Award recordCONTRACT

DUNBAR MECHANICAL CONTRACTORS, LLC

PIID VA24916C0173· VHA· 249-NETWORK CONTRACT OFFICE 9 (36C249)· Z2DZ · REPAIR OR ALTERATION OF OTHER HOSPITAL BUILDINGS· FY2016· $4,359,150 net obligations· UEI X6N1HC5H7M74· TN

Description

IGF::OT::IGF REPLACE CHILLER&COOLING TOWER ALVIN C. YORK VAMC MURFREESBORO, TN EXTEND POP TO 1/15/2018 FOR DESIGN DEFICIENCIES AND CHANGES TO SECURITY REQUIREMENTS. ADD FUNDING FOR AFOREMENTIONED PRIOR YEAR FUNDS REQUEST. EXTEND POP DUE TO ADMIN ERROR. TIME EXTENSION SHOULD HAVE BEEN ACCOMPLISHED PREVIOUSLY ON THE MOD TO ADD PRIOR YEAR FUNDS. ADDITION OF FUNDING AND EXTENSION OF DAYS TO THE POP TO ACCOUNT FOR DESIGN OMISSIONS AND CHANGES TO SECURITY REQUIREMENTS DURING CONSTRUCTION.

Base award description: IGF::OT::IGF REPLACE CHILLER&COOLING TOWER ALVIN C. YORK VAMC MURFREESBORO, TN

First action · last action
2016-06-30 · 2018-03-08
Transactions
6
First transaction's obligation
$4,181,097
Base + all options value (sum of deltas)
$4,359,150
Extent competed
FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
Other than full & open authority
—
Set-aside
SERVICE DISABLED VETERAN OWNED SMALL BUSINESS SET-ASIDE
Offers received
5
SDVOSB flag on record
Yes (self-representation)
NAICS
238220 · PLUMBING, HEATING, AND AIR-CONDITIONING CONTRACTORS

Modification chain · 6 transactions

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$4,359,150$0Base award · 2016-06-30 · this action $4,181,097 · running total $4,181,097Modification P00001 · 2017-08-01 · this action $0 · running total $4,181,097Modification P00002 · 2017-11-30 · this action $0 · running total $4,181,097Modification P00003 · 2017-11-30 · this action $124,023 · running total $4,305,120Modification P00004 · 2018-01-16 · this action $0 · running total $4,305,120Modification P00005 · 2018-03-08 · this action $54,030 · running total $4,359,150
  • Base2016-06-30+$4,181,097= $4,181,097
  • Mod P000012017-08-01+$0= $4,181,097
  • Mod P000022017-11-30+$0= $4,181,097
  • Mod P000032017-11-30+$124,023= $4,305,120
  • Mod P000042018-01-16+$0= $4,305,120
  • Mod P000052018-03-08+$54,030= $4,359,150
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2016-06-30+$4,181,097$4,181,097IGF::OT::IGF REPLACE CHILLER&COOLING TOWER ALVIN C. YORK VAMC MURFREESBORO, TN
Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-08-01+$0$4,181,097IGF::OT::IGF REPLACE CHILLER&COOLING TOWER ALVIN C. YORK VAMC MURFREESBORO, TN
Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-11-30+$0$4,181,097IGF::OT::IGF REPLACE CHILLER&COOLING TOWER ALVIN C. YORK VAMC MURFREESBORO, TN EXTEND POP TO 1/15/2018 FOR DES…
Mod P00003· FUNDING ONLY ACTION2017-11-30+$124,023$4,305,120IGF::OT::IGF REPLACE CHILLER&COOLING TOWER ALVIN C. YORK VAMC MURFREESBORO, TN EXTEND POP TO 1/15/2018 FOR DES…
Mod P00004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-01-16+$0$4,305,120IGF::OT::IGF REPLACE CHILLER&COOLING TOWER ALVIN C. YORK VAMC MURFREESBORO, TN EXTEND POP TO 1/15/2018 FOR DES…
Mod P00005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-03-08+$54,030$4,359,150IGF::OT::IGF REPLACE CHILLER&COOLING TOWER ALVIN C. YORK VAMC MURFREESBORO, TN EXTEND POP TO 1/15/2018 FOR DES…

Related awards · 11

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other VA awards to the same recipient (UEI X6N1HC5H7M74)

AwardOffice · PSC / listingNet obligationsFY
36C24926P0509249-NETWORK CONTRACT OFFICE 9 (36C249) · S208 · HOUSEKEEPING- LANDSCAPING/GROUNDSKEEPING$24,480FY2026
36C24926C0067249-NETWORK CONTRACT OFFICE 9 (36C249) · Z2JZ · REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS$10,800FY2026
36C24926P0507249-NETWORK CONTRACT OFFICE 9 (36C249) · Z2LZ · REPAIR OR ALTERATION OF PARKING FACILITIES$18,144FY2026
36C24926P0499249-NETWORK CONTRACT OFFICE 9 (36C249) · J041 · MAINT/REPAIR/REBUILD OF EQUIPMENT- REFRIGERATION, AIR CONDITIONING, AND AIR CIRCULATING EQUIPMENT$69,231FY2026
36C24926P0442249-NETWORK CONTRACT OFFICE 9 (36C249) · J041 · MAINT/REPAIR/REBUILD OF EQUIPMENT- REFRIGERATION, AIR CONDITIONING, AND AIR CIRCULATING EQUIPMENT$19,613FY2026
36C24926P0472249-NETWORK CONTRACT OFFICE 9 (36C249) · Y1LB · CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS$15,480FY2026

Other recipients under Z2DZ from 249-NETWORK CONTRACT OFFICE 9 (36C249) (most recent first)

AwardRecipientOfficeNet obligationsFY
36C24925C0014TAYLOR CONSTRUCTION SERVICES, LLC249-NETWORK CONTRACT OFFICE 9 (36C249)$863,845FY2025
36C24924C0071CONTEGO ENVIRONMENTAL LLC249-NETWORK CONTRACT OFFICE 9 (36C249)$553,267FY2024
36C24924N0114PARAMOUNT CONSTRUCTION GROUP, LLC249-NETWORK CONTRACT OFFICE 9 (36C249)$2,239,414FY2024
36C24924P0176RUBICON ENGINEERING SERVICES LLC249-NETWORK CONTRACT OFFICE 9 (36C249)$0FY2024
36C24923C0091CONTEGO ENVIRONMENTAL LLC249-NETWORK CONTRACT OFFICE 9 (36C249)$3,841,000FY2023