JIMMY DAY PLUMBING & HEATING INC

PIID VA619C05329· VHA· 619-CENTRAL ALABAMA· R425 · ENGINEERING AND TECHNICAL SERVICES· FY2010· $3,255 net obligations· UEI RNDBFHZ93H67· AL

Description

1 CONTRACTOR WILL MAKE NECESSARY 1 JB 3255.00 3255.00 REPAIRS TO BOILERS AT CAVHCE EAST CAMPUS BOILER PLANT, LOCATED AT 2400 HOSPITAL ROAD, TUSKEGEE, AL. 1. REMOVE DAMAGED 3/4" STEAM GATE VALVE ON DA TANK LINE AND INSTALL SOCKET WELD GATE VALVE W/NECESSARY PIPE AND REINSULATED AS REQUIRED. (SOCKET WELD GATE VALVE FUNISHED BY VA). 2. DISASSEMBLE THE 10" STEAM GATE VALVE AND PERTINENT PIPING LOCATED DOWNSTREAM OF THE PRESSURE REDUCING STATION. REPLACE THE GASKETS AND BOLTS AND INSULATE THE GATE VALVE. (CONTRACTOR PRICE ONLY INCLUDES REPAIRING THE LEAK BY REPLACING THE GASKETS BUT EXCLUDES REPLACING THE GATE VALVE, FLANGE OR PIPE IF THE FIND THEM BEYOND REPAIR). 3. CUT AND REMOVE A SECTION OF THE 2 1/2" BLOW DOWN PIPE ON BOILER #1 AND WELD BACK TOGETHER FOR THE INSTALLATION OF A VALVE ASSEMBLY BY OTHERS. ****NOTICE**** CONTRACTOR WILL NEED TO GIVE US SEVERAL DAYS NOTICE BEFORE STARTING JOB, AS THIS JOB WILL REQUIRE A STEAM SHUTDOWN. THE MOST AFFECTED AREA WILL BE THE KITCHEN BECAUSE THE BOILER PLANT WILL NOT BE ABLE TO PRODUCE HOT WATER.

First action · last action
2010-06-17 · 2010-06-17
Transactions
1
First transaction's obligation
$3,255
Base + all options value (sum of deltas)
$3,255
Extent competed
COMPETED UNDER SAP
Other than full & open authority
—
Set-aside
NO SET ASIDE USED.
Offers received
1
SDVOSB flag on record
No
NAICS
238220 · PLUMBING, HEATING, AND AIR-CONDITIONING CONTRACTORS

Modification chain · 1 transaction

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$3,255$0Base award · 2010-06-17 · this action $3,255 · running total $3,255
  • Base2010-06-17+$3,255= $3,255
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2010-06-17+$3,255$3,2551 CONTRACTOR WILL MAKE NECESSARY 1 JB 3255.00 3255.00 REPAIRS TO BOILERS AT CAVHCE…

Related awards · 10

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other VA awards to the same recipient (UEI RNDBFHZ93H67)

AwardOffice · PSC / listingNet obligationsFY
VA619C15323247-NETWORK CONTRACT OFFICE 7 · N045 · INSTALL OF PLUMBING-HEATING EQ$3,540FY2011
VA619C15201619-CENTRAL ALABAMA · J045 · MAINT-REP OF PLUMBING-HEATING EQ$7,650FY2011
VA619C05404619-CENTRAL ALABAMA · N045 · INSTALL OF PLUMBING-HEATING EQ$3,820FY2010
VA619C05405619-CENTRAL ALABAMA · N045 · INSTALL OF PLUMBING-HEATING EQ$6,240FY2010
VA619C05306619-CENTRAL ALABAMA · R425 · ENGINEERING AND TECHNICAL SERVICES$15,439FY2010

Other recipients under R425 from 619-CENTRAL ALABAMA (most recent first)

AwardRecipientOfficeNet obligationsFY
VA619C15055JOHNSON CONTROLS, INC619-CENTRAL ALABAMA$41,280FY2011
VA619C15056JOHNSON CONTROLS, INC619-CENTRAL ALABAMA$586,480FY2011
VA619C05409CMARK INTERNATIONAL, INC.619-CENTRAL ALABAMA$3,120FY2010
VA619C05381REVOLUTION WRAPS, L.L.C.619-CENTRAL ALABAMA$3,243FY2010
VA619C05375FIRE GUARD PROTECTION SYSTEMS, INC.619-CENTRAL ALABAMA$3,400FY2010