07 | +$53,336 | $1,026,266,557 | SLVHCS - REVISE LAB SPACES |
| Mod CO12I· CHANGE ORDER | 2016-11-08 | +$0 | $1,026,266,557 | SLVHCS -ADD AND CHANGE DOOR SECURITY FOR DNT AND OUTPATIENT |
| Mod SA1613· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-08 | +$27,714 | $1,026,294,271 | PROVIDE EXHAUST DUCT AND CONTROLS FOR CONDENSATE HOOD IN TLR |
| Mod SA1621· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-08 | +$514 | $1,026,294,785 | SLVHCS - REWORK WALLS AT OUT ROOMS 2J305 AND 2J315 DUE TO CONFLICTS WITH FLOOR OUTLETS, AS PER RFI 7682 RESPON… |
| Mod SA1622· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-08 | +$2,188 | $1,026,296,973 | SLVHCS - PROVIDE OUTPATIENT STAIR SIGNAGE AT EACH FLOOR LANDING |
| Mod SA1623· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-08 | +$13,907 | $1,026,310,880 | PROVIDE&INSTALL 2 ADDITIONAL OUTLETS IN MP-01 ELEVATOR SHAFTS |
| Mod SA1625· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-08 | +$14,112 | $1,026,324,992 | PROVIDE AN INTAKE AND EXHAUST LOUVER CONCOURSE LEVEL 1 |
| Mod SA1626· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-08 | +$7,060 | $1,026,332,052 | PROVIDE FLOW CONTROL VALVES IN UV SYSTEM |
| Mod CO12J· CHANGE ORDER | 2016-11-09 | +$3,200 | $1,026,335,252 | SLVHCS - MODIFY HOLDING CELL |
| Mod CO12K· CHANGE ORDER | 2016-11-09 | +$80,000 | $1,026,415,252 | SLVHCS - BOILER SAFETY VALVES |
| Mod SA1624· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-09 | +$6,616 | $1,026,421,868 | INSTALL 10 NEW MILITARY SEALS |
| Mod SA1628· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-09 | +$3,511 | $1,026,425,379 | RELOCATE TEMPERATURE SENSORS |
| Mod SA1631· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-09 | +$2,029 | $1,026,427,408 | PROVIDE COLUMN FUR OUT AT DNT LEVEL 1 AREA F1 ATRIUM |
| Mod SA1535· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-10 | +$330,818 | $1,026,758,226 | SLVCHS - DIXIE TIME EXTENSION COSTS FOR CONTI |
| Mod SA1646· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-10 | +$38,844 | $1,026,797,070 | PROVIDE&INSTALL AIR RELIEF VALVES @ CEP STANDPIPES - DEFINITIZE CO-12G |
| Mod SA1627· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-16 | +$1,350 | $1,026,798,420 | SLVHCS: PROVIDE MINERAL WOOL AND SPRAY FIREPROOFING TO CLOSE GAP BETWEEN THE CON WALL AND THE DNT SLAB EDGE, A… |
| Mod SA1629· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-16 | +$28,920 | $1,026,827,340 | PROVIDE FIRE PUMP PIPING SUPPORT AT CEP |
| Mod SA1630· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-16 | +$976 | $1,026,828,316 | RELOCATE ELECTRICAL OUTLET AT DNT DISPLAY CABINET |
| Mod SA1632· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-16 | +$7,679 | $1,026,835,995 | PROVIDE&INSTALL TEST PORTS AND VIEW PORTS ON THE BOILER FUEL OIL PUMP SET RELIEF VALVE |
| Mod SA1634· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-16 | +$7,591 | $1,026,843,586 | SHIFT THE SEPARATING WALL OVER TO ENCAPSULATE THE PIPE HANGERS @ DNT |
| Mod SA1635· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-16 | +$26,493 | $1,026,870,079 | PROVIDE 14 WINDOW SPRINKLERS @ PATIENT GAR LEVEL 2 |
| Mod SA1636· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-16 | +$1,575 | $1,026,871,654 | PROVIDE A WIREWAY BEHIND THE EMERGENCY SIGN AT THE ED RAMP |
| Mod SA1637· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-16 | +$2,700 | $1,026,874,354 | PROVIDE FIRE STOP PILLOWS&FIRE CAULK SEALANT TO GAPS AT FP-03, 04&05 ELEVATORS |
| Mod SA1638· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-16 | +$3,676 | $1,026,878,030 | SLVHCS PROVIDE TELECOM OUTLETS IN OUTPATIENT DENTAL LAB |
| Mod SA1639· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-16 | +$1,648 | $1,026,879,678 | SLVHCS: RELOCATE FTP6D LIGHT FIXTURE AT CON 3A201 TO 8'-0" AFF BOTTOM OF FIXTURE, AS PER RFIS 7996&7996.1 RESP… |
| Mod SA1640· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-16 | +$3,029 | $1,026,882,707 | SLVHCS: PROVIDE 2 LAYERS OF DRYWALL AT NORTH SIDE OF THE COLUMN WRAP AT DNT ROOM 3F176 TO AVOID CORNER GUARD A… |
| Mod SA1641· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-16 | +$10,190 | $1,026,892,897 | SLVHCS: PROVIDE POWER FOR COILING DOOR AND DOCK LEVELER AT DNT ROOM 1F126; AS PER RFI 8558 RESPONSE |
| Mod SA1642· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-16 | +$11,791 | $1,026,904,688 | DEFINITIZE CO-10H |
| Mod SA1644· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-16 | +$2,980 | $1,026,907,668 | RELOCATE CEILING DEVICES DNT |
| Mod SA1645· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-16 | +$1,706 | $1,026,909,374 | PROVIDE GFCI OUTLETS @ TLR ROOMS |
| Mod SA1647· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-16 | +$2,476 | $1,026,911,850 | SLVHCS: PROVIDE TROUBLESHOOTING AND REPAIRING THE POWER OUTLET FOR THE HEADWALL UNIT IN ROOM 2M045 AND TO PRO… |
| Mod CO12L· CHANGE ORDER | 2016-11-17 | +$79,700 | $1,026,991,550 | SLVHCS - MODIFY METAL PANEL ATTACHMENT SYSTEM DIXIE |
| Mod CO12N· CHANGE ORDER | 2016-11-17 | +$3,500 | $1,026,995,050 | SLVHCS - EXIT DEVICES AT LEVEL 4 CONCOURSE |
| Mod SA1633· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-17 | +$4,790 | $1,026,999,840 | REWORK LOW VOLTAGES AND ELECTRICAL DEVICES TO RELOCATE |
| Mod CO12O· CHANGE ORDER | 2016-11-30 | +$8,000 | $1,027,007,840 | SLVHCS - MISC CANTEEN CHANGES |
| Mod CO12P· CHANGE ORDER | 2016-11-30 | +$9,500 | $1,027,017,340 | SLVHCS - ADDITIONAL CARD READERS AND KEYPADS DNT |
| Mod SA1649· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-30 | +$110,000 | $1,027,127,340 | SLVHCS - PROVIDE ATS AND INCLUDED IN THE CONTROL LOGIC OF THE SCADA SYSTEM, ALSO INCLUDE THE FIVE ADDITIONAL C… |
| Mod SA1648· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-12-06 | +$4,417 | $1,027,131,757 | SLVHCS: RELOCATED THE WASHER UNIT DISCONNECTS TO THE WALL TO THE RIGHT OF THE DISHWASHER AT DNT 1F KITCHEN |
| Mod SA1650· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-12-06 | +$13,342 | $1,027,145,099 | MECHANICAL SHAFT OPENING MISSING IN DIXIE |
| Mod SA1651· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-12-06 | +$2,320 | $1,027,147,419 | SLVHCS: ADDED MATERIAL COSTS FOR THE DIFFUSER FILM AT SPANDREL, WIDEN DNT CANAL STREET SIDEWALK, PENDANT FIXTU… |
| Mod SA1652· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-12-06 | +$2,282 | $1,027,149,701 | PROVIDE BULKHEAD WITH 4"STUD AT 7'-2"AFF @ DNT CORRIDOR |
| Mod SA1653· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-12-06 | +$1,400 | $1,027,151,101 | LIGHT ROTATION DNT |
| Mod SA1654· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-12-06 | +$8,810 | $1,027,159,911 | MISSING FIRE ALARM&LIGHTING CON AND PAN AM |
| Mod SA1655· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-12-06 | +$1,894 | $1,027,161,805 | PAINT EXPOSED STEEL IN TLR |
| Mod SA1657· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-12-06 | +$20,590 | $1,027,182,395 | SLVHCS: PROVIDE PAINTED KICKERS AT ALL ELEVATIONS OF THE DIX RESEARCH BUILDING LEVELS 1, 2, 3, AND 4 THAT WERE… |
| Mod SA1658· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-12-06 | +$5,136 | $1,027,187,531 | SLVCHS - PROVIDE HARDWARE SET (HW11U) IN LIEU OF (HW11AX) FOR DNT DOOR 4E125E.1 NOT CAPTURED IN PCO 811227 |
| Mod SA1659· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-12-06 | +$4,870 | $1,027,192,401 | REWORK ENTRY CEILING DEVICES @ DNT MRI |
| Mod SA1660· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-12-06 | +$8,792 | $1,027,201,193 | PROVIDE DOOR LOW VOLTAGE REQUIREMENTS OMITTED IN PCO 812120 |
| Mod SA1661· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-12-06 | +$7,400 | $1,027,208,593 | INSTALL FIRE RATED WALL BETWEEN THE STF-02 STAIR&ELEVATOR SHAFT |
| Mod SA1662· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-12-07 | +$18,984 | $1,027,227,577 | SLVHCS: PROVIDE TWO (2) HOURS RATED WALL PARTITIONS AT DIX LEVEL 2-5, AS PER RFI 8531.1 RESPONSE |
| Mod SA1663· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-12-07 | +$15,169 | $1,027,242,746 | INSTALL COPPER FEEDERS AT DIXIE BUILDING 8, AS DIRECTED WITH CHANGE ORDER CO-12F |
| Mod SA1665· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-12-12 | +$1,900 | $1,027,244,646 | PROVIDE PRESSURE PLATE CAP AND ADDITIONAL ETA AT BRICK FACADE AT DIX AS PER RFI 7700 RESPONSE |
| Mod SA1656· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-12-14 | +$23,914 | $1,027,268,560 | POOL HEAT EXCHANGER TLR |
| Mod SA1668· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-12-14 | +$5,064 | $1,027,273,624 | PROVIDE DATA OUTLET&AV DIX |
| Mod SA1666· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-12-15 | +$6,210 | $1,027,279,834 | PROVIDE LIGHT COVE LENS AT OP ELEVATOR LOBBY 1H100 AND MAS RECEPTION 1H102 AS PER RFI 8554 RESPONSE |
| Mod SA1670· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-12-15 | +$8,232 | $1,027,288,066 | REMOVE EXISTING CATWALK&ASSOCIATED STAIR DIX |
| Mod SA1671· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-12-15 | +$10,964 | $1,027,299,030 | PROVIDE EXTENDED BENT PLATE DIX LEVEL 5 |
| Mod SA1672· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-12-15 | +$7,427 | $1,027,306,457 | PROVIDE RESINOUS FLOORING IN LIEU OF SEALED CONCRETE FLOORING DIX |
| Mod SA1669· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-12-20 | +$9,283 | $1,027,315,740 | SLVHCS: PROVIDE NEW HARDWARE AND TRIM FOR DNT DOORS 2D220 AND 4D220 |
| Mod SA1673· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-12-20 | +$4,500 | $1,027,320,240 | SLVHCS: INSTALL GWB SOFFITS ABOVE THE CASEWORK IN ROOMS 1G168 AND 1G169 |
| Mod SA1674· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-12-20 | +$3,582 | $1,027,323,822 | SLVHCS: PROVIDE CARD READER AT EXTERIOR STAFF GARAGE LOBBY DOORS E-K7-100 AS PER RFI 8649 |
| Mod SA1675· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-12-20 | +$6,492 | $1,027,330,314 | SLVHCS: PROVIDE AND INSTALL 2 FTP(5A) FIXTURES ON LEVEL 5 OF STAIR STP-2 PER THE RESPONSE TO RFI 8106 |
| Mod SA1677· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-12-20 | +$2,700 | $1,027,333,014 | SLVHCS: RELOCATE THE SHARPS CONTAINER (CTR1906) AND GLOVE BOX (DSP0705)AT TLR PER RFI 8375&8375.1 RESPONSES |
| Mod SA1680· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-12-20 | +$4,345 | $1,027,337,359 | SLVHCS: REMOVE THE TOILET SEAT COVER DISPENSERS AT DNT ROOMS AS PER RFI 8491 |
| Mod SA1619· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-12-21 | +$3,098,535 | $1,030,435,894 | SLVCHS - AS AND HW FUNDING FOR SECOND INSTALLMENT OF INSURANCE PAYMENT |
| Mod SA1664· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-12-21 | +$1,161 | $1,030,437,055 | STEEL AT CARRIAGEWAY |
| Mod SA1676· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-12-21 | +$525,483 | $1,030,962,538 | HS FUNDING FOR SECOND INSTALLMENT PAYMENT OF INSURANCE |
| Mod SA1678· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-12-21 | +$6,721 | $1,030,969,259 | REMOVE EXISTING STEEL FLANGE&BEAM A1 LEVEL 3 DIX |
| Mod SA1681· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-12-21 | +$7,044 | $1,030,976,303 | RELOCATE ELECTRICAL OUTLETS&DATA DROPS FOR TELEVISIONS DNT |
| Mod SA1683· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-12-22 | −$24,880 | $1,030,951,423 | STAFF GARAGE SIGNS - POWER REQUIREMENT |
| Mod CO12S· CHANGE ORDER | 2017-01-04 | +$18,000 | $1,030,969,423 | SLVHCS - MODIFY CANTEEN DOORS |
| Mod SA1682· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-01-04 | +$37,000 | $1,031,006,423 | SLVHCS - RAISING THE DOMESTIC WATER TANK |
| Mod SA1685· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-01-04 | +$8,332 | $1,031,014,755 | DELETE GWB SOFFIT&ADD GUARD RAIL AT STF-2 DNT |
| Mod SA1686· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-01-04 | −$1,295 | $1,031,013,460 | CREDIT FOR 5 INTERCOM BOXES AND THE INSTALLATION OF ONE (1) MASTER STATION INTERCOM |
| Mod CO12R· CHANGE ORDER | 2017-01-06 | +$4,300 | $1,031,017,760 | SLVHCS - PROGRAM THE COOLING TOWERS TIMING SEQUENCE TO INCREASE THE NUMBER OF ROTATIONS CURRENTLY PROGRAMMED T… |
| Mod SA1684· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-01-06 | +$4,765 | $1,031,022,525 | PROVIDE A PAINTED FINISH TO 25 STEEL COLUMNS AND 3 PLASTIC RAIN LEADERS AT MAIN ENTRANCE CANOPY AREA |
| Mod SA1687· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-01-06 | +$46,224 | $1,031,068,749 | DEFINITIZE CO-11M REPAIR AREA A3 NORTH PARAPET CRACK @ DIXIE BLDG 8 |
| Mod SA1688· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-01-09 | −$80,571 | $1,030,988,178 | ADD AND CHANGE DOOR SECURITY |
| Mod SA1689· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-01-10 | +$8,401 | $1,030,996,579 | PROVIDE BLOCK OUTS AT BRICK FACADE WINDOW LOCATIONS DIXIE |
| Mod SA1691· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-01-10 | +$8,911 | $1,031,005,490 | PROVIDE EXPANSION JOINTS @ TLR COURTYARD BRICK WORK |
| Mod SA1690· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-01-18 | +$16,589 | $1,031,022,079 | PROVIDE MONITOR POINTS FOR COMPRESSOR MALFUNCTION ALARM, DESICCANT AIR DRYER ALARM, OR VACUUM PUMP ALARM AT TL… |
| Mod CO12T· CHANGE ORDER | 2017-01-23 | +$109,508 | $1,031,131,587 | REMOVE CONCRETE FLOORS IN AREA A3 DIXIE BLDG 8 -2ND CO FOR THIS EFFORT |
| Mod SA1693· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-01-24 | +$13,375 | $1,031,144,962 | PROVIDE LABOR AND MATERIALS FOR REPAIRING WALLS, CEILINGS, FRAMES AND REMOVING 2 POWER POLES ON LEVEL 4 IN THE… |
| Mod SA1695· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-01-24 | +$4,200 | $1,031,149,162 | PROVIDE AN ALARM/STROBE DEVICE IN RM 3F164 DNT&RELOCATE FIRE ALARM STROBE IN RM 3F169 |
| Mod SA1696· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-01-26 | +$950 | $1,031,150,112 | PROVIDE MODIFIED CLOSER TO DOOR 1F101C.5 DNT |
| Mod SA1667· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-01-27 | +$5,100 | $1,031,155,212 | PROVIDE LABOR AND MATERIALS TO CLOSE DNT LOADING DOCK TRASH COMPACTOR CHUTE DOOR OPENING |
| Mod SA1694· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-01-27 | +$820 | $1,031,156,032 | PROVIDE LABOR AND MATERIALS TO REPAIR AND REPLACE DAMAGED DOORS AND HARDWARE ON LEVEL 4 OF PAN AM BUILDING |
| Mod SA1697· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-01-27 | +$11,000 | $1,031,167,032 | PROVIDE TAMPER AND WATER FLOW DEVICES AT STG-03, STG-04, 4I A7 AREA |
| Mod SA1699· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-01-27 | +$4,200 | $1,031,171,232 | PROVIDE A TWO (2) HOUR FIRE RATED WALL TO SEPARATE MECHANICAL SPACE FROM OCCUPIED SPACE AT DNT LEVEL 4 AREA F1… |
| Mod SA1698· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-01-30 | +$47,500 | $1,031,218,732 | PROVIDE TAMPER AND FLOW DEVICES IN ALL SERVICE AND PASSENGER ELEVATOR PITS CAMPUS WIDE |
| Mod CO12U· CHANGE ORDER | 2017-02-02 | +$17,800 | $1,031,236,532 | SLVHCS - INSTALL LAB HOOD PROVIDED BY THE MC IN THE DIRTY LAB ROOM 4J291A |
| Mod CO12V· CHANGE ORDER | 2017-02-02 | +$2,100 | $1,031,238,632 | SLVHCS - PROVIDE AND INSTALL A FIXED SECURITY CAMERA IN THE ARMORY ROOM 1G145 |
| Mod SA1692· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-02-02 | +$11,028 | $1,031,249,660 | PROVIDE PUSH PADS AND ASSOCIATED CONNECTIONS FOR DIX AUTOMATIC DOORS 4P304, 4PC03.1, 4P314A, AS PER RFI 8244 |
| Mod SA1701· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-02-02 | +$85,000 | $1,031,334,660 | PROVIDE MECHANICAL EQUIPMENT CONTROL TRANSFORMER POWER AT DIXIE BUILDING 8 AS DIRECTED WITH CHANGE ORDER CO-12… |
| Mod SA1709· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-02-02 | +$1,631 | $1,031,336,291 | LOWER FIRE SPRINKLERS AT DNT ROOM 1F127 DUE TO LOWERING OF CEILING, AS PER RFI 8481 RESPONSE |
| Mod SA1710· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-02-02 | +$1,750 | $1,031,338,041 | RELOCATE AUTOMATIC DOOR OPENER (ADO) FOR DNT DOOR 2E-C12 AS PER RFI 7827 RESPONSE |
| Mod CO12W· CHANGE ORDER | 2017-02-07 | +$2,000 | $1,031,340,041 | SLVHCS - REMOVE EXISTING ELECTRICAL AND REROUTE ELECTRICAL OVERHEAD FOR EQUIPMENT QF-85 WASTE PULPIER AND QF-8… |
| Mod CO12X· CHANGE ORDER | 2017-02-07 | +$32,000 | $1,031,372,041 | SLVHCS - MENTAL HEALTH CHANGES |
| Mod CO12Y· CHANGE ORDER | 2017-02-07 | +$2,000 | $1,031,374,041 | SLVHCS - PROVIDE SHUNT TRIP AND ASSOCIATED ANSUL SYSTEM CONNECTION FOR EQUIPMENT QF-38 AND QF-39 AT DNT ROOM 4… |
| Mod SA1700· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-02-10 | +$623,437 | $1,031,997,478 | AECO AND ALLAN SPEAR DELAY COSTS TO 2/9/17 |
| Mod SA1702· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-02-10 | +$0 | $1,031,997,478 | FUNDING FOR AECO AND ALLAN SPEAR DELAY COSTS DIXIE TO 2/9/17 |
| Mod SA1703· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-02-10 | +$532,962 | $1,032,530,440 | INTEGRATED DOOR, NYCOM, RAM COSTS FOR DIXIE DELAY TO 2/9/17 |
| Mod SA1704· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-02-10 | +$0 | $1,032,530,440 | INTEGRATED DOOR, NYCOM, RAM COSTS FOR DIXIE DELAY TO 2/9/17 FUNDING ONLY |
| Mod SA1705· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-02-10 | +$495,383 | $1,033,025,823 | NCFI COSTS FOR DIXIE DELAY TO 2/9/17 |
| Mod SA1706· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-02-10 | +$0 | $1,033,025,823 | NCFI COSTS FOR DIXIE DELAY TO 2/9/17 FUNDING ONLY |
| Mod SA1707· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-02-10 | +$425,810 | $1,033,451,633 | THE PAINTING COMPANY COST FOR DIXIE DELAY TO 2/9/17 |
| Mod SA1708· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-02-10 | +$0 | $1,033,451,633 | THE PAINTING COMPANY COSTS DIXIE DELAY TO 2/9/17 FUNDING ONLY |
| Mod CO13A· CHANGE ORDER | 2017-02-15 | +$60,000 | $1,033,511,633 | SLVHCS - EMERGENCY POWER SHUTDOWN MANAGEMENT SYSTEM (EPSMS) FOR MCR, DNT BUILDING 2 |
| Mod CO13B· CHANGE ORDER | 2017-02-15 | +$59,000 | $1,033,570,633 | SLVHCS - LEVEL THE FLOORS IN AREA A1 AT DIXIE BUILDING 8 |
| Mod SA1712· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-02-15 | +$24,000 | $1,033,594,633 | CHANGE VOLTAGE ON "IN USE" LIGHTS FOR ALL OF THE MEDICAL EQUIPMENT IN DNT AS PER RFI 8538 AND 8611 |
| Mod SA1713· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-02-15 | +$1,241 | $1,033,595,874 | PROVIDE CREDIT FOR ELEVATOR MACHINE ROOM LOUVER LOCATED AT DIX SOUTH ELEVATION LEVEL 5, AS PER RFI 8154 |
| Mod SA1711· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-02-16 | +$145,714 | $1,033,741,588 | PROVIDE CONTROLS FOR ONE (1) VAV AT BLDG 3 CAFE AND SEVEN (7) VAVS AT BLDG 1 TR CLOSETS: PROVIDE ONE WALL PHON… |
| Mod SA1714· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-02-16 | +$41,803 | $1,033,783,391 | PROVIDE&INSTALL 1 JOCKEY BOOSTER PUMP ON THE CHILL WATER LINES SCR ROOM |
| Mod SA1679· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-03-01 | +$1,618 | $1,033,785,009 | PROVIDE ELEVATOR OPERATION FOR VAMC EQUIPMENT VENDOR DELIVERIES&INSTALLATION |
| Mod SA1715· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-03-14 | +$4,262 | $1,033,789,271 | DEFINITIZE CO-12C FOR EMERGENCY SHUTOFF VALVE TO MAIN NATURAL GAS FEED. |
| Mod SA1721· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-03-22 | −$22,387 | $1,033,766,884 | CREDIT FOR LAB TABLES THAT WILL NOT BE USED IN DIX LABS |
| Mod SA1722· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-03-22 | −$8,166 | $1,033,758,718 | DEOBLIGATOIN&DEFINITIZATION FOR CO-12L |
| Mod SA1723· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-03-31 | +$18,167 | $1,033,776,885 | REMOVE STEAM VENT CAP CEP |
| Mod CO13G· CHANGE ORDER | 2017-04-05 | +$6,000 | $1,033,782,885 | PROVIDE THE RO CONNECTION FOR DNT ROOM 4D155 |
| Mod CO13H· CHANGE ORDER | 2017-04-06 | +$1,300 | $1,033,784,185 | PERFORM UTILITY SUPPORT FOR RO BASED OPTIPURE 350/50 FILTRATION SYSTEM |
| Mod CO13J· CHANGE ORDER | 2017-04-12 | −$500,000 | $1,033,284,185 | DELETE DIXIE BUILDOUT |
| Mod SA1717· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-04-12 | +$17,339 | $1,033,301,524 | PROVIDE ALUMINUM WINDOW SILL PANS FOR NEW WINDOWS @ DIX |
| Mod SA1719· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-04-12 | +$4,728 | $1,033,306,252 | PROVIDE CORRECT AMPERAGE BREAKERS @ DISTRIBUTION PANEL EQD8451 |
| Mod SA1720· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-04-12 | +$9,341 | $1,033,315,593 | PROVIDE HVAC EXHAUST&SUPPLY TO COLD RM 4P305 DIX |
| Mod CO13C· CHANGE ORDER | 2017-04-13 | +$7,500 | $1,033,323,093 | SLVHCS - EGRESS EXIT DEVICES |
| Mod CO13D· CHANGE ORDER | 2017-04-13 | +$500 | $1,033,323,593 | SLVHCS - PROVIDE GROUND FAULT CIRCUIT INTERRUPTERS (GFCI) AT MULTIPLE LOCATIONS THROUGHOUT DNT BLDG DUE TO SIN… |
| Mod SA1267· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-04-13 | +$27,666 | $1,033,351,259 | REVISIONS FOR BOTH GARAGES CABLE BARRIER SYSTEM |
| Mod SA1716· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-04-13 | +$1,660 | $1,033,352,919 | REMOVE CONCRETE AT DIXIE EAST STAIR TO INSTALL EAST STAIR CURTAINWALL CONNECTIONS DIRECTLY TO THE HSS 20X12 |
| Mod SA1718· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-04-13 | +$165,619 | $1,033,518,538 | PROVIDE REVISED METAL PANELS AT WEST ELEVATION OF CONCOURSE&BOTH GARAGES |
| Mod SA1724· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-04-13 | +$425,000 | $1,033,943,538 | PROVIDE FIRE PROOFING OF EXPOSED TUBE STEEL IN ALL ELEVATOR SHAFTS |
| Mod SA1725· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-04-14 | +$40,985 | $1,033,984,523 | PROVIDE TEMPORARY BRACING @ LIGHTWELL GLASS |
| Mod SA1726· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-04-14 | +$1,918 | $1,033,986,441 | REROUTE ELECTRICAL FOR QF-85&QF-88 EQUIPMENT IN 4G122 DNT - DEFINITIZES CO-12W |
| Mod SA1727· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-04-14 | +$15,532 | $1,034,001,973 | PROVIDE CONNECTIONS FOR FIRE ALARM DEVICES NOT ON FIRE ALARM DRAWINGS DIX |
| Mod SA1728· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-04-14 | +$31,970 | $1,034,033,943 | PROVIDE REPROGRAMMING OF FREQUENCIES FOR VAMC POLICE&ENGINEERING EQUIPMENT |
| Mod SA1729· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-04-14 | +$9,647 | $1,034,043,590 | PROVIDE REVERSE OSMOSIS START-UP |
| Mod SA1730· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-04-19 | +$175,000 | $1,034,218,590 | REROUTE DATA CABLES IN D&T THAT EXCEEDS 325' |
| Mod SA1739· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-04-20 | −$9,827 | $1,034,208,763 | DEADBOLT LOCKSETS ON ROOF ACCESS DOORS INP DNT OUT CON TLR |
| Mod SA1732· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-04-21 | +$4,177 | $1,034,212,940 | MODIFICATIONS ON THE DNT LEVEL 5 D1\D2 MENTAL HEALTH DEFINITIZE CO-12X |
| Mod SA1733· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-04-24 | +$2,142 | $1,034,215,082 | PROVIDE AND INSTALL POWER FOR HOT WATER RECIRCULATION |
| Mod SA1735· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-04-24 | −$1,191 | $1,034,213,891 | PROVIDE AND INSTALL SOD AROUND PROJECT BOUNDARY |
| Mod SA1736· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-04-24 | +$590 | $1,034,214,481 | PROVIDE P-414 CARRIER HUNG IN THE TWO RESTROOMS IN THE NE CORNER OF L4 |
| Mod SA1737· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-04-24 | +$2,033 | $1,034,216,514 | PROGRAM THE COOLING TOWERS TIMING SEQUENCE TO INCREASE THE NUMBER OF ROTATIONS PROGRAMMED TO ENHANCE TREATMENT… |
| Mod SA1738· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-04-24 | +$1,580 | $1,034,218,094 | PROVIDE SHAFT LID ASSEMBLIES AT DIX LEVEL 5 AND 5.5 JUST NORTH OF STAIR STP-1 BETWEEN GRIDLINES 8/A AND 8/B AS… |
| Mod SA1740· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-04-24 | +$4,606 | $1,034,222,700 | PROVIDE GYPSUM BOARD CEILING IN LIEU OF ACT DIX |
| Mod SA1741· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-04-24 | +$3,512 | $1,034,226,212 | PROVIDE PHASE 3 CIRCUIT BREAKER FOR L3160 DIX |
| Mod SA1742· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-04-24 | +$5,947 | $1,034,232,159 | REROUTE VENT STACK AT DNT COURTYARD |
| Mod SA1743· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-04-24 | +$16,562 | $1,034,248,721 | PROVIDE WATER AND AIR PIPING FOR STERILIZERS |
| Mod SA1744· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-04-24 | +$33,675 | $1,034,282,396 | PROVIDE AND INSTALL EMERGENCY POWER SHUTDOWN MANAGEMENT SYSTEM FOR MAIN COMPUTER ROOM |
| Mod SA1746· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-04-24 | −$7,443 | $1,034,274,953 | PROVIDE P-414 CARRIER HUNG IN THE TWO RESTROOMS IN THE NE CORNER OF L4 (DIX 4P300D AND 4P300E) |
| Mod SA1750· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-04-24 | +$7,547 | $1,034,282,500 | 60 AMP BRANCH CIRCUITS FOR HARDWIRE CONNECTION TO UPS |
| Mod SA1747· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-04-25 | +$29,000 | $1,034,311,500 | PROVIDE&INSTALL 1 JOCKEY BOOSTER PUMP ON THE CHILL WATER LINES SCR ROOM |
| Mod SA1748· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-04-25 | +$10,287 | $1,034,321,787 | PROVIDE POWER REQUIREMENTS FOR DIX LEVEL 5 WATER HEAT EXCHANGES. |
| Mod SA1749· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-04-25 | +$6,680 | $1,034,328,467 | PROVIDE REVISED EXIT DEVICES AT LEVEL 4 CONCOURSE. |
| Mod SA1734· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-04-26 | −$17,767 | $1,034,310,700 | SLVHCS - LEVEL THE FLOORS IN AREA A1 IN DIXIE BUILDING AND AS DIRECTED WITH CHANGE ORDER CO-13B |
| Mod SA1753· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-04-26 | +$13,201 | $1,034,323,901 | SLVHCS - PROVIDE AN ADDITIONAL 8 ELECTRICAL CIRCUITS FOR A FULLY FUNCTIONAL FIRE ALARM SYSTEM AT DIXIE |
| Mod SA1754· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-04-26 | +$17,622 | $1,034,341,523 | PROVIDE FLASHING, SUB GIRTS, AND INSULATION AT DIX SOUTH ELEVATION FACADE AT WEST CONNECTOR. |
| Mod SA1751· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-04-27 | +$29,203 | $1,034,370,726 | PROVIDE REPLACEMENT STEEL BEAM FOR ELEVATOR SHAFT DIXIE |
| Mod SA1752· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-04-27 | +$4,257 | $1,034,374,983 | PROVIDE AND INSTALL DATA DROPS AT INTERVIEW ROOMS IN OUTPATIENT |
| Mod SA1757· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-05-01 | +$20,376 | $1,034,395,359 | PROVIDE TWO (2) VALVES, ROUTER FOR COMMUNICATIONS, ADDITIONAL COMMISSIONING AND BAS CABLE FOR PHOENIX SUPPLY V… |
| Mod SA1758· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-05-01 | +$4,400 | $1,034,399,759 | PROVIDE TWO (2) C-CHANNELS WHERE EXITING DIAGONAL BRACES ATTACH TO THE DIX SOUTH AREA B WALL. |
| Mod SA1755· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-05-02 | +$36,502 | $1,034,436,261 | PROVIDE PLUMBING, FLOOR CORES, AND WALL FURR OUTS FOR PLACEMENT OF DIX FUME HOODS AS PER RFI 8660 AND 8660.1 R… |
| Mod SA1756· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-05-02 | +$1,450 | $1,034,437,711 | PROVIDE WOOD BASE TO COMPLETE THE SLAB FIRE SAFING AND BACKING FOR THE FLOOR COVE BASE |
| Mod SA1759· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-05-02 | +$32,577 | $1,034,470,288 | PROVIDE DUAL DISC (SPRING LOADED) WAFER CHECK VALVES TO REPLACE STEAM CONDENSATE CHECK VALVES AT IP, OP, TL, A… |
| Mod CO13K· CHANGE ORDER | 2017-05-03 | +$18,000 | $1,034,488,288 | PROCURE AND DELIVER THE DOOR HARDWARE IN MENTAL HEALTH. |
| Mod SA1731· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-05-03 | +$492,302 | $1,034,980,590 | MULTI PCO SETTLEMENT |
| Mod SA1745· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-05-03 | +$80,564 | $1,035,061,154 | DEFINITIZE CO-09X&CO-12M, INSTALL&MODIFY LAB SPACES DIX |
| Mod SA1760· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-05-10 | +$3,251 | $1,035,064,405 | PROVIDE POWER FOR COLD STORAGE UNITS 4P305&3P149A DIX |
| Mod SA1761· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-05-10 | +$55,578 | $1,035,119,983 | PROCURE AND DELIVER 12 TRAY DELIVERY CARTS FOR THE DNT 4TH FLOOR FOOD SERVICES KITCHEN |
| Mod SA1765· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-05-18 | +$9,882 | $1,035,129,865 | PROVIDE SEALED INTERIOR CONCRETE COLUMNS IN DIXIE |
| Mod SA1766· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-05-18 | +$14,483 | $1,035,144,348 | PROVIDE POWER AFTER COOLER FOR MED GAS&MECHANICAL EQUIPMENT TLR |
| Mod SA1767· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-05-18 | +$46,090 | $1,035,190,438 | PROVIDE&INSTALL REVISED HARDWARE&OPERATORS FOR DIX DOORS |
| Mod SA1768· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-05-18 | +$6,942 | $1,035,197,380 | PROVIDE PHOENIX VALVE FOR SNORKEL DROP @ DIX |
| Mod SA1769· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-05-18 | +$19,150 | $1,035,216,530 | PERFORM BRICK WORK&WINDOW ADJUSTMENTS @ DIX A1 LEVEL 1-5&A3 LEVEL 5. |
| Mod SA1770· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-05-18 | +$4,793 | $1,035,221,323 | PROVIDE DRYWALL WINDOW JAMB DETAIL AT WEST STAIRWELL |
| Mod SA1771· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-05-18 | +$7,151 | $1,035,228,474 | SWAP OUT CANTEEN DOORS AND DELETE EXIT SIGN DEFINE CO-12S |
| Mod SA1772· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-05-18 | +$992 | $1,035,229,466 | PROVIDE GROUND FAULT CIRCUIT INTERRUPTERS AT LOCATIONS IN DNT |
| Mod SA1773· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-05-18 | +$1,911 | $1,035,231,377 | PROVIDE POWER REQUIREMENTS FOR FCU PER BULLETIN 046 |
| Mod SA1774· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-05-18 | −$5,911 | $1,035,225,466 | PROVIDE AND INSTALL SECURITY CAMERAS IN DNT ROOMS 1G145 AND 1G146, ALSO MODIFY THE HOLDING CELL TO ACHIEVE SEC… |
| Mod CO13L· CHANGE ORDER | 2017-05-24 | +$5,000 | $1,035,230,466 | PROVIDE ELECTRICAL REQUIREMENTS FOR TLR FOOD CORDS AND DNT LEVEL 4 KITCHEN KETTLE. |
| Mod SA1762· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-05-25 | +$48,155 | $1,035,278,621 | PROVIDE DIX LAB WASHING AND STERILIZING EQUIPMENT WITH 208V POWER, AS PER RFIS 8723 AND 8723.1 RESPONSES |
| Mod SA1763· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-05-25 | +$46,915 | $1,035,325,536 | PROVIDE VIVARIUM HOLDING ROOM EXHAUST, INDUCT AND EXHAUST CEILING GRILL FILTERS, PRESSURE DIFFERENTIAL SENSORS… |
| Mod SA1764· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-05-25 | +$3,297 | $1,035,328,833 | PROVIDE STORM DRAIN OVERFLOW PENETRATION MODIFICATION AT DIX LEVEL 5 OF AREA A1 |
| Mod SA1775· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-05-31 | +$1,793 | $1,035,330,626 | PROVIDE INSULATION FOR CONDENSATE PIPING AT TLR AHU-3 AND AHU-4 AND REPAIR WALL DAMAGE |
| Mod SA1777· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-05-31 | +$11,555 | $1,035,342,181 | PROVIDE TAMPER AND FLOW DEVICES CAMPUS WIDE THAT HAVE NOT BEEN CAPTURED IN PREVIOUS MODIFICATIONS. |
| Mod SA1776· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-06-01 | +$2,676 | $1,035,344,857 | STEEL PLATE AND WINDOW INSTALLATION AT OPENING FOR CW-C ON THE WEST WALL OF DIX AREA A1, AS PER RFI 8740 |
| Mod SA1780· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-06-01 | +$7,434 | $1,035,352,291 | PROVIDE REPLACEMENT CEILING TILES TO REPLACE DAMAGED TILES DUE TO PATIENT LIFT INSTALLATION AT TLR |
| Mod SA1782· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-06-05 | +$4,157 | $1,035,356,448 | DEFINITIZE CHANGE ORDER CO-12Y. PROVIDE SHUNT TIP AND ASSOCIATED ANSUL SYSTEM CONNECTION FOR EQUIPMENT QF-38 A… |
| Mod SA1778· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-06-06 | +$20,538 | $1,035,376,986 | COMPLETE MISCELLANEOUS WORK IN CANTEEN TO ACHIEVE REQUIREMENTS OF THIS SPACE AND ALLOW OPERATION AND AS DIRECT… |
| Mod SA1779· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-06-07 | +$3,626 | $1,035,380,612 | PROVIDE 2-80AMP BREAKERS AND 1-70 AMP BREAKER IN PANELS EQ8451 DIX |
| Mod SA1781· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-06-07 | +$6,071 | $1,035,386,683 | PROVIDE DOOR LOCKSET THAT ACCOMMODATES DOOR SWING FOR MAIN ENTRANCE CANOPY |
| Mod SA1784· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-06-13 | −$36,449 | $1,035,350,234 | CO-12D MISSING KITCHEN CONNECTIONS FOR EXHAUST HOODS AND FANS DNT INP EWP08 |
| Mod SA1643· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-06-14 | +$40,893 | $1,035,391,127 | PROVIDE AND INSTALL STUCCO AROUND EACH FACE OF THE COLUMN COVERS AT ED IN LIEU OF THE METAL PANELS PER THE RES… |
| Mod SA1783· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-06-15 | +$25,458 | $1,035,416,585 | PROVIDE FIRE DAMPERS AT OUTPATIENT CAFE THAT WASN'T CAPTURED IN THE ORIGINAL COST FOR BULLETIN 15C |
| Mod SA1785· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-06-15 | +$8,372 | $1,035,424,957 | PROVIDE A NEW CONCRETE SURFACE STAFF GARAGE RAMP TO DOUBLE T EXPANSION JOINT DUE TO CRACKING OF UNSUPPORTED CO… |
| Mod SA1786· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-06-23 | +$28,574 | $1,035,453,531 | PROVIDE LEAD ABATEMENT/REMOVAL ON EXPOSED EXISTING STEEL BEANS DIX BLDG 8 |
| Mod SA1787· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-06-29 | +$9,270 | $1,035,462,801 | PROVIDE SMOKE DETECTORS TO THREE DNT PROCEDURE ROOMS |
| Mod SA1793· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-07-07 | +$4,098 | $1,035,466,899 | PROVIDE RES-1 FLOORING IN LIEU OF CFT-1 @ DIX |
| Mod SA1794· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-07-07 | +$2,190 | $1,035,469,089 | PROVIDE OUTLET TYPE FOR L1500 CENTRIFUGE/REPLACE 2P135 D TYPE FREEZER RECEPTACLE DIX |
| Mod SA1795· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-07-07 | +$5,531 | $1,035,474,620 | PROVIDE STAIR INSIDE OF DIX DOOR 4P-C01 |
| Mod SA1788· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-07-11 | +$10,951 | $1,035,485,571 | PROVIDE A FUEL ANTI-SYPHON VALVE POWER TO CONNECT THE GENERATORS FOR THE DAY TANK CONTROLS AT CEP. |
| Mod SA1789· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-07-11 | +$6,844 | $1,035,492,415 | PROVIDE REPAIRS TO DIXIE BUILDING FOUNDATION AND PILE TO CORRECT STRUCTURAL DEFICIENCIES AS OUTLINED IN RFIS 6… |
| Mod SA1790· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-07-11 | +$3,639 | $1,035,496,054 | RELOCATE AND EXTEND TWO EXISTING TOP OF RACK CIRCUITS WITHIN THE RADIO ROOM OF OUT 7J1 |
| Mod SA1791· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-07-11 | +$1,340 | $1,035,497,394 | PROVIDE ELECTRICAL REQUIREMENTS FOR TLR FOOD CARTS AND DNT LEVEL 4 KITCHEN KETTLE QF-41 AS DIRECTED WITH CHANG… |
| Mod SA1792· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-07-11 | +$11,910 | $1,035,509,304 | REVISE INTERIOR STOREFRONT AND CEILING HEIGHT AT DIX DOOR 3P100B, CORRECT CEILING HEIGHT ISSUES AS OUTLINED IN… |
| Mod SA1796· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-07-12 | +$7,915 | $1,035,517,219 | PROVIDE EMERGENCY TELEPHONE @ PAN AM SITE |
| Mod SA1797· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-07-12 | +$5,174 | $1,035,522,393 | PROVIDE TWO TUBE STEEL COLUMNS TO SUPPORT DIXIE GATE |
| Mod SA1798· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-08-09 | +$61,404 | $1,035,583,797 | PROVIDE ABATEMENT @ DIX DOME |
| Mod SA1799· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-08-09 | +$8,271 | $1,035,592,068 | PROVIDE CARPET FLOORING IN RMS 1G197&1G199 DNT |
| Mod SA1800· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-08-09 | +$6,895 | $1,035,598,963 | PROVIDE ADDITIONAL BRICK INSTALLATION @ DIXIE BLDG. 8 |
| Mod SA1801· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-08-14 | +$2,401 | $1,035,601,364 | PROVIDE 2 HOUR FIRE RATED WALL @ DNT ELEVATOR LOBBIES |
| Mod SA1803· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-08-15 | +$5,753 | $1,035,607,117 | PROVIDE AND INSTALL THE SIX (6) MISSING RECESSED SOFFIT LIGHTS IN THE AREA A3 CARRIAGEWAY OF DIXIE BUILDING 8 |
| Mod SA1804· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-08-15 | +$3,315 | $1,035,610,432 | PROVIDE AND INSTALL THE SIX MISSING RECESSED SOFFIT LIGHTS IN THE AREA A3 CARRIAGEWAY OF DIXIE BUILDING 8 PER… |
| Mod SA1802· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-08-30 | +$16,416 | $1,035,626,848 | ADDED CONDENSATE DRAINS IN SERVICE BAYS DNT |
| Mod SA1805· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-09-08 | +$12,215 | $1,035,639,063 | PROVIDE AND INSTALL THE ADDITIONAL LIGHTING AND POWER CIRCUITS FOR AHUS AND EAHUS IN THE DIXIE BUILDING 8 AS P… |
| Mod SA1806· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-09-08 | +$1,381 | $1,035,640,444 | PROVIDE THE NECESSARY LAPTOP WORKSTATION FOR THE EDSTROM LIGHTING CONTROL SYSTEM FOR THE VIVARIUM IN THE DIXIE… |
| Mod SA1807· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-09-13 | +$1,602 | $1,035,642,046 | PROVIDE 120V POWER REQUIREMENTS FOR DIX HOISTWAY VENT DAMPER |
| Mod SA1808· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-09-13 | +$2,731 | $1,035,644,777 | DEFINITIZE CO-13G- PROVIDE REVERSE OSMOSIS FOR DNT ROOM 4D155 |
| Mod SA1809· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-09-20 | +$11,516 | $1,035,656,293 | GROUT THE EXISTING BRICK WINDOW OPENINGS IN ORDER TO INSTALL THE STEEL SUPPORT PLATES IN AREA B OF DIXIE BUILD… |
| Mod SA1810· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-09-20 | +$5,162 | $1,035,661,455 | PROVIDE SINGLE PHASE POWER IN LIEU OF THREE PHASES POWER AND REPLACE COIL, AT DNT CANTEEN SERVICES REFRIGERATO… |
| Mod SA1811· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-09-21 | +$3,748 | $1,035,665,203 | PROVIDE THE CONTROLS AND SEQUENCE OF OPERATIONS FOR THE HUMIDIFIERS IN AHUS 3 AND 4 IN DIXIE BUILDING 8 AS PER… |
| Mod SA1812· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-09-21 | +$5,616 | $1,035,670,819 | PERFORM THE ELECTRICAL REVISIONS REQUIRED TO PROVIDE EXTERNAL 480V POWER TO THE CONTROL DEVICES IN EUSS08 IN D… |
| Mod SA1813· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-09-28 | +$38,877 | $1,035,709,696 | SWAP OUT ALL EXIT SIGNS AND CAULK SHOWERS MH |
| Mod SA1814· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-10-19 | −$7,500 | $1,035,702,196 | REVISE THE EXIT DEVICE (CAMPUS-WIDE) THAT WAS ISSUED UNDER CHANGE ORDER CO-13C HAS NOT BEEN PERFORMED AND IS B… |
| Mod SA1817· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-10-27 | +$26,492 | $1,035,728,688 | PROVIDE AND INSTALL THE ELECTRICAL AND BAS CONNECTION ASSOCIATED WITH EXHAUST FAN EF-19 |
| Mod SA1815· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-10-30 | +$64,283 | $1,035,792,971 | PROVIDE THE FOLLOWING BOILER SAFETY MODIFICATIONS FOR EACH BOILER AT THE CEP RUNNING THE SYSTEM AT 115 PSI |
| Mod SA1816· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-10-30 | +$1,900 | $1,035,794,871 | PROVIDE AND INSTALL THE ELECTRICAL AND DRAINAGE LINES FOR THE RO-BASED WATER FILTRATION SYSTEM FOR THE TWO ALT… |
| Mod SA1818· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-10-31 | −$53,000 | $1,035,741,871 | CREDIT FOR EPSMS PANEL AND ALL WORK NOT PERFORMED IAW CO-13A |
| Mod SA1822· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-11-02 | +$9,027 | $1,035,750,898 | PROCURE AND DELIVER THE DOOR HARDWARE IN MENTAL HEALTH |
| Mod SA1823· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-11-02 | +$7,194 | $1,035,758,092 | PROVIDE THE LABOR AND MATERIALS TO CREATE 16SF OPENING WITHIN THE EXISTING PLENUM, ALSO REMOVE THE EXISTING DU… |
| Mod CO13N· CHANGE ORDER | 2017-11-03 | +$6,000,000 | $1,041,758,092 | PRELIMINARY OBLIGATION FOR DIXIE TIME EXTENSION, INSURANCE FINAL PAYMENT AND BOND TRUE UP. |
| Mod SA1824· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-11-06 | +$9,573 | $1,041,767,665 | PROVIDE 4A ORNAMENTAL FENCE SECTIONS AT THE SOUTHEAST CORNER OF DIX BUILDING WHERE CONTRACT DOCUMENTS INDICATE… |
| Mod SA1825· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-11-06 | +$13,000 | $1,041,780,665 | PROVIDE ADDITIONAL VISITS FOR REVERSE OSMOSIS SYSTEM TO PROVIDE RO START UP/COMMISSIONING/OWNER TRAINING AT IN… |
| Mod SA1826· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-11-06 | +$14,041 | $1,041,794,706 | PROVIDE PAINT OVER THE PLASTER ON THE DIX LEVEL 4 ROOF AND THE PLASTER ON THE DIX WEST WING WALL OF DIX AREA B… |
| Mod SA1828· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-11-13 | +$4,128 | $1,041,798,834 | PROVIDE THE REGLETS (SAW-CUT) IN THE MASONRY WINDOW SILLS (15 EACH) IN DIXIE BUILDING 8 |
| Mod SA1827· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-11-15 | +$113,840 | $1,041,912,674 | DEFINITIZE CHANGE ORDER 12-B AND CHANGE ORDER 12-T. |
| Mod SA1820· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-11-16 | +$9,350 | $1,041,922,024 | SWAP OUT ALL EXIT SIGNS AND CAULK SHOWERS MH |
| Mod SA1819· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-11-22 | +$13,028 | $1,041,935,052 | PROVIDE PLANT REPLACEMENT |
| Mod SA1829· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-11-22 | +$35,411 | $1,041,970,463 | SWAP OUT ALL EXIT SIGNS AND CAULK SHOWERS MH |
| Mod SA1830· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-11-22 | +$19,616 | $1,041,990,079 | REPAIR THE FIRE MAIN PIPING AT CEP |
| Mod SA1831· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-11-29 | +$13,450,000 | $1,055,440,079 | FINALIZATION OF BOND, INSURANCE AND TIME EXTENSION FOR DIXIE RESEARCH ON VA MEDICAL CENTER CAMPUS, NEW ORLEANS |
| Mod SA1832· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-12-18 | +$0 | $1,055,440,079 | CORRECT LINES OF ACCOUNTING |
| Mod SA1833· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-12-18 | +$0 | $1,055,440,079 | CORRECT LINES OF ACCOUNTING |
| Mod SA1834· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-06-21 | +$425,000 | $1,055,865,079 | CONTRACT SHORTAGE CONTRIBUTED TO FFP SA407 |
| Mod SA1835· OTHER ADMINISTRATIVE ACTION | 2019-01-18 | −$97,236 | $1,055,767,844 | ADMINISTRATIVE MOD DEOBLIGATION DUE TO FISCAL ACCOUNTING ERROR |
Related awards · 4
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI FLLTY3SH3K95)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| VA25616C0038 | 256-NETWORK CONTRACT OFFICE 16 (36C256) · S216 · HOUSEKEEPING- FACILITIES OPERATIONS SUPPORT | $4,756,289 | FY2016 |
Other recipients under Y111 from OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA101CFMC0139 | ARCHER WESTERN-DEMARIA JV 11 | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | $109,327,964 | FY2011 |
| VA101CFMC0080 | INTEGRATED PRO SERVICES, LLC | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | $12,513,790 | FY2010 |
| VA101CFMC0039 | MCCARTHY BUILDING COMPANIES, INC. | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | $43,512,526 | FY2009 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA101CFMC0064_3600_-NONE-_-NONE- · retrieved 2026-09-25.