Award recordCONTRACT

VETERANS CONTRACTING GROUP, INC.

PIID VA101F15C0018· VA Staff Offices· OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)· Z2DA · REPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES· FY2015· $17,492,789 net obligations· UEI F2B1FMNRVJH3· NY

Description

CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK

Base award description: CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'

First action · last action
2015-03-31 · 2023-01-24
Transactions
239
First transaction's obligation
$11,671,000
Base + all options value (sum of deltas)
$17,492,789
Extent competed
FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
Other than full & open authority
—
Set-aside
SERVICE DISABLED VETERAN OWNED SMALL BUSINESS SET-ASIDE
Offers received
3
SDVOSB flag on record
Yes (self-representation)
NAICS
236220 · COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION

Modification chain · 239 transactions

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$17,492,789$0Base award · 2015-03-31 · this action $11,671,000 · running total $11,671,000Modification P00001 · 2015-09-02 · this action $50,000 · running total $11,721,000Modification P00002 · 2015-10-14 · this action -$4,466 · running total $11,716,534Modification P00004 · 2015-10-23 · this action $0 · running total $11,716,534Modification P00005 · 2016-01-11 · this action $4,927 · running total $11,721,460Modification P00006 · 2016-01-26 · this action $10,719 · running total $11,732,180Modification P00008 · 2016-02-25 · this action $11,027 · running total $11,743,207Modification P00009 · 2016-03-22 · this action $11,836 · running total $11,755,043Modification P00018 · 2016-03-23 · this action $2,200 · running total $11,757,243Modification P00007 · 2016-04-04 · this action $5,900 · running total $11,763,143Modification P00021 · 2016-04-18 · this action $13,766 · running total $11,776,909Modification P00023 · 2016-04-18 · this action $22,000 · running total $11,798,909Modification P00026 · 2016-04-25 · this action $10,000 · running total $11,808,909Modification P00010 · 2016-04-28 · this action $4,993 · running total $11,813,901Modification P00013 · 2016-05-06 · this action $9,000 · running total $11,822,901Modification P00014 · 2016-05-06 · this action $19,686 · running total $11,842,587Modification P00019 · 2016-05-06 · this action $512 · running total $11,843,099Modification P00024 · 2016-05-06 · this action $13,000 · running total $11,856,099Modification P00012 · 2016-05-26 · this action $44,000 · running total $11,900,099Modification P00016 · 2016-06-02 · this action $24,496 · running total $11,924,595Modification P00025 · 2016-06-02 · this action $55,771 · running total $11,980,366Modification P00027 · 2016-06-02 · this action $68,000 · running total $12,048,366Modification P00030 · 2016-06-02 · this action $10,000 · running total $12,058,366Modification P00020 · 2016-06-17 · this action $199,917 · running total $12,258,283Modification P00028 · 2016-07-14 · this action -$575 · running total $12,257,708Modification P00031 · 2016-07-14 · this action $4,500 · running total $12,262,208Modification P00039 · 2016-08-09 · this action $0 · running total $12,262,208Modification P00035 · 2016-08-16 · this action $95,000 · running total $12,357,208Modification P00032 · 2016-08-18 · this action $10,372 · running total $12,367,580Modification P00034 · 2016-08-18 · this action $26,000 · running total $12,393,580Modification P00036 · 2016-08-18 · this action $27,250 · running total $12,420,830Modification P00044 · 2016-09-29 · this action $9,000 · running total $12,429,830Modification P00046 · 2016-10-06 · this action $0 · running total $12,429,830Modification P00040 · 2016-10-14 · this action $2,800 · running total $12,432,630Modification P00043 · 2016-10-18 · this action $13,200 · running total $12,445,830Modification P00047 · 2016-10-27 · this action $5,490 · running total $12,451,320Modification P00048 · 2016-10-27 · this action $0 · running total $12,451,320Modification P00049 · 2016-10-31 · this action $28,059 · running total $12,479,379Modification P00052 · 2016-11-16 · this action $0 · running total $12,479,379Modification P00042 · 2016-11-22 · this action $10,055 · running total $12,489,434Modification P00017 · 2016-11-29 · this action $8,625 · running total $12,498,059Modification P00051 · 2016-12-05 · this action $99,500 · running total $12,597,559Modification P00045 · 2016-12-06 · this action $111,105 · running total $12,708,664Modification P00050 · 2016-12-06 · this action $236,033 · running total $12,944,697Modification P00029 · 2017-01-12 · this action $4,807 · running total $12,949,504Modification P00055 · 2017-01-13 · this action $32,740 · running total $12,982,244Modification P00053 · 2017-01-18 · this action $16,464 · running total $12,998,708Modification P00058 · 2017-01-19 · this action $48,060 · running total $13,046,768Modification P00057 · 2017-01-31 · this action $100,269 · running total $13,147,037Modification P00059 · 2017-01-31 · this action $54,747 · running total $13,201,784Modification P00060 · 2017-02-13 · this action $2,000 · running total $13,203,784Modification P00061 · 2017-02-13 · this action $0 · running total $13,203,784Modification P00062 · 2017-03-06 · this action $0 · running total $13,203,784Modification P00063 · 2017-03-23 · this action $0 · running total $13,203,784Modification P00065 · 2017-04-10 · this action $49,000 · running total $13,252,784Modification P00067 · 2017-04-14 · this action $0 · running total $13,252,784Modification P00064 · 2017-04-27 · this action $48,000 · running total $13,300,784Modification P00068 · 2017-04-27 · this action $39,000 · running total $13,339,784Modification P00069 · 2017-04-27 · this action $24,000 · running total $13,363,784Modification P00070 · 2017-04-27 · this action $3,300 · running total $13,367,084Modification P00071 · 2017-05-10 · this action $0 · running total $13,367,084Modification P00066 · 2017-05-11 · this action $77,525 · running total $13,444,609Modification P00072 · 2017-05-23 · this action $99,000 · running total $13,543,609Modification P00073 · 2017-05-30 · this action $0 · running total $13,543,609Modification P00011 · 2017-06-15 · this action $35,500 · running total $13,579,109Modification P00033 · 2017-06-15 · this action $54,160 · running total $13,633,269Modification P00076 · 2017-06-15 · this action $11,100 · running total $13,644,369Modification P00077 · 2017-06-15 · this action $14,000 · running total $13,658,369Modification P00074 · 2017-06-19 · this action $0 · running total $13,658,369Modification P00075 · 2017-07-06 · this action $9,000 · running total $13,667,369Modification P00079 · 2017-07-06 · this action $25,000 · running total $13,692,369Modification P00080 · 2017-07-06 · this action $25,500 · running total $13,717,869Modification P00081 · 2017-07-07 · this action $30,524 · running total $13,748,393Modification P00082 · 2017-07-07 · this action $0 · running total $13,748,393Modification P00078 · 2017-07-11 · this action $3,361 · running total $13,751,754Modification P00083 · 2017-07-14 · this action $10,200 · running total $13,761,954Modification P00084 · 2017-07-14 · this action $29,500 · running total $13,791,454Modification P00085 · 2017-07-14 · this action $10,831 · running total $13,802,285Modification P00086 · 2017-07-14 · this action $1,974 · running total $13,804,259Modification P00087 · 2017-07-20 · this action $14,200 · running total $13,818,459Modification P00088 · 2017-07-20 · this action $98,000 · running total $13,916,459Modification P00089 · 2017-07-25 · this action $56,000 · running total $13,972,459Modification P00090 · 2017-07-26 · this action $0 · running total $13,972,459Modification P00091 · 2017-08-15 · this action $0 · running total $13,972,459Modification P00054 · 2017-08-29 · this action -$15,000 · running total $13,957,459Modification P00056 · 2017-08-29 · this action $4,200 · running total $13,961,659Modification P00092 · 2017-08-29 · this action $78,000 · running total $14,039,659Modification P00093 · 2017-08-29 · this action $12,600 · running total $14,052,259Modification P00094 · 2017-08-29 · this action $35,000 · running total $14,087,259Modification P00095 · 2017-09-05 · this action $0 · running total $14,087,259Modification P00096 · 2017-09-06 · this action $24,500 · running total $14,111,759Modification P00100 · 2017-09-27 · this action $0 · running total $14,111,759Modification P00097 · 2017-10-16 · this action $31,500 · running total $14,143,259Modification P00098 · 2017-10-16 · this action $93,000 · running total $14,236,259Modification P00103 · 2017-10-16 · this action $4,415 · running total $14,240,674Modification P00104 · 2017-10-16 · this action $2,152 · running total $14,242,826Modification P00101 · 2017-10-17 · this action $0 · running total $14,242,826Modification P00105 · 2017-11-16 · this action $0 · running total $14,242,826Modification P00107 · 2017-12-05 · this action $0 · running total $14,242,826Modification P00099 · 2017-12-06 · this action $432,000 · running total $14,674,826Modification P00109 · 2017-12-22 · this action $0 · running total $14,674,826Modification P00106 · 2018-01-05 · this action $13,350 · running total $14,688,176Modification P00108 · 2018-01-05 · this action $64,400 · running total $14,752,576Modification P00110 · 2018-01-09 · this action $4,000 · running total $14,756,576Modification P00112 · 2018-01-15 · this action $0 · running total $14,756,576Modification P00111 · 2018-02-02 · this action $44,000 · running total $14,800,576Modification P00113 · 2018-02-02 · this action $0 · running total $14,800,576Modification P00102 · 2018-02-05 · this action $234,000 · running total $15,034,576Modification P00114 · 2018-02-23 · this action $0 · running total $15,034,576Modification P00115 · 2018-03-08 · this action $6,100 · running total $15,040,676Modification P00116 · 2018-03-15 · this action $0 · running total $15,040,676Modification P00117 · 2018-04-05 · this action $2,881 · running total $15,043,557Modification P00118 · 2018-04-05 · this action $0 · running total $15,043,557Modification P00119 · 2018-04-09 · this action $15,664 · running total $15,059,221Modification P00120 · 2018-04-24 · this action $5,198 · running total $15,064,419Modification P00121 · 2018-04-24 · this action $0 · running total $15,064,419Modification A00122 · 2018-05-15 · this action $70,000 · running total $15,134,419Modification A00123 · 2018-05-15 · this action $3,324 · running total $15,137,743Modification A00125 · 2018-05-15 · this action $0 · running total $15,137,743Modification A00126 · 2018-05-29 · this action $0 · running total $15,137,743Modification A00128 · 2018-06-13 · this action $2,308 · running total $15,140,051Modification A00129 · 2018-06-23 · this action $0 · running total $15,140,051Modification P00130 · 2018-07-12 · this action $110,000 · running total $15,250,051Modification P00131 · 2018-07-12 · this action $230,000 · running total $15,480,051Modification A00131 · 2018-07-14 · this action $8,400 · running total $15,488,451Modification A00132 · 2018-08-03 · this action $15,290 · running total $15,503,741Modification A00133 · 2018-08-03 · this action $826 · running total $15,504,567Modification A00134 · 2018-08-03 · this action $0 · running total $15,504,567Modification A00136 · 2018-08-03 · this action $11,500 · running total $15,516,067Modification A00135 · 2018-08-20 · this action $5,000 · running total $15,521,067Modification A00137 · 2018-08-20 · this action $9,500 · running total $15,530,567Modification A00138 · 2018-08-20 · this action $37,000 · running total $15,567,567Modification A00139 · 2018-08-23 · this action $0 · running total $15,567,567Modification A00141 · 2018-08-28 · this action $16,796 · running total $15,584,363Modification A00142 · 2018-08-28 · this action $10,400 · running total $15,594,763Modification A00143 · 2018-09-10 · this action $27,131 · running total $15,621,894Modification A00144 · 2018-09-10 · this action $7,068 · running total $15,628,962Modification A00145 · 2018-09-10 · this action $0 · running total $15,628,962Modification A00140 · 2018-09-12 · this action $10,000 · running total $15,638,962Modification A00146 · 2018-09-25 · this action $44,000 · running total $15,682,962Modification A00147 · 2018-10-01 · this action $0 · running total $15,682,962Modification A00148 · 2018-10-04 · this action $2,418 · running total $15,685,380Modification A00149 · 2018-10-11 · this action $60,393 · running total $15,745,773Modification A00150 · 2018-10-21 · this action $0 · running total $15,745,773Modification A00152 · 2018-11-05 · this action $0 · running total $15,745,773Modification A00153 · 2018-11-27 · this action $0 · running total $15,745,773Modification A00154 · 2018-12-18 · this action $0 · running total $15,745,773Modification A00155 · 2019-01-10 · this action $28,000 · running total $15,773,773Modification A00156 · 2019-01-10 · this action $20,169 · running total $15,793,942Modification A00157 · 2019-01-10 · this action $0 · running total $15,793,942Modification A00151 · 2019-01-14 · this action $11,000 · running total $15,804,942Modification A00158 · 2019-01-29 · this action $0 · running total $15,804,942Modification A00159 · 2019-02-09 · this action $9,000 · running total $15,813,942Modification A00160 · 2019-02-18 · this action $0 · running total $15,813,942Modification A00161 · 2019-03-10 · this action $10,300 · running total $15,824,242Modification A00162 · 2019-03-10 · this action $0 · running total $15,824,242Modification A00165 · 2019-03-30 · this action $0 · running total $15,824,242Modification A00163 · 2019-03-31 · this action $40,000 · running total $15,864,242Modification A00164 · 2019-03-31 · this action $49,000 · running total $15,913,242Modification A00166 · 2019-04-02 · this action $2,300 · running total $15,915,542Modification A00167 · 2019-04-11 · this action $1,371 · running total $15,916,913Modification A00168 · 2019-04-19 · this action $0 · running total $15,916,913Modification A00169 · 2019-05-10 · this action $0 · running total $15,916,913Modification P00169 · 2019-05-23 · this action $305,046 · running total $16,221,959Modification A00170 · 2019-05-29 · this action $0 · running total $16,221,959Modification A00171 · 2019-06-19 · this action $0 · running total $16,221,959Modification A00172 · 2019-06-26 · this action $16,900 · running total $16,238,859Modification A00173 · 2019-06-26 · this action $6,500 · running total $16,245,359Modification A00174 · 2019-07-08 · this action $25,000 · running total $16,270,359Modification A00175 · 2019-07-08 · this action $0 · running total $16,270,359Modification A00176 · 2019-07-29 · this action $0 · running total $16,270,359Modification A00178 · 2019-08-14 · this action $0 · running total $16,270,359Modification A00177 · 2019-08-15 · this action $9,000 · running total $16,279,359Modification A00180 · 2019-08-26 · this action $38,000 · running total $16,317,359Modification A00179 · 2019-09-06 · this action $0 · running total $16,317,359Modification A00181 · 2019-09-27 · this action $0 · running total $16,317,359Modification A00183 · 2019-10-17 · this action $0 · running total $16,317,359Modification A00184 · 2019-11-04 · this action $0 · running total $16,317,359Modification A00182 · 2019-11-14 · this action $60,500 · running total $16,377,859Modification A00187 · 2019-11-25 · this action $4,641 · running total $16,382,500Modification A00185 · 2019-11-26 · this action $0 · running total $16,382,500Modification A00186 · 2019-12-16 · this action $0 · running total $16,382,500Modification A00188 · 2020-01-05 · this action $0 · running total $16,382,500Modification A00189 · 2020-01-24 · this action $6,900 · running total $16,389,400Modification A00190 · 2020-01-24 · this action $0 · running total $16,389,400Modification A00191 · 2020-01-31 · this action $2,550 · running total $16,391,950Modification A00192 · 2020-02-14 · this action $4,641 · running total $16,396,591Modification A00193 · 2020-02-14 · this action $0 · running total $16,396,591Modification A00194 · 2020-02-25 · this action $15,334 · running total $16,411,925Modification A00195 · 2020-02-27 · this action $8,552 · running total $16,420,477Modification A00196 · 2020-03-05 · this action $0 · running total $16,420,477Modification A00197 · 2020-03-25 · this action $0 · running total $16,420,477Modification P00173 · 2020-03-31 · this action $177,230 · running total $16,597,707Modification P00199 · 2020-04-08 · this action -$175,000 · running total $16,422,707Modification A00198 · 2020-04-14 · this action $0 · running total $16,422,707Modification A00199 · 2020-04-14 · this action $9,800 · running total $16,432,507Modification A00200 · 2020-04-30 · this action $6,180 · running total $16,438,687Modification A00201 · 2020-04-30 · this action $0 · running total $16,438,687Modification A00202 · 2020-05-22 · this action $0 · running total $16,438,687Modification A00203 · 2020-06-12 · this action $0 · running total $16,438,687Modification A00204 · 2020-07-02 · this action $0 · running total $16,438,687Modification A00205 · 2020-07-22 · this action $0 · running total $16,438,687Modification A00206 · 2020-08-11 · this action $0 · running total $16,438,687Modification A00208 · 2020-09-01 · this action $0 · running total $16,438,687Modification A00207 · 2020-09-02 · this action $12,867 · running total $16,451,554Modification A00210 · 2020-09-16 · this action $0 · running total $16,451,554Modification P00172 · 2020-09-17 · this action $270,944 · running total $16,722,498Modification A00209 · 2020-09-23 · this action $2,525 · running total $16,725,023Modification A00211 · 2020-10-11 · this action $0 · running total $16,725,023Modification A00212 · 2020-10-30 · this action $0 · running total $16,725,023Modification A00213 · 2020-11-20 · this action $0 · running total $16,725,023Modification A00214 · 2020-12-11 · this action $0 · running total $16,725,023Modification A00215 · 2020-12-31 · this action $0 · running total $16,725,023Modification A00217 · 2021-01-20 · this action $0 · running total $16,725,023Modification A00219 · 2021-02-09 · this action $0 · running total $16,725,023Modification A00216 · 2021-02-25 · this action $32,500 · running total $16,757,523Modification A00218 · 2021-02-25 · this action $7,000 · running total $16,764,523Modification A00220 · 2021-03-01 · this action $0 · running total $16,764,523Modification A00222 · 2021-03-18 · this action $0 · running total $16,764,523Modification A00221 · 2021-03-24 · this action $1,839 · running total $16,766,362Modification A00223 · 2021-04-09 · this action $0 · running total $16,766,362Modification A00224 · 2021-04-30 · this action $0 · running total $16,766,362Modification A00225 · 2021-05-20 · this action $0 · running total $16,766,362Modification A00226 · 2021-06-09 · this action $0 · running total $16,766,362Modification A00228 · 2021-06-28 · this action $0 · running total $16,766,362Modification A00227 · 2021-07-15 · this action $1,600 · running total $16,767,962Modification A00229 · 2021-07-19 · this action $0 · running total $16,767,962Modification A00231 · 2021-07-31 · this action $0 · running total $16,767,962Modification A00230 · 2021-08-18 · this action $3,200 · running total $16,771,162Modification A00232 · 2021-11-03 · this action $41,400 · running total $16,812,562Modification A00233 · 2021-11-03 · this action $27,500 · running total $16,840,062Modification A00234 · 2021-11-03 · this action $33,000 · running total $16,873,062Modification A00235 · 2021-11-03 · this action $29,000 · running total $16,902,062Modification A00236 · 2021-11-03 · this action $85,000 · running total $16,987,062Modification A00237 · 2021-11-03 · this action $7,000 · running total $16,994,062Modification A00238 · 2021-11-03 · this action $13,000 · running total $17,007,062Modification P00241 · 2022-09-13 · this action $0 · running total $17,007,062Modification P00239 · 2022-11-08 · this action $447,000 · running total $17,454,062Modification A00240 · 2023-01-24 · this action $38,727 · running total $17,492,789
  • Base2015-03-31+$11,671,000= $11,671,000
  • Mod P000012015-09-02+$50,000= $11,721,000
  • Mod P000022015-10-14-$4,466= $11,716,534
  • Mod P000042015-10-23+$0= $11,716,534
  • Mod P000052016-01-11+$4,927= $11,721,460
  • Mod P000062016-01-26+$10,719= $11,732,180
  • Mod P000082016-02-25+$11,027= $11,743,207
  • Mod P000092016-03-22+$11,836= $11,755,043
  • Mod P000182016-03-23+$2,200= $11,757,243
  • Mod P000072016-04-04+$5,900= $11,763,143
  • Mod P000212016-04-18+$13,766= $11,776,909
  • Mod P000232016-04-18+$22,000= $11,798,909
  • Mod P000262016-04-25+$10,000= $11,808,909
  • Mod P000102016-04-28+$4,993= $11,813,901
  • Mod P000132016-05-06+$9,000= $11,822,901
  • Mod P000142016-05-06+$19,686= $11,842,587
  • Mod P000192016-05-06+$512= $11,843,099
  • Mod P000242016-05-06+$13,000= $11,856,099
  • Mod P000122016-05-26+$44,000= $11,900,099
  • Mod P000162016-06-02+$24,496= $11,924,595
  • Mod P000252016-06-02+$55,771= $11,980,366
  • Mod P000272016-06-02+$68,000= $12,048,366
  • Mod P000302016-06-02+$10,000= $12,058,366
  • Mod P000202016-06-17+$199,917= $12,258,283
  • Mod P000282016-07-14-$575= $12,257,708
  • Mod P000312016-07-14+$4,500= $12,262,208
  • Mod P000392016-08-09+$0= $12,262,208
  • Mod P000352016-08-16+$95,000= $12,357,208
  • Mod P000322016-08-18+$10,372= $12,367,580
  • Mod P000342016-08-18+$26,000= $12,393,580
  • Mod P000362016-08-18+$27,250= $12,420,830
  • Mod P000442016-09-29+$9,000= $12,429,830
  • Mod P000462016-10-06+$0= $12,429,830
  • Mod P000402016-10-14+$2,800= $12,432,630
  • Mod P000432016-10-18+$13,200= $12,445,830
  • Mod P000472016-10-27+$5,490= $12,451,320
  • Mod P000482016-10-27+$0= $12,451,320
  • Mod P000492016-10-31+$28,059= $12,479,379
  • Mod P000522016-11-16+$0= $12,479,379
  • Mod P000422016-11-22+$10,055= $12,489,434
  • Mod P000172016-11-29+$8,625= $12,498,059
  • Mod P000512016-12-05+$99,500= $12,597,559
  • Mod P000452016-12-06+$111,105= $12,708,664
  • Mod P000502016-12-06+$236,033= $12,944,697
  • Mod P000292017-01-12+$4,807= $12,949,504
  • Mod P000552017-01-13+$32,740= $12,982,244
  • Mod P000532017-01-18+$16,464= $12,998,708
  • Mod P000582017-01-19+$48,060= $13,046,768
  • Mod P000572017-01-31+$100,269= $13,147,037
  • Mod P000592017-01-31+$54,747= $13,201,784
  • Mod P000602017-02-13+$2,000= $13,203,784
  • Mod P000612017-02-13+$0= $13,203,784
  • Mod P000622017-03-06+$0= $13,203,784
  • Mod P000632017-03-23+$0= $13,203,784
  • Mod P000652017-04-10+$49,000= $13,252,784
  • Mod P000672017-04-14+$0= $13,252,784
  • Mod P000642017-04-27+$48,000= $13,300,784
  • Mod P000682017-04-27+$39,000= $13,339,784
  • Mod P000692017-04-27+$24,000= $13,363,784
  • Mod P000702017-04-27+$3,300= $13,367,084
  • Mod P000712017-05-10+$0= $13,367,084
  • Mod P000662017-05-11+$77,525= $13,444,609
  • Mod P000722017-05-23+$99,000= $13,543,609
  • Mod P000732017-05-30+$0= $13,543,609
  • Mod P000112017-06-15+$35,500= $13,579,109
  • Mod P000332017-06-15+$54,160= $13,633,269
  • Mod P000762017-06-15+$11,100= $13,644,369
  • Mod P000772017-06-15+$14,000= $13,658,369
  • Mod P000742017-06-19+$0= $13,658,369
  • Mod P000752017-07-06+$9,000= $13,667,369
  • Mod P000792017-07-06+$25,000= $13,692,369
  • Mod P000802017-07-06+$25,500= $13,717,869
  • Mod P000812017-07-07+$30,524= $13,748,393
  • Mod P000822017-07-07+$0= $13,748,393
  • Mod P000782017-07-11+$3,361= $13,751,754
  • Mod P000832017-07-14+$10,200= $13,761,954
  • Mod P000842017-07-14+$29,500= $13,791,454
  • Mod P000852017-07-14+$10,831= $13,802,285
  • Mod P000862017-07-14+$1,974= $13,804,259
  • Mod P000872017-07-20+$14,200= $13,818,459
  • Mod P000882017-07-20+$98,000= $13,916,459
  • Mod P000892017-07-25+$56,000= $13,972,459
  • Mod P000902017-07-26+$0= $13,972,459
  • Mod P000912017-08-15+$0= $13,972,459
  • Mod P000542017-08-29-$15,000= $13,957,459
  • Mod P000562017-08-29+$4,200= $13,961,659
  • Mod P000922017-08-29+$78,000= $14,039,659
  • Mod P000932017-08-29+$12,600= $14,052,259
  • Mod P000942017-08-29+$35,000= $14,087,259
  • Mod P000952017-09-05+$0= $14,087,259
  • Mod P000962017-09-06+$24,500= $14,111,759
  • Mod P001002017-09-27+$0= $14,111,759
  • Mod P000972017-10-16+$31,500= $14,143,259
  • Mod P000982017-10-16+$93,000= $14,236,259
  • Mod P001032017-10-16+$4,415= $14,240,674
  • Mod P001042017-10-16+$2,152= $14,242,826
  • Mod P001012017-10-17+$0= $14,242,826
  • Mod P001052017-11-16+$0= $14,242,826
  • Mod P001072017-12-05+$0= $14,242,826
  • Mod P000992017-12-06+$432,000= $14,674,826
  • Mod P001092017-12-22+$0= $14,674,826
  • Mod P001062018-01-05+$13,350= $14,688,176
  • Mod P001082018-01-05+$64,400= $14,752,576
  • Mod P001102018-01-09+$4,000= $14,756,576
  • Mod P001122018-01-15+$0= $14,756,576
  • Mod P001112018-02-02+$44,000= $14,800,576
  • Mod P001132018-02-02+$0= $14,800,576
  • Mod P001022018-02-05+$234,000= $15,034,576
  • Mod P001142018-02-23+$0= $15,034,576
  • Mod P001152018-03-08+$6,100= $15,040,676
  • Mod P001162018-03-15+$0= $15,040,676
  • Mod P001172018-04-05+$2,881= $15,043,557
  • Mod P001182018-04-05+$0= $15,043,557
  • Mod P001192018-04-09+$15,664= $15,059,221
  • Mod P001202018-04-24+$5,198= $15,064,419
  • Mod P001212018-04-24+$0= $15,064,419
  • Mod A001222018-05-15+$70,000= $15,134,419
  • Mod A001232018-05-15+$3,324= $15,137,743
  • Mod A001252018-05-15+$0= $15,137,743
  • Mod A001262018-05-29+$0= $15,137,743
  • Mod A001282018-06-13+$2,308= $15,140,051
  • Mod A001292018-06-23+$0= $15,140,051
  • Mod P001302018-07-12+$110,000= $15,250,051
  • Mod P001312018-07-12+$230,000= $15,480,051
  • Mod A001312018-07-14+$8,400= $15,488,451
  • Mod A001322018-08-03+$15,290= $15,503,741
  • Mod A001332018-08-03+$826= $15,504,567
  • Mod A001342018-08-03+$0= $15,504,567
  • Mod A001362018-08-03+$11,500= $15,516,067
  • Mod A001352018-08-20+$5,000= $15,521,067
  • Mod A001372018-08-20+$9,500= $15,530,567
  • Mod A001382018-08-20+$37,000= $15,567,567
  • Mod A001392018-08-23+$0= $15,567,567
  • Mod A001412018-08-28+$16,796= $15,584,363
  • Mod A001422018-08-28+$10,400= $15,594,763
  • Mod A001432018-09-10+$27,131= $15,621,894
  • Mod A001442018-09-10+$7,068= $15,628,962
  • Mod A001452018-09-10+$0= $15,628,962
  • Mod A001402018-09-12+$10,000= $15,638,962
  • Mod A001462018-09-25+$44,000= $15,682,962
  • Mod A001472018-10-01+$0= $15,682,962
  • Mod A001482018-10-04+$2,418= $15,685,380
  • Mod A001492018-10-11+$60,393= $15,745,773
  • Mod A001502018-10-21+$0= $15,745,773
  • Mod A001522018-11-05+$0= $15,745,773
  • Mod A001532018-11-27+$0= $15,745,773
  • Mod A001542018-12-18+$0= $15,745,773
  • Mod A001552019-01-10+$28,000= $15,773,773
  • Mod A001562019-01-10+$20,169= $15,793,942
  • Mod A001572019-01-10+$0= $15,793,942
  • Mod A001512019-01-14+$11,000= $15,804,942
  • Mod A001582019-01-29+$0= $15,804,942
  • Mod A001592019-02-09+$9,000= $15,813,942
  • Mod A001602019-02-18+$0= $15,813,942
  • Mod A001612019-03-10+$10,300= $15,824,242
  • Mod A001622019-03-10+$0= $15,824,242
  • Mod A001652019-03-30+$0= $15,824,242
  • Mod A001632019-03-31+$40,000= $15,864,242
  • Mod A001642019-03-31+$49,000= $15,913,242
  • Mod A001662019-04-02+$2,300= $15,915,542
  • Mod A001672019-04-11+$1,371= $15,916,913
  • Mod A001682019-04-19+$0= $15,916,913
  • Mod A001692019-05-10+$0= $15,916,913
  • Mod P001692019-05-23+$305,046= $16,221,959
  • Mod A001702019-05-29+$0= $16,221,959
  • Mod A001712019-06-19+$0= $16,221,959
  • Mod A001722019-06-26+$16,900= $16,238,859
  • Mod A001732019-06-26+$6,500= $16,245,359
  • Mod A001742019-07-08+$25,000= $16,270,359
  • Mod A001752019-07-08+$0= $16,270,359
  • Mod A001762019-07-29+$0= $16,270,359
  • Mod A001782019-08-14+$0= $16,270,359
  • Mod A001772019-08-15+$9,000= $16,279,359
  • Mod A001802019-08-26+$38,000= $16,317,359
  • Mod A001792019-09-06+$0= $16,317,359
  • Mod A001812019-09-27+$0= $16,317,359
  • Mod A001832019-10-17+$0= $16,317,359
  • Mod A001842019-11-04+$0= $16,317,359
  • Mod A001822019-11-14+$60,500= $16,377,859
  • Mod A001872019-11-25+$4,641= $16,382,500
  • Mod A001852019-11-26+$0= $16,382,500
  • Mod A001862019-12-16+$0= $16,382,500
  • Mod A001882020-01-05+$0= $16,382,500
  • Mod A001892020-01-24+$6,900= $16,389,400
  • Mod A001902020-01-24+$0= $16,389,400
  • Mod A001912020-01-31+$2,550= $16,391,950
  • Mod A001922020-02-14+$4,641= $16,396,591
  • Mod A001932020-02-14+$0= $16,396,591
  • Mod A001942020-02-25+$15,334= $16,411,925
  • Mod A001952020-02-27+$8,552= $16,420,477
  • Mod A001962020-03-05+$0= $16,420,477
  • Mod A001972020-03-25+$0= $16,420,477
  • Mod P001732020-03-31+$177,230= $16,597,707
  • Mod P001992020-04-08-$175,000= $16,422,707
  • Mod A001982020-04-14+$0= $16,422,707
  • Mod A001992020-04-14+$9,800= $16,432,507
  • Mod A002002020-04-30+$6,180= $16,438,687
  • Mod A002012020-04-30+$0= $16,438,687
  • Mod A002022020-05-22+$0= $16,438,687
  • Mod A002032020-06-12+$0= $16,438,687
  • Mod A002042020-07-02+$0= $16,438,687
  • Mod A002052020-07-22+$0= $16,438,687
  • Mod A002062020-08-11+$0= $16,438,687
  • Mod A002082020-09-01+$0= $16,438,687
  • Mod A002072020-09-02+$12,867= $16,451,554
  • Mod A002102020-09-16+$0= $16,451,554
  • Mod P001722020-09-17+$270,944= $16,722,498
  • Mod A002092020-09-23+$2,525= $16,725,023
  • Mod A002112020-10-11+$0= $16,725,023
  • Mod A002122020-10-30+$0= $16,725,023
  • Mod A002132020-11-20+$0= $16,725,023
  • Mod A002142020-12-11+$0= $16,725,023
  • Mod A002152020-12-31+$0= $16,725,023
  • Mod A002172021-01-20+$0= $16,725,023
  • Mod A002192021-02-09+$0= $16,725,023
  • Mod A002162021-02-25+$32,500= $16,757,523
  • Mod A002182021-02-25+$7,000= $16,764,523
  • Mod A002202021-03-01+$0= $16,764,523
  • Mod A002222021-03-18+$0= $16,764,523
  • Mod A002212021-03-24+$1,839= $16,766,362
  • Mod A002232021-04-09+$0= $16,766,362
  • Mod A002242021-04-30+$0= $16,766,362
  • Mod A002252021-05-20+$0= $16,766,362
  • Mod A002262021-06-09+$0= $16,766,362
  • Mod A002282021-06-28+$0= $16,766,362
  • Mod A002272021-07-15+$1,600= $16,767,962
  • Mod A002292021-07-19+$0= $16,767,962
  • Mod A002312021-07-31+$0= $16,767,962
  • Mod A002302021-08-18+$3,200= $16,771,162
  • Mod A002322021-11-03+$41,400= $16,812,562
  • Mod A002332021-11-03+$27,500= $16,840,062
  • Mod A002342021-11-03+$33,000= $16,873,062
  • Mod A002352021-11-03+$29,000= $16,902,062
  • Mod A002362021-11-03+$85,000= $16,987,062
  • Mod A002372021-11-03+$7,000= $16,994,062
  • Mod A002382021-11-03+$13,000= $17,007,062
  • Mod P002412022-09-13+$0= $17,007,062
  • Mod P002392022-11-08+$447,000= $17,454,062
  • Mod A002402023-01-24+$38,727= $17,492,789
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2015-03-31+$11,671,000$11,671,000CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00001· CHANGE ORDER2015-09-02+$50,000$11,721,000CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK MODIFICATION P0000…
Mod P00002· DEFINITIZE CHANGE ORDER2015-10-14−$4,466$11,716,534CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00004· FUNDING ONLY ACTION2015-10-23+$0$11,716,534CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00005· CHANGE ORDER2016-01-11+$4,927$11,721,460CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00006· CHANGE ORDER2016-01-26+$10,719$11,732,180CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-02-25+$11,027$11,743,207CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK P00008 TO RELOCATE…
Mod P00009· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-03-22+$11,836$11,755,043CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF' P00…
Mod P00018· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-03-23+$2,200$11,757,243CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK FOR P00018. 'IGF::…
Mod P00007· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-04-04+$5,900$11,763,143CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF' DOO…
Mod P00021· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-04-18+$13,766$11,776,909CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK P00008 TO RELOCATE…
Mod P00023· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-04-18+$22,000$11,798,909CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK P00023 TO RELOCATE…
Mod P00026· CHANGE ORDER2016-04-25+$10,000$11,808,909CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK MODIFICATION P0002…
Mod P00010· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-04-28+$4,993$11,813,901CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00013· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-05-06+$9,000$11,822,901CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00014· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-05-06+$19,686$11,842,587CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00019· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-05-06+$512$11,843,099CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00024· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-05-06+$13,000$11,856,099CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00012· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-05-26+$44,000$11,900,099CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF' P00…
Mod P00016· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-06-02+$24,496$11,924,595CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK P00016 'IGF::OT::…
Mod P00025· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-06-02+$55,771$11,980,366CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK P00008 TO RELOCATE…
Mod P00027· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-06-02+$68,000$12,048,366CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00030· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-06-02+$10,000$12,058,366CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00020· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-06-17+$199,917$12,258,283CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK P00020 FOR DIFFERI…
Mod P00028· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-07-14−$575$12,257,708CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00031· DEFINITIZE CHANGE ORDER2016-07-14+$4,500$12,262,208CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00039· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-08-09+$0$12,262,208CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK MODIFICATION P0003…
Mod P00035· CHANGE ORDER2016-08-16+$95,000$12,357,208CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK MODIFICATION P0003…
Mod P00032· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-08-18+$10,372$12,367,580CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK P00032 'IGF::OT::I…
Mod P00034· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-08-18+$26,000$12,393,580CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK P00020 FOR DIFFERI…
Mod P00036· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-08-18+$27,250$12,420,830CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK MODIFICATION P0003…
Mod P00044· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-09-29+$9,000$12,429,830CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK MODIFICATION P0004…
Mod P00046· OTHER ADMINISTRATIVE ACTION2016-10-06+$0$12,429,830CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK MODIFICATION P0004…
Mod P00040· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-10-14+$2,800$12,432,630CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK MODIFICATION P0004…
Mod P00043· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-10-18+$13,200$12,445,830CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK MODIFICATION P0004…
Mod P00047· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-10-27+$5,490$12,451,320CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK MODIFICATION P0004…
Mod P00048· OTHER ADMINISTRATIVE ACTION2016-10-27+$0$12,451,320CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK MODIFICATION P0004…
Mod P00049· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-10-31+$28,059$12,479,379CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK MODIFICATION P0004…
Mod P00052· OTHER ADMINISTRATIVE ACTION2016-11-16+$0$12,479,379CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK MODIFICATION P0005…
Mod P00042· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-11-22+$10,055$12,489,434CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK MODIFICATION P0004…
Mod P00017· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-11-29+$8,625$12,498,059CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00051· CHANGE ORDER2016-12-05+$99,500$12,597,559CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK MODIFICATION P0005…
Mod P00045· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-12-06+$111,105$12,708,664CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK MODIFICATION P0004…
Mod P00050· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-12-06+$236,033$12,944,697CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK MODIFICATION P0005…
Mod P00029· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-01-12+$4,807$12,949,504CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00055· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-01-13+$32,740$12,982,244CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK MODIFICATION P0005…
Mod P00053· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-01-18+$16,464$12,998,708CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00058· CHANGE ORDER2017-01-19+$48,060$13,046,768CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK MODIFICATION P0005…
Mod P00057· DEFINITIZE CHANGE ORDER2017-01-31+$100,269$13,147,037CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK MODIFICATION P0005…
Mod P00059· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-01-31+$54,747$13,201,784CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK MODIFICATION P0005…
Mod P00060· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-02-13+$2,000$13,203,784CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK MODIFICATION P0006…
Mod P00061· CHANGE ORDER2017-02-13+$0$13,203,784CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK MODIFICATION P0006…
Mod P00062· CHANGE ORDER2017-03-06+$0$13,203,784CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK MODIFICATION P0006…
Mod P00063· CHANGE ORDER2017-03-23+$0$13,203,784CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK MODIFICATION P0006…
Mod P00065· CHANGE ORDER2017-04-10+$49,000$13,252,784CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK MODIFICATION P0006…
Mod P00067· CHANGE ORDER2017-04-14+$0$13,252,784CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK MODIFICATION P0006…
Mod P00064· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-04-27+$48,000$13,300,784CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK MODIFICATION P0006…
Mod P00068· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-04-27+$39,000$13,339,784CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK MODIFICATION P0006…
Mod P00069· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-04-27+$24,000$13,363,784CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK MODIFICATION P0006…
Mod P00070· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-04-27+$3,300$13,367,084CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK MODIFICATION P0007…
Mod P00071· CHANGE ORDER2017-05-10+$0$13,367,084CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK MODIFICATION P0007…
Mod P00066· DEFINITIZE CHANGE ORDER2017-05-11+$77,525$13,444,609CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK DEFINITIZE MODIFIC…
Mod P00072· CHANGE ORDER2017-05-23+$99,000$13,543,609CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK DEFINITIZE MODIFIC…
Mod P00073· CHANGE ORDER2017-05-30+$0$13,543,609CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00011· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-06-15+$35,500$13,579,109CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00033· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-06-15+$54,160$13,633,269CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00076· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-06-15+$11,100$13,644,369CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00077· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-06-15+$14,000$13,658,369CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK. 'IGF::OT::IGF'
Mod P00074· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-06-19+$0$13,658,369CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS. 'IGF::OT::IGF'
Mod P00075· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-07-06+$9,000$13,667,369CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00079· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-07-06+$25,000$13,692,369CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00080· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-07-06+$25,500$13,717,869CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00081· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-07-07+$30,524$13,748,393CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00082· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-07-07+$0$13,748,393CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00078· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-07-11+$3,361$13,751,754CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK. 'IGF::OT::IGF'
Mod P00083· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-07-14+$10,200$13,761,954CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00084· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-07-14+$29,500$13,791,454CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00085· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-07-14+$10,831$13,802,285CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00086· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-07-14+$1,974$13,804,259CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK. 'IGF::OT::IGF'
Mod P00087· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-07-20+$14,200$13,818,459CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00088· DEFINITIZE CHANGE ORDER2017-07-20+$98,000$13,916,459CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK DEFINITIZE MODIFIC…
Mod P00089· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-07-25+$56,000$13,972,459CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK. 'IGF::OT::IGF'
Mod P00090· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-07-26+$0$13,972,459CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK DEFINITIZE MODIFIC…
Mod P00091· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-08-15+$0$13,972,459CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK. 'IGF::OT::IGF'
Mod P00054· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-08-29−$15,000$13,957,459CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK MODIFICATION IGF::…
Mod P00056· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-08-29+$4,200$13,961,659CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00092· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-08-29+$78,000$14,039,659CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00093· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-08-29+$12,600$14,052,259CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK. 'IGF::OT::IGF'
Mod P00094· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-08-29+$35,000$14,087,259CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK. 'IGF::OT::IGF'
Mod P00095· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-09-05+$0$14,087,259CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00096· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-09-06+$24,500$14,111,759CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK. 'IGF::OT::IGF'
Mod P00100· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-09-27+$0$14,111,759CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00097· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-10-16+$31,500$14,143,259CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00098· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-10-16+$93,000$14,236,259CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00103· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-10-16+$4,415$14,240,674CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00104· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-10-16+$2,152$14,242,826CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00101· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-10-17+$0$14,242,826CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00105· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-11-16+$0$14,242,826CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00107· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-12-05+$0$14,242,826CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00099· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-12-06+$432,000$14,674,826CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK TIME EXTENSION WIT…
Mod P00109· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-12-22+$0$14,674,826CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00106· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-01-05+$13,350$14,688,176CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00108· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-01-05+$64,400$14,752,576CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00110· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-01-09+$4,000$14,756,576CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00112· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-01-15+$0$14,756,576CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00111· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-02-02+$44,000$14,800,576CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00113· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-02-02+$0$14,800,576CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00102· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-02-05+$234,000$15,034,576CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK MODIFICATION P0010…
Mod P00114· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-02-23+$0$15,034,576CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00115· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-03-08+$6,100$15,040,676CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00116· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-03-15+$0$15,040,676CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00117· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-04-05+$2,881$15,043,557CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00118· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-04-05+$0$15,043,557CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00119· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-04-09+$15,664$15,059,221CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00120· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-04-24+$5,198$15,064,419CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00121· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-04-24+$0$15,064,419CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod A00122· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-05-15+$70,000$15,134,419CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod A00123· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-05-15+$3,324$15,137,743CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod A00125· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-05-15+$0$15,137,743CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod A00126· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-05-29+$0$15,137,743CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod A00128· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-06-13+$2,308$15,140,051CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod A00129· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-06-23+$0$15,140,051CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00130· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-07-12+$110,000$15,250,051CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod P00131· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-07-12+$230,000$15,480,051CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod A00131· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-07-14+$8,400$15,488,451CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod A00132· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-08-03+$15,290$15,503,741CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod A00133· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-08-03+$826$15,504,567CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod A00134· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-08-03+$0$15,504,567CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod A00136· CHANGE ORDER2018-08-03+$11,500$15,516,067CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod A00135· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-08-20+$5,000$15,521,067CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod A00137· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-08-20+$9,500$15,530,567CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod A00138· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-08-20+$37,000$15,567,567CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod A00139· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-08-23+$0$15,567,567CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod A00141· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-08-28+$16,796$15,584,363CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod A00142· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-08-28+$10,400$15,594,763CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod A00143· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-09-10+$27,131$15,621,894CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod A00144· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-09-10+$7,068$15,628,962CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod A00145· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-09-10+$0$15,628,962CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod A00140· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-09-12+$10,000$15,638,962CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod A00146· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-09-25+$44,000$15,682,962CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod A00147· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-10-01+$0$15,682,962CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod A00148· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-10-04+$2,418$15,685,380CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod A00149· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-10-11+$60,393$15,745,773CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod A00150· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-10-21+$0$15,745,773CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod A00152· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-11-05+$0$15,745,773CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod A00153· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-11-27+$0$15,745,773CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod A00154· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-12-18+$0$15,745,773CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod A00155· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-01-10+$28,000$15,773,773CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod A00156· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-01-10+$20,169$15,793,942CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod A00157· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-01-10+$0$15,793,942CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod A00151· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-01-14+$11,000$15,804,942CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF::OT::IGF'
Mod A00158· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-01-29+$0$15,804,942CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK TIME EXTENSION WIT…
Mod A00159· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-02-09+$9,000$15,813,942CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK TIME. 'IGF::OT::I…
Mod A00160· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-02-18+$0$15,813,942CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK TIME EXTENSION 'IG…
Mod A00161· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-03-10+$10,300$15,824,242CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK TIME EXTENSION 'IG…
Mod A00162· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-03-10+$0$15,824,242CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK TIME EXTENSION 'IG…
Mod A00165· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-03-30+$0$15,824,242CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK TIME EXTENSION 'IG…
Mod A00163· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-03-31+$40,000$15,864,242CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK TIME EXTENSION 'IG…
Mod A00164· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-03-31+$49,000$15,913,242CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK TIME EXTENSION 'IG…
Mod A00166· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-04-02+$2,300$15,915,542CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK TIME EXTENSION 'IG…
Mod A00167· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-04-11+$1,371$15,916,913CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK TIME EXTENSION 'IG…
Mod A00168· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-04-19+$0$15,916,913CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK TIME EXTENSION 'IG…
Mod A00169· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-05-10+$0$15,916,913CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK TIME EXTENSION 'IG…
Mod P00169· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-05-23+$305,046$16,221,959CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK TIME EXTENSION 'IG…
Mod A00170· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-05-29+$0$16,221,959CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK TIME EXTENSION 'IG…
Mod A00171· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-06-19+$0$16,221,959CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK TIME EXTENSION 'IG…
Mod A00172· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-06-26+$16,900$16,238,859CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK TIME EXTENSION 'IG…
Mod A00173· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-06-26+$6,500$16,245,359CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK TIME EXTENSION 'IG…
Mod A00174· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-07-08+$25,000$16,270,359CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK TIME EXTENSION 'IG…
Mod A00175· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-07-08+$0$16,270,359CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK TIME EXTENSION 'IG…
Mod A00176· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-07-29+$0$16,270,359CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK TIME EXTENSION 'IG…
Mod A00178· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-08-14+$0$16,270,359CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK TIME EXTENSION 'IG…
Mod A00177· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-08-15+$9,000$16,279,359CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK TIME EXTENSION 'IG…
Mod A00180· CHANGE ORDER2019-08-26+$38,000$16,317,359CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK TIME EXTENSION 'IG…
Mod A00179· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-09-06+$0$16,317,359CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK TIME EXTENSION 'IG…
Mod A00181· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-09-27+$0$16,317,359CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK TIME EXTENSION 'IG…
Mod A00183· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-10-17+$0$16,317,359CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK TIME EXTENSION 'IG…
Mod A00184· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-11-04+$0$16,317,359CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK TIME EXTENSION 'IG…
Mod A00182· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-11-14+$60,500$16,377,859CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK TIME EXTENSION 'IG…
Mod A00187· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-11-25+$4,641$16,382,500CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK TIME EXTENSION 'IG…
Mod A00185· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-11-26+$0$16,382,500CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK TIME EXTENSION 'IG…
Mod A00186· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-12-16+$0$16,382,500CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK TIME EXTENSION 'IG…
Mod A00188· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2020-01-05+$0$16,382,500CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK TIME EXTENSION 'IG…
Mod A00189· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2020-01-24+$6,900$16,389,400CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK TIME EXTENSION 'IG…
Mod A00190· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2020-01-24+$0$16,389,400CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK TIME EXTENSION 'IG…
Mod A00191· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2020-01-31+$2,550$16,391,950CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK TIME EXTENSION 'IG…
Mod A00192· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2020-02-14+$4,641$16,396,591CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK TIME EXTENSION 'IG…
Mod A00193· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2020-02-14+$0$16,396,591CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK TIME EXTENSION 'IG…
Mod A00194· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2020-02-25+$15,334$16,411,925CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK TIME EXTENSION 'IG…
Mod A00195· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2020-02-27+$8,552$16,420,477CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK 'IGF:OT:IGF'
Mod A00196· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2020-03-05+$0$16,420,477CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK TIME EXTENSION 'IG…
Mod A00197· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2020-03-25+$0$16,420,477CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK TIME EXTENSION 'IG…
Mod P00173· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2020-03-31+$177,230$16,597,707CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK MODIFICATION FOR A…
Mod P00199· FUNDING ONLY ACTION2020-04-08−$175,000$16,422,707CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK MODIFICATION PER U…
Mod A00198· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2020-04-14+$0$16,422,707CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK TIME EXTENSION 'IG…
Mod A00199· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2020-04-14+$9,800$16,432,507CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK MODIFICATION FOR A…
Mod A00200· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2020-04-30+$6,180$16,438,687CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK MODIFICATION PER U…
Mod A00201· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2020-04-30+$0$16,438,687CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK MODIFICATION PER U…
Mod A00202· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2020-05-22+$0$16,438,687CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK MODIFICATION PER U…
Mod A00203· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2020-06-12+$0$16,438,687CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK MODIFICATION PER U…
Mod A00204· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2020-07-02+$0$16,438,687CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK MODIFICATION PER U…
Mod A00205· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2020-07-22+$0$16,438,687CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK MODIFICATION PER U…
Mod A00206· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2020-08-11+$0$16,438,687CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK MODIFICATION PER U…
Mod A00208· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2020-09-01+$0$16,438,687CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK MODIFICATION PER U…
Mod A00207· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2020-09-02+$12,867$16,451,554CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK MODIFICATION PER U…
Mod A00210· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2020-09-16+$0$16,451,554CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK MODIFICATION PER U…
Mod P00172· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2020-09-17+$270,944$16,722,498CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK TIME EXTENSION
Mod A00209· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2020-09-23+$2,525$16,725,023CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK
Mod A00211· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2020-10-11+$0$16,725,023CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK
Mod A00212· CHANGE ORDER2020-10-30+$0$16,725,023CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK
Mod A00213· CHANGE ORDER2020-11-20+$0$16,725,023CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK
Mod A00214· CHANGE ORDER2020-12-11+$0$16,725,023CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK
Mod A00215· CHANGE ORDER2020-12-31+$0$16,725,023CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK
Mod A00217· CHANGE ORDER2021-01-20+$0$16,725,023CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK
Mod A00219· CHANGE ORDER2021-02-09+$0$16,725,023CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK
Mod A00216· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2021-02-25+$32,500$16,757,523CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK
Mod A00218· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2021-02-25+$7,000$16,764,523CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK
Mod A00220· CHANGE ORDER2021-03-01+$0$16,764,523CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK
Mod A00222· CHANGE ORDER2021-03-18+$0$16,764,523CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK
Mod A00221· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2021-03-24+$1,839$16,766,362CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK
Mod A00223· CHANGE ORDER2021-04-09+$0$16,766,362CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK
Mod A00224· CHANGE ORDER2021-04-30+$0$16,766,362CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK
Mod A00225· CHANGE ORDER2021-05-20+$0$16,766,362CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK
Mod A00226· CHANGE ORDER2021-06-09+$0$16,766,362CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK
Mod A00228· CHANGE ORDER2021-06-28+$0$16,766,362CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK
Mod A00227· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2021-07-15+$1,600$16,767,962CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK
Mod A00229· CHANGE ORDER2021-07-19+$0$16,767,962CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK
Mod A00231· CHANGE ORDER2021-07-31+$0$16,767,962CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK
Mod A00230· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2021-08-18+$3,200$16,771,162CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK
Mod A00232· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2021-11-03+$41,400$16,812,562CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK
Mod A00233· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2021-11-03+$27,500$16,840,062CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK
Mod A00234· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2021-11-03+$33,000$16,873,062CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK
Mod A00235· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2021-11-03+$29,000$16,902,062CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK
Mod A00236· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2021-11-03+$85,000$16,987,062CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK
Mod A00237· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2021-11-03+$7,000$16,994,062CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK
Mod A00238· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2021-11-03+$13,000$17,007,062CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK
Mod P00241· FUNDING ONLY ACTION2022-09-13+$0$17,007,062CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK
Mod P00239· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2022-11-08+$447,000$17,454,062CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK EQUITABLE ADJUSTME…
Mod A00240· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2023-01-24+$38,727$17,492,789CONSTRUCTION AND RENOVATION OF THE GROUND FLOOR PHASE 1B AT VAMC MANHATTAN CAMPUS, NEW YORK

Related awards · 8

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other VA awards to the same recipient (UEI F2B1FMNRVJH3)

AwardOffice · PSC / listingNet obligationsFY
36C24226C0100242-NETWORK CONTRACT OFFICE 02 (36C242) · J045 · MAINT/REPAIR/REBUILD OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT$200,000FY2026
36C24226C0049242-NETWORK CONTRACT OFFICE 02 (36C242) · Z1DA · MAINTENANCE OF HOSPITALS AND INFIRMARIES$6,320,000FY2026
36C24226C0035242-NETWORK CONTRACT OFFICE 02 (36C242) · Y1DZ · CONSTRUCTION OF OTHER HOSPITAL BUILDINGS$1,040,000FY2026
36C24226C0012242-NETWORK CONTRACT OFFICE 02 (36C242) · Y1DZ · CONSTRUCTION OF OTHER HOSPITAL BUILDINGS$435,000FY2026
36C77626C0002PCAC (36C776) · Y1NB · CONSTRUCTION OF HEATING AND COOLING PLANTS$54,192,000FY2026
36C77625C0080PCAC (36C776) · Z1DA · MAINTENANCE OF HOSPITALS AND INFIRMARIES$7,825,000FY2025

Other recipients under Z2DA from OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) (most recent first)

AwardRecipientOfficeNet obligationsFY
VA101F16C2540J KOKOLAKIS CONTRACTING INCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$66,033,617FY2016
VA101F15C0034CALCEDO CONSTRUCTION CORP.OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$24,364,242FY2015