KADENA PACIFIC, INC.

PIID VA101CFMC0079· VA Staff Offices· OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT· Y111 · CONSTRUCTION OF OFFICE BUILDINGS· FY2010· $10,106,703 net obligations· UEI XMRKP148NDE4· CA

Description

THIS WAS A DELETION OF WORK UNDER MODIFICATION SA-002 AND A CREDIT TO THE GOVERNMENT. THIS MODIFICATION ALSO OFFICIALLY CLOSES THE CONTRACT WITH THE CONTRACTOR PROVIDED RELEASE OF CLAIMS.

Base award description: PHASE 1B SITE UTILITY DEVELOPMENT, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA

First action · last action
2010-03-09 · 2013-08-16
Transactions
56
First transaction's obligation
$8,277,127
Base + all options value (sum of deltas)
$10,106,703
Extent competed
FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
Other than full & open authority
—
Set-aside
SERVICE DISABLED VETERAN OWNED SMALL BUSINESS SET-ASIDE
Offers received
5
SDVOSB flag on record
Yes (self-representation)
NAICS
237110 · WATER AND SEWER LINE AND RELATED STRUCTURES CONSTRUCTION

Modification chain · 56 transactions

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$10,113,326$0Base award · 2010-03-09 · this action $8,277,127 · running total $8,277,127Modification CO01A · 2010-08-09 · this action $7,062 · running total $8,284,189Modification CO01B · 2010-08-16 · this action $96,000 · running total $8,380,189Modification CO01C · 2010-09-14 · this action $3,742 · running total $8,383,931Modification CO01D · 2010-11-30 · this action $24,514 · running total $8,408,445Modification CO01E · 2010-12-08 · this action $30,000 · running total $8,438,445Modification SA001 · 2011-01-14 · this action $6,649 · running total $8,445,094Modification SA002 · 2011-01-31 · this action $6,623 · running total $8,451,717Modification SA003 · 2011-01-31 · this action $67,057 · running total $8,518,774Modification SA004 · 2011-01-31 · this action -$34,104 · running total $8,484,670Modification SA005 · 2011-01-31 · this action $57,527 · running total $8,542,197Modification SA006 · 2011-02-24 · this action $14,141 · running total $8,556,338Modification SA007 · 2011-03-15 · this action $16,500 · running total $8,572,838Modification CO01F · 2011-03-21 · this action $4,431 · running total $8,577,269Modification CO01H · 2011-03-31 · this action $40,000 · running total $8,617,269Modification SA008 · 2011-03-31 · this action $38,027 · running total $8,655,296Modification SA009 · 2011-03-31 · this action $38,027 · running total $8,693,323Modification SA010 · 2011-03-31 · this action $76,935 · running total $8,770,258Modification CO01G · 2011-04-01 · this action $4,500 · running total $8,774,758Modification CO01I · 2011-04-21 · this action $1,150 · running total $8,775,908Modification CO01J · 2011-05-13 · this action $5,500 · running total $8,781,408Modification CO01K · 2011-05-31 · this action $98,000 · running total $8,879,408Modification CO01L · 2011-06-17 · this action $7,000 · running total $8,886,408Modification SA013 · 2011-09-29 · this action $17,374 · running total $8,903,782Modification CO01M · 2011-09-30 · this action $49,702 · running total $8,953,484Modification SA014 · 2011-09-30 · this action $47,055 · running total $9,000,539Modification SA015 · 2011-09-30 · this action $90,119 · running total $9,090,658Modification SA016 · 2011-09-30 · this action $69,217 · running total $9,159,875Modification SA017 · 2011-09-30 · this action $81,768 · running total $9,241,643Modification CO01O · 2011-10-28 · this action $94,000 · running total $9,335,643Modification CO01P · 2011-10-28 · this action $97,000 · running total $9,432,643Modification SA018 · 2011-10-31 · this action $37,165 · running total $9,469,808Modification SA019 · 2011-10-31 · this action $70,000 · running total $9,539,808Modification SA021 · 2012-01-12 · this action $5,731 · running total $9,545,539Modification SA022 · 2012-01-24 · this action $14,893 · running total $9,560,432Modification SA012 · 2012-02-23 · this action $92,584 · running total $9,653,016Modification SA029 · 2012-02-29 · this action $44,456 · running total $9,697,472Modification SA023 · 2012-03-09 · this action $29,500 · running total $9,726,972Modification SA024 · 2012-03-09 · this action $15,687 · running total $9,742,659Modification SA025 · 2012-03-09 · this action $49,993 · running total $9,792,652Modification SA026 · 2012-03-09 · this action $13,112 · running total $9,805,764Modification SA030 · 2012-03-30 · this action $5,098 · running total $9,810,862Modification SA032 · 2012-03-30 · this action $44,410 · running total $9,855,272Modification SA033 · 2012-03-30 · this action $21,497 · running total $9,876,769Modification SA028 · 2012-04-29 · this action $33,792 · running total $9,910,561Modification SA027 · 2012-04-30 · this action $11,000 · running total $9,921,561Modification SA034 · 2012-05-03 · this action $60,665 · running total $9,982,226Modification SA031 · 2012-05-07 · this action $40,935 · running total $10,023,161Modification SA036 · 2012-06-22 · this action $12,113 · running total $10,035,274Modification SA037 · 2012-06-22 · this action $9,000 · running total $10,044,274Modification SA020 · 2012-06-24 · this action $20,305 · running total $10,064,579Modification SA035 · 2012-06-25 · this action $5,248 · running total $10,069,827Modification SA038 · 2012-08-14 · this action $10,797 · running total $10,080,624Modification SA039 · 2012-08-14 · this action $5,660 · running total $10,086,284Modification SA040 · 2012-08-14 · this action $27,042 · running total $10,113,326Modification P00001 · 2013-08-16 · this action -$6,623 · running total $10,106,703
  • Base2010-03-09+$8,277,127= $8,277,127
  • Mod CO01A2010-08-09+$7,062= $8,284,189
  • Mod CO01B2010-08-16+$96,000= $8,380,189
  • Mod CO01C2010-09-14+$3,742= $8,383,931
  • Mod CO01D2010-11-30+$24,514= $8,408,445
  • Mod CO01E2010-12-08+$30,000= $8,438,445
  • Mod SA0012011-01-14+$6,649= $8,445,094
  • Mod SA0022011-01-31+$6,623= $8,451,717
  • Mod SA0032011-01-31+$67,057= $8,518,774
  • Mod SA0042011-01-31-$34,104= $8,484,670
  • Mod SA0052011-01-31+$57,527= $8,542,197
  • Mod SA0062011-02-24+$14,141= $8,556,338
  • Mod SA0072011-03-15+$16,500= $8,572,838
  • Mod CO01F2011-03-21+$4,431= $8,577,269
  • Mod CO01H2011-03-31+$40,000= $8,617,269
  • Mod SA0082011-03-31+$38,027= $8,655,296
  • Mod SA0092011-03-31+$38,027= $8,693,323
  • Mod SA0102011-03-31+$76,935= $8,770,258
  • Mod CO01G2011-04-01+$4,500= $8,774,758
  • Mod CO01I2011-04-21+$1,150= $8,775,908
  • Mod CO01J2011-05-13+$5,500= $8,781,408
  • Mod CO01K2011-05-31+$98,000= $8,879,408
  • Mod CO01L2011-06-17+$7,000= $8,886,408
  • Mod SA0132011-09-29+$17,374= $8,903,782
  • Mod CO01M2011-09-30+$49,702= $8,953,484
  • Mod SA0142011-09-30+$47,055= $9,000,539
  • Mod SA0152011-09-30+$90,119= $9,090,658
  • Mod SA0162011-09-30+$69,217= $9,159,875
  • Mod SA0172011-09-30+$81,768= $9,241,643
  • Mod CO01O2011-10-28+$94,000= $9,335,643
  • Mod CO01P2011-10-28+$97,000= $9,432,643
  • Mod SA0182011-10-31+$37,165= $9,469,808
  • Mod SA0192011-10-31+$70,000= $9,539,808
  • Mod SA0212012-01-12+$5,731= $9,545,539
  • Mod SA0222012-01-24+$14,893= $9,560,432
  • Mod SA0122012-02-23+$92,584= $9,653,016
  • Mod SA0292012-02-29+$44,456= $9,697,472
  • Mod SA0232012-03-09+$29,500= $9,726,972
  • Mod SA0242012-03-09+$15,687= $9,742,659
  • Mod SA0252012-03-09+$49,993= $9,792,652
  • Mod SA0262012-03-09+$13,112= $9,805,764
  • Mod SA0302012-03-30+$5,098= $9,810,862
  • Mod SA0322012-03-30+$44,410= $9,855,272
  • Mod SA0332012-03-30+$21,497= $9,876,769
  • Mod SA0282012-04-29+$33,792= $9,910,561
  • Mod SA0272012-04-30+$11,000= $9,921,561
  • Mod SA0342012-05-03+$60,665= $9,982,226
  • Mod SA0312012-05-07+$40,935= $10,023,161
  • Mod SA0362012-06-22+$12,113= $10,035,274
  • Mod SA0372012-06-22+$9,000= $10,044,274
  • Mod SA0202012-06-24+$20,305= $10,064,579
  • Mod SA0352012-06-25+$5,248= $10,069,827
  • Mod SA0382012-08-14+$10,797= $10,080,624
  • Mod SA0392012-08-14+$5,660= $10,086,284
  • Mod SA0402012-08-14+$27,042= $10,113,326
  • Mod P000012013-08-16-$6,623= $10,106,703
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2010-03-09+$8,277,127$8,277,127PHASE 1B SITE UTILITY DEVELOPMENT, VA PALO ALTO HEALTH CARE SYSTEM, PALO ALTO, CA
Mod CO01A· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-08-09+$7,062$8,284,189START WORK IMMEDIATELY FOR THE TELECOMMUNICATION DUCTBANK, WHICH RUNS FROM THE NEW VAULT, JUST WEST OF BUILD…
Mod CO01B· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-08-16+$96,000$8,380,189A. FUTURE PLANNING AND SITING FOR THE AMBULATORY CARE CENTER AND LOOP ROAD RE-ALIGNMENT WAS REVISED. THIS RESU…
Mod CO01C· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-09-14+$3,742$8,383,931REMOVE THE ABANDONED DIESEL PIPE SO THAT IT DOES NOT INTERFERE WITH THE INSTALLATION OF THE LOOP ROAD AND THE…
Mod CO01D· CHANGE ORDER2010-11-30+$24,514$8,408,445IT IS NECESSARY TO CROSS THE BELOW THE STEAM TRENCH, BECAUSE THE TOP OF THE STEAM TRENCH IS ONLY 24" BELOW GR…
Mod CO01E· CHANGE ORDER2010-12-08+$30,000$8,438,445A. DIFFERING SITE CONDITIONS. B. A NUMBER OF UNKNOWN PIPES OF VARIOUS MAKE AND SIZES ARE BEING ENCOUNTERED IN…
Mod SA001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-01-14+$6,649$8,445,0941) THE DEMOLITION PLAN SHOWED REMOVAL OF THE EXISTING ASPHALT PAVING IN FRONT OF THE FACILITY GAS PUMPS. AN EL…
Mod SA002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-01-31+$6,623$8,451,717THE EXISTING WATER LINE IDENTIFIED FOR DEMOLITION IS ON TOP OF EXISTING UNDERGROUND FUEL TANKS AND PIPING. THE…
Mod SA003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-01-31+$67,057$8,518,774DIFFERING SITE CONDITIONS. EXCAVATION OF THE SEWER TRENCH ALONG LOOP ROAD REVEALED UNSUITABLE SUB-GRADE MATERI…
Mod SA004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-01-31−$34,104$8,484,670DETERMINATION WAS MADE THAT EMH-06, PMH 033 AND PULL BOX CPB-07 IS NOT NEEDED AND COULD BE DELETED.
Mod SA005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-01-31+$57,527$8,542,197UNSTABLE SOIL CONDITIONS RESULTED IN COLLAPSE OF THE TRENCH WALL, REQUIRING TO BACKFILL, COMPACT AND RE-EXCAVA…
Mod SA006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-02-24+$14,141$8,556,338A. CONTRACT PLANS DID NOT SHOW THE REMOVAL OF THE DIESEL PIPE. THE PIPE WAS DISCOVERED DURING THE DEMOLITION O…
Mod SA007· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-03-15+$16,500$8,572,838A. CONTRACT PLANS DID NOT INDICATE THE LOCATION OF THE INLET FILL PIPE ON THE TANK. VA DIRECTED PER THE AE REC…
Mod CO01F· CHANGE ORDER2011-03-21+$4,431$8,577,269TO MATCH THE EXISTING FEEDER THAT IS BEING SPLICED TO AND TO MAINTAIN THE SIGNAL INTEGRITY OF THE MED GAS ALAR…
Mod CO01H· CHANGE ORDER2011-03-31+$40,000$8,617,2691. DIFFERING SITE CONDITIONS. DURING THE EXCAVATION FOR THE MANHOLE, AN EXISTING 8" WATERLINE WAS ENCOUNTERED…
Mod SA008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-03-31+$38,027$8,655,296A. DIFFERING SITE CONDITIONS. UNKNOWN UTILITIES ENCOUNTERED DURING INSTALLATION OF NEW UTILITIES.
Mod SA009· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-03-31+$38,027$8,693,323A. DIFFERING SITE CONDITIONS. UNKNOWN UTILITIES ENCOUNTERED DURING INSTALLATION OF NEW UTILITIES.
Mod SA010· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-03-31+$76,935$8,770,2581. IN-SITU MATERIAL AT THE INVERT ELEVATION OF THE NEW SEWER LINE IS TOO SOFT AND WET, REQUIRING REMOVAL AND R…
Mod CO01G· CHANGE ORDER2011-04-01+$4,500$8,774,758IT IS NECCESARY TO RUN THE MED GAS CABLE TO BUILDING 43, SINCE IT IS THE CLOSEST ACCESSABLE LOCATION OF THE CA…
Mod CO01I· CHANGE ORDER2011-04-21+$1,150$8,775,908IDENTIFY UNKNOWN TELECOM CABLES THAT HEAD TOWARD BUILDING 4. DEMOLISH CABLES AS NECESSARY TO ALLOW FOR TMH-03…
Mod CO01J· CHANGE ORDER2011-05-13+$5,500$8,781,4081. DIFFERING SITE CONDITIONS. 2. DIESEL PIPE WAS DISCOVERED IN THE DEMOLITION WORK. PIPE WAS NOT SHOWN ON THE…
Mod CO01K· CHANGE ORDER2011-05-31+$98,000$8,879,408TO REALIGN STEAM AND CHILLED WATER TRENCH FOR STORM DRAIN, WATER AND SEWER LINES.
Mod CO01L· CHANGE ORDER2011-06-17+$7,000$8,886,408TO PROVIDE 8 ADDITIONAL CONDUIT STUB OUTS FROM PHM-30 TO CURB.
Mod SA013· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-29+$17,374$8,903,782THE SITE UTILITY PROJECT REQUIRED THE DEMOLITION OF POWER FEEDS TO THE AQUATIC CENTER'S TRANSFORMER. THIS REQU…
Mod CO01M· CHANGE ORDER2011-09-30+$49,702$8,953,484DESIGN CHANGES. NEEDED CONDUCTORS NOT SHOWN ON THE ORIGINAL CONTRACT DRAWINGS.
Mod SA014· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-30+$47,055$9,000,539DUE TO CHANGES IN THE ROAD ALIGNMENT, THE ASSOCIATED STORM DRAIN UTILITY LINES NEEDED TO BE CHANGED.
Mod SA015· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-30+$90,119$9,090,658WATER AND SEWER LINE AND RELATED STRUCTURAL ISSUES
Mod SA016· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-30+$69,217$9,159,875WATER AND SEWER LINE AND RELATED STRUCTURE
Mod SA017· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-09-30+$81,768$9,241,643WATER AND SEWER LINE AND RELATED STRUCTURE
Mod CO01O· CHANGE ORDER2011-10-28+$94,000$9,335,643ELECTRICAL CHANGES TO SHEET ES1.1.2 DUE TO CHANGES IN ROAD ALIGNMENT.
Mod CO01P· CHANGE ORDER2011-10-28+$97,000$9,432,643DESIGN CHANGES ON SHEET ES1.1.1.
Mod SA018· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-10-31+$37,165$9,469,808DESIGN CHANGE. THE PRE-CAST STEAM TRENCH NEEDED ADDITIONAL CONCRETE STRUCTURES FOR INSTALLATION OF SEISMIC STR…
Mod SA019· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-10-31+$70,000$9,539,808PROVIDE ADDITIONAL ANCHORS TO STEAM AND CHILLED WATER PIPES.
Mod SA021· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-01-12+$5,731$9,545,539THE CURRENT ELECTRICAL DISTRIBUTION SYSTEM IS NOT SIZED TO SUPPORT THE LOADS FOR BOTH 50 HP MOTORS. INSTALLING…
Mod SA022· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-01-24+$14,893$9,560,432USER REQUESTED CHANGE. ADDITIONAL VALVES IMPROVES ABILITY TO CONTROL WATER FLOW DURING REPAIR AND MAINTENANCE…
Mod SA012· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-02-23+$92,584$9,653,016THE STORM DRAIN AND WATER LINE CAN NOT BE INSTALLED PER PLAN BECAUSE OF THE EXISTING SIX INCH GAS LINE FOR THE…
Mod SA029· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-02-29+$44,456$9,697,472VARIOUS ELEMENTS OF THE UTILITIES NEEDED TO BE REVISED TO ACCOMODATE THE EXISTING GAS LINE, WHICH COULD NOT BE…
Mod SA023· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-03-09+$29,500$9,726,972THE VAMC MAINTENANCE STAFF COULD NOT SHUT-OFF THE WATER IN ORDER TO ISOLATE TWO WATER LINES AND RE-ROUTE THE M…
Mod SA024· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-03-09+$15,687$9,742,659GOVERNMENT CAUSED DELAY. VAMC MAINTENANCE STAFF COULD NOT SHUT OFF THE VALVES IN THE MAIN WATER LINE TO CONNEC…
Mod SA025· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-03-09+$49,993$9,792,652A TEMPORARY SIPHON WAS NEEDED TO PROVIDE CONTINUED CONNECTION OF THE STORM DRAIN DURING CONSTRUCTION OF THE NE…
Mod SA026· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-03-09+$13,112$9,805,764DIFFERING SITE CONDITION. EXISTING ELECTRICAL DUCT BLOCKED THE ELEVATION AND ALIGNMENT OF THE STORM DRAIN PIPE…
Mod SA030· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-03-30+$5,098$9,810,862DIFFERING SITE CONDITIONS. DRAWINGS SHOWED LOCATION FOR CONNECTING WATER SERVICE TO BUILDING 41. HOWEVER, THE…
Mod SA032· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-03-30+$44,410$9,855,272THIS A DESIGN OMISSION. THE CONTRACT DOCUMENTS CALLED FOR SUMP PUMPS, PROVIDED POWER FOR THE SUMP PUMPS BUT DI…
Mod SA033· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-03-30+$21,497$9,876,769THE CONTRACT ONLY INDICATED 350 LF OF ASBESTOS INSULATION TO BE REMOVED. ACTUAL LENGTH OF PIPING WITH ASBESTO…
Mod SA028· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-04-29+$33,792$9,910,561THE 8 INCH WATERLINE WAS RE-ROUTED TO AVOID THE EXISTING GAS LINE.
Mod SA027· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-04-30+$11,000$9,921,561SLEEVES AND CONDUITS UNDER THE NEW ACCESS ROAD AND SECTION OF THE NEW LOOP ROAD ARE NEEDED FOR FUTURE UTILITY…
Mod SA034· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-05-03+$60,665$9,982,226CRITICAL FUNCTION: THIS CHANGE IS NECESSARY DUE TO DIFFERING SITE CONDITIONS. THE CONTRACT DID NOT INCLUDE PRO…
Mod SA031· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-05-07+$40,935$10,023,161DUE TO A CONFLICT IN THE MECHANICAL AND CIVIL DRAWINGS, THE ELEVATION OF THE INCOMING TRENCH FROM VAULT 1 TO V…
Mod SA036· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-06-22+$12,113$10,035,274PLAN SHOWED DRAIN INLET. HOWEVER, THERE ARE THREE PIPES (8, 18 AND 21 INCH PIPES) THAT ARE CONNECTED TO THIS…
Mod SA037· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-06-22+$9,000$10,044,274REMOVE AND REPLACE UNSUITABLE SOIL WITHIN THE SUB-GRADE OF THE ACCESS ROAD. THIS IS NEEDED TO HAVE ADEQUATE SU…
Mod SA020· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-06-24+$20,305$10,064,579CRITICAL FUNCTION: TO ALLOW FOR THE INSTALLATION OF NEW CONDUIT FOR PARKING LIGHTS DUE TO DESIGN ERROR AND NEC…
Mod SA035· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-06-25+$5,248$10,069,827THE CONTRACTOR'S INITIAL TESTING SHOWED PRESENCE OF MOTOR OIL ON THE SURPLUS SOIL. TO DETERMINE THE PROPER LOC…
Mod SA038· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-14+$10,797$10,080,624THIS CHANGE IS THE RESULT OF A DESIGN OMISSION. THE AE DESIGNED THE NEW WATER TANK TO BE POWERED FROM THE SA…
Mod SA039· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-14+$5,660$10,086,284THE CHANGE IS A RESULT OF A DESIGN OMISSION. THE CONTRACT SHOWED TO REUSE AN EXISTING TELECOMMUNICATION VAULT.…
Mod SA040· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-08-14+$27,042$10,113,326THE EXISTING SDMH POINT OF CONNECTION WAS ACTUALLY 1-FT HIGHER THAN SHOWN ON THE DRAWINGS. THE SD ELEVATIONS A…
Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-08-16−$6,623$10,106,703THIS WAS A DELETION OF WORK UNDER MODIFICATION SA-002 AND A CREDIT TO THE GOVERNMENT. THIS MODIFICATION ALSO O…

Related awards · 11

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other VA awards to the same recipient (UEI XMRKP148NDE4)

AwardOffice · PSC / listingNet obligationsFY
VA261RA0825261-NETWORK CONTRACT OFFICE 21 · Y299 · CONTRUCT/ALL OTHER NON-BLDG FACS$1,952,527FY2010
VA261RA0826261-NETWORK CONTRACT OFFICE 21 · Y299 · CONTRUCT/ALL OTHER NON-BLDG FACS$1,818,100FY2010
VA261RA0827261-NETWORK CONTRACT OFFICE 21 · Y299 · CONTRUCT/ALL OTHER NON-BLDG FACS$1,857,100FY2010
VA101CFMC0065OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT · Y111 · CONSTRUCTION OF OFFICE BUILDINGS$11,144,426FY2009
VA262C0630262-NETWORK CONTRACT OFFICE 22 · Z141 · MAINT-REP-ALT/HOSPITALS & INFIRMARY$675,317FY2009
VA262C0583262-NETWORK CONTRACT OFFICE 22 · Z141 · MAINT-REP-ALT/HOSPITALS & INFIRMARY$2,590,150FY2009

Other recipients under Y111 from OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT (most recent first)

AwardRecipientOfficeNet obligationsFY
VA101CFMC0136P.J. DICK INCORPORATEDOFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT$28,493,376FY2011
VA101CFMC0125BIOSPHERE INTERNATIONAL, INC.OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT$4,003,449FY2010
VA101CFMC0107WALSH CONSTRUCTION COMPANYOFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT$25,244,590FY2010
VACFM05D0106GLHN ARCHITECTS & ENGINEERS INCOFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT$60,000FY2010
VA101CFMC0056STRATEGIC PERSPECTIVES DEVELOPMENT, LLCOFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT$4,749,454FY2009

Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA101CFMC0079_3600_-NONE-_-NONE- · retrieved 2026-09-26.