Award recordCONTRACT

HALBERT CONSTRUCTION COMPANY, INC.

PIID VA101F13C0092· VA Staff Offices· OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)· Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES· FY2013· $18,984,832 net obligations· UEI JUHDFA8S7NU8· CA

Description

IGF::OT::IGF FINAL DEOBLIGATION OF EXCESS FUNDS.

Base award description: IGF::OT::IGF LAS VEGAS EMERGENCY DEPARTMENT EXPANSION

First action · last action
2013-09-30 · 2018-01-18
Transactions
147
First transaction's obligation
$16,047,572
Base + all options value (sum of deltas)
$18,984,832
Extent competed
FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
Other than full & open authority
—
Set-aside
SERVICE DISABLED VETERAN OWNED SMALL BUSINESS SET-ASIDE
Offers received
3
SDVOSB flag on record
Yes (self-representation)
NAICS
236220 · COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION

Modification chain · 147 transactions

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$19,172,255$0Base award · 2013-09-30 · this action $16,047,572 · running total $16,047,572Modification P00001 · 2014-02-13 · this action $2,000 · running total $16,049,572Modification P00002 · 2014-02-21 · this action $45,000 · running total $16,094,572Modification P00003 · 2014-03-14 · this action $7,000 · running total $16,101,572Modification P00004 · 2014-03-24 · this action $5,486 · running total $16,107,058Modification P00005 · 2014-04-07 · this action $35,000 · running total $16,142,058Modification P00006 · 2014-04-10 · this action $0 · running total $16,142,058Modification P00008 · 2014-04-28 · this action $90,000 · running total $16,232,058Modification P00009 · 2014-05-01 · this action $11,232 · running total $16,243,290Modification P00010 · 2014-05-01 · this action $13,000 · running total $16,256,290Modification P00013 · 2014-05-16 · this action $10,823 · running total $16,267,113Modification P00012 · 2014-05-23 · this action $45,000 · running total $16,312,113Modification P00014 · 2014-05-28 · this action $4,500 · running total $16,316,613Modification P00015 · 2014-05-30 · this action $0 · running total $16,316,613Modification P00016 · 2014-05-30 · this action $6,000 · running total $16,322,613Modification P00017 · 2014-06-11 · this action $30,000 · running total $16,352,613Modification P00018 · 2014-07-07 · this action $1,293 · running total $16,353,906Modification P00019 · 2014-07-09 · this action $30,000 · running total $16,383,906Modification P00011 · 2014-07-23 · this action -$807 · running total $16,383,099Modification P00020 · 2014-08-21 · this action $66,000 · running total $16,449,099Modification P00021 · 2014-08-21 · this action $99,999 · running total $16,549,098Modification P00022 · 2014-09-05 · this action $48,000 · running total $16,597,098Modification P00023 · 2014-09-18 · this action $57,674 · running total $16,654,772Modification P00024 · 2014-09-24 · this action $1,500 · running total $16,656,272Modification P00025 · 2014-09-26 · this action $40,000 · running total $16,696,272Modification P00026 · 2014-09-30 · this action $14,757 · running total $16,711,029Modification P00028 · 2014-10-21 · this action $14,000 · running total $16,725,029Modification P00029 · 2014-10-30 · this action $55,000 · running total $16,780,029Modification P00030 · 2014-11-25 · this action $40,899 · running total $16,820,927Modification P00031 · 2014-11-26 · this action $60,000 · running total $16,880,927Modification P00027 · 2014-12-04 · this action $137,767 · running total $17,018,694Modification P00032 · 2014-12-08 · this action $5,000 · running total $17,023,694Modification P00033 · 2014-12-09 · this action $1,198 · running total $17,024,892Modification P00035 · 2015-01-07 · this action $71,960 · running total $17,096,852Modification P00036 · 2015-01-15 · this action $0 · running total $17,096,852Modification P00037 · 2015-01-16 · this action $55,000 · running total $17,151,852Modification P00038 · 2015-01-20 · this action $3,500 · running total $17,155,352Modification P00040 · 2015-02-02 · this action $2,558 · running total $17,157,910Modification P00041 · 2015-02-02 · this action $25,000 · running total $17,182,910Modification P00042 · 2015-02-04 · this action $12,000 · running total $17,194,910Modification P00043 · 2015-02-05 · this action $0 · running total $17,194,910Modification P00044 · 2015-02-11 · this action $6,200 · running total $17,201,110Modification P00045 · 2015-02-11 · this action $75,000 · running total $17,276,110Modification P00034 · 2015-02-19 · this action $91,800 · running total $17,367,910Modification P00047 · 2015-02-20 · this action $35,000 · running total $17,402,910Modification P00049 · 2015-02-24 · this action $84,972 · running total $17,487,882Modification P00046 · 2015-02-27 · this action $5,193 · running total $17,493,075Modification P00039 · 2015-03-04 · this action $3,580 · running total $17,496,655Modification P00050 · 2015-03-04 · this action $2,600 · running total $17,499,255Modification P00048 · 2015-03-10 · this action $30,000 · running total $17,529,255Modification P00051 · 2015-03-11 · this action $65,000 · running total $17,594,255Modification P00052 · 2015-03-31 · this action $16,000 · running total $17,610,255Modification P00053 · 2015-04-02 · this action $20,000 · running total $17,630,255Modification P00054 · 2015-04-03 · this action $0 · running total $17,630,255Modification P00055 · 2015-04-08 · this action $1,790 · running total $17,632,045Modification P00057 · 2015-04-10 · this action $3,000 · running total $17,635,045Modification P00058 · 2015-04-17 · this action $26,521 · running total $17,661,566Modification P00059 · 2015-04-21 · this action $5,000 · running total $17,666,566Modification P00060 · 2015-04-24 · this action $11,000 · running total $17,677,566Modification P00061 · 2015-04-24 · this action $15,000 · running total $17,692,566Modification P00062 · 2015-04-28 · this action $30,000 · running total $17,722,566Modification P00063 · 2015-05-01 · this action $2,000 · running total $17,724,566Modification P00064 · 2015-05-05 · this action $5,000 · running total $17,729,566Modification P00065 · 2015-05-07 · this action $17,313 · running total $17,746,879Modification P00066 · 2015-05-15 · this action $44,951 · running total $17,791,830Modification P00068 · 2015-05-15 · this action $12,000 · running total $17,803,830Modification P00067 · 2015-05-18 · this action $11,229 · running total $17,815,059Modification P00069 · 2015-05-18 · this action $30,000 · running total $17,845,059Modification P00070 · 2015-05-29 · this action $29,394 · running total $17,874,453Modification P00071 · 2015-05-29 · this action $65,000 · running total $17,939,453Modification P00074 · 2015-06-03 · this action $10,000 · running total $17,949,453Modification P00075 · 2015-06-04 · this action $5,309 · running total $17,954,762Modification P00073 · 2015-06-08 · this action $5,000 · running total $17,959,762Modification P00076 · 2015-06-09 · this action $14,817 · running total $17,974,579Modification P00077 · 2015-06-09 · this action $8,445 · running total $17,983,024Modification P00078 · 2015-06-10 · this action $50,000 · running total $18,033,024Modification P00080 · 2015-06-17 · this action $7,500 · running total $18,040,524Modification P00072 · 2015-06-19 · this action $16,000 · running total $18,056,524Modification P00079 · 2015-06-21 · this action -$19,049 · running total $18,037,475Modification P00081 · 2015-06-23 · this action $30,000 · running total $18,067,475Modification P00082 · 2015-06-23 · this action $6,442 · running total $18,073,917Modification P00083 · 2015-07-10 · this action $9,355 · running total $18,083,272Modification P00084 · 2015-07-13 · this action $13,292 · running total $18,096,564Modification P00085 · 2015-07-14 · this action -$3,471 · running total $18,093,093Modification P00086 · 2015-07-15 · this action $25,000 · running total $18,118,093Modification P00088 · 2015-07-15 · this action $8,000 · running total $18,126,093Modification P00087 · 2015-07-16 · this action $335 · running total $18,126,428Modification P00090 · 2015-07-16 · this action -$6,368 · running total $18,120,060Modification P00094 · 2015-07-20 · this action $20,000 · running total $18,140,060Modification P00093 · 2015-07-21 · this action $5,000 · running total $18,145,060Modification P00092 · 2015-07-22 · this action -$36,617 · running total $18,108,443Modification P00089 · 2015-07-24 · this action $0 · running total $18,108,443Modification P00095 · 2015-08-01 · this action $18,009 · running total $18,126,452Modification P00097 · 2015-08-14 · this action $25,000 · running total $18,151,452Modification P00098 · 2015-08-17 · this action $1,695 · running total $18,153,147Modification P00099 · 2015-08-19 · this action $24,580 · running total $18,177,727Modification P00100 · 2015-08-20 · this action $1,790 · running total $18,179,517Modification P00101 · 2015-08-27 · this action $15,318 · running total $18,194,835Modification P00102 · 2015-09-01 · this action $45,000 · running total $18,239,835Modification P00103 · 2015-09-01 · this action $4,495 · running total $18,244,330Modification P00104 · 2015-09-02 · this action -$4,653 · running total $18,239,677Modification P00091 · 2015-09-08 · this action $1,748 · running total $18,241,425Modification P00105 · 2015-09-10 · this action $4,000 · running total $18,245,425Modification P00096 · 2015-09-11 · this action $0 · running total $18,245,425Modification P00106 · 2015-09-11 · this action $26,264 · running total $18,271,689Modification P00107 · 2015-09-15 · this action $0 · running total $18,271,689Modification P00108 · 2015-09-17 · this action $0 · running total $18,271,689Modification P00109 · 2015-09-18 · this action $5,000 · running total $18,276,689Modification P00110 · 2015-09-18 · this action $0 · running total $18,276,689Modification P00111 · 2015-09-21 · this action $666 · running total $18,277,355Modification P00112 · 2015-09-25 · this action $8,579 · running total $18,285,934Modification P00114 · 2015-10-06 · this action $16,368 · running total $18,302,302Modification P00115 · 2015-10-07 · this action $4,345 · running total $18,306,647Modification P00116 · 2015-10-19 · this action $13,242 · running total $18,319,889Modification P00117 · 2015-10-23 · this action $34,202 · running total $18,354,091Modification P00119 · 2015-11-04 · this action $40,000 · running total $18,394,091Modification P00118 · 2015-11-06 · this action $14,389 · running total $18,408,480Modification P00120 · 2015-11-12 · this action $0 · running total $18,408,480Modification P00121 · 2015-11-13 · this action $0 · running total $18,408,480Modification P00124 · 2015-11-19 · this action $0 · running total $18,408,480Modification P00056 · 2015-12-04 · this action $40,000 · running total $18,448,480Modification P00125 · 2015-12-08 · this action $3,761 · running total $18,452,241Modification P00126 · 2015-12-09 · this action $13,532 · running total $18,465,773Modification P00127 · 2015-12-11 · this action $2,233 · running total $18,468,006Modification P00128 · 2015-12-22 · this action $4,205 · running total $18,472,211Modification P00130 · 2015-12-28 · this action $30,000 · running total $18,502,211Modification P00129 · 2015-12-31 · this action $0 · running total $18,502,211Modification P00131 · 2016-01-07 · this action $12,928 · running total $18,515,139Modification P00132 · 2016-01-15 · this action $0 · running total $18,515,139Modification P00134 · 2016-01-29 · this action $8,218 · running total $18,523,357Modification P00135 · 2016-01-29 · this action $13,364 · running total $18,536,721Modification P00136 · 2016-01-29 · this action -$11,856 · running total $18,524,865Modification P00137 · 2016-02-02 · this action $0 · running total $18,524,865Modification P00133 · 2016-02-12 · this action $466,746 · running total $18,991,611Modification P00138 · 2016-02-18 · this action -$8,223 · running total $18,983,388Modification P00122 · 2016-05-05 · this action $12,358 · running total $18,995,746Modification P00123 · 2016-05-05 · this action $19,323 · running total $19,015,069Modification P00139 · 2016-06-10 · this action $0 · running total $19,015,069Modification P00140 · 2016-06-10 · this action $0 · running total $19,015,069Modification P00141 · 2016-06-10 · this action $43,073 · running total $19,058,142Modification P00142 · 2016-06-10 · this action $72,091 · running total $19,130,233Modification P00143 · 2016-06-10 · this action $42,022 · running total $19,172,255Modification P00144 · 2016-06-10 · this action -$80,680 · running total $19,091,575Modification P00145 · 2016-06-10 · this action -$63,420 · running total $19,028,155Modification P00146 · 2016-06-28 · this action $15,209 · running total $19,043,364Modification P00147 · 2016-07-07 · this action $0 · running total $19,043,364Modification P00148 · 2018-01-18 · this action -$58,532 · running total $18,984,832
  • Base2013-09-30+$16,047,572= $16,047,572
  • Mod P000012014-02-13+$2,000= $16,049,572
  • Mod P000022014-02-21+$45,000= $16,094,572
  • Mod P000032014-03-14+$7,000= $16,101,572
  • Mod P000042014-03-24+$5,486= $16,107,058
  • Mod P000052014-04-07+$35,000= $16,142,058
  • Mod P000062014-04-10+$0= $16,142,058
  • Mod P000082014-04-28+$90,000= $16,232,058
  • Mod P000092014-05-01+$11,232= $16,243,290
  • Mod P000102014-05-01+$13,000= $16,256,290
  • Mod P000132014-05-16+$10,823= $16,267,113
  • Mod P000122014-05-23+$45,000= $16,312,113
  • Mod P000142014-05-28+$4,500= $16,316,613
  • Mod P000152014-05-30+$0= $16,316,613
  • Mod P000162014-05-30+$6,000= $16,322,613
  • Mod P000172014-06-11+$30,000= $16,352,613
  • Mod P000182014-07-07+$1,293= $16,353,906
  • Mod P000192014-07-09+$30,000= $16,383,906
  • Mod P000112014-07-23-$807= $16,383,099
  • Mod P000202014-08-21+$66,000= $16,449,099
  • Mod P000212014-08-21+$99,999= $16,549,098
  • Mod P000222014-09-05+$48,000= $16,597,098
  • Mod P000232014-09-18+$57,674= $16,654,772
  • Mod P000242014-09-24+$1,500= $16,656,272
  • Mod P000252014-09-26+$40,000= $16,696,272
  • Mod P000262014-09-30+$14,757= $16,711,029
  • Mod P000282014-10-21+$14,000= $16,725,029
  • Mod P000292014-10-30+$55,000= $16,780,029
  • Mod P000302014-11-25+$40,899= $16,820,927
  • Mod P000312014-11-26+$60,000= $16,880,927
  • Mod P000272014-12-04+$137,767= $17,018,694
  • Mod P000322014-12-08+$5,000= $17,023,694
  • Mod P000332014-12-09+$1,198= $17,024,892
  • Mod P000352015-01-07+$71,960= $17,096,852
  • Mod P000362015-01-15+$0= $17,096,852
  • Mod P000372015-01-16+$55,000= $17,151,852
  • Mod P000382015-01-20+$3,500= $17,155,352
  • Mod P000402015-02-02+$2,558= $17,157,910
  • Mod P000412015-02-02+$25,000= $17,182,910
  • Mod P000422015-02-04+$12,000= $17,194,910
  • Mod P000432015-02-05+$0= $17,194,910
  • Mod P000442015-02-11+$6,200= $17,201,110
  • Mod P000452015-02-11+$75,000= $17,276,110
  • Mod P000342015-02-19+$91,800= $17,367,910
  • Mod P000472015-02-20+$35,000= $17,402,910
  • Mod P000492015-02-24+$84,972= $17,487,882
  • Mod P000462015-02-27+$5,193= $17,493,075
  • Mod P000392015-03-04+$3,580= $17,496,655
  • Mod P000502015-03-04+$2,600= $17,499,255
  • Mod P000482015-03-10+$30,000= $17,529,255
  • Mod P000512015-03-11+$65,000= $17,594,255
  • Mod P000522015-03-31+$16,000= $17,610,255
  • Mod P000532015-04-02+$20,000= $17,630,255
  • Mod P000542015-04-03+$0= $17,630,255
  • Mod P000552015-04-08+$1,790= $17,632,045
  • Mod P000572015-04-10+$3,000= $17,635,045
  • Mod P000582015-04-17+$26,521= $17,661,566
  • Mod P000592015-04-21+$5,000= $17,666,566
  • Mod P000602015-04-24+$11,000= $17,677,566
  • Mod P000612015-04-24+$15,000= $17,692,566
  • Mod P000622015-04-28+$30,000= $17,722,566
  • Mod P000632015-05-01+$2,000= $17,724,566
  • Mod P000642015-05-05+$5,000= $17,729,566
  • Mod P000652015-05-07+$17,313= $17,746,879
  • Mod P000662015-05-15+$44,951= $17,791,830
  • Mod P000682015-05-15+$12,000= $17,803,830
  • Mod P000672015-05-18+$11,229= $17,815,059
  • Mod P000692015-05-18+$30,000= $17,845,059
  • Mod P000702015-05-29+$29,394= $17,874,453
  • Mod P000712015-05-29+$65,000= $17,939,453
  • Mod P000742015-06-03+$10,000= $17,949,453
  • Mod P000752015-06-04+$5,309= $17,954,762
  • Mod P000732015-06-08+$5,000= $17,959,762
  • Mod P000762015-06-09+$14,817= $17,974,579
  • Mod P000772015-06-09+$8,445= $17,983,024
  • Mod P000782015-06-10+$50,000= $18,033,024
  • Mod P000802015-06-17+$7,500= $18,040,524
  • Mod P000722015-06-19+$16,000= $18,056,524
  • Mod P000792015-06-21-$19,049= $18,037,475
  • Mod P000812015-06-23+$30,000= $18,067,475
  • Mod P000822015-06-23+$6,442= $18,073,917
  • Mod P000832015-07-10+$9,355= $18,083,272
  • Mod P000842015-07-13+$13,292= $18,096,564
  • Mod P000852015-07-14-$3,471= $18,093,093
  • Mod P000862015-07-15+$25,000= $18,118,093
  • Mod P000882015-07-15+$8,000= $18,126,093
  • Mod P000872015-07-16+$335= $18,126,428
  • Mod P000902015-07-16-$6,368= $18,120,060
  • Mod P000942015-07-20+$20,000= $18,140,060
  • Mod P000932015-07-21+$5,000= $18,145,060
  • Mod P000922015-07-22-$36,617= $18,108,443
  • Mod P000892015-07-24+$0= $18,108,443
  • Mod P000952015-08-01+$18,009= $18,126,452
  • Mod P000972015-08-14+$25,000= $18,151,452
  • Mod P000982015-08-17+$1,695= $18,153,147
  • Mod P000992015-08-19+$24,580= $18,177,727
  • Mod P001002015-08-20+$1,790= $18,179,517
  • Mod P001012015-08-27+$15,318= $18,194,835
  • Mod P001022015-09-01+$45,000= $18,239,835
  • Mod P001032015-09-01+$4,495= $18,244,330
  • Mod P001042015-09-02-$4,653= $18,239,677
  • Mod P000912015-09-08+$1,748= $18,241,425
  • Mod P001052015-09-10+$4,000= $18,245,425
  • Mod P000962015-09-11+$0= $18,245,425
  • Mod P001062015-09-11+$26,264= $18,271,689
  • Mod P001072015-09-15+$0= $18,271,689
  • Mod P001082015-09-17+$0= $18,271,689
  • Mod P001092015-09-18+$5,000= $18,276,689
  • Mod P001102015-09-18+$0= $18,276,689
  • Mod P001112015-09-21+$666= $18,277,355
  • Mod P001122015-09-25+$8,579= $18,285,934
  • Mod P001142015-10-06+$16,368= $18,302,302
  • Mod P001152015-10-07+$4,345= $18,306,647
  • Mod P001162015-10-19+$13,242= $18,319,889
  • Mod P001172015-10-23+$34,202= $18,354,091
  • Mod P001192015-11-04+$40,000= $18,394,091
  • Mod P001182015-11-06+$14,389= $18,408,480
  • Mod P001202015-11-12+$0= $18,408,480
  • Mod P001212015-11-13+$0= $18,408,480
  • Mod P001242015-11-19+$0= $18,408,480
  • Mod P000562015-12-04+$40,000= $18,448,480
  • Mod P001252015-12-08+$3,761= $18,452,241
  • Mod P001262015-12-09+$13,532= $18,465,773
  • Mod P001272015-12-11+$2,233= $18,468,006
  • Mod P001282015-12-22+$4,205= $18,472,211
  • Mod P001302015-12-28+$30,000= $18,502,211
  • Mod P001292015-12-31+$0= $18,502,211
  • Mod P001312016-01-07+$12,928= $18,515,139
  • Mod P001322016-01-15+$0= $18,515,139
  • Mod P001342016-01-29+$8,218= $18,523,357
  • Mod P001352016-01-29+$13,364= $18,536,721
  • Mod P001362016-01-29-$11,856= $18,524,865
  • Mod P001372016-02-02+$0= $18,524,865
  • Mod P001332016-02-12+$466,746= $18,991,611
  • Mod P001382016-02-18-$8,223= $18,983,388
  • Mod P001222016-05-05+$12,358= $18,995,746
  • Mod P001232016-05-05+$19,323= $19,015,069
  • Mod P001392016-06-10+$0= $19,015,069
  • Mod P001402016-06-10+$0= $19,015,069
  • Mod P001412016-06-10+$43,073= $19,058,142
  • Mod P001422016-06-10+$72,091= $19,130,233
  • Mod P001432016-06-10+$42,022= $19,172,255
  • Mod P001442016-06-10-$80,680= $19,091,575
  • Mod P001452016-06-10-$63,420= $19,028,155
  • Mod P001462016-06-28+$15,209= $19,043,364
  • Mod P001472016-07-07+$0= $19,043,364
  • Mod P001482018-01-18-$58,532= $18,984,832
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2013-09-30+$16,047,572$16,047,572IGF::OT::IGF LAS VEGAS EMERGENCY DEPARTMENT EXPANSION
Mod P00001· CHANGE ORDER2014-02-13+$2,000$16,049,572IGF::OT::IGF TO PROVIDE AN OPENING IN THE WEST WALL OF ROOM 1D417.
Mod P00002· CHANGE ORDER2014-02-21+$45,000$16,094,572IGF::OT::IGF TO DELETE FIVE FOOTERS, WHICH WERE PREVIOUSLY INSTALLED.
Mod P00003· CHANGE ORDER2014-03-14+$7,000$16,101,572IGF::OT::IGF TO REMOVE DUCT BANK AND BACKFILL.
Mod P00004· CHANGE ORDER2014-03-24+$5,486$16,107,058IGF::OT::IGF TO PURCHASE TRIRIGA LICENSES FOR THE CONTRACTOR.
Mod P00005· CHANGE ORDER2014-04-07+$35,000$16,142,058IGF::OT::IGF EXPOSE CONDUITS FOR CROSSING CONFLICTS ALONG 6" SANITARY REROUTE.
Mod P00006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-04-10+$0$16,142,058IGF::OT::IGF MATERIALS OFF-SITE STORAGE FOR STRUCTURAL STEEL FRAMING.
Mod P00008· CHANGE ORDER2014-04-28+$90,000$16,232,058IGF::OT::IGF TO RELOCATE SANITARY SEWER LINE.
Mod P00009· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-05-01+$11,232$16,243,290IGF::OT::IGF SURVEY EXISTING SANITARY LINES
Mod P00010· CHANGE ORDER2014-05-01+$13,000$16,256,290IGF::OT::IGF TO PROVIDE SHORING AT FIVE PREVIOUSLY INSTALLED FOOTERS.
Mod P00013· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-05-16+$10,823$16,267,113IGF::OT::IGF REPAIR EXISTING MANHOLE AND TWO (2) CLEAN-OUTS.
Mod P00012· CHANGE ORDER2014-05-23+$45,000$16,312,113IGF::OT::IGF SECOND CHANGE ORDER TO RELOCATE SANITARY SEWER LINE. (P00008 FIRST CHANGE ORDER)
Mod P00014· CHANGE ORDER2014-05-28+$4,500$16,316,613IGF::OT::IGF SECOND CHANGE ORDER TO RELOCATE SANITARY SEWER LINE. (P00008 FIRST CHANGE ORDER)
Mod P00015· CHANGE ORDER2014-05-30+$0$16,316,613IGF::OT::IGF SECOND CHANGE ORDER TO RELOCATE SANITARY SEWER LINE. (P00008 FIRST CHANGE ORDER)
Mod P00016· CHANGE ORDER2014-05-30+$6,000$16,322,613IGF::OT::IGF TO TEMPORARILY INSULATE THE EXTERIOR WALL OF THE EXISTING ED.
Mod P00017· CHANGE ORDER2014-06-11+$30,000$16,352,613IGF::OT::IGF TO TIE-IN AN 8" SANITARY LINE AND ADD A DROP INLET AT SOUTH SIDE OF ED EXPANSION
Mod P00018· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-07-07+$1,293$16,353,906IGF::OT::IGF TO RELOCATE STORED PIPE.
Mod P00019· CHANGE ORDER2014-07-09+$30,000$16,383,906IGF::OT::IGF ADDITIONAL WAITING AREA AND ACCESS TO PUBLIC BATHROOMS.
Mod P00011· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-07-23−$807$16,383,099IGF::OT::IGF REMOVE DUCT BANK
Mod P00020· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-08-21+$66,000$16,449,099IGF::OT::IGF TO PROVIDE A HILL-ROM NURSE CALL SYSTEM.
Mod P00021· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-08-21+$99,999$16,549,098IGF::OT::IGF TO PROVIDE GULDMANN PATIENT LIFTS.
Mod P00022· CHANGE ORDER2014-09-05+$48,000$16,597,098IGF::OT::IGF TO COMPLETE THE TEMPORARY WAITING ROOM AND ACCESS TO PUBLIC RESTROOMS.
Mod P00023· CHANGE ORDER2014-09-18+$57,674$16,654,772IGF::OT::IGF TO REVISE THE DOORS AND FRAMES.
Mod P00024· CHANGE ORDER2014-09-24+$1,500$16,656,272IGF::OT::IGF TO REMOVE THE TEMPORARY PARTITION AT THE WAITING ROOM.
Mod P00025· CHANGE ORDER2014-09-26+$40,000$16,696,272IGF::OT::IGF TO REVISE PATIENT HEADWALLS AT EXTERIOR WALLS.
Mod P00026· CHANGE ORDER2014-09-30+$14,757$16,711,029IGF::OT::IGF DELETE ALUMINUM EXPANSION JOINT COVER, INSTALL GALVANIZED SHEET METAL "DUST COVERS", AND ADD FURR…
Mod P00028· CHANGE ORDER2014-10-21+$14,000$16,725,029IGF::OT::IGF ADD OPAQUE WINDOWS ALONG THE EXTERIOR EAST AND WEST ELEVATION OF THE ED EXPANSION.
Mod P00029· CHANGE ORDER2014-10-30+$55,000$16,780,029IGF::OT::IGF TO PROVIDE 3-PANEL DOORS AT PATIENT ROOMS.
Mod P00030· CHANGE ORDER2014-11-25+$40,899$16,820,927IGF::OT::IGF ADD HSS FRAMES FOR LOUVERS AND WELD LEDGER ANGLE TO STUD FRAMING.
Mod P00031· CHANGE ORDER2014-11-26+$60,000$16,880,927IGF::OT::IGF TO PROVIDE TEMPORARY HEATING.
Mod P00027· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-12-04+$137,767$17,018,694IGF::OT::IGF TO PROVIDE ADDITIONAL REINFORCEMENT FOR EXTERIOR FRAMING.
Mod P00032· CHANGE ORDER2014-12-08+$5,000$17,023,694IGF::OT::IGF TO PROVIDE HANDHELD SHOWERS.
Mod P00033· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-12-09+$1,198$17,024,892IGF::OT::IGF TRIRIGA LICENSES.
Mod P00035· CHANGE ORDER2015-01-07+$71,960$17,096,852IGF::OT::IGF TO PROVIDE ADDITIONAL ACCESS CONTROL DEVICES.
Mod P00036· CHANGE ORDER2015-01-15+$0$17,096,852IGF::OT::IGF THIRD CHANGE ORDER TO RELOCATE SANITARY SEWER LINE. (P00008 FIRST CHANGE ORDER, P00012 SECOND CHA…
Mod P00037· CHANGE ORDER2015-01-16+$55,000$17,151,852IGF::OT::IGF TOTO PROVIDE ADDITIONAL MEDICAL GAS PIPING.
Mod P00038· CHANGE ORDER2015-01-20+$3,500$17,155,352IGF::OT::IGF TO PROVIDE CONDUIT FOR ENHANCED ACCESS POINTS.
Mod P00040· CHANGE ORDER2015-02-02+$2,558$17,157,910IGF::OT::IGF TO PROVIDE 48-INCH DOORS AT OB/GYN EXAM ROOMS.
Mod P00041· CHANGE ORDER2015-02-02+$25,000$17,182,910IGF::OT::IGF TO PROVIDE A MEANS FOR ROUTING STORM WATER DISCHARGE FROM THE ROOF DRAINS OF THE BUILDING.
Mod P00042· CHANGE ORDER2015-02-04+$12,000$17,194,910IGF::OT::IGF TO RELOCATE THE MED GAS TIE-IN TO THE EXISTING BUILDING.
Mod P00043· CHANGE ORDER2015-02-05+$0$17,194,910IGF::OT::IGF TIME EXTENSION 43 DAYS.
Mod P00044· CHANGE ORDER2015-02-11+$6,200$17,201,110IGF::OT::IGF TO INCORPORATE THE RESPONSE TO RFI #0181 INTO THE CONTRACT.
Mod P00045· CHANGE ORDER2015-02-11+$75,000$17,276,110IGF::OT::IGF TO PROVIDE A PAGING SYSTEM.
Mod P00034· CHANGE ORDER2015-02-19+$91,800$17,367,910IGF::OT::IGF FINAL DEFINITIZATION OF TWO CHANGE ORDERS TO RELOCATE SANITARY SEWER LINE. (P00008 AND P00012)
Mod P00047· CHANGE ORDER2015-02-20+$35,000$17,402,910IGF::OT::IGF TO INCORPORATE THE RESPONSE TO RFI #173 INTO THE CONTRACT.
Mod P00049· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-02-24+$84,972$17,487,882IGF::OT::IGF TO COMPLETE PAVING AT WEST SIDE OF SITE.
Mod P00046· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-02-27+$5,193$17,493,075IGF::OT::IGF TO DELETE FIVE FOOTERS, WHICH WERE PREVIOUSLY INSTALLED FROM SOW. THIS IS THE DEFINITIZATION.
Mod P00039· CHANGE ORDER2015-03-04+$3,580$17,496,655IGF::OT::IGF TO CHANGE THE SHOWER FIXTURE TO SYMMONS MODEL.
Mod P00050· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-03-04+$2,600$17,499,255IGF::OT::IGF TO PROVIDE HAFELE CABINET PULLS.
Mod P00048· CHANGE ORDER2015-03-10+$30,000$17,529,255IGF::OT::IGF TO ADD FLOWMETERS.
Mod P00051· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-03-11+$65,000$17,594,255IGF::OT::IGF ADD EXPANSION LOOPS FOR PIPING.
Mod P00052· CHANGE ORDER2015-03-31+$16,000$17,610,255IGF::OT::IGF TO PROVIDE ENHANCED ACCESS POINT SUPPORT ARMS FOR EACH PATIENT HEADWALL.
Mod P00053· CHANGE ORDER2015-04-02+$20,000$17,630,255IGF::OT::IGF TO REVISE PAVING AND BOLLARDS AT ED EXPANSION ENTRY DRIVE AND PATIENT DROP-OFF.
Mod P00054· CHANGE ORDER2015-04-03+$0$17,630,255IGF::OT::IGF TO REVISE PATIENT HEADWALLS AT EXTERIOR WALLS.
Mod P00055· CHANGE ORDER2015-04-08+$1,790$17,632,045IGF::OT::IGF TO EXTEND THE TRIRIGA LICENSES FOR THE CONTRACTOR FOR A PERIOD OF FOUR (4) MONTHS (APRIL 2015 - A…
Mod P00057· CHANGE ORDER2015-04-10+$3,000$17,635,045IGF::OT::IGF TO PROVIDE OUTDOOR LIGHT FIXTURES AT THE PORTE COCHERE.
Mod P00058· CHANGE ORDER2015-04-17+$26,521$17,661,566IGF::OT::IGF TO REVISE PAVING AND BOLLARDS AT ED EXPANSION ENTRY DRIVE AND PATIENT DROP-OFF.
Mod P00059· CHANGE ORDER2015-04-21+$5,000$17,666,566IGF::OT::IGF REINSTALL ELECTRICAL AND DATA OUTLETS AT MAMMOGRAPHY
Mod P00060· CHANGE ORDER2015-04-24+$11,000$17,677,566IGF::OT::IGF REVISE 4X4 CEILING GRID TO 2X2 CEILING GRID IN ROOMS 1G108, 1G116 AND 1G160E.
Mod P00061· CHANGE ORDER2015-04-24+$15,000$17,692,566IGF::OT::IGF TO REVISE THE OPERATION SEQUENCE AND ADD SENSORS FOR THE HEATING HOT WATER SYSTEM AT THE MECHANIC…
Mod P00062· CHANGE ORDER2015-04-28+$30,000$17,722,566IGF::OT::IGF PROCURE GREY TRESPA PANELS
Mod P00063· CHANGE ORDER2015-05-01+$2,000$17,724,566IGF::OT::IGF TO CHANGE EMERGENCY SHOWER TO PREVIOUSLY APPROVED SYMMONS SHOWER PRODUCT IN THE DECONTAMINATION R…
Mod P00064· CHANGE ORDER2015-05-05+$5,000$17,729,566IGF::OT::IGF INSTALL TERMINATED STOPS AT HOLLOW METAL DOOR FRAMES.
Mod P00065· CHANGE ORDER2015-05-07+$17,313$17,746,879IGF::OT::IGF TO PROVIDE CONDUIT FOR ENHANCED ACCESS POINTS.
Mod P00066· CHANGE ORDER2015-05-15+$44,951$17,791,830IGF::OT::IGF TO PROVIDE ADDITIONAL ACCESS CONTROL DEVICES.
Mod P00068· CHANGE ORDER2015-05-15+$12,000$17,803,830IGF::OT::IGF TO PROVIDE POWER TO HEAT EXCHANGERS.
Mod P00067· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-05-18+$11,229$17,815,059IGF::OT::IGF REWORK LENGTH OF EXISTING CANOPY LEGS
Mod P00069· CHANGE ORDER2015-05-18+$30,000$17,845,059IGF::OT::IGF NURSE STATION MODIFICATIONS
Mod P00070· CHANGE ORDER2015-05-29+$29,394$17,874,453IGF::OT::IGF TO PROCURE AND INSTALL ADDITIONAL INTERIOR SIGNAGE.
Mod P00071· CHANGE ORDER2015-05-29+$65,000$17,939,453IGF::OT::IGF TO PROVIDE LC CONNECTORS FOR PRIMARY FIBER OPTIC BACKBONE.
Mod P00074· CHANGE ORDER2015-06-03+$10,000$17,949,453IGF::OT::IGF TO REMOVE THE DOOR BETWEEN THE DECONTAMINATION ROOM (1G167) AND STRETCHER SHOWER ROOM (1G168).
Mod P00075· CHANGE ORDER2015-06-04+$5,309$17,954,762IGF::OT::IGF TO SURVEY AND EXTEND THE SLAB EDGE AND REWORK THE STEEL SHOP DRAWING TO MATCH THE EXISTING CONDIT…
Mod P00073· CHANGE ORDER2015-06-08+$5,000$17,959,762IGF::OT::IGF TO PROVIDE FIRE ALARM RELAYS AT THREE (3) DOORS.
Mod P00076· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-06-09+$14,817$17,974,579IGF::OT::IGF CHANGE BUILT-UP ROOF TO TPO MEMBRANE AT PARAPET WALLS.
Mod P00077· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-06-09+$8,445$17,983,024IGF::OT::IGF PIPING AND DUCT CHANGES PER ISSUES FOUND IN THE CONTRACT DRAWINGS.
Mod P00078· CHANGE ORDER2015-06-10+$50,000$18,033,024IGF::OT::IGF TO REPLACE EXPANSION LOOPS FOR STEAM AND CHILLED WATER PIPING.
Mod P00080· CHANGE ORDER2015-06-17+$7,500$18,040,524IGF::OT::IGF TO PAINT BOLLARDS AT ED ENTRANCE.
Mod P00072· CHANGE ORDER2015-06-19+$16,000$18,056,524IGF::OT::IGF TO PROVIDE LC CONNECTORS FOR FACILITIES FIBER OPTIC BACKBONE.
Mod P00079· CHANGE ORDER2015-06-21−$19,049$18,037,475IGF::OT::IGF TO CREATE ADDITIONAL WAITING AREA AND ACCESS TO REST ROOMS.
Mod P00081· CHANGE ORDER2015-06-23+$30,000$18,067,475IGF::OT::IGF TO CORRECT LANDSCAPING ISSUES.
Mod P00082· CHANGE ORDER2015-06-23+$6,442$18,073,917IGF::OT::IGF TO INSTALL STAINLESS STEEL PIPE IN LIEU OF BLACK IRON PIPE.
Mod P00083· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-07-10+$9,355$18,083,272IGF::OT::IGF MRI CONDENSATE COOLER VENT RELOCATION
Mod P00084· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-07-13+$13,292$18,096,564IGF::OT::IGF RAISE EXISTING MANHOLES TO PLAN ELEVATION.
Mod P00085· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-07-14−$3,471$18,093,093IGF::OT::IGF INSTALL TEMPORARY INSULATION AT THE EXISTING EMERGENCY DEPARTMENT.
Mod P00086· CHANGE ORDER2015-07-15+$25,000$18,118,093IGF::OT::IGF TO REPLACE THE CARPET TILES IN THE WAITING ROOMS WITH RESILIENT SHEET FLOORING.
Mod P00088· CHANGE ORDER2015-07-15+$8,000$18,126,093IGF::OT::IGF INSTALL ALUMINUM DOOR AT EXTERIOR ENTRANCE OF WEST SIDE OF THE ED EXPANSION.
Mod P00087· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-07-16+$335$18,126,428IGF::OT::IGF PROVIDE POWER FOR PNEUMATIC TUBING
Mod P00090· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-07-16−$6,368$18,120,060IGF::OT::IGF REVISED P-420 FAUCET
Mod P00094· CHANGE ORDER2015-07-20+$20,000$18,140,060IGF::OT::IGF PROVIDE DATA AND POWER OUTLETS
Mod P00093· CHANGE ORDER2015-07-21+$5,000$18,145,060IGF::OT::IGF INSTALL HAND SINK AT MENTAL HEALTH
Mod P00092· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-07-22−$36,617$18,108,443IGF::OT::IGF DELETE EXTERIOR SIGNAGE
Mod P00089· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-07-24+$0$18,108,443IGF::OT::IGF TIME EXTENSION RESOLUTION LV EMERGENCY DEPARTMENT EXPANSION.
Mod P00095· CHANGE ORDER2015-08-01+$18,009$18,126,452IGF::OT::IGF TO INSTALL CHILLED WATER AND STEAM SEISMIC JOINTS.
Mod P00097· CHANGE ORDER2015-08-14+$25,000$18,151,452IGF::OT::IGF TO RELOCATE THE BED INTERFACE AND NURSE CALL STATION
Mod P00098· CHANGE ORDER2015-08-17+$1,695$18,153,147IGF::OT::IGF TO PROCURE FIBER SWITCH FOR THE CAMERAS
Mod P00099· CHANGE ORDER2015-08-19+$24,580$18,177,727IGF::OT::IGF TO RELOCATE THE HALBERT TRAILER FROM THE PHOTOVOLTAIC PROJECT SITE.
Mod P00100· CHANGE ORDER2015-08-20+$1,790$18,179,517IGF::OT::IGF TO EXTEND THE TRIRIGA LICENSES FOR THE CONTRACTOR FOR A PERIOD OF FOUR (4) MONTHS (AUGUST 2015 -…
Mod P00101· CHANGE ORDER2015-08-27+$15,318$18,194,835IGF::OT::IGF TO REVISE COVE LIGHTING AND CEILING IN CG-10.
Mod P00102· CHANGE ORDER2015-09-01+$45,000$18,239,835IGF::OT::IGF BLOWDOWN TANK ADDITION
Mod P00103· CHANGE ORDER2015-09-01+$4,495$18,244,330IGF::OT::IGF PROVIDE PRISM CAMERA LICENSES
Mod P00104· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-09-02−$4,653$18,239,677IGF::OT::IGF DELETE CAMERA PROGRAMMING, TESTING AND LICENSING
Mod P00091· CHANGE ORDER2015-09-08+$1,748$18,241,425IGF::OT::IGF TO PROVIDE FOR MED GAS TIME EXTENSION AND PARTIAL PAYMENT.
Mod P00105· CHANGE ORDER2015-09-10+$4,000$18,245,425IGF::OT::IGF TO PROVIDE ENHANCED ACCESS POINT SUPPORT ARM PLATES FOR THE MONITOR ARMS.
Mod P00096· CHANGE ORDER2015-09-11+$0$18,245,425IGF::OT::IGF TO INSTALL CHILLED WATER AND STEAM SEISMIC JOINTS TIME EXTENSION.
Mod P00106· CHANGE ORDER2015-09-11+$26,264$18,271,689IGF::OT::IGF TO REVISE DOORS TO MEET LIFE SAFETY REQUIREMENTS
Mod P00107· CHANGE ORDER2015-09-15+$0$18,271,689IGF::OT::IGF TO INSTALL DATA AND POWER AT ALCOVES.
Mod P00108· CHANGE ORDER2015-09-17+$0$18,271,689IGF::OT::IGF TO PROVIDE 3 PAIRS OF DOORS TIME EXTENSION
Mod P00109· CHANGE ORDER2015-09-18+$5,000$18,276,689IGF::OT::IGF TO UPGRADE NVR RECORDING CAPACITY
Mod P00110· CHANGE ORDER2015-09-18+$0$18,276,689IGF::OT::IGF TIME EXTENSION DUE TO THE REPLACEMENT OF WAITING ROOM FLOORING
Mod P00111· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-09-21+$666$18,277,355IGF::OT::IGF PROVIDE POWER FOR PNEUMATIC TUBING
Mod P00112· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-09-25+$8,579$18,285,934IGF::OT::IGF PROVIDE 90 DEGREE ELBOW SOUND ATTENUATORS
Mod P00114· CHANGE ORDER2015-10-06+$16,368$18,302,302IGF::OT::IGF TO INSTALL CONTROLS FOR HX AND STEAM GENERATOR
Mod P00115· CHANGE ORDER2015-10-07+$4,345$18,306,647IGF::OT::IGF TO CONNECT FIRE DAMPERS TO ELECTRICAL CIRCUITS
Mod P00116· CHANGE ORDER2015-10-19+$13,242$18,319,889IGF::OT::IGF BLOWDOWN TANK ADDITION AND DEAERATOR CONNECTION.
Mod P00117· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-10-23+$34,202$18,354,091IGF::OT::IGF FLOW METER ADDITIONS
Mod P00119· CHANGE ORDER2015-11-04+$40,000$18,394,091IGF::OT::IGF INSTALL CAT 6 CABLE FOR WIRELESS INFRASTRUCTURE
Mod P00118· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-11-06+$14,389$18,408,480IGF::OT::IGF CORRECT LANDSCAPING ISSUES
Mod P00120· CHANGE ORDER2015-11-12+$0$18,408,480IGF::OT::IGF 55 DAY TIME EXTENSION FOR P00049, P00053, P00080 AND P00088.
Mod P00121· CHANGE ORDER2015-11-13+$0$18,408,480IGF::OT::IGF TIME EXTENSION TO PROVIDE LC CONNECTORS FOR FACILITIES FIBER OPTIC BACKBONE.
Mod P00124· CHANGE ORDER2015-11-19+$0$18,408,480IGF::OT::IGF 30 DAY TIME EXTENSION FOR P00106 FOR CHANGING OF 4 SETS OF DOUBLE DOORS TO MEET SAFETY AND ACCESS…
Mod P00056· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLIES)2015-12-04+$40,000$18,448,480IGF::OT::IGF TO REVISE PATIENT HEADWALLS AT EXTERIOR WALLS, CHANGE ORDER.
Mod P00125· CHANGE ORDER2015-12-08+$3,761$18,452,241IGF::OT::IGF REMOVE WALK-OFF MAT AND INFILL WITH CONCRETE.
Mod P00126· CHANGE ORDER2015-12-09+$13,532$18,465,773IGF::OT::IGF SUPPORT FRAMING FOR PARTITIONS AND ABOVE CEILING CONDUITS RESULTING FROM DEMOLISHING THE EXISTING…
Mod P00127· CHANGE ORDER2015-12-11+$2,233$18,468,006IGF::OT::IGF REMOVE SURGICAL LIGHTS AND PATIENT LIFTS
Mod P00128· CHANGE ORDER2015-12-22+$4,205$18,472,211IGF::OT::IGF REMOVE EXISTING HEADWALLS AND ASSOCIATED EQUIPMENT.
Mod P00130· CHANGE ORDER2015-12-28+$30,000$18,502,211IGF::OT::IGF TIE-IN WORK AT LEVELS 2 AND 3
Mod P00129· CHANGE ORDER2015-12-31+$0$18,502,211IGF::OT::IGF 8 DAY TIME EXTENSION DUE TO THE VAMC DELAYING THE CONTRACTOR FROM STARTING PHASE II DEMOLITION.
Mod P00131· CHANGE ORDER2016-01-07+$12,928$18,515,139IGF::OT::IGF INSTALL FIREWORKS SOFTWARE AT CUP
Mod P00132· CHANGE ORDER2016-01-15+$0$18,515,139IGF::OT::IGF TIME EXTENSIONS DUE TO PREVIOUS CHANGES (P00102 AND P00125).
Mod P00134· CHANGE ORDER2016-01-29+$8,218$18,523,357IGF::OT::IGF TIE-IN WORK AT LEVELS 2 AND 3
Mod P00135· CHANGE ORDER2016-01-29+$13,364$18,536,721IGF::OT::IGF TO REPLACE FLOORING TYPE AT LEVEL 1 IN RENOVATED EMERGENCY DEPARTMENT AREA
Mod P00136· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-01-29−$11,856$18,524,865IGF::OT::IGF DELETE THE INSTALLATION OF THE FURNITURE AT THE NURSE STATIONS AND PROCURE NEW FURNITURE
Mod P00137· CHANGE ORDER2016-02-02+$0$18,524,865IGF::OT::IGF TIME EXTENSION AS A RESULT OF CHANGE ORDER P00135 (FLOOR MODIFICATIONS ON LEVEL 1)
Mod P00133· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-02-12+$466,746$18,991,611IGF::OT::IGF PAYMENT OF EXTENDED GENERAL CONDITIONS
Mod P00138· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-02-18−$8,223$18,983,388IGF::OT::IGF DELETE 16 GA HANDRAILS AND CRASHRAILS, SIX SHOWER VALVES, AND WALL COVERING
Mod P00122· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-05-05+$12,358$18,995,746IGF::OT::IGF PATIENT HEADWALL REVISIONS
Mod P00123· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-05-05+$19,323$19,015,069IGF::OT::IGF NURSE STATION MODIFICATIONS
Mod P00139· CHANGE ORDER2016-06-10+$0$19,015,069IGF::OT::IGF SA TO CLOSE FULLY FUNDED CHANGE ORDERS
Mod P00140· CHANGE ORDER2016-06-10+$0$19,015,069IGF::OT::IGF DEFINITIZE FULLY FUNDED CHANGE ORDERS WITH NO TIME IMPACT
Mod P00141· CHANGE ORDER2016-06-10+$43,073$19,058,142IGF::OT::IGF DEFINITIZES VARIOUS CHANGE ORDERS (C.O.) THAT WERE PARTIALLY FUNDED AND FULLY FUNDS ADDITIONAL CH…
Mod P00142· CHANGE ORDER2016-06-10+$72,091$19,130,233IGF::OT::IGF COMPLETE MODIFICATIONS
Mod P00143· CHANGE ORDER2016-06-10+$42,022$19,172,255IGF::OT::IGF FULLY FUND ADDITIONAL CHANGES
Mod P00144· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-06-10−$80,680$19,091,575IGF::OT::IGF CREDITS OWED TO THE GOVERNMENT
Mod P00145· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-06-10−$63,420$19,028,155IGF::OT::IGF CREDITS OWED TO THE GOVERNMENT
Mod P00146· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-06-28+$15,209$19,043,364IGF::OT::IGF FINAL BOND INVOICE PAYMENT.
Mod P00147· FUNDING ONLY ACTION2016-07-07+$0$19,043,364IGF::OT::IGF NO COST EXTENSION OF FUNDS OBLIGATION.
Mod P00148· FUNDING ONLY ACTION2018-01-18−$58,532$18,984,832IGF::OT::IGF FINAL DEOBLIGATION OF EXCESS FUNDS.

Related awards · 11

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other VA awards to the same recipient (UEI JUHDFA8S7NU8)

AwardOffice · PSC / listingNet obligationsFY
VA70117C0033PCAC NATIONAL ENERGY BUSINESS CENTER (36E776) · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES$8,092,109FY2017
VA26117C0151261-NETWORK CONTRACT OFFICE 21 (36C261) · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES$7,424,575FY2017
VA26216J6801258-NETWORK CNTRCT OFF 22G (36C258) · Z1DZ · MAINTENANCE OF OTHER HOSPITAL BUILDINGS$5,422,806FY2016
VA26116J2566261-NETWORK CONTRACT OFFICE 21 (36C261) · Z1DZ · MAINTENANCE OF OTHER HOSPITAL BUILDINGS$2,129,768FY2016
VA26216J4441258-NETWORK CNTRCT OFF 22G (36C258) · Z2DZ · REPAIR OR ALTERATION OF OTHER HOSPITAL BUILDINGS$1,176,684FY2016
VA26115P1913261-NETWORK CONTRACT OFFICE 21 · J046 · MAINT/REPAIR/REBUILD OF EQUIPMENT- WATER PURIFICATION AND SEWAGE TREATMENT EQUIPMENT$12,189FY2015

Other recipients under Y1DA from OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) (most recent first)

AwardRecipientOfficeNet obligationsFY
36C10F26C0014PROJECT MANAGEMENT SOLUTIONS LLCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$2,229,000FY2026
36C10F26C0013V&C GENERAL CONTRACTOR LLCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$2,518,650FY2026
36C10F23C0007WALSH CONSTRUCTION COMPANY II, LLCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$215,172,226FY2023
36C10F23N0064SSPC LLCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$421,407FY2023
36C10F23C0003DAV ENERGY SOLUTIONS, INC.OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$175,181FY2023

Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA101F13C0092_3600_-NONE-_-NONE- · retrieved 2026-09-26.