Description
COR 400
Base award description: IGF::OT::IGF CONSTRUCTION SERVICES
Modification chain · 357 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2015-12-30+$58,274,929= $58,274,929
- Mod P000022016-08-19+$0= $58,274,929
- Mod P000012016-08-24+$21,998= $58,296,927
- Mod P000032016-08-24-$28,566= $58,268,361
- Mod P000042016-09-07+$55,819= $58,324,180
- Mod P000052016-09-14+$4,500= $58,328,680
- Mod P00092016-11-10+$6,334= $58,335,014
- Mod P000062016-11-21+$13,717= $58,348,731
- Mod P000072016-11-21+$24,654= $58,373,385
- Mod P000082016-11-21+$17,208= $58,390,593
- Mod P000102016-12-02+$13,042= $58,403,635
- Mod P000112016-12-02+$5,000= $58,408,635
- Mod P000122016-12-23+$119,665= $58,528,300
- Mod P000132017-01-04+$107,432= $58,635,732
- Mod P000152017-02-06+$5,953= $58,641,685
- Mod P000142017-02-15-$10,206= $58,631,479
- Mod P000162017-02-23+$3,800= $58,635,279
- Mod P000172017-02-24-$13,660= $58,621,619
- Mod P000182017-03-10-$181,368= $58,440,251
- Mod P000212017-03-10+$0= $58,440,251
- Mod P000192017-04-05+$2,096,198= $60,536,449
- Mod A002212017-04-07+$1,000= $60,537,449
- Mod P000222017-05-05+$0= $60,537,449
- Mod P000232017-05-05+$12,000= $60,549,449
- Mod P000242017-05-05+$46,500= $60,595,949
- Mod P000282017-05-11+$60,000= $60,655,949
- Mod P000312017-06-09+$2,600= $60,658,549
- Mod P000252017-06-14+$0= $60,658,549
- Mod P000302017-06-14+$1,413,939= $62,072,488
- Mod P000332017-06-21+$99,000= $62,171,488
- Mod P000292017-06-25+$5,582= $62,177,070
- Mod P000322017-06-29-$249,978= $61,927,092
- Mod P000342017-07-08+$6,213= $61,933,305
- Mod P000372017-07-10+$42,689= $61,975,994
- Mod P000352017-07-14+$46,138= $62,022,132
- Mod P000362017-07-21-$12,510= $62,009,622
- Mod P000382017-08-16+$3,884= $62,013,506
- Mod P000392017-08-16+$981= $62,014,487
- Mod P000402017-08-18+$2,139= $62,016,626
- Mod P000412017-08-22+$300,000= $62,316,626
- Mod P000422017-08-23+$136,391= $62,453,017
- Mod P000432017-08-28+$10,000= $62,463,017
- Mod P000442017-08-28+$68,000= $62,531,017
- Mod P000452017-11-29+$451,609= $62,982,626
- Mod P000482017-11-30-$82,129= $62,900,497
- Mod P000512017-11-30+$24,520= $62,925,017
- Mod P000462017-12-08+$0= $62,925,017
- Mod P000492017-12-12+$278,192= $63,203,209
- Mod P000502018-01-05+$68,000= $63,271,209
- Mod P000472018-01-10+$52,000= $63,323,209
- Mod P000532018-01-10+$1,151= $63,324,360
- Mod P000562018-01-12+$76,110= $63,400,470
- Mod P000542018-01-18+$29,213= $63,429,683
- Mod P000522018-01-22+$2,106= $63,431,789
- Mod P000552018-01-23+$53,000= $63,484,789
- Mod P000572018-01-24-$30,000= $63,454,789
- Mod P000582018-01-25+$5,873= $63,460,662
- Mod P000592018-02-07-$29,720= $63,430,942
- Mod P000622018-03-05+$30,000= $63,460,942
- Mod P000632018-03-05+$9,300= $63,470,242
- Mod P000652018-03-09+$18,840= $63,489,082
- Mod P000602018-03-13+$120,000= $63,609,082
- Mod P000642018-03-14+$29,510= $63,638,592
- Mod P000612018-03-20+$50,552= $63,689,144
- Mod P000662018-04-12+$25,368= $63,714,512
- Mod P000682018-04-16+$23,190= $63,737,702
- Mod P000692018-04-25+$2,009= $63,739,711
- Mod P000702018-05-04+$294,412= $64,034,123
- Mod P000722018-05-18+$15,000= $64,049,123
- Mod P000732018-05-21+$0= $64,049,123
- Mod P000742018-05-22+$2,434= $64,051,557
- Mod P000752018-06-01+$49,219= $64,100,776
- Mod P000802018-06-08+$13,889= $64,114,665
- Mod P000762018-06-12+$2,167= $64,116,832
- Mod P000772018-06-12+$1,474,477= $65,591,309
- Mod P000812018-06-13+$79,644= $65,670,953
- Mod P000822018-06-15+$26,912= $65,697,865
- Mod P000782018-06-19+$2,235= $65,700,100
- Mod P000832018-06-20+$58,743= $65,758,843
- Mod P000842018-06-21+$42,892= $65,801,735
- Mod P000852018-07-16+$8,690= $65,810,425
- Mod P000792018-07-23+$230,000= $66,040,425
- Mod A000862018-07-24+$25,757= $66,066,182
- Mod A000882018-07-24+$16,170= $66,082,352
- Mod A000872018-07-25+$1,280= $66,083,632
- Mod A000912018-07-25+$2,000= $66,085,632
- Mod A000892018-07-26+$21,500= $66,107,132
- Mod A000922018-08-09+$43,765= $66,150,897
- Mod A000932018-08-13+$0= $66,150,897
- Mod A000942018-09-17+$45,000= $66,195,897
- Mod A000952018-09-21+$4,000= $66,199,897
- Mod A000962018-09-25+$9,133= $66,209,030
- Mod P000862018-12-07+$18,456= $66,227,486
- Mod A000972018-12-12+$40,314= $66,267,800
- Mod A000982018-12-12+$24,283= $66,292,083
- Mod A000992019-01-11+$96,355= $66,388,438
- Mod A001002019-01-29-$8,580= $66,379,858
- Mod A001012019-01-30+$5,311= $66,385,169
- Mod A001022019-03-07+$6,260= $66,391,429
- Mod A001042019-03-07+$13,930= $66,405,359
- Mod A001032019-03-12+$24,000= $66,429,359
- Mod P000892019-03-28+$82,950= $66,512,309
- Mod A001052019-04-08+$7,670= $66,519,979
- Mod A001062019-04-09+$7,000= $66,526,979
- Mod A001072019-04-11+$2,505= $66,529,484
- Mod P000882019-05-01+$190,000= $66,719,484
- Mod A001092019-05-03+$6,500= $66,725,984
- Mod A001082019-05-13+$21,666= $66,747,650
- Mod P000902019-05-17+$90,689= $66,838,339
- Mod A001102019-07-05+$4,156= $66,842,495
- Mod A001112019-07-12+$23,299= $66,865,794
- Mod A001122019-07-17+$2,754= $66,868,548
- Mod A001132019-07-22+$1,937= $66,870,485
- Mod A001142019-07-22+$36,855= $66,907,340
- Mod A001152019-07-22+$3,207= $66,910,547
- Mod A001162019-07-23+$33,746= $66,944,293
- Mod A001172019-07-25+$4,001= $66,948,294
- Mod A001182019-07-25+$40,115= $66,988,409
- Mod A001192019-07-26+$6,696= $66,995,105
- Mod A001202019-07-26+$5,930= $67,001,035
- Mod A001212019-07-26+$22,635= $67,023,670
- Mod A001222019-08-26+$53,121= $67,076,791
- Mod A001232019-09-03+$81,636= $67,158,427
- Mod A001242019-09-03+$37,253= $67,195,680
- Mod A001252019-09-11+$4,686= $67,200,366
- Mod A001262019-09-14+$5,050= $67,205,416
- Mod A001272019-09-14+$9,788= $67,215,204
- Mod A001282019-09-20+$42,743= $67,257,947
- Mod A001292019-10-01+$8,100= $67,266,047
- Mod A001302019-10-08+$3,405= $67,269,452
- Mod A001312019-10-09+$15,324= $67,284,776
- Mod A001342019-11-19+$20,000= $67,304,776
- Mod A001352019-11-20+$26,502= $67,331,278
- Mod A001362019-11-20+$1,043= $67,332,321
- Mod A001372019-11-20+$967= $67,333,288
- Mod A001392019-11-21+$3,804= $67,337,092
- Mod A001402019-11-26+$3,360= $67,340,452
- Mod P001332019-11-26+$130,352= $67,470,804
- Mod P001382019-12-03+$32,677= $67,503,481
- Mod P001432019-12-26+$0= $67,503,481
- Mod A001442020-01-14+$14,473= $67,517,954
- Mod A001412020-01-22+$18,146= $67,536,100
- Mod A001452020-01-22+$2,525= $67,538,625
- Mod A001462020-01-22+$2,486= $67,541,111
- Mod A001472020-01-23+$20,000= $67,561,111
- Mod A001502020-01-24+$9,000= $67,570,111
- Mod P001482020-01-28+$0= $67,570,111
- Mod A001492020-02-11+$953= $67,571,064
- Mod A001512020-02-17+$52,908= $67,623,972
- Mod A001522020-02-17+$44,190= $67,668,162
- Mod A001542020-02-26+$6,029= $67,674,191
- Mod A001552020-02-28+$44,251= $67,718,442
- Mod P001532020-02-28+$0= $67,718,442
- Mod A001562020-03-02+$29,383= $67,747,825
- Mod A001572020-03-03+$12,019= $67,759,844
- Mod A001582020-03-11+$1,050= $67,760,894
- Mod A001592020-03-27+$58,733= $67,819,627
- Mod P001612020-03-30+$0= $67,819,627
- Mod A001602020-04-02+$9,058= $67,828,685
- Mod A001622020-04-07+$16,776= $67,845,461
- Mod A001632020-04-13+$1,500= $67,846,961
- Mod A001642020-04-21+$9,472= $67,856,433
- Mod P001652020-04-29+$0= $67,856,433
- Mod P001662020-05-07+$0= $67,856,433
- Mod A001672020-05-08+$2,133= $67,858,566
- Mod P001692020-05-28+$0= $67,858,566
- Mod A001682020-05-29+$9,935= $67,868,501
- Mod A001712020-06-02+$44,190= $67,912,691
- Mod A001702020-06-04+$10,000= $67,922,691
- Mod A001732020-06-17+$19,687= $67,942,378
- Mod A001762020-06-19+$1,600= $67,943,978
- Mod A001722020-06-20+$7,501= $67,951,479
- Mod A001752020-06-22+$3,488= $67,954,967
- Mod P001772020-06-26+$0= $67,954,967
- Mod A001782020-07-14+$14,447= $67,969,414
- Mod A001792020-07-14+$40,000= $68,009,414
- Mod A001802020-07-22+$10,132= $68,019,546
- Mod A001812020-07-22+$10,984= $68,030,530
- Mod A001822020-08-11+$7,602= $68,038,132
- Mod A001832020-08-11+$3,756= $68,041,888
- Mod A001842020-08-11+$44,031= $68,085,919
- Mod A001742020-08-18+$8,466= $68,094,385
- Mod A001862020-09-02-$30,012= $68,064,373
- Mod A001872020-09-02+$20,254= $68,084,627
- Mod A001882020-09-02+$44,190= $68,128,817
- Mod P001852020-09-04+$0= $68,128,817
- Mod A001892020-10-05+$5,013= $68,133,830
- Mod P001912020-10-30+$164,391= $68,298,221
- Mod A001902020-11-02+$8,846= $68,307,067
- Mod A001922020-11-02+$3,676= $68,310,743
- Mod A001932020-11-12+$32,000= $68,342,743
- Mod A001942020-11-13+$8,188= $68,350,931
- Mod A001972020-12-03-$8,816= $68,342,115
- Mod A001982020-12-14+$4,028= $68,346,143
- Mod A001992020-12-14+$15,085= $68,361,228
- Mod A002002020-12-15+$27,345= $68,388,573
- Mod A002012020-12-16+$9,048= $68,397,621
- Mod A002022020-12-18+$41,887= $68,439,508
- Mod A002032021-01-13+$88,500= $68,528,008
- Mod A002062021-01-13+$15,085= $68,543,093
- Mod A002072021-01-21+$16,125= $68,559,218
- Mod P002052021-01-21+$30,000= $68,589,218
- Mod A001962021-01-22+$35,000= $68,624,218
- Mod A002082021-02-18+$7,033= $68,631,251
- Mod A002102021-02-18+$4,506= $68,635,757
- Mod A002092021-02-23+$1,809= $68,637,566
- Mod A002142021-02-23+$5,141= $68,642,707
- Mod A002152021-02-23+$6,545= $68,649,252
- Mod A002112021-03-08+$6,549= $68,655,801
- Mod P002172021-03-16+$9,700= $68,665,501
- Mod A002202021-03-29+$3,233= $68,668,734
- Mod P002192021-03-30+$0= $68,668,734
- Mod A002122021-04-28+$836= $68,669,570
- Mod A002132021-04-28+$35,284= $68,704,854
- Mod A002232021-05-06+$700= $68,705,554
- Mod A002252021-05-12+$1,205= $68,706,759
- Mod A002262021-05-14+$289= $68,707,048
- Mod A002272021-05-14+$1,500= $68,708,548
- Mod A002222021-05-19+$2,443= $68,710,991
- Mod A002242021-05-19+$25,000= $68,735,991
- Mod A002282021-05-19+$62,454= $68,798,445
- Mod A002292021-05-24+$13,589= $68,812,034
- Mod A002312021-06-04+$3,000= $68,815,034
- Mod A002302021-06-08+$6,100= $68,821,134
- Mod A002322021-06-21+$5,078= $68,826,212
- Mod A002182021-07-19-$3,486= $68,822,726
- Mod A002332021-07-20+$1,500= $68,824,226
- Mod A002342021-08-17+$4,680= $68,828,906
- Mod A002362021-08-23+$20,321= $68,849,227
- Mod A002402021-08-30+$1,500= $68,850,727
- Mod A002412021-08-31+$7,000= $68,857,727
- Mod A002352021-09-07+$58,594= $68,916,321
- Mod A002372021-09-16+$8,000= $68,924,321
- Mod A002432021-09-20+$3,500= $68,927,821
- Mod A002442021-09-22+$20,000= $68,947,821
- Mod A002382021-09-24+$6,816= $68,954,637
- Mod A002392021-09-24+$49,560= $69,004,197
- Mod A002452021-09-24+$1,210= $69,005,407
- Mod A002422021-09-28+$1,748= $69,007,155
- Mod A002472021-11-15+$12,488= $69,019,643
- Mod A002482021-11-16+$14,003= $69,033,646
- Mod A002492021-11-30+$7,497= $69,041,143
- Mod A002502021-12-17+$3,000= $69,044,143
- Mod A002512021-12-23+$13,000= $69,057,143
- Mod A002522021-12-23+$17,000= $69,074,143
- Mod A002462022-02-08+$0= $69,074,143
- Mod A002532022-02-08+$15,640= $69,089,783
- Mod A002542022-02-08+$60,663= $69,150,446
- Mod A002552022-02-10+$7,381= $69,157,827
- Mod A002562022-02-24+$8,665= $69,166,492
- Mod A002572022-02-24+$2,231= $69,168,723
- Mod A002622022-03-15+$3,000= $69,171,723
- Mod A002632022-03-16+$10,000= $69,181,723
- Mod A002592022-03-18+$6,307= $69,188,030
- Mod A002602022-03-18+$5,957= $69,193,987
- Mod A002662022-04-28+$14,411= $69,208,398
- Mod A002692022-05-01+$4,308= $69,212,706
- Mod A002672022-05-02+$2,644= $69,215,350
- Mod A002652022-05-11+$4,221= $69,219,571
- Mod A002722022-05-25+$12,000= $69,231,571
- Mod A002732022-05-27+$3,091= $69,234,662
- Mod A002742022-05-31+$1,846= $69,236,508
- Mod A002752022-06-13+$7,000= $69,243,508
- Mod A002772022-06-28+$68,001= $69,311,509
- Mod A002762022-06-29+$21,843= $69,333,352
- Mod A002792022-06-29+$3,444= $69,336,796
- Mod A002802022-06-29+$2,350= $69,339,146
- Mod A002782022-06-30+$28,552= $69,367,698
- Mod A002812022-06-30+$500= $69,368,198
- Mod A002822022-08-05+$2,537= $69,370,735
- Mod A002832022-08-05+$2,209= $69,372,944
- Mod A002842022-08-05+$90,000= $69,462,944
- Mod A002862022-08-11+$3,222= $69,466,166
- Mod A002852022-08-15+$9,237= $69,475,403
- Mod A002702022-08-16+$889= $69,476,292
- Mod A002712022-08-17+$5,822= $69,482,114
- Mod A002892022-08-30+$4,326= $69,486,440
- Mod A002872022-09-06+$5,056= $69,491,496
- Mod A002902022-09-06+$24,000= $69,515,496
- Mod A002882022-09-09+$3,046= $69,518,542
- Mod A002912022-09-26+$42,000= $69,560,542
- Mod A002942022-10-14+$3,000= $69,563,542
- Mod A002922022-11-02+$17,340= $69,580,882
- Mod A002952022-11-08+$976= $69,581,858
- Mod A002962022-11-10+$1,244= $69,583,102
- Mod A002992022-11-10+$2,837= $69,585,939
- Mod A003002022-11-18+$30,000= $69,615,939
- Mod A003022022-11-25+$3,823= $69,619,762
- Mod A003032022-12-13+$959= $69,620,721
- Mod A002972023-02-02+$1,024= $69,621,745
- Mod A003052023-02-02+$2,100= $69,623,845
- Mod A003082023-02-14+$20,500= $69,644,345
- Mod A003092023-03-13+$8,500= $69,652,845
- Mod A003112023-03-31+$17,194= $69,670,039
- Mod A003122023-04-14+$3,400= $69,673,439
- Mod A003132023-04-21+$3,800= $69,677,239
- Mod A003142023-05-03+$72,119= $69,749,358
- Mod A003152023-05-17+$39,600= $69,788,958
- Mod A003162023-05-31+$9,400= $69,798,358
- Mod A003202023-08-29+$66,951= $69,865,309
- Mod A003172023-09-05+$23,000= $69,888,309
- Mod P003232023-09-19+$1,600,000= $71,488,309
- Mod P003262023-09-19+$3,060,330= $74,548,639
- Mod A003222023-09-22+$2,570= $74,551,209
- Mod A003212023-09-25+$9,130= $74,560,339
- Mod A003252023-10-26+$5,000= $74,565,339
- Mod A003272023-10-26+$12,697= $74,578,036
- Mod P003242023-11-02+$17,311,949= $91,889,985
- Mod A003282023-12-18+$8,470= $91,898,455
- Mod A003292024-01-02+$0= $91,898,455
- Mod A003352024-03-06+$39,892= $91,938,347
- Mod A003312024-04-01+$9,864= $91,948,211
- Mod A003322024-04-02+$5,397= $91,953,608
- Mod A003362024-04-10+$64,939= $92,018,547
- Mod A003392024-04-12+$121,861= $92,140,408
- Mod A003372024-04-18+$118,890= $92,259,298
- Mod A003382024-04-24+$20,000= $92,279,298
- Mod P003342024-04-30+$0= $92,279,298
- Mod A003402024-05-21+$46,268= $92,325,566
- Mod A003412024-06-26+$20,326= $92,345,892
- Mod A003422024-06-26+$111,624= $92,457,516
- Mod P003442024-08-28+$0= $92,457,516
- Mod A003432024-09-05+$213,479= $92,670,995
- Mod P003452024-09-16+$4,975,000= $97,645,995
- Mod P003012024-09-17+$0= $97,645,995
- Mod P003192024-09-17+$0= $97,645,995
- Mod A003462024-09-18+$25,054= $97,671,049
- Mod A003472024-09-30+$50,868= $97,721,917
- Mod A003492024-11-15+$72,829= $97,794,746
- Mod A003512024-12-16+$115,000= $97,909,746
- Mod A003502024-12-31+$42,597= $97,952,343
- Mod A003522025-02-27+$24,789= $97,977,132
- Mod A003532025-05-13+$13,658= $97,990,790
- Mod A003542025-06-06+$85,930= $98,076,720
- Mod A003552025-06-09+$17,751= $98,094,471
- Mod A003572025-08-11+$30,903= $98,125,374
- Mod A003482025-09-26+$34,485= $98,159,859
- Mod A003562025-09-29+$46,061= $98,205,920
- Mod A003582025-10-28+$229,625= $98,435,545
- Mod A003602025-10-29+$28,495= $98,464,040
- Mod A003622025-11-07+$138,328= $98,602,368
- Mod A003612025-11-13+$124,159= $98,726,527
- Mod P003592025-11-13+$588,790= $99,315,317
- Mod P003652025-11-13+$40,033= $99,355,350
- Mod A003632025-11-14+$87,417= $99,442,767
- Mod P003682026-01-05+$6,019,825= $105,462,592
- Mod A003642026-01-23+$101,389= $105,563,981
- Mod P003662026-02-02+$228,326= $105,792,307
- Mod A003672026-02-06+$212,176= $106,004,483
- Mod A003692026-04-20+$210,966= $106,215,449
- Mod P003702026-06-16+$1,099,939= $107,315,389
- Mod P003712026-06-17+$12,880,235= $120,195,624
- Mod A003722026-06-23+$39,516= $120,235,140
- Mod P003732026-06-24+$23,208= $120,258,348
- Mod A003742026-07-07+$156,295= $120,414,643
- Mod A003752026-08-18+$79,495= $120,494,138
- Mod P003762026-09-02+$6,507,283= $127,001,421
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2015-12-30 | +$58,274,929 | $58,274,929 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00002· CHANGE ORDER | 2016-08-19 | +$0 | $58,274,929 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00001· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED) | 2016-08-24 | +$21,998 | $58,296,927 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-24 | −$28,566 | $58,268,361 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00004· CHANGE ORDER | 2016-09-07 | +$55,819 | $58,324,180 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00005· CHANGE ORDER | 2016-09-14 | +$4,500 | $58,328,680 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P0009· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-10 | +$6,334 | $58,335,014 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-21 | +$13,717 | $58,348,731 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00007· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-21 | +$24,654 | $58,373,385 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-21 | +$17,208 | $58,390,593 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00010· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-12-02 | +$13,042 | $58,403,635 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00011· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-12-02 | +$5,000 | $58,408,635 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00012· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-12-23 | +$119,665 | $58,528,300 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00013· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-01-04 | +$107,432 | $58,635,732 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00015· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-02-06 | +$5,953 | $58,641,685 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00014· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-02-15 | −$10,206 | $58,631,479 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00016· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-02-23 | +$3,800 | $58,635,279 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00017· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-02-24 | −$13,660 | $58,621,619 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00018· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-03-10 | −$181,368 | $58,440,251 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00021· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-03-10 | +$0 | $58,440,251 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00019· OTHER ADMINISTRATIVE ACTION | 2017-04-05 | +$2,096,198 | $60,536,449 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod A00221· CHANGE ORDER | 2017-04-07 | +$1,000 | $60,537,449 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod P00022· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-05-05 | +$0 | $60,537,449 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00023· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-05-05 | +$12,000 | $60,549,449 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00024· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-05-05 | +$46,500 | $60,595,949 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00028· DEFINITIZE CHANGE ORDER | 2017-05-11 | +$60,000 | $60,655,949 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00031· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-06-09 | +$2,600 | $60,658,549 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00025· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-06-14 | +$0 | $60,658,549 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00030· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-06-14 | +$1,413,939 | $62,072,488 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00033· CHANGE ORDER | 2017-06-21 | +$99,000 | $62,171,488 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00029· CHANGE ORDER | 2017-06-25 | +$5,582 | $62,177,070 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00032· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-06-29 | −$249,978 | $61,927,092 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00034· CHANGE ORDER | 2017-07-08 | +$6,213 | $61,933,305 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00037· CHANGE ORDER | 2017-07-10 | +$42,689 | $61,975,994 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00035· CHANGE ORDER | 2017-07-14 | +$46,138 | $62,022,132 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00036· CHANGE ORDER | 2017-07-21 | −$12,510 | $62,009,622 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00038· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-08-16 | +$3,884 | $62,013,506 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00039· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-08-16 | +$981 | $62,014,487 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00040· CHANGE ORDER | 2017-08-18 | +$2,139 | $62,016,626 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00041· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-08-22 | +$300,000 | $62,316,626 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00042· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-08-23 | +$136,391 | $62,453,017 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00043· CHANGE ORDER | 2017-08-28 | +$10,000 | $62,463,017 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00044· CHANGE ORDER | 2017-08-28 | +$68,000 | $62,531,017 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00045· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-11-29 | +$451,609 | $62,982,626 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00048· CHANGE ORDER | 2017-11-30 | −$82,129 | $62,900,497 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00051· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-11-30 | +$24,520 | $62,925,017 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00046· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-12-08 | +$0 | $62,925,017 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00049· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-12-12 | +$278,192 | $63,203,209 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00050· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-01-05 | +$68,000 | $63,271,209 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00047· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-01-10 | +$52,000 | $63,323,209 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00053· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-01-10 | +$1,151 | $63,324,360 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00056· CHANGE ORDER | 2018-01-12 | +$76,110 | $63,400,470 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00054· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-01-18 | +$29,213 | $63,429,683 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00052· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-01-22 | +$2,106 | $63,431,789 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00055· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-01-23 | +$53,000 | $63,484,789 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00057· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-01-24 | −$30,000 | $63,454,789 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00058· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-01-25 | +$5,873 | $63,460,662 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00059· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-02-07 | −$29,720 | $63,430,942 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00062· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-03-05 | +$30,000 | $63,460,942 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00063· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-03-05 | +$9,300 | $63,470,242 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00065· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-03-09 | +$18,840 | $63,489,082 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00060· DEFINITIZE CHANGE ORDER | 2018-03-13 | +$120,000 | $63,609,082 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00064· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-03-14 | +$29,510 | $63,638,592 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00061· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-03-20 | +$50,552 | $63,689,144 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00066· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-04-12 | +$25,368 | $63,714,512 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00068· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-04-16 | +$23,190 | $63,737,702 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00069· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-04-25 | +$2,009 | $63,739,711 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00070· CHANGE ORDER | 2018-05-04 | +$294,412 | $64,034,123 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00072· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-05-18 | +$15,000 | $64,049,123 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00073· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-05-21 | +$0 | $64,049,123 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00074· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-05-22 | +$2,434 | $64,051,557 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00075· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-06-01 | +$49,219 | $64,100,776 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00080· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-06-08 | +$13,889 | $64,114,665 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00076· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-06-12 | +$2,167 | $64,116,832 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00077· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-06-12 | +$1,474,477 | $65,591,309 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00081· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-06-13 | +$79,644 | $65,670,953 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00082· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-06-15 | +$26,912 | $65,697,865 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00078· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-06-19 | +$2,235 | $65,700,100 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00083· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-06-20 | +$58,743 | $65,758,843 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00084· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-06-21 | +$42,892 | $65,801,735 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00085· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-07-16 | +$8,690 | $65,810,425 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod P00079· CHANGE ORDER | 2018-07-23 | +$230,000 | $66,040,425 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod A00086· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-07-24 | +$25,757 | $66,066,182 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod A00088· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-07-24 | +$16,170 | $66,082,352 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00087· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-07-25 | +$1,280 | $66,083,632 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod A00091· CHANGE ORDER | 2018-07-25 | +$2,000 | $66,085,632 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod A00089· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-07-26 | +$21,500 | $66,107,132 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod A00092· CHANGE ORDER | 2018-08-09 | +$43,765 | $66,150,897 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod A00093· CHANGE ORDER | 2018-08-13 | +$0 | $66,150,897 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod A00094· CHANGE ORDER | 2018-09-17 | +$45,000 | $66,195,897 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00095· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-09-21 | +$4,000 | $66,199,897 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod A00096· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-09-25 | +$9,133 | $66,209,030 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod P00086· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-12-07 | +$18,456 | $66,227,486 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod A00097· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-12-12 | +$40,314 | $66,267,800 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod A00098· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-12-12 | +$24,283 | $66,292,083 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod A00099· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-01-11 | +$96,355 | $66,388,438 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod A00100· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-01-29 | −$8,580 | $66,379,858 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod A00101· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-01-30 | +$5,311 | $66,385,169 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod A00102· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-03-07 | +$6,260 | $66,391,429 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod A00104· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-03-07 | +$13,930 | $66,405,359 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod A00103· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-03-12 | +$24,000 | $66,429,359 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod P00089· DEFINITIZE CHANGE ORDER | 2019-03-28 | +$82,950 | $66,512,309 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod A00105· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-04-08 | +$7,670 | $66,519,979 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod A00106· CHANGE ORDER | 2019-04-09 | +$7,000 | $66,526,979 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod A00107· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-04-11 | +$2,505 | $66,529,484 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod P00088· CHANGE ORDER | 2019-05-01 | +$190,000 | $66,719,484 | IGF::OT::IGF CONSTRUCTION SERVICES |
| Mod A00109· CHANGE ORDER | 2019-05-03 | +$6,500 | $66,725,984 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod A00108· CHANGE ORDER | 2019-05-13 | +$21,666 | $66,747,650 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod P00090· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-05-17 | +$90,689 | $66,838,339 | CONSTRUCTION |
| Mod A00110· CHANGE ORDER | 2019-07-05 | +$4,156 | $66,842,495 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod A00111· CHANGE ORDER | 2019-07-12 | +$23,299 | $66,865,794 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod A00112· CHANGE ORDER | 2019-07-17 | +$2,754 | $66,868,548 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod A00113· CHANGE ORDER | 2019-07-22 | +$1,937 | $66,870,485 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod A00114· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-07-22 | +$36,855 | $66,907,340 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod A00115· CHANGE ORDER | 2019-07-22 | +$3,207 | $66,910,547 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod A00116· CHANGE ORDER | 2019-07-23 | +$33,746 | $66,944,293 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod A00117· CHANGE ORDER | 2019-07-25 | +$4,001 | $66,948,294 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod A00118· CHANGE ORDER | 2019-07-25 | +$40,115 | $66,988,409 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod A00119· CHANGE ORDER | 2019-07-26 | +$6,696 | $66,995,105 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod A00120· CHANGE ORDER | 2019-07-26 | +$5,930 | $67,001,035 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod A00121· CHANGE ORDER | 2019-07-26 | +$22,635 | $67,023,670 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod A00122· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-08-26 | +$53,121 | $67,076,791 | PHASE 3 SEISMIC CORRECTION RENOVATIONS AT VAMC SAN JUAN PR ADMINISTRATIVE CONTRACT MODIFICATION |
| Mod A00123· CHANGE ORDER | 2019-09-03 | +$81,636 | $67,158,427 | CONSTRUCTION SERVICES |
| Mod A00124· CHANGE ORDER | 2019-09-03 | +$37,253 | $67,195,680 | CONSTRUCTION SERVICES |
| Mod A00125· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-09-11 | +$4,686 | $67,200,366 | CONSTRUCTION SERVICES |
| Mod A00126· CHANGE ORDER | 2019-09-14 | +$5,050 | $67,205,416 | CONSTRUCTION SERVICES |
| Mod A00127· CHANGE ORDER | 2019-09-14 | +$9,788 | $67,215,204 | CONSTRUCTION SERVICES |
| Mod A00128· CHANGE ORDER | 2019-09-20 | +$42,743 | $67,257,947 | CONSTRUCTION SERVICES |
| Mod A00129· CHANGE ORDER | 2019-10-01 | +$8,100 | $67,266,047 | CONSTRUCTION SERVICES |
| Mod A00130· CHANGE ORDER | 2019-10-08 | +$3,405 | $67,269,452 | CONSTRUCTION SERVICES |
| Mod A00131· CHANGE ORDER | 2019-10-09 | +$15,324 | $67,284,776 | CONSTRUCTION SERVICES |
| Mod A00134· CHANGE ORDER | 2019-11-19 | +$20,000 | $67,304,776 | CONSTRUCTION SERVICES |
| Mod A00135· CHANGE ORDER | 2019-11-20 | +$26,502 | $67,331,278 | CONSTRUCTION SERVICES |
| Mod A00136· CHANGE ORDER | 2019-11-20 | +$1,043 | $67,332,321 | CONSTRUCTION SERVICES |
| Mod A00137· CHANGE ORDER | 2019-11-20 | +$967 | $67,333,288 | CONSTRUCTION SERVICES |
| Mod A00139· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-11-21 | +$3,804 | $67,337,092 | CONSTRUCTION SERVICES |
| Mod A00140· CHANGE ORDER | 2019-11-26 | +$3,360 | $67,340,452 | CONSTRUCTION SERVICES |
| Mod P00133· CHANGE ORDER | 2019-11-26 | +$130,352 | $67,470,804 | IGF.OT.GF |
| Mod P00138· CHANGE ORDER | 2019-12-03 | +$32,677 | $67,503,481 | CONSTRUCTION.IG.IG.IG |
| Mod P00143· CHANGE ORDER | 2019-12-26 | +$0 | $67,503,481 | CONSTRUCTION.IG.IG.IG |
| Mod A00144· CHANGE ORDER | 2020-01-14 | +$14,473 | $67,517,954 | CONSTRUCTION SERVICES |
| Mod A00141· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-01-22 | +$18,146 | $67,536,100 | CONSTRUCTION SERVICES |
| Mod A00145· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-01-22 | +$2,525 | $67,538,625 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00146· CHANGE ORDER | 2020-01-22 | +$2,486 | $67,541,111 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00147· CHANGE ORDER | 2020-01-23 | +$20,000 | $67,561,111 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00150· CHANGE ORDER | 2020-01-24 | +$9,000 | $67,570,111 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod P00148· CHANGE ORDER | 2020-01-28 | +$0 | $67,570,111 | CONSTRUCTION.IG.IG.IG |
| Mod A00149· CHANGE ORDER | 2020-02-11 | +$953 | $67,571,064 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00151· CHANGE ORDER | 2020-02-17 | +$52,908 | $67,623,972 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod A00152· CHANGE ORDER | 2020-02-17 | +$44,190 | $67,668,162 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod A00154· CHANGE ORDER | 2020-02-26 | +$6,029 | $67,674,191 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod A00155· CHANGE ORDER | 2020-02-28 | +$44,251 | $67,718,442 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod P00153· CHANGE ORDER | 2020-02-28 | +$0 | $67,718,442 | CONSTRUCTION.IG.IG.IG |
| Mod A00156· CHANGE ORDER | 2020-03-02 | +$29,383 | $67,747,825 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod A00157· CHANGE ORDER | 2020-03-03 | +$12,019 | $67,759,844 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod A00158· CHANGE ORDER | 2020-03-11 | +$1,050 | $67,760,894 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod A00159· CHANGE ORDER | 2020-03-27 | +$58,733 | $67,819,627 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod P00161· CHANGE ORDER | 2020-03-30 | +$0 | $67,819,627 | CONSTRUCTION.IG.IG.IG |
| Mod A00160· CHANGE ORDER | 2020-04-02 | +$9,058 | $67,828,685 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod A00162· CHANGE ORDER | 2020-04-07 | +$16,776 | $67,845,461 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00163· CHANGE ORDER | 2020-04-13 | +$1,500 | $67,846,961 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00164· CHANGE ORDER | 2020-04-21 | +$9,472 | $67,856,433 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod P00165· OTHER ADMINISTRATIVE ACTION | 2020-04-29 | +$0 | $67,856,433 | CONSTRUCTION.IG.IG.IG |
| Mod P00166· OTHER ADMINISTRATIVE ACTION | 2020-05-07 | +$0 | $67,856,433 | CONSTRUCTION.IG.IG.IG |
| Mod A00167· CHANGE ORDER | 2020-05-08 | +$2,133 | $67,858,566 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod P00169· CHANGE ORDER | 2020-05-28 | +$0 | $67,858,566 | CONSTRUCTION.IG.IG.IG |
| Mod A00168· CHANGE ORDER | 2020-05-29 | +$9,935 | $67,868,501 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00171· CHANGE ORDER | 2020-06-02 | +$44,190 | $67,912,691 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00170· CHANGE ORDER | 2020-06-04 | +$10,000 | $67,922,691 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00173· CHANGE ORDER | 2020-06-17 | +$19,687 | $67,942,378 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00176· CHANGE ORDER | 2020-06-19 | +$1,600 | $67,943,978 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00172· CHANGE ORDER | 2020-06-20 | +$7,501 | $67,951,479 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00175· CHANGE ORDER | 2020-06-22 | +$3,488 | $67,954,967 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod P00177· OTHER ADMINISTRATIVE ACTION | 2020-06-26 | +$0 | $67,954,967 | CONSTRUCTION.IG.IG.IG |
| Mod A00178· CHANGE ORDER | 2020-07-14 | +$14,447 | $67,969,414 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00179· CHANGE ORDER | 2020-07-14 | +$40,000 | $68,009,414 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00180· CHANGE ORDER | 2020-07-22 | +$10,132 | $68,019,546 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00181· CHANGE ORDER | 2020-07-22 | +$10,984 | $68,030,530 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00182· CHANGE ORDER | 2020-08-11 | +$7,602 | $68,038,132 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00183· CHANGE ORDER | 2020-08-11 | +$3,756 | $68,041,888 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00184· CHANGE ORDER | 2020-08-11 | +$44,031 | $68,085,919 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00174· CHANGE ORDER | 2020-08-18 | +$8,466 | $68,094,385 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00186· CHANGE ORDER | 2020-09-02 | −$30,012 | $68,064,373 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00187· CHANGE ORDER | 2020-09-02 | +$20,254 | $68,084,627 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00188· CHANGE ORDER | 2020-09-02 | +$44,190 | $68,128,817 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod P00185· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-09-04 | +$0 | $68,128,817 | CONSTRUCTION.IG.IG.IG |
| Mod A00189· CHANGE ORDER | 2020-10-05 | +$5,013 | $68,133,830 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod P00191· CHANGE ORDER | 2020-10-30 | +$164,391 | $68,298,221 | CONSTRUCTION.IG.IG.IG |
| Mod A00190· CHANGE ORDER | 2020-11-02 | +$8,846 | $68,307,067 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00192· CHANGE ORDER | 2020-11-02 | +$3,676 | $68,310,743 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00193· CHANGE ORDER | 2020-11-12 | +$32,000 | $68,342,743 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00194· CHANGE ORDER | 2020-11-13 | +$8,188 | $68,350,931 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00197· CHANGE ORDER | 2020-12-03 | −$8,816 | $68,342,115 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00198· CHANGE ORDER | 2020-12-14 | +$4,028 | $68,346,143 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00199· CHANGE ORDER | 2020-12-14 | +$15,085 | $68,361,228 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00200· CHANGE ORDER | 2020-12-15 | +$27,345 | $68,388,573 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00201· CHANGE ORDER | 2020-12-16 | +$9,048 | $68,397,621 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00202· CHANGE ORDER | 2020-12-18 | +$41,887 | $68,439,508 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00203· CHANGE ORDER | 2021-01-13 | +$88,500 | $68,528,008 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00206· CHANGE ORDER | 2021-01-13 | +$15,085 | $68,543,093 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00207· CHANGE ORDER | 2021-01-21 | +$16,125 | $68,559,218 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod P00205· CHANGE ORDER | 2021-01-21 | +$30,000 | $68,589,218 | CONSTRUCTION.IG.IG.IG |
| Mod A00196· CHANGE ORDER | 2021-01-22 | +$35,000 | $68,624,218 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00208· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2021-02-18 | +$7,033 | $68,631,251 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00210· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2021-02-18 | +$4,506 | $68,635,757 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00209· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2021-02-23 | +$1,809 | $68,637,566 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00214· CHANGE ORDER | 2021-02-23 | +$5,141 | $68,642,707 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00215· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2021-02-23 | +$6,545 | $68,649,252 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00211· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2021-03-08 | +$6,549 | $68,655,801 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod P00217· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2021-03-16 | +$9,700 | $68,665,501 | CONSTRUCTION.IG.IG.IG |
| Mod A00220· CHANGE ORDER | 2021-03-29 | +$3,233 | $68,668,734 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod P00219· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2021-03-30 | +$0 | $68,668,734 | CONSTRUCTION.IG.IG.IG |
| Mod A00212· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2021-04-28 | +$836 | $68,669,570 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00213· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2021-04-28 | +$35,284 | $68,704,854 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00223· CHANGE ORDER | 2021-05-06 | +$700 | $68,705,554 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00225· CHANGE ORDER | 2021-05-12 | +$1,205 | $68,706,759 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00226· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2021-05-14 | +$289 | $68,707,048 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00227· CHANGE ORDER | 2021-05-14 | +$1,500 | $68,708,548 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00222· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2021-05-19 | +$2,443 | $68,710,991 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00224· CHANGE ORDER | 2021-05-19 | +$25,000 | $68,735,991 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00228· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2021-05-19 | +$62,454 | $68,798,445 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00229· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2021-05-24 | +$13,589 | $68,812,034 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00231· CHANGE ORDER | 2021-06-04 | +$3,000 | $68,815,034 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00230· CHANGE ORDER | 2021-06-08 | +$6,100 | $68,821,134 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00232· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2021-06-21 | +$5,078 | $68,826,212 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00218· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2021-07-19 | −$3,486 | $68,822,726 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod A00233· CHANGE ORDER | 2021-07-20 | +$1,500 | $68,824,226 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00234· CHANGE ORDER | 2021-08-17 | +$4,680 | $68,828,906 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00236· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2021-08-23 | +$20,321 | $68,849,227 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00240· CHANGE ORDER | 2021-08-30 | +$1,500 | $68,850,727 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00241· CHANGE ORDER | 2021-08-31 | +$7,000 | $68,857,727 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod A00235· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2021-09-07 | +$58,594 | $68,916,321 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod A00237· CHANGE ORDER | 2021-09-16 | +$8,000 | $68,924,321 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod A00243· CHANGE ORDER | 2021-09-20 | +$3,500 | $68,927,821 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00244· CHANGE ORDER | 2021-09-22 | +$20,000 | $68,947,821 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00238· CHANGE ORDER | 2021-09-24 | +$6,816 | $68,954,637 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod A00239· DEFINITIZE CHANGE ORDER | 2021-09-24 | +$49,560 | $69,004,197 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod A00245· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2021-09-24 | +$1,210 | $69,005,407 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00242· DEFINITIZE CHANGE ORDER | 2021-09-28 | +$1,748 | $69,007,155 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00247· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2021-11-15 | +$12,488 | $69,019,643 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod A00248· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2021-11-16 | +$14,003 | $69,033,646 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00249· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2021-11-30 | +$7,497 | $69,041,143 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00250· CHANGE ORDER | 2021-12-17 | +$3,000 | $69,044,143 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00251· CHANGE ORDER | 2021-12-23 | +$13,000 | $69,057,143 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00252· CHANGE ORDER | 2021-12-23 | +$17,000 | $69,074,143 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00246· DEFINITIZE CHANGE ORDER | 2022-02-08 | +$0 | $69,074,143 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00253· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2022-02-08 | +$15,640 | $69,089,783 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod A00254· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2022-02-08 | +$60,663 | $69,150,446 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod A00255· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2022-02-10 | +$7,381 | $69,157,827 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00256· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2022-02-24 | +$8,665 | $69,166,492 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00257· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2022-02-24 | +$2,231 | $69,168,723 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00262· CHANGE ORDER | 2022-03-15 | +$3,000 | $69,171,723 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00263· CHANGE ORDER | 2022-03-16 | +$10,000 | $69,181,723 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00259· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2022-03-18 | +$6,307 | $69,188,030 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00260· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2022-03-18 | +$5,957 | $69,193,987 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00266· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2022-04-28 | +$14,411 | $69,208,398 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod A00269· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2022-05-01 | +$4,308 | $69,212,706 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00267· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2022-05-02 | +$2,644 | $69,215,350 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod A00265· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2022-05-11 | +$4,221 | $69,219,571 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION. |
| Mod A00272· CHANGE ORDER | 2022-05-25 | +$12,000 | $69,231,571 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00273· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2022-05-27 | +$3,091 | $69,234,662 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00274· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2022-05-31 | +$1,846 | $69,236,508 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00275· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2022-06-13 | +$7,000 | $69,243,508 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00277· CHANGE ORDER | 2022-06-28 | +$68,001 | $69,311,509 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00276· CHANGE ORDER | 2022-06-29 | +$21,843 | $69,333,352 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00279· CHANGE ORDER | 2022-06-29 | +$3,444 | $69,336,796 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00280· CHANGE ORDER | 2022-06-29 | +$2,350 | $69,339,146 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00278· CHANGE ORDER | 2022-06-30 | +$28,552 | $69,367,698 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00281· CHANGE ORDER | 2022-06-30 | +$500 | $69,368,198 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00282· CHANGE ORDER | 2022-08-05 | +$2,537 | $69,370,735 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00283· CHANGE ORDER | 2022-08-05 | +$2,209 | $69,372,944 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00284· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2022-08-05 | +$90,000 | $69,462,944 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00286· CHANGE ORDER | 2022-08-11 | +$3,222 | $69,466,166 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00285· CHANGE ORDER | 2022-08-15 | +$9,237 | $69,475,403 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00270· CHANGE ORDER | 2022-08-16 | +$889 | $69,476,292 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00271· CHANGE ORDER | 2022-08-17 | +$5,822 | $69,482,114 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00289· CHANGE ORDER | 2022-08-30 | +$4,326 | $69,486,440 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00287· CHANGE ORDER | 2022-09-06 | +$5,056 | $69,491,496 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00290· CHANGE ORDER | 2022-09-06 | +$24,000 | $69,515,496 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00288· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2022-09-09 | +$3,046 | $69,518,542 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00291· CHANGE ORDER | 2022-09-26 | +$42,000 | $69,560,542 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00294· CHANGE ORDER | 2022-10-14 | +$3,000 | $69,563,542 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00292· CHANGE ORDER | 2022-11-02 | +$17,340 | $69,580,882 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00295· CHANGE ORDER | 2022-11-08 | +$976 | $69,581,858 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00296· CHANGE ORDER | 2022-11-10 | +$1,244 | $69,583,102 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00299· CHANGE ORDER | 2022-11-10 | +$2,837 | $69,585,939 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00300· CHANGE ORDER | 2022-11-18 | +$30,000 | $69,615,939 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00302· CHANGE ORDER | 2022-11-25 | +$3,823 | $69,619,762 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00303· CHANGE ORDER | 2022-12-13 | +$959 | $69,620,721 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00297· CHANGE ORDER | 2023-02-02 | +$1,024 | $69,621,745 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00305· CHANGE ORDER | 2023-02-02 | +$2,100 | $69,623,845 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00308· CHANGE ORDER | 2023-02-14 | +$20,500 | $69,644,345 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00309· CHANGE ORDER | 2023-03-13 | +$8,500 | $69,652,845 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00311· CHANGE ORDER | 2023-03-31 | +$17,194 | $69,670,039 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00312· CHANGE ORDER | 2023-04-14 | +$3,400 | $69,673,439 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00313· CHANGE ORDER | 2023-04-21 | +$3,800 | $69,677,239 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00314· CHANGE ORDER | 2023-05-03 | +$72,119 | $69,749,358 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00315· CHANGE ORDER | 2023-05-17 | +$39,600 | $69,788,958 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00316· CHANGE ORDER | 2023-05-31 | +$9,400 | $69,798,358 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00320· CHANGE ORDER | 2023-08-29 | +$66,951 | $69,865,309 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00317· CHANGE ORDER | 2023-09-05 | +$23,000 | $69,888,309 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod P00323· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2023-09-19 | +$1,600,000 | $71,488,309 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod P00326· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2023-09-19 | +$3,060,330 | $74,548,639 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00322· CHANGE ORDER | 2023-09-22 | +$2,570 | $74,551,209 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00321· CHANGE ORDER | 2023-09-25 | +$9,130 | $74,560,339 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00325· CHANGE ORDER | 2023-10-26 | +$5,000 | $74,565,339 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00327· CHANGE ORDER | 2023-10-26 | +$12,697 | $74,578,036 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod P00324· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2023-11-02 | +$17,311,949 | $91,889,985 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00328· CHANGE ORDER | 2023-12-18 | +$8,470 | $91,898,455 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00329· CHANGE ORDER | 2024-01-02 | +$0 | $91,898,455 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00335· FUNDING ONLY ACTION | 2024-03-06 | +$39,892 | $91,938,347 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00331· CHANGE ORDER | 2024-04-01 | +$9,864 | $91,948,211 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00332· CHANGE ORDER | 2024-04-02 | +$5,397 | $91,953,608 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00336· CHANGE ORDER | 2024-04-10 | +$64,939 | $92,018,547 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00339· CHANGE ORDER | 2024-04-12 | +$121,861 | $92,140,408 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00337· CHANGE ORDER | 2024-04-18 | +$118,890 | $92,259,298 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00338· CHANGE ORDER | 2024-04-24 | +$20,000 | $92,279,298 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod P00334· CHANGE ORDER | 2024-04-30 | +$0 | $92,279,298 | VAMC SAN JUAN PR PHASE THREE SEISMIC CORRECTION RENOVATIONS PROJECT. THE VA IS ISSUING THIS UNILATERAL MODIFIC… |
| Mod A00340· CHANGE ORDER | 2024-05-21 | +$46,268 | $92,325,566 | VAMC SAN JUAN PR PHASE THREE SEISMIC CORRECTION RENOVATIONS PROJECT. THE VA IS ISSUING THIS UNILATERAL MODIFIC… |
| Mod A00341· CHANGE ORDER | 2024-06-26 | +$20,326 | $92,345,892 | VAMC SAN JUAN PR PHASE THREE SEISMIC CORRECTION RENOVATIONS PROJECT. THE VA IS ISSUING THIS UNILATERAL MODIFIC… |
| Mod A00342· CHANGE ORDER | 2024-06-26 | +$111,624 | $92,457,516 | VAMC SAN JUAN PR PHASE THREE SEISMIC CORRECTION RENOVATIONS PROJECT. THE VA IS ISSUING THIS UNILATERAL MODIFIC… |
| Mod P00344· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2024-08-28 | +$0 | $92,457,516 | VAMC SAN JUAN PR PHASE THREE SEISMIC CORRECTION RENOVATIONS PROJECT. THE VA IS ISSUING THIS UNILATERAL MODIFIC… |
| Mod A00343· CHANGE ORDER | 2024-09-05 | +$213,479 | $92,670,995 | VAMC SAN JUAN PR PHASE THREE SEISMIC CORRECTION RENOVATIONS PROJECT. THE VA IS ISSUING THIS UNILATERAL MODIFIC… |
| Mod P00345· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2024-09-16 | +$4,975,000 | $97,645,995 | VAMC SAN JUAN PR PHASE THREE SEISMIC CORRECTION RENOVATIONS PROJECT. THE VA IS ISSUING THIS UNILATERAL MODIFIC… |
| Mod P00301· CHANGE ORDER | 2024-09-17 | +$0 | $97,645,995 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod P00319· CHANGE ORDER | 2024-09-17 | +$0 | $97,645,995 | VAMC SAN JUAN PR PHASE 3 SEISMIC CORRECTION RENOVATIONS PROJECT ADMINISTRATIVE MODIFICATION |
| Mod A00346· CHANGE ORDER | 2024-09-18 | +$25,054 | $97,671,049 | VAMC SAN JUAN PR PHASE THREE SEISMIC CORRECTION RENOVATIONS PROJECT. THE VA IS ISSUING THIS UNILATERAL MODIFIC… |
| Mod A00347· CHANGE ORDER | 2024-09-30 | +$50,868 | $97,721,917 | VAMC SAN JUAN PR PHASE THREE SEISMIC CORRECTION RENOVATIONS PROJECT. THE VA IS ISSUING THIS UNILATERAL MODIFIC… |
| Mod A00349· CHANGE ORDER | 2024-11-15 | +$72,829 | $97,794,746 | VAMC SAN JUAN PR PHASE THREE SEISMIC CORRECTION RENOVATIONS PROJECT. THE VA IS ISSUING THIS UNILATERAL MODIFIC… |
| Mod A00351· CHANGE ORDER | 2024-12-16 | +$115,000 | $97,909,746 | VAMC SAN JUAN PR PHASE THREE SEISMIC CORRECTION RENOVATIONS PROJECT. THE VA IS ISSUING THIS UNILATERAL MODIFIC… |
| Mod A00350· CHANGE ORDER | 2024-12-31 | +$42,597 | $97,952,343 | VAMC SAN JUAN PR PHASE THREE SEISMIC CORRECTION RENOVATIONS PROJECT. THE VA IS ISSUING THIS UNILATERAL MODIFIC… |
| Mod A00352· CHANGE ORDER | 2025-02-27 | +$24,789 | $97,977,132 | VAMC SAN JUAN PR PHASE THREE SEISMIC CORRECTION RENOVATIONS PROJECT. THE VA IS ISSUING THIS UNILATERAL MODIFIC… |
| Mod A00353· CHANGE ORDER | 2025-05-13 | +$13,658 | $97,990,790 | VAMC SAN JUAN PR PHASE THREE SEISMIC CORRECTION RENOVATIONS PROJECT. THE VA IS ISSUING THIS UNILATERAL MODIFIC… |
| Mod A00354· CHANGE ORDER | 2025-06-06 | +$85,930 | $98,076,720 | VAMC SAN JUAN PR PHASE THREE SEISMIC CORRECTION RENOVATIONS PROJECT. THE VA IS ISSUING THIS UNILATERAL MODIFIC… |
| Mod A00355· CHANGE ORDER | 2025-06-09 | +$17,751 | $98,094,471 | VAMC SAN JUAN PR PHASE THREE SEISMIC CORRECTION RENOVATIONS PROJECT. THE VA IS ISSUING THIS UNILATERAL MODIFIC… |
| Mod A00357· CHANGE ORDER | 2025-08-11 | +$30,903 | $98,125,374 | VAMC SAN JUAN PR PHASE THREE SEISMIC CORRECTION RENOVATIONS PROJECT. THE VA IS ISSUING THIS UNILATERAL MODIFIC… |
| Mod A00348· CHANGE ORDER | 2025-09-26 | +$34,485 | $98,159,859 | VAMC SAN JUAN PR PHASE THREE SEISMIC CORRECTION RENOVATIONS PROJECT. THE VA IS ISSUING THIS UNILATERAL MODIFIC… |
| Mod A00356· CHANGE ORDER | 2025-09-29 | +$46,061 | $98,205,920 | VAMC SAN JUAN PR PHASE THREE SEISMIC CORRECTION RENOVATIONS PROJECT. THE VA IS ISSUING THIS UNILATERAL MODIFIC… |
| Mod A00358· CHANGE ORDER | 2025-10-28 | +$229,625 | $98,435,545 | VAMC SAN JUAN PR PHASE THREE SEISMIC CORRECTION RENOVATIONS PROJECT. THE VA IS ISSUING THIS UNILATERAL MODIFIC… |
| Mod A00360· CHANGE ORDER | 2025-10-29 | +$28,495 | $98,464,040 | VAMC SAN JUAN PR PHASE THREE SEISMIC CORRECTION RENOVATIONS PROJECT. THE VA IS ISSUING THIS UNILATERAL MODIFIC… |
| Mod A00362· CHANGE ORDER | 2025-11-07 | +$138,328 | $98,602,368 | VAMC SAN JUAN PR PHASE THREE SEISMIC CORRECTION RENOVATIONS PROJECT. THE VA IS ISSUING THIS UNILATERAL MODIFIC… |
| Mod A00361· CHANGE ORDER | 2025-11-13 | +$124,159 | $98,726,527 | VAMC SAN JUAN PR PHASE THREE SEISMIC CORRECTION RENOVATIONS PROJECT. THE VA IS ISSUING THIS UNILATERAL MODIFIC… |
| Mod P00359· CHANGE ORDER | 2025-11-13 | +$588,790 | $99,315,317 | VAMC SAN JUAN PR PHASE THREE SEISMIC CORRECTION RENOVATIONS PROJECT. THE VA IS ISSUING THIS UNILATERAL MODIFIC… |
| Mod P00365· CHANGE ORDER | 2025-11-13 | +$40,033 | $99,355,350 | VAMC SAN JUAN PR PHASE THREE SEISMIC CORRECTION RENOVATIONS PROJECT. THE VA IS ISSUING THIS UNILATERAL MODIFIC… |
| Mod A00363· CHANGE ORDER | 2025-11-14 | +$87,417 | $99,442,767 | VAMC SAN JUAN PR PHASE THREE SEISMIC CORRECTION RENOVATIONS PROJECT. THE VA IS ISSUING THIS UNILATERAL MODIFIC… |
| Mod P00368· CHANGE ORDER | 2026-01-05 | +$6,019,825 | $105,462,592 | VAMC SAN JUAN PR PHASE THREE SEISMIC CORRECTION RENOVATIONS PROJECT. THE VA IS ISSUING THIS UNILATERAL MODIFIC… |
| Mod A00364· CHANGE ORDER | 2026-01-23 | +$101,389 | $105,563,981 | TO COMPENSATE THE CONTRACTOR FOR THE WORK REQUIRED UNDER CORS 221, 226, 235 R2, 290-B, & 299B. |
| Mod P00366· CHANGE ORDER | 2026-02-02 | +$228,326 | $105,792,307 | CHANGE ORDER CORS 262 REV. 2, 300, 303, 320, 324, 325, 327, 340 R1, 350, 351 R1, 370 REV. 3, 374 R1, 376, 379… |
| Mod A00367· CHANGE ORDER | 2026-02-06 | +$212,176 | $106,004,483 | VAMC SAN JUAN PR PHASE THREE SEISMIC CORRECTION RENOVATIONS PROJECT. THE VA IS ISSUING THIS UNILATERAL MODIFIC… |
| Mod A00369· CHANGE ORDER | 2026-04-20 | +$210,966 | $106,215,449 | CORS 274, 282 REV-A 3, 339 REV 1, 349 REV 1, 377, 384, 385, 388, 390, 392, 394, 395, 397 |
| Mod P00370· CHANGE ORDER | 2026-06-16 | +$1,099,939 | $107,315,389 | VAMC SAN JUAN PR PHASE THREE SEISMIC CORRECTION RENOVATIONS PROJECT. THE VA IS ISSUING THIS BILATERAL MODIFICA… |
| Mod P00371· CHANGE ORDER | 2026-06-17 | +$12,880,235 | $120,195,624 | VAMC SAN JUAN PR PHASE THREE SEISMIC CORRECTION RENOVATIONS PROJECT. THE VA IS ISSUING THIS BILATERAL MODIFICA… |
| Mod A00372· CHANGE ORDER | 2026-06-23 | +$39,516 | $120,235,140 | ADJUSTMENT FOR VARIOUS CORS (PROPOSALS) |
| Mod P00373· CHANGE ORDER | 2026-06-24 | +$23,208 | $120,258,348 | VAMC SAN JUAN PR PHASE THREE SEISMIC CORRECTION RENOVATIONS PROJECT. THE VA IS ISSUING THIS UNILATERAL MODIFIC… |
| Mod A00374· CHANGE ORDER | 2026-07-07 | +$156,295 | $120,414,643 | VARIOUS CORS ADJUSTMENT |
| Mod A00375· CHANGE ORDER | 2026-08-18 | +$79,495 | $120,494,138 | TO COMPENSATE THE CONTRACTOR FOR ADDITIONAL WORK REQUIRED UNDER CORS 362, 364, 382, 383, 408, AND 409. |
| Mod P00376· CHANGE ORDER | 2026-09-02 | +$6,507,283 | $127,001,421 | COR 400 |
Related awards · 5
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other recipients under Y1DA from OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| 36C10F26C0014 | PROJECT MANAGEMENT SOLUTIONS LLC | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | $2,229,000 | FY2026 |
| 36C10F26C0013 | V&C GENERAL CONTRACTOR LLC | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | $2,518,650 | FY2026 |
| 36C10F23C0007 | WALSH CONSTRUCTION COMPANY II, LLC | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | $215,172,226 | FY2023 |
| 36C10F23N0064 | SSPC LLC | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | $421,407 | FY2023 |
| 36C10F23C0003 | DAV ENERGY SOLUTIONS, INC. | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | $175,181 | FY2023 |