Description
THIS PROJECT WAS TERMINATED FOR CONVENIENCE DUE TO THE CONTRACTOR UNABLE TO MEET THE SOW. IT WAS IN THE BEST INTEREST OF THE GOVERNMENT.
Base award description: 5 SHOEBOX ELECTRICAL BOXES REMOVED/UNINSTALLED AND 4 OUTLETS NEED TO BE INSTALLED AS REPLACEMENT WHERE EACH SHOEBOX IS LOCATED, FLUSH MOUNT IN THEIR PLACE.
Modification chain · 2 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2023-12-01+$7,850= $7,850
- Mod P000012024-03-12-$7,850= $0
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2023-12-01 | +$7,850 | $7,850 | 5 SHOEBOX ELECTRICAL BOXES REMOVED/UNINSTALLED AND 4 OUTLETS NEED TO BE INSTALLED AS REPLACEMENT WHERE EACH SH… |
| Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2024-03-12 | −$7,850 | $0 | THIS PROJECT WAS TERMINATED FOR CONVENIENCE DUE TO THE CONTRACTOR UNABLE TO MEET THE SOW. IT WAS IN THE BEST… |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI MNDZHLFRY5A3)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C25025P1758 | 250-NETWORK CONTRACT OFFICE 10 (36C250) · R425 · SUPPORT- PROFESSIONAL: ENGINEERING/TECHNICAL | $109,650 | FY2025 |
| 36C24824P1881 | 248-NETWORK CONTRACT OFFICE 8 (36C248) · U099 · EDUCATION/TRAINING- OTHER | $246,633 | FY2024 |
| 36C24924P0696 | 249-NETWORK CONTRACT OFFICE 9 (36C249) · 5999 · MISCELLANEOUS ELECTRICAL AND ELECTRONIC COMPONENTS | $29,721 | FY2024 |
| 36C24924P0185 | 249-NETWORK CONTRACT OFFICE 9 (36C249) · J061 · MAINT/REPAIR/REBUILD OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT | $29,420 | FY2024 |
| 36C24924P0115 | 249-NETWORK CONTRACT OFFICE 9 (36C249) · J061 · MAINT/REPAIR/REBUILD OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT | $15,490 | FY2024 |
| 36C24924P0107 | 249-NETWORK CONTRACT OFFICE 9 (36C249) · J059 · MAINT/REPAIR/REBUILD OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $4,755 | FY2024 |
Other recipients under Z2DZ from 249-NETWORK CONTRACT OFFICE 9 (36C249) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| 36C24925C0014 | TAYLOR CONSTRUCTION SERVICES, LLC | 249-NETWORK CONTRACT OFFICE 9 (36C249) | $863,845 | FY2025 |
| 36C24924C0071 | CONTEGO ENVIRONMENTAL LLC | 249-NETWORK CONTRACT OFFICE 9 (36C249) | $553,267 | FY2024 |
| 36C24924N0114 | PARAMOUNT CONSTRUCTION GROUP, LLC | 249-NETWORK CONTRACT OFFICE 9 (36C249) | $2,239,414 | FY2024 |
| 36C24923C0091 | CONTEGO ENVIRONMENTAL LLC | 249-NETWORK CONTRACT OFFICE 9 (36C249) | $3,841,000 | FY2023 |
| 36C24923C0081 | DUNBAR MECHANICAL CONTRACTORS, LLC | 249-NETWORK CONTRACT OFFICE 9 (36C249) | $17,895 | FY2023 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_36C24924P0176_3600_-NONE-_-NONE- · retrieved 2026-09-26.