Description
IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. BOND PREMIUM ADJUSTMENT
Base award description: RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. IGF::CT::IGF
Modification chain · 60 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2014-08-21+$9,294,857= $9,294,857
- Mod P000012015-02-24+$37,709= $9,332,566
- Mod P000022015-03-26+$27,567= $9,360,133
- Mod P000032015-03-30+$6,580= $9,366,713
- Mod P000042015-04-08+$0= $9,366,713
- Mod P000052015-04-23+$0= $9,366,713
- Mod P000062015-05-21+$397,893= $9,764,606
- Mod P000072015-07-15+$22,829= $9,787,435
- Mod P000082015-07-23+$0= $9,787,435
- Mod P000092015-08-12+$179,670= $9,967,105
- Mod P000102015-08-12+$89,807= $10,056,912
- Mod P000112015-08-12+$3,891= $10,060,803
- Mod P000122015-08-28+$2,897= $10,063,700
- Mod P000152015-09-25+$6,836= $10,070,536
- Mod P000142015-10-23+$1,287= $10,071,823
- Mod P000132015-11-04+$485,040= $10,556,863
- Mod P000162015-11-20+$8,031= $10,564,894
- Mod P000172015-11-20+$5,587= $10,570,481
- Mod P000202016-01-15+$22,111= $10,592,592
- Mod P000182016-01-18+$0= $10,592,592
- Mod P000192016-01-18+$13,868= $10,606,460
- Mod P000222016-02-10+$3,363= $10,609,823
- Mod P000212016-02-29+$5,292= $10,615,115
- Mod P000232016-03-03+$1,884= $10,616,999
- Mod P000242016-03-11+$2,564= $10,619,563
- Mod P000252016-04-04+$2,335= $10,621,898
- Mod P000262016-04-19+$3,292= $10,625,190
- Mod P000272016-04-26+$8,800= $10,633,990
- Mod P000282016-06-30+$7,842= $10,641,831
- Mod P000292016-07-15+$5,927= $10,647,758
- Mod P000302016-08-05+$27,704= $10,675,463
- Mod P000342016-08-24+$2,713= $10,678,176
- Mod P000322016-08-31+$2,642= $10,680,818
- Mod P000312016-09-27+$65,778= $10,746,596
- Mod P000332016-10-11+$21,468= $10,768,064
- Mod P000372016-11-14-$10,411= $10,757,653
- Mod P000352016-11-16+$14,134= $10,771,787
- Mod P000362016-11-16+$2,673= $10,774,460
- Mod P000382016-11-16+$5,644= $10,780,104
- Mod P000392016-11-16+$5,555= $10,785,659
- Mod P000402016-11-30+$7,107= $10,792,766
- Mod P000412016-12-07+$5,269= $10,798,035
- Mod P000432016-12-13+$968= $10,799,003
- Mod P000422016-12-22+$0= $10,799,003
- Mod P000442017-02-28+$6,215= $10,805,218
- Mod P000452017-03-06+$3,969= $10,809,187
- Mod P000462017-03-06+$16,570= $10,825,758
- Mod P000492017-03-20+$0= $10,825,758
- Mod P000502017-03-20+$0= $10,825,758
- Mod P000472017-03-21+$21,520= $10,847,277
- Mod P000522017-04-07+$888= $10,848,165
- Mod P000512017-04-10+$6,000= $10,854,165
- Mod P000532017-05-25+$2,903= $10,857,068
- Mod P000542017-05-25+$2,510= $10,859,578
- Mod P000482017-06-14+$80,184= $10,939,762
- Mod P000552017-06-29+$1,966= $10,941,729
- Mod P000562017-06-29+$0= $10,941,729
- Mod P000572017-06-29+$1,662= $10,943,391
- Mod P000582017-07-20+$17,647= $10,961,038
- Mod P000592017-07-28+$9,570= $10,970,607
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2014-08-21 | +$9,294,857 | $9,294,857 | RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. IGF::CT::IGF |
| Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-02-24 | +$37,709 | $9,332,566 | MODIFY CONTRACT TO SUPPLY A DOUBLE WIDE RE OFFICE TRAILER IN LIEU OF A SINGLE WIDE. PROVIDE ALL UTILITIES, CLE… |
| Mod P00002· CHANGE ORDER | 2015-03-26 | +$27,567 | $9,360,133 | REMOVE ADDITIONAL UNFORESEEN ASBESTOS FLOORING. THE CONTRACT VALUE IS INCREASED BY $27,567.00. IGF::CT::IGF |
| Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-03-30 | +$6,580 | $9,366,713 | ABATE UNFORESEEN LEAD TILE WITHIN STAFF BATHROOMS. IGF::CT::IGF |
| Mod P00004· CHANGE ORDER | 2015-04-08 | +$0 | $9,366,713 | RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. IGF::CT::IGF CHANGE COMPLETION DATE FROM 3/7/2017… |
| Mod P00005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-04-23 | +$0 | $9,366,713 | RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. IGF::CT::IGF |
| Mod P00006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-05-21 | +$397,893 | $9,764,606 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. IGF::CT::IGF CHANGE VC TO CC FOR PAT… |
| Mod P00007· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-07-15 | +$22,829 | $9,787,435 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. COST ASSOCIATED WITH P0004 FOR DELAY |
| Mod P00008· OTHER ADMINISTRATIVE ACTION | 2015-07-23 | +$0 | $9,787,435 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. FUNDING LINE CHANGE FROM .25 TO .13. |
| Mod P00009· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-08-12 | +$179,670 | $9,967,105 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. IGF::CT::IGF PROCUREMENT OF HEADWALL… |
| Mod P00010· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-08-12 | +$89,807 | $10,056,912 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. IGF::CT::IGF UPGRADE FLUORESCENT TO… |
| Mod P00011· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-08-12 | +$3,891 | $10,060,803 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. IGF::CT::IGF INSTALL TELECOM CONDUIT… |
| Mod P00012· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-08-28 | +$2,897 | $10,063,700 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. IGF::CT::IGF INSTALL AIR BARRIER ON… |
| Mod P00015· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-25 | +$6,836 | $10,070,536 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. IGF::CT::IGF LED OVER BED LIGHTS |
| Mod P00014· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-23 | +$1,287 | $10,071,823 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. IGF::CT::IGF UNFORESEEN STEAM PIPE… |
| Mod P00013· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-04 | +$485,040 | $10,556,863 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. IGF::CT::IGF CHANGE VC TO CC FOR P… |
| Mod P00016· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-20 | +$8,031 | $10,564,894 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. IGF::CT::IGF ADDITIONAL HALLWAY CI… |
| Mod P00017· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-20 | +$5,587 | $10,570,481 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. IGF::CT::IGF INSTALL SHEET FLOORIN… |
| Mod P00020· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-15 | +$22,111 | $10,592,592 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. IGF::CT::IGF PLUMBING CORRECTIONS |
| Mod P00018· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-18 | +$0 | $10,592,592 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. IGF::CT::IGF TIME EXTENSION FOR LO… |
| Mod P00019· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-18 | +$13,868 | $10,606,460 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. IGF::CT::IGF HEADWALL LIGHTING AND… |
| Mod P00022· CHANGE ORDER | 2016-02-10 | +$3,363 | $10,609,823 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. IGF::CT::IGF STERILIZE WATER AND C… |
| Mod P00021· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-02-29 | +$5,292 | $10,615,115 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. IGF::CT::IGF INTERSTITIAL RAMPS |
| Mod P00023· CHANGE ORDER | 2016-03-03 | +$1,884 | $10,616,999 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. IGF::CT::IGF ADD NURSE CALL DOME L… |
| Mod P00024· CHANGE ORDER | 2016-03-11 | +$2,564 | $10,619,563 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. IGF::CT::IGF COMMS CLOSET OUTLETS… |
| Mod P00025· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-04 | +$2,335 | $10,621,898 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. IGF::CT::IGF PROVIDE SURGE PROTECT… |
| Mod P00026· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-19 | +$3,292 | $10,625,190 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. IGF::CT::IGF PNEUMATIC TUBE, MATV… |
| Mod P00027· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-26 | +$8,800 | $10,633,990 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. SHOWER CURTAIN MAGNETS |
| Mod P00028· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-30 | +$7,842 | $10,641,831 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. IGF::CT::IGF HEADWALL LIGHTING AND… |
| Mod P00029· CHANGE ORDER | 2016-07-15 | +$5,927 | $10,647,758 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. ADDITIONAL DRYWALL AND SEALING ABOV… |
| Mod P00030· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-05 | +$27,704 | $10,675,463 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. UNFORESEEN LEAD REMOVAL |
| Mod P00034· CHANGE ORDER | 2016-08-24 | +$2,713 | $10,678,176 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. UNFORESEEN FLOORING REMOVAL AND REM… |
| Mod P00032· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-31 | +$2,642 | $10,680,818 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. CAULK INTERIOR JOINT ON PRECAST PAN… |
| Mod P00031· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-27 | +$65,778 | $10,746,596 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. |
| Mod P00033· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-11 | +$21,468 | $10,768,064 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. 4 FUNCTION PATIENT LIFT MOTORS |
| Mod P00037· CHANGE ORDER | 2016-11-14 | −$10,411 | $10,757,653 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. MECHANICAL CONFLICTS AND TRANSFER D… |
| Mod P00035· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-16 | +$14,134 | $10,771,787 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. EXTERIOR WINDOW ENVELOPE CAULK |
| Mod P00036· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-16 | +$2,673 | $10,774,460 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. LIGHTNING PROTECTION ON EXHAUST FAN |
| Mod P00038· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-16 | +$5,644 | $10,780,104 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. 4 FUNCTION PATIENT LIFT MOTORS |
| Mod P00039· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-16 | +$5,555 | $10,785,659 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. REPLACE DOMESTIC COPPER MAIN |
| Mod P00040· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-11-30 | +$7,107 | $10,792,766 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. MEDBOX AND PIXIS REFRIGERATOR CONDU… |
| Mod P00041· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-12-07 | +$5,269 | $10,798,035 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. DIALYSIS MACHINE CONNECTIONS |
| Mod P00043· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-12-13 | +$968 | $10,799,003 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. MOD VILLAGE SECURITY LOCK |
| Mod P00042· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-12-22 | +$0 | $10,799,003 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. TIME EXTENSION FOR UNFORESEEN LEAD… |
| Mod P00044· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-02-28 | +$6,215 | $10,805,218 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. TILE AT WATER FOUNTAIN PER URC |
| Mod P00045· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-03-06 | +$3,969 | $10,809,187 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. INSTALL DATA CABLE FOR VA/VA MEDICI… |
| Mod P00046· DEFINITIZE CHANGE ORDER | 2017-03-06 | +$16,570 | $10,825,758 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. DEFINITIZE P00037 MECH DUCT RECONCI… |
| Mod P00049· DEFINITIZE CHANGE ORDER | 2017-03-20 | +$0 | $10,825,758 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. DEFINITIZE P00022, P00024&P00029 |
| Mod P00050· DEFINITIZE CHANGE ORDER | 2017-03-20 | +$0 | $10,825,758 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. DEFINITIZE P00015 |
| Mod P00047· DEFINITIZE CHANGE ORDER | 2017-03-21 | +$21,520 | $10,847,277 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. DEFINITIZE P00034 AND ADDITIONAL FL… |
| Mod P00052· DEFINITIZE CHANGE ORDER | 2017-04-07 | +$888 | $10,848,165 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. DEFINITIZE P00023 NURSE CALL DOME L… |
| Mod P00051· CHANGE ORDER | 2017-04-10 | +$6,000 | $10,854,165 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. P00051 CLEAN AHU |
| Mod P00053· DEFINITIZE CHANGE ORDER | 2017-05-25 | +$2,903 | $10,857,068 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. DEFINITIZE P00051 AHU CLEANUP |
| Mod P00054· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-05-25 | +$2,510 | $10,859,578 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. INSTALL MISC DRYWALL |
| Mod P00048· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-06-14 | +$80,184 | $10,939,762 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. MHA FIRE ALARM ADDITIONS |
| Mod P00055· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-06-29 | +$1,966 | $10,941,729 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. FLUSH SCALD GUARDS |
| Mod P00056· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-06-29 | +$0 | $10,941,729 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. BATHROOM TILE TE |
| Mod P00057· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-06-29 | +$1,662 | $10,943,391 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. MISC CAULKING |
| Mod P00058· CHANGE ORDER | 2017-07-20 | +$17,647 | $10,961,038 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. EARLY NTP COSTS AND BATHROOM TILE R… |
| Mod P00059· CHANGE ORDER | 2017-07-28 | +$9,570 | $10,970,607 | IGF::CT::IGF RENOVATION OF WARDS 3D AND 5D BAY PINES, VAMC BAY PINES, FL. BOND PREMIUM ADJUSTMENT |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI WRV2FR811M24)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C24626C0053 | 246-NETWORK CONTRACTING OFFICE 6 (36C246) · Z2DA · REPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES | $3,786,379 | FY2026 |
| 36C77626C0071 | PCAC (36C776) · Y1DZ · CONSTRUCTION OF OTHER HOSPITAL BUILDINGS | $19,850,316 | FY2026 |
| 36C24826C0027 | 248-NETWORK CONTRACT OFFICE 8 (36C248) · J045 · MAINT/REPAIR/REBUILD OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT | $754,544 | FY2026 |
| 36C25626C0046 | 256-NETWORK CONTRACT OFFICE 16 (36C256) · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES | $30,995,241 | FY2026 |
| 36C24626P0608 | 246-NETWORK CONTRACTING OFFICE 6 (36C246) · J045 · MAINT/REPAIR/REBUILD OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT | $497,299 | FY2026 |
| 36C24826N0357 | 248-NETWORK CONTRACT OFFICE 8 (36C248) · Z1DA · MAINTENANCE OF HOSPITALS AND INFIRMARIES | $382,745 | FY2026 |
Other recipients under Y1DA from OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| 36C10F26C0014 | PROJECT MANAGEMENT SOLUTIONS LLC | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | $2,229,000 | FY2026 |
| 36C10F26C0013 | V&C GENERAL CONTRACTOR LLC | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | $2,518,650 | FY2026 |
| 36C10F23C0007 | WALSH CONSTRUCTION COMPANY II, LLC | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | $215,172,226 | FY2023 |
| 36C10F23N0064 | SSPC LLC | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | $421,407 | FY2023 |
| 36C10F23C0003 | DAV ENERGY SOLUTIONS, INC. | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | $175,181 | FY2023 |