Description
IGF::OT::IGF 59 DAY NO COST MODIFICATION DUE TO VA DESIGN REVIEW DELAY
Base award description: IGF::OT::IGF NORTHERN CA AE IDIQ THE INTENT OF THIS PROJECT IS TO PROVIDE A STUDY TO INSTALL A NEW VESTIBULE BETWEEN COSS BLDG. 646 AND NEW CEMP BLDG. 645 CURRENTLY UNDER CONSTRUCTION AT THE VANCHCS MATHER, CA.
Modification chain · 2 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2015-09-23+$114,500= $114,500
- Mod P000012016-03-08+$0= $114,500
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2015-09-23 | +$114,500 | $114,500 | IGF::OT::IGF NORTHERN CA AE IDIQ THE INTENT OF THIS PROJECT IS TO PROVIDE A STUDY TO INSTALL A NEW VESTIBULE B… |
| Mod P00001· OTHER ADMINISTRATIVE ACTION | 2016-03-08 | +$0 | $114,500 | IGF::OT::IGF 59 DAY NO COST MODIFICATION DUE TO VA DESIGN REVIEW DELAY |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI D3QKNFJSATL5)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| VA26116J2009 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · C214 · ARCHITECT AND ENGINEERING- GENERAL: MANAGEMENT ENGINEERING | $47,651 | FY2016 |
| VA26116J1506 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · C1AA · ARCHITECT AND ENGINEERING- CONSTRUCTION: OFFICE BUILDINGS | $37,581 | FY2016 |
| VA26116J0896 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $198,992 | FY2016 |
| VA26116J0657 | 261-NETWORK CONTRACT OFFICE 21 · C1DZ · ARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER HOSPITAL BUILDINGS | $182,912 | FY2016 |
| VA26116J0472 | 261-NETWORK CONTRACT OFFICE 21 · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $11,717 | FY2016 |
| VA26115D0056 | 261-NETWORK CONTRACT OFFICE 21 · C214 · ARCHITECT AND ENGINEERING- GENERAL: MANAGEMENT ENGINEERING | $0 | FY2015 |
Other recipients under C214 from 261-NETWORK CONTRACT OFFICE 21 (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA26115J2547 | HILLIARD ARCHITECTS INC. | 261-NETWORK CONTRACT OFFICE 21 | $142,493 | FY2015 |
| VA26115D0082 | SRD ARCHITECTS INC | 261-NETWORK CONTRACT OFFICE 21 | $0 | FY2015 |
| VA26115D0049 | ADVANCE DESIGN CONSULTANTS, INC. | 261-NETWORK CONTRACT OFFICE 21 | $0 | FY2015 |
| VA26115D0055 | K.F. DAVIS ENGINEERING, INC | 261-NETWORK CONTRACT OFFICE 21 | $0 | FY2015 |
| VA26115D0050 | ATI-AC MARTIN, INC. | 261-NETWORK CONTRACT OFFICE 21 | $0 | FY2015 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA26115J3167_3600_VA26115D0056_3600 · retrieved 2026-09-26.