Description
CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY ADMINISTRATIVE MODIFICATION FOR FUNDING ONLY
Base award description: CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF"
Modification chain · 99 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2016-03-29+$67,906,000= $67,906,000
- Mod P000012016-08-12+$30,000= $67,936,000
- Mod P000022016-09-24+$75,000= $68,011,000
- Mod P000042017-04-05+$20,000= $68,031,000
- Mod P000052017-04-11+$80,000= $68,111,000
- Mod P000062017-04-11+$50,000= $68,161,000
- Mod P000072017-05-04+$20,000= $68,181,000
- Mod P000082017-05-04+$7,000= $68,188,000
- Mod P000092017-06-06+$15,000= $68,203,000
- Mod P000102017-06-08+$41,700= $68,244,700
- Mod P000112017-06-09+$90,000= $68,334,700
- Mod P000032017-06-22+$9,300= $68,344,000
- Mod P000122017-06-22+$95,000= $68,439,000
- Mod P000132017-07-01+$25,000= $68,464,000
- Mod P000142017-07-10+$15,000= $68,479,000
- Mod P000152017-08-14+$88,600= $68,567,600
- Mod P000162017-08-14+$40,000= $68,607,600
- Mod P000172017-08-14+$50,000= $68,657,600
- Mod P000182017-09-01+$16,500= $68,674,100
- Mod P000202017-10-17+$59,850= $68,733,950
- Mod P000212017-10-17+$23,481= $68,757,431
- Mod P000192017-10-20+$2,500= $68,759,931
- Mod P000242017-10-31-$7,071= $68,752,860
- Mod P000232017-11-28+$24,193= $68,777,053
- Mod P000222017-12-06+$94,919= $68,871,972
- Mod P000342018-01-26+$7,520= $68,879,492
- Mod P000322018-01-29+$2,000= $68,881,492
- Mod P000352018-01-31+$813,816= $69,695,308
- Mod P000262018-02-15+$12,550= $69,707,858
- Mod P000252018-03-12+$14,000= $69,721,858
- Mod P000312018-03-12+$33,700= $69,755,558
- Mod P000412018-03-12+$9,000= $69,764,558
- Mod P000302018-03-26+$39,036= $69,803,594
- Mod P000442018-03-27+$827,609= $70,631,203
- Mod P000282018-04-11+$42,042= $70,673,245
- Mod P000292018-04-11+$291,561= $70,964,806
- Mod P000272018-04-26+$3,300= $70,968,106
- Mod P000402018-04-30+$145,498= $71,113,604
- Mod P000382018-05-03+$4,562= $71,118,166
- Mod P000432018-05-03+$10,700= $71,128,866
- Mod P000362018-05-14+$25,663= $71,154,529
- Mod P000482018-05-29+$0= $71,154,529
- Mod P000492018-07-30+$0= $71,154,529
- Mod P000472018-09-11+$14,036= $71,168,565
- Mod P000372018-09-13+$13,582= $71,182,147
- Mod A000512018-09-19+$41,027= $71,223,174
- Mod P000532018-09-26+$0= $71,223,174
- Mod A000542018-10-05+$84,830= $71,308,004
- Mod A000552018-10-31+$88,863= $71,396,867
- Mod A000502018-11-07+$80,969= $71,477,836
- Mod A000562018-11-16+$38,735= $71,516,571
- Mod P000582018-11-29+$0= $71,516,571
- Mod P000592018-12-10-$700,000= $70,816,571
- Mod A000612018-12-28+$27,453= $70,844,024
- Mod A000622019-01-03+$87,584= $70,931,608
- Mod A000632019-01-03+$55,467= $70,987,075
- Mod A000662019-01-04+$16,555= $71,003,630
- Mod A000642019-01-17+$91,000= $71,094,630
- Mod A000652019-01-17+$60,532= $71,155,162
- Mod P000332019-01-17+$20,748= $71,175,910
- Mod P000682019-01-30+$0= $71,175,910
- Mod P000672019-02-12+$60,970= $71,236,880
- Mod A000692019-03-14+$92,000= $71,328,880
- Mod A000712019-03-14+$90,282= $71,419,162
- Mod P000602019-04-04+$213,235= $71,632,397
- Mod A000732019-05-16+$66,816= $71,699,213
- Mod A000772019-07-09+$4,856= $71,704,069
- Mod A000782019-07-25+$9,198= $71,713,267
- Mod A000792019-07-25+$21,510= $71,734,777
- Mod P000782019-07-25-$14,452,000= $57,282,777
- Mod A000762019-07-29+$65,159= $57,347,936
- Mod A000802019-07-29+$17,338= $57,365,274
- Mod P000772019-08-06+$5,743,575= $63,108,849
- Mod P000702019-08-22+$98= $63,108,947
- Mod P000522019-08-23+$1,601,155= $64,710,102
- Mod P000722019-08-26+$167,148= $64,877,249
- Mod A000572019-10-15+$13,231= $64,890,480
- Mod P000792019-12-10+$225,000= $65,115,480
- Mod P000822019-12-10+$147,000= $65,262,480
- Mod A000832019-12-30+$34,515= $65,296,995
- Mod P000742020-01-29-$183,923= $65,113,072
- Mod A000842020-01-31+$7,900= $65,120,972
- Mod A000852020-01-31+$1,328= $65,122,300
- Mod A000902020-01-31+$78,000= $65,200,300
- Mod A000912020-01-31+$58,000= $65,258,300
- Mod A000932020-01-31+$1,644= $65,259,945
- Mod A000942020-01-31+$29,367= $65,289,312
- Mod P000462020-01-31+$15,054= $65,304,366
- Mod A000892020-02-07+$16,000= $65,320,366
- Mod A000922020-03-04+$92,000= $65,412,366
- Mod P000862020-03-10+$92,071= $65,504,437
- Mod A000962020-05-01+$42,000= $65,546,437
- Mod A000972020-06-01+$21,900= $65,568,337
- Mod P000992020-10-02+$239,887= $65,808,223
- Mod A001002020-10-21+$4,138= $65,812,361
- Mod A001012021-03-18+$60,644= $65,873,005
- Mod P001002021-03-18+$0= $65,873,005
- Mod P001022021-09-07+$145,348= $66,018,354
- Mod A001032021-09-14+$15,263= $66,033,617
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2016-03-29 | +$67,906,000 | $67,906,000 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" |
| Mod P00001· CHANGE ORDER | 2016-08-12 | +$30,000 | $67,936,000 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" |
| Mod P00002· CHANGE ORDER | 2016-09-24 | +$75,000 | $68,011,000 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" |
| Mod P00004· CHANGE ORDER | 2017-04-05 | +$20,000 | $68,031,000 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" |
| Mod P00005· CHANGE ORDER | 2017-04-11 | +$80,000 | $68,111,000 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" |
| Mod P00006· CHANGE ORDER | 2017-04-11 | +$50,000 | $68,161,000 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" |
| Mod P00007· CHANGE ORDER | 2017-05-04 | +$20,000 | $68,181,000 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" |
| Mod P00008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-05-04 | +$7,000 | $68,188,000 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" |
| Mod P00009· CHANGE ORDER | 2017-06-06 | +$15,000 | $68,203,000 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" |
| Mod P00010· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-06-08 | +$41,700 | $68,244,700 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" |
| Mod P00011· CHANGE ORDER | 2017-06-09 | +$90,000 | $68,334,700 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" |
| Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-06-22 | +$9,300 | $68,344,000 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" |
| Mod P00012· CHANGE ORDER | 2017-06-22 | +$95,000 | $68,439,000 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" |
| Mod P00013· CHANGE ORDER | 2017-07-01 | +$25,000 | $68,464,000 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" |
| Mod P00014· CHANGE ORDER | 2017-07-10 | +$15,000 | $68,479,000 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" |
| Mod P00015· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-08-14 | +$88,600 | $68,567,600 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" |
| Mod P00016· CHANGE ORDER | 2017-08-14 | +$40,000 | $68,607,600 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" |
| Mod P00017· CHANGE ORDER | 2017-08-14 | +$50,000 | $68,657,600 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" |
| Mod P00018· CHANGE ORDER | 2017-09-01 | +$16,500 | $68,674,100 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" |
| Mod P00020· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-10-17 | +$59,850 | $68,733,950 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" |
| Mod P00021· CHANGE ORDER | 2017-10-17 | +$23,481 | $68,757,431 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" |
| Mod P00019· CHANGE ORDER | 2017-10-20 | +$2,500 | $68,759,931 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" |
| Mod P00024· DEFINITIZE CHANGE ORDER | 2017-10-31 | −$7,071 | $68,752,860 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" |
| Mod P00023· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-11-28 | +$24,193 | $68,777,053 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" |
| Mod P00022· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-12-06 | +$94,919 | $68,871,972 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" |
| Mod P00034· CHANGE ORDER | 2018-01-26 | +$7,520 | $68,879,492 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" |
| Mod P00032· CHANGE ORDER | 2018-01-29 | +$2,000 | $68,881,492 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" |
| Mod P00035· CHANGE ORDER | 2018-01-31 | +$813,816 | $69,695,308 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" - CHAN… |
| Mod P00026· DEFINITIZE CHANGE ORDER | 2018-02-15 | +$12,550 | $69,707,858 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" DEFINI… |
| Mod P00025· DEFINITIZE CHANGE ORDER | 2018-03-12 | +$14,000 | $69,721,858 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" |
| Mod P00031· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-03-12 | +$33,700 | $69,755,558 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" |
| Mod P00041· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-03-12 | +$9,000 | $69,764,558 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" DEFINI… |
| Mod P00030· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-03-26 | +$39,036 | $69,803,594 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" |
| Mod P00044· CHANGE ORDER | 2018-03-27 | +$827,609 | $70,631,203 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" |
| Mod P00028· DEFINITIZE CHANGE ORDER | 2018-04-11 | +$42,042 | $70,673,245 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" |
| Mod P00029· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-04-11 | +$291,561 | $70,964,806 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" |
| Mod P00027· CHANGE ORDER | 2018-04-26 | +$3,300 | $70,968,106 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" |
| Mod P00040· CHANGE ORDER | 2018-04-30 | +$145,498 | $71,113,604 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" |
| Mod P00038· CHANGE ORDER | 2018-05-03 | +$4,562 | $71,118,166 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" |
| Mod P00043· CHANGE ORDER | 2018-05-03 | +$10,700 | $71,128,866 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" |
| Mod P00036· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-05-14 | +$25,663 | $71,154,529 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" |
| Mod P00048· CHANGE ORDER | 2018-05-29 | +$0 | $71,154,529 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" TIME E… |
| Mod P00049· CHANGE ORDER | 2018-07-30 | +$0 | $71,154,529 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" TIME E… |
| Mod P00047· CHANGE ORDER | 2018-09-11 | +$14,036 | $71,168,565 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" |
| Mod P00037· CHANGE ORDER | 2018-09-13 | +$13,582 | $71,182,147 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" |
| Mod A00051· CHANGE ORDER | 2018-09-19 | +$41,027 | $71,223,174 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" TIME E… |
| Mod P00053· CHANGE ORDER | 2018-09-26 | +$0 | $71,223,174 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" TIME E… |
| Mod A00054· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-10-05 | +$84,830 | $71,308,004 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" MDP MR… |
| Mod A00055· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-10-31 | +$88,863 | $71,396,867 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" JKC-10… |
| Mod A00050· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-11-07 | +$80,969 | $71,477,836 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" JKC 72… |
| Mod A00056· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-11-16 | +$38,735 | $71,516,571 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" JKC-65… |
| Mod P00058· CHANGE ORDER | 2018-11-29 | +$0 | $71,516,571 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" TIME E… |
| Mod P00059· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-12-10 | −$700,000 | $70,816,571 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" TIME E… |
| Mod A00061· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-12-28 | +$27,453 | $70,844,024 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" |
| Mod A00062· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-01-03 | +$87,584 | $70,931,608 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" TIME E… |
| Mod A00063· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-01-03 | +$55,467 | $70,987,075 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" JKC-84… |
| Mod A00066· CHANGE ORDER | 2019-01-04 | +$16,555 | $71,003,630 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF:OT:IGF" TIME EXT… |
| Mod A00064· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-01-17 | +$91,000 | $71,094,630 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" SA FOR… |
| Mod A00065· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-01-17 | +$60,532 | $71,155,162 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" JKC-03… |
| Mod P00033· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-01-17 | +$20,748 | $71,175,910 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF:OT:IGF" |
| Mod P00068· CHANGE ORDER | 2019-01-30 | +$0 | $71,175,910 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" TIME E… |
| Mod P00067· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-02-12 | +$60,970 | $71,236,880 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" JKC-75… |
| Mod A00069· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-03-14 | +$92,000 | $71,328,880 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" JKC-09… |
| Mod A00071· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-03-14 | +$90,282 | $71,419,162 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" JKC-01… |
| Mod P00060· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-04-04 | +$213,235 | $71,632,397 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF::OT::IGF" FOR AD… |
| Mod A00073· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-05-16 | +$66,816 | $71,699,213 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF:OT:IGF" |
| Mod A00077· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-07-09 | +$4,856 | $71,704,069 | CONSTRUCTION OF ELECTRICAL RELOCATION PHASE 2B MANHATTAN CAMPUS, NEW YORK, NY "IGF:OT:IGF" |
| Mod A00078· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-07-25 | +$9,198 | $71,713,267 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF:OT:IGF" |
| Mod A00079· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-07-25 | +$21,510 | $71,734,777 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF:OT:IGF" |
| Mod P00078· TERMINATE FOR CONVENIENCE (COMPLETE OR PARTIAL) | 2019-07-25 | −$14,452,000 | $57,282,777 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY REMOVAL OF GENERATOR… |
| Mod A00076· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-07-29 | +$65,159 | $57,347,936 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF:OT:IGF" FOR ADDI… |
| Mod A00080· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-07-29 | +$17,338 | $57,365,274 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF:OT:IGF" FOR ADDI… |
| Mod P00077· DEFINITIZE CHANGE ORDER | 2019-08-06 | +$5,743,575 | $63,108,849 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY DEFINITIZE REA 1 FOR… |
| Mod P00070· DEFINITIZE CHANGE ORDER | 2019-08-22 | +$98 | $63,108,947 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY DEFINITIZE CHANGE ORD… |
| Mod P00052· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-08-23 | +$1,601,155 | $64,710,102 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, DIFFERING SITE CONDITION… |
| Mod P00072· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-08-26 | +$167,148 | $64,877,249 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY DEMOLITION AND ASBEST… |
| Mod A00057· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-10-15 | +$13,231 | $64,890,480 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF:OT:IGF" |
| Mod P00079· DEFINITIZE CHANGE ORDER | 2019-12-10 | +$225,000 | $65,115,480 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY TO DEFINITIZE P00012… |
| Mod P00082· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-12-10 | +$147,000 | $65,262,480 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY CHANGE IS ROOFING SYS… |
| Mod A00083· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-12-30 | +$34,515 | $65,296,995 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY D |
| Mod P00074· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-01-29 | −$183,923 | $65,113,072 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, TO DELETE THE DRILLING O… |
| Mod A00084· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-01-31 | +$7,900 | $65,120,972 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY CHANGE IS ROOFING SYS… |
| Mod A00085· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-01-31 | +$1,328 | $65,122,300 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY CHANGE IS ROOFING SYS… |
| Mod A00090· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-01-31 | +$78,000 | $65,200,300 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY D |
| Mod A00091· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-01-31 | +$58,000 | $65,258,300 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY |
| Mod A00093· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-01-31 | +$1,644 | $65,259,945 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY |
| Mod A00094· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-01-31 | +$29,367 | $65,289,312 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY |
| Mod P00046· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-01-31 | +$15,054 | $65,304,366 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY "IGF:OT:IGF" |
| Mod A00089· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-02-07 | +$16,000 | $65,320,366 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY D |
| Mod A00092· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-03-04 | +$92,000 | $65,412,366 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY D |
| Mod P00086· DEFINITIZE CHANGE ORDER | 2020-03-10 | +$92,071 | $65,504,437 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY D SUPPLEMENTAL AGREEM… |
| Mod A00096· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-05-01 | +$42,000 | $65,546,437 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY D |
| Mod A00097· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-06-01 | +$21,900 | $65,568,337 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY D SUPPLEMENTAL AGREEM… |
| Mod P00099· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-10-02 | +$239,887 | $65,808,223 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY D SUPPLEMENTAL AGREEM… |
| Mod A00100· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-10-21 | +$4,138 | $65,812,361 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY D SUPPLEMENTAL AGREEM… |
| Mod A00101· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2021-03-18 | +$60,644 | $65,873,005 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY D SUPPLEMENTAL AGREEM… |
| Mod P00100· FUNDING ONLY ACTION | 2021-03-18 | +$0 | $65,873,005 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY ADMINISTRATIVE MODIFI… |
| Mod P00102· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2021-09-07 | +$145,348 | $66,018,354 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY SUPPLEMENTAL AGREEMEN… |
| Mod A00103· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2021-09-14 | +$15,263 | $66,033,617 | CONSTRUCTION OF THE ELECTRICAL RELOCATION PHASE 2B AT VAMC MANHATTAN CAMPUS NEW YORK, NY ADMINISTRATIVE MODIFI… |
Related awards · 3
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI NWMLSEK4HXN3)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| VA70114C0040 | PCAC NATIONAL ENERGY BUSINESS CENTER (36E776) · Y1MZ · CONSTRUCTION OF EPG FACILITIES - OTHER, INCLUDING TRANSMISSION | $45,047,012 | FY2014 |
Other recipients under Z2DA from OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA101F15C0034 | CALCEDO CONSTRUCTION CORP. | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | $24,364,242 | FY2015 |
| VA101F15C0018 | VETERANS CONTRACTING GROUP, INC. | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | $17,492,789 | FY2015 |