Award recordCONTRACT

ROY ANDERSON CORP

PIID VA101CFMC0070· VA Staff Offices· OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT· Y111 · CONSTRUCTION OF OFFICE BUILDINGS· FY2008· $38,245,927 net obligations· UEI WMX2JXNH41J8· MS

Description

TO ADJUST THE CONTRACTOR'S BOND PREMIUM BECAUSE OF THE MODIFICATIONS ISSUED TO THE CONTRACT DURING CONSTRUCTION.

Base award description: MH

First action · last action
2008-09-30 · 2012-01-09
Transactions
63
First transaction's obligation
$36,299,500
Base + all options value (sum of deltas)
$38,245,927
Extent competed
FULL AND OPEN COMPETITION
Other than full & open authority
—
Set-aside
NO SET ASIDE USED.
Offers received
3
SDVOSB flag on record
No
NAICS
236220 · COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION

Modification chain · 63 transactions

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$38,245,927$0Base award · 2008-09-30 · this action $36,299,500 · running total $36,299,500Modification SA001 · 2009-01-07 · this action $6,484 · running total $36,305,984Modification SA002 · 2009-06-09 · this action $5,986 · running total $36,311,970Modification SA003 · 2009-06-09 · this action $5,958 · running total $36,317,928Modification SA005 · 2009-06-09 · this action $6,714 · running total $36,324,642Modification CO01A · 2009-06-10 · this action $10,000 · running total $36,334,642Modification SA006 · 2009-06-10 · this action $11,602 · running total $36,346,244Modification SA007 · 2009-06-10 · this action -$5,501 · running total $36,340,743Modification SA010 · 2009-09-21 · this action $1,854 · running total $36,342,597Modification SA011 · 2009-09-21 · this action -$7,486 · running total $36,335,112Modification SA012 · 2009-09-21 · this action $66,520 · running total $36,401,632Modification SA013 · 2009-09-21 · this action $4,049 · running total $36,405,681Modification SA004 · 2009-09-22 · this action $1,875 · running total $36,407,556Modification SA014 · 2009-09-22 · this action $11,387 · running total $36,418,943Modification SA016 · 2009-09-22 · this action $9,362 · running total $36,428,305Modification SA017 · 2009-09-22 · this action $7,140 · running total $36,435,445Modification SA024 · 2009-09-22 · this action -$19,060 · running total $36,416,385Modification SA008 · 2009-09-23 · this action $18,463 · running total $36,434,848Modification SA009 · 2009-09-23 · this action $4,625 · running total $36,439,473Modification SA018 · 2010-02-04 · this action $26,288 · running total $36,465,761Modification SA019 · 2010-02-04 · this action $79,951 · running total $36,545,712Modification SA020 · 2010-02-04 · this action $17,563 · running total $36,563,275Modification SA021 · 2010-02-04 · this action $1,817 · running total $36,565,092Modification SA022 · 2010-02-04 · this action $6,618 · running total $36,571,710Modification SA023 · 2010-02-04 · this action $54,911 · running total $36,626,621Modification SA025 · 2010-02-04 · this action $25,244 · running total $36,651,865Modification SA026 · 2010-02-04 · this action $2,190 · running total $36,654,055Modification CO01B · 2010-08-30 · this action $469,200 · running total $37,123,255Modification SA027 · 2011-01-18 · this action $13,148 · running total $37,136,403Modification SA028 · 2011-01-18 · this action $1,588 · running total $37,137,991Modification SA029 · 2011-01-18 · this action $997 · running total $37,138,988Modification SA030 · 2011-01-18 · this action $7,818 · running total $37,146,806Modification SA031 · 2011-01-18 · this action $87,110 · running total $37,233,916Modification SA032 · 2011-03-21 · this action $202,266 · running total $37,436,182Modification SA033 · 2011-03-21 · this action $14,539 · running total $37,450,721Modification SA034 · 2011-03-21 · this action $18,053 · running total $37,468,774Modification SA035 · 2011-03-21 · this action $128,800 · running total $37,597,574Modification SA036 · 2011-03-21 · this action $62,893 · running total $37,660,467Modification SA037 · 2011-03-21 · this action $31,816 · running total $37,692,283Modification SA038 · 2011-07-05 · this action $36,184 · running total $37,728,467Modification SA039 · 2011-07-05 · this action $2,399 · running total $37,730,866Modification SA040 · 2011-07-05 · this action $13,905 · running total $37,744,771Modification SA041 · 2011-07-05 · this action $12,898 · running total $37,757,669Modification SA042 · 2011-07-05 · this action $7,840 · running total $37,765,509Modification SA043 · 2011-07-05 · this action $48,562 · running total $37,814,071Modification SA044 · 2011-07-05 · this action $4,514 · running total $37,818,585Modification SA046 · 2011-08-01 · this action $37,601 · running total $37,856,186Modification SA047 · 2011-08-01 · this action $34,445 · running total $37,890,631Modification SA048 · 2011-08-01 · this action $10,018 · running total $37,900,649Modification SA049 · 2011-08-01 · this action $6,934 · running total $37,907,583Modification SA051 · 2011-08-01 · this action $9,988 · running total $37,917,571Modification SA045 · 2011-08-16 · this action $23,407 · running total $37,940,978Modification CO01C · 2011-09-16 · this action $89,500 · running total $38,030,478Modification CO01D · 2011-09-16 · this action $15,600 · running total $38,046,078Modification CO01E · 2011-09-16 · this action $88,000 · running total $38,134,078Modification SA050 · 2011-09-16 · this action $19,732 · running total $38,153,810Modification SA052 · 2011-09-16 · this action $9,881 · running total $38,163,691Modification SA053 · 2011-09-16 · this action $3,127 · running total $38,166,818Modification SA057 · 2011-12-21 · this action $5,750 · running total $38,172,568Modification SA054 · 2011-12-22 · this action $10,409 · running total $38,182,977Modification SA055 · 2011-12-22 · this action $42,484 · running total $38,225,461Modification SA056 · 2011-12-22 · this action $8,497 · running total $38,233,958Modification SA058 · 2012-01-09 · this action $11,969 · running total $38,245,927
  • Base2008-09-30+$36,299,500= $36,299,500
  • Mod SA0012009-01-07+$6,484= $36,305,984
  • Mod SA0022009-06-09+$5,986= $36,311,970
  • Mod SA0032009-06-09+$5,958= $36,317,928
  • Mod SA0052009-06-09+$6,714= $36,324,642
  • Mod CO01A2009-06-10+$10,000= $36,334,642
  • Mod SA0062009-06-10+$11,602= $36,346,244
  • Mod SA0072009-06-10-$5,501= $36,340,743
  • Mod SA0102009-09-21+$1,854= $36,342,597
  • Mod SA0112009-09-21-$7,486= $36,335,112
  • Mod SA0122009-09-21+$66,520= $36,401,632
  • Mod SA0132009-09-21+$4,049= $36,405,681
  • Mod SA0042009-09-22+$1,875= $36,407,556
  • Mod SA0142009-09-22+$11,387= $36,418,943
  • Mod SA0162009-09-22+$9,362= $36,428,305
  • Mod SA0172009-09-22+$7,140= $36,435,445
  • Mod SA0242009-09-22-$19,060= $36,416,385
  • Mod SA0082009-09-23+$18,463= $36,434,848
  • Mod SA0092009-09-23+$4,625= $36,439,473
  • Mod SA0182010-02-04+$26,288= $36,465,761
  • Mod SA0192010-02-04+$79,951= $36,545,712
  • Mod SA0202010-02-04+$17,563= $36,563,275
  • Mod SA0212010-02-04+$1,817= $36,565,092
  • Mod SA0222010-02-04+$6,618= $36,571,710
  • Mod SA0232010-02-04+$54,911= $36,626,621
  • Mod SA0252010-02-04+$25,244= $36,651,865
  • Mod SA0262010-02-04+$2,190= $36,654,055
  • Mod CO01B2010-08-30+$469,200= $37,123,255
  • Mod SA0272011-01-18+$13,148= $37,136,403
  • Mod SA0282011-01-18+$1,588= $37,137,991
  • Mod SA0292011-01-18+$997= $37,138,988
  • Mod SA0302011-01-18+$7,818= $37,146,806
  • Mod SA0312011-01-18+$87,110= $37,233,916
  • Mod SA0322011-03-21+$202,266= $37,436,182
  • Mod SA0332011-03-21+$14,539= $37,450,721
  • Mod SA0342011-03-21+$18,053= $37,468,774
  • Mod SA0352011-03-21+$128,800= $37,597,574
  • Mod SA0362011-03-21+$62,893= $37,660,467
  • Mod SA0372011-03-21+$31,816= $37,692,283
  • Mod SA0382011-07-05+$36,184= $37,728,467
  • Mod SA0392011-07-05+$2,399= $37,730,866
  • Mod SA0402011-07-05+$13,905= $37,744,771
  • Mod SA0412011-07-05+$12,898= $37,757,669
  • Mod SA0422011-07-05+$7,840= $37,765,509
  • Mod SA0432011-07-05+$48,562= $37,814,071
  • Mod SA0442011-07-05+$4,514= $37,818,585
  • Mod SA0462011-08-01+$37,601= $37,856,186
  • Mod SA0472011-08-01+$34,445= $37,890,631
  • Mod SA0482011-08-01+$10,018= $37,900,649
  • Mod SA0492011-08-01+$6,934= $37,907,583
  • Mod SA0512011-08-01+$9,988= $37,917,571
  • Mod SA0452011-08-16+$23,407= $37,940,978
  • Mod CO01C2011-09-16+$89,500= $38,030,478
  • Mod CO01D2011-09-16+$15,600= $38,046,078
  • Mod CO01E2011-09-16+$88,000= $38,134,078
  • Mod SA0502011-09-16+$19,732= $38,153,810
  • Mod SA0522011-09-16+$9,881= $38,163,691
  • Mod SA0532011-09-16+$3,127= $38,166,818
  • Mod SA0572011-12-21+$5,750= $38,172,568
  • Mod SA0542011-12-22+$10,409= $38,182,977
  • Mod SA0552011-12-22+$42,484= $38,225,461
  • Mod SA0562011-12-22+$8,497= $38,233,958
  • Mod SA0582012-01-09+$11,969= $38,245,927
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2008-09-30+$36,299,500$36,299,500MH
Mod SA001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-01-07+$6,484$36,305,984TEMPORARY SIDEWALK FOR MENTAL HEALTH
Mod SA002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-06-09+$5,986$36,311,970CONSTRUCT 225' ADDITIONAL SIDEWALK.
Mod SA003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-06-09+$5,958$36,317,928TEMPORARY TESTING LAB SERVICES
Mod SA005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-06-09+$6,714$36,324,642INSTALL 16 ELECTRONIC FAUCETS.
Mod CO01A· CHANGE ORDER2009-06-10+$10,000$36,334,642INVESTIGATE CAUSE OF HIGH-VOLTAGE GROUND.
Mod SA006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-06-10+$11,602$36,346,244MODIFICATIONS TO RM #1B135.
Mod SA007· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-06-10−$5,501$36,340,743DELETE SEISMIC REQUIREMENTS FOR ELEVATOR.
Mod SA010· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-09-21+$1,854$36,342,597INSTALL ADDITIONAL TIE BEAMS.
Mod SA011· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-09-21−$7,486$36,335,112INVESTIGATE STATUS OF CIRCUIT #6.
Mod SA012· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-09-21+$66,520$36,401,632REMOVE CONCRETE UNDER ASPHALT ROADWAYS.
Mod SA013· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-09-21+$4,049$36,405,681REMOVE SCREEN AND MOVE PARKING LOT FENCE.
Mod SA004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-09-22+$1,875$36,407,556RELOCATE FIRE HYDRANT.
Mod SA014· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-09-22+$11,387$36,418,943INCREASE SIZE OF BOOSTER PUMP.
Mod SA016· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2009-09-22+$9,362$36,428,305REPAIR WATER MAIN IN BLDG 19.
Mod SA017· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-09-22+$7,140$36,435,445INSTALL ADDITIONAL SHELF SUPPORT ANGLES.
Mod SA024· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-09-22−$19,060$36,416,385CREDIT FOR CHANGE IN BUILDING PANEL COATING.
Mod SA008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-09-23+$18,463$36,434,848CONSTRUCT MOCK-UP WALL.
Mod SA009· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-09-23+$4,625$36,439,473ADDITIONAL LAB TESTING SERVICES.
Mod SA018· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2010-02-04+$26,288$36,465,761ABATE TRANSITE DUCTBANK
Mod SA019· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2010-02-04+$79,951$36,545,712ADD'L COMM DUCT BANK
Mod SA020· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2010-02-04+$17,563$36,563,275SANITARY SEWER LATERAL CONNECTIONS
Mod SA021· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2010-02-04+$1,817$36,565,092PROTECTIOJN OF ENERGIZED CIRCUTS
Mod SA022· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2010-02-04+$6,618$36,571,710REPLACE FIBER OPTIC CABLE FOR MARQUEE SIGN
Mod SA023· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2010-02-04+$54,911$36,626,621ADD'L ELECTRICAL DUCTBANK
Mod SA025· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2010-02-04+$25,244$36,651,865ADD'L SEWER TO LIFT STATION
Mod SA026· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2010-02-04+$2,190$36,654,055MOVE FENCING FOR CHILLED WATER LINE
Mod CO01B· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2010-08-30+$469,200$37,123,255HOT WATER BOILERS
Mod SA027· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2011-01-18+$13,148$37,136,403INSTALL ADD'L SALLY PORT WINDOWS
Mod SA028· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2011-01-18+$1,588$37,137,991SHOWER BENCHES
Mod SA029· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2011-01-18+$997$37,138,988ADD PRECAST, BRICK AND STUCCO AT BALCONY
Mod SA030· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2011-01-18+$7,818$37,146,806ADD PRECAST, BRICK AND STUCCO AT BALCONY
Mod SA031· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2011-01-18+$87,110$37,233,916PATIENT SAFETY CHANGES
Mod SA032· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2011-03-21+$202,266$37,436,182LEXAN WINDOWS WITH INTERGRAL BLINDS
Mod SA033· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2011-03-21+$14,539$37,450,721CHANGE GROUT IN PRECAST TO CAULK
Mod SA034· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2011-03-21+$18,053$37,468,774CHANGES IN ELEVATOR CONTROLS
Mod SA035· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2011-03-21+$128,800$37,597,574HOT WATER BOILER ADDITION
Mod SA036· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2011-03-21+$62,893$37,660,467ADDITIONAL CAMERAS
Mod SA037· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2011-03-21+$31,816$37,692,283CONSTRUCT RETAINING WALL
Mod SA038· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2011-07-05+$36,184$37,728,467IT WAS DETERMINED BY THE AE , RE, AND INTERIOR DESIGNER USING THE MENTAL HEALTH GUIDE THAT PLANK FLOORING IN T…
Mod SA039· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2011-07-05+$2,399$37,730,866TO PROVIDE TESTING LAB SERVICES UNTIL SUCH TIME AS THE VA AWARDS A TESTING LAB CONTRACT.
Mod SA040· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2011-07-05+$13,905$37,744,771THE ORIGINAL SCREEN SPECIFIED WAS DEEMED UN-SAFE BY THE STATION SAFETY PERSONNEL AND PATIENT SAFETY. THE SCREE…
Mod SA041· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2011-07-05+$12,898$37,757,669RFI'S 189, 192, AND 195 IDENTIFIED CONFLICTS BETWEEN THE DRAWINGS AND DOOR SCHEDULES. SIX DOORS THAT REQUIRE E…
Mod SA042· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2011-07-05+$7,840$37,765,509RFI-161 REQUESTED INFO ABOUT AN OUTLINE ON THE DRAWINGS IN THE "IN-PROCESSING AREA OF "C". THE REFERENCED DET…
Mod SA043· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2011-07-05+$48,562$37,814,071THE SPECIFIED SHOWER VALVES DO NOT MEET THE REQUIREMENTS FOR ANTI-LIGATURE TYPE VALVES. REMOVE THE INSTALLED V…
Mod SA044· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2011-07-05+$4,514$37,818,585ALL OF THE REQUIRED WI-FI OUTLETS WERE NOT IDENTIFIED ON THE DRAWINGS, RESULTING IN NUMEROUS DEAD-ZONES THAT W…
Mod SA046· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2011-08-01+$37,601$37,856,186ARCHITECTURAL METAL CHANGE
Mod SA047· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2011-08-01+$34,445$37,890,631CHANGES TO CAST STONE
Mod SA048· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2011-08-01+$10,018$37,900,649STRUCTURAL CHANGES
Mod SA049· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2011-08-01+$6,934$37,907,583CEILING AND DAMPER CHANGES
Mod SA051· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2011-08-01+$9,988$37,917,571PATIENT BATHROOM CHANGES
Mod SA045· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2011-08-16+$23,407$37,940,978THE WINDOW DETAIL PROVIDE BY THE AE DID NOT PROVIDE AN AIR AND WATER TIGHT SEAL TO THE BLAST RESISTANT WINDOWS…
Mod CO01C· CHANGE ORDER2011-09-16+$89,500$38,030,478TO ADD A SMOKE WALL AROUND THE MECHANICAL ROOMS AND CORRIDOR IN THE ATTIC IN ORDER TO BE IN COMPLIANCE WITH TH…
Mod CO01D· CHANGE ORDER2011-09-16+$15,600$38,046,078STAIR #7 , A COMMUNICATING STAIR BETWEEN THE 1ST AND 2ND FLOORS SHOULD BE ENCLOSED SINCE THE IN-PATIENT AND OU…
Mod CO01E· CHANGE ORDER2011-09-16+$88,000$38,134,078TO MAKE LIFE SAFETY CHANGES TO THE CORRIDORS BETWEEN MECHANICAL ROOMS AND STAIRWAYS IN THE ATTIC SPACE TO MEET…
Mod SA050· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2011-09-16+$19,732$38,153,810MANY POWER CIRCUITS WERE NOT SHOWN ON THE DRAWINGS AND THE FIBER WAS MISLABELED, ADDITIONALLY, THE REMOTE GENE…
Mod SA052· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2011-09-16+$9,881$38,163,691THE TILE SPECIFIED FOR THE LOBBY AREAS IS NOT AVAILABLE ANYMORE THIS YEAR DUE TO BEING BOUGHT OUT BY A CHAIN S…
Mod SA053· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2011-09-16+$3,127$38,166,818THE ROOF HAS NO ACCESS TO IT FROM INSIDE THE BUILDING. THE ROOFING CONTRACTOR IS WILLING TO INSTALL ONE AT COS…
Mod SA057· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2011-12-21+$5,750$38,172,568THE DESIGN OF THE DIESEL FILL SYSTEM DID NOT HAVE A MEANS TO PREVENT SIPHONING. A CHECK VALVE NEEDS TO BE INST…
Mod SA054· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2011-12-22+$10,409$38,182,977ADDITIONAL ATTIC FIRE RATING
Mod SA055· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2011-12-22+$42,484$38,225,461COMMUNICATING STAIR ENCLOSURE
Mod SA056· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2011-12-22+$8,497$38,233,958SMOKE WALL IN ATTIC
Mod SA058· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2012-01-09+$11,969$38,245,927TO ADJUST THE CONTRACTOR'S BOND PREMIUM BECAUSE OF THE MODIFICATIONS ISSUED TO THE CONTRACT DURING CONSTRUCTIO…

Related awards · 7

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other VA awards to the same recipient (UEI WMX2JXNH41J8)

AwardOffice · PSC / listingNet obligationsFY
VA101F14C0021OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) · Y1DZ · CONSTRUCTION OF OTHER HOSPITAL BUILDINGS$44,067,533FY2014
VA101F13C0016OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES$42,845,047FY2013

Other recipients under Y111 from OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT (most recent first)

AwardRecipientOfficeNet obligationsFY
VA101CFMC0136P.J. DICK INCORPORATEDOFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT$28,493,376FY2011
VA101CFMC0107WALSH CONSTRUCTION COMPANYOFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT$25,244,590FY2010
VA101CFMC0125BIOSPHERE INTERNATIONAL, INC.OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT$4,003,449FY2010
VACFM05D0106GLHN ARCHITECTS & ENGINEERS INCOFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT$60,000FY2010
VA101CFMC0079KADENA PACIFIC, INC.OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT$10,106,703FY2010

Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA101CFMC0070_3600_-NONE-_-NONE- · retrieved 2026-09-26.