Description
BLDG 51 SEISMIC REPLACEMENT, SITE DEVELOPMENT AND UTILITIES UPGRADE FOR VA PALO ALTO DIVISION.
Base award description: BLDG 51 SEISMIC REPLACEMENT, SITE DEVELOPMENT AND UTILITIES UPGRADE FOR VA PALO ALTO DIVISION. PO 640-Z05001
Modification chain · 7 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2010-03-10+$445,289= $445,289
- Mod 12010-10-29+$0= $445,289
- Mod 22010-12-29+$0= $445,289
- Mod 32011-02-26+$50,571= $495,860
- Mod 42011-10-19+$20,815= $516,675
- Mod P000052013-12-18+$94,785= $611,460
- Mod P000062014-06-11+$90,088= $701,548
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2010-03-10 | +$445,289 | $445,289 | BLDG 51 SEISMIC REPLACEMENT, SITE DEVELOPMENT AND UTILITIES UPGRADE FOR VA PALO ALTO DIVISION. PO 640-Z05001 |
| Mod 1· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-10-29 | +$0 | $445,289 | BLDG 51 SEISMIC REPLACEMENT, SITE DEVELOPMENT AND UTILITIES UPGRADE FOR VA PALO ALTO DIVISION. PO 640-Z05001 |
| Mod 2· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-29 | +$0 | $445,289 | BLDG 51 SEISMIC REPLACEMENT, SITE DEVELOPMENT AND UTILITIES UPGRADE FOR VA PALO ALTO DIVISION. PO 640-Z05001 |
| Mod 3· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-02-26 | +$50,571 | $495,860 | BLDG 51 SEISMIC REPLACEMENT, SITE DEVELOPMENT AND UTILITIES UPGRADE FOR VA PALO ALTO DIVISION. PO 640-Z05001 |
| Mod 4· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-19 | +$20,815 | $516,675 | BLDG 51 SEISMIC REPLACEMENT, SITE DEVELOPMENT AND UTILITIES UPGRADE FOR VA PALO ALTO DIVISION. PO 640-Z05001 |
| Mod P00005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-12-18 | +$94,785 | $611,460 | BLDG 51 SEISMIC REPLACEMENT, SITE DEVELOPMENT AND UTILITIES UPGRADE FOR VA PALO ALTO DIVISION. PO 640-Z05001 |
| Mod P00006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-06-11 | +$90,088 | $701,548 | BLDG 51 SEISMIC REPLACEMENT, SITE DEVELOPMENT AND UTILITIES UPGRADE FOR VA PALO ALTO DIVISION. |
Related awards · 8
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI D3QKNFJSATL5)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| VA26116J2009 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · C214 · ARCHITECT AND ENGINEERING- GENERAL: MANAGEMENT ENGINEERING | $47,651 | FY2016 |
| VA26116J1506 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · C1AA · ARCHITECT AND ENGINEERING- CONSTRUCTION: OFFICE BUILDINGS | $37,581 | FY2016 |
| VA26116J0896 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $198,992 | FY2016 |
| VA26116J0657 | 261-NETWORK CONTRACT OFFICE 21 · C1DZ · ARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER HOSPITAL BUILDINGS | $182,912 | FY2016 |
| VA26116J0472 | 261-NETWORK CONTRACT OFFICE 21 · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $11,717 | FY2016 |
| VA26115J3167 | 261-NETWORK CONTRACT OFFICE 21 · C214 · ARCHITECT AND ENGINEERING- GENERAL: MANAGEMENT ENGINEERING | $114,500 | FY2015 |
Other recipients under C114 from 640-PALO ALTO (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA640C04257 | SABAH INTERNATIONAL INCORPORATED | 640-PALO ALTO | $28,800 | FY2010 |
| VA640C04258 | UNIVERSAL SECURITY AND FIRE, INC. | 640-PALO ALTO | $27,993 | FY2010 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA640Z05001_3600_VA261P0668_3600 · retrieved 2026-09-26.