Indiana
GDX reports $4.2B of VA expenditures for Indiana in FY2022, across all categories. In the 4 categories that can be compared like-for-like, GDX reports $2.2B and USAspending shows $2.2B of obligations (101.7%). Every compared category is within the tolerance band set by all states this year.
GDX expenditure, USAspending obligations, coverage ratio
| Category | GDX expenditure | USAspending obligations | Coverage ratio | Band (all states) | Status | Structural explanation |
|---|---|---|---|---|---|---|
Compensation & Pension GDX source: USAspending.gov (plus FMS for certain C&P items), per the GDX data guide | $2.0B | $2.0B | 100.0% | 100.0%–100.1% | Within tolerance | VA states this GDX figure was taken from USAspending.gov, so a gap points to reporting revisions or state assignment rather than an independent difference. |
Education & Vocational Rehabilitation/Employment GDX source: USAspending.gov (plus FMS for non-beneficiary items), per the GDX data guide | $113M | $115M | 101.4% | 97.6%–108.0% | Within tolerance | VA states this GDX figure was taken from USAspending.gov, so a gap points to reporting revisions or state assignment rather than an independent difference. Education payments to schools can follow the school's location on one side and the student's residence on the other. |
Insurance & Indemnities GDX source: VA Regional Office & Insurance Center (RO&IC), Philadelphia | $14.1M | $14.2M | 100.8% | 99.2%–101.9% | Within tolerance | Insurance payees are located by linked residence records in GDX (FY2024+ partly by ZIP code), by payee address on USAspending. |
Construction GDX source: VA Financial Management System (FMS) / iFAMS | $28.2M | $62.8M | 222.5% | 3.0%–3163% | Within tolerance | Construction is obligated up front and spent over several years; single-year ratios swing with project phasing. |
Medical Care GDX source: VHA Allocation Resource Center (ARC) and FMS | $2.0B | — | — | — | Not comparable | Most of VA medical spending is the payroll and operating cost of VA hospitals and clinics, which is not an award and never appears on USAspending. VHA's cost-of-care assistance listings (64.009–64.050) are reported inconsistently from year to year, and contract place of performance follows the facility rather than the patient's home. |
General Operating Expenses GDX source: FMS / iFAMS | $64.4M | — | — | — | Not comparable | Mostly salaries and overhead with no award record; the contract share that does exist is booked to the buying office, not to a beneficiary geography. |
Loan Guaranty GDX source: FMS (through FY2023); VBA PA&I (FY2024+) | $0 | — | — | — | Not comparable | USAspending records guaranteed loans by face value with zero federal obligation per loan; the budgetary cost (subsidy and claims) is not in the award file. |
Compared categories · FY2022
Grey = GDX expenditure · teal = USAspending obligations (amber when outside tolerance)
Each pair is scaled to its own larger value.
- Compensation & Pension100.0%$2.0B$2.0B
- Education & Vocational Rehabilitation/Employment101.4%$113M$115M
- Insurance & Indemnities100.8%$14.1M$14.2M
- Construction222.5%$28.2M$62.8M
Multi-year trend, compared categories
Sum of the categories compared in each year
Programs, recipients and offices
Assistance listings
Obligations mapped into compared categories
- VETERANS COMPENSATION FOR SERVICE-CONNECTED DISABILITY64.109 · Compensation & Pension · 1,103 rows$1.8B
- VETERANS DEPENDENCY AND INDEMNITY COMPENSATION FOR SERVICE-CONNECTED DEATH64.110 · Compensation & Pension · 985 rows$144M
- POST-9/11 VETERANS EDUCATIONAL ASSISTANCE64.028 · Education & Vocational Rehabilitation/Employment · 1,102 rows$83.8M
- PENSION FOR NON-SERVICE-CONNECTED DISABILITY FOR VETERANS64.104 · Compensation & Pension · 966 rows$44.3M
- BURIAL EXPENSES ALLOWANCE FOR VETERANS64.101 · Compensation & Pension · 968 rows$23.7M
- PENSION TO VETERANS SURVIVING SPOUSES, AND CHILDREN64.105 · Compensation & Pension · 934 rows$15.4M
- LIFE INSURANCE FOR VETERANS - DIRECT PAYMENTS FOR INSURANCE64.031 · Insurance & Indemnities · 1,416 rows$14.2M
- SURVIVORS AND DEPENDENTS EDUCATIONAL ASSISTANCE64.117 · Education & Vocational Rehabilitation/Employment · 925 rows$12.1M
- VETERANS CEMETERY GRANTS PROGRAM64.203 · Construction · 2 rows$7.7M
- VOCATIONAL REHABILITATION FOR DISABLED VETERANS64.116 · Education & Vocational Rehabilitation/Employment · 889 rows$6.5M
- VETERAN RAPID RETRAINING ASSISTANCE PROGRAM64.130 · Education & Vocational Rehabilitation/Employment · 218 rows$3.5M
- MONTGOMERY GI BILL SELECTED RESERVE; RESERVE EDUCATIONAL ASSISTANCE PROGRAM64.032 · Education & Vocational Rehabilitation/Employment · 707 rows$2.6M
- ALL-VOLUNTEER FORCE EDUCATIONAL ASSISTANCE64.124 · Education & Vocational Rehabilitation/Employment · 537 rows$2.5M
- SPECIALLY ADAPTED HOUSING FOR DISABLED VETERANS64.106 · Education & Vocational Rehabilitation/Employment · 78 rows$2.0M
- AUTOMOBILES AND ADAPTIVE EQUIPMENT FOR CERTAIN DISABLED VETERANS AND MEMBERS OF THE ARMED FORCES64.100 · Education & Vocational Rehabilitation/Employment · 67 rows$1.8M
- MONTHLY ALLOWANCE FOR CHILDREN OF VIETNAM VETERANS BORN WITH SPINA BIFIDA64.127 · Compensation & Pension · 192 rows$540K
- POST-VIETNAM ERA VETERANS' EDUCATIONAL ASSISTANCE64.120 · Education & Vocational Rehabilitation/Employment · 130 rows$111K
Construction contractors
PSC Y contracts performed in this state
- VALIANT CONSTRUCTION LLC2 awards · largest action →$39.1M
- AC JV ONE LLC1 award · largest action →$10.1M
- KNIGHTO LLC1 award · largest action →$4.0M
- EAGLE CONTRACTORS, INC.4 awards · largest action →$621K
- ARMCORP CONSTRUCTION INC4 awards · largest action →$562K
- $385K
- CALVARY CONTRACTING INC1 award · largest action →$228K
- $107K
- $27K
- AZTEC CONTRACTING LLC1 award · largest action →$18K
Awarding offices (construction)
Office that recorded the obligation
- PCAC (36C776)2 awards$48.3M
- NATIONAL CEMETERY ADMIN (36C786)2 awards$4.0M
- 250-NETWORK CONTRACT OFFICE 10 (36C250)14 awards$2.8M
Observations for Indiana, all years
Pattern definition and thresholds: gdx-reconciliation-variance.
Categories GDX reports that are not compared
| Category | GDX expenditure | How GDX places it | Why not compared |
|---|---|---|---|
| Medical Care | $2.0B | Patient's home residence, not the site of care (research is booked to the facility performing it). | Most of VA medical spending is the payroll and operating cost of VA hospitals and clinics, which is not an award and never appears on USAspending. VHA's cost-of-care assistance listings (64.009–64.050) are reported inconsistently from year to year, and contract place of performance follows the facility rather than the patient's home. |
| General Operating Expenses | $64.4M | Where the cost is booked in FMS/iFAMS — headquarters costs concentrate in the District of Columbia. | Mostly salaries and overhead with no award record; the contract share that does exist is booked to the buying office, not to a beneficiary geography. |
| Loan Guaranty | $0 | Through FY2023: Travis County, TX (processing location). FY2024+: county of the loan. | USAspending records guaranteed loans by face value with zero federal obligation per loan; the budgetary cost (subsidy and claims) is not in the award file. |
GDX also publishes an estimated veteran population of 388,083 and 126,051 unique VA patients for Indiana. Per-veteran figures are deliberately not shown: VA advises against dividing these categories by veteran population.
- GDX expenditure
- VA's estimate of money spent in the fiscal year, by state (an expenditure measure, closer to outlays than to obligations; VA notes it can differ from both), from VA's Geographic Distribution of VA Expenditures report.
- USAspending obligations
- Net obligations recorded on USAspending.gov in the same fiscal year (sum of every transaction's federal action obligation), for the programs mapped to the same GDX category.
- Coverage ratio
- USAspending ÷ GDX. 100% means the award record accounts for the same dollars VA reports as spent. Obligations and expenditures are different measures, so exact agreement is not expected.