Award recordCONTRACT

MCCARTHY BUILDING COMPANIES, INC.

PIID VA701C0171· VA Staff Offices· PCAC (36C776)· Y249 · CONSTRUCTION OF OTHER UTILITIES· FY2011· $25,360,242 net obligations· UEI GZH9ED5FL2V3· MO

Description

THIS CONTRACT IS TO BUILD A POWER PLANT ON THE VETERANS AFFAIRS MEDICAL CENTER DALLAS CAMPUS.

Base award description: DESIGN AND BUILD A COGENERATION SYSTEM AT VAMC DALLAS, TX.

First action · last action
2011-09-14 · 2017-07-13
Transactions
44
First transaction's obligation
$22,865,715
Base + all options value (sum of deltas)
$25,360,242
Extent competed
FULL AND OPEN COMPETITION
Other than full & open authority
—
Set-aside
NO SET ASIDE USED.
Offers received
8
SDVOSB flag on record
No
NAICS
237130 · POWER AND COMMUNICATION LINE AND RELATED STRUCTURES CONSTRUCTION

Modification chain · 44 transactions

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$25,360,242$0Base award · 2011-09-14 · this action $22,865,715 · running total $22,865,715Modification P00001 · 2012-02-14 · this action $95,747 · running total $22,961,462Modification P00004 · 2012-05-16 · this action $35,356 · running total $22,996,818Modification P00008 · 2012-06-20 · this action -$12,348 · running total $22,984,470Modification P00005 · 2012-07-10 · this action -$10,936 · running total $22,973,534Modification P00012 · 2012-07-12 · this action $14,646 · running total $22,988,180Modification P00009 · 2012-07-17 · this action -$88,203 · running total $22,899,977Modification P00014 · 2012-09-07 · this action $1,375 · running total $22,901,352Modification P00006 · 2012-09-27 · this action $6,300 · running total $22,907,652Modification P00007 · 2012-10-05 · this action $53,008 · running total $22,960,660Modification P00010 · 2012-11-08 · this action $0 · running total $22,960,660Modification P00015 · 2012-11-16 · this action $0 · running total $22,960,660Modification P00016 · 2013-01-17 · this action $99,858 · running total $23,060,518Modification P00013 · 2013-02-11 · this action -$4,163 · running total $23,056,355Modification P00011 · 2013-02-13 · this action -$196 · running total $23,056,159Modification P00017 · 2013-02-21 · this action $34,180 · running total $23,090,339Modification P00018 · 2013-03-12 · this action $18,145 · running total $23,108,484Modification P00019 · 2013-03-14 · this action $9,135 · running total $23,117,619Modification P00003 · 2013-05-01 · this action $8,271 · running total $23,125,890Modification P00020 · 2013-05-03 · this action $8,440 · running total $23,134,330Modification P00021 · 2013-05-08 · this action $18,103 · running total $23,152,433Modification P00023 · 2013-06-18 · this action $11,029 · running total $23,163,462Modification P00024 · 2013-06-21 · this action $9,829 · running total $23,173,291Modification P00025 · 2013-06-25 · this action $310,666 · running total $23,483,957Modification P00022 · 2013-07-10 · this action $0 · running total $23,483,957Modification P00026 · 2013-07-12 · this action $88,328 · running total $23,572,285Modification P00002 · 2013-07-26 · this action $0 · running total $23,572,285Modification P00027 · 2013-09-18 · this action $0 · running total $23,572,285Modification P00029 · 2014-01-06 · this action $79,086 · running total $23,651,371Modification P00030 · 2014-01-06 · this action $24,885 · running total $23,676,256Modification P00028 · 2014-05-02 · this action $77,302 · running total $23,753,558Modification P00031 · 2014-06-03 · this action $40,000 · running total $23,793,558Modification P00032 · 2014-06-11 · this action -$10,919 · running total $23,782,639Modification P00033 · 2014-06-18 · this action $15,706 · running total $23,798,345Modification P00035 · 2014-08-14 · this action -$1,902 · running total $23,796,443Modification P00034 · 2014-08-18 · this action $37,625 · running total $23,834,068Modification P00036 · 2014-09-10 · this action $50,000 · running total $23,884,068Modification P00037 · 2014-09-11 · this action $0 · running total $23,884,068Modification P00038 · 2014-11-03 · this action -$45,924 · running total $23,838,144Modification P00039 · 2015-05-13 · this action -$9,811 · running total $23,828,333Modification P00040 · 2015-06-02 · this action $300,000 · running total $24,128,333Modification P00041 · 2017-07-13 · this action -$15,424 · running total $24,112,909Modification P00042 · 2017-07-13 · this action $367,333 · running total $24,480,242Modification P00043 · 2017-07-13 · this action $880,000 · running total $25,360,242
  • Base2011-09-14+$22,865,715= $22,865,715
  • Mod P000012012-02-14+$95,747= $22,961,462
  • Mod P000042012-05-16+$35,356= $22,996,818
  • Mod P000082012-06-20-$12,348= $22,984,470
  • Mod P000052012-07-10-$10,936= $22,973,534
  • Mod P000122012-07-12+$14,646= $22,988,180
  • Mod P000092012-07-17-$88,203= $22,899,977
  • Mod P000142012-09-07+$1,375= $22,901,352
  • Mod P000062012-09-27+$6,300= $22,907,652
  • Mod P000072012-10-05+$53,008= $22,960,660
  • Mod P000102012-11-08+$0= $22,960,660
  • Mod P000152012-11-16+$0= $22,960,660
  • Mod P000162013-01-17+$99,858= $23,060,518
  • Mod P000132013-02-11-$4,163= $23,056,355
  • Mod P000112013-02-13-$196= $23,056,159
  • Mod P000172013-02-21+$34,180= $23,090,339
  • Mod P000182013-03-12+$18,145= $23,108,484
  • Mod P000192013-03-14+$9,135= $23,117,619
  • Mod P000032013-05-01+$8,271= $23,125,890
  • Mod P000202013-05-03+$8,440= $23,134,330
  • Mod P000212013-05-08+$18,103= $23,152,433
  • Mod P000232013-06-18+$11,029= $23,163,462
  • Mod P000242013-06-21+$9,829= $23,173,291
  • Mod P000252013-06-25+$310,666= $23,483,957
  • Mod P000222013-07-10+$0= $23,483,957
  • Mod P000262013-07-12+$88,328= $23,572,285
  • Mod P000022013-07-26+$0= $23,572,285
  • Mod P000272013-09-18+$0= $23,572,285
  • Mod P000292014-01-06+$79,086= $23,651,371
  • Mod P000302014-01-06+$24,885= $23,676,256
  • Mod P000282014-05-02+$77,302= $23,753,558
  • Mod P000312014-06-03+$40,000= $23,793,558
  • Mod P000322014-06-11-$10,919= $23,782,639
  • Mod P000332014-06-18+$15,706= $23,798,345
  • Mod P000352014-08-14-$1,902= $23,796,443
  • Mod P000342014-08-18+$37,625= $23,834,068
  • Mod P000362014-09-10+$50,000= $23,884,068
  • Mod P000372014-09-11+$0= $23,884,068
  • Mod P000382014-11-03-$45,924= $23,838,144
  • Mod P000392015-05-13-$9,811= $23,828,333
  • Mod P000402015-06-02+$300,000= $24,128,333
  • Mod P000412017-07-13-$15,424= $24,112,909
  • Mod P000422017-07-13+$367,333= $24,480,242
  • Mod P000432017-07-13+$880,000= $25,360,242
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2011-09-14+$22,865,715$22,865,715DESIGN AND BUILD A COGENERATION SYSTEM AT VAMC DALLAS, TX.
Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-02-14+$95,747$22,961,462MODIFICATION TO HAVE THE CONTRACTOR BRING THE DESIGN DOCUMENTS UP TO A 65% LEVEL.
Mod P00004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-05-16+$35,356$22,996,818OTHER FUNCTIONS - MODIFICATION TO HAVE THE CONTRACTOR PROVIDE CONCRETE TESTING SERVICES ON THE POWER PLANT.
Mod P00008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-06-20−$12,348$22,984,470MODIFICATION TO DELETE FOUR INCH GAS LINE FROM THE CONTRACT.
Mod P00005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-10−$10,936$22,973,534MODIFICATION TO RECIEVE CREDIT FOR A CONSTRUCTION TRAILER THAT WILL NO LONGER BE USED.
Mod P00012· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-12+$14,646$22,988,180MODIFICATION TO UTILIZE STAINLESS STEEL INSTEAD OF CARBON STEEL ON A GENERATOR.
Mod P00009· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-17−$88,203$22,899,977OTHER FUNCTIONS - MODIFICATION TO HAVE THE CONTRACTOR NOT COMPLY WITH THE BLAST RESISTANCE SPECIFICATION.
Mod P00014· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-09-07+$1,375$22,901,352OTHER FUNCTIONS - MODIFICATION TO HAVE THE CONTRACTOR CHANGE THE SANITARY SEWER LINE.
Mod P00006· CHANGE ORDER2012-09-27+$6,300$22,907,652OTHER FUNCTIONS - MODIFICATION TO PROVIDE THE CONTRACTOR A CHANGE ORDER FOR THE DUCT WORK BURNER AND THE GAS L…
Mod P00007· CHANGE ORDER2012-10-05+$53,008$22,960,660THIS ACTION IS TO PROVIDE THE CONTRACTOR A CHANGE ORDER FOR THE WORK IN FOR THE DESIGN PORTION OF THE ALTERNAT…
Mod P00010· CHANGE ORDER2012-11-08+$0$22,960,660OTHER FUNCTION THIS ACTION IS TO PROVIDE THE CONTRACTOR ADVANCE PAYMENTS. THE ORIGINAL CONTRACT WAS FOR A COM…
Mod P00015· OTHER ADMINISTRATIVE ACTION2012-11-16+$0$22,960,660OTHER FUNCTION THIS ACTION IS TO INCORPORATE THE ENGINEERING CHANGES CLAUSE INTO THIS CONTRACT.
Mod P00016· OTHER ADMINISTRATIVE ACTION2013-01-17+$99,858$23,060,518OTHER FUNCTION THIS ACTION IS FOR A CHANGE ORDER FOR THE ALTERNATE FEED EATON CONSTRUCTION.
Mod P00013· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-02-11−$4,163$23,056,355OTHER FUNCTION THIS ACTION IS A MODIFICATION FOR THE ALTERNATE ELECTRICAL FEED DESIGN.
Mod P00011· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-02-13−$196$23,056,159OTHER FUNCTION THIS ACTION IS TO DEFINITIZE THE CHANGE ORDER FOR THE DESIGN WORK TO RE-ROUTE THE GAS LINE.
Mod P00017· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-02-21+$34,180$23,090,339OTHER FUNCTION THIS FOR STANDARD CONTROLS FOR A CONTROL PLATFORM MODULE.
Mod P00018· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-03-12+$18,145$23,108,484THIS MODIFICATION IS FOR A FIVE INCH CONDUIT AT BUILDING 87.
Mod P00019· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-03-14+$9,135$23,117,619THIS MODIFICATION IS TO ADD ELECTRICAL LOAD BREAKS TO THE CONTRACT.
Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-05-01+$8,271$23,125,890THIS MODIFICATION IS RE-ROUTE THE GAS LINE TO THE ENERGY CENTER.
Mod P00020· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-05-03+$8,440$23,134,330THIS MODIFICATION IS TO ALLOW FOR LONG TERM STORAGE OF THE TURBINE UNIT.
Mod P00021· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-05-08+$18,103$23,152,433THIS MODIFICATION IS TO ALLOW FOR ADDITIONAL PIER CASINGS.
Mod P00023· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-06-18+$11,029$23,163,462THIS MODIFICATION IS TO ALLOW FOR ADDITIONAL FIRE MASS NOTIFICATION DEVICES. THE ORIGINAL CONTRACT WAS TO BUI…
Mod P00024· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-06-21+$9,829$23,173,291THIS MODIFICATION IS TO REMOVE A FENCE AND SOME CONCRETE FOR THE DALLAS MEDICAL CENTER. THE ORIGINAL CONTRACT…
Mod P00025· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-06-25+$310,666$23,483,957THIS MODIFICATION IS TO REMOVE A FENCE AND SOME CONCRETE FOR THE DALLAS MEDICAL CENTER. THE ORIGINAL CONTRACT…
Mod P00022· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-07-10+$0$23,483,957THIS AWARD IS FOR A COMBINED HEAT AND POWER PLANT IN DALLAS TEXAS.
Mod P00026· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-07-12+$88,328$23,572,285THIS AWARD IS FOR A COMBINED HEAT AND POWER PLANT IN DALLAS TEXAS.
Mod P00002· DEFINITIZE CHANGE ORDER2013-07-26+$0$23,572,285THIS CONTRACT IS TO BUILD A POWER PLANT ON THE VETERANS AFFAIRS MEDICAL CENTER DALLAS CAMPUS.
Mod P00027· DEFINITIZE CHANGE ORDER2013-09-18+$0$23,572,285THIS CONTRACT IS TO BUILD A POWER PLANT ON THE VETERANS AFFAIRS MEDICAL CENTER DALLAS CAMPUS.
Mod P00029· DEFINITIZE CHANGE ORDER2014-01-06+$79,086$23,651,371THIS CONTRACT IS TO BUILD A POWER PLANT ON THE VETERANS AFFAIRS MEDICAL CENTER DALLAS CAMPUS.
Mod P00030· DEFINITIZE CHANGE ORDER2014-01-06+$24,885$23,676,256THIS CONTRACT IS TO BUILD A POWER PLANT ON THE VETERANS AFFAIRS MEDICAL CENTER DALLAS CAMPUS.
Mod P00028· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-05-02+$77,302$23,753,558THIS CONTRACT IS TO BUILD A POWER PLANT ON THE VETERANS AFFAIRS MEDICAL CENTER DALLAS CAMPUS.
Mod P00031· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-06-03+$40,000$23,793,558THIS CONTRACT IS TO BUILD A POWER PLANT ON THE VETERANS AFFAIRS MEDICAL CENTER DALLAS CAMPUS.
Mod P00032· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-06-11−$10,919$23,782,639THIS CONTRACT IS TO BUILD A POWER PLANT ON THE VETERANS AFFAIRS MEDICAL CENTER DALLAS CAMPUS.
Mod P00033· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-06-18+$15,706$23,798,345THIS CONTRACT IS TO BUILD A POWER PLANT ON THE VETERANS AFFAIRS MEDICAL CENTER DALLAS CAMPUS.
Mod P00035· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-08-14−$1,902$23,796,443THIS CONTRACT IS TO BUILD A POWER PLANT ON THE VETERANS AFFAIRS MEDICAL CENTER DALLAS CAMPUS.
Mod P00034· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-08-18+$37,625$23,834,068THIS CONTRACT IS TO BUILD A POWER PLANT ON THE VETERANS AFFAIRS MEDICAL CENTER DALLAS CAMPUS.
Mod P00036· CHANGE ORDER2014-09-10+$50,000$23,884,068THIS CONTRACT IS TO BUILD A POWER PLANT ON THE VETERANS AFFAIRS MEDICAL CENTER DALLAS CAMPUS.
Mod P00037· CHANGE ORDER2014-09-11+$0$23,884,068THIS CONTRACT IS TO BUILD A POWER PLANT ON THE VETERANS AFFAIRS MEDICAL CENTER DALLAS CAMPUS.
Mod P00038· DEFINITIZE CHANGE ORDER2014-11-03−$45,924$23,838,144THIS CONTRACT IS TO BUILD A POWER PLANT ON THE VETERANS AFFAIRS MEDICAL CENTER DALLAS CAMPUS.
Mod P00039· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-05-13−$9,811$23,828,333THIS CONTRACT IS TO BUILD A POWER PLANT ON THE VETERANS AFFAIRS MEDICAL CENTER DALLAS CAMPUS.
Mod P00040· CHANGE ORDER2015-06-02+$300,000$24,128,333THIS CONTRACT IS TO BUILD A POWER PLANT ON THE VETERANS AFFAIRS MEDICAL CENTER DALLAS CAMPUS.
Mod P00041· DEFINITIZE CHANGE ORDER2017-07-13−$15,424$24,112,909THIS CONTRACT IS TO BUILD A POWER PLANT ON THE VETERANS AFFAIRS MEDICAL CENTER DALLAS CAMPUS.
Mod P00042· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-07-13+$367,333$24,480,242THIS CONTRACT IS TO BUILD A POWER PLANT ON THE VETERANS AFFAIRS MEDICAL CENTER DALLAS CAMPUS.
Mod P00043· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-07-13+$880,000$25,360,242THIS CONTRACT IS TO BUILD A POWER PLANT ON THE VETERANS AFFAIRS MEDICAL CENTER DALLAS CAMPUS.

Related awards · 2

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other VA awards to the same recipient (UEI GZH9ED5FL2V3)

AwardOffice · PSC / listingNet obligationsFY
VA101F12C0039OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) · Y1DB · CONSTRUCTION OF LABORATORIES AND CLINICS$58,590,140FY2012
VA101CFMC0039OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) · Y111 · CONSTRUCTION OF OFFICE BUILDINGS$43,512,526FY2009

Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA701C0171_3600_-NONE-_-NONE- · retrieved 2026-09-26.