THIS MODIFICATION SHALL BE DEEMED A FULL RELEASE AND WAIVER BY THE VA FOR CLARK/HUNT JV, SAFECO (LIBERTY MUTUAL) AND ALLIANCE/PENTA FROM ANY CURRENT OR FUTURE OBLIGATIONS RELATED TO THE REFERENCED CONTRACT, KNOWN OR UNKNOWN, INCLUDING REPLACEMENT FOR BURNERS AND PATIENT LIFTS, FOR THE TOTAL CONTRIBUTION OF $800,000. THE VA WILL ISSUE A BILL OF COLLECTION TO CLARK/HUNT JV FOR THE SUM OF $457,928.00
Base award description: CONSTRUCTION OF NEW VA SOUTHERN NEVADA HEALTHCARE SYSTEM MEDICAL CENTER PHASE IV.
Modification chain · 1084 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2008-09-23+$364,942,000= $364,942,000
- Mod CO01A2009-01-29+$10,000= $364,952,000
- Mod 32009-02-27+$775= $364,952,775
- Mod 42009-02-27+$78,426= $365,031,201
- Mod 52009-03-05-$2,033= $365,029,168
- Mod 12009-03-11+$93,198= $365,122,366
- Mod 22009-03-11+$48,553= $365,170,919
- Mod 62009-03-23+$12,662= $365,183,581
- Mod CO01B2009-03-24+$6,000= $365,189,581
- Mod CO01C2009-03-25+$99,000= $365,288,581
- Mod 72009-04-13+$1,387= $365,289,968
- Mod 82009-04-22+$4,739= $365,294,707
- Mod 102009-04-30+$8,181= $365,302,888
- Mod 92009-04-30+$5,989= $365,308,877
- Mod 112009-05-04+$8,084= $365,316,961
- Mod 122009-05-16+$4,196= $365,321,157
- Mod CO01D2009-05-21+$4,458,621= $369,779,778
- Mod 132009-05-26+$13,304= $369,793,082
- Mod 142009-05-26+$4,225= $369,797,307
- Mod 152009-05-26+$966= $369,798,273
- Mod CO01E2009-05-27+$2,500= $369,800,773
- Mod CO01F2009-05-27+$3,000= $369,803,773
- Mod 162009-06-02+$6,979= $369,810,752
- Mod 172009-06-02+$3,185= $369,813,937
- Mod 182009-06-05+$37,268= $369,851,205
- Mod 192009-06-05+$1,366= $369,852,571
- Mod CO01G2009-06-05+$2,500= $369,855,071
- Mod CO01H2009-06-05+$12,771= $369,867,842
- Mod 202009-06-08+$1,094= $369,868,936
- Mod 212009-06-08+$5,885= $369,874,821
- Mod 222009-06-09+$7,116= $369,881,937
- Mod 232009-06-09+$2,823= $369,884,760
- Mod 242009-06-10+$713= $369,885,473
- Mod 252009-06-10+$0= $369,885,473
- Mod 262009-06-11+$0= $369,885,473
- Mod CO01I2009-06-11+$30,722= $369,916,195
- Mod 272009-06-15+$6,209= $369,922,404
- Mod 282009-06-15+$1,679= $369,924,083
- Mod 292009-06-24+$5,034= $369,929,117
- Mod 302009-06-24+$0= $369,929,117
- Mod CO01J2009-06-24+$70,408= $369,999,525
- Mod 312009-06-26+$10,042= $370,009,567
- Mod 322009-06-26+$7,988= $370,017,555
- Mod 332009-06-30+$13,795= $370,031,350
- Mod 342009-06-30+$21,600= $370,052,950
- Mod 352009-06-30+$3,476= $370,056,426
- Mod 362009-06-30-$734= $370,055,692
- Mod 372009-06-30+$0= $370,055,692
- Mod SA0382009-07-06+$94,049= $370,149,741
- Mod SA0392009-07-06+$4,551= $370,154,292
- Mod CO01K2009-07-09+$82,914= $370,237,206
- Mod SA0412009-07-10+$11,456= $370,248,662
- Mod SA0402009-07-13+$3,383= $370,252,045
- Mod SA0422009-07-14+$6,198= $370,258,243
- Mod CO01L2009-07-16+$10,000= $370,268,243
- Mod SA0432009-07-16+$4,222= $370,272,465
- Mod SA0442009-07-17+$6,482= $370,278,947
- Mod CO01M2009-07-22+$30,000= $370,308,947
- Mod CO01N2009-07-30+$55,000= $370,363,947
- Mod SA0452009-07-30+$2,519= $370,366,466
- Mod CO01O2009-07-31+$14,000= $370,380,466
- Mod SA0462009-07-31+$3,371= $370,383,837
- Mod CO01P2009-08-27+$2,000= $370,385,837
- Mod CO01Q2009-08-27+$70,000= $370,455,837
- Mod CO01R2009-08-28+$20,000= $370,475,837
- Mod CO01S2009-08-31+$11,000= $370,486,837
- Mod CO01T2009-08-31+$50,000= $370,536,837
- Mod CO01U2009-08-31+$30,000= $370,566,837
- Mod SA0472009-09-04+$28,038= $370,594,875
- Mod SA0482009-09-04+$7,182= $370,602,057
- Mod SA0492009-09-04+$16,299= $370,618,356
- Mod SA0502009-09-04+$26,152= $370,644,508
- Mod SA0512009-09-06+$4,353= $370,648,861
- Mod SA0522009-09-11-$6,870= $370,641,991
- Mod SA0532009-09-11+$17,116= $370,659,107
- Mod SA0542009-09-11+$0= $370,659,107
- Mod SA0552009-09-11-$955= $370,658,152
- Mod SA0562009-09-11+$1,265= $370,659,417
- Mod SA0572009-09-11+$15,639= $370,675,056
- Mod SA0582009-09-11+$4,341= $370,679,397
- Mod SA0592009-09-14+$12,626= $370,692,023
- Mod SA0602009-09-14-$324= $370,691,699
- Mod SA0612009-09-14+$3,063= $370,694,762
- Mod SA0622009-09-14+$4,117= $370,698,879
- Mod SA0632009-09-15+$1,587= $370,700,466
- Mod SA0642009-09-15+$9,207= $370,709,673
- Mod CO01V2009-09-17+$261,000= $370,970,673
- Mod SA0652009-09-17-$8,447= $370,962,226
- Mod SA0662009-09-18+$12,916= $370,975,142
- Mod SA0672009-09-21+$1,575= $370,976,717
- Mod 682009-09-22+$287,008= $371,263,725
- Mod SA0702009-09-30+$6,380= $371,270,105
- Mod SA0712009-09-30+$7,505= $371,277,610
- Mod 692009-10-05+$4,833= $371,282,443
- Mod CO01W2009-10-14+$15,000= $371,297,443
- Mod CO01X2009-10-14+$10,000= $371,307,443
- Mod SA0722009-10-14+$30,412= $371,337,855
- Mod CO01Y2009-10-20+$11,800= $371,349,655
- Mod SA0742009-10-21+$3,650= $371,353,305
- Mod SA0752009-10-26+$4,292= $371,357,597
- Mod CO01Z2009-10-27+$15,000= $371,372,597
- Mod SA0762009-10-27-$3,307= $371,369,290
- Mod SA0772009-10-29-$41,778= $371,327,512
- Mod CO02A2009-10-30+$7,056= $371,334,568
- Mod CO02B2009-11-11+$9,100= $371,343,668
- Mod SA0782009-11-11+$7,480= $371,351,148
- Mod SA0792009-11-11+$1,236= $371,352,384
- Mod SA0802009-11-11+$3,831= $371,356,215
- Mod SA0822009-11-13+$5,825= $371,362,040
- Mod SA0832009-11-17-$3,397= $371,358,643
- Mod SA0842009-11-17+$489= $371,359,132
- Mod SA0852009-11-18+$16,414= $371,375,546
- Mod SA0862009-11-20+$5,747= $371,381,293
- Mod SA0812009-11-23+$4,285= $371,385,578
- Mod SA0872009-11-24+$5,599= $371,391,177
- Mod SA0882009-11-24+$4,369= $371,395,546
- Mod SA0892009-11-25+$763= $371,396,309
- Mod SA902009-11-25+$2,649= $371,398,958
- Mod SA0912009-11-27+$79,000= $371,477,958
- Mod SA0922009-11-27-$8,282= $371,469,676
- Mod CO02D2009-12-04-$22,500= $371,447,176
- Mod SA0942009-12-04+$10,583= $371,457,759
- Mod CO02C2009-12-07+$7,000= $371,464,759
- Mod CO02E2009-12-08+$90,000= $371,554,759
- Mod SA0932009-12-08+$1,589= $371,556,348
- Mod CO02F2009-12-10+$4,000= $371,560,348
- Mod SA0952009-12-10+$8,361= $371,568,709
- Mod SA0962009-12-11+$3,732= $371,572,441
- Mod SA0972009-12-11+$695= $371,573,136
- Mod SA0982009-12-16-$1,698= $371,571,438
- Mod SA0992009-12-17+$2,404= $371,573,842
- Mod CO02G2009-12-23+$3,750= $371,577,592
- Mod CO02H2010-01-05+$23,000= $371,600,592
- Mod SA1022010-01-05+$7,848= $371,608,440
- Mod SA1032010-01-05+$2,554= $371,610,994
- Mod SA1042010-01-05+$16,155= $371,627,149
- Mod SA1052010-01-05+$3,284= $371,630,433
- Mod SA1062010-01-11-$741= $371,629,692
- Mod SA1072010-01-11+$3,915= $371,633,607
- Mod SA1002010-01-12+$20,303= $371,653,910
- Mod SA1012010-01-12+$1,300= $371,655,210
- Mod CO02I2010-01-13+$35,000= $371,690,210
- Mod CO02J2010-01-13+$55,000= $371,745,210
- Mod SA1082010-01-13+$54,031= $371,799,241
- Mod CO02K2010-01-14+$0= $371,799,241
- Mod CO02L2010-01-18+$55,000= $371,854,241
- Mod CO02M2010-01-26+$95,000= $371,949,241
- Mod SA1092010-01-27+$0= $371,949,241
- Mod SA1102010-01-27+$1,974= $371,951,215
- Mod SA1112010-01-27+$3,207= $371,954,422
- Mod SA1122010-01-27+$23,390= $371,977,812
- Mod SA1132010-01-28+$6,806= $371,984,618
- Mod SA1142010-01-28+$1,231= $371,985,849
- Mod SA1152010-01-29-$17,778= $371,968,071
- Mod SA1162010-01-29-$1,003= $371,967,068
- Mod SA1172010-01-29+$58,011= $372,025,079
- Mod SA0262010-02-05+$104,487= $372,129,566
- Mod CO02N2010-02-08+$10,000= $372,139,566
- Mod SA1192010-02-09+$3,779= $372,143,345
- Mod SA1202010-02-09+$6,474= $372,149,819
- Mod SA1212010-02-09+$2,457= $372,152,276
- Mod SA1222010-02-09+$2,443= $372,154,719
- Mod SA1182010-02-11+$53,050= $372,207,769
- Mod SA1232010-02-12+$5,608= $372,213,377
- Mod SA1242010-02-12+$20,683= $372,234,060
- Mod CO02O2010-02-15+$17,173= $372,251,233
- Mod CO02P2010-02-16+$1,800= $372,253,033
- Mod CO02Q2010-02-17+$70,000= $372,323,033
- Mod SA1252010-02-18+$1,325= $372,324,358
- Mod SA1262010-02-18+$7,504= $372,331,862
- Mod SA1272010-02-18-$29,020= $372,302,842
- Mod SA1282010-02-18+$14,077= $372,316,919
- Mod SA1292010-02-22+$2,179= $372,319,098
- Mod SA1302010-02-22+$5,535= $372,324,633
- Mod SA1312010-02-22-$28,703= $372,295,930
- Mod CO02R2010-02-23+$17,300= $372,313,230
- Mod CO02S2010-02-24+$7,500= $372,320,730
- Mod SA1322010-02-24+$2,499= $372,323,229
- Mod CO02U2010-02-25+$99,000= $372,422,229
- Mod CO02V2010-02-26+$18,000= $372,440,229
- Mod SA1332010-02-26+$10,400= $372,450,629
- Mod SA1342010-02-26-$3,883= $372,446,746
- Mod SA1352010-02-26+$7,176= $372,453,922
- Mod SA1362010-02-26+$11,636= $372,465,558
- Mod SA1372010-02-26+$5,390= $372,470,948
- Mod CO02T2010-03-01+$222,000= $372,692,948
- Mod SA1782010-03-01+$8,552= $372,701,500
- Mod SA1792010-03-01+$32,961= $372,734,461
- Mod SA1802010-03-01+$27,163= $372,761,624
- Mod SA1382010-03-02+$0= $372,761,624
- Mod CO03A2010-03-04+$32,300= $372,793,924
- Mod CO02W2010-03-05+$90,000= $372,883,924
- Mod SA1392010-03-09+$51,506= $372,935,430
- Mod SA1402010-03-09+$7,552= $372,942,982
- Mod SA1412010-03-09+$2,119= $372,945,101
- Mod SA1422010-03-12+$3,017= $372,948,118
- Mod SA1432010-03-12+$14,328= $372,962,446
- Mod SA1442010-03-12+$961= $372,963,407
- Mod SA1452010-03-12+$2,040= $372,965,447
- Mod SA1462010-03-15+$1,007= $372,966,454
- Mod CO02X2010-03-16+$750= $372,967,204
- Mod SA1472010-03-16+$4,640= $372,971,844
- Mod SA1482010-03-16+$0= $372,971,844
- Mod CO02Y2010-03-18+$1,464,395= $374,436,239
- Mod SA1492010-03-22+$68,459= $374,504,698
- Mod CO02Z2010-03-23+$38,000= $374,542,698
- Mod SA1522010-03-26+$14,174= $374,556,872
- Mod SA1532010-04-01+$37,983= $374,594,855
- Mod SA1512010-04-05+$695= $374,595,550
- Mod CO03B2010-04-06+$4,000= $374,599,550
- Mod SA1542010-04-13+$0= $374,599,550
- Mod CO03C2010-04-14+$15,000= $374,614,550
- Mod CO03D2010-04-14+$15,000= $374,629,550
- Mod CO03E2010-04-16+$15,000= $374,644,550
- Mod CO03F2010-04-20+$22,000= $374,666,550
- Mod SA1552010-04-22+$5,709= $374,672,259
- Mod SA1562010-04-22+$1,434= $374,673,693
- Mod CO03G2010-04-23+$35,000= $374,708,693
- Mod SA1572010-04-26+$0= $374,708,693
- Mod SA1582010-04-26+$0= $374,708,693
- Mod CO03H2010-04-30+$21,000= $374,729,693
- Mod CO03I2010-04-30+$30,000= $374,759,693
- Mod CO03J2010-04-30+$31,000= $374,790,693
- Mod SA1592010-04-30-$2,462= $374,788,231
- Mod SA1502010-05-02-$5,595= $374,782,636
- Mod CO03K2010-05-03+$99,000= $374,881,636
- Mod SA1602010-05-03+$6,698= $374,888,334
- Mod CO03L2010-05-05+$15,000= $374,903,334
- Mod SA1622010-05-05-$3,896= $374,899,438
- Mod SA1612010-05-06+$19,715= $374,919,153
- Mod SA1632010-05-06-$1,316= $374,917,837
- Mod SA1642010-05-14+$18,774= $374,936,611
- Mod SA1652010-05-14+$816= $374,937,427
- Mod SA1662010-05-14+$6,301= $374,943,728
- Mod SA1672010-05-14+$44,500= $374,988,228
- Mod SA1682010-05-14+$2,659= $374,990,887
- Mod SA1692010-05-14+$13,232= $375,004,119
- Mod SA1712010-05-20+$9,381= $375,013,500
- Mod SA1702010-05-21+$5,478= $375,018,978
- Mod SA1722010-05-21+$10,897= $375,029,875
- Mod SA1732010-05-21+$10,858= $375,040,733
- Mod SA1742010-05-21+$39,975= $375,080,708
- Mod SA1772010-05-21+$0= $375,080,708
- Mod CO03M2010-06-02+$24,300= $375,105,008
- Mod CO03N2010-06-04+$6,100= $375,111,108
- Mod CO03O2010-06-07+$55,000= $375,166,108
- Mod CO03P2010-06-07+$4,000= $375,170,108
- Mod SA1752010-06-08+$1,213= $375,171,321
- Mod CO03Q2010-06-09+$15,000= $375,186,321
- Mod SA1762010-06-10+$121,642= $375,307,963
- Mod CO03R2010-06-16+$2,000= $375,309,963
- Mod SA1812010-06-21+$29,990= $375,339,953
- Mod CO03S2010-06-22+$50,000= $375,389,953
- Mod CO03T2010-06-23+$10,000= $375,399,953
- Mod CO03U2010-06-23+$10,000= $375,409,953
- Mod CO03V2010-06-30+$5,000= $375,414,953
- Mod CO03W2010-06-30+$0= $375,414,953
- Mod SA1822010-06-30+$1,139= $375,416,092
- Mod SA1832010-06-30+$3,327= $375,419,419
- Mod SA1842010-06-30+$2,326= $375,421,745
- Mod SA1852010-06-30+$748= $375,422,493
- Mod SA1862010-06-30+$4,307= $375,426,800
- Mod SA1872010-06-30+$24,242= $375,451,042
- Mod SA1882010-06-30+$0= $375,451,042
- Mod CO03X2010-07-02+$90,000= $375,541,042
- Mod SA1892010-07-06-$25,184= $375,515,858
- Mod SA1902010-07-06+$3,217= $375,519,075
- Mod CO03Y2010-07-08+$20,000= $375,539,075
- Mod SA1912010-07-08+$3,496= $375,542,571
- Mod SA1922010-07-08-$2,000= $375,540,571
- Mod CO03Z2010-07-09+$50,000= $375,590,571
- Mod CO04A2010-07-09+$5,000= $375,595,571
- Mod CO04B2010-07-09+$90,000= $375,685,571
- Mod CO04E2010-07-09+$10,000= $375,695,571
- Mod SA1932010-07-09+$13,999= $375,709,570
- Mod CO04C2010-07-10+$99,000= $375,808,570
- Mod CO04D2010-07-10+$99,000= $375,907,570
- Mod CO04F2010-07-10+$10,000= $375,917,570
- Mod SA1942010-07-13+$4,526= $375,922,096
- Mod CO04G2010-07-14+$0= $375,922,096
- Mod CO04H2010-07-16+$30,000= $375,952,096
- Mod SA1952010-07-16+$7,198= $375,959,294
- Mod CO04I2010-07-23+$5,000= $375,964,294
- Mod CO04J2010-07-27+$3,000= $375,967,294
- Mod CO04K2010-07-27+$40,000= $376,007,294
- Mod SA1962010-08-04+$34,187= $376,041,481
- Mod SA1972010-08-04+$19,752= $376,061,233
- Mod SA1982010-08-04+$7,019= $376,068,252
- Mod SA1992010-08-04+$20,745= $376,088,997
- Mod SA2002010-08-04+$2,776= $376,091,773
- Mod CO04L2010-08-05+$10,000= $376,101,773
- Mod SA2012010-08-09-$6,355= $376,095,418
- Mod SA2022010-08-09-$12,829= $376,082,589
- Mod SA2032010-08-09+$1,933= $376,084,522
- Mod SA2042010-08-09+$3,585= $376,088,107
- Mod SA2052010-08-09+$1,962= $376,090,069
- Mod SA2062010-08-09+$23,280= $376,113,349
- Mod CO04M2010-08-13+$12,000= $376,125,349
- Mod SA2072010-08-13+$6,289= $376,131,638
- Mod SA2082010-08-19+$18,547= $376,150,185
- Mod SA2092010-08-23-$20,774= $376,129,411
- Mod SA2102010-08-23+$40,145= $376,169,556
- Mod CO04N2010-08-25+$5,000= $376,174,556
- Mod CO04O2010-08-25+$3,000= $376,177,556
- Mod CO04P2010-08-25+$5,000= $376,182,556
- Mod CO04Q2010-08-30+$80,000= $376,262,556
- Mod CO04R2010-08-31+$95,000= $376,357,556
- Mod CO04S2010-09-02+$95,000= $376,452,556
- Mod CO04T2010-09-02+$13,000= $376,465,556
- Mod CO04U2010-09-03+$15,000= $376,480,556
- Mod SA2112010-09-10+$26,162= $376,506,718
- Mod SA2122010-09-13+$4,354= $376,511,072
- Mod SA2132010-09-13+$3,831= $376,514,903
- Mod SA2142010-09-13+$3,080= $376,517,983
- Mod SA2152010-09-13-$3,796= $376,514,187
- Mod SA2162010-09-13+$3,000= $376,517,187
- Mod SA2172010-09-16+$3,104= $376,520,291
- Mod SA2182010-09-16+$13,014= $376,533,305
- Mod CO04V2010-09-17+$5,000= $376,538,305
- Mod CO04W2010-09-23+$47,500= $376,585,805
- Mod SA2272010-09-27+$12,816= $376,598,621
- Mod SA2282010-09-27+$2,629= $376,601,250
- Mod SA2292010-09-27+$12,025= $376,613,275
- Mod SA2202010-09-28+$888= $376,614,163
- Mod SA2212010-09-28+$1,332= $376,615,495
- Mod SA2222010-09-28+$1,019= $376,616,514
- Mod SA2232010-09-28+$1,285= $376,617,799
- Mod SA2242010-09-28+$936= $376,618,735
- Mod SA2252010-09-28+$1,658= $376,620,393
- Mod SA2262010-09-28+$5,219= $376,625,612
- Mod SA2302010-09-28+$414= $376,626,026
- Mod SA2312010-09-28+$83= $376,626,109
- Mod SA2322010-09-28+$3,611= $376,629,720
- Mod SA2332010-09-28+$50,404= $376,680,124
- Mod SA2342010-09-29+$2,453= $376,682,577
- Mod SA2352010-09-29+$11,247= $376,693,824
- Mod CO05P2010-10-05+$95,000= $376,788,824
- Mod CO04X2010-10-07+$20,000= $376,808,824
- Mod CO04Y2010-10-07+$21,000= $376,829,824
- Mod CO04Z2010-10-07+$28,000= $376,857,824
- Mod CO05A2010-10-07+$55,000= $376,912,824
- Mod SA2362010-10-07+$13,728= $376,926,552
- Mod SA2372010-10-07+$3,277= $376,929,829
- Mod SA2382010-10-07+$7,759= $376,937,588
- Mod SA2412010-10-08-$5,690= $376,931,898
- Mod CO05B2010-10-11+$95,000= $377,026,898
- Mod CO05C2010-10-11+$70,000= $377,096,898
- Mod CO05D2010-10-11+$30,000= $377,126,898
- Mod SA2422010-10-11+$25,000= $377,151,898
- Mod SA2392010-10-12+$59,028= $377,210,926
- Mod SA2402010-10-12+$3,432= $377,214,358
- Mod CO05E2010-10-15+$50,000= $377,264,358
- Mod CO05F2010-10-15+$15,000= $377,279,358
- Mod SA2192010-10-15+$84,318= $377,363,676
- Mod SA2432010-10-15+$12,578= $377,376,254
- Mod SA2442010-10-15-$10,000= $377,366,254
- Mod SA2452010-10-15+$9,635= $377,375,889
- Mod SA2462010-10-15+$3,365= $377,379,254
- Mod CO05G2010-10-26+$2,000= $377,381,254
- Mod CO05H2010-10-26+$1,900= $377,383,154
- Mod SA2472010-10-26+$3,128= $377,386,282
- Mod SA2482010-10-26-$59,122= $377,327,160
- Mod CO05I2010-10-27+$6,500= $377,333,660
- Mod CO05J2010-10-27+$3,500= $377,337,160
- Mod CO05K2010-10-27+$2,500= $377,339,660
- Mod CO05L2010-10-27+$5,000= $377,344,660
- Mod SA2492010-10-27-$936= $377,343,724
- Mod SA2502010-10-27-$92,260= $377,251,464
- Mod SA2512010-10-27+$9,253= $377,260,717
- Mod 2192010-10-28+$84,318= $377,345,035
- Mod CO05M2010-11-04+$5,000= $377,350,035
- Mod SA2522010-11-04-$335= $377,349,700
- Mod CO05N2010-11-05+$6,000= $377,355,700
- Mod CO05O2010-11-05+$99,000= $377,454,700
- Mod CO05Q2010-11-05+$80,000= $377,534,700
- Mod SA2532010-11-05+$10,794= $377,545,494
- Mod SA2542010-11-05-$4,604= $377,540,890
- Mod SA2562010-11-08+$2,224= $377,543,114
- Mod CO05R2010-11-10+$5,000= $377,548,114
- Mod SA2572010-11-10-$5,374= $377,542,740
- Mod SA2582010-11-10+$8,988= $377,551,728
- Mod CO05S2010-11-12+$5,000= $377,556,728
- Mod CO05T2010-11-16+$5,000= $377,561,728
- Mod CO05U2010-11-18+$5,000= $377,566,728
- Mod SA2592010-11-18+$2,245= $377,568,973
- Mod SA2602010-11-19+$33,815= $377,602,788
- Mod SA2622010-11-19+$4,948= $377,607,736
- Mod SA2632010-11-19-$3,577= $377,604,159
- Mod SA2642010-11-19+$17,000= $377,621,159
- Mod SA2652010-11-19+$65,685= $377,686,844
- Mod SA2662010-11-19-$5,474= $377,681,370
- Mod SA2672010-11-19+$33,499= $377,714,869
- Mod CO05V2010-11-22+$4,000= $377,718,869
- Mod SA2612010-11-22+$1,627= $377,720,496
- Mod SA2682010-11-22+$1,109= $377,721,605
- Mod CO05W2010-11-23+$1,600= $377,723,205
- Mod CO05X2010-12-01+$5,000= $377,728,205
- Mod CO05Y2010-12-01+$9,500= $377,737,705
- Mod SA2692010-12-01+$4,175= $377,741,880
- Mod SA2702010-12-01+$21,766= $377,763,646
- Mod SA2712010-12-01+$3,831= $377,767,477
- Mod SA2722010-12-01+$5,619= $377,773,096
- Mod SA2732010-12-02+$20,200= $377,793,296
- Mod CO05Z2010-12-03+$25,000= $377,818,296
- Mod CO06A2010-12-03+$20,000= $377,838,296
- Mod CO06B2010-12-03+$81,657= $377,919,953
- Mod SA2742010-12-03+$12,252= $377,932,205
- Mod SA2752010-12-03+$19,099= $377,951,304
- Mod SA2762010-12-03+$86,000= $378,037,304
- Mod CO06C2010-12-08+$5,000= $378,042,304
- Mod SA2552010-12-08+$84,219= $378,126,523
- Mod CO06D2010-12-09+$10,000= $378,136,523
- Mod SA2802010-12-09+$1,543= $378,138,066
- Mod CO06E2010-12-10+$5,000= $378,143,066
- Mod SA2772010-12-10-$112= $378,142,954
- Mod SA2782010-12-10-$1,813= $378,141,141
- Mod SA2792010-12-10-$1,713= $378,139,428
- Mod CO06F2010-12-15-$4,000= $378,135,428
- Mod CO06G2010-12-15+$600= $378,136,028
- Mod SA2812010-12-16+$2,845= $378,138,873
- Mod CO06H2010-12-17+$10,000= $378,148,873
- Mod CO06K2010-12-17+$20,000= $378,168,873
- Mod SA2842010-12-17+$47,136= $378,216,009
- Mod CO06I2010-12-20+$35,000= $378,251,009
- Mod CO06J2010-12-20+$10,000= $378,261,009
- Mod SA2822010-12-21+$13,836= $378,274,845
- Mod SA2832010-12-21-$1,084= $378,273,761
- Mod CO06L2010-12-22+$2,700= $378,276,461
- Mod CO06M2010-12-27+$10,000= $378,286,461
- Mod CO06N2010-12-28+$2,600= $378,289,061
- Mod CO06O2010-12-28+$10,000= $378,299,061
- Mod CO06P2010-12-28+$25,000= $378,324,061
- Mod CO06Q2010-12-28+$10,000= $378,334,061
- Mod CO06R2010-12-28+$25,000= $378,359,061
- Mod CO06S2011-01-03+$5,000= $378,364,061
- Mod SA2852011-01-03+$2,735= $378,366,796
- Mod CO06T2011-01-04+$20,000= $378,386,796
- Mod SA2892011-01-04+$44,388= $378,431,184
- Mod SA2862011-01-05+$28,312= $378,459,496
- Mod CO06U2011-01-10+$750= $378,460,246
- Mod CO06V2011-01-12+$2,000= $378,462,246
- Mod SA2932011-01-12+$74,531= $378,536,777
- Mod CO06W2011-01-13+$17,500= $378,554,277
- Mod CO06X2011-01-20+$5,000= $378,559,277
- Mod CO06Y2011-01-21+$2,300= $378,561,577
- Mod CO06Z2011-01-21+$2,400= $378,563,977
- Mod CO07A2011-01-21+$5,000= $378,568,977
- Mod CO07B2011-01-21+$5,000= $378,573,977
- Mod CO07C2011-01-21+$15,000= $378,588,977
- Mod SA2952011-01-21+$20,772= $378,609,749
- Mod SA2972011-01-24+$2,904= $378,612,653
- Mod CO07D2011-01-28+$6,000= $378,618,653
- Mod CO07E2011-01-28+$14,600= $378,633,253
- Mod CO07F2011-01-28+$2,800= $378,636,053
- Mod SA2872011-01-28+$129,433= $378,765,486
- Mod SA2902011-01-28-$135,000= $378,630,486
- Mod SA2912011-01-28-$110,000= $378,520,486
- Mod SA2982011-01-28+$7,152= $378,527,638
- Mod SA2992011-01-28+$33,162= $378,560,800
- Mod SA3002011-01-28+$1,834= $378,562,634
- Mod SA3012011-01-28+$31,446= $378,594,080
- Mod SA2922011-01-31+$141,693= $378,735,773
- Mod SA3022011-01-31+$91,802= $378,827,575
- Mod SA3032011-02-04-$6= $378,827,569
- Mod SA3042011-02-04-$3,074= $378,824,495
- Mod SA3052011-02-04+$7,290= $378,831,785
- Mod SA3062011-02-04-$32,727= $378,799,058
- Mod CO07G2011-02-08+$9,000= $378,808,058
- Mod CO07H2011-02-08+$2,000= $378,810,058
- Mod CO07I2011-02-09+$5,000= $378,815,058
- Mod CO07J2011-02-09+$1,500= $378,816,558
- Mod CO07K2011-02-10+$2,300= $378,818,858
- Mod CO07L2011-02-11+$7,500= $378,826,358
- Mod CO07M2011-02-11+$8,000= $378,834,358
- Mod CO07N2011-02-11+$14,000= $378,848,358
- Mod CO07O2011-02-11+$15,000= $378,863,358
- Mod SA3072011-02-14-$724= $378,862,634
- Mod SA3082011-02-14-$291= $378,862,343
- Mod SA3092011-02-14+$855= $378,863,198
- Mod SA3102011-02-14-$1,538= $378,861,660
- Mod SA3112011-02-14+$9,019= $378,870,679
- Mod SA3122011-02-14-$71= $378,870,608
- Mod SA3132011-02-14+$4,722= $378,875,330
- Mod CO07P2011-02-15+$10,000= $378,885,330
- Mod CO07Q2011-02-15+$25,000= $378,910,330
- Mod CO07R2011-02-15+$16,000= $378,926,330
- Mod CO07S2011-02-16+$10,000= $378,936,330
- Mod SA2942011-02-16+$153,148= $379,089,478
- Mod CO07T2011-02-18+$1,500= $379,090,978
- Mod CO07U2011-02-18+$10,000= $379,100,978
- Mod SA2962011-02-18+$89,146= $379,190,124
- Mod CO07V2011-02-21+$7,000= $379,197,124
- Mod CO07W2011-02-21+$99,000= $379,296,124
- Mod SA3142011-02-22+$370= $379,296,494
- Mod SA3152011-02-22+$5,451= $379,301,945
- Mod SA3162011-02-22+$1,922= $379,303,867
- Mod SA3172011-02-22-$3,047= $379,300,820
- Mod SA3182011-02-22+$1,405= $379,302,225
- Mod SA3192011-02-22+$16,966= $379,319,191
- Mod SA3202011-02-22-$35,502= $379,283,689
- Mod SA3212011-02-22+$4,763= $379,288,452
- Mod SA3222011-02-22-$26,750= $379,261,702
- Mod SA3232011-02-22+$573= $379,262,275
- Mod SA3242011-02-22+$3,717= $379,265,992
- Mod SA3252011-02-22+$19,312= $379,285,304
- Mod CO07X2011-02-24+$4,500= $379,289,804
- Mod SA2882011-02-28+$261,938= $379,551,742
- Mod CO07Z2011-03-02+$4,000= $379,555,742
- Mod CO08A2011-03-04+$10,000= $379,565,742
- Mod CO08B2011-03-04+$14,000= $379,579,742
- Mod CO08C2011-03-04+$1,000= $379,580,742
- Mod CO08D2011-03-09+$20,000= $379,600,742
- Mod CO08E2011-03-11+$27,000= $379,627,742
- Mod CO08F2011-03-11+$95,000= $379,722,742
- Mod SA3262011-03-15+$1,881= $379,724,623
- Mod SA3272011-03-15+$5,197= $379,729,820
- Mod SA3282011-03-15-$4,273= $379,725,547
- Mod SA3292011-03-15+$12,329= $379,737,876
- Mod CO08G2011-03-16+$2,400= $379,740,276
- Mod CO08H2011-03-18+$3,000= $379,743,276
- Mod CO08I2011-03-18-$20,000= $379,723,276
- Mod CO08J2011-03-18-$8,000= $379,715,276
- Mod CO08K2011-03-18+$7,000= $379,722,276
- Mod SA3302011-03-21+$2,580= $379,724,856
- Mod SA3312011-03-21+$867= $379,725,723
- Mod SA3322011-03-21-$9,522= $379,716,201
- Mod SA3332011-03-21+$3,135= $379,719,336
- Mod SA3342011-03-21-$4,746= $379,714,590
- Mod CO08L2011-03-22+$85,000= $379,799,590
- Mod CO08M2011-03-22+$5,000= $379,804,590
- Mod CO08N2011-03-23+$3,700= $379,808,290
- Mod CO08O2011-03-23+$2,000= $379,810,290
- Mod CO08P2011-03-23+$5,000= $379,815,290
- Mod CO08Q2011-03-25+$6,500= $379,821,790
- Mod CO08R2011-03-25+$1,400= $379,823,190
- Mod CO08S2011-03-28+$45,000= $379,868,190
- Mod CO08T2011-04-04+$5,000= $379,873,190
- Mod CO08U2011-04-06+$15,000= $379,888,190
- Mod SA3372011-04-06+$771= $379,888,961
- Mod SA3382011-04-06+$603= $379,889,564
- Mod SA3392011-04-06+$982= $379,890,546
- Mod SA3402011-04-11-$190= $379,890,356
- Mod SA3412011-04-11+$1,636= $379,891,992
- Mod CO08V2011-04-13+$8,000= $379,899,992
- Mod CO08W2011-04-13+$5,000= $379,904,992
- Mod SA3422011-04-13-$5,254= $379,899,738
- Mod SA3432011-04-13+$12,576= $379,912,314
- Mod CO08X2011-04-14+$2,000= $379,914,314
- Mod CO08Y2011-04-15+$30,000= $379,944,314
- Mod CO08Z2011-04-15+$8,000= $379,952,314
- Mod CO09A2011-04-15+$2,300= $379,954,614
- Mod CO09B2011-04-15+$50,000= $380,004,614
- Mod CO09C2011-04-15+$30,000= $380,034,614
- Mod CO09D2011-04-15+$30,000= $380,064,614
- Mod SA3442011-04-15+$76,908= $380,141,522
- Mod SA3452011-04-15+$5,952= $380,147,474
- Mod SA3462011-04-15+$10,134= $380,157,608
- Mod CO09E2011-04-19+$5,000= $380,162,608
- Mod SA3472011-04-19+$3,740= $380,166,348
- Mod SA3482011-04-19+$1,599= $380,167,947
- Mod CO09F2011-04-22+$15,000= $380,182,947
- Mod SA3492011-04-22-$212= $380,182,735
- Mod CO09I2011-04-25+$20,000= $380,202,735
- Mod SA3352011-04-25+$1,096,059= $381,298,794
- Mod SA3502011-04-25+$18,209= $381,317,003
- Mod SA3512011-04-25+$3,965= $381,320,968
- Mod CO09H2011-04-26+$1,000= $381,321,968
- Mod SA3522011-04-26+$20,873= $381,342,841
- Mod CO09J2011-04-27+$10,000= $381,352,841
- Mod SA3542011-04-29+$25,892= $381,378,733
- Mod CO09L2011-05-02+$7,500= $381,386,233
- Mod SA3532011-05-02-$679= $381,385,554
- Mod SA3562011-05-02+$15,424= $381,400,978
- Mod CO09K2011-05-03+$2,500= $381,403,478
- Mod CO09M2011-05-03+$1,000= $381,404,478
- Mod CO09N2011-05-03+$95,000= $381,499,478
- Mod CO09O2011-05-05+$10,000= $381,509,478
- Mod CO09P2011-05-06+$90,000= $381,599,478
- Mod SA3572011-05-09-$1,793= $381,597,685
- Mod SA3582011-05-09+$1,430= $381,599,115
- Mod SA3592011-05-09+$5,566= $381,604,681
- Mod SA3602011-05-12-$2,828= $381,601,853
- Mod SA3632011-05-12+$1,399= $381,603,252
- Mod SA3612011-05-13+$1,149= $381,604,401
- Mod SA3622011-05-13-$3,703= $381,600,698
- Mod SA3642011-05-13+$3,950= $381,604,648
- Mod SA3652011-05-16-$2,510= $381,602,138
- Mod SA3662011-05-16+$14,490= $381,616,628
- Mod SA3672011-05-16+$2,120= $381,618,748
- Mod SA3682011-05-19+$583= $381,619,331
- Mod CO09Q2011-05-20+$10,000= $381,629,331
- Mod CO09S2011-05-25+$7,800= $381,637,131
- Mod SA3552011-05-25-$118,681= $381,518,450
- Mod SA3692011-05-25-$1,841= $381,516,609
- Mod SA3702011-05-25+$2,534= $381,519,143
- Mod SA3712011-05-25-$2,007= $381,517,136
- Mod CO09T2011-05-26+$2,000= $381,519,136
- Mod CO09U2011-05-26+$10,000= $381,529,136
- Mod CO09V2011-05-26+$5,000= $381,534,136
- Mod CO09X2011-05-26+$75,000= $381,609,136
- Mod CO09W2011-05-27+$6,000= $381,615,136
- Mod SA3722011-05-31+$3,087= $381,618,223
- Mod CO09Y2011-06-03+$14,000= $381,632,223
- Mod CO09Z2011-06-03+$5,000= $381,637,223
- Mod SA3742011-06-03+$3,061= $381,640,284
- Mod CO09R2011-06-07+$5,000= $381,645,284
- Mod CO10A2011-06-07+$15,000= $381,660,284
- Mod SA3752011-06-07-$158= $381,660,126
- Mod SA3762011-06-08+$20,354= $381,680,480
- Mod CO10B2011-06-14+$5,000= $381,685,480
- Mod CO10C2011-06-14+$16,500= $381,701,980
- Mod CO10D2011-06-14+$86,000= $381,787,980
- Mod SA3772011-06-14-$2,817= $381,785,163
- Mod SA3782011-06-14+$19,069= $381,804,232
- Mod SA3792011-06-14+$7,991= $381,812,223
- Mod SA3802011-06-14+$1,742= $381,813,965
- Mod SA3812011-06-14-$880= $381,813,085
- Mod SA3832011-06-14+$16,651= $381,829,736
- Mod SA3842011-06-14-$1,788= $381,827,948
- Mod SA3822011-06-16-$3,681= $381,824,267
- Mod SA3862011-06-21+$1,921= $381,826,188
- Mod SA3852011-06-28-$749= $381,825,439
- Mod SA3872011-06-30-$453= $381,824,986
- Mod SA3882011-06-30+$10,797= $381,835,783
- Mod SA3892011-06-30+$2,882= $381,838,665
- Mod SA3902011-06-30+$19,961= $381,858,626
- Mod SA3912011-06-30+$11,232= $381,869,858
- Mod SA3922011-07-01+$93,651= $381,963,509
- Mod CO10E2011-07-05+$20,000= $381,983,509
- Mod SA3932011-07-06+$2,551= $381,986,060
- Mod SA3942011-07-06+$3,420= $381,989,480
- Mod SA3952011-07-06+$7,152= $381,996,632
- Mod SA3962011-07-07-$4,120= $381,992,512
- Mod CO10F2011-07-08+$10,000= $382,002,512
- Mod CO10G2011-07-08+$25,000= $382,027,512
- Mod CO10H2011-07-08+$5,000= $382,032,512
- Mod CO10I2011-07-08+$1,500= $382,034,012
- Mod SA4002011-07-08+$31,417= $382,065,429
- Mod CO10J2011-07-12+$6,000= $382,071,429
- Mod CO10K2011-07-12+$4,200= $382,075,629
- Mod SA3972011-07-12+$1,608= $382,077,237
- Mod SA3982011-07-12+$68,254= $382,145,491
- Mod SA3992011-07-12+$4,675= $382,150,166
- Mod CO10L2011-07-14+$2,500= $382,152,666
- Mod CO10N2011-07-18+$30,000= $382,182,666
- Mod SA3362011-07-18+$1,745,866= $383,928,532
- Mod SA3732011-07-18+$130,568= $384,059,100
- Mod SA4012011-07-18+$119= $384,059,219
- Mod SA4022011-07-21+$3,310= $384,062,529
- Mod SA4032011-07-25+$9,750= $384,072,279
- Mod SA4052011-07-25+$18,029= $384,090,308
- Mod CO10O2011-07-27+$40,000= $384,130,308
- Mod SA4042011-07-27+$4,132= $384,134,440
- Mod SA4062011-07-27+$82,268= $384,216,708
- Mod CO10P2011-07-29+$10,000= $384,226,708
- Mod CO10S2011-07-29+$30,000= $384,256,708
- Mod SA4082011-08-01+$76,908= $384,333,616
- Mod CO10Q2011-08-02+$10,000= $384,343,616
- Mod CO10R2011-08-02+$2,600= $384,346,216
- Mod SA4072011-08-03+$2,162= $384,348,378
- Mod CO10T2011-08-08+$8,500= $384,356,878
- Mod SA4092011-08-08-$4,267= $384,352,611
- Mod SA4102011-08-08+$116= $384,352,727
- Mod SA4112011-08-08-$3,104= $384,349,623
- Mod SA4132011-08-08+$11,744= $384,361,367
- Mod SA4142011-08-08+$8,096= $384,369,463
- Mod SA4162011-08-08+$1,250= $384,370,713
- Mod CO10U2011-08-09+$15,000= $384,385,713
- Mod SA4122011-08-09+$22,500= $384,408,213
- Mod SA4152011-08-09+$22,072= $384,430,285
- Mod CO10V2011-08-11+$45,000= $384,475,285
- Mod CO10X2011-08-12+$8,500= $384,483,785
- Mod CO10Y2011-08-12+$5,000= $384,488,785
- Mod CO10W2011-08-15+$85,000= $384,573,785
- Mod CO10Z2011-08-15+$15,000= $384,588,785
- Mod SA4172011-08-15-$96,320= $384,492,465
- Mod SA4202011-08-15-$100= $384,492,365
- Mod SA4212011-08-15-$2,434= $384,489,931
- Mod SA4222011-08-15+$1,415= $384,491,346
- Mod SA4232011-08-15+$16,431= $384,507,777
- Mod SA4242011-08-15+$31,565= $384,539,342
- Mod SA4252011-08-15+$44,875= $384,584,217
- Mod SA4262011-08-15+$4,489= $384,588,706
- Mod SA4272011-08-15+$14,696= $384,603,402
- Mod CO11A2011-08-17+$5,000= $384,608,402
- Mod CO11B2011-08-17+$95,000= $384,703,402
- Mod CO11C2011-08-17+$65,000= $384,768,402
- Mod SA4332011-08-18+$76,908= $384,845,310
- Mod CO11E2011-08-19+$20,000= $384,865,310
- Mod SA4282011-08-19+$7,631= $384,872,941
- Mod SA4312011-08-19+$0= $384,872,941
- Mod SA4352011-08-19+$0= $384,872,941
- Mod SA4362011-08-19+$0= $384,872,941
- Mod SA4372011-08-19-$860= $384,872,081
- Mod SA4392011-08-22+$0= $384,872,081
- Mod CO11D2011-08-23+$5,000= $384,877,081
- Mod SA4342011-08-23+$0= $384,877,081
- Mod SA4382011-08-23+$0= $384,877,081
- Mod SA4402011-08-23+$0= $384,877,081
- Mod SA4292011-08-25+$2,963= $384,880,044
- Mod SA4322011-08-25+$1,000= $384,881,044
- Mod SA4422011-08-25+$0= $384,881,044
- Mod CO10M2011-08-26+$900,000= $385,781,044
- Mod SA4302011-08-26+$12,000= $385,793,044
- Mod SA4432011-08-31+$4,400= $385,797,444
- Mod SA4462011-08-31+$20,000= $385,817,444
- Mod SA4472011-08-31+$10,168= $385,827,612
- Mod SA4482011-08-31+$5,139= $385,832,751
- Mod SA4442011-09-01+$2,995= $385,835,746
- Mod SA4192011-09-05+$200,819= $386,036,565
- Mod SA4502011-09-06+$16,619= $386,053,184
- Mod SA4492011-09-08+$64,460= $386,117,644
- Mod CO11F2011-09-09+$5,000= $386,122,644
- Mod SA4512011-09-09+$4,817= $386,127,461
- Mod SA4522011-09-09+$1,778= $386,129,239
- Mod SA4542011-09-09+$65,329= $386,194,568
- Mod SA4552011-09-09+$76,908= $386,271,476
- Mod CO11G2011-09-12+$60,000= $386,331,476
- Mod SA4562011-09-12+$17,523= $386,348,999
- Mod SA4582011-09-14+$5,127= $386,354,126
- Mod CO11H2011-09-15+$2,000= $386,356,126
- Mod SA4412011-09-15+$16,000= $386,372,126
- Mod SA4592011-09-15+$2,803= $386,374,929
- Mod CO11J2011-09-20+$50,000= $386,424,929
- Mod CO11K2011-09-21+$40,000= $386,464,929
- Mod CO11L2011-09-22+$50,000= $386,514,929
- Mod SA4602011-09-23+$3,522= $386,518,451
- Mod SA4612011-09-23-$4,385= $386,514,066
- Mod SA4622011-09-26+$19,491= $386,533,557
- Mod SA4632011-09-26+$26,151= $386,559,708
- Mod SA4642011-09-26+$4,630= $386,564,338
- Mod CO11M2011-09-27+$10,000= $386,574,338
- Mod CO11N2011-09-27+$10,000= $386,584,338
- Mod CO11O2011-09-29+$1,500= $386,585,838
- Mod CO11P2011-10-03+$78,000= $386,663,838
- Mod CO11Q2011-10-04+$2,500= $386,666,338
- Mod SA4652011-10-05+$2,689= $386,669,027
- Mod CO11R2011-10-07+$55,000= $386,724,027
- Mod CO11S2011-10-07+$25,000= $386,749,027
- Mod CO11T2011-10-07+$3,000= $386,752,027
- Mod CO11U2011-10-07+$1,500= $386,753,527
- Mod SA4662011-10-11-$1,414= $386,752,113
- Mod CO11W2011-10-18+$10,000= $386,762,113
- Mod SA4672011-10-18+$6,351= $386,768,464
- Mod SA4692011-10-18+$6,441= $386,774,905
- Mod CO11X2011-10-20+$35,000= $386,809,905
- Mod SA4682011-10-20+$19,839= $386,829,744
- Mod SA4702011-10-20+$69,011= $386,898,755
- Mod SA4572011-10-24+$340,132= $387,238,887
- Mod SA4712011-10-24+$12,187= $387,251,074
- Mod SA4722011-10-24-$4,737= $387,246,337
- Mod SA4732011-10-24+$12,817= $387,259,154
- Mod CO11I2011-10-25+$250,000= $387,509,154
- Mod SA4742011-10-25+$69,817= $387,578,971
- Mod SA4752011-10-28+$43,338= $387,622,309
- Mod SA4772011-11-02+$76,908= $387,699,217
- Mod CO12A2011-11-03+$30,000= $387,729,217
- Mod CO12B2011-11-03+$2,500= $387,731,717
- Mod SA4792011-11-04+$76,908= $387,808,625
- Mod SA4762011-11-07+$1,179= $387,809,804
- Mod SA4782011-11-07-$177= $387,809,627
- Mod SA4822011-11-07+$2,554= $387,812,181
- Mod SA4832011-11-07+$2,968= $387,815,149
- Mod SA4842011-11-07+$11,447= $387,826,596
- Mod SA4802011-11-08+$688= $387,827,284
- Mod SA4812011-11-08+$63,858= $387,891,142
- Mod SA4872011-11-10-$5,419= $387,885,723
- Mod SA4882011-11-16+$2,939= $387,888,662
- Mod SA4892011-11-16+$3,730= $387,892,392
- Mod SA4902011-11-16+$4,245= $387,896,637
- Mod SA4912011-11-16+$92,000= $387,988,637
- Mod SA4922011-11-16+$29,790= $388,018,427
- Mod CO11V2011-11-17+$25,000= $388,043,427
- Mod SA4932011-11-18+$1,665= $388,045,092
- Mod SA4942011-11-18+$940= $388,046,032
- Mod CO11Y2011-11-24+$98,000= $388,144,032
- Mod SA4972011-11-28+$89,000= $388,233,032
- Mod SA4982011-11-28+$11,000= $388,244,032
- Mod SA4992011-11-29+$895= $388,244,927
- Mod SA5012011-11-29+$29,948= $388,274,875
- Mod SA5032011-11-29+$912= $388,275,787
- Mod SA5042011-11-29+$4,793= $388,280,580
- Mod SA4962011-11-30+$20,299= $388,300,879
- Mod SA5002011-11-30-$3,204= $388,297,675
- Mod SA5022011-11-30+$1,218= $388,298,893
- Mod SA5052011-11-30-$9,098= $388,289,795
- Mod SA5062011-11-30-$16,375= $388,273,420
- Mod SA5072011-11-30-$4,063= $388,269,357
- Mod SA5082011-11-30+$12,980= $388,282,337
- Mod SA5092011-11-30+$37,586= $388,319,923
- Mod CO12C2011-12-01+$80,000= $388,399,923
- Mod SA5122011-12-04-$6,001= $388,393,922
- Mod SA5102011-12-08+$67,936= $388,461,858
- Mod SA5112011-12-08+$68,004= $388,529,862
- Mod SA5132011-12-08+$68,826= $388,598,688
- Mod SA5142011-12-08+$5,026= $388,603,714
- Mod SA5152011-12-08-$1,132= $388,602,582
- Mod SA5162011-12-09-$2,149= $388,600,433
- Mod SA5172011-12-09+$356= $388,600,789
- Mod SA5182011-12-09+$674= $388,601,463
- Mod SA5192011-12-13+$69,900= $388,671,363
- Mod SA5202011-12-13+$76,908= $388,748,271
- Mod SA5212011-12-13+$444= $388,748,715
- Mod SA5222011-12-13+$70,307= $388,819,022
- Mod SA5232011-12-14+$2,272= $388,821,294
- Mod SA5252011-12-19-$585= $388,820,709
- Mod SA5402011-12-29+$1,007= $388,821,716
- Mod SA4852012-01-03+$31,417= $388,853,133
- Mod SA5412012-01-03+$10,880= $388,864,013
- Mod SA4862012-01-05+$204,411= $389,068,424
- Mod SA4952012-01-05+$84,529= $389,152,953
- Mod SA4452012-01-06+$163,438= $389,316,391
- Mod CO12D2012-01-09+$15,000= $389,331,391
- Mod SA5442012-01-10+$2,323= $389,333,714
- Mod SA5452012-01-10+$50,025= $389,383,739
- Mod SA5462012-01-10+$50,000= $389,433,739
- Mod SA5472012-01-10+$3,361= $389,437,100
- Mod SA5422012-01-11-$27,476= $389,409,624
- Mod SA5432012-01-11+$17,121= $389,426,745
- Mod SA5482012-01-12+$43,148= $389,469,893
- Mod SA5492012-01-12+$43,148= $389,513,041
- Mod SA5502012-01-12+$46,085= $389,559,126
- Mod SA5512012-01-12+$45,501= $389,604,627
- Mod SA5522012-01-12-$635= $389,603,992
- Mod SA5532012-01-12-$228= $389,603,764
- Mod SA4182012-01-13+$350,065= $389,953,829
- Mod SA5542012-01-19+$12= $389,953,841
- Mod SA5562012-01-19+$6,000= $389,959,841
- Mod SA5572012-01-19+$3,358= $389,963,199
- Mod CO12E2012-01-22+$35,000= $389,998,199
- Mod SA5582012-01-27+$14,138= $390,012,337
- Mod SA5592012-01-27+$2,867= $390,015,204
- Mod CO12F2012-01-30+$50,000= $390,065,204
- Mod CO12G2012-01-30+$10,000= $390,075,204
- Mod CO12H2012-01-30+$65,000= $390,140,204
- Mod CO12I2012-01-30+$7,000= $390,147,204
- Mod CO12J2012-01-31+$23,000= $390,170,204
- Mod CO12K2012-01-31+$6,000= $390,176,204
- Mod SA5612012-01-31+$5,873= $390,182,077
- Mod SA5622012-01-31-$14,997= $390,167,080
- Mod SA5632012-01-31-$134= $390,166,946
- Mod SA5642012-01-31+$10,006= $390,176,952
- Mod SA5652012-01-31+$2,365= $390,179,317
- Mod SA5662012-01-31+$3,253= $390,182,570
- Mod SA5692012-01-31+$10,705= $390,193,275
- Mod SA4532012-02-09+$363,646= $390,556,921
- Mod SA5672012-02-09+$71,082= $390,628,003
- Mod SA5682012-02-09+$72,031= $390,700,034
- Mod SA5242012-02-14+$0= $390,700,034
- Mod SA5712012-02-15+$3,443= $390,703,477
- Mod SA5732012-02-15+$99,986= $390,803,463
- Mod SA5752012-02-16+$86= $390,803,549
- Mod SA5702012-02-22+$60,066= $390,863,615
- Mod SA5772012-02-22+$71,148= $390,934,763
- Mod SA5782012-02-22+$97,075= $391,031,838
- Mod SA5792012-02-22+$681,913= $391,713,751
- Mod SA5802012-02-22+$12,964= $391,726,715
- Mod SA5812012-02-22-$9,284= $391,717,431
- Mod SA5822012-02-22+$21,536= $391,738,967
- Mod SA5832012-02-29-$1,372= $391,737,595
- Mod SA5842012-02-29+$1,970= $391,739,565
- Mod SA5852012-02-29+$1,133= $391,740,698
- Mod SA5862012-02-29+$3,151= $391,743,849
- Mod SA5872012-02-29+$7,827= $391,751,676
- Mod SA5882012-02-29+$99,960= $391,851,636
- Mod SA5892012-02-29+$28,701= $391,880,337
- Mod SA5902012-02-29+$18,752= $391,899,089
- Mod SA5912012-02-29+$1,178= $391,900,267
- Mod SA5932012-02-29+$10,257= $391,910,524
- Mod SA5922012-03-06+$76,908= $391,987,432
- Mod SA5942012-03-06+$76,908= $392,064,340
- Mod SA5952012-03-09+$4,501= $392,068,841
- Mod SA5962012-03-13+$44,461= $392,113,302
- Mod SA5972012-03-13+$4,036= $392,117,338
- Mod SA6042012-03-13+$26,824= $392,144,162
- Mod SA6052012-03-15+$56,555= $392,200,717
- Mod SA6002012-03-19-$42,933= $392,157,784
- Mod SA6012012-03-19+$69,640= $392,227,424
- Mod SA6022012-03-19+$33,733= $392,261,157
- Mod SA6032012-03-19+$14,107= $392,275,264
- Mod SA6062012-03-19+$42,441= $392,317,705
- Mod SA5982012-03-21+$14,599= $392,332,304
- Mod SA5992012-03-21+$646= $392,332,950
- Mod SA6112012-03-21-$2,574= $392,330,376
- Mod SA6122012-03-21+$19,351= $392,349,727
- Mod SA5722012-03-22+$80,000= $392,429,727
- Mod SA6142012-03-22+$6,358= $392,436,085
- Mod SA6082012-03-23+$68,461= $392,504,546
- Mod SA6092012-03-23+$70,357= $392,574,903
- Mod SA5742012-03-27+$90,000= $392,664,903
- Mod SA5762012-03-27+$30,795= $392,695,698
- Mod SA6152012-03-27+$3,664= $392,699,362
- Mod SA6162012-03-29+$76,908= $392,776,270
- Mod SA6172012-03-29+$8,000= $392,784,270
- Mod SA6182012-03-29+$800= $392,785,070
- Mod SA6192012-03-29+$2,000= $392,787,070
- Mod SA6202012-03-29+$2,000= $392,789,070
- Mod SA6212012-03-29+$8,000= $392,797,070
- Mod SA6222012-03-30-$1,993= $392,795,077
- Mod SA6242012-03-30+$3,627= $392,798,704
- Mod SA5602012-04-09+$118,861= $392,917,565
- Mod SA6072012-04-13+$77,941= $392,995,506
- Mod SA6302012-04-25-$2,106= $392,993,400
- Mod SA6232012-04-26+$1,500= $392,994,900
- Mod SA6252012-04-26+$5,000= $392,999,900
- Mod SA6262012-04-26-$10,819= $392,989,081
- Mod SA6292012-04-26+$2,500= $392,991,581
- Mod SA6322012-04-26-$2,038= $392,989,543
- Mod SA6332012-04-26+$17,000= $393,006,543
- Mod SA6402012-04-26+$5,993= $393,012,536
- Mod SA5552012-04-30+$220,000= $393,232,536
- Mod SA6342012-04-30-$3,300= $393,229,236
- Mod SA6352012-04-30-$2,295= $393,226,941
- Mod SA6362012-04-30-$5,666= $393,221,275
- Mod SA6372012-04-30+$2,000= $393,223,275
- Mod SA6382012-04-30+$10,000= $393,233,275
- Mod SA6392012-04-30+$80,988= $393,314,263
- Mod SA6412012-04-30+$491= $393,314,754
- Mod SA6422012-04-30+$11,700= $393,326,454
- Mod SA6432012-04-30+$6,034= $393,332,488
- Mod SA6442012-04-30-$1,610= $393,330,878
- Mod SA6452012-04-30+$1,379= $393,332,257
- Mod SA6462012-04-30+$32,113= $393,364,370
- Mod SA6472012-04-30+$33,012= $393,397,382
- Mod SA6482012-04-30+$7,888= $393,405,270
- Mod SA6492012-04-30+$5,393= $393,410,663
- Mod SA6502012-04-30+$12,268= $393,422,931
- Mod SA6512012-04-30+$8,313= $393,431,244
- Mod SA6522012-04-30+$13,993= $393,445,237
- Mod SA6532012-04-30+$4,449= $393,449,686
- Mod SA6542012-04-30+$76,908= $393,526,594
- Mod SA6552012-04-30+$89,241= $393,615,835
- Mod SA6602012-04-30+$73,699= $393,689,534
- Mod SA6562012-05-05+$54,934= $393,744,468
- Mod SA6572012-05-10+$4,568= $393,749,036
- Mod SA6582012-05-10+$30,206= $393,779,242
- Mod SA6592012-05-10+$49,937= $393,829,179
- Mod SA6612012-05-16+$99,986= $393,929,165
- Mod SA6622012-05-17+$38,565= $393,967,730
- Mod SA6632012-05-17+$0= $393,967,730
- Mod SA6652012-05-23+$0= $393,967,730
- Mod SA6662012-05-23+$5,600= $393,973,330
- Mod SA6642012-05-31+$43,000= $394,016,330
- Mod SA6672012-05-31+$33,482= $394,049,812
- Mod SA6682012-05-31+$26,710= $394,076,522
- Mod SA6692012-05-31+$99,926= $394,176,448
- Mod SA6732012-05-31+$20,488= $394,196,936
- Mod SA6742012-05-31+$9,105= $394,206,041
- Mod SA6712012-06-07-$17,530= $394,188,511
- Mod SA6722012-06-07-$33,224= $394,155,287
- Mod SA6102012-06-08+$153,274= $394,308,561
- Mod SA6132012-06-08+$183,377= $394,491,938
- Mod SA5262012-06-11-$14,985= $394,476,953
- Mod SA5272012-06-11+$28,000= $394,504,953
- Mod SA5282012-06-11+$7,958= $394,512,911
- Mod SA5292012-06-11+$4,767= $394,517,678
- Mod SA5302012-06-11+$11,413= $394,529,091
- Mod SA5312012-06-11+$6,597= $394,535,688
- Mod SA5322012-06-11-$24,522= $394,511,166
- Mod SA5332012-06-11-$25,948= $394,485,218
- Mod SA5342012-06-11-$12,488= $394,472,730
- Mod SA5352012-06-11+$15,990= $394,488,720
- Mod SA5362012-06-11+$5,309= $394,494,029
- Mod SA5372012-06-11+$3,626= $394,497,655
- Mod SA5382012-06-11+$2,107= $394,499,762
- Mod SA5392012-06-11+$78,627= $394,578,389
- Mod SA6282012-06-13+$76,908= $394,655,297
- Mod SA6312012-06-13+$5,385= $394,660,682
- Mod SA6752012-06-13+$68,882= $394,729,564
- Mod SA6772012-06-13+$12,879= $394,742,443
- Mod SA6782012-06-13+$24,832= $394,767,275
- Mod SA6792012-06-13-$15,802= $394,751,473
- Mod SA6802012-06-13+$300= $394,751,773
- Mod SA6812012-06-13+$782= $394,752,555
- Mod SA6822012-06-13+$1,500= $394,754,055
- Mod SA6832012-06-13+$24,000= $394,778,055
- Mod SA6842012-06-13+$8,000= $394,786,055
- Mod SA6852012-06-13+$8,000= $394,794,055
- Mod SA6862012-06-13+$8,500= $394,802,555
- Mod SA6872012-06-13+$33,500= $394,836,055
- Mod SA6882012-06-13+$600= $394,836,655
- Mod SA6892012-06-13+$8,800= $394,845,455
- Mod SA6902012-06-13+$10,150= $394,855,605
- Mod SA6912012-06-13+$45,948= $394,901,553
- Mod SA6922012-06-13+$7,416= $394,908,969
- Mod SA6932012-06-13+$25,804= $394,934,773
- Mod SA6942012-06-13+$10,525= $394,945,298
- Mod SA6952012-06-13+$13,000= $394,958,298
- Mod SA6962012-06-13+$41,000= $394,999,298
- Mod SA6272012-06-19+$591,354= $395,590,652
- Mod SA7022012-06-20+$2,400= $395,593,052
- Mod SA6972012-06-28+$5,129= $395,598,181
- Mod SA6982012-06-28+$4,500= $395,602,681
- Mod SA6992012-06-28+$3,500= $395,606,181
- Mod SA7002012-06-28+$10,000= $395,616,181
- Mod SA7012012-06-28+$2,500= $395,618,681
- Mod SA7032012-06-28+$8,053= $395,626,734
- Mod SA7042012-06-28+$12,617= $395,639,351
- Mod SA7052012-06-28+$18,200= $395,657,551
- Mod SA7062012-06-28+$6,000= $395,663,551
- Mod SA7072012-06-29+$6,900= $395,670,451
- Mod SA7082012-06-29+$7,000= $395,677,451
- Mod SA7092012-06-29+$9,263= $395,686,714
- Mod SA7102012-06-29+$99,000= $395,785,714
- Mod SA7112012-06-29+$12,189= $395,797,903
- Mod SA7122012-06-29-$25,000= $395,772,903
- Mod SA6762012-07-06+$616,754= $396,389,657
- Mod SA7142012-07-17+$13,600= $396,403,257
- Mod SA7162012-07-17+$22,779= $396,426,036
- Mod SA7172012-07-17+$10,000= $396,436,036
- Mod SA7182012-07-17+$6,468= $396,442,504
- Mod SA7192012-07-19+$23,658= $396,466,162
- Mod SA7132012-07-20+$88,000= $396,554,162
- Mod SA7202012-07-23+$40,000= $396,594,162
- Mod SA7212012-07-23+$41,000= $396,635,162
- Mod SA7222012-07-23+$17,658= $396,652,820
- Mod SA7232012-07-23+$32,079= $396,684,899
- Mod SA7242012-07-23+$14,691= $396,699,590
- Mod SA7252012-07-23+$86,820= $396,786,410
- Mod SA7292012-07-24+$25,000= $396,811,410
- Mod SA7302012-07-24+$6,882= $396,818,292
- Mod SA7152012-07-25+$15,000= $396,833,292
- Mod SA7262012-07-25+$75,092= $396,908,384
- Mod SA7272012-07-25+$15,526= $396,923,910
- Mod SA7282012-07-27+$74,908= $396,998,818
- Mod SA7332012-07-27+$2,000= $397,000,818
- Mod SA7342012-07-27+$11,000= $397,011,818
- Mod SA7352012-07-31+$7,810= $397,019,628
- Mod SA7362012-07-31+$12,250= $397,031,878
- Mod SA7372012-07-31+$7,500= $397,039,378
- Mod SA7382012-07-31+$3,300= $397,042,678
- Mod SA7392012-07-31+$20,221= $397,062,899
- Mod SA7402012-08-01+$16,953= $397,079,852
- Mod SA7432012-08-09+$3,178= $397,083,030
- Mod SA7412012-08-10+$25,495= $397,108,525
- Mod SA7422012-08-10+$52,101= $397,160,626
- Mod SA7442012-08-10+$0= $397,160,626
- Mod SA7452012-08-10+$2,532= $397,163,158
- Mod SA7472012-08-13+$15,000= $397,178,158
- Mod SA7482012-08-13+$66,000= $397,244,158
- Mod SA7462012-08-14+$17,101= $397,261,259
- Mod SA6702012-09-05+$988,367= $398,249,626
- Mod SA7312012-09-10+$60,000= $398,309,626
- Mod SA7322012-09-10+$105,000= $398,414,626
- Mod SA7512012-09-27+$33,000= $398,447,626
- Mod SA7492012-10-01+$5,700= $398,453,326
- Mod SA7522012-10-01+$16,720= $398,470,046
- Mod SA7532012-10-01+$32,375= $398,502,421
- Mod SA7542012-10-01+$22,177= $398,524,598
- Mod SA7552012-10-01+$54,991= $398,579,589
- Mod SA7562012-10-01+$80,466= $398,660,055
- Mod SA7572012-10-01+$10,434= $398,670,489
- Mod SA7582012-10-01+$10,730= $398,681,219
- Mod SA7602012-10-01+$27,378= $398,708,597
- Mod SA7612012-10-01+$22,168= $398,730,765
- Mod SA7622012-10-01+$21,900= $398,752,665
- Mod SA7632012-10-01+$38,130= $398,790,795
- Mod SA7642012-10-01+$16,066= $398,806,861
- Mod SA7652012-10-01+$27,677= $398,834,538
- Mod SA7662012-10-01+$29,884= $398,864,422
- Mod SA7672012-10-01+$5,312= $398,869,734
- Mod SA7682012-10-01+$1,369= $398,871,103
- Mod SA7692012-10-01+$7,000= $398,878,103
- Mod SA7702012-10-01+$9,812= $398,887,915
- Mod SA7712012-10-01+$2,029= $398,889,944
- Mod SA7722012-10-01+$2,401= $398,892,345
- Mod SA7592012-10-09+$28,237= $398,920,582
- Mod SA7732012-10-11+$20,000= $398,940,582
- Mod SA7742012-10-11+$25,000= $398,965,582
- Mod SA7752012-10-11+$31,623= $398,997,205
- Mod SA7762012-10-11+$12,648= $399,009,853
- Mod SA7772012-10-30+$14,801= $399,024,654
- Mod SA7502012-11-01+$61,600= $399,086,254
- Mod SA7782012-11-06+$67,263= $399,153,517
- Mod SA7792012-11-06+$13,500= $399,167,017
- Mod SA7802012-11-13+$28,976= $399,195,993
- Mod SA7812012-12-27+$17,919= $399,213,912
- Mod SA7832013-01-25+$21,000= $399,234,912
- Mod SA7842013-01-25+$81,564= $399,316,476
- Mod SA7822013-01-28+$22,766= $399,339,242
- Mod SA7852013-01-28+$78,737= $399,417,979
- Mod P000032017-09-21-$143,228= $399,274,751
- Mod P00042017-12-20+$0= $399,274,751
- Mod P000052018-05-24-$342,072= $398,932,679
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2008-09-23 | +$364,942,000 | $364,942,000 | CONSTRUCTION OF NEW VA SOUTHERN NEVADA HEALTHCARE SYSTEM MEDICAL CENTER PHASE IV. |
| Mod CO01A· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-01-29 | +$10,000 | $364,952,000 | — |
| Mod 3· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-02-27 | +$775 | $364,952,775 | — |
| Mod 4· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-02-27 | +$78,426 | $365,031,201 | CONSTRUCTION OF NEW VA SOUTHERN NEVADA HEALTHCARE SYSTEM MEDICAL CENTER PHASE IV. |
| Mod 5· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-03-05 | −$2,033 | $365,029,168 | — |
| Mod 1· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-03-11 | +$93,198 | $365,122,366 | — |
| Mod 2· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-03-11 | +$48,553 | $365,170,919 | — |
| Mod 6· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-03-23 | +$12,662 | $365,183,581 | CONSTRUCTION SERVICES FIBER OPTIC CABLE TO RE OFFICE |
| Mod CO01B· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-03-24 | +$6,000 | $365,189,581 | PHASE IV CONSTUCTION SERVICES LAS VEGAS, NV |
| Mod CO01C· CHANGE ORDER | 2009-03-25 | +$99,000 | $365,288,581 | TO CONSTRUCT A UTILITY TUNNEL FROM THE EXISTING ENERGY CENTER BUILDING TO THE NEW MEDICAL CENTER. |
| Mod 7· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-04-13 | +$1,387 | $365,289,968 | LAS VEGAS MED CTR PHASE IV PLUBMING HANGER RELCOATION BLDG 3 |
| Mod 8· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-04-22 | +$4,739 | $365,294,707 | CONSTRUCTION SERVICES LAS VEGAS PHASE IV |
| Mod 10· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-04-30 | +$8,181 | $365,302,888 | PHASE IV CONSTUCTION SERVICES LAS VEGAS, NV |
| Mod 9· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-04-30 | +$5,989 | $365,308,877 | CONSTRUCTION SERVICES LAS VEGAS PHASE IV |
| Mod 11· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-05-04 | +$8,084 | $365,316,961 | PHASE IV CONSTUCTION SERVICES LAS VEGAS, NV 6" U/G SS EXTEND FOR TIE-IN |
| Mod 12· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-05-16 | +$4,196 | $365,321,157 | PHASE IV CONSTUCTION SERVICES LAS VEGAS, NV |
| Mod CO01D· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-05-21 | +$4,458,621 | $369,779,778 | PHASE IV CONSTUCTION SERVICES LAS VEGAS, NV |
| Mod 13· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-05-26 | +$13,304 | $369,793,082 | PHASE IV CONSTUCTION SERVICES LAS VEGAS, NV |
| Mod 14· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-05-26 | +$4,225 | $369,797,307 | PHASE IV CONSTUCTION SERVICES LAS VEGAS, NV |
| Mod 15· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-05-26 | +$966 | $369,798,273 | PHASE IV CONSTUCTION SERVICES LAS VEGAS, NV |
| Mod CO01E· CHANGE ORDER | 2009-05-27 | +$2,500 | $369,800,773 | CO 1E TO ADD BEAM NOT SHOWN ON DRAWINGS |
| Mod CO01F· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-05-27 | +$3,000 | $369,803,773 | PHASE IV CONSTUCTION SERVICES LAS VEGAS, NV |
| Mod 16· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-06-02 | +$6,979 | $369,810,752 | PHASE IV CONSTUCTION SERVICES LAS VEGAS, NV |
| Mod 17· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-06-02 | +$3,185 | $369,813,937 | PHASE IV CONSTUCTION SERVICES LAS VEGAS, NV |
| Mod 18· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-06-05 | +$37,268 | $369,851,205 | PHASE IV CONSTUCTION SERVICES LAS VEGAS, NV |
| Mod 19· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-06-05 | +$1,366 | $369,852,571 | PHASE IV CONSTUCTION SERVICES LAS VEGAS, NV |
| Mod CO01G· CHANGE ORDER | 2009-06-05 | +$2,500 | $369,855,071 | TO MODIFY THE SITE FENCE ALIGNMENT AT THE NW CORNER OF THE SITE TO AVOID INTERFERENCE WITH AN EXISTING UTILITY… |
| Mod CO01H· CHANGE ORDER | 2009-06-05 | +$12,771 | $369,867,842 | RETURN AIR INLETS FOR AHU-ADM-1 & 2 WERE SHOWN TOO SMALL ON THE CONTRACT DRAWINGS. THIS CHANGE CORRECTS THE AI… |
| Mod 20· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-06-08 | +$1,094 | $369,868,936 | PHASE IV CONSTUCTION SERVICES LAS VEGAS, NV |
| Mod 21· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-06-08 | +$5,885 | $369,874,821 | PHASE IV CONSTUCTION SERVICES LAS VEGAS, NV |
| Mod 22· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-06-09 | +$7,116 | $369,881,937 | PHASE IV CONSTUCTION SERVICES LAS VEGAS, NV |
| Mod 23· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-06-09 | +$2,823 | $369,884,760 | PHASE IV CONSTUCTION SERVICES LAS VEGAS, NV |
| Mod 24· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-06-10 | +$713 | $369,885,473 | PHASE IV CONSTUCTION SERVICES LAS VEGAS, NV |
| Mod 25· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-06-10 | +$0 | $369,885,473 | PHASE IV CONSTUCTION SERVICES LAS VEGAS, NV |
| Mod 26· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-06-11 | +$0 | $369,885,473 | PHASE IV CONSTUCTION SERVICES LAS VEGAS, NV |
| Mod CO01I· CHANGE ORDER | 2009-06-11 | +$30,722 | $369,916,195 | TO REMOVE HANDRAILS BLOCKING ACCESS TO CENTRAL PLANT AIR HANDLER DOORS AND EXTEND CATWALK PLATFORMS TO PROVIDE… |
| Mod 27· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-06-15 | +$6,209 | $369,922,404 | PHASE IV CONSTUCTION SERVICES LAS VEGAS, NV |
| Mod 28· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-06-15 | +$1,679 | $369,924,083 | PHASE IV CONSTUCTION SERVICES LAS VEGAS, NV |
| Mod 29· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-06-24 | +$5,034 | $369,929,117 | PHASE IV CONSTUCTION SERVICES LAS VEGAS, NV |
| Mod 30· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-06-24 | +$0 | $369,929,117 | PHASE IV CONSTUCTION SERVICES LAS VEGAS, NV |
| Mod CO01J· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-06-24 | +$70,408 | $369,999,525 | PHASE IV CONSTUCTION SERVICES LAS VEGAS, NV |
| Mod 31· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-06-26 | +$10,042 | $370,009,567 | PHASE IV CONSTUCTION SERVICES LAS VEGAS, NV |
| Mod 32· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-06-26 | +$7,988 | $370,017,555 | PHASE IV CONSTUCTION SERVICES LAS VEGAS, NV |
| Mod 33· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-06-30 | +$13,795 | $370,031,350 | PHASE IV CONSTUCTION SERVICES LAS VEGAS, NV |
| Mod 34· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-06-30 | +$21,600 | $370,052,950 | PHASE IV CONSTUCTION SERVICES LAS VEGAS, NV |
| Mod 35· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-06-30 | +$3,476 | $370,056,426 | PHASE IV CONSTUCTION SERVICES LAS VEGAS, NV |
| Mod 36· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-06-30 | −$734 | $370,055,692 | PHASE IV CONSTUCTION SERVICES LAS VEGAS, NV |
| Mod 37· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-06-30 | +$0 | $370,055,692 | PHASE IV CONSTUCTION SERVICES LAS VEGAS, NV |
| Mod SA038· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-07-06 | +$94,049 | $370,149,741 | TO PROVIDE DUCT SYSTEMS CAPABLE OF OPERATING AT THE CORRECT DESIGN STATIC PRESSURE. |
| Mod SA039· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-07-06 | +$4,551 | $370,154,292 | TO ADD ACID RESISTENT WASTE AND VENT PIPING FOR A FUTURE SINK IN MICROBIOLOGY LAB 2D352. |
| Mod CO01K· CHANGE ORDER | 2009-07-09 | +$82,914 | $370,237,206 | TO PROVIDE HEPA FILTERS FOR AHUS RTU-DT-12B AND 13B. |
| Mod SA041· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-07-10 | +$11,456 | $370,248,662 | TO MODIFY THE RETURN AIR INLETS FOR AHU-ADM-1 & 2 SINCE THEY WERE SHOWN TOO SMALL ON THE CONTRACT DRAWINGS. |
| Mod SA040· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-07-13 | +$3,383 | $370,252,045 | TO SUPPLY BOILERS WITH A PROPANE PILOT GAS LINE FOR COLD PLANT START-UP . |
| Mod SA042· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-07-14 | +$6,198 | $370,258,243 | TO MODIFY THE SIZE OF THE EXHAUST DUCT RISER FOR FANS EF-DT-22 AND 24 IN ORDER TO FIT WITHIN THE DESIGNATED SH… |
| Mod CO01L· CHANGE ORDER | 2009-07-16 | +$10,000 | $370,268,243 | THIS REVISION IS FOR THE COORDINATION OF ARCHITECTURAL HARDWARE AND DOOR FRAMES WITH THE SECURITY ACCESS CONTR… |
| Mod SA043· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-07-16 | +$4,222 | $370,272,465 | TO MODIFY THE SITE FENCE ALIGNMENT AT THE NW CORNER OF THE SITE TO AVOID INTERFERENCE WITH AN EXISTING UTILITY… |
| Mod SA044· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-07-17 | +$6,482 | $370,278,947 | TO CHANGE CURTAIN TYPE FIRE DAMPERS AT VARIOUS LOCATIONS TO MULTI-LOUVER TYPE TO MEET CODE REQUIREMENTS. |
| Mod CO01M· CHANGE ORDER | 2009-07-22 | +$30,000 | $370,308,947 | TO INSTALL NEW ANCHOR BOLTS AT COLUMN F-9 SINCE THEY WERE ORIENTED INCORRECTLY IN PHASE II. |
| Mod CO01N· CHANGE ORDER | 2009-07-30 | +$55,000 | $370,363,947 | TO INSTALL NEW ANCHOR BOLTS AT COLUMNS K-5 AND K-9 SINCE THEY WERE ORIENTED INCORRECTLY IN PHASE II. |
| Mod SA045· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-07-30 | +$2,519 | $370,366,466 | TO ROUTE 4" GREASE WASTE LINE DOWN FROM LEVEL 1 AND TIE INTO GREASE WASTE IN THE BASEMENT RUNNING THROUGH THE… |
| Mod CO01O· CHANGE ORDER | 2009-07-31 | +$14,000 | $370,380,466 | TO INSTALL THREE SANITARY SEWER LATERALS (3) FROM THE NEW MEDICAL CENTER TO THE SANITARY MAIN SINCE THEY WERE… |
| Mod SA046· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-07-31 | +$3,371 | $370,383,837 | TO INSTALL EXIT SIGNS IN TWO UNIT SUBSTATION ELECTRICAL ROOMS SINCE THEY ARE REQUIRED BY CODE AND WERE NOT SHO… |
| Mod CO01P· CHANGE ORDER | 2009-08-27 | +$2,000 | $370,385,837 | TO REROUTE THE DUCTWORK AT STAIR #6, BASEMENT LEVEL, DUE TO CONFLICTS WITH OTHER UTILITIES. |
| Mod CO01Q· CHANGE ORDER | 2009-08-27 | +$70,000 | $370,455,837 | TO REVISE THE ROUGH-IN FOR THE MEDICAL EQUIPMENT AT VARIOUS ROOMS ON THE 1ST FLOOR OF THE NEW MEDICAL CENTER T… |
| Mod CO01R· CHANGE ORDER | 2009-08-28 | +$20,000 | $370,475,837 | TO INTERCONNECT THE PLATFORMS SO THAT MAINTAINANCE PERSONNEL CAN ASCEND THE STAIRS AND ACCESS ANY OR ALL SIDES… |
| Mod CO01S· CHANGE ORDER | 2009-08-31 | +$11,000 | $370,486,837 | TO REWORK THE 3D MODEL DUE TO DUCT CHANGES AT THE BASEMENT AND 2ND FLOOR LEVELS. |
| Mod CO01T· CHANGE ORDER | 2009-08-31 | +$50,000 | $370,536,837 | TO REWORK THE 3D MODEL DUE TO DUCT CHANGES AT THE 1ST FLOOR LEVEL. |
| Mod CO01U· CHANGE ORDER | 2009-08-31 | +$30,000 | $370,566,837 | TO REDUCE THE MECHANICAL OPENING AND INFILL THE FLOOR SLAB AT COLUMN LINE H/18, LEVEL 1. |
| Mod SA047· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-09-04 | +$28,038 | $370,594,875 | TO INSTALL THREE SANITARY SEWER LATERALS (3) FROM THE NEW MEDICAL CENTER TO THE SANITARY MAIN SINCE THEY WERE… |
| Mod SA048· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-09-04 | +$7,182 | $370,602,057 | PHASE II PROJECT INSTALLED WATERPROOFING THAT STOPPED AT CERTAIN ELEVATIONS IN ACCORDANCE WITH THE CONTRACT D… |
| Mod SA049· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-09-04 | +$16,299 | $370,618,356 | TO RELOCATE EXHAUST FANS EF-DT-21, 32, AND 36 TO AVOID INTERFERENCE WITH ROOF DRAIN INLETS. |
| Mod SA050· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-09-04 | +$26,152 | $370,644,508 | TO REMOVE HANDRAILS BLOCKING ACCESS TO CENTRAL PLANT AIR HANDLER DOORS AND EXTEND CATWALK PLATFORMS TO PROVIDE… |
| Mod SA051· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-09-06 | +$4,353 | $370,648,861 | TO INSTALL THE OXYGEN LINES FROM THE BULK OXYGEN TANK FARM TO THE NEW MEDICAL CENTER THREE (3) FT BELOW FINISH… |
| Mod SA052· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-09-11 | −$6,870 | $370,641,991 | TO DELETE SP-20 AND ADD A NEW 3" TYPE R (FD-R) FLOOR DRAIN AND ASSOCIATED SANITARY PIPING. |
| Mod SA053· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-09-11 | +$17,116 | $370,659,107 | TO IMPLEMENT MISCELLANEOUS STEEL CHANGES AS INSTRUCTED IN VARIOUS RFIS. |
| Mod SA054· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-09-11 | +$0 | $370,659,107 | TO ENLARGE THE DENTAL MECHANICAL PENHOUSE FROM 17'-4" TO 19'-0" THE WESTERN COLUMNS WILL THEN LAND ON THE W18… |
| Mod SA055· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-09-11 | −$955 | $370,658,152 | TO DELETE DRY-SIDEWALL SPRINKLERS AT THE AMBULANCE ENTRANCE CANOPY. |
| Mod SA056· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-09-11 | +$1,265 | $370,659,417 | TO RELOCATE THE W12X14 BRACING BEAMS FOR THE ADMINISTRATION PENTHOUSE SLAB OPENING TO PROVIDE A CLEAR OPENING… |
| Mod SA057· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-09-11 | +$15,639 | $370,675,056 | TO IINSULATE THE DOMESTIC WATER STORAGE TANK AND DELETE THE CHLORINE DIOXIDE SYSTEM. |
| Mod SA058· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-09-11 | +$4,341 | $370,679,397 | TO INSTALL A MISSING GRADE BEAM AT GRID L/4-5 FROM PHASE II, PER RFI #0949. |
| Mod SA059· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-09-14 | +$12,626 | $370,692,023 | TO ADD ELEVATOR PIT WASTE LINE TO SERVE ELEVATORS S5, S7, AND S8. |
| Mod SA060· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-09-14 | −$324 | $370,691,699 | THE RE OFFICE CHOSE NOT TO EXERCISE THEIR OPTION TO WITNESS FACTORY TESTING OF THE CUSTOM AIR HANDLERS. |
| Mod SA061· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-09-14 | +$3,063 | $370,694,762 | TO ADD AN INDUSTRIAL WATER CIRCULATION PUMP IN THE BASEMENT PUMP ROOM OF THE ENERGY CENTER, BLDG #2, TO CIRCUL… |
| Mod SA062· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-09-14 | +$4,117 | $370,698,879 | TO CORRECT A PANEL FEEDER FROM 3 WIRE TO 4 WIRE IN PANEL 5-L-1D. |
| Mod SA063· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-09-15 | +$1,587 | $370,700,466 | THIS REVISION IS FOR THE COORDINATION OF ARCHITECTURAL HARDWARE AND DOOR FRAMES WITH THE SECURITY ACCESS CONTR… |
| Mod SA064· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-09-15 | +$9,207 | $370,709,673 | TO PROVIDE HEPA FILTERS FOR AHU RTU-DT-13B AND BACKDRAFT DAMPERS TO AHUS RTU-DT-12A, 12B, 13A AND 13B. |
| Mod CO01V· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-09-17 | +$261,000 | $370,970,673 | PHASE IV CONSTUCTION SERVICES LAS VEGAS, NV |
| Mod SA065· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-09-17 | −$8,447 | $370,962,226 | MOST OF THE SUBJECT DUCT SECTIONS WERE SIGNIFICANTLY OVERSIZED AS SHOWN IN THE CONTRACT DRAWINGS. THE DIMENSIO… |
| Mod SA066· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-09-18 | +$12,916 | $370,975,142 | TO INSTALL NEW ANCHOR BOLTS AT COLUMNS K-5 AND K-9 SINCE THEY WERE ORIENTED INCORRECTLY IN PHASE II. |
| Mod SA067· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-09-21 | +$1,575 | $370,976,717 | 3-D COORDINATION SHOWED THAT ABOVE CEILING SPACE IN CORRIDOR CB-12 COULD NOT ACCOMMODATE ALL THE BUILDING SYST… |
| Mod 68· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-09-22 | +$287,008 | $371,263,725 | PHASE IV CONSTUCTION SERVICES LAS VEGAS, NV |
| Mod SA070· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-09-30 | +$6,380 | $371,270,105 | TO REVISE THE NON-ILLUMINATED TYPE S12B BOLLARDS (NON-STRUCTURAL) TO THE PROTECTIVE BOLLARD TYPE SHOWN ON DETA… |
| Mod SA071· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-09-30 | +$7,505 | $371,277,610 | TO INSTALL NEW ANCHOR BOLTS AT COLUMN F-9 SINCE THEY WERE ORIENTED INCORRECTLY IN PHASE II. |
| Mod 69· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-10-05 | +$4,833 | $371,282,443 | PHASE IV CONSTUCTION SERVICES LAS VEGAS, NV |
| Mod CO01W· CHANGE ORDER | 2009-10-14 | +$15,000 | $371,297,443 | TO EXPAND THE PHARMACY VAULT AND MODIFY EQUIPMENT LAYOUT DUE TO UPDATED EQUIPMENT REQUIREMENTS. |
| Mod CO01X· CHANGE ORDER | 2009-10-14 | +$10,000 | $371,307,443 | TO EXPAND THE PHARMACY VAULT AND MODIFY EQUIPMENT LAYOUT DUE TO UPDATED EQUIPMENT REQUIREMENTS. |
| Mod SA072· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-10-14 | +$30,412 | $371,337,855 | TO INSTALL TWO (2) NEW JIB HOIST UNITS IN THE CENTRAL ENERGY PLANT ADJACENT TO THE CHILLERS. |
| Mod CO01Y· CHANGE ORDER | 2009-10-20 | +$11,800 | $371,349,655 | THIS MODIFICATION OS TO CORRECT DESIGN ERRORS AND OMISSIONS REGARDING THE ISOLATED POWER PANELS AND FEEDERS. L… |
| Mod SA074· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-10-21 | +$3,650 | $371,353,305 | THE MRI CRYOGEN VENT WILL CONTRACT SIGNIFICANTLY DURING A MAGNET QUENCH. ACCORDINGLY, GE REQUIRES THAT CONTRAC… |
| Mod SA075· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-10-26 | +$4,292 | $371,357,597 | INCREASE THE INSTRUMENT AIR COMPRESSOR (IAC-1) FROM 5 HORSEPOWER TO 7.5 HORSEPOWER. |
| Mod CO01Z· CHANGE ORDER | 2009-10-27 | +$15,000 | $371,372,597 | TO INSTALL COMBINATION SMOKE/FIRE DAMPERS (CFSDS) OR FIRE DAMPERS AT DUCTS IN THE BASEMENT AND ON LEVEL 3 THAT… |
| Mod SA076· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-10-27 | −$3,307 | $371,369,290 | DELETE THE BACKFLOW PREVENTER FROM THE NEW FIRE PROTECTION LINES FEEDING THE NURSING HOME. |
| Mod SA077· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-10-29 | −$41,778 | $371,327,512 | THIS MODIFICATION IS BEING ISSUED TO DELETE THE INSTALLATION OF SPARE CONDUITS FROM THE UNDERGROUND DISTRIBUTI… |
| Mod CO02A· CHANGE ORDER | 2009-10-30 | +$7,056 | $371,334,568 | ADD DRAIN, WASTE, AND VENT PIPING TO FLOOR DRAINS IN ROOMS 2D322 AND 2D302. |
| Mod CO02B· CHANGE ORDER | 2009-11-11 | +$9,100 | $371,343,668 | TO ADD FLOOR RECEPTACLES IN VARIOUS CONFERENCE AND MEETING ROOMS WHERE DATA WAS SHOWN BUT NO POWER. |
| Mod SA078· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-11-11 | +$7,480 | $371,351,148 | TO MODIFY THE SIZE OF THE MARKERBOARDS AND INSTALL ADDITIONAL MARKERBOARDS SINCE THE CONTRACT DOCUMENTS HAD IN… |
| Mod SA079· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-11-11 | +$1,236 | $371,352,384 | TO INSTALL A BASE PLATE TO SUPPORT THE HSS ELEVATOR RAIL AT ELEVATOR S-5. |
| Mod SA080· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-11-11 | +$3,831 | $371,356,215 | TO INSTALL MISSING DOWELS AT VARIOUS LACATIONS AT THE EXISTING FOOTINGS AND CONCRETE SLABS. |
| Mod SA082· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-11-13 | +$5,825 | $371,362,040 | THIS MODIFICATION IS ISSUED TO MEET ELECTRICAL AND TELECOM REQUIREMENTS FOR THE OXYGEN TANK PAD AREA. |
| Mod SA083· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-11-17 | −$3,397 | $371,358,643 | THE CONTRACT DRAWINGS PLACED LARGE DUCTWORK OVER WALLS AND DOORS ON LEVEL 5. THIS DUCTWORK PREVENTED THE INSTA… |
| Mod SA084· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-11-17 | +$489 | $371,359,132 | TO ADD FLOOR RECEPTACLES IN VARIOUS CONFERENCE AND MEETING ROOMS WHERE DATA WAS SHOWN BUT POWER WAS NOT. |
| Mod SA085· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-11-18 | +$16,414 | $371,375,546 | CHANGE DENTAL VACUUM SYSTEM PIPING FROM SCHEDULE 40 PVC TO DWV COPPER TUBING AND FITTINGS. |
| Mod SA086· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-11-20 | +$5,747 | $371,381,293 | WHILE THE MECHANICAL CONTROL SEQUENCE REQUIRES CONTROL OF EXHAUST FAN 3-TX-1, APPROPRIATE ELECTRICAL PROVISION… |
| Mod SA081· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-11-23 | +$4,285 | $371,385,578 | TO ADD A FLOOR DRAIN AND ASSOCIATED PIPING TO MECHANICAL EQUIPMENT ROOM 4A101. |
| Mod SA087· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-11-24 | +$5,599 | $371,391,177 | TO PROVIDE DISCHARGE PIPING FROM PHASE IV TUNNEL ADDITION TO PHASE III SANITARY MANHOLE. |
| Mod SA088· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-11-24 | +$4,369 | $371,395,546 | TO PROVIDE ACCESS TO LEVEL 3, AREA E&H ROOF FROM STAIR #5. NO ROOF ACCESS SHOWN ON THE CONTRACT DRAWINGS. |
| Mod SA089· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-11-25 | +$763 | $371,396,309 | TO CHANGE SINK FROM A P-413A TO A P-414 IN ROOM BD212 AND BD215. |
| Mod SA90· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-11-25 | +$2,649 | $371,398,958 | TO MODIFY THE ELEVATOR GUIDE RAIL TUBE CONNECTION AT THE BEAM ENCASEMENT FOR ELEVATOR P-9. |
| Mod SA091· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-11-27 | +$79,000 | $371,477,958 | TO PROVIDE ADDITIONAL STEEL SUPPORTS FOR THE ELEVATOR GUIDE RAILS FOR ELEVATORS P-8, P-9, S-1 AND S-2. |
| Mod SA092· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-11-27 | −$8,282 | $371,469,676 | TO DELETE THE WALL FURRING AT THE BASEMENT CORRIDOR AND APPLY A DRYWALL FINISH OVER THE CONCRETE. |
| Mod CO02D· CHANGE ORDER | 2009-12-04 | −$22,500 | $371,447,176 | TO DELETE THE CEILING ASSEMBLY IN ELECTRICAL ROOM 4D410 AND EXTEND THE ROOM PARTITIONS TO THE STRUCTURE ABOVE. |
| Mod SA094· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-12-04 | +$10,583 | $371,457,759 | TO PROVIDE COAXIAL CABLE DROPS AND TELEVISION RECEIVER OUTLETS AT 15 ROOMS. |
| Mod CO02C· CHANGE ORDER | 2009-12-07 | +$7,000 | $371,464,759 | TO ADD STORM WASTE AND OVERFLOW DRAIN PIPING TO LEVEL 1 ROOF AND STORM DRAINS SHOWN AT GRIDLINE 3.7/E |
| Mod CO02E· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-12-08 | +$90,000 | $371,554,759 | PHASE IV CONSTUCTION SERVICES LAS VEGAS, NV |
| Mod SA093· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-12-08 | +$1,589 | $371,556,348 | TO ADD A 3" TYPE-S FLOOR DRAIN (FD-S) TO THE GREASE WASTE LINE SHOWN IN THE FIRST FLOOR KITCHEN. |
| Mod CO02F· CHANGE ORDER | 2009-12-10 | +$4,000 | $371,560,348 | TO PERFORM A ELECTRICAL PROTECTIVE DEVICE STUDY ON THE AUTOMATIC TRANSFER SWITCHES DUE TO THE REVISION OF THE… |
| Mod SA095· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-12-10 | +$8,361 | $371,568,709 | TO INSTALL SMOKE DETECTORS IN BLDG #3 THAT ARE REQUIRED BUT NOT SHOWN ON THE CONTRACT DOCUMENTS. |
| Mod SA096· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-12-11 | +$3,732 | $371,572,441 | TO REPLACE P-702 SHOWER FIXTURES IN 5 BASEMENT ADA SHOWER STALLS WITH ADA COMPLIANT P-711 FIXTURES. |
| Mod SA097· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-12-11 | +$695 | $371,573,136 | TO PROVIDE A 4-WAY SWITCH AT CORRIDOR CB-25 AND CB-24. |
| Mod SA098· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-12-16 | −$1,698 | $371,571,438 | TO REVISE POWER DISTRIBUTION TO FUEL OIL PUMPS, IN BLDG #4. |
| Mod SA099· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-12-17 | +$2,404 | $371,573,842 | TO PROVIDE SKYTRON BACK BOXES TO ALLOW FOR THE EFFECTED ROOMS TO BE FINISHED ON SCHEDULE. |
| Mod CO02G· CHANGE ORDER | 2009-12-23 | +$3,750 | $371,577,592 | TO PROVIDE 120V CIRCUITS FOR THE OPERATION OF THE CLEAN AGENT FIRE SUPPRESSION SYSTEMS IN THE IRMS COMPUTER RO… |
| Mod CO02H· CHANGE ORDER | 2010-01-05 | +$23,000 | $371,600,592 | TO PROVIDE MISCELLANEOUS POWER FEEDS TO EQUIPMENT IN THE GENERATOR ROOM THAT WERE NOT ON THE CONTRACT DRAWINGS… |
| Mod SA102· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-01-05 | +$7,848 | $371,608,440 | TO CHANGE SEVEN (7) P-413A PLUMBING FIXTURES ON LEVEL 2 TO P-418 FIXTURES. |
| Mod SA103· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-01-05 | +$2,554 | $371,610,994 | TO FURR OUT WALLS IN ORDER TO ACCOMMODATE THE DEPTH OF THE ELECTRICAL PANELS. |
| Mod SA104· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-01-05 | +$16,155 | $371,627,149 | TO INSTALL ADDITIONAL BEAMS TO ACCOMMODATE THE INSTALLATION OF WINDOW WASHING DAVITS. |
| Mod SA105· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-01-05 | +$3,284 | $371,630,433 | TO CORE DRILL THE EXISTING FOUNDATION WALL (PHASE II) SINCE THE LOCATION OF THE SLEEVE WAS INCORRECTLY LOCATED… |
| Mod SA106· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-01-11 | −$741 | $371,629,692 | TO MODIFY THE SIZE OF THE ENDOSCOPIC PASS-THROUGH UNITS. |
| Mod SA107· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-01-11 | +$3,915 | $371,633,607 | TO CHANGE ONE P-525 PLUMBING FIXTURE IN ROOM BD212 TO A P-531 FIXTURE. |
| Mod SA100· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-01-12 | +$20,303 | $371,653,910 | TO PROVIDE AN ADDITIONAL LADDER TRAY FOR IRMS AND BACKUP IRMS ROOMS. |
| Mod SA101· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-01-12 | +$1,300 | $371,655,210 | TO PROVIDE AN ADDITIONAL SECTION IN MOTOR CONTROL CENTER 1-EEMCC-4D DUE TO REVISIONS IN NUMEROUS PANELS. |
| Mod CO02I· CHANGE ORDER | 2010-01-13 | +$35,000 | $371,690,210 | TO DETAIL THE CHANGES TO THE MECHANICAL AND PLUMBING SYSTEMS ABOVE THE CEILING AT THE 5TH AND 6TH FLOOR LEVELS… |
| Mod CO02J· CHANGE ORDER | 2010-01-13 | +$55,000 | $371,745,210 | CO-02J, TO INSTALL A DOUBLE RAIL (X-Y) SYSTEM AT THE 5TH FLOOR ICU ROOMS IN LIEU OF THE CONTRACT REQUIRED SING… |
| Mod SA108· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-01-13 | +$54,031 | $371,799,241 | TO CHANGE THE PAVEMENT AT THE LOADING DOCK DRIVE FROM ASPHALT TO CONCRETE. |
| Mod CO02K· CHANGE ORDER | 2010-01-14 | +$0 | $371,799,241 | CO-02K, TO REVISED THE PUMP HEAD INDICATED IN THE HVAC PUMP SCHEDULE ON MH-604 TO REFLECT THE ACTUAL DESIGN VA… |
| Mod CO02L· CHANGE ORDER | 2010-01-18 | +$55,000 | $371,854,241 | CO-02L, AS DESIGNED, THE ABOVE CEILING SPACE IN THE CORRIDORS IS NOT LARGE ENOUGH TO ACCOMMODATE ALL THE SYSTE… |
| Mod CO02M· CHANGE ORDER | 2010-01-26 | +$95,000 | $371,949,241 | CO-02M, TO PROVIDE HIGH PRESSURE MEDICAL AIR TO THE HYPERBARIC CHAMBERS. |
| Mod SA109· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-01-27 | +$0 | $371,949,241 | TO MODIFY THE SIZE OF THE EXHAUST GRILLE SIZE IN THE OPERATIING ROOMS DUE TO CONFLICTS WITH THE GYPSUM BOARD E… |
| Mod SA110· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-01-27 | +$1,974 | $371,951,215 | TO REROUTE STORM WASTE AND OVERFLOW DRAIN PIPING FROM THE 3RD FLOOR LEVEL AND TIE INTO THE RISERS AT THE 1ST F… |
| Mod SA111· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-01-27 | +$3,207 | $371,954,422 | TO ADD INSULATION TO OVERHEAD HEAT TRACED GREASE WASTE LINE RUNNING UNDER THE FIRST FLOOR KITCHEN. |
| Mod SA112· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-01-27 | +$23,390 | $371,977,812 | TO REROUTE THE RETURN AIR DUCT FROM RTU-AMB-6 TO AVOID CONFLICT WITH THE ELEVATOR RELIEF VENT OPENING SHOWN ON… |
| Mod SA113· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-01-28 | +$6,806 | $371,984,618 | TO PROVIDE A DUCT SYSTEM FOR THE FCU IN MECHANICAL ROOM BB208 IN ORDER TO DISTRIBUTE THE AIR THROUGHOUT THE RO… |
| Mod SA114· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-01-28 | +$1,231 | $371,985,849 | TO RUN GAS LINE IN KITCHEN OUTSIDE WALL ABOVE CEILING AND DROP BRANCHES DOWN IN THE WALL AND STUB OUT TO EQUIP… |
| Mod SA115· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-01-29 | −$17,778 | $371,968,071 | TO PROVIDE A SMALLER SINGLE-RAIL HEADWALL UNIT AT THE EXTERIOR WALL AT SEVERAL DIALYSIS ROOMS DUE TO INTERFER… |
| Mod SA116· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-01-29 | −$1,003 | $371,967,068 | TO DELETE UNNECESSARY WASTE AND VENT PIPING SHOWN IN ROOM 2D418. |
| Mod SA117· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-01-29 | +$58,011 | $372,025,079 | TO MODIFY THE CEILING SOFFIT IN CORRIDOR C1-28, C2-2 AND C3-1 TO ACCOMMODATE THE SPECIFIED LIGHT FIXTURES. |
| Mod SA026· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-02-05 | +$104,487 | $372,129,566 | SA# 26, PATIENT LIFT SUPPORT MODIFICATIONS |
| Mod CO02N· CHANGE ORDER | 2010-02-08 | +$10,000 | $372,139,566 | CO-02N, TO INSTALL A DUCT SMOKE DETECTOR FOR AHU 2-AHU-5 AND 6 IN THE SUPPLY AND RETURN DUCT. THE AHU'S ARE LO… |
| Mod SA119· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-02-09 | +$3,779 | $372,143,345 | TO CORE DRILL EXISTING GRADE BEAMS IN ORDER TO INSTALL UNDERGROUND SANITARY PIPING AT LEVEL 1, AREA C. GRADE… |
| Mod SA120· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-02-09 | +$6,474 | $372,149,819 | TO INSTALL A RETURN AIR GRILLE AT EACH AUDIOMETRIC SOUND ROOM AND RELOCATE THE THERMOSTAT INTO THE CONTROL ROO… |
| Mod SA121· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-02-09 | +$2,457 | $372,152,276 | TO INSTALL MEDICAL GAS PIPING AND OUTLETS IN ROOMS 1D144 AND 1D139. |
| Mod SA122· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-02-09 | +$2,443 | $372,154,719 | TO CHANGE THE WINDOW SIZE IN ROOMS 1D208, 1D432 AND 1D433 DUE TO INCONSISTENCIES ON THE CONTRACT DRAWINGS. |
| Mod SA118· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-02-11 | +$53,050 | $372,207,769 | TO INSTALL TERMINAL UNITS IN LIEU OF THE CONTRACT REQUIRED FCU'S IN CORRIDOR C1-1 DUE TO LIMITED CEILING SPACE… |
| Mod SA123· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-02-12 | +$5,608 | $372,213,377 | TO REROUTE SUPPLY/RETURN AIR DUCT AT THE 1ST FLOOR LEVEL DUE TO CONFILICTS WITH OTHER MECHANICAL SYSTEMS AND D… |
| Mod SA124· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-02-12 | +$20,683 | $372,234,060 | TO INSTALL MOTORIZED DAMPERS IN THE RETURN AIR DUCT IN ROOMS BD137 AND BD139 IN ORDER TO CONTROL THE FM-200 FI… |
| Mod CO02O· CHANGE ORDER | 2010-02-15 | +$17,173 | $372,251,233 | KCO-02O, TO EXTEND THE STORM WATER AND STORM WATER OVERFLOW PIPING 100' TO THE SOUTH IN ORDER TO DISCHARGE INT… |
| Mod CO02P· CHANGE ORDER | 2010-02-16 | +$1,800 | $372,253,033 | CO-02P, AMENDMENT 2 INADVERTENTLY DELETED THE INTERCONNECTION OF THE SPECIFIED ELEVATOR CARD READER TO THE SEC… |
| Mod CO02Q· CHANGE ORDER | 2010-02-17 | +$70,000 | $372,323,033 | CO-02Q, TO PROVIDE REQUIRED NURSE CALL DEVICES WHICH WERE INADVERTENTLY OMITTED FROM THE DESIGN. |
| Mod SA125· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-02-18 | +$1,325 | $372,324,358 | TO PROVIDE A GAMMA CAMERA IN ROOM 1D146 WITH 480 VOLTS, IN LIEU OF 208 VOLTS. |
| Mod SA126· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-02-18 | +$7,504 | $372,331,862 | TO INSTALL TEMPERATURE MIXING VALVES AT THE DOMESTIC WATER HEATER ASSEMBLY SINCE THEY WERE NOT SHOWN ON THE CO… |
| Mod SA127· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-02-18 | −$29,020 | $372,302,842 | TO REDUCE THE INSULATION THICKNESS FROM 4 TO 2 INCHES ON ALL INTERIOR EXPOSED DUCTWORK. |
| Mod SA128· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-02-18 | +$14,077 | $372,316,919 | TO INSTALL A WEBCAM AT THE NW END OF SITE TO MONITOR CONSTRUCTION PROGRESS. |
| Mod SA129· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-02-22 | +$2,179 | $372,319,098 | TO PROVIDE FLOOR RECEPTACLES IN CONFERENCE ROOM 2D346 AND POWER POLES IN ROOM 2D140. |
| Mod SA130· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-02-22 | +$5,535 | $372,324,633 | TO MODIFY WALL THICKNESS AND EXPAND UTILITY CHASES IN VARIOUS LOCATIONS THROUGHOUT THE NEW BUILDING IN ORDER T… |
| Mod SA131· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-02-22 | −$28,703 | $372,295,930 | TO CHANGE THE TOILET ACCESSORIES FROM CC (CONTRACTOR PROVIDED/CONTRACTOR INSTALLED) TO VV (GOVERNMENT PROVIDE… |
| Mod CO02R· CHANGE ORDER | 2010-02-23 | +$17,300 | $372,313,230 | CO-02R, TO PROVIDE ADDITIONAL VARIABLE FREQUENCY DRIVES IN ORDER TO COORDINATE THE MECHANICAL EQUIPMENT AND CO… |
| Mod CO02S· CHANGE ORDER | 2010-02-24 | +$7,500 | $372,320,730 | CO-02S, TO REPLACE WATTS MODULATING FLOAT VALVES WITH ELECTRONICALLY CONTROLLED VALVES AND ACTUATORS TO REGULA… |
| Mod SA132· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-02-24 | +$2,499 | $372,323,229 | TO PROVIDE REQUIRED RECEPTACLES (GFI) FOR DRINKING FOUNTAINSTHAT WERE FOUND TO HAVE BEEN OMITTED FROM THECON… |
| Mod CO02U· CHANGE ORDER | 2010-02-25 | +$99,000 | $372,422,229 | CO-01U, TO PROVIDE HEADWALL UNITS, COMPUTER AND MEDICAL EQUIPMENT BRACKETS, AND REVISE SOME OF THE HEADWALLS… |
| Mod CO02V· CHANGE ORDER | 2010-02-26 | +$18,000 | $372,440,229 | CO-02V, TO INSTALL AN ADDITIONAL ELECTRICAL PANEL IN THE ENERGY CENTER FOR FUTURE EXPANSION SINCE THE EXISTING… |
| Mod SA133· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-02-26 | +$10,400 | $372,450,629 | TO REPLACE CAST IRON DRAIN AND VENT PIPE IN DIALYSIS ROOMS WITH ACID RESISTANT PIPE. |
| Mod SA134· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-02-26 | −$3,883 | $372,446,746 | TO PROVIDE BOLLARD TYPE FIXTURES IN LIEU OF RECESSED FIXTURES, AS ALTERING OF EXISTING WALLS, TO ACCEPT RECES… |
| Mod SA135· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-02-26 | +$7,176 | $372,453,922 | TO ADD TWO SHOP VACUUM OUTLETS AND ADD SPECIFIED HOSE REELS FOR SHOP AIR DROPS IN ROOM 1B249. |
| Mod SA136· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-02-26 | +$11,636 | $372,465,558 | TO PROVIDE AN ALTERNATE SUPPORT SYSTEM FOR THE AUTOPSY ROOM EXAM LIGHT DUE TO INTERFERENCE WITH DUCTWORK. |
| Mod SA137· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-02-26 | +$5,390 | $372,470,948 | TO INSTALL THREE (3) COMBINATION FIRE/SMOKE DAMPERS AND ONE (1) FIRE DAMPER THAT WERE OMITTED IN THE CONTRACT… |
| Mod CO02T· CHANGE ORDER | 2010-03-01 | +$222,000 | $372,692,948 | PHASE IV CONSTUCTION SERVICES LAS VEGAS, NV |
| Mod SA178· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-03-01 | +$8,552 | $372,701,500 | SA# 178, BLANK OFF LOUVERS AT 4TH FLOOR ELECTRICAL ROOM. |
| Mod SA179· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-03-01 | +$32,961 | $372,734,461 | SA#179, 3D COORDINATION |
| Mod SA180· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-03-01 | +$27,163 | $372,761,624 | SA 180, PHARMACY VAULT CHANGES |
| Mod SA138· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-03-02 | +$0 | $372,761,624 | TO REVISE THE ELECTRICAL PROTECTIVE DEVICE STUDY TO CHANGE THE "CLOSED' TRANSITION AUTOMATIC TRANSFER SWITCHES… |
| Mod CO03A· CHANGE ORDER | 2010-03-04 | +$32,300 | $372,793,924 | TO PROVIDE AREA ALARMS FOR MEDICAL GAS SYSTEMS SUPPLYING ANESTHETIZING LOCATIONS. |
| Mod CO02W· CHANGE ORDER | 2010-03-05 | +$90,000 | $372,883,924 | CO-02V, TO INSTALL AN ADDITIONAL ELECTRICAL PANEL IN THE ENERGY CENTER FOR FUTURE EXPANSION SINCE THE EXISTING… |
| Mod SA139· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-03-09 | +$51,506 | $372,935,430 | PROVIDE EIGHT ADDITIONAL AUTOMATIC OPERATORS IN THE OR SUITE SINCE THE OPERATORS WERE NOT SHOWN ON THE CONTRAC… |
| Mod SA140· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-03-09 | +$7,552 | $372,942,982 | TO PROVIDE 10' CEILING HEIGHTS AT VARIOUS OPERATING ROOMS DUE TO EQUIPMENT REQUIREMENTS. |
| Mod SA141· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-03-09 | +$2,119 | $372,945,101 | TO PROVIDE 120V CIRCUITS FOR THE OPERATION OF THE CLEAN AGENT FIRE SUPPRESSION SYSTEMS IN THE IRMS COMPUTER RO… |
| Mod SA142· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-03-12 | +$3,017 | $372,948,118 | TO REROUTE VENT STACK P-40 SO THAT IT DOES NOT TERMINATE IN THE LEVEL 5 COURTYARD. |
| Mod SA143· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-03-12 | +$14,328 | $372,962,446 | TO PROVIDE BREAKERS IN FOUR PANELBOARDS SINCE THEY WERE NOT INCLUDED IN THE CONTRACT DOCUMENTS. |
| Mod SA144· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-03-12 | +$961 | $372,963,407 | TO FRAME PARTITIONS FOR THE INSTALLATION OF NEW MEDICAL GAS ALARM PANELS THAT WERE NOT SHOWN ON THE CONTRACT D… |
| Mod SA145· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-03-12 | +$2,040 | $372,965,447 | TO REPLACE ABANDONED CONDUITS FEEDING THE ISOLATION PANELS IN VARIOUS OPERATING ROOMS DUE TO CONFLICT WITH EX… |
| Mod SA146· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-03-15 | +$1,007 | $372,966,454 | TO PROVIDE POWER FOR DRINKING FOUNTAINS ON THE THIRD FLOOR THAT WERE OMITTED FROM THE CONTRACT DRAWINGS. |
| Mod CO02X· CHANGE ORDER | 2010-03-16 | +$750 | $372,967,204 | CO-02X, TO LOCATE DWH 9 & 10 N ROOM BB208 SINCE THE MECHANICAL AND PLUMBING DRAWINGS SHOW THE WATER HEATERS I… |
| Mod SA147· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-03-16 | +$4,640 | $372,971,844 | TO PROVIDE THE SUMP, FOR SE 9 & 10, WITH A TRAFFIC RATED COVER AND ADD A VALVE PIT IMMEDIATELY OUTSIDE THE SUM… |
| Mod SA148· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-03-16 | +$0 | $372,971,844 | TO INSTALL CORROSION RESISTANT SOUND ATTENUATOR IN STAINLESS STEEL DUCT AND GALVANIZED SOUND ATTENUATOR IN GAL… |
| Mod CO02Y· CHANGE ORDER | 2010-03-18 | +$1,464,395 | $374,436,239 | TO CONSTRUCT A NEW UTILITY TUNNEL FROM THE ENERGY CENTER TO THE NEW MEDICAL CENTER. |
| Mod SA149· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-03-22 | +$68,459 | $374,504,698 | TO PROVIDE MISCELLANEOUS POWER FEEDS TO EQUIPMENT IN THE GENERATOR ROOM THAT WERE NOT ON THE CONTRACT DRAWINGS… |
| Mod CO02Z· CHANGE ORDER | 2010-03-23 | +$38,000 | $374,542,698 | TO REPLACE (31) 4 INCH GATE VALVES AND (13) 6 INCH GATE VALVES WITH EPOXY COATED GATE VALVES OF THE SAME SIZE. |
| Mod SA152· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-03-26 | +$14,174 | $374,556,872 | TO ADD (10 EACH) 32" MONITORS (PROVIDED BY THE VA), (3 EACH) MANAGEMENT WORKSTATIONS, (2 EACH) EQUIPMENT CONSO… |
| Mod SA153· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-04-01 | +$37,983 | $374,594,855 | TO MODIFY ISOLATED POWER PANELS IN THE O.R. SUITE DUE TO THE EQUIPMENT REQUIREMENTS THAT WERE NOT ADDRESSED ON… |
| Mod SA151· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-04-05 | +$695 | $374,595,550 | TO REMOVE SHEAR STUDS IN ORDER TO PLACE TRENCH DUCT AT VARIOUS IMAGING ROOMS AT LEVEL 1 OF THE TOWER. |
| Mod CO03B· CHANGE ORDER | 2010-04-06 | +$4,000 | $374,599,550 | TO REDUCE THE SIZE OF THE STEAM FLOW METERS IN ORDER TO PROVIDE ACCURATE READINGS. |
| Mod SA154· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-04-13 | +$0 | $374,599,550 | PURSUANT TO VAAR 852.236-83(D) PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (INCLUDING (NAS) AND FAR 52.… |
| Mod CO03C· CHANGE ORDER | 2010-04-14 | +$15,000 | $374,614,550 | SOLID COUNTERTOPS TO REPLACE PLASTIC LAMINATE |
| Mod CO03D· CHANGE ORDER | 2010-04-14 | +$15,000 | $374,629,550 | SOLID COUNTERTOPS TO REPLACE PLASTIC LAMINATE |
| Mod CO03E· CHANGE ORDER | 2010-04-16 | +$15,000 | $374,644,550 | SOLID COUNTERTOPS TO REPLACE PLASTIC LAMINATE |
| Mod CO03F· CHANGE ORDER | 2010-04-20 | +$22,000 | $374,666,550 | IT ROOM CHANGES |
| Mod SA155· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-04-22 | +$5,709 | $374,672,259 | TO REPLACE P-702 SHOWER FIXTURES IN SEVEN (7) ADA SHOWER STALLS WITH ADA COMPLIANT P-711 FIXTURES. |
| Mod SA156· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-04-22 | +$1,434 | $374,673,693 | TO RELOCATE LIGHT SWITCHES AND ADD TWO (2) OCCUPANCY SENSORS IN ROOM 1A204. |
| Mod CO03G· CHANGE ORDER | 2010-04-23 | +$35,000 | $374,708,693 | TO PROVIDE SUPPORTS FOR A DOUBLE RAIL SYSTEM IN LIEU OF SINGLE RAIL AT ALL PATIENT ROOMS AT LEVEL 6. |
| Mod SA157· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-04-26 | +$0 | $374,708,693 | PURSUANT TO VAAR 852.236-83(D) PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (INCLUDING (NAS) AND FAR 52.… |
| Mod SA158· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-04-26 | +$0 | $374,708,693 | PURSUANT TO VAAR 852.236-83(D) PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (INCLUDING (NAS) AND FAR 52.… |
| Mod CO03H· CHANGE ORDER | 2010-04-30 | +$21,000 | $374,729,693 | TO ADD FLOOR SINKS AND ASSOCIATED PIPING FOR STERILIZERS IN ROOMS 3D383, 3D390, 3D421, AND 3D434. |
| Mod CO03I· CHANGE ORDER | 2010-04-30 | +$30,000 | $374,759,693 | TO PROVIDE HOISTWAY VENTS FOR ELEVATOR P-1, P-2, S-3 AND S-5 SINCE THEY ARE REQUIRED AND WERE NOT SHOWN ON THE… |
| Mod CO03J· CHANGE ORDER | 2010-04-30 | +$31,000 | $374,790,693 | TO ADD FLOOR SINKS AND ASSOCIATED PIPING FOR STERILIZERS AND WASHER/DISINFECTOR IN ROOM 2D454. |
| Mod SA159· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-04-30 | −$2,462 | $374,788,231 | TO EXTEND THE STORM WATER AND STORM WATER OVERFLOW PIPING 100' TO THE SOUTH IN ORDER TO DISCHARGE INTO THE SWA… |
| Mod SA150· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-05-02 | −$5,595 | $374,782,636 | TO MODIFY THE COLUMN ENCLOSURES AT THE 4TH FLOOR MECHANICAL ROOM IN ORDER TO PROTECT THE SPRAYED-ON FIREPROOFI… |
| Mod CO03K· CHANGE ORDER | 2010-05-03 | +$99,000 | $374,881,636 | TO PROVIDE NECESSARY UTILITIES, SERVICING THE LAB AREA ON THE SECOND FLOOR, WHICH WERE INADVERTENTLY OMITTED F… |
| Mod SA160· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-05-03 | +$6,698 | $374,888,334 | TO PROVIDE 3-WAY SWITCHING AND A REFRACTION DESK INTERFACE KITS AT THE EXAM ROOMS AT LEVEL 1. |
| Mod CO03L· CHANGE ORDER | 2010-05-05 | +$15,000 | $374,903,334 | TO ADD A 3" EXHAUST LINE TO THE SHOP VACUUM PUMP (SVP-1) AND A 3" AIR INTAKE LINE TO THE SHOP AIR COMPRESSOR (… |
| Mod SA162· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-05-05 | −$3,896 | $374,899,438 | TO REVISE THE ROUGH-IN FOR THE MEDICAL EQUIPMENT AT VARIOUS ROOMS ON THE 1ST FLOOR OF THE NEW MEDICAL CENTER T… |
| Mod SA161· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-05-06 | +$19,715 | $374,919,153 | TO ADD A MEDICAL GAS OUTLET FOR EACH OF SIX MEDICAL GAS SERVICES IN ROOM 3D422 AND AN EXTRA ALARM PANEL TO MON… |
| Mod SA163· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-05-06 | −$1,316 | $374,917,837 | DELETE TWO TYPE F23 LIGHT FIXTURES IN ROOM 1D143 THAT ARE NO LONGER REQUIRED. |
| Mod SA164· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-05-14 | +$18,774 | $374,936,611 | TO INSTALL AN ADDITIONAL ELECTRICAL PANEL IN THE ENERGY CENTER FOR FUTURE EXPANSION SINCE THE EXISTING PANELS… |
| Mod SA165· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-05-14 | +$816 | $374,937,427 | TO PROVIDE A CLEAR SPACE FOR THE INSTALLATION OF A PERSONNEL LIFT IN THE BOILER PLANT. |
| Mod SA166· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-05-14 | +$6,301 | $374,943,728 | SURFACE MOUNT TYPE F44 FIXTURE TO UNISTRUT ASSY BELOW DUCTWORK. |
| Mod SA167· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-05-14 | +$44,500 | $374,988,228 | AS DESIGNED, THE ABOVE CEILING SPACE IN THE CORRIDORS IS NOT LARGE ENOUGH TO ACCOMMODATE ALL THE SYSTEMS SHOWN… |
| Mod SA168· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-05-14 | +$2,659 | $374,990,887 | TO MODIFY THE DEAERATOR AND CONDENSATE TANK SUPPORT STRUCTURE IN ORDER TO ACCESS THE BOILER FEED WATER AND CON… |
| Mod SA169· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-05-14 | +$13,232 | $375,004,119 | TO REDUCE THE MECHANICAL OPENING AND INFILL THE FLOOR SLAB AT COLUMN LINE H/18, LEVEL 1. |
| Mod SA171· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-05-20 | +$9,381 | $375,013,500 | AMENDMENT 2 INADVERTENTLY DELETED THE INTERCONNECTION OF THE SPECIFIED ELEVATOR CARD READER TO THE SECURITY AC… |
| Mod SA170· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-05-21 | +$5,478 | $375,018,978 | TO ADD PIPING TO THE CANTEEN DELI OVEN AND ADD A PRESSURE REGULATOR FOR THE NATURAL GAS LINE SERVING THE KITCH… |
| Mod SA172· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-05-21 | +$10,897 | $375,029,875 | TO PROVIDE ADDITIONAL VARIABLE FREQUENCY DRIVES IN ORDER TO COORDINATE THE MECHANICAL EQUIPMENT AND CONTROLS S… |
| Mod SA173· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-05-21 | +$10,858 | $375,040,733 | TO VERIFY THE LOCATION OF EXISTING BENCHMARKS AND INSTALL NEW MONUMENTS AT THE NEW MEDICAL CENTER COMPLEX. |
| Mod SA174· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-05-21 | +$39,975 | $375,080,708 | TO PROVIDE STRYKER MEDICAL GAS PIPING FITTINGS TO COMPLETE THE ROUGH-IN OF THE PIPING TO THE OR EQUIPMENT BOOM… |
| Mod SA177· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-05-21 | +$0 | $375,080,708 | NOT USED |
| Mod CO03M· CHANGE ORDER | 2010-06-02 | +$24,300 | $375,105,008 | TO PROVIDE POWER AND DATA FOR SUPPLY AND MEDICATION DISPENSING UNITS FOR THE SPECIFIED VV (VA SUPPLIED, VA IN… |
| Mod CO03N· CHANGE ORDER | 2010-06-04 | +$6,100 | $375,111,108 | REVISE WIRING AND CIRCUIT BREAKERS AS WELL AS ADD EXTRA DISCONNECTS IN ORDER TO OPERATE HEATING HOT WATER PUMP… |
| Mod CO03O· CHANGE ORDER | 2010-06-07 | +$55,000 | $375,166,108 | TO RAISE THE CONDENSER WATER HEADER AND PUMP INLET BRANCH PIPES TO PROVIDE MAINTENANCE ACCESS TO THE PUMPS AND… |
| Mod CO03P· CHANGE ORDER | 2010-06-07 | +$4,000 | $375,170,108 | TO PROVIDE ADEQUATE VENTILATION AT FOUR (4) ROOMS IN SEGMENTS D AND G ON LEVEL 1 WERE DESIGNED WITH IMPROPER V… |
| Mod SA175· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-06-08 | +$1,213 | $375,171,321 | TO PROVIDE POWER TO AN ELECTRIC RANGE IN ROOM 1B207, OCCUPATIONAL THERAPY, SINCE IT DID NOT HAVE A POWER SOURC… |
| Mod CO03Q· CHANGE ORDER | 2010-06-09 | +$15,000 | $375,186,321 | TO PROVIDE POWER TO AUTOMATIC DOOR OPERATORS AND MAGNETIC DOOR HOLDERS WHICH WERE OMITTED FROM THE CONTRACT DR… |
| Mod SA176· CHANGE ORDER | 2010-06-10 | +$121,642 | $375,307,963 | TO DETAIL THE DUCT AT LEVELS 1 THROUGH 6 DUE TO THE RESIZING OF THE DUCT BY THE A/E. |
| Mod CO03R· CHANGE ORDER | 2010-06-16 | +$2,000 | $375,309,963 | TO ADD A PRESSURE REGULATOR ON INSTRUMENT AIR PIPING IN ROOM 2D454 SINCE IT WAS NOT SHOWN ON THE CONTRACT DRAW… |
| Mod SA181· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-06-21 | +$29,990 | $375,339,953 | TO PROVIDE MEDICAL GAS PIPING FITTINGS TO COMPLETE THE ROUGH-IN OF THE PIPING TO THE OR EQUIPMENT BOOMS. |
| Mod CO03S· CHANGE ORDER | 2010-06-22 | +$50,000 | $375,389,953 | TO INCREASE THE SIZE OF THE RETURN DUCT FOR AHU-ADM-1 AND 2 IN MECHANICAL ROOM 2C200 DUE TO EXCESSIVE NOISE C… |
| Mod CO03T· CHANGE ORDER | 2010-06-23 | +$10,000 | $375,399,953 | TO PROVIDE A SOLID SURFACE FOR ALL COUNTERTOPS AT LEVEL 5 IN LIEU OF THE CONTRACT REQUIRED PLASTIC LAMINATE. |
| Mod CO03U· CHANGE ORDER | 2010-06-23 | +$10,000 | $375,409,953 | TO PROVIDE A SOLID SURFACE FOR ALL COUNTERTOPS AT LEVEL 6 IN LIEU OF THE CONTRACT REQUIRED PLASTIC LAMINATE. |
| Mod CO03V· CHANGE ORDER | 2010-06-30 | +$5,000 | $375,414,953 | TO MAKE PLUMBING FIXTURE CHANGES AS DIRECTED BY RESPONSES TO RFI 1270, 1495, 1594, 1595, 1667, AND 1532. |
| Mod CO03W· CHANGE ORDER | 2010-06-30 | +$0 | $375,414,953 | TO REVISE P-302 BATH TUB, TO A P-711 SHOWER FIXTURE, AND ADD A FLOOR DRAIN IN ROOM 1B209. |
| Mod SA182· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-06-30 | +$1,139 | $375,416,092 | TO PROVIDE POWER TO AUTOMATIC DOOR OPERATORS AND MAGNETIC DOOR HOLDERS WHICH WERE OMITTED FROM THE CONTRACT DR… |
| Mod SA183· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-06-30 | +$3,327 | $375,419,419 | TO REPLACE TWO (2) TYPE B FLOOR DRAINS (FD-B'S) IN FOURTH FLOOR MECHANICAL ROOMS WITH DRAINS INSTALLED BY FLOA… |
| Mod SA184· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-06-30 | +$2,326 | $375,421,745 | TO REVISE WIRING, CIRCUIT BREAKERS AND INSTALL DISCONNECTS IN ORDER TO OPERATE HEATING HOT WATER PUMPS SIMULTA… |
| Mod SA185· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-06-30 | +$748 | $375,422,493 | TO PROVIDE 1" WATER SUPPLY TO EMERGENCY SHOWER AND REPLACE 3/4" WATER LINE BACK TO 2" MAIN. |
| Mod SA186· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-06-30 | +$4,307 | $375,426,800 | TO INSTALL RECEPTACLES IN THE CARDIOLOGY CLINIC IN LIEU OF PROVIDING POWER OUTLETS AT THE HEADWALL UNITS SINCE… |
| Mod SA187· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-06-30 | +$24,242 | $375,451,042 | TO CORRECT DISCREPANCIES IN THE SWITCHING AND CIRCUITING DESIGN FOR LIGHTING AT LEVEL 1, TOWER. |
| Mod SA188· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-06-30 | +$0 | $375,451,042 | TO PROVIDE THE REQUIRED POWER SOURCE FOR THE WATER FILTRATION AND SOFTENER SYSTEMS DUE TO A DISCREPANCY BETWEE… |
| Mod CO03X· CHANGE ORDER | 2010-07-02 | +$90,000 | $375,541,042 | TO PROVIDE PIPING FOR THE DIALYSIS STATIONS AT LEVEL 3 FROM THE NEWLY CREATED DIALYSIS EQUIPMENT ROOM AT LEVEL… |
| Mod SA189· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-07-06 | −$25,184 | $375,515,858 | TO DELETE THE INSTALLATION OF THE FIBERGLASS BLANKET INSULATION DUE TO THE POTENTIAL FOR WATER TO GET BETWEEN… |
| Mod SA190· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-07-06 | +$3,217 | $375,519,075 | TO RAISE THE PIT DEPTH FOR ELEVATOR S5 DUE TO THE INCORRECT DEPTH SET BY PHASE II. |
| Mod CO03Y· CHANGE ORDER | 2010-07-08 | +$20,000 | $375,539,075 | TO ADD MOTORIZED AIRTIGHT SHUT-OFF DAMPERS WHERE DUCTS PENETRATE INTO COMPUTER ROOMS THAT ARE PROTECTED BY THE… |
| Mod SA191· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-07-08 | +$3,496 | $375,542,571 | TO REPLACE 200 DEGREE SPRINKLER HEADS, IN THE GENERATOR BUILDING,WITH HEADS RATED FOR HIGH TEMPERATURE PER NFP… |
| Mod SA192· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-07-08 | −$2,000 | $375,540,571 | TO ADD A PRESSURE REGULATOR ON INSTRUMENT AIR PIPING IN ROOM 2D454 SINCE IT WAS NOT SHOWN ON THE CONTRACT DRAW… |
| Mod CO03Z· CHANGE ORDER | 2010-07-09 | +$50,000 | $375,590,571 | TO MODIFY THE EDGE OF SLAB AT LEVELS 2 AND 4 DUE TO CONFLICTS BETWEEN THE ARCHITECTURAL AND STRUCTURAL DRAWING… |
| Mod CO04A· CHANGE ORDER | 2010-07-09 | +$5,000 | $375,595,571 | TO PROVIDE EXHAUST TO THE DISSECTION SINK IN ROOM BD215 SINCE THE CONTRACT DOCUMENTS DID PROPERLY SHOW THE EXH… |
| Mod CO04B· CHANGE ORDER | 2010-07-09 | +$90,000 | $375,685,571 | TO MODIFY THE CONTRACT REQUIRED EQUIPMENT BOOM SUPPORTS TO THE MEET THE REQUIREMENTS OF THE EQUIPMENT MANUFAC… |
| Mod CO04E· CHANGE ORDER | 2010-07-09 | +$10,000 | $375,695,571 | TO PROVIDE AN ACCESS FOR THE INSTALLAITON OF THE HYPERBARIC CHAMBER UNITS INTO ROOM 3B222. |
| Mod SA193· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-07-09 | +$13,999 | $375,709,570 | TO PROVIDE REQUIRED NURSE CALL DEVICES WHICH WERE INADVERTENTLY OMITTED FROM THE CONTRACT DRAWINGS AT VARIOUS… |
| Mod CO04C· CHANGE ORDER | 2010-07-10 | +$99,000 | $375,808,570 | TO MODIFY/LOCATE THE EDGE OF SLAB AT THE PERIMETER LEVELS 2 AND 3 DUE TO CONFLICTS BETWEEN THE ARCHITECTURAL A… |
| Mod CO04D· CHANGE ORDER | 2010-07-10 | +$99,000 | $375,907,570 | TO MODIFY THE CONTRACT REQUIRED EQUIPMENT BOOM SUPPORTS TO THE MEET THE REQUIREMENTS OF THE EQUIPMENT MANUFACT… |
| Mod CO04F· CHANGE ORDER | 2010-07-10 | +$10,000 | $375,917,570 | TO ELIMINATE A WINDOW AT ROOM 1C122, INSTALL ROLLUP DOOR IN ROOM 2E122 AND DELETE COUNTERTOP IN ROOM 1C213. |
| Mod SA194· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-07-13 | +$4,526 | $375,922,096 | POWER PROVISIONS FOR TELEVISIONS IN THE CANTEEN DINING AREA WERE OMITTED FROM THE CONTRACT ELECTRICAL DRAWINGS… |
| Mod CO04G· CHANGE ORDER | 2010-07-14 | +$0 | $375,922,096 | THE CONTRACT DRAWINGS INCLUDED A SCHEMATIC OF THE REFRIGERATION EQUIPMENT CONDENSER WATER SYSTEM, BUT THEY DID… |
| Mod CO04H· CHANGE ORDER | 2010-07-16 | +$30,000 | $375,952,096 | THIS CHANGE ORDER ADDRESSED DESIGN OMISSIONS ADDRESSED BY RFIS 1922, 1941, AND 1944. RFI 1922 IDENTIFIED MISSI… |
| Mod SA195· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-07-16 | +$7,198 | $375,959,294 | POWER PROVISIONS FOR SOME OF THE PATIENT LIFTS INDICATED ON EQUIPMENT LAYOUT DRAWINGS WERE OMITTED FROM THE CO… |
| Mod CO04I· CHANGE ORDER | 2010-07-23 | +$5,000 | $375,964,294 | TO PROVIDE INSTRUMENT AIR AND ELECTRICAL CONNECTIONS TO THE CONVEYOR FOR THE WASHER/DISINFECTOR IN ACCORDANCE… |
| Mod CO04J· CHANGE ORDER | 2010-07-27 | +$3,000 | $375,967,294 | TO RELOCATE MED GAS TO MATCH THE LOCATION OF THE ANESTHESIA BOOM AND ADD NITROGEN PIPING FOR THE BRAKING SYSTE… |
| Mod CO04K· CHANGE ORDER | 2010-07-27 | +$40,000 | $376,007,294 | REROUTE THE 8 INCH FIRE MAIN AND 6 INCH FIRE HYDRANT LINE WHERE THEY RUN OVER THE TOP OF THE TUNNEL, IN ORDER… |
| Mod SA196· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-08-04 | +$34,187 | $376,041,481 | TO REPLACE WATTS MODULATING FLOAT VALVES WITH ELECTRONICALLY CONTROLLED VALVES AND ACTUATORS TO REGULATE WATER… |
| Mod SA197· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-08-04 | +$19,752 | $376,061,233 | TO INSTALL CLOCKS WITH ELAPSED TIMERS IN THE OPERATING ROOMS SINCE THEY WERE NOT SHOWN ON THE CONTRACT DRAWING… |
| Mod SA198· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-08-04 | +$7,019 | $376,068,252 | TO PROVIDE TELEDATA OUTLETS IN THE WAREHOUSE SINCE NONE WERE SHOWN ON THE CONTRACT DRAWINGS. |
| Mod SA199· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-08-04 | +$20,745 | $376,088,997 | PROVIDE BYPASS PIPING AROUND FUEL OIL FLOW METER(S) IN BLDG 4. |
| Mod SA200· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-08-04 | +$2,776 | $376,091,773 | TO MODIFY THE ANCHORAGE OF 7 BOLLARDS SIINCE THEY WERE NOT ABLE TO BE INSTALLED AT THE DEPTH SHOWN ON THE CONT… |
| Mod CO04L· CHANGE ORDER | 2010-08-05 | +$10,000 | $376,101,773 | TO PROVIDE A NEW DOMESTIC WATER LINE TO THE SELF-CLEANING HOODS IN THE KITCHEN SINCE THE WATER LINES SHOWN ON… |
| Mod SA201· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-08-09 | −$6,355 | $376,095,418 | TO APPLY PROVIDE A DIFFERENT FINISH COAT TO THE EXPOSED CANOPY SUPPORTS (TNEMEC-ZINC IN LIEU OF GALVANIZING). |
| Mod SA202· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-08-09 | −$12,829 | $376,082,589 | TO DELETE REVERSE OSMOSIS PIPING INSULATION AS WELL AS HEAT TRACING, FROM THE CONDENSOR WATER PIPING, IN THE C… |
| Mod SA203· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-08-09 | +$1,933 | $376,084,522 | TO MAKE PLUMBING FIXTURE CHANGES AS DIRECTED BY RESPONSES TO RFI 1270, 1495, 1594, 1595, 1667, AND 1532. |
| Mod SA204· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-08-09 | +$3,585 | $376,088,107 | TO MODIFY THE BENT PLATE, WELD AND PATCH FOR THE ALTERED FRAMED OPENINGS AT LEVEL 2, N/4 AND N/9. |
| Mod SA205· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-08-09 | +$1,962 | $376,090,069 | TO PROVIDE ADDITIONAL CONCRETE TOPPING AT THE ELEVATOR MACHINE ROOM SLAB (ROOMS 7D301 AND 7D401) SINCE THERE… |
| Mod SA206· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-08-09 | +$23,280 | $376,113,349 | TO PROVIDE DETAILS FOR THE CEILING SOFFIT AND EXPANSION JOINT BETWEEN THE 120-BED CLC AND THE BRIDGE TO THE CL… |
| Mod CO04M· CHANGE ORDER | 2010-08-13 | +$12,000 | $376,125,349 | TO PROVIDE THE NECESSARY POWER SOURCES FOR PROPER OPERATION FOR THE CONDENSING UNITS, EVAPORATOR COILS, AND LI… |
| Mod SA207· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-08-13 | +$6,289 | $376,131,638 | TO ADD FOUR (4) P-802 PLUMBING FIXTURES AND THREE (3) P-803 PLUMBING FIXTURES AT THE BESEMENT LEVEL. |
| Mod SA208· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-08-19 | +$18,547 | $376,150,185 | TO PROVIDE MED GAS OUTLETS ON NORTH AND SOUTH WALLS OF ROOM BD339 - BIOMEDICAL ENGINEERING REPAIR SHOP. |
| Mod SA209· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-08-23 | −$20,774 | $376,129,411 | TO MODIFY THE CONTRACT REQUIRED EQUIPMENT BOOM SUPPORTS TO THE MEET THE REQUIREMENTS OF THE EQUIPMENT MANUFAC… |
| Mod SA210· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-08-23 | +$40,145 | $376,169,556 | TO PROVIDE RACEWAYS FOR DATA CONNECTION OF THE DENTAL CHAIR MONITOR WITH THE OVERHEAD MONITOR, DIGITAL X-RAY U… |
| Mod CO04N· CHANGE ORDER | 2010-08-25 | +$5,000 | $376,174,556 | TO PROVIDE ACCESS TO THREE (3) FIRE ALARM KEY TEST SWITCHES INSTALLED IN PHASE I THAT IS BLOCKED BY STEAM PIPI… |
| Mod CO04O· CHANGE ORDER | 2010-08-25 | +$3,000 | $376,177,556 | TO RELOCATE EXISTING CONTROL PANELS IN THE BOILER ROOM IN ORDER TO PROVIDE ADEQUATE ACCESS FOR MONITORING AND… |
| Mod CO04P· CHANGE ORDER | 2010-08-25 | +$5,000 | $376,182,556 | CONTRACT DOCUMENTS FAILED TO ADDRESS CONTROLLED ACCESS INTO THE SURGERY/DIGESTIVE DISEASES AREA FROM THE WAITI… |
| Mod CO04Q· CHANGE ORDER | 2010-08-30 | +$80,000 | $376,262,556 | TO MODIFY THE EXTERIOR WINDOW WALL AT THE NORTH ELEVATION OF LEVELS 2 AND 4. THE CONTRACT SHOWN WINDOW WALL L… |
| Mod CO04R· CHANGE ORDER | 2010-08-31 | +$95,000 | $376,357,556 | TO MODIFY THE UTILITIES SERVING THE RADIOLOGY SUITE EQUIPMENT TO MEET THE MEET THE REQUIREMENTS OF THE VENDOR/… |
| Mod CO04S· CHANGE ORDER | 2010-09-02 | +$95,000 | $376,452,556 | TO MODIFY THE WINDOW TREATMENT THROUGHOUT THE NEW MEDICAL CENTER SINCE THE CONTRACT DOCUMENTS DID NOT ADEQUATE… |
| Mod CO04T· CHANGE ORDER | 2010-09-02 | +$13,000 | $376,465,556 | TO MODIFY THE LAYOUT OF THE 6TH FLOOR PATIENT ROOM BASED ON THE REVIEW OF THE MOCK-UP ROOM. |
| Mod CO04U· CHANGE ORDER | 2010-09-03 | +$15,000 | $376,480,556 | THE CONTRACT DRAWINGS CALL OUT ONE FOOT BY FOUR FEET LAMINAR FLOW DIFFUSERS TO FORM THE AIR CURTAIN AROUND THE… |
| Mod SA211· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-10 | +$26,162 | $376,506,718 | TO ADD FLOOR SINKS AND ASSOCIATED PIPING FOR STERILIZERS AND WASHER/DISINFECTOR IN ROOM 2D454. |
| Mod SA212· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-13 | +$4,354 | $376,511,072 | TO DELETE THE CEILING, MAINTAIN THE LIGHT FIXTURES, CHANGE THE SPRINKLER HEADS FROM PENDENT TYPE TO UPRIGHTS,… |
| Mod SA213· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-13 | +$3,831 | $376,514,903 | TO CLOSE THE SLAB OPENING IN THE SHAFT BETWEEN THE 1ST AND 2ND FLOOR AT ELEVATOR S6 (DUMBWAITER). |
| Mod SA214· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-13 | +$3,080 | $376,517,983 | TO PROVIDE A BYPASS BETWEEN THE FIRE SYSTEM SUPPLY AND THE INDUSTRIAL WATER SUPPLY. |
| Mod SA215· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-13 | −$3,796 | $376,514,187 | TO PROVIDE THE NECESSARY POWER SOURCES FOR PROPER OPERATION OF THE CONDENSING UNITS, EVAPORATOR COILS, AND LIG… |
| Mod SA216· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-13 | +$3,000 | $376,517,187 | TO REPLACE (31) 4 INCH GATE VALVES AND (13) 6 INCH GATE VALVES WITH EPOXY COATED GATE VALVES OF THE SAME SIZE. |
| Mod SA217· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-16 | +$3,104 | $376,520,291 | TO PROVIDE PROPERLY SIZED THERMAL EXPANSION TANKS. |
| Mod SA218· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-16 | +$13,014 | $376,533,305 | REROUTE THE 8 INCH FIRE MAIN AND 6 INCH FIRE HYDRANT LINE WHERE THEY RUN OVER THE TOP OF THE TUNNEL, IN ORDER… |
| Mod CO04V· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-17 | +$5,000 | $376,538,305 | TO PROVIDE EXHAUST IN TOILET AND SHOWER ROOM 2E228. CONTRACT DOCUMENTS SHOWED RETURN DUCT IN LIEU OF EXHAUST… |
| Mod CO04W· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-23 | +$47,500 | $376,585,805 | TO PROVIDE ADDITIONAL NURSE CALL DEVICES AT VARIOUS ROOMS THAT WERE NOT SHOWN ON CONTRACT DOCUMENTS BUT ARE RE… |
| Mod SA227· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-27 | +$12,816 | $376,598,621 | THIS REVISION IS TO PROVIDE NECESSARY TELEDATA OUTLETS AT PATIENT HEADWALLS THAT WERE OMITTED FROM THE CONTRAC… |
| Mod SA228· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-27 | +$2,629 | $376,601,250 | THIS CHANGE ORDER ADDRESSED DESIGN OMISSIONS ADDRESSED BY RFIS 1922, 1941, AND 1944. RFI 1922 IDENTIFIED MISSI… |
| Mod SA229· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-27 | +$12,025 | $376,613,275 | THIS CHANGE ORDER ADDRESSES DESIGN OMISSIONS RESOLVED BY RFIS 2048 AND 2049. RFI 2048 IDENTIFIED MISSING OCCU… |
| Mod SA220· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-28 | +$888 | $376,614,163 | TO PROVIDE POWER AND DATA FOR SUPPLY AND MEDICATION DISPENSING UNITS FOR THE SPECIFIED VV (VA SUPPLIED, VA IN… |
| Mod SA221· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-28 | +$1,332 | $376,615,495 | TO ADD VENT PIPING TO TYPE B FLOOR DRAIN (FD-B) IN ROOM 1B103. |
| Mod SA222· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-28 | +$1,019 | $376,616,514 | TO ADD VENT PIPING TO TYPE B FLOOR DRAIN (FD-B) IN ROOM 1B103. |
| Mod SA223· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-28 | +$1,285 | $376,617,799 | TO ADD WASTE PIPING TO A TYPE-C FLOOR DRAIN (FD-C) LOCATED INRROOM 1D352. |
| Mod SA224· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-28 | +$936 | $376,618,735 | TO ADD DRAIN, WASTE, AND VENT PIPING TO FLOOR DRAINS IN RROOMS 2D322 AND 2D302 SINCE THE PIPING WAS NOT SHOWN… |
| Mod SA225· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-28 | +$1,658 | $376,620,393 | TO PROVIDE POWER TO THE THE FUEL OIL MASTER CONTROL PANEL THAT CONTROLS THE AUTOMATIC VALVES, FOR THE UNDERGRO… |
| Mod SA226· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-28 | +$5,219 | $376,625,612 | TO PROVIDE 'MODULARM 75' PANELS , FOR KITCHEN WALK INS, THAT WILL ALOW FOR CONNECTION TO THE BUILDING MANAGEME… |
| Mod SA230· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-28 | +$414 | $376,626,026 | TO REVISE P-302 BATH TUB, TO A P-711 SHOWER FIXTURE, AND ADD A TYPE C FLOOR DRAIN (FD-C) IN ROOM 1B209. |
| Mod SA231· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-28 | +$83 | $376,626,109 | TO INCREASE THE SIZE OF THE RETURN DUCT FOR AHU-ADM-1 AND 2 IN MECHANICAL ROOM 2C200 DUE TO EXCESSIVE NOISE C… |
| Mod SA232· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-28 | +$3,611 | $376,629,720 | TO INSTALL A GATE AT EACH OF THE THREE COURTYARDS AT THE 120-BED NHCU. |
| Mod SA233· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-28 | +$50,404 | $376,680,124 | TO WORK PREMIUM TIME IN THE RADIOLOGY SUITE TO MAINTAIN THE CURRENT SCHEDULE. |
| Mod SA234· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-29 | +$2,453 | $376,682,577 | THE MEDICAL CENTER CHANGED THE AUTOPSY LIGHTING FROM ONE MANUFACTURED BY 'SKYTRON' TO ONE MANUFACTURED BY ST… |
| Mod SA235· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-29 | +$11,247 | $376,693,824 | TO MODIFY COMPUTER BRACKET 3446-001 AND 008 TO BE COMPATIBLE WITH THE AMICO HEADWALL UNIT. |
| Mod CO05P· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-10-05 | +$95,000 | $376,788,824 | TO INSTALL A DOUBLE RAIL (X-Y) SYSTEM AT ALL PATIENT ROOMS ON LEVEL 6 IN LIEU OF THE CONTRACT REQUIRED SINGLE… |
| Mod CO04X· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-10-07 | +$20,000 | $376,808,824 | TO INSTALL SMOKE VENTS ON THE WAREHOUSE ROOF. |
| Mod CO04Y· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-10-07 | +$21,000 | $376,829,824 | TO PROVIDE A KNEE WALL FOR THE ATTACHMENT OF THE EXPANSION JOINT COVER ASSEMBLY AT THE 4TH FLOOR ROOF. |
| Mod CO04Z· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-10-07 | +$28,000 | $376,857,824 | TO RELOCATE AND MODIFY DAVIT BASES AT THE 7TH FLOOR ROOF THAT ARE IN CONFLICT WITH THE SCREEN WALL. |
| Mod CO05A· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-10-07 | +$55,000 | $376,912,824 | TO REVISE THE REVERSE OSMOSIS WATER SYSTEM SERVING THE WASHER/STERILIZERS AS INDICATED BY REVISED SPECIFICATIO… |
| Mod SA236· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-10-07 | +$13,728 | $376,926,552 | TO CHANGE THE COLOR TO THE COMPOSITE METAL PANELS AT THE AUDITORIUM. |
| Mod SA237· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-10-07 | +$3,277 | $376,929,829 | TO PROVIDE SUPPORT FOR THE CMU WALL SOUTH OF ELEVATOR S-5 AT THE WAREHOUSE ROOF. |
| Mod SA238· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-10-07 | +$7,759 | $376,937,588 | TO PROVIDE SUPPORT FOR THE METAL CAP AND INSULATION BOARDS THAT COVER THE CHASES AT THE ROOF LEVEL. |
| Mod SA241· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-10-08 | −$5,690 | $376,931,898 | TO DELETE THE WALLS THAT CONFLICT WITH THE LOUVERS ON 3/AE-5620. |
| Mod CO05B· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-10-11 | +$95,000 | $377,026,898 | TO MODIFY THE UTILITIES SERVING THE CARDIAC CATH LAB SUITE EQUIPMENT TO MEET THE MEET THE REQUIREMENTS OF THE… |
| Mod CO05C· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-10-11 | +$70,000 | $377,096,898 | TO MODIFY THE UTILITY REQUIREMENTS FOR GOVERNMENT FURNISHED EQUIPMENT (VV) IN THE PHARMACY. |
| Mod CO05D· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-10-11 | +$30,000 | $377,126,898 | TO PROVIDE POWER TO MOTORIZED WINDOW TREATMENT AT VARIOUS LOCATIONS. |
| Mod SA242· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-10-11 | +$25,000 | $377,151,898 | TO INTERCONNECT THE PLATFORMS SO THAT MAINTAINANCE PERSONNEL CAN ASCEND THE STAIRS AND ACCESS ANY OR ALL SIDES… |
| Mod SA239· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-10-12 | +$59,028 | $377,210,926 | TO PROVIDE HORIZONTAL ADJUSTMENT OF THE FIRE SHUTTER TRACK AND APPLY INTUMESCENT PAINT FOR FIRE PROOFING. |
| Mod SA240· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-10-12 | +$3,432 | $377,214,358 | TO CHANGE THE DIMENSIONS OF THE WALLS TO CORRECT THE DISCREPANCY ON THE DRAWINGS FOR THE BRIDGE. |
| Mod CO05E· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-10-15 | +$50,000 | $377,264,358 | AS DESIGNED, THE COOLING TOWERS ARE NOT HIGH ENOUGH TO PROVIDE SUFFICIENT INLET PRESSURE TO THE CONDENSER PUMP… |
| Mod CO05F· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-10-15 | +$15,000 | $377,279,358 | AS DESIGNED, THE LOW TEMPERATURE HOT WATER (LTHW) PIPES SERVING 2-AHU-5 AND -6 ARE SIGNIFICANTLY SMALLER THAN… |
| Mod SA219· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-10-15 | +$84,318 | $377,363,676 | TO MODIFY/LOCATE THE EDGE OF SLAB AT THE PERIMETER LEVELS 2 AND 3 DUE TO CONFLICTS BETWEEN THE ARCHITECTURAL A… |
| Mod SA243· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-10-15 | +$12,578 | $377,376,254 | TO COMPLETE THE MEDICAL GAS CERTIFICATION AND CONNECT NURSING HOME MEDICAL GAS ALARMS INTO BMS IN CENTRAL PLAN… |
| Mod SA244· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-10-15 | −$10,000 | $377,366,254 | TO PROVIDE A SOLID SURFACE FOR ALL COUNTERTOPS AT LEVEL 6 IN LIEU OF THE CONTRACT REQUIRED PLASTIC LAMINATE. |
| Mod SA245· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-10-15 | +$9,635 | $377,375,889 | TO MODIFY THE ACOUSTICAL CEILING GRID SYSTEM AT THE PATIENT LIFT SUPPORTS FOR ACCESS TO SYSTEMS ABOVE THE CEIL… |
| Mod SA246· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-10-15 | +$3,365 | $377,379,254 | TO PROVIDE SUPPORTS FOR A DOUBLE RAIL SYSTEM IN LIEU OF SINGLE RAIL AT ALL PATIENT ROOMS AT LEVEL 6. |
| Mod CO05G· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-10-26 | +$2,000 | $377,381,254 | THREE RECESS-MOUNTED LIGHT FIXTURES SHOWN ON REFLECTED CEILING PLANS, BUT NOT ON ELECTRICAL LIGHTING DRAWINGS,… |
| Mod CO05H· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-10-26 | +$1,900 | $377,383,154 | ELECTRICAL CIRCUITS FOR THE HEADWALL CONSOLE RECEPTACLES IN ROOM 2B111 WERE OMITTED FROM THE DESIGN. |
| Mod SA247· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-10-26 | +$3,128 | $377,386,282 | PROVIDE ADDITIONAL FLOOR DRAINS IN ROOMS BD210 AND BD215. |
| Mod SA248· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-10-26 | −$59,122 | $377,327,160 | THE CONTRACT SPECIFICATIONS REQUIRE THE CONTRACTOR TO PAY FOR WATER USAGE. THIS CREDIT IS FOR WATER USAGE FRO… |
| Mod CO05I· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-10-27 | +$6,500 | $377,333,660 | AS A RESULT OF DESIGN DRAWING COORDINATION ISSUES, THE PATIENT TOILET NURSE CALL EMERGENCY STATIONS IN THE MEN… |
| Mod CO05J· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-10-27 | +$3,500 | $377,337,160 | AS A RESULT OF DESIGN OMISSION, PUBLIC ADDRESS SPEAKERS WERE NOT INDICATED IN THE ENTRANCE LOBBY 1C398. THE NE… |
| Mod CO05K· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-10-27 | +$2,500 | $377,339,660 | AS A RESULT OF AN ERROR ON THE ELECTRICAL DRAWINGS, THE DISCONNECTS FOR HYDRAULIC ELEVATORS S7 AND S8 HAD TO B… |
| Mod CO05L· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-10-27 | +$5,000 | $377,344,660 | TO ADD A P-507 PLASTER SINK AND ASSOCIATED PIPING TO ROOM 3B187. THE CONTRACT DID NOT SHOW A SINK IN CAST ROO… |
| Mod SA249· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-10-27 | −$936 | $377,343,724 | TO PROVIDE INSTRUMENT AIR AND ELECTRICAL CONNECTIONS, TO THE CONVEYOR FOR THE WASHER/DISINFECTOR, IN ACCORDANC… |
| Mod SA250· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-10-27 | −$92,260 | $377,251,464 | THE VAMC ALLOWED THE CONTRACTOR TO UTILIZE POWER FROM THE ENERGY PLANT FOR THE CONTRACTOR'S TRAILER AND STAGIN… |
| Mod SA251· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-10-27 | +$9,253 | $377,260,717 | THE CONTRACT DRAWINGS SHOW THE MEDIUM PRESSURE STEAM LINE AT THE LOADING DOCK SUPPORTED FROM STRUCTURE ABOVE.… |
| Mod 219· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-10-28 | +$84,318 | $377,345,035 | SLAB EDGE ADJUSTMENTS ON LEVELS 2 AND 3 |
| Mod CO05M· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-11-04 | +$5,000 | $377,350,035 | TO INSTALL EXHAUST DUCT IN HAC ROOM 5D307A SINCE THE CONTRACT DRAWINGS DID NOT SHOW ANY EXHUAST TO THE ROOM. |
| Mod SA252· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-11-04 | −$335 | $377,349,700 | TO RELOCATE THE PATIENT TOILET NURSE CALL EMERGENCY STATIONS IN THE MENTAL HEALTH WING DUE TO CONFLICT WITH OT… |
| Mod CO05N· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-11-05 | +$6,000 | $377,355,700 | IN ORDER TO COORDINATE NEW WORK WITH THE VA-PURCHASED OPERATIONS CONTROL CASEWORK, ELECTRICAL AND TELEDATA RO… |
| Mod CO05O· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-11-05 | +$99,000 | $377,454,700 | TO PROCURE ALL THE NECESSARY EQUIPMENT FOR A R.O. WATER SYSTEM IN ROOM 4D412 SINCE THE CONTRACT DOCUMENTS DID… |
| Mod CO05Q· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-11-05 | +$80,000 | $377,534,700 | TO MODIFY COMPUTER BRACKET 3449 TO BE COMPATIBLE WITH THE AMICO HEADWALL UNIT. |
| Mod SA253· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-11-05 | +$10,794 | $377,545,494 | TO PROVIDE FOR ROLL-UP DOORS AT LEVEL 4 SINCE NO POWER WAS SHOWN ON THE CONTRACT DOCUMENTS. |
| Mod SA254· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-11-05 | −$4,604 | $377,540,890 | TO PROVIDE LONGER LAMINAR FLOW DIFFUSERS TO COMPLETELY SURROUND THE OPERATING TABLES.THE CONTRACT DRAWINGS CA… |
| Mod SA256· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-11-08 | +$2,224 | $377,543,114 | TO INCREASE THE HEIGHT OF THE WALL THE NW PLANTER IN COURTYARD 1TO ACCOMMODATE THE INSTALLATION OF THE WALKWAY… |
| Mod CO05R· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-11-10 | +$5,000 | $377,548,114 | PROVIDE LIGHT SWITCH IN ROOM 2D434 AND ADDITIONAL RECEPTACLES IN ROOM 2A142. |
| Mod SA257· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-11-10 | −$5,374 | $377,542,740 | TO INSTALL DOUBLE DOORS, FRAME AND HARDWARE IN ORDER TO PROVIDE AN ACCESS FOR THE INSTALLATION OF THE HYPERBAR… |
| Mod SA258· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-11-10 | +$8,988 | $377,551,728 | TO ADD ROOF AND OVERFLOW DRAINS AND ASSOCIATED PIPING ON SMALL LEVEL 1 ROOF NEAR GRID LINES 16/E. THE SIZE OF… |
| Mod CO05S· CHANGE ORDER | 2010-11-12 | +$5,000 | $377,556,728 | THE CONTRACT DRAWINGS SHOW A MAKEUP WATER CONNECTION FOR THE LOW TEMPERATURE HOT WATER (LTHW) SYSTEM IN THE CE… |
| Mod CO05T· CHANGE ORDER | 2010-11-16 | +$5,000 | $377,561,728 | TO ADD A TYPE B FLOOR DRAIN (FD-B) AND ASSOCIATED PIPING TO ROOM 1B246 AS DIRECTED BY RESPONSE TO RFI 2297. |
| Mod CO05U· CHANGE ORDER | 2010-11-18 | +$5,000 | $377,566,728 | TO ADD MEDICAL GAS AREA ALARMS FOR ROOMS 3B216&3B220 AS DIRECTED BY RESPONSE TO RFI 2129. |
| Mod SA259· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-11-18 | +$2,245 | $377,568,973 | PROVIDE THE CORRECT DOOR FRAME SIZES AS DELINEATED IN RFI #1598. |
| Mod SA260· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-11-19 | +$33,815 | $377,602,788 | AT THE REQUEST OF THE VA MEDICAL CENTER, THIS CHANGE IS TO RELOCATE CRAC DT-3B IN THE BASEMENT IT ROOM AND TO… |
| Mod SA262· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-11-19 | +$4,948 | $377,607,736 | TO PROVIDE A SUPPORT FRAME FOR THE GREASE REMOVAL SYSTEM AS DIRECTED BY RFI 1943. |
| Mod SA263· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-11-19 | −$3,577 | $377,604,159 | TO PROVIDE A SOLID SURFACE FOR ALL COUNTERTOPS AT LEVEL 3 IN LIEU OF THE CONTRACT REQUIRED PLASTIC LAMINATE. |
| Mod SA264· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-11-19 | +$17,000 | $377,621,159 | TO PROVIDE A SOLID SURFACE FOR ALL COUNTERTOPS AT LEVEL 2 IN LIEU OF THE CONTRACT REQUIRED PLASTIC LAMINATE. |
| Mod SA265· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-11-19 | +$65,685 | $377,686,844 | TO PROVIDE A SOLID SURFACE FOR ALL COUNTERTOPS AT LEVEL 1IN LIEU OF THE CONTRACT REQUIRED PLASTIC LAMINATE. |
| Mod SA266· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-11-19 | −$5,474 | $377,681,370 | TO PROVIDE A SOLID SURFACE FOR ALL COUNTERTOPS AT LEVEL 5 IN LIEU OF THE CONTRACT REQUIRED PLASTIC LAMINATE. |
| Mod SA267· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-11-19 | +$33,499 | $377,714,869 | TO INSTALL A DOUBLE RAIL (X-Y) SYSTEM AT THE 5TH FLOOR ICU ROOMS IN LIEU OF THE CONTRACT REQUIRED SINGLE RAIL… |
| Mod CO05V· CHANGE ORDER | 2010-11-22 | +$4,000 | $377,718,869 | THIS CHANGE IS FOR A CORRECTION OF THE BOILER FORCED DRAFT FAN FEEDER SIZE, AND FOR A CIRCUIT FOR THE BOILER M… |
| Mod SA261· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-11-22 | +$1,627 | $377,720,496 | TO RELOCATE MED GAS TO MATCH THE LOCATION OF THE ANESTHESIA BOOM AND ADD NITROGEN PIPING FOR THE BRAKING SYSTE… |
| Mod SA268· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-11-22 | +$1,109 | $377,721,605 | TO PROVIDE A PIECE OF ALUMINUM BREAK METAL FLASHING AT THE E4 WINDOWS AT THE ATRIUMS. |
| Mod CO05W· CHANGE ORDER | 2010-11-23 | +$1,600 | $377,723,205 | RECEPTACLES ARE BEING ADDED IN A VENDING MACHINE ROOM THAT DID NOT SHOW ANY BY CONTRACT. |
| Mod CO05X· CHANGE ORDER | 2010-12-01 | +$5,000 | $377,728,205 | TO PROVIDE ADDITIONAL LIGHTING IN ROOM 3B107 IN ORDER TO MEET THE MINIMUM LIGHTING LEVELS. |
| Mod CO05Y· CHANGE ORDER | 2010-12-01 | +$9,500 | $377,737,705 | THE VEEDER ROOT SYSTEM, INSTALLED DURING PHASE I, HAS TO BE MODIFIED IN ORDER TO BE ABLE TO VIEW TANK LEVELS I… |
| Mod SA269· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-01 | +$4,175 | $377,741,880 | TTO REVISE THE CABLE TRAY ROUTING ON THE 2ND FLOOR, IN SEGMENT E, IN ORDER TO PROVIDE PATHWAYS LESS THAN MAXIM… |
| Mod SA270· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-01 | +$21,766 | $377,763,646 | TO RAISE THE CONDENSER WATER HEADER AND PUMP INLET BRANCH PIPES TO PROVIDE MAINTENANCE ACCESS TO THE PUMPS AND… |
| Mod SA271· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-01 | +$3,831 | $377,767,477 | TO REPLACE P-418 FIXUTRE IN ROOM 2A158 WITH A P-508 PLUMBING FIXTURE. |
| Mod SA272· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-01 | +$5,619 | $377,773,096 | TO PROVIDE WASTE AND VENT PIPING FOR THE FIXTURE P-502 IN ROOM 1C378A. |
| Mod SA273· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-02 | +$20,200 | $377,793,296 | TO MODIFY THE OXYGEN TANK FARM FOUNDATION PAD. |
| Mod CO05Z· CHANGE ORDER | 2010-12-03 | +$25,000 | $377,818,296 | TO PROVIDE MOTOR-OPERATED CONTROL VALVES ARE REQUIRED AT THE COOLING TOWER BASIN OUTLETS IN ORDER FOR THE COND… |
| Mod CO06A· CHANGE ORDER | 2010-12-03 | +$20,000 | $377,838,296 | TO PROVIDE TWO (2) ADDITIONAL MOTORIZED DAMPERS IN ROOM BD134 SINCE THEY WERE OMITTED FROM THE CONTRACT DRAWIN… |
| Mod CO06B· CHANGE ORDER | 2010-12-03 | +$81,657 | $377,919,953 | PROVIDE FUEL OIL FOR INTIAL BOILER START-UP |
| Mod SA274· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-03 | +$12,252 | $377,932,205 | TO INSTALL A DUCT SMOKE DETECTOR FOR AHU 2-AHU-5 AND 6 IN THE SUPPLY AND RETURN DUCT. THE AHU'S ARE LOCATED IN… |
| Mod SA275· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-03 | +$19,099 | $377,951,304 | TO MODIFY THE ELEVATION OF THE EQUIPMENT BOOM SUPPORTS IN THE OR SUITE TO MEET THE REQUIREMENTS OF THE EQUIPME… |
| Mod SA276· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-03 | +$86,000 | $378,037,304 | TO INCREASE THE SIZE OF THE BOILER BLOWDOWN TANK (2-T-2) TO MEET THE REQUIREMENTS OF THE BOILERS. |
| Mod CO06C· CHANGE ORDER | 2010-12-08 | +$5,000 | $378,042,304 | TO RELOCATE BACKFLOW PREVENTER FROM BELOW FLOOR OF 2D326 TO ABOVE FLOOR OF WATER TREATMENT ROOM 2D322. |
| Mod SA255· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-08 | +$84,219 | $378,126,523 | INSTALLATION OF DIALYSIS R. O. WATER SYSTEM |
| Mod CO06D· CHANGE ORDER | 2010-12-09 | +$10,000 | $378,136,523 | TO PROVIDE A SUPPORT FOR THE BRIDGE CONNECTION EXPANSION JOINT MODIFICATION AT LEVEL 2 FOR PHASE III TO PHASE… |
| Mod SA280· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-09 | +$1,543 | $378,138,066 | PROVIDE FUEL OIL FOR INITIAL BOILER START-UP |
| Mod CO06E· CHANGE ORDER | 2010-12-10 | +$5,000 | $378,143,066 | TO PROVIDE POWER FOR FIXTURE P-418 IN ROOM 3A110 SINCE IT WAS SHOWN ON THE CONTRACT DOCUMENTS AND RELOCATE REC… |
| Mod SA277· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-10 | −$112 | $378,142,954 | TO PROVIDE ELECTRICAL CIRCUITS FOR THE HEADWALL CONSOLE RECEPTACLES IN ROOM 2B111 WHICH WERE NOT SHOWN ON THE… |
| Mod SA278· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-10 | −$1,813 | $378,141,141 | TO INCREASE THE SIZE OF THE DISCONNECTS FROM 100 AMP TO 200 AMP FOR HYDRAULIC ELEVATORS S7 AND S8 SINCE THE SI… |
| Mod SA279· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-10 | −$1,713 | $378,139,428 | PROVIDE LIGHT SWITCH IN ROOM 2D434 AND ADDITIONAL RECEPTACLES IN ROOM 2A142. |
| Mod CO06F· CHANGE ORDER | 2010-12-15 | −$4,000 | $378,135,428 | TO DELETE THE INSTALLATION OF THE HYDROTHERAPY TUBS, REPLACE CERAMIC TILE ON THE WALLS AND FLOORS WITH PAINT O… |
| Mod CO06G· CHANGE ORDER | 2010-12-15 | +$600 | $378,136,028 | TO EXTEND A CHASE IN ROOM 3D392 BY 22 INCHES TO ACCOMMODATE THE INSTALLATION OF PIPING. |
| Mod SA281· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-16 | +$2,845 | $378,138,873 | TO PROVIDE AN ACCESS FOR WEST SIDE OF THE AIR HANDLING UNIT ON LEVEL 4 OF THE MAIN HOSPITAL TOWER ALONG GRIDLI… |
| Mod CO06H· CHANGE ORDER | 2010-12-17 | +$10,000 | $378,148,873 | TO PROVIDE POWER FOR THE POWER FOR THE MONTEL SHELVING SYSTEM, TO BE INSTALLED IN 2D170 AND 1B263. THE CONTRA… |
| Mod CO06K· CHANGE ORDER | 2010-12-17 | +$20,000 | $378,168,873 | RELOCATE HYDRANTS THAT WERE IN THE CENTER OF THE SIDEWALKS IN ORDER TO PROVIDE AN UNRESTRICTED PATH. |
| Mod SA284· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-17 | +$47,136 | $378,216,009 | TO INSTALL WATERPROOING MEMBRANE AT THE EQUIPMENT PADS AT LEVEL 4 AND 7 ROOFS, SINCE THERE WAS NO WATERPROOFIN… |
| Mod CO06I· CHANGE ORDER | 2010-12-20 | +$35,000 | $378,251,009 | TO REVISE POWER AND UTILITIES TO DENTAL BAYS AS INSTRUCTED BY RE OFFICE RESPONSE TO RFI 989, 989A, AND 1470. |
| Mod CO06J· CHANGE ORDER | 2010-12-20 | +$10,000 | $378,261,009 | THE CONTRACT DRAWINGS CONFLICTED IN THE VOLTAGE REQUIREMENT FOR THE CSGF EQUIPMENT. THIS CHANGE IS TO PROVIDE… |
| Mod SA282· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-21 | +$13,836 | $378,274,845 | TO REPLACE THE FLOOR MOUNTED CLOSERS AT ALL EXTERIOR DOOR LOCATIONS WITH FRAME MOUNTED PIVOTS AND A STANDARD C… |
| Mod SA283· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-21 | −$1,084 | $378,273,761 | TO PROVIDE EXHAUST IN TOILET AND SHOWER ROOM 2E228. CONTRACT DOCUMENTS SHOWED RETURN DUCT IN LIEU OF EXHAUST… |
| Mod CO06L· CHANGE ORDER | 2010-12-22 | +$2,700 | $378,276,461 | THE HARDWARE DESIGN FOR THE ROOF DOORS HAD AN IMPROPER LOCKSET SPECIFIED. IN ADDITION HEAVY DUTY SPRING STOPS… |
| Mod CO06M· CHANGE ORDER | 2010-12-27 | +$10,000 | $378,286,461 | TO MODIFY THE CURB AT THE DROP OFF AREA BETWEEN THE NEW MEDICAL CENTER AND THE 120-BED CLC IN ORDER TO PROVIDE… |
| Mod CO06N· CHANGE ORDER | 2010-12-28 | +$2,600 | $378,289,061 | THE LIGHTING DRAWINGS FOR THE PREVIOUS UTILITY TUNNEL CHANGE ORDER FAILED TO INDICATE THE PROPER NUMBER OF EXI… |
| Mod CO06O· CHANGE ORDER | 2010-12-28 | +$10,000 | $378,299,061 | TO PROVIDE ADDITIONAL COMBUSTION AIR FOR THE BOILERS. |
| Mod CO06P· CHANGE ORDER | 2010-12-28 | +$25,000 | $378,324,061 | TO MODIFY/RELOCATE ROOF OPENINGS FOR THE GENERATOR EXHAUST STACKS. |
| Mod CO06Q· CHANGE ORDER | 2010-12-28 | +$10,000 | $378,334,061 | TO PROVIDE POWER, WATER AND WASTE FOR THE WASTE MANAGEMENT STATIONS IN SOILED RECEIVING/DECONTAMINATION ROOM 2… |
| Mod CO06R· CHANGE ORDER | 2010-12-28 | +$25,000 | $378,359,061 | TO REPLACE THE FLOATING FLOOR ISOLATORS IN DIALYSIS EQUIPMENT ROOM 4D412 DUE TO THE WEIGHT OF THE NEW EQUIPMEN… |
| Mod CO06S· CHANGE ORDER | 2011-01-03 | +$5,000 | $378,364,061 | TO INSTALL A NEW DOOR AND FRAME IN ROOM BG115, BASEMENT LEVEL. CONTRACT SPECIFIED DOOR IS TOO LARGE FOR THE E… |
| Mod SA285· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-03 | +$2,735 | $378,366,796 | A PIT LADDER WAS NOT SHOWN FOR PASSENGER ELEVATOR P2. THIS IS BEING ADDED SO THAT THIS ELEVATOR CAN BE SERVICE… |
| Mod CO06T· CHANGE ORDER | 2011-01-04 | +$20,000 | $378,386,796 | TO PIPE THE CONTINUOUS BLOWDOWN FLASH TANK VENT TO THE LOW PRESSURE STEAM SYSTEM, IN THE BOILER PLANT, IN ORDE… |
| Mod SA289· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-04 | +$44,388 | $378,431,184 | TO PROVIDE A USED, TEMPORARY WATER SOFTENER IN THE BOILER ROOM, BLDG 2, AND PERFORM ALL NECESSARY MAINTENANCE… |
| Mod SA286· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-05 | +$28,312 | $378,459,496 | TO PROVIDE SHOP,LAB AND DENTAL VACUUM EXHAUST AS WELL AS SHOP AIR INTAKE LINES. |
| Mod CO06U· CHANGE ORDER | 2011-01-10 | +$750 | $378,460,246 | THIS CHANGE IS BEING ISSUED TO INSTALL 3-WAY SWITCHING FOR THE MRI EXAMINATION ROOM FROM THE CONTROL ROOM TO M… |
| Mod CO06V· CHANGE ORDER | 2011-01-12 | +$2,000 | $378,462,246 | IN ORDER TO COORDINATE WITH FUTURE VAMC EQUIPMENT IN ROOM 3D422, ANESTHESIA WORKROOM, THE RECEPTACLE AND PLUG… |
| Mod SA293· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-12 | +$74,531 | $378,536,777 | MOTOR-OPERATED CONTROL VALVES ARE REQUIRED AT THE COOLING TOWER BASIN OUTLETS IN ORDER FOR THE CONDENSER WATER… |
| Mod CO06W· CHANGE ORDER | 2011-01-13 | +$17,500 | $378,554,277 | THIS MODIFICATION PROVIDES POWER FOR THE HORIZONTAL FIRE SHUTTERS THAT WAS OMITTED FROM THE CONTRACT DRAWINGS. |
| Mod CO06X· CHANGE ORDER | 2011-01-20 | +$5,000 | $378,559,277 | TO PROVIDE ROOF ASPHALT WALK-OFF PADS IN LIEU OF THE CONCRETE PADS SPECIFIED AT ALL ROOF LEVELS AND THE WAREHO… |
| Mod CO06Y· CHANGE ORDER | 2011-01-21 | +$2,300 | $378,561,577 | THE NUMBER OF HEAT DETECTORS SHOWN ON FIRE ALARM DRAWINGS DID NOT CORRESPOND TO THE NUMBER NECESSARY FOR COMPL… |
| Mod CO06Z· CHANGE ORDER | 2011-01-21 | +$2,400 | $378,563,977 | TO PROVIDE THE NECESSARY ELECTRICAL PROVISIONS FOR OPERATION OF A PNEUMATIC OPERATED, DOOR FOR THE MRI PROCEDU… |
| Mod CO07A· CHANGE ORDER | 2011-01-21 | +$5,000 | $378,568,977 | TO PROVIDE A COUPON RACK FOR THE LTHW SYSTEM IN THE CENTRAL PLANT SINCE NONE WAS SHOWN ON THE CONTRACT DRAWING… |
| Mod CO07B· CHANGE ORDER | 2011-01-21 | +$5,000 | $378,573,977 | TO RELOCATE THE SUPPLY DIFFUSERS IN THE AUDITORIUM (1C166) IN ORDER FOR THE DUCTWORK DIFFUSER LAYOUT TO MATCH… |
| Mod CO07C· CHANGE ORDER | 2011-01-21 | +$15,000 | $378,588,977 | TO SUPPLY THE CLEAN STEAM GENERATORS WITH SOFT WATER, PER MANUFACTURER'S RECOMMENDATIONS. |
| Mod SA295· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-21 | +$20,772 | $378,609,749 | TO PROVIDE AREA ALARMS FOR MEDICAL GAS SYSTEMS SUPPLYING ANESTHETIZING LOCATIONS. |
| Mod SA297· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-24 | +$2,904 | $378,612,653 | TO COVER BRINE FEED LINE WITH INSULATION AND WEATHER PROOF ALUMINUM JACKETING IN ORDER TO PROVIDE UV PROTECTIO… |
| Mod CO07D· CHANGE ORDER | 2011-01-28 | +$6,000 | $378,618,653 | TO PROVIDE POWER AND TELECOM IN ROOM 1A149 FOR VV EQUIPMENT. POWER AND TELECOM WAS NOT SHOWN IN ROOM. |
| Mod CO07E· CHANGE ORDER | 2011-01-28 | +$14,600 | $378,633,253 | TO ADD MOTORS TO THE COILING SHUTTERS THAT ARE GREATER THAN 7' WIDE, AND NOT SUITABLE FOR MANUAL OPERATION. TH… |
| Mod CO07F· CHANGE ORDER | 2011-01-28 | +$2,800 | $378,636,053 | TO ADD SHUT OFF VALVE(S) AT OPERATOR LEVEL, FOR THE 85 PSIG OXYGEN FEEDING THE HYPERBARIC CHAMBERS IN ROOM 3B… |
| Mod SA287· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-28 | +$129,433 | $378,765,486 | INSTALLATION OF TERRAZZO FLOORING IN CANTEEN ROOM 1D307. |
| Mod SA290· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-28 | −$135,000 | $378,630,486 | ELIMINATE SEVEN SUMP PUMPS AND BASINS. |
| Mod SA291· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-28 | −$110,000 | $378,520,486 | CHANGE EXTERIOR WALL SHEATHING MATERIAL. |
| Mod SA298· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-28 | +$7,152 | $378,527,638 | TO ADD PARTITION SUPPORT HANGERS UNDER 108" X 24" DUCTS THAT WERE RELOCATED DURING THE COORDINATION PROCESS. |
| Mod SA299· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-28 | +$33,162 | $378,560,800 | TO PROVIDE THE DEER SPRINGS WAY GATES WITH AUTOMATED OPERATORS FOR SITE SECURITY. THE CONTRACT DRAWINGS INDICA… |
| Mod SA300· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-28 | +$1,834 | $378,562,634 | TRENCH DRAINS AT COURTYARD 1 |
| Mod SA301· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-28 | +$31,446 | $378,594,080 | TO CHANGE TO CANOPY FRAMING ROOF SUPPORTS TO ACCOMMODATE THE METAL DECKING SYSTEM. |
| Mod SA292· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-31 | +$141,693 | $378,735,773 | SECOND FLOOR LABORATORY MODIFICATIONS. |
| Mod SA302· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-31 | +$91,802 | $378,827,575 | TO RAISE THE STRUCTURAL STEEL AT THE MECHANICAL SHAFT PENTHOUSES AT LEVEL 4 AND 7. THE STRUCTURAL STEEL WAS N… |
| Mod SA303· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-02-04 | −$6 | $378,827,569 | TO INSTALL THREE (3) LIGHT FIXTURES IN ROOM 2A128 SHOWN ON THE REFLECTED CEILING PLAN BUT NO ON THE ELECTRICAL… |
| Mod SA304· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-02-04 | −$3,074 | $378,824,495 | TO PROVIDE ADDITIONAL LIGHTING IN ROOM 3B107 IN ORDER TO MEET THE MINIMUM LIGHTING LEVELS. |
| Mod SA305· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-02-04 | +$7,290 | $378,831,785 | TO PROVIDE POWER AND ACHORING DETAILS FOR SEVERAL ACCORDION DOORS AT VARIOUS LOCATIONS. |
| Mod SA306· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-02-04 | −$32,727 | $378,799,058 | TO CHANGE THE MCP-2 (METAL PANEL SYSTEM) TO A ACOUSTICAL TILE SYSTEM AT VARIOUS ROOM AT THE BASEMENT LEVEL. |
| Mod CO07G· CHANGE ORDER | 2011-02-08 | +$9,000 | $378,808,058 | TO PROVIDE A 2-HR SEPARATION FROM THE NEW MEDICAL CENTER AND THE CLC AT THE CONNECTING BRIDGE WITH THE INSTALL… |
| Mod CO07H· CHANGE ORDER | 2011-02-08 | +$2,000 | $378,810,058 | TO MODIFY THE TYPE OF MIXING VALVE NEEDED FOR THE CART WASH AREA. |
| Mod CO07I· CHANGE ORDER | 2011-02-09 | +$5,000 | $378,815,058 | TO PROVIDE COORDINATED POWER FOR THE DENTAL VACUUM PUMP SYSTEM DVP-1. CONTRACT PLUMBING DOCUMENTS REQUIRED A L… |
| Mod CO07J· CHANGE ORDER | 2011-02-09 | +$1,500 | $378,816,558 | TO PROVIDE POWER FOR THE FIRE ALARM PANEL SPECIFIED IN ROOM BD336. REQUIRED POWER WAS NOT INDICATED ON CONTRA… |
| Mod CO07K· CHANGE ORDER | 2011-02-10 | +$2,300 | $378,818,858 | TO PROVIDE POWER FOR THE FOUR (4) STAIR PRESSURIZATION FAN DAMPERS THAT WAS NOT INDICATED ON CONTRACT ELECTRIC… |
| Mod CO07L· CHANGE ORDER | 2011-02-11 | +$7,500 | $378,826,358 | TO PROVIDE A DOOR IN ROOMS 2D453 AND 5D208 WITH PROPER HARDWARE SETS AND RATED ACCORDING TO WALL RATING (1 HOU… |
| Mod CO07M· CHANGE ORDER | 2011-02-11 | +$8,000 | $378,834,358 | TO MODIFY PIPING ELEVATIONS AT NORTH CANTEEN COURTYARD AND INSTALL STORM PIPING FOR PROPER DRAINAGE. THE CONT… |
| Mod CO07N· CHANGE ORDER | 2011-02-11 | +$14,000 | $378,848,358 | TO MODIFY THE O.R CEILING SYSTEM TO ACCOMMODATE LIGHT FIXTURES AND DIFFUSERS. |
| Mod CO07O· CHANGE ORDER | 2011-02-11 | +$15,000 | $378,863,358 | TO RELOCATE THE FIRE VALVE CABINET AT VARIOUS LOCATIONS DUE TO CONFLICTS WITH UTILITES AND WALL CONSTRUCTION. |
| Mod SA307· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-02-14 | −$724 | $378,862,634 | TO PROVIDE EXHAUST TO THE DISSECTION SINK IN ROOM BD215 SINCE THE CONTRACT DOCUMENTS DID PROPERLY SHOW THE EXH… |
| Mod SA308· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-02-14 | −$291 | $378,862,343 | AS A RESULT OF DESIGN OMISSION, PUBLIC ADDRESS SPEAKERS WERE NOT INDICATED IN THE ENTRANCE LOBBY 1C398. THE NE… |
| Mod SA309· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-02-14 | +$855 | $378,863,198 | THE LIGHTING DRAWINGS FOR THE PREVIOUS UTILITY TUNNEL CHANGE ORDER FAILED TO INDICATE THE PROPER NUMBER OF EXI… |
| Mod SA310· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-02-14 | −$1,538 | $378,861,660 | TO PROVIDE ACCESS TO THREE (3) FIRE ALARM KEY TEST SWITCHES INSTALLED IN PHASE I THAT IS BLOCKED BY STEAM PIPI… |
| Mod SA311· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-02-14 | +$9,019 | $378,870,679 | TO PROVIDE ADJUSTMENT ON TWO MANHOLES #11 AND #12 THAT WERE INSTALLED PER THE PHASE III DRAWINGS. THE PHASE I… |
| Mod SA312· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-02-14 | −$71 | $378,870,608 | THIS CHANGE IS BEING ISSUED TO INSTALL 3-WAY SWITCHING FOR THE MRI EXAMINATION ROOM FROM THE CONTROL ROOM TO M… |
| Mod SA313· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-02-14 | +$4,722 | $378,875,330 | TO EXTEND COLUMN ENCLOSURES AND EXTEND PIPE CHASES AT LEVELS 5 AND 6 TO CONCEAL COKUMNS AND PIPING. |
| Mod CO07P· CHANGE ORDER | 2011-02-15 | +$10,000 | $378,885,330 | EXTEND THE 6" NATURAL GAS LINE TO ACCOMODATE REVISED LOCATION OF THE METER SET. |
| Mod CO07Q· CHANGE ORDER | 2011-02-15 | +$25,000 | $378,910,330 | TO PROVIDE AN ALTERNATIVE EXPANSION JOINT DETAIL ALONG COLUMN LINE (N.2). THE CONTRACT REFERENCE DETAIL WOUL… |
| Mod CO07R· CHANGE ORDER | 2011-02-15 | +$16,000 | $378,926,330 | TO PROVIDE AN ALTERNATIVE DETAIL IN THE INSTALLATION OF THE EXPANSION JOINT ABOVE THE ELEVATOR MACHINE ROOM 4A… |
| Mod CO07S· CHANGE ORDER | 2011-02-16 | +$10,000 | $378,936,330 | PROVIDE CHILLED WATER TO ICE MAKERS IN ROOM BD450C SINCE THE EQUIPMENT REQUIRES THE CHILLED WATER AND NONE WAS… |
| Mod SA294· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-02-16 | +$153,148 | $379,089,478 | SECURITY HARDWARE COORDINATION |
| Mod CO07T· CHANGE ORDER | 2011-02-18 | +$1,500 | $379,090,978 | TO PROVIDE ELECTRICAL PROVISIONS FOR THE FUTURE INSTALLATION OF A GOVERNMENT FURNISHED/GOVERNMENT INSTALLED ME… |
| Mod CO07U· CHANGE ORDER | 2011-02-18 | +$10,000 | $379,100,978 | TO PROVIDE CORRECTLY SIZED FAN SHEAVES IN EIGHT (8) FAN-COIL UNITS. |
| Mod SA296· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-02-18 | +$89,146 | $379,190,124 | LEVEL 3 HEADWALLS AND MONITOR BRACKETS |
| Mod CO07V· CHANGE ORDER | 2011-02-21 | +$7,000 | $379,197,124 | TO MODIFY THE DENTAL LIGHT SUPPORT IN ROOM 2A111 IN ORDER TO MEET THE REQUIREMENTS OF THE VC LIGHT. |
| Mod CO07W· CHANGE ORDER | 2011-02-21 | +$99,000 | $379,296,124 | TO INCREASE THE HEIGHT OF THE LEVEL 7 INNER PARAPET WALL TO 42" ABOVE THE ROOF LEVEL. |
| Mod SA314· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-02-22 | +$370 | $379,296,494 | RECEPTACLES ARE BEING ADDED IN A VENDING MACHINE ROOM THAT DID NOT SHOW ANY BY CONTRACT. |
| Mod SA315· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-02-22 | +$5,451 | $379,301,945 | TO INSTALL TO INSTALL SHUNT TRIP BREAKERS FOR KITCHEN EQUIPMENT UNDER THE HOODS AS REQUIRED BY FIRE ALARM SEQU… |
| Mod SA316· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-02-22 | +$1,922 | $379,303,867 | TO MODIFY THE SLAB EDGE AT STAIR 10 LEVELS 3 AND 4 IN ORDER TO ACCOMMODATE THE F2 WINDOW. THE LOCATION OF TH… |
| Mod SA317· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-02-22 | −$3,047 | $379,300,820 | TO RELOCATE THE SUPPLY DIFFUSERS IN THE AUDITORIUM (1C166) IN ORDER FOR THE DUCTWORK DIFFUSER LAYOUT TO MATCH… |
| Mod SA318· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-02-22 | +$1,405 | $379,302,225 | TO MODIFY THE LOCATIONS OF SEVERAL SECURITY DEVICES IN PHARMACY DISPENSING ROOM 1D320 DUE TO MODIFICATIONS TO… |
| Mod SA319· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-02-22 | +$16,966 | $379,319,191 | THE VEEDER ROOT SYSTEM, INSTALLED DURING PHASE I, HAS TO BE MODIFIED IN ORDER TO BE ABLE TO VIEW TANK LEVELS I… |
| Mod SA320· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-02-22 | −$35,502 | $379,283,689 | TO DELETE BIOHAZARD SAFETY CABINETS THAT THE MEDICAL CENTER PLANS TO PURCHASE AND INSTALL THEMSELVES. |
| Mod SA321· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-02-22 | +$4,763 | $379,288,452 | TO PROVIDE A NEW CURB CUT AND PAINTED CROSSWALK NEAR CENTRAL PLANT AND LOOP RD. |
| Mod SA322· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-02-22 | −$26,750 | $379,261,702 | TO DELETE 47 WARDROBE CABINETS FROM THE 6TH FLOOR PATIENT ROOMS. |
| Mod SA323· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-02-22 | +$573 | $379,262,275 | TO PROVIDE A DOOR IN ROOMS 2D453 AND 5D208 WITH PROPER HARDWARE SETS AND RATED ACCORDING TO WALL RATING (1 HOU… |
| Mod SA324· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-02-22 | +$3,717 | $379,265,992 | TO PROVIDE AN ALTERNATIVE DETAIL IN THE INSTALLATION OF THE EXPANSION JOINT ABOVE THE ELEVATOR MACHINE ROOM 4A… |
| Mod SA325· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-02-22 | +$19,312 | $379,285,304 | TO REVISE POWER AND UTILITIES TO DENTAL BAYS |
| Mod CO07X· CHANGE ORDER | 2011-02-24 | +$4,500 | $379,289,804 | TO PROVIDE POWER FOR THE LOW VOLTAGE FACILITY SYSTEM RACKS IN ROOMS BD138 AND 2E134. REQUIRED POWER WAS NOT I… |
| Mod SA288· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-02-28 | +$261,938 | $379,551,742 | MODIFY EQUIPMENT BOOM SUPPORTS FOR LEVELS 1, 2 AND 3. |
| Mod CO07Z· CHANGE ORDER | 2011-03-02 | +$4,000 | $379,555,742 | TO PROVIDE STEAM SCRUBBER LAB WASHER WITH THE PROPER VOLTAGE AND REVISE UNDERCOUNTER REFRIGERATORS TO ADA HEIG… |
| Mod CO08A· CHANGE ORDER | 2011-03-04 | +$10,000 | $379,565,742 | TO PROVIDE CORRECT AIRFLOW TO ROOM 1D352. |
| Mod CO08B· CHANGE ORDER | 2011-03-04 | +$14,000 | $379,579,742 | TO PROVIDE TELECOM OUTLETS IN ALL PATIENT ROOMS AND CHARTING AREAS ON THE 6TH FLOOR. THE CONTRACT DRAWINGS FA… |
| Mod CO08C· CHANGE ORDER | 2011-03-04 | +$1,000 | $379,580,742 | TO PROVIDE A 8" - 10" TILED PONY WALL ACROSS THE WINDOW, CAULK BETWEEN THE TOP LEDGE AND THE WINDOW. |
| Mod CO08D· CHANGE ORDER | 2011-03-09 | +$20,000 | $379,600,742 | TO REPLACE THE SPECIFIED OVERSIZED DUST COLLECTORS WITH PROPERLY SIZED UNITS IN ROOMS BB210 AND BD410. |
| Mod CO08E· CHANGE ORDER | 2011-03-11 | +$27,000 | $379,627,742 | TO PROVIDE ACCESS CONTROL TO MEET VA SECURITY STANDARDS TO FOUR DOORS IN THE UTILITY TUNNEL THAT WERE NOT ADD… |
| Mod CO08F· CHANGE ORDER | 2011-03-11 | +$95,000 | $379,722,742 | TO PROVIDE A CHLORINE DIOXIDE SYSTEM IN ORDER TO PROVIDE EPA SUGGECTED SECONDARY DISENFECTANT LEVELS WITHOUT… |
| Mod SA326· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-03-15 | +$1,881 | $379,724,623 | TO MODIFY PIPING ELEVATIONS AT NORTH CANTEEN COURTYARD AND INSTALL STORM PIPING FOR PROPER DRAINAGE. THE CONT… |
| Mod SA327· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-03-15 | +$5,197 | $379,729,820 | TO INSTALL THE TUNNEL AIR INTAKE/EXHAUST CHASE. THE CONTRACT DOCUMENTS DID NOT PROVIDE ADEQUATE DRAWINGS DETA… |
| Mod SA328· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-03-15 | −$4,273 | $379,725,547 | TO PROVIDE POWER FOR FIXTURE P-418 IN ROOM 3A110 SINCE IT WAS SHOWN ON THE CONTRACT DOCUMENTS AND RELOCATE REC… |
| Mod SA329· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-03-15 | +$12,329 | $379,737,876 | TO MODIFY THE LAYOUT OF THE 6TH FLOOR PATIENT ROOM BASED ON THE REVIEW OF THE MOCK-UP ROOM. |
| Mod CO08G· CHANGE ORDER | 2011-03-16 | +$2,400 | $379,740,276 | TO PROVIDE THE NECESSARY POWER SOURCE FOR THE SPD CART WASH THAT WAS OMITTED FROM THE CONTRACT DOCUMENTS. |
| Mod CO08H· CHANGE ORDER | 2011-03-18 | +$3,000 | $379,743,276 | TO INSTALL THE FIRE PUMP TEST HEADER IN BUILDING 2. |
| Mod CO08I· CHANGE ORDER | 2011-03-18 | −$20,000 | $379,723,276 | TO MODIFY THE PARAPET FLASHING/ROOFING DETAIL AT ALL ROOF LEVELS DUE TO WARRANTY CONCERNS. |
| Mod CO08J· CHANGE ORDER | 2011-03-18 | −$8,000 | $379,715,276 | TO PROVIDE CORRUGATION METAL PANELS AND WATERPROOFING BARRIER 360 DEGREES AROUND THE PERIMETER OF ALL SKYLIGHT… |
| Mod CO08K· CHANGE ORDER | 2011-03-18 | +$7,000 | $379,722,276 | TO INSTALL PANEL BOARDS AT THE THREE (3) TRANSIT SHELTER LOCATIONS AS A MEANS OF DISCONNECT, AND FOR FUTURE US… |
| Mod SA330· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-03-21 | +$2,580 | $379,724,856 | THE HARDWARE DESIGN FOR THE ROOF DOORS HAD AN IMPROPER LOCKSET SPECIFIED. IN ADDITION HEAVY DUTY SPRING STOPS… |
| Mod SA331· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-03-21 | +$867 | $379,725,723 | TO COORDINATE THE TV OUTLET INSTALLATION IN ROOM 3D348, GOWNED WAITING, WITH THE NUMBER OF BEDS SHOWN TO BE I… |
| Mod SA332· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-03-21 | −$9,522 | $379,716,201 | TO PROVIDE TWO (2) ADDITIONAL MOTORIZED DAMPERS IN ROOM BD134 SINCE THEY WERE OMITTED FROM THE CONTRACT DRAWIN… |
| Mod SA333· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-03-21 | +$3,135 | $379,719,336 | TO ADD ADDITIONAL SIDEWALK UNDER THE WEST END OF THE BRIDGE UP TO THE NE ENTRANCE TO THE NEW MEDICAL CENTER.… |
| Mod SA334· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-03-21 | −$4,746 | $379,714,590 | TO PROVIDE CORRECTLY SIZED FAN SHEAVES IN EIGHT (8) FAN-COIL UNITS. |
| Mod CO08L· CHANGE ORDER | 2011-03-22 | +$85,000 | $379,799,590 | TO UPGRADE THE TWO-WAY RADIO SYSTEM REPEATER EQUIPMENT AND REVISE THE LOCATION OF RADIO CONSOLES TO MEETS THE… |
| Mod CO08M· CHANGE ORDER | 2011-03-22 | +$5,000 | $379,804,590 | TO RELOCATE THE EMERGENCY EYEWASH IN ROOM 1D352 IN ORDER TO INSTALL WALL CABINETS. |
| Mod CO08N· CHANGE ORDER | 2011-03-23 | +$3,700 | $379,808,290 | TO CORRECT A DESIGN OMISSION, WALL TELECOM OUTLETS ARE BEING INSTALLED AT THE PHONE BAYS ADJACENT TO ROOM 1C10… |
| Mod CO08O· CHANGE ORDER | 2011-03-23 | +$2,000 | $379,810,290 | TO CHANGE THE RANGE OF THE BOILER PLANT FUEL OIL BACK PRESSURE REGULATOR. |
| Mod CO08P· CHANGE ORDER | 2011-03-23 | +$5,000 | $379,815,290 | TO PROVIDE EXHAUST FOR ROOM 2A283A. |
| Mod CO08Q· CHANGE ORDER | 2011-03-25 | +$6,500 | $379,821,790 | AS A RESULT OF A DESIGN OMISSION, MISSING TELECOM OUTLETS ARE BEING ADDED FOR ELEVATOR EMERGENCY PHONE CONNECT… |
| Mod CO08R· CHANGE ORDER | 2011-03-25 | +$1,400 | $379,823,190 | A PREVIOUS RFI RESPONSE RELOCATED DOORS BUT FAILED TO COORDINATE THE FIRE ALARM STROBE SPACING REQUIREMENTS. |
| Mod CO08S· CHANGE ORDER | 2011-03-28 | +$45,000 | $379,868,190 | TO PROVIDE CIRCUIT SETTER VALVES FOR ALL CRAC UNITS, WHICH WERE INADVERTENTLY OMITTED FROM THE DESIGN. |
| Mod CO08T· CHANGE ORDER | 2011-04-04 | +$5,000 | $379,873,190 | TO PROVIDE STAINLESS STEEL CASEWORK IN LIEU OF THE PLASTIC LAMINATED CASEWORK ORIGINALLY SPECIFIED FOR THE AUT… |
| Mod CO08U· CHANGE ORDER | 2011-04-06 | +$15,000 | $379,888,190 | TO PROVIDE ICU BOOMS AT LEVEL 5 WITH MEDICAL GAS CONNECTIONS TO MEET THE REQUIREMENTS OF THE GOVERNMENT FURNI… |
| Mod SA337· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-06 | +$771 | $379,888,961 | TO ADD MEDICAL GAS AREA ALARMS FOR ROOMS 3B216&3B220 AS DIRECTED BY RESPONSE TO RFI 2129. |
| Mod SA338· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-06 | +$603 | $379,889,564 | TO ADD SHUT OFF VALVE(S) AT OPERATOR LEVEL, FOR THE 85 PSIG OXYGEN FEEDING THE HYPERBARIC CHAMBERS IN ROOM 3B… |
| Mod SA339· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-06 | +$982 | $379,890,546 | TO RELOCATE EXISTING CONTROL PANELS IN THE BOILER ROOM IN ORDER TO PROVIDE ADEQUATE ACCESS FOR MONITORING AND… |
| Mod SA340· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-11 | −$190 | $379,890,356 | TO PROVIDE POWER FOR THE FIRE ALARM PANEL SPECIFIED IN ROOM BD336. REQUIRED POWER WAS NOT INDICATED ON CONTRA… |
| Mod SA341· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-11 | +$1,636 | $379,891,992 | TO MODIFY BOX-OUT EXPOSED SPRINKLER PIPING BETWEEN THE MAIN BUILDING AND THE ENTRY VESTIBULES AT AREAS B, C, A… |
| Mod CO08V· CHANGE ORDER | 2011-04-13 | +$8,000 | $379,899,992 | TO PROVIDE RECEPTACLES AND DATA OUTLETS FOR THE RECEPTION DESK, IN ROOM 1C398, THAT WERE OMITTED FROM THE DESI… |
| Mod CO08W· CHANGE ORDER | 2011-04-13 | +$5,000 | $379,904,992 | PROVIDE POWER FOR EQUIPMENT AND LIGHTING, FOR THE MORGUE WALK-IN REFRIGERATOR. SUFFICIENT POWER FOR THE SPECI… |
| Mod SA342· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-13 | −$5,254 | $379,899,738 | TO SUPPLY THE CLEAN STEAM GENERATORS WITH SOFT WATER, PER MANUFACTURER'S RECOMMENDATIONS. |
| Mod SA343· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-13 | +$12,576 | $379,912,314 | TO COORDINATE THE FEEDERS AND PANELS FOR THE SECURITY SHELTERS. CONTRACT SPECIFICATIONS AND DRAWINGS DID NOT C… |
| Mod CO08X· CHANGE ORDER | 2011-04-14 | +$2,000 | $379,914,314 | TO PROVIDE TWO COMBINATION HOLD OPEN/CLOSERS, TIED TO THE FIRE ALARM SYSTEM, NOT PREVIOUSLY IN THE DOORS HARDW… |
| Mod CO08Y· CHANGE ORDER | 2011-04-15 | +$30,000 | $379,944,314 | TO PROVIDE PRESSURE POWERED PUMPS FOR CSG-AMB-1 AND 2 IN ROOM BB208. |
| Mod CO08Z· CHANGE ORDER | 2011-04-15 | +$8,000 | $379,952,314 | TO PROVIDE POWER TO THE MAGNETIC DOOR HOLDERS IN THE AUDITORIUM ENTRANCE AND A CARD READER AT THE HEALTH BENEF… |
| Mod CO09A· CHANGE ORDER | 2011-04-15 | +$2,300 | $379,954,614 | TO PERFORM FIELD TESTING OF THE CONDENSER WATER PUMPS TO EVALUATE PERFORMANCE DUE TO NOISE FROM ENTRAINED AIR. |
| Mod CO09B· CHANGE ORDER | 2011-04-15 | +$50,000 | $380,004,614 | TO PROVIDE PRESSURE POWERED PUMPS FOR HX-ADM-1,2 AND CSG-ADM-1,2 IN ROOM BD160. |
| Mod CO09C· CHANGE ORDER | 2011-04-15 | +$30,000 | $380,034,614 | TO PROVIDE PRESSURE POWERED PUMPS FOR CSG-DT-1 AND 2, ROOM BD423. |
| Mod CO09D· CHANGE ORDER | 2011-04-15 | +$30,000 | $380,064,614 | TO PROVIDE PRESSURE POWERED PUMPS FOR CSG-MH-1,2 IN ROOM BD101. |
| Mod SA344· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-15 | +$76,908 | $380,141,522 | TO PROVIDE BOILER OPERATORS TO MONITOR NEWLY INSTALLED BOILERS 24 HOURS A DAY, 7 DAYS PER WEEK, IN ORDER TO SU… |
| Mod SA345· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-15 | +$5,952 | $380,147,474 | RELOCATE HYDRANTS THAT WERE IN THE CENTER OF THE SIDEWALKS IN ORDER TO PROVIDE AN UNRESTRICTED PATH. |
| Mod SA346· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-15 | +$10,134 | $380,157,608 | TO PROVIDE POWER TO MOTORIZED WINDOW TREATMENT AT VARIOUS LOCATIONS. |
| Mod CO09E· CHANGE ORDER | 2011-04-19 | +$5,000 | $380,162,608 | TO RECONFIGURE THE VENTILATION IN ROOM 2D450 DUE TO THE DELETION OF THE ETO STERILIZERS. |
| Mod SA347· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-19 | +$3,740 | $380,166,348 | TO PROVIDE POWER FOR THE FOUR (4) STAIR PRESSURIZATION FAN DAMPERS THAT WAS NOT INDICATED ON ELECTRICAL DRAWIN… |
| Mod SA348· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-19 | +$1,599 | $380,167,947 | TO INSTALL SHUNT TRIP BREAKERS FOR CANTEEN EQUIPMENT UNDER THE EXHAUST HOOD AS REQUIRED BY FIRE ALARM SEQUENCE… |
| Mod CO09F· CHANGE ORDER | 2011-04-22 | +$15,000 | $380,182,947 | THIS MODIFICATION IS TO ADD POWER AND DATA OUTLETS FOR NUMEROUS PIECES OF VV (VA SUPPLIED-VA INSTALLED) EQUIPM… |
| Mod SA349· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-22 | −$212 | $380,182,735 | TO CHANGE THE RANGE OF THE BOILER PLANT FUEL OIL BACK PRESSURE REGULATOR. |
| Mod CO09I· CHANGE ORDER | 2011-04-25 | +$20,000 | $380,202,735 | TO MODIFY THE FRAMING FOR THE EXTERIOR WINDOWS AT COLUMN LINE E.5 DUE TO CONFLICTS WITH INTERIOR RATED PARTITI… |
| Mod SA335· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-25 | +$1,096,059 | $381,298,794 | CRITICAL: TO PROVIDE A TIME EXTENSION OF 39 CALENDAR DAYS AND ASSOCIATED COST DUE TO THE STRUCTURAL STEEL PRO… |
| Mod SA350· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-25 | +$18,209 | $381,317,003 | TO SKIM COAT THE STRUCTURAL STEEL TUBE AT THE MAIN VESTIBULE COVERED WITH INTUMESCENT COATING. |
| Mod SA351· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-25 | +$3,965 | $381,320,968 | TO REPAINT THE 8 OPERATING ROOMS IN THE OR SUITE TO A LIGHTER COLOR. |
| Mod CO09H· CHANGE ORDER | 2011-04-26 | +$1,000 | $381,321,968 | TO REMOVE ALL WATER SOURCES, FROM ROOM 3D225, IN ORDER TO COMPLY WITH SANITARY REQUIREMENTS FOR 'CLEAN MEDICAL… |
| Mod SA352· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-26 | +$20,873 | $381,342,841 | TO MODIFY THE EQUIPMENT&CASEWORK IN ROOM 5D214 DUE TO CONFLICT IN THE EQUIPMENT AND CASEWORK. |
| Mod CO09J· CHANGE ORDER | 2011-04-27 | +$10,000 | $381,352,841 | TO PROVIDE VENT PIPING FOR THE CONDENSATE COOLER SERVING HUMIDIFIER DSH-DT-1. |
| Mod SA354· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-29 | +$25,892 | $381,378,733 | TO PROVIDE A MIRROR WITHOUT A SHELF AT ALL TOILET ROOMS IN LIEU OF THE CONTRACT REQUIRED MIRROR WITH A SHELF. |
| Mod CO09L· CHANGE ORDER | 2011-05-02 | +$7,500 | $381,386,233 | TO MODIFY THE AUDIOLOGY EXAM LAYOUT AND POWER REQUIREMENTS TO MEET THE EQUIPMENT (VV) BEING FURNISHED BY THE M… |
| Mod SA353· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-02 | −$679 | $381,385,554 | TO INSTALL THE FIRE PUMP TEST HEADER IN BUILDING 2. |
| Mod SA356· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-02 | +$15,424 | $381,400,978 | TO INSTALL A DOUBLE RAIL (X-Y) SYSTEM AT ALL PATIENT ROOMS ON LEVEL 6 IN LIEU OF THE CONTRACT REQUIRED SINGLE… |
| Mod CO09K· CHANGE ORDER | 2011-05-03 | +$2,500 | $381,403,478 | PROVIDE 3/4" MAKE-UP LINE TO THE CONDENSATE COOLER THAT WAS OMITTED FROM THE CONTRACT DRAWINGS. |
| Mod CO09M· CHANGE ORDER | 2011-05-03 | +$1,000 | $381,404,478 | TO COORDINATE THE ELECTRICAL PROVISIONS FOR THE FAN COIL UNITS IN THE UTILITY TUNNEL WITH THE MECHANICAL CONTR… |
| Mod CO09N· CHANGE ORDER | 2011-05-03 | +$95,000 | $381,499,478 | TO COMMENCE WITH THE DEMOLITION OF EXISTING FINISHES AT THE MENTAL HEALTH CLINIC IN PREPARATION FOR THE NEW WO… |
| Mod CO09O· CHANGE ORDER | 2011-05-05 | +$10,000 | $381,509,478 | TO PROVIDE EXHAUST CANOPY FOR LAMINATING TABLE IN ROOM 1B251 DUE TO EQUIPMENT REVISIONS BY THE MEDICAL CENTER. |
| Mod CO09P· CHANGE ORDER | 2011-05-06 | +$90,000 | $381,599,478 | TO CHANGE THE PARAPET HEIGHT AT VARIOUS PARAPET LOCATIONS AT LEVEL 4 AND 7 DUE TO DISCREPANCIES BETWEEN THE S… |
| Mod SA357· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-09 | −$1,793 | $381,597,685 | TO MODIFY THE DENTAL LIGHT SUPPORT IN ROOM 2A111 IN ORDER TO MEET THE REQUIREMENTS OF THE VC LIGHT. |
| Mod SA358· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-09 | +$1,430 | $381,599,115 | TO ADD PARTITION SUPPORT HANGERS UNDER DUCTS THAT WERE RELOCATED DURING THE COORDINATION PROCESS. |
| Mod SA359· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-09 | +$5,566 | $381,604,681 | TO REPLACE THE FLOATING FLOOR ISOLATORS IN DIALYSIS EQUIPMENT ROOM 4D412 DUE TO THE WEIGHT OF THE NEW EQUIPMEN… |
| Mod SA360· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-12 | −$2,828 | $381,601,853 | TO PROVIDE POWER AND TELECOM IN ROOM 1A149, FOR VV EQUIPMENT. POWER AND TELECOM WAS NOT SHOWN IN ROOM. |
| Mod SA363· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-12 | +$1,399 | $381,603,252 | TO MODIFY THE HORIZONTAL DIMENSION OF WINDOW TYPE B11 TO MATCH WINDOW TYPE B21 AT THE SOUTH ELEVATION OF TOWER… |
| Mod SA361· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-13 | +$1,149 | $381,604,401 | TO PROVIDE POWER FOR THE LOW VOLTAGE FACILITY SYSTEM RACKS IN ROOMS BD138 AND 2E134. REQUIRED POWER WAS NOT I… |
| Mod SA362· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-13 | −$3,703 | $381,600,698 | TO PROVIDE EXHAUST FOR HOUSEKEEPING AID CLOSET 5D307A. |
| Mod SA364· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-13 | +$3,950 | $381,604,648 | TO RELOCATE THE COLUMNS TO THE INSIDE FACE OF THE EXTERIOR GYPSUM BOARD SUPPORTING THE VA SEAL AT THE AUDITORI… |
| Mod SA365· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-16 | −$2,510 | $381,602,138 | TO PROVIDE A FLOOR MOUNTED PIVOT AND AN OVERHEAD CLOSER IN LIEU OF THE FLOOR CLOSER AT ROOMS 2D334 AND 4D410. |
| Mod SA366· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-16 | +$14,490 | $381,616,628 | TO BALNK OFF THE EXTERIOR LOUVER AT LEVEL 4 (COL. LINE P/14) SINCE THE SPACE BEHIND THE LOUVER IS NOT ACCESSIB… |
| Mod SA367· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-16 | +$2,120 | $381,618,748 | TO RELOCATE THE EMERGENCY EYEWASH IN ROOM 1D352 IN ORDER TO INSTALL WALL CABINETS. |
| Mod SA368· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-19 | +$583 | $381,619,331 | TO ADD A TYPE B FLOOR DRAIN (FD-B) AND ASSOCIATED PIPING TO ROOM 1B246. |
| Mod CO09Q· CHANGE ORDER | 2011-05-20 | +$10,000 | $381,629,331 | TO PROVIDE AN OXYGEN ANALYZER FOR THE MRI (ROOM 1D264). |
| Mod CO09S· CHANGE ORDER | 2011-05-25 | +$7,800 | $381,637,131 | TO PROVIDE POWER CORD DROPS, FOR THE EQUIPMENT AT THE KITCHEN FOOD TRAY MAKE-UP LINE, IN BD450G. CONTRACT DOCU… |
| Mod SA355· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-25 | −$118,681 | $381,518,450 | DELETE WALL MOUNTED FOLD DOWN DESKS. |
| Mod SA369· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-25 | −$1,841 | $381,516,609 | TO PROVIDE EXHAUST FOR ROOM 2A283A. |
| Mod SA370· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-25 | +$2,534 | $381,519,143 | TO PROVIDE STAINLESS STEEL CASEWORK IN LIEU OF THE PLASTIC LAMINATED CASEWORK ORIGINALLY SPECIFIED FOR THE AUT… |
| Mod SA371· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-25 | −$2,007 | $381,517,136 | TO PROVIDE POWER, WATER AND WASTE FOR THE WASTE MANAGEMENT STATIONS IN SOILED RECEIVING/DECONTAMINATION ROOM 2… |
| Mod CO09T· CHANGE ORDER | 2011-05-26 | +$2,000 | $381,519,136 | THIS MODIFICATION PROVIDES AN OMITTED NURSE CALL DOME LIGHT IN WAITING ROOM 3D198. |
| Mod CO09U· CHANGE ORDER | 2011-05-26 | +$10,000 | $381,529,136 | TO PROVIDE SECURITY ACCESS CONTROL DEVICES AND CONNECTIONS FOR THE DOORS IN 1B158 AND 1B245. CONTRACT DOCUMENT… |
| Mod CO09V· CHANGE ORDER | 2011-05-26 | +$5,000 | $381,534,136 | TO PROVIDE ACCESS TO THE INTERSTITIAL SPACE BELOW THE LEVEL 2 PENTHOUSE, FOR ACCESS TO THE ISOLATION DAMPER(S)… |
| Mod CO09X· CHANGE ORDER | 2011-05-26 | +$75,000 | $381,609,136 | TO ADD VALVES FOR FUTURE CONNECTIONS TO THE CONDENSER WATER SYSTEM. |
| Mod CO09W· CHANGE ORDER | 2011-05-27 | +$6,000 | $381,615,136 | TO REVISE THE DOOR HARDWARE AND ADD SECURITY ACCESS CONTROL DEVICES AT THE ENTRANCE FROM THE PHARMACY OFFICES… |
| Mod SA372· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-31 | +$3,087 | $381,618,223 | TO AUTOMATE THE GLYCOL MAKE-UP SYSTEM. |
| Mod CO09Y· CHANGE ORDER | 2011-06-03 | +$14,000 | $381,632,223 | TO ADD POWER AND DATA OUTLETS FOR NUMEROUS PIECES OF VV (VA SUPPLIED-VA INSTALLED) EQUIPMENT THAT WAS NOT INCL… |
| Mod CO09Z· CHANGE ORDER | 2011-06-03 | +$5,000 | $381,637,223 | TO PROVIDE ACCESS TO THE CHILLED WATER FLOW METER IN THE MENTAL HEALTH WING. |
| Mod SA374· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-06-03 | +$3,061 | $381,640,284 | TO MODIFY/RELOCATE ROOF OPENINGS FOR THE GENERATOR EXHAUST STACKS. |
| Mod CO09R· CHANGE ORDER | 2011-06-07 | +$5,000 | $381,645,284 | TO PROVIDE NON-POTABLE WATER TO HUMIDIFIERS SERVING CRAC UNITS IN ROOMS 1A112 AND 1A114, THAT WERE OMITTED FR… |
| Mod CO10A· CHANGE ORDER | 2011-06-07 | +$15,000 | $381,660,284 | TO PROVIDE CORRECTLY SIZED TERMINAL UNITS AND EXHAUST GRILLES. |
| Mod SA375· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-06-07 | −$158 | $381,660,126 | TO CORRECT A DESIGN OMISSION, WALL TELECOM OUTLETS ARE BEING INSTALLED AT THE PHONE BAYS ADJACENT TO ROOM 1C10… |
| Mod SA376· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-06-08 | +$20,354 | $381,680,480 | TO CHANGE THE FLOORING IN THE CANTEEN RETAIL STORE FROM CARPET TO RESILIENT FLOORING. |
| Mod CO10B· CHANGE ORDER | 2011-06-14 | +$5,000 | $381,685,480 | TO PROVIDE LOUVERS FOR OPENINGS IN THE WAREHOUSE EXTERIOR WALL. THE CONTRACT DRAWINGS SHOW TWO OPENINGS AT TH… |
| Mod CO10C· CHANGE ORDER | 2011-06-14 | +$16,500 | $381,701,980 | DUE TO A DESIGN ISSUE, WITH THE EMERGENCY POWER DISTRIBUTION SYSTEM, THE CONTROL OF THE EMS-1 FEEDER BREAKERS… |
| Mod CO10D· CHANGE ORDER | 2011-06-14 | +$86,000 | $381,787,980 | TO PROVIDE TEN (10) ADDITIONAL MONITORS TO VIEW THE MORE THAN 200 CCTV CAMERA FEEDS. THE CONTRACT DOCUMENTS W… |
| Mod SA377· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-06-14 | −$2,817 | $381,785,163 | TO PROVIDE TELECOM OUTLETS IN ALL PATIENT ROOMS AND CHARTING AREAS ON THE 6TH FLOOR. THE CONTRACT DRAWINGS FA… |
| Mod SA378· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-06-14 | +$19,069 | $381,804,232 | TO PROVIDE ICU BOOMS AT LEVEL 5 WITH MEDICAL GAS CONNECTIONS TO MEET THE REQUIREMENTS OF THE GOVERNMENT FURNIS… |
| Mod SA379· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-06-14 | +$7,991 | $381,812,223 | TO PROVIDE CONTROLS TO ACTIVATE KITCHEN EXHAUST DURING OFF-HOURS FIRE EMERGENCIES. |
| Mod SA380· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-06-14 | +$1,742 | $381,813,965 | THE NUMBER OF HEAT DETECTORS SHOWN ON FIRE ALARM DRAWINGS DID NOT CORRESPOND TO THE NUMBER NECESSARY FOR COMPL… |
| Mod SA381· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-06-14 | −$880 | $381,813,085 | TO PROVIDE THE NECESSARY POWER SOURCE FOR THE SPD CART WASH THAT WAS OMITTED FROM THE CONTRACT DOCUMENTS. |
| Mod SA383· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-06-14 | +$16,651 | $381,829,736 | TO PROVIDE A FINISH FLOOR AND PAINT THE WALLS IN THE TUNNEL TO THE CLC. |
| Mod SA384· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-06-14 | −$1,788 | $381,827,948 | TO INSTALL A NEW DOOR AND FRAME IN ROOM BG115, BASEMENT LEVEL. CONTRACT SPECIFIED DOOR IS TOO LARGE FOR THE E… |
| Mod SA382· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-06-16 | −$3,681 | $381,824,267 | AS A RESULT OF A DESIGN OMISSION, TELECOM OUTLETS ARE BEING ADDED FOR ELEVATOR EMERGENCY PHONE CONNECTIONS. |
| Mod SA386· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-06-21 | +$1,921 | $381,826,188 | TO MODIFY THE SLEEVE FOR A FLAGPOLE DUE TO CONFLICTS WITH AN ELECTRICAL DUCTBANK. |
| Mod SA385· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-06-28 | −$749 | $381,825,439 | PROVIDE 3/4" MAKE-UP LINE TO THE CONDENSATE COOLER THAT WAS OMITTED FROM THE CONTRACT DRAWINGS. |
| Mod SA387· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-06-30 | −$453 | $381,824,986 | TO REMOVE ALL WATER SOURCES, FROM ROOM 3D225, IN ORDER TO COMPLY WITH SANITARY REQUIREMENTS FOR 'CLEAN MEDICAL… |
| Mod SA388· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-06-30 | +$10,797 | $381,835,783 | TO MODIFY UTILITY REQUIREMENTS IN ROOMS 2A227 AND 2A158 TO ACCOMMODATE GOVERNMENT FURNISHED EQUIPMENT. |
| Mod SA389· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-06-30 | +$2,882 | $381,838,665 | TO RECONFIGURE THE VENTILATION IN ROOM 2D450 DUE TO THE DELETION OF THE ETO STERILIZERS. |
| Mod SA390· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-06-30 | +$19,961 | $381,858,626 | TO MODIFY COMPUTER BRACKET 3449 TO BE COMPATIBLE WITH THE AMICO HEADWALL UNIT. |
| Mod SA391· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-06-30 | +$11,232 | $381,869,858 | TO MODIFY THE LAWN TYPE AND PROVIDE IRRIGATION FOR COURTYARD 1. CONTACT DRAWINGS DID NOT SHOW IRRIGATION AND… |
| Mod SA392· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-07-01 | +$93,651 | $381,963,509 | TO INSTALL A FIRE LANE AT THE EAST END OF THE 120-BED CLC. THE CONTRACT DRAWINGS DID NOT SHOW THE FIRE LANE A… |
| Mod CO10E· CHANGE ORDER | 2011-07-05 | +$20,000 | $381,983,509 | TO MODIFY SINKS IN THE LABORATORY AREA. |
| Mod SA393· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-07-06 | +$2,551 | $381,986,060 | THE CEILINGS IN THE AREA B IT AND FACILITY CLOSETS 1C368 AND 1C242 WERE REVISED TO COORDINATE WITH THE CRAC EQ… |
| Mod SA394· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-07-06 | +$3,420 | $381,989,480 | TO MODIFY THE WALL PROTECTION THAT IS IN CONFLICT WITH THE DOOR SWING AT VARIOUS LOCATIONS. |
| Mod SA395· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-07-06 | +$7,152 | $381,996,632 | TO PROVIDE A CONCRETE PAD FOR THE FURNISHINGS AT THE NATURE WALK. CONTRACT DRAWINGS DID NO SHOW ANY FOUNDATIO… |
| Mod SA396· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-07-07 | −$4,120 | $381,992,512 | TO PROVIDE CORRECT AIRFLOW TO ROOM 1D352. |
| Mod CO10F· CHANGE ORDER | 2011-07-08 | +$10,000 | $382,002,512 | TO PROVIDE THE CENTRAL PLANT WITH SOFT WATER, THE PRESSURE OF WHICH WOULD MEET CODE WITHOUT THE INSTALLATION O… |
| Mod CO10G· CHANGE ORDER | 2011-07-08 | +$25,000 | $382,027,512 | TO PROVIDE ACCESS TO ROOFTOP AIR HANDLER RTU-AMB-7, IN ORDER TO PERFORM ROUTINE MAINTENANCE.. |
| Mod CO10H· CHANGE ORDER | 2011-07-08 | +$5,000 | $382,032,512 | TO PROPERLY BALANCE AIRFLOW IN THE LABORATORY AREA. |
| Mod CO10I· CHANGE ORDER | 2011-07-08 | +$1,500 | $382,034,012 | TO PROVIDE DIMMING FOR THE FIXTURES IN THE PET INDUCTION VESTIBULE ROOM 1D160. PATIENTS UNDERGOING INDUCTION A… |
| Mod SA400· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-07-08 | +$31,417 | $382,065,429 | TO LEVEL THE EXISTING CONCRETE SLAB AT LEVEL 2 AND 3 AT THE WEST WING IN ORDER TO INSTALL CARPET AND RESILIENT… |
| Mod CO10J· CHANGE ORDER | 2011-07-12 | +$6,000 | $382,071,429 | THIS MODIFICATION PROVIDES POWER FOR TWO SHREDDERS IN ROOM BB206. |
| Mod CO10K· CHANGE ORDER | 2011-07-12 | +$4,200 | $382,075,629 | THIS MODIFICATION PROVIDES ELECTRICAL REVISIONS NECESSARY FOR COORDINATION AS A RESULT OF RFIS 2379 AND 2475. |
| Mod SA397· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-07-12 | +$1,608 | $382,077,237 | TO REPLACE THE SPECIFIED OVERSIZED DUST COLLECTORS WITH PROPERLY SIZED UNITS IN ROOMS BB210 AND BD410. |
| Mod SA398· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-07-12 | +$68,254 | $382,145,491 | TO ADD FLOOR SINKS, ASSOCIATED PIPING, AND BACKFLOW PREVENTERS FOR STERILIZERS IN SURGERY SUITE. |
| Mod SA399· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-07-12 | +$4,675 | $382,150,166 | TO DELETE THE INSTALLATION OF THE HYDROTHERAPY TUBS, REPLACE WELD SHEET FLOORING WITH VCT FLOORING, AND DELETE… |
| Mod CO10L· CHANGE ORDER | 2011-07-14 | +$2,500 | $382,152,666 | TO RELOCATE THE MEDICAL GAS ALARM PANELS FROM INSIDE OF ROOM 1D257 TO CORRIDOR C1-78, IN ORDER TO ALLOW FOR CO… |
| Mod CO10N· CHANGE ORDER | 2011-07-18 | +$30,000 | $382,182,666 | TO PROVIDE A TEMPORARY PUMP TO PRESSURIZE THE IRRIGATION SYSTEM. |
| Mod SA336· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-07-18 | +$1,745,866 | $383,928,532 | TO CONSTRUCT A NEW UTILITY TUNNEL FROM THE ENERGY CENTER TO THE NEW MEDICAL CENTER. |
| Mod SA373· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-07-18 | +$130,568 | $384,059,100 | TO PROVIDE AND INSTALL ONE FLOOR MOUNTED STERILIZER IN THE SPD AREA. THREE ARE SHOWN ON THE CONTRACT DRAWINGS… |
| Mod SA401· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-07-18 | +$119 | $384,059,219 | TO PROVIDE TWO COMBINATION HOLD OPEN/CLOSERS, TIED TO THE FIRE ALARM SYSTEM, NOT PREVIOUSLY IN THE DOORS HARDW… |
| Mod SA402· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-07-21 | +$3,310 | $384,062,529 | THIS CHANGE IS TO ENSURE THE PHASE 1 ENERGY PLANT CCTV CAMERAS THAT ARE TO BE CONNECTED TO THE PHASE 4 CAMPUS-… |
| Mod SA403· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-07-25 | +$9,750 | $384,072,279 | TO PROVIDE A HEAT WELDED SEAM IN LIEU OF CHEMICAL WELD SEAM AT ALL RESILIENT FLOORING. |
| Mod SA405· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-07-25 | +$18,029 | $384,090,308 | TO MODIFY GLAZING (GLASS) AT VARIOUS LOCATIONS DUE TO CONFLICTS ON THE CONTRACT DRAWINGS. |
| Mod CO10O· CHANGE ORDER | 2011-07-27 | +$40,000 | $384,130,308 | TO CHANGE THE BASE AT THE RESILIENT SHEET FLOORING FROM RUBBER BASE TO INTEGRAL BASE. |
| Mod SA404· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-07-27 | +$4,132 | $384,134,440 | TO MODIFY THE DOOR BETWEEN ROOMS 1A160 AND 1A159 FROM A THREE (3) PANEL TO A TWO (2) PANEL. |
| Mod SA406· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-07-27 | +$82,268 | $384,216,708 | TO PROVIDE FUEL OIL FOR BOILER START-UP&TESTING. |
| Mod CO10P· CHANGE ORDER | 2011-07-29 | +$10,000 | $384,226,708 | TO PROVIDE CORRECTLY SIZED FAN SHEAVES FOR OVERPERFORMING EXHAUST FANS. |
| Mod CO10S· CHANGE ORDER | 2011-07-29 | +$30,000 | $384,256,708 | TO PROVIDE A TRENCH FOR THE NATURAL GAS TIE-IN TO THE MEDICAL CENTER. |
| Mod SA408· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-01 | +$76,908 | $384,333,616 | TO PROVIDE BOILER OPERATORS TO MONITOR NEWLY INSTALLED BOILERS 24 HOURS A DAY, 7 DAYS PER WEEK, IN ORDER TO SU… |
| Mod CO10Q· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-02 | +$10,000 | $384,343,616 | TO REPAIR DAMAGED DUCTWORK INSULATION, DUE TO PROXIMITY OF EXHAUST AIR, AND PROTECT IT FROM FUTURE DAMAGE. |
| Mod CO10R· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-02 | +$2,600 | $384,346,216 | ARCHITECTURAL ELEVATIONS INDICATED THE INSTALLATION OF ELECTRICAL RECEPTACLE BEHIND FIXED STORAGE CABINETS. TH… |
| Mod SA407· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-03 | +$2,162 | $384,348,378 | TO PROVIDE CONCRETE DAMS AROUND FUEL OIL TANK FILL MANHOLE TO PREVENT FUTURE WATER INTRUSION. |
| Mod CO10T· CHANGE ORDER | 2011-08-08 | +$8,500 | $384,356,878 | TO CUT THE BOTTOM OF THE HIGH IMPACT WALL COVERING TO ALLOW FOR THE INSTALLATION OF RUBBER AND RESILIENT SHEET… |
| Mod SA409· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-08 | −$4,267 | $384,352,611 | THE CONTRACT DRAWINGS CONFLICTED IN THE VOLTAGE REQUIREMENT FOR THE CSGF EQUIPMENT. THIS CHANGE IS TO PROVIDE… |
| Mod SA410· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-08 | +$116 | $384,352,727 | TO PROVIDE POWER CORD DROPS, FOR THE EQUIPMENT AT THE KITCHEN FOOD TRAY MAKE-UP LINE, IN BD450G. CONTRACT DOCU… |
| Mod SA411· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-08 | −$3,104 | $384,349,623 | PROVIDE POWER FOR EQUIPMENT AND LIGHTING, FOR THE MORGUE WALK-IN REFRIGERATOR. SUFFICIENT POWER FOR THE SPECI… |
| Mod SA413· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-08 | +$11,744 | $384,361,367 | TO PROVIDE THREE COURSES OF CMU TO CREATE A RAISED PLANTER AT FOUR PLANTER LOCATIONS. |
| Mod SA414· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-08 | +$8,096 | $384,369,463 | TO PROVIDE BENCHES AT VARIOUS LOCKER ROOMS SINCE THEY WERE NOT SHOWN ON THE CONTRACT DRAWINGS. |
| Mod SA416· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-08 | +$1,250 | $384,370,713 | TO PROVIDE EXHAUST CANOPY FOR LAMINATING TABLE IN ROOM 1B251 DUE TO EQUIPMENT REVISIONS BY THE MEDICAL CENTER. |
| Mod CO10U· CHANGE ORDER | 2011-08-09 | +$15,000 | $384,385,713 | TO MODIFY THE STANLEY SLIDER DOOR FRAMES DUE TO UNEVEN FLOORING AT LEVEL 2, 3 AND 5. |
| Mod SA412· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-09 | +$22,500 | $384,408,213 | TO DELETE THE CEILING ASSEMBLY IN ELECTRICAL ROOM 4D410 AND EXTEND THE ROOM PARTITIONS TO THE STRUCTURE ABOVE. |
| Mod SA415· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-09 | +$22,072 | $384,430,285 | TO PROVIDE ISOLATION AND CHECK VALVES FOR THE CLEAN STEAM GENERATOR FEEDWATER (CSGF) UNITS. |
| Mod CO10V· CHANGE ORDER | 2011-08-11 | +$45,000 | $384,475,285 | TO PROVIDE THE CORRECT VENTILATION FOR THE NUCLEAR MEDICINE AREA. |
| Mod CO10X· CHANGE ORDER | 2011-08-12 | +$8,500 | $384,483,785 | TO CHANGE THE FLOORING IN AUTOPSY VESTIBULE BD210 FROM RESILIENT FLOORING TO VINYL RESIN. |
| Mod CO10Y· CHANGE ORDER | 2011-08-12 | +$5,000 | $384,488,785 | TO CONNECT VV EQUIPMENT CHARGING STATIONS IN ROOM BG109. |
| Mod CO10W· CHANGE ORDER | 2011-08-15 | +$85,000 | $384,573,785 | TO PROVIDE CIRCULATING LOOPS AT EACH CHILLED WATER FUTURE CONNECTION, IN ORDER TO ELIMINATE 'DEAD LEGS', SO TH… |
| Mod CO10Z· CHANGE ORDER | 2011-08-15 | +$15,000 | $384,588,785 | TO PROVIDE COOLING FOR DUMBWAITER VESTIBULE 2D442. |
| Mod SA417· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-15 | −$96,320 | $384,492,465 | TO RESIZE THE DUCTWORK AT LEVEL 3, TOWER, IN ORDER TO ACCOMMODATE THE SPACE ABOVE THE FINISH CEILING. |
| Mod SA420· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-15 | −$100 | $384,492,365 | TO PROVIDE POWER TO THE MAGNETIC DOOR HOLDERS IN THE AUDITORIUM ENTRANCE AND A CARD READER AT THE HEALTH BENEF… |
| Mod SA421· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-15 | −$2,434 | $384,489,931 | THIS MODIFICATION IS TO ADD POWER AND DATA OUTLETS FOR NUMEROUS PIECES OF VV (VA SUPPLIED-VA INSTALLED) EQUIPM… |
| Mod SA422· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-15 | +$1,415 | $384,491,346 | TO ADD POWER AND DATA OUTLETS FOR NUMEROUS PIECES OF VV (VA SUPPLIED-VA INSTALLED) EQUIPMENT THAT WAS NOT INCL… |
| Mod SA423· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-15 | +$16,431 | $384,507,777 | TO ADD VALVES FOR FUTURE CONNECTIONS TO THE CONDENSER WATER SYSTEM. |
| Mod SA424· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-15 | +$31,565 | $384,539,342 | TO PROVIDE HOISTWAY VENTS FOR ELEVATOR P-1, P-2, S-3 AND S-5 SINCE THEY ARE REQUIRED AND WERE NOT SHOWN ON THE… |
| Mod SA425· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-15 | +$44,875 | $384,584,217 | PROVIDE ADDITIONAL FUEL OIL FOR BOILER START-UP&TESTING. |
| Mod SA426· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-15 | +$4,489 | $384,588,706 | TO PROVIDE ADEQUATE VENTILATION AT FOUR (4) ROOMS IN SEGMENTS D AND G ON LEVEL 1 WERE DESIGNED WITH IMPROPER V… |
| Mod SA427· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-15 | +$14,696 | $384,603,402 | TO PROVIDE A SIDEWALK AT THE SOUTH ENTRANCE TO THE SITE FROM DEER SPRING ROAD. A SIDEWALK WAS NOT SHOWN ON TH… |
| Mod CO11A· CHANGE ORDER | 2011-08-17 | +$5,000 | $384,608,402 | TO PROVIDE ADDITIONAL POWER IN ORDER TO OPERATE BOTH COMPRESSORS, ASSOCIATED WITH DAC-1, AT ONE TIME. |
| Mod CO11B· CHANGE ORDER | 2011-08-17 | +$95,000 | $384,703,402 | TO REMOVE THE BACTERIAL DEBRIS BUILT UP IN EACH PIECE OF MECHANICAL EQUIPMENT. |
| Mod CO11C· CHANGE ORDER | 2011-08-17 | +$65,000 | $384,768,402 | TO REMOVE THE BACTERIA GROWTH FROM THE CHILLED WATER SYSTEM. |
| Mod SA433· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-18 | +$76,908 | $384,845,310 | TO PROVIDE BOILER OPERATORS TO MONITOR NEWLY INSTALLED BOILERS 24 HOURS A DAY, 7 DAYS PER WEEK, IN ORDER TO SU… |
| Mod CO11E· CHANGE ORDER | 2011-08-19 | +$20,000 | $384,865,310 | TO PROVIDE A TRENCH FOR THE NATURAL GAS TIE-IN TO THE CENTRAL PLANT. |
| Mod SA428· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-19 | +$7,631 | $384,872,941 | TO RELOCATE BOILER CHEMICAL SINK FROM LOCATION IN BOILER ROOM TO THE AGREED UPON LOCATION IN THE CHILLER PLANT… |
| Mod SA431· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-19 | +$0 | $384,872,941 | TO RELOCATE AND MODIFY THE DAVIT BASES AT THE 7TH FLOOR ROOF TGHAT ARE IN CONFLICT WITH THE SCREEN WALL. |
| Mod SA435· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-19 | +$0 | $384,872,941 | TO COORDINATE WITH FUTURE VAMC EQUIPMENT IN ROOM 3D422, ANESTHESIA WORKWOOM, THE RECEPTACLE AND PLUG MOLD LAYO… |
| Mod SA436· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-19 | +$0 | $384,872,941 | TO REVISED THE PUMP HEAD INDICATED IN THE HVAC PUMP SCHEDULE ON MH-604 TO REFLECT THE ACTUAL DESIGN VALUES. |
| Mod SA437· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-19 | −$860 | $384,872,081 | TO REVISE THE DOOR HARDWARE AND ADD SECURITY ACCESS CONTROL DEVICES AT THE ENTRANCE FROM THE PHARMACY OFFICES… |
| Mod SA439· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-22 | +$0 | $384,872,081 | TO RELOCATE THE FIRE VALVE CABINETS AT VARIOUS LOCATIONS DUE TO CONFLICTS WITH UTILITIES AND WALL CONSTRUCTIO… |
| Mod CO11D· CHANGE ORDER | 2011-08-23 | +$5,000 | $384,877,081 | TO PROVIDE NON-POTABLE WATER, DRAIN, AND VENT PIPING TO THE CUP SINK IN ROOM 1B251 AS DIRECTED BY RFI 2871. |
| Mod SA434· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-23 | +$0 | $384,877,081 | TO ADD MOTORIZED AIRTIGHT SHUT-OFF DAMPERS WHERE DUCTS PENETRATE INTO COMPUTER ROOMS THAT ARE PROTECTED BY THE… |
| Mod SA438· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-23 | +$0 | $384,877,081 | TO PROVIDE COORDINATED POWER FOR THE DENTAL VACUUM PUMP SYSTEM DVP-1. CONTRACT PLUMBING DOCUMENTS REQUIRED A L… |
| Mod SA440· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-23 | +$0 | $384,877,081 | TO PROVIDE ELECTRICAL PROVISIONS FOR THE FUTURE INSTALLATION OF A GOVERNMENT FURNISHED/GOVERNMENT INSTALLED ME… |
| Mod SA429· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-25 | +$2,963 | $384,880,044 | TO PROVIDE A NEW DOMESTIC WATER LINE TO THE SELF-CLEANING HOODS, IN THE KITCHEN, AS THE WATER LINES SHOWN ON T… |
| Mod SA432· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-25 | +$1,000 | $384,881,044 | TO MODIFY SINKS IN THE LABORATORY AREA. |
| Mod SA442· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-25 | +$0 | $384,881,044 | TO ADD STORM WASTE AND OVERFLOW DRAIN PIPING TO LEVEL 1 ROOF AND STORM DRAINS SHOWN AT GRIDLINE 3.7/E |
| Mod CO10M· CHANGE ORDER | 2011-08-26 | +$900,000 | $385,781,044 | TO MODIFY THE MENTAL HEALTH CLINIC TO COMPLY WITH THE REQUIREMENTS OF THE DECEMBER 2010 DESIGN GUIDE. |
| Mod SA430· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-26 | +$12,000 | $385,793,044 | PROVIDE CHILLED WATER TO ICE MAKERS IN ROOM BD450C SINCE THE EQUIPMENT REQUIRES THE CHILLED WATER AND NONE WAS… |
| Mod SA443· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-31 | +$4,400 | $385,797,444 | TO PROVIDE STEAM SCRUBBER LAB WASHER WITH THE PROPER VOLTAGE, REVISE UNDERCOUNTER REFRIGERATORS TO ADA HEIGHT,… |
| Mod SA446· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-31 | +$20,000 | $385,817,444 | TO PROVIDE A KNEE WALL FOR THE ATTACHMENT OF THE EXPANSION JOINT COVER ASSEMBLY AT THE 4TH FLOOR ROOF LEVEL. |
| Mod SA447· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-31 | +$10,168 | $385,827,612 | TO CUT THE SLAB EDGE AT LEVEL7 TO ACCOMODATE THE INSTALLATION OF THE EXTERIOR SKIN. |
| Mod SA448· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-31 | +$5,139 | $385,832,751 | TO RELOCATE THE FIRE EXTINGUISHER CABINETS FROM INSIDE THE OPERATING ROOMS TO WITHIN THE OR SUITE. |
| Mod SA444· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-01 | +$2,995 | $385,835,746 | TO PROVIDE SINK STRAINERS THAT WILL FIT THE INTEGRAL SINK BOWLS. |
| Mod SA419· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-05 | +$200,819 | $386,036,565 | TO RESIZE THE DUCTWORK AT LEVEL 3, TOWER, IN ORDER TO ACCOMMODATE THE SPACE ABOVE THE FINISH CEILING. |
| Mod SA450· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-06 | +$16,619 | $386,053,184 | TO PROVIDE SUPPORT FOR THE COPING CAP BETWEEN THE PARAPET AND THE CURTAIN WALL. SUPPORT FOR THE COPING CAP WA… |
| Mod SA449· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-08 | +$64,460 | $386,117,644 | TO PROVIDE FUEL OIL FOR BOILER START-UP&EQUIPMENT TESTING. |
| Mod CO11F· CHANGE ORDER | 2011-09-09 | +$5,000 | $386,122,644 | TO PROVIDE PRESSURE RELIEF FOR THE BOILER MAKE-UP SYSTEM. |
| Mod SA451· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-09 | +$4,817 | $386,127,461 | TO UPGRADE THE TWO-WAY RADIO SYSTEM REPEATER EQUIPMENT AND REVISE THE LOCATION OF RADIO CONSOLES TO MEETS THE… |
| Mod SA452· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-09 | +$1,778 | $386,129,239 | TO MODIFY THE STANLEY SLIDER DOOR FRAMES DUE TO UNEVEN FLOORING AT LEVEL 2, 3 AND 5. |
| Mod SA454· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-09 | +$65,329 | $386,194,568 | TO PROVIDE FUEL OIL FOR BOILER START-UP&EQUIPMENT TESTING. |
| Mod SA455· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-09 | +$76,908 | $386,271,476 | TO PROVIDE BOILER OPERATORS TO MONITOR NEWLY INSTALLED BOILERS 24 HOURS A DAY, 7 DAYS PER WEEK, IN ORDER TO SU… |
| Mod CO11G· CHANGE ORDER | 2011-09-12 | +$60,000 | $386,331,476 | TO INSTALL A PERMAMENT PUMP ASSEMBLY TO BOOST THE PRESSURE FOR THE IRRIGATION SYSTEM. THE CITY WATER PRESSURE… |
| Mod SA456· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-12 | +$17,523 | $386,348,999 | PROVIDE THE PLUMBING PIPING AND POINT OF CONNECTION, FOR THE COURTYARD IRRIGATION SUPPLY LINES, WHICH WAS NOT… |
| Mod SA458· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-14 | +$5,127 | $386,354,126 | TO INSTALL FLOOR PROTECTION AT THE BASEMENT CORRIDORS TO PROTECT THE RESILIENT FLOORING. |
| Mod CO11H· CHANGE ORDER | 2011-09-15 | +$2,000 | $386,356,126 | TO PROVIDE EMERGENCY POWER TO UNDERCOUNTER REFRIGERATOR IN MEDS ROOM 1A126, WHICH WAS OMITTED FROM THE CONTRAC… |
| Mod SA441· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-15 | +$16,000 | $386,372,126 | TO PROVIDE ELECTRICAL PROVISIONS FOR THE FUTURE INSTALLATION OF A GOVERNMENT FURNISHED/GOVERNMENT INSTALLED ME… |
| Mod SA459· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-15 | +$2,803 | $386,374,929 | TO MODIFY THE DOOR OPENING AT THE CANTEEN RETAIL STORE TO MEET ADA REQUIREMENTS. |
| Mod CO11J· CHANGE ORDER | 2011-09-20 | +$50,000 | $386,424,929 | TO INSTALL A VAULT DOOR (CLASS 5) AND DAY GATE FOR THE PHARMACY VAULT SINCE THE SPECIFIED PHARMACY VAULT DOOR… |
| Mod CO11K· CHANGE ORDER | 2011-09-21 | +$40,000 | $386,464,929 | TO PROVIDE LEAD SHIELDING IN ROOM 1D159 TO MEET THE NEEDS OF THE RADIOLOGY DEPARTMENT. |
| Mod CO11L· CHANGE ORDER | 2011-09-22 | +$50,000 | $386,514,929 | TO CHANGE THE COLOR OF THE CERAMIC WALL TILE AT ALL PATIENTS ROOM TOILETS AT LEVE 6. |
| Mod SA460· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-23 | +$3,522 | $386,518,451 | TO INSTALL A NEW PIPE SO THE IRRIGATION LOOP IS CONNECTED FROM THE SE PARKING LOT TO THE CENTRAL ENERGY PLANT. |
| Mod SA461· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-23 | −$4,385 | $386,514,066 | TO PROVIDE THE CENTRAL PLANT WITH SOFT WATER, THE PRESSURE OF WHICH WOULD MEET CODE WITHOUT THE INSTALLATION O… |
| Mod SA462· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-26 | +$19,491 | $386,533,557 | TO PROVIDE A PLATFORM AND A MATERIAL HOIST FOR THE WINDOW WASHING ASSEMBLY BETRWEEN LEVEL 4 AND LEVEL 7 ROOFS. |
| Mod SA463· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-26 | +$26,151 | $386,559,708 | TO PROVIDE CORRUGATION METAL PANELS AND WATERPROOFING BARRIER 360 DEGREES AROUND THE PERIMETER OF ALL SKYLIGHT… |
| Mod SA464· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-26 | +$4,630 | $386,564,338 | TO ELIMINATE THE GAP AT THE BOTTOM OF WINDOW ASSEMBLY E5, E6 AND R6. THE CONTRACT DOCUMENTS DID NOT ADDRESS T… |
| Mod CO11M· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-09-27 | +$10,000 | $386,574,338 | TO PROVIDE THE NECESSARY SUPPLY AND RETURN GRILLES FOR ROOMS 1C362 AND 1C364A. |
| Mod CO11N· CHANGE ORDER | 2011-09-27 | +$10,000 | $386,584,338 | TO PROVIDE A CORRECTLY SIZED EXHAUST TERMINAL UNIT FOR ROOM 1D267. |
| Mod CO11O· CHANGE ORDER | 2011-09-29 | +$1,500 | $386,585,838 | PROVIDE A SMOKE DETECTOR AND FIRE ALARM RELAY THAT WAS OMITTED FROM DESIGN DOCUMENTS. |
| Mod CO11P· CHANGE ORDER | 2011-10-03 | +$78,000 | $386,663,838 | TO MODIFY THE NURSE CALL BEDSIDE PILLOW SPEAKER TO CONTROL THE TV IN THE PATIENT ROOMS AT LEVEL 5 AND 6. THE C… |
| Mod CO11Q· CHANGE ORDER | 2011-10-04 | +$2,500 | $386,666,338 | TO INSTALL GOVERNMENT FURNISHED (VV) TV MONITOR BRACKETS IN THE ORS. |
| Mod SA465· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-05 | +$2,689 | $386,669,027 | TO MODIFY THE LABORATORY SINK CABINET AND PROVIDE CLOSURE PIECES TO CONCEAL THE SINK. THE CONTRACT DOCUMENTS… |
| Mod CO11R· CHANGE ORDER | 2011-10-07 | +$55,000 | $386,724,027 | TO PROVIDE DIFFERENTIAL PRESSURE SENSORS/ALARMS FOR THE CORRECT ISOLATION ROOM DOORS. |
| Mod CO11S· CHANGE ORDER | 2011-10-07 | +$25,000 | $386,749,027 | TO PROVIDE A HARD CEILING IN 2D456 TO MEET ELEVATOR CODE. |
| Mod CO11T· CHANGE ORDER | 2011-10-07 | +$3,000 | $386,752,027 | TO RELOCATE 42 INCH BMS MONITOR AND COMPUTER FFROM CHIEF ENGINEER'S OFFICE TO COMMON AREA. |
| Mod CO11U· CHANGE ORDER | 2011-10-07 | +$1,500 | $386,753,527 | TO PROVIDE POWER TO A GOVERNMENT FURNISHED SCALE IN PT ROOM 1B211. POWER FOR THE SCALE WAS NOT SHOWN ON THE C… |
| Mod SA466· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-11 | −$1,414 | $386,752,113 | TO PROVIDE A RELIEF VALVE ON A COMMON HEADER IN LIEU OF INDIVIDUAL RELIEFS AT EACH PUMP. |
| Mod CO11W· CHANGE ORDER | 2011-10-18 | +$10,000 | $386,762,113 | TO PIPE SOFT COLD WATER (SCW) FEEDING EAST WING AND MENTAL HEALTH IN ORDER TO PROVIDE REDUCED PRESSURE WATER. |
| Mod SA467· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-18 | +$6,351 | $386,768,464 | REPLACE DIRTY AIR FILTERS IN 2-AHU-1 THRU 2-AHU-7 IN THE CUP. |
| Mod SA469· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-18 | +$6,441 | $386,774,905 | TO CHANGE THE HARDWARE TO THE DOORS LEADING TO THE ROOF AT LEVEL 2 AND 4. |
| Mod CO11X· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-20 | +$35,000 | $386,809,905 | TO PROVIDE AIR FILTER RACKS AT THE OUTSIDE AIR INTAKES FOR THE LEVEL 4 AIR HANDLERS. |
| Mod SA468· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-20 | +$19,839 | $386,829,744 | CRITICAL FUNCTION: EXTEND THE 6" NATURAL GAS LINE TO ACCOMODATE REVISED LOCATION OF THE METER SET, AND PROVID… |
| Mod SA470· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-20 | +$69,011 | $386,898,755 | CRITICAL FUNCTION: TO PROVIDE FUEL OIL FOR BOILER START-UP&EQUIPMENT TESTING. |
| Mod SA457· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-24 | +$340,132 | $387,238,887 | CRITICAL FUNCTION: TO RESIZE THE DUCTWORK AT LEVEL 2, TOWER, IN ORDER TO BE INSTALLED IN THE SPACE ABOVE THE F… |
| Mod SA471· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-24 | +$12,187 | $387,251,074 | PROVIDE CORRECT THRESHOLDS AT RAISED EXTERIOR WALLS. |
| Mod SA472· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-24 | −$4,737 | $387,246,337 | TO REPAIR DAMAGED DUCTWORK INSULATION, DUE TO PROXIMITY OF EXHAUST AIR, AND PROTECT IT FROM FUTURE DAMAGE. |
| Mod SA473· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-24 | +$12,817 | $387,259,154 | TO PROVIDE ACCESS PANELS FOR VC EQUIPMENT IN THE OPERATING ROOMS, LEVEL 3. |
| Mod CO11I· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-25 | +$250,000 | $387,509,154 | TO REVISE THE EXISTING CONTRACT SPECIFIED PACS CARD READERS TO BE COMPATIBLE WITH THE HSPD-12 PIV II CREDENTIA… |
| Mod SA474· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-25 | +$69,817 | $387,578,971 | TO PROVIDE FUEL OIL FOR BOILER START-UP&EQUIPMENT TESTING. |
| Mod SA475· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-28 | +$43,338 | $387,622,309 | PROVIDE ADDITIONAL SPRINKLER COVERAGE IN CENTRAL PLANT , IN ORDER TO MEET NFPA 13 REQUIREMENTS, AFTER NEW EQUI… |
| Mod SA477· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-02 | +$76,908 | $387,699,217 | TO PROVIDE BOILER OPERATORS TO MONITOR NEWLY INSTALLED BOILERS 24 HOURS A DAY, 7 DAYS PER WEEK, IN ORDER TO SU… |
| Mod CO12A· CHANGE ORDER | 2011-11-03 | +$30,000 | $387,729,217 | TO PROVIDE CONTAINMENT AND AN ALARM SENSORS FOR THE FUEL OIL BUILDING. |
| Mod CO12B· CHANGE ORDER | 2011-11-03 | +$2,500 | $387,731,717 | TO PROVIDE POWER FOR 'VA MEDICAL CENTER' SIGN LETTERING THAT WAS INADVERTENTLY OMITTED FROM THE CONTRACT. |
| Mod SA479· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-04 | +$76,908 | $387,808,625 | TO PROVIDE BOILER OPERATORS TO MONITOR NEWLY INSTALLED BOILERS 24 HOURS A DAY, 7 DAYS PER WEEK, IN ORDER TO SU… |
| Mod SA476· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-07 | +$1,179 | $387,809,804 | TO PROVIDE BREAKMETAL AT THE TUNNEL STAIR DOOR BETWEEN THE CMU AND CONCRETE WALL. |
| Mod SA478· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-07 | −$177 | $387,809,627 | TO REPLACE THE IMAGE BEHIND THE RECEPTION AREAS WITH CUSTOM ARTWORK. |
| Mod SA482· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-07 | +$2,554 | $387,812,181 | TO PLACE CONCRETE BETWEEN THE CURBS AT THE PARKING CONTROL ISLAND. |
| Mod SA483· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-07 | +$2,968 | $387,815,149 | TO MODIFY THE AUDIOLOGY EXAM LAYOUT AND POWER REQUIREMENTS TO MEET THE EQUIPMENT (VV) BEING FURNISHED BY THE M… |
| Mod SA484· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-07 | +$11,447 | $387,826,596 | TO PROVIDE POWER TO VARIOUS CONTROL PANELS IN THE ENERGY PLANT. POWER WAS NOT SHOWN ON THE CONTRACT DRAWINGS. |
| Mod SA480· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-08 | +$688 | $387,827,284 | CRITICAL FUNCTION: THIS MODIFICATION PROVIDED AN OMITTED NURSE CALL DOME LIGHT IN WAITING ROOM 3D198. |
| Mod SA481· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-08 | +$63,858 | $387,891,142 | TO PROVIDE FUEL OIL FOR BOILER START-UP&EQUIPMENT TESTING. |
| Mod SA487· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-10 | −$5,419 | $387,885,723 | CRITICAL FUNCTION: TO PROVIDE AIR FILTER RACKS AT THE OUTSIDE AIR INTAKES FOR THE LEVEL 4 AIR HANDLERS. |
| Mod SA488· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-16 | +$2,939 | $387,888,662 | PROVIDE A BELT DRIVEN, 277 VOLT FAN COIL UNIT IN LIEU OF UNITS SPECIFIIED. |
| Mod SA489· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-16 | +$3,730 | $387,892,392 | CRITICAL FUNCTION: TO REMOVE THE BACTERIA GROWTH FROM THE CHILLED WATER SYSTEM. |
| Mod SA490· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-16 | +$4,245 | $387,896,637 | CRITICAL FUNCTION: TO ELIMINATE A WINDOW AT ROOM 1C122, INSTALL ROLLUP DOOR IN ROOM 2E122 AND DELETE COUNTERTO… |
| Mod SA491· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-16 | +$92,000 | $387,988,637 | TO PROVIDE THE NECESSARY POWER FOR THE BOILER FORCED DRAFT FAN FEEDER SIZE, AND FOR A CIRCUIT FOR THE BOILER M… |
| Mod SA492· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-16 | +$29,790 | $388,018,427 | TO PROVIDE ADDITIONAL FEEDER TO THE ROOF TOP AHUS. THE CONTRACT DRAWINGS DID NOT SHOW ALL THE REQUIRED FEEDER… |
| Mod CO11V· CHANGE ORDER | 2011-11-17 | +$25,000 | $388,043,427 | TO PROVIDE ADDITIONAL VALVES REQUIRED TO PREVENT THE DOMESTIC WATER HEATERS FROM DUMPING LARGE QUANTITIES OF W… |
| Mod SA493· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-18 | +$1,665 | $388,045,092 | PROVIDE ADDITIONAL POWER SVP-1&SAC-1 LOCATED IN ROOM 1B246. |
| Mod SA494· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-18 | +$940 | $388,046,032 | TO PROVIDE POWER FOR THE MONTEL SHELVING SYSTEM, TO BE INSTALLED IN 2D170 AND 1B263. THE CONTRACT DRAWINGS DI… |
| Mod CO11Y· CHANGE ORDER | 2011-11-24 | +$98,000 | $388,144,032 | SEPARATE FIRE STORAGE FROM POTABLE STORAGE BY CONNECTING INDUSTRIAL WATER LINES TO TANK 1 AND DOMESTIC WATER L… |
| Mod SA497· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-28 | +$89,000 | $388,233,032 | TO MODIFY THE EXISTING CATWALK IN THE BOILER ROOM DUE TO INTERFERENCES WITH THE NEW BOILER ECONOMIZER. |
| Mod SA498· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-28 | +$11,000 | $388,244,032 | TO MODIFY THE NURSE CALL BEDSIDE PILLOW SPEAKER TO CONTROL THE TV IN THE PATIENT ROOMS AT LEVEL 5 AND 6. THE… |
| Mod SA499· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-29 | +$895 | $388,244,927 | TO PROVIDE POWER TO A GOVERNMENT FURNISHED SCALE IN PT ROOM 1B211. POWER FOR THE SCALE WAS NOT SHOWN ON THE C… |
| Mod SA501· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-29 | +$29,948 | $388,274,875 | DUE TO A DESIGN ISSUE, WITH THE EMERGENCY POWER DISTRIBUTION SYSTEM, THE CONTROL OF THE EMS-1 FEEDER BREAKERS… |
| Mod SA503· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-29 | +$912 | $388,275,787 | TO PROVIDE LOUVERS FOR OPENINGS IN THE WAREHOUSE EXTERIOR WALL. THE CONTRACT DRAWINGS SHOW TWO OPENINGS AT TH… |
| Mod SA504· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-29 | +$4,793 | $388,280,580 | TO PROVIDE A GYPSUM BOARD SOFFIT FOR THE INSTALLATION OF THE F28 LIGHT FIXTURE. THE FIXTURE COULD NOT BE INST… |
| Mod SA496· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-30 | +$20,299 | $388,300,879 | CRITICAL: TO PROVIDE ADDITIONAL FIRE SPRINKLER COVERAGE IN ROOMS WITH MOBILE SHELVING, IN ORDER TO SATISFY NFP… |
| Mod SA500· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-30 | −$3,204 | $388,297,675 | TO PROVIDE SECURITY ACCESS CONTROL DEVICES AND CONNECTIONS FOR THE DOORS IN 1B158 AND 1B245. CONTRACT DOCUMENT… |
| Mod SA502· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-30 | +$1,218 | $388,298,893 | TO PROVIDE NON-POTABLE WATER TO HUMIDIFIERS SERVING CRAC UNITS IN ROOMS 1A112 AND 1A114, THAT WERE OMITTED FR… |
| Mod SA505· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-30 | −$9,098 | $388,289,795 | TO PROVIDE THE CORRECT VENTILATION FOR THE NUCLEAR MEDICINE AREA. |
| Mod SA506· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-30 | −$16,375 | $388,273,420 | TO PROVIDE DIFFERENTIAL PRESSURE SENSORS/ALARMS FOR THE CORRECT ISOLATION ROOM DOORS. |
| Mod SA507· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-30 | −$4,063 | $388,269,357 | TO PROPERLY BALANCE AIRFLOW IN THE LABORATORY AREA. |
| Mod SA508· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-30 | +$12,980 | $388,282,337 | PROVIDE MAINTENACE CONTRACT FOR THE CHLORINE DIOXIDE GENERATOR INSTALLED UNDER CO-08F. |
| Mod SA509· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-30 | +$37,586 | $388,319,923 | TO PROVIDE DISPLAY CABINETS AT THE MAIN LOBBY OF THE NEW MEDICAL CENTER. THE CONTRACT DRAWINGS AND SPECIFICAT… |
| Mod CO12C· CHANGE ORDER | 2011-12-01 | +$80,000 | $388,399,923 | TO CONNECT THE UTILITIES (POWER, WATER AND DATA) TO THE GOVERNMENT FURNISHED/ GOVERNMENT INSTALLED (VV) EQUIPM… |
| Mod SA512· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-04 | −$6,001 | $388,393,922 | CRITICAL: TO PROVIDE THE NECESSARY SUPPLY AND RETURN GRILLES FOR ROOMS 1C362 AND 1C364A. |
| Mod SA510· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-08 | +$67,936 | $388,461,858 | TO PROVIDE FUEL OIL FOR BOILER START-UP&EQUIPMENT TESTING. |
| Mod SA511· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-08 | +$68,004 | $388,529,862 | TO PROVIDE FUEL OIL FOR BOILER START-UP&EQUIPMENT TESTING. |
| Mod SA513· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-08 | +$68,826 | $388,598,688 | CRITICAL FUNCTION: TO PROVIDE FUEL OIL FOR BOILER START-UP&EQUIPMENT TESTING. |
| Mod SA514· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-08 | +$5,026 | $388,603,714 | TO RELOCATE THE MEDICAL GAS ALARM PANELS FROM INSIDE OF ROOM 1D257 TO CORRIDOR C1-78, IN ORDER TO ALLOW FOR CO… |
| Mod SA515· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-08 | −$1,132 | $388,602,582 | TO PROVIDE ADDITIONAL POWER IN ORDER TO OPERATE BOTH COMPRESSORS, ASSOCIATED WITH DAC-1, AT ONE TIME. |
| Mod SA516· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-09 | −$2,149 | $388,600,433 | CRITICAL: TO PROVIDE CORRECTLY SIZED FAN SHEAVES FOR OVERPERFORMING EXHAUST FANS. |
| Mod SA517· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-09 | +$356 | $388,600,789 | CRITICAL FUNCTION: TO PROVIDE DIMMING FOR THE FIXTURES IN THE PET INDUCTION VESTIBULE ROOM 1D160. PATIENTS UND… |
| Mod SA518· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-09 | +$674 | $388,601,463 | TO PROVIDE EMERGENCY POWER TO UNDER-COUNTER REFRIGERATOR IN MEDS ROOM 1A126, WHICH WAS OMITTED FROM THE CONTRA… |
| Mod SA519· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-13 | +$69,900 | $388,671,363 | TO PROVIDE FUEL OIL FOR BOILER START-UP&EQUIPMENT TESTING. |
| Mod SA520· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-13 | +$76,908 | $388,748,271 | TO PROVIDE BOILER OPERATORS TO MONITOR NEWLY INSTALLED BOILERS 24 HOURS A DAY, 7 DAYS PER WEEK, IN ORDER TO SU… |
| Mod SA521· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-13 | +$444 | $388,748,715 | TO RELEOCATE SMOKE DETECTOR AND STROBE, IN THE WAREHOUSE, IN ORDER TO AVOID INTERFERENCES. |
| Mod SA522· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-13 | +$70,307 | $388,819,022 | TO PROVIDE FUEL OIL FOR BOILER START-UP&EQUIPMENT TESTING. |
| Mod SA523· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-14 | +$2,272 | $388,821,294 | TO PROVIDE A CHLORINE DIOXIDE SYSTEM IN ORDER TO PROVIDE EPA SUGGECTED SECONDARY DISENFECTANT LEVELS WITHOUT… |
| Mod SA525· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-19 | −$585 | $388,820,709 | TO PROVIDE ROOF ASPHALT WALK-OFF PADS IN LIEU OF THE CONCRETE PADS SPECIFIED AT ALL ROOF LEVELS AND THE WAREHO… |
| Mod SA540· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-29 | +$1,007 | $388,821,716 | TO PROVIDE A CORRECTLY SIZED EXHAUST TERMINAL UNIT FOR ROOM 1D267. |
| Mod SA485· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-03 | +$31,417 | $388,853,133 | CRITICAL FUNCTION: TO PROVIDE TEN (10) ADDITIONAL MONITORS TO VIEW THE MORE THAN 200 CCTV CAMERA FEEDS. THE C… |
| Mod SA541· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-03 | +$10,880 | $388,864,013 | TO MODIFY THE SLAB EDGE AT THE SOUTH ELEVATION AT THE EMERGENCY DEPARTMENT ENTRANCE DUE TO VARIATIONS OF THE E… |
| Mod SA486· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-05 | +$204,411 | $389,068,424 | TO PROVIDE THE NECESSARY UTILITIES FOR THE GOVERNMENT FURNISHED/CONTRACTOR INSTALLED (VC) EQUIPMENT IN THE OPE… |
| Mod SA495· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-05 | +$84,529 | $389,152,953 | TO COMMENCE WITH THE DEMOLITION OF EXISTING FINISHES AT THE MENTAL HEALTH CLINIC IN PREPARATION FOR THE NEW WO… |
| Mod SA445· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-06 | +$163,438 | $389,316,391 | CRITICAL FUNCTION: TO PROVIDE MEDICAL AIR TO THE HYPERBARIC CHAMBERS AND MODIFY OTHER UTILITIES DUE TO THE EQU… |
| Mod CO12D· CHANGE ORDER | 2012-01-09 | +$15,000 | $389,331,391 | CRITICAL FUNCTION: TO PROVIDE ADDITIONAL LIGHTING IN THE ELEVATOR EQUIPMENT ROOMS SO THAT FOOTCANDLE LEVELS… |
| Mod SA544· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-10 | +$2,323 | $389,333,714 | TO CUT THE BOTTOM OF THE HIGH IMPACT WALL COVERING TO ALLOW FOR THE INSTALLATION OF RUBBER AND RESILIENT SHEET… |
| Mod SA545· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-10 | +$50,025 | $389,383,739 | TO MODIFY THE GRADE IN ORDER FOR THE CHAIN LINK OPERABLE GATES AT THE SE AND SW ENTRY TO OPERATE. |
| Mod SA546· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-10 | +$50,000 | $389,433,739 | TO PROVIDE A FINISH FOR THE WALKWAY CANOPY STEEL TO MATCH THE COLOR OF THE METAL ROOF DECKING. |
| Mod SA547· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-10 | +$3,361 | $389,437,100 | TO MODIFY THE TRESPA PANELS AT THE MAIN ENTRANCE LOBBIES. |
| Mod SA542· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-11 | −$27,476 | $389,409,624 | TO PROVIDE LEAD SHIELDING IN ROOM 1D159 TO MEET THE NEEDS OF THE RADIOLOGY DEPARTMENT. |
| Mod SA543· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-11 | +$17,121 | $389,426,745 | TO REMOVE THE CENTRAL PLANT EQUIPMENT FROM PRIORITY 1&2 ( LIFE SAFETY) AND PLACE THEM ON PRIORITY 3 (EQUIPMEN… |
| Mod SA548· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-12 | +$43,148 | $389,469,893 | TO PROVIDE BOOST PUMPS IN ORDER TO ACHIEVE THE REQUIRED DOMESTIC HOT WATER (DHW) PRESSURE FOR THE 5TH&6TH FLOO… |
| Mod SA549· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-12 | +$43,148 | $389,513,041 | TO PROVIDE BOOST PUMPS IN ORDER TO ACHIEVE THE REQUIRED DOMESTIC HOT WATER (DHW) PRESSURE FOR THE 5TH&6TH FLOO… |
| Mod SA550· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-12 | +$46,085 | $389,559,126 | TO PROVIDE BOOST PUMPS IN ORDER TO ACHIEVE THE REQUIRED DOMESTIC HOT WATER (DHW) PRESSURE FOR THE 5TH&6TH FLOO… |
| Mod SA551· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-12 | +$45,501 | $389,604,627 | TO PROVIDE BOOST PUMPS IN ORDER TO ACHIEVE THE REQUIRED DOMESTIC HOT WATER (DHW) PRESSURE FOR THE 5TH&6TH FLOO… |
| Mod SA552· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-12 | −$635 | $389,603,992 | ARCHITECTURAL ELEVATIONS INDICATED THE INSTALLATION OF ELECTRICAL RECEPTACLE BEHIND FIXED STORAGE CABINETS. TH… |
| Mod SA553· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-12 | −$228 | $389,603,764 | THE CONTRACT DRAWINGS SHOW A MAKEUP WATER CONNECTION FOR THE LOW TEMPERATURE HOT WATER (LTHW) SYSTEM IN THE CE… |
| Mod SA418· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-13 | +$350,065 | $389,953,829 | CRITICAL FUNCTION- TO RESIZE THE DUCTWORK AT LEVEL 5&6, TOWER, IN ORDER TO BE INSTALLED IN THE SPACE ABOVE THE… |
| Mod SA554· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-19 | +$12 | $389,953,841 | TO MODIFY THE TYPE OF MIXING VALVE NEEDED FOR THE CART WASH AREA. |
| Mod SA556· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-19 | +$6,000 | $389,959,841 | TO MODIFY THE PARAPET WALL DUE TO CONFLICT WITH THE DAVIT BASE AT STAIR 1, 7 AND 10. |
| Mod SA557· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-19 | +$3,358 | $389,963,199 | TO PROVIDE A STAINLESS STEEL TRIM FOR THE CABINETS IN THE OPERATING ROOMS. |
| Mod CO12E· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-22 | +$35,000 | $389,998,199 | CRTITCAL FUNCTION: TO MODIFY THE DOOR OPENING FRAMING, INSTALL ACCESS PANELS FOR THE VV SOUND BOOTHS AT THE AU… |
| Mod SA558· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-27 | +$14,138 | $390,012,337 | TO MODIFY THE WINDOW TYPE AT STAIR 1 AND 10 DUE TO CONFLICTS WITH THE TRESPA PANELS AND THE EDGE OF SLAB. |
| Mod SA559· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-27 | +$2,867 | $390,015,204 | TO PERFORM FIELD TESTING OF THE CONDENSER WATER PUMPS TO EVALUATE PERFORMANCE DUE TO NOISE FROM ENTRAINED AIR. |
| Mod CO12F· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-30 | +$50,000 | $390,065,204 | CRITICAL FUNCTION: TO PROVIDE A PRESSURE POWERED PUMP FOR THE BOILER PLANT LOW PRESSURE CONDENSATE SYSTEM. |
| Mod CO12G· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-30 | +$10,000 | $390,075,204 | CRITICAL FUNCTION: TO PROVIDE ADDITIONAL INSULATION AND REVISE DUCTWORK IN BE101, IN TO REDUCE EXCESSIVE AMBIE… |
| Mod CO12H· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-30 | +$65,000 | $390,140,204 | CRITICAL FUNCTION: TO PROVIDE A FLASH TANK FOR THE BOILER PLANT HIGH PRESSURE CONDENSATE SYSTEM. |
| Mod CO12I· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-30 | +$7,000 | $390,147,204 | CRITICAL FUNCTION: TO PROVIDE POWER AND A RACEWAY FOR THE STERILIZER DETERGENT DISPENSING SYSTEM IN SPD. THE… |
| Mod CO12J· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-31 | +$23,000 | $390,170,204 | CRITICAL FUCTION: TO MODIFY THE DOOR OPENING AND INSTALL A NEW DOOR TO ROOM 1D146 IN ORDER FOR THE NEW EQUIPM… |
| Mod CO12K· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-31 | +$6,000 | $390,176,204 | CRITICAL FUNCTION: TO REPAIR/REPLACE FUEL OIL SENSORS THAT ARE CONTAMINATED. |
| Mod SA561· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-31 | +$5,873 | $390,182,077 | TO PROVIDE A ROOF ENCLOSURE TO ELIMINATE A CONFLICT BETWEEN A DUCT AND THE LEVEL 7 ROOF. |
| Mod SA562· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-31 | −$14,997 | $390,167,080 | TO PROVIDE CONTAINMENT AND AN ALARM SENSOR FOR THE FUEL OIL BUILDING. |
| Mod SA563· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-31 | −$134 | $390,166,946 | TO PROVIDE A 8" - 10" TILED PONY WALL ACROSS THE WINDOW, CAULK BETWEEN THE TOP LEDGE AND THE WINDOW. |
| Mod SA564· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-31 | +$10,006 | $390,176,952 | CRITICAL FUNCTION: TO MODIFY INTERIOR WINDOW FRAMING AND WINDOW ASSEMBLIES DUE TO DISCREPANCIES ON THE CONTRAC… |
| Mod SA565· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-31 | +$2,365 | $390,179,317 | TO PROVIDE A CONNECTION BETWEEN WALKWAY DOWNSPOUT AND THE STORM SEWER. |
| Mod SA566· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-31 | +$3,253 | $390,182,570 | TO PROVIDE MISSING POWER TO UNDERCABINET SINKS IN C1-41. |
| Mod SA569· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-31 | +$10,705 | $390,193,275 | TO LEVEL THE EXISTING CONCRETE SLAB AT CORRIDOR C2-1 AND C3-45 IN ORDER TO INSTALL CARPET AND RESILIENT FLOORI… |
| Mod SA453· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-02-09 | +$363,646 | $390,556,921 | TOWER 1 DUCT RESIZING AT VAMC LAS VEGAS |
| Mod SA567· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-02-09 | +$71,082 | $390,628,003 | TO PROVIDE FUEL OIL FOR BOILER START-UP&EQUIPMENT TESTING. |
| Mod SA568· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-02-09 | +$72,031 | $390,700,034 | TO PROVIDE FUEL OIL FOR BOILER START-UP&EQUIPMENT TESTING. |
| Mod SA524· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-02-14 | +$0 | $390,700,034 | TO PROVIDE A CHLORINE DIOXIDE SYSTEM IN ORDER TO PROVIDE EPA SUGGECTED SECONDARY DISENFECTANT LEVELS WITHOUT… |
| Mod SA571· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-02-15 | +$3,443 | $390,703,477 | TO MODIFY THE CURB AT THE DROP OFF AREA BETWEEN THE NEW MEDICAL CENTER AND THE 120-BED CLC IN ORDER TO PROVIDE… |
| Mod SA573· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-02-15 | +$99,986 | $390,803,463 | CRITICAL FUNCTION: TO INSTALL THE GOVERNMENT FURNISHED CANTEEN EQUIPMENT. THE MEDICAL CENTER DID NOT PRUCHASE… |
| Mod SA575· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-02-16 | +$86 | $390,803,549 | TO CHANGE THE COLOR OF THE CERAMIC WALL TILE AT ALL PATIENTS ROOM TOILETS AT LEVE 6. |
| Mod SA570· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-02-22 | +$60,066 | $390,863,615 | TO PROVIDE FUEL OIL FOR BOILER START-UP&EQUIPMENT TESTING. |
| Mod SA577· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-02-22 | +$71,148 | $390,934,763 | PROVIDE NEW TRANSIENT VOLTAGE SURGE SUPPRESSORS (TVSS) IN PHASE IV (GE) UNIT SUBSTATIONS, MEETING UL96A, SO T… |
| Mod SA578· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-02-22 | +$97,075 | $391,031,838 | TO MODIFY THE WINDOW TREATMENT THROUGHOUT THE NEW MEDICAL CENTER SINCE THE CONTRACT DOCUMENTS DID NOT ADEQUATE… |
| Mod SA579· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-02-22 | +$681,913 | $391,713,751 | TO MODIFY THE UTILITIES SERVING THE RADIOLOGY SUITE EQUIPMENT TO MEET THE MEET THE REQUIREMENTS OF THE VENDOR/… |
| Mod SA580· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-02-22 | +$12,964 | $391,726,715 | TO MODIFY THE SIZE FOOT GRILLES AT VARIOUS LOCATIONS. |
| Mod SA581· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-02-22 | −$9,284 | $391,717,431 | TO PROVIDE A TRENCH FOR THE NATURAL GAS TIE-IN TO THE CENTRAL PLANT. |
| Mod SA582· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-02-22 | +$21,536 | $391,738,967 | TO LEVEL THE CONCRETE FLOORING FOR THE INSTALLATION OF THE TERAZZO TILE IN THE CANTEEN DINING AREA. |
| Mod SA583· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-02-29 | −$1,372 | $391,737,595 | TO PIPE SOFT COLD WATER (SCW) FEEDING EAST WING AND MENTAL HEALTH IN ORDER TO PROVIDE REDUCED PRESSURE WATER. |
| Mod SA584· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-02-29 | +$1,970 | $391,739,565 | CRITICAL FUNCTION: TO PROVIDE POWER FOR 'VA MEDICAL CENTER' SIGN LETTERING THAT WAS INADVERTENTLY OMITTED FRO… |
| Mod SA585· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-02-29 | +$1,133 | $391,740,698 | TO PROVIDE THE CORRECT SHEAVE AND BELTS IN ORDER TO ACHIEVE DESIGN AIR VOLUMES. |
| Mod SA586· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-02-29 | +$3,151 | $391,743,849 | TO PROVIDE DIRECTION ON RESOLVING A FIXTURE/CASEWORK CONFLICT. |
| Mod SA587· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-02-29 | +$7,827 | $391,751,676 | TO MODIFY THE THRESHOLDS AT THE MAIN ENTRY VESTIBULES. |
| Mod SA588· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-02-29 | +$99,960 | $391,851,636 | TO PROVIDE COMMISSIONING FOR THE BUILDING SYSTEMS. |
| Mod SA589· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-02-29 | +$28,701 | $391,880,337 | TO RECONFIGURE PLUMBING, MECHANICAL PIPING, AND FIRE PROTECTION PIPES AFFECTED BY THE DUCTWORK REDESIGN. |
| Mod SA590· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-02-29 | +$18,752 | $391,899,089 | TO PROVIDE HIGH AND LOW PRESSURE ALARMS FOR 6 HYDRONIC SYSTEMS. |
| Mod SA591· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-02-29 | +$1,178 | $391,900,267 | TO MODIFY EXISTING DAVID BASE AT STAIR 8&9. |
| Mod SA593· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-02-29 | +$10,257 | $391,910,524 | TO MODIFY THE SECURITY HARDWARE TO THE DOOR TO ROOM BD460. |
| Mod SA592· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-06 | +$76,908 | $391,987,432 | TO PROVIDE BOILER OPERATORS TO MONITOR NEWLY INSTALLED BOILERS 24 HOURS A DAY, 7 DAYS PER WEEK, IN ORDER TO SU… |
| Mod SA594· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-06 | +$76,908 | $392,064,340 | TO PROVIDE BOILER OPERATORS TO MONITOR NEWLY INSTALLED BOILERS 24 HOURS A DAY, 7 DAYS PER WEEK, IN ORDER TO SU… |
| Mod SA595· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-09 | +$4,501 | $392,068,841 | TO PROVIDE ACCESS TO THE INTERSTITIAL SPACE BELOW THE LEVEL 2 PENTHOUSE, FOR ACCESS TO THE ISOLATION DAMPER(S)… |
| Mod SA596· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-13 | +$44,461 | $392,113,302 | TO PROVIDE FUEL OIL FOR GENERATORS IN ORDER TO PERFORM CAMPUS "DARK-START". |
| Mod SA597· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-13 | +$4,036 | $392,117,338 | TO RELOCATE 42 INCH BMS MONITOR AND COMPUTER FFROM CHIEF ENGINEER'S OFFICE TO COMMON AREA. |
| Mod SA604· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-13 | +$26,824 | $392,144,162 | TO RECONFIGURE PLUMBING, MECHANICAL PIPING, AND FIRE PROTECTION PIPES AFFECTED BY THE DUCTWORK REDESIGN. |
| Mod SA605· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-15 | +$56,555 | $392,200,717 | TO RECONFIGURE PLUMBING, MECHANICAL PIPING, AND FIRE PROTECTION PIPES AFFECTED BY THE DUCTWORK REDESIGN. |
| Mod SA600· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-19 | −$42,933 | $392,157,784 | TO CONNECT THE UTILITIES (POWER, WATER AND DATA) TO THE GOVERNMENT FURNISHED/ GOVERNMENT INSTALLED (VV) EQUIPM… |
| Mod SA601· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-19 | +$69,640 | $392,227,424 | TO PROVIDE PRESSURE POWERED PUMPS FOR CSG-DT-1 AND 2, HX-DT-1 AND 2, AND THE DOMESTIC WATER HEATERS IN BD423. |
| Mod SA602· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-19 | +$33,733 | $392,261,157 | TO PROVIDE PRESSURE POWERED PUMPS FOR CSG-MH-1, 2 AND THE DOMESTIC WATER HEATERS IN BE101. |
| Mod SA603· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-19 | +$14,107 | $392,275,264 | TO PROVIDE PRESSURE POWERED PUMPS FOR HX-ADM-1,2 AND CSG-ADM-1,2. |
| Mod SA606· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-19 | +$42,441 | $392,317,705 | TO CONNECT THE UTILITIES (POWER, WATER AND DATA) TO THE GOVERNMENT FURNISHED/ GOVERNMENT INSTALLED (VV) EQUIPM… |
| Mod SA598· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-21 | +$14,599 | $392,332,304 | TO PROVIDE PATIENT NURSE CALL DEVICE AT EACH EMERGENCY ROOM HEADWALL AS REQUIRED BY CODE. |
| Mod SA599· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-21 | +$646 | $392,332,950 | TO PROVIDE ACCESS TO ROOFTOP AIR HANDLER RTU-AMB-7, IN ORDER TO PERFORM ROUTINE MAINTENANCE. |
| Mod SA611· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-21 | −$2,574 | $392,330,376 | TO PROVIDE A CREDIT FOR USE OF DIFFERENT FASTENERS FOR THE PIPING LABELS. |
| Mod SA612· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-21 | +$19,351 | $392,349,727 | TO PIPE THE CONTINUOUS BLOWDOWN FLASH TANK VENT TO THE LOW PRESSURE STEAM SYSTEM IN THE BOILER PLANT. |
| Mod SA572· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-22 | +$80,000 | $392,429,727 | CRITICAL FUNCTION: DEFINITIZATION OF CO-05B&CO-05C FOR PHARMACY EQUIPTMENT (VV) MODIFICATIONS |
| Mod SA614· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-22 | +$6,358 | $392,436,085 | TO MODIFY THE FRAMING FOR THE EXTERIOR WINDOWS AT COLUMN LINE E.5 DUE TO CONFLICTS WITH INTERIOR RATED PARTITI… |
| Mod SA608· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-23 | +$68,461 | $392,504,546 | TO RECONFIGURE PLUMBING, MECHANICAL PIPING, AND FIRE PROTECTION PIPES AFFECTED BY THE DUCTWORK REDESIGN. |
| Mod SA609· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-23 | +$70,357 | $392,574,903 | TO RECONFIGURE PLUMBING, MECHANICAL PIPING, AND FIRE PROTECTION PIPES AFFECTED BY THE DUCTWORK REDESIGN. |
| Mod SA574· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-27 | +$90,000 | $392,664,903 | TO MODIFY THE UTILITIES SERVING THE CARDIAC CATH LAB SUITE EQUIPMENT TO MEET THE MEET THE REQUIREMENTS OF THE… |
| Mod SA576· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-27 | +$30,795 | $392,695,698 | TO MODIFY THE EXTERIOR WINDOW WALL AT THE NORTH ELEVATION OF LEVELS 2 AND 4. THE CONTRACT SHOWN WINDOW WALL L… |
| Mod SA615· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-27 | +$3,664 | $392,699,362 | TO PROVIDE ADDITIONAL LIGHTING IN THE ELEVATOR EQUIPMENT ROOMS SO THAT FOOTCANDLE LEVELS SATISFY THE ELEVATO… |
| Mod SA616· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-29 | +$76,908 | $392,776,270 | TO PROVIDE BOILER OPERATORS TO MONITOR NEWLY INSTALLED BOILERS 24 HOURS A DAY, 7 DAYS PER WEEK, IN ORDER TO SU… |
| Mod SA617· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-29 | +$8,000 | $392,784,270 | TO PROVIDE ACCESS CONTROL TO MEET VA SECURITY STANDARDS TO FOUR DOORS IN THE UTILITY TUNNEL THAT WERE NOT ADDR… |
| Mod SA618· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-29 | +$800 | $392,785,070 | TO PROVIDE THE NECESSARY ELECTRICAL PROVISIONS FOR OPERATION OF A PNEUMATIC OPERATED, DOOR FOR THE MRI PROCEDU… |
| Mod SA619· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-29 | +$2,000 | $392,787,070 | TO MODIFY THE O.R CEILING SYSTEM TO ACCOMMODATE LIGHT FIXTURES AND DIFFUSERS. |
| Mod SA620· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-29 | +$2,000 | $392,789,070 | CONTRACT DOCUMENTS FAILED TO ADDRESS CONTROLLED ACCESS INTO THE SURGERY/DIGESTIVE DISEASES AREA FROM THE WAITI… |
| Mod SA621· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-29 | +$8,000 | $392,797,070 | TO PROVIDE DISINFECTION AND CLEANING OF THE WATER STORAGE TANK(S). |
| Mod SA622· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-30 | −$1,993 | $392,795,077 | TO PROVIDE PRESSURE RELIEF FOR THE BOILER MAKE-UP SYSTEM. |
| Mod SA624· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-30 | +$3,627 | $392,798,704 | TO REPROGRAM FIRE ALARM SYSTEM SO THAT THE 'DEVICES' ARE ACTIVATED ONLY IN THE BUILDING IN ALARM. |
| Mod SA560· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-09 | +$118,861 | $392,917,565 | CRITICAL FUNCTION: TO INSULATE THE NE WATER STORAGE TANK IN ORDER TO ELIMINATE MICRO-BACTERIAL GROWTH DUE TO… |
| Mod SA607· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-13 | +$77,941 | $392,995,506 | TO PROVIDE PRESSURE POWERED PUMPS FOR CSG-AMB-1 AND 2, HX-AMB-1 AND 2, AND THE DOMESTIC WATER HEATERS IN BB208… |
| Mod SA630· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-25 | −$2,106 | $392,993,400 | TO PROVIDE RECEPTACLES AND DATA OUTLETS FOR THE RECEPTION DESK, IN ROOM 1C398, THAT WERE OMITTED FROM THE DESI… |
| Mod SA623· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-26 | +$1,500 | $392,994,900 | TO REVISE WINDOW AT ROOM 3D108 FROM A CONVENTIONAL WINDOW TO A TRANSACTION PASS-THRU WINDOW. |
| Mod SA625· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-26 | +$5,000 | $392,999,900 | TO PROVIDE THE REVISIONS TO THE CART WASH ROOMS 2D453A AND 2D454. |
| Mod SA626· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-26 | −$10,819 | $392,989,081 | TO MODIFY THE DOOR OPENING AND INSTALL A NEW DOOR TO ROOM 1D146 IN ORDER FOR THE NEW EQUIPMENT TO HAVE ACCESS… |
| Mod SA629· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-26 | +$2,500 | $392,991,581 | TO ADD DRYWALL TO COVER THE SPANDREL GLASS AT THE DOORS TO COURTYARD 1. |
| Mod SA632· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-26 | −$2,038 | $392,989,543 | TO CONNECT VV EQUIPMENT CHARGING STATIONS IN ROOM BG109. |
| Mod SA633· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-26 | +$17,000 | $393,006,543 | TO MODIFY THE LAYOUT OF THE EQUIPMENT IN THE DIALYSIS TREATMENT BAYS AT LEVEL 3. |
| Mod SA640· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-26 | +$5,993 | $393,012,536 | TO CAP THE BYPASS ON THE 3-WAY VALVES INSTALLED ON CENTRAL PLANT AHUS IN ORDER TO REDUCE ENERGY CONSUMPTION. |
| Mod SA555· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-30 | +$220,000 | $393,232,536 | CRITICAL FUNCTION: TO PROVIDE PIPING FOR THE DIALYSIS STATIONS AT LEVEL 3 FROM THE NEWLY CREATED DIALYSIS EQUI… |
| Mod SA634· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-30 | −$3,300 | $393,229,236 | TO RELOCATE BACKFLOW PREVENTER FORM BELOW FLOOR OF ROOM 2D326 TO ABOVE FLOOR OF WATER TREATMETN ROOM 2D322. |
| Mod SA635· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-30 | −$2,295 | $393,226,941 | TO PROVIDE ADDITIONAL NURSE CALL DEVICES AT VARIOUS ROOMS THAT WERE NOT SHOWN ON THE CONTRACT DRAWINGS BUT AR… |
| Mod SA636· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-30 | −$5,666 | $393,221,275 | TO PROVIDE POWER FOR THE HORIZONTAL FIRE SHUTTERS THAT WAS OMITTED FROM THE CONTRACT DRAWINGS. |
| Mod SA637· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-30 | +$2,000 | $393,223,275 | TO ADDD A P-507 PLASTER SINK AND ASSOCIATED PIPING TO ROOM 3B187. THE CONTRACTOR DID NOT SHOW A SINK IN CAST… |
| Mod SA638· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-30 | +$10,000 | $393,233,275 | CRITICAL FUNCTION: TO REVISE THE REVERSE OSMOSIS WATER SYSTEM SERVING THE WASHER/STERILIZERS AS INDICATED BY R… |
| Mod SA639· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-30 | +$80,988 | $393,314,263 | TO MODIFY THE FLOOR EXPANSION JOINT ASSEMBLY AT THE MAIN CORRIDORS TO MEET THE REQUIRED FIRE RATING. |
| Mod SA641· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-30 | +$491 | $393,314,754 | TO PROVIDE ADDITIONAL VALVES REQUIRED TO PREVENT THE DOMESTIC WATER HEATERS FROM DUMPING LARGE QUANTITIES OF W… |
| Mod SA642· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-30 | +$11,700 | $393,326,454 | CRITICAL FUNCTION: TO PROVIDE SLAB OPENINGS PER RFI 995, STAIR RISERS AND CONCRETE PAD PER RFI 1899, AND RELOC… |
| Mod SA643· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-30 | +$6,034 | $393,332,488 | CRITICAL FUNCTION: TO PROVIDE AN ALTERNATIVE EXPANSION DETAIL ALONG COLUMN LINE N.2. THE CONTRACT REFERENCE D… |
| Mod SA644· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-30 | −$1,610 | $393,330,878 | TO REPAIR/REPLACE FUEL OIL SENSORS THAT WERE CONTAMINATED. |
| Mod SA645· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-30 | +$1,379 | $393,332,257 | TO INSTALL THE CORRECT FAUCET FOR DOUBLE COMPARTMENT SINKS IN ROOMS 2D455 AND 1B207. |
| Mod SA646· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-30 | +$32,113 | $393,364,370 | CRITICAL FUNCTION: TO MODIFY THE EXPANSION JOINT COVER ALONG 4-LINE AT LEVEL 2 AND 3. THE COVER REFERENCED ON… |
| Mod SA647· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-30 | +$33,012 | $393,397,382 | CRITICAL FUNCTION: TO LEVEL THE EXISTING CONCRETE SLAB AT THE AUDIOLOGY FOR THE PLACEMENT OF THE AUDIOLOGY BOO… |
| Mod SA648· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-30 | +$7,888 | $393,405,270 | CRITICAL FUNCTION: TO MODIFY FEEDS TO EG DC SWITCHBOARD TO EMS-1 |
| Mod SA649· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-30 | +$5,393 | $393,410,663 | CRITICAL FUNCTION: TO MODIFY THE WOOD STAIR HANDRAIL AT COURTYARD 1. |
| Mod SA650· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-30 | +$12,268 | $393,422,931 | CRITICAL FUNCTION: TO MODIFY THE SUPPORT FOR THE PHONE BOOTHS AND INSTALL METAL BACKING FOR VA FURNISHED EQUIP… |
| Mod SA651· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-30 | +$8,313 | $393,431,244 | CRITICAL FUNCTION: TO ADD COUNTERTOPS IN INTERVIEW ROOMS 1C302 THRU 1C305. COUNTERTOPS WERE NOT IDENTIFIED O… |
| Mod SA652· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-30 | +$13,993 | $393,445,237 | CRITICAL FUNCTION: TO INSTALL WALL FURRING AT THE SECLUSION ROOMS AT THE MENTAL HEALTH CLINIC AND TO RELOCATE… |
| Mod SA653· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-30 | +$4,449 | $393,449,686 | CRITICAL FUNCTION: TO REPROGRAM THE CONTROLS TO INCORPORATE RTU SHUTDOWN ON FREEZE. THIS FUNCTION WAS NOT IDE… |
| Mod SA654· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-30 | +$76,908 | $393,526,594 | CRITICAL FUNCTION: TO PROVIDE BOILER OPERATORS TO MONITOR NEWLY INSTALLED BOILERS 24 HOURS A DAY, 7 DAYS PER W… |
| Mod SA655· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-30 | +$89,241 | $393,615,835 | TO PROVIDE DEDICATED CONDENSATE DRAIN PIPING FOR THE ROOFTOP AIR HANDLING UNITS (RTUS). |
| Mod SA660· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-04-30 | +$73,699 | $393,689,534 | CRITICAL FUNCTION: TO REMOVE AND REINSTALL STERILIZERS IN ROOM 2D448, SPD, IN ORDER TO CORRECT DRAINAGE AND WA… |
| Mod SA656· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-05-05 | +$54,934 | $393,744,468 | CRITICAL FUNCTION: TO PROVIDE BOILER OPERATORS TO MONITOR NEWLY INSTALLED BOILERS 24 HOURS A DAY, 7 DAYS PER W… |
| Mod SA657· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-05-10 | +$4,568 | $393,749,036 | CRITICAL FUNCTION: TO PROVIDE ELECTRIFIED DOOR HARDWARE, WHICH WAS OMITTED FROM THE DESIGN. |
| Mod SA658· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-05-10 | +$30,206 | $393,779,242 | CRITICAL FUNCTION: TO PROVIDE DEDICATED CONDENSATE DRAIN PIPING FOR THE ROOFTOP AIR HANDLING UNITS (RTUS) SERV… |
| Mod SA659· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-05-10 | +$49,937 | $393,829,179 | CRITICAL FUNCTION: TO REWORK THE 3D MODEL DUE TO DUCT CHANGES AT THE 1ST FLOOR LEVEL. |
| Mod SA661· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-05-16 | +$99,986 | $393,929,165 | CRITICAL FUNCTION: TO PROVIDE POWER TO THE NEW EQUIPMENT IN LAB ROOM 2D326. THE MEDICAL CENTER CHANGED THE EQ… |
| Mod SA662· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-05-17 | +$38,565 | $393,967,730 | TO PROVIDE A REVERSE OSMOSIS (RO) WATER PURIFICATION UNIT, WITH THE NECESSARY CAPACITY, TO SERVE THE LABORATOR… |
| Mod SA663· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-05-17 | +$0 | $393,967,730 | TO REMOVE THE BACTERIAL DEBRIS BUILT UP IN EACH PIECE OF MECHANICAL EQUIPMENT. |
| Mod SA665· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-05-23 | +$0 | $393,967,730 | TO PROVIDE CIRCULATING LOOPS AT EACH CHILLED WATER FUTURE CONNECTION. |
| Mod SA666· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-05-23 | +$5,600 | $393,973,330 | TO REROUTE THE MEDIUM PRESSURE STEAM CONDENSATE FROM THE KITCHEN. |
| Mod SA664· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-05-31 | +$43,000 | $394,016,330 | TO PROVIDE THE REVISION OF THE SILL PANEL CHANNELS PER THE MOCKUP COMMENTS. |
| Mod SA667· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-05-31 | +$33,482 | $394,049,812 | PROVIDE NECESSARY POWER IN ORDER TO ACCOMODATE THE ELECTRICAL REQUIREMENTS OF THE PURCHASED STERILIZERS IN ROO… |
| Mod SA668· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-05-31 | +$26,710 | $394,076,522 | PROVIDE A MEANS FOR THE SECURITY SYSTEM TO DIFFERENTIATE WHEN A DOOR IS OPENED BY A "PUSH TO EXIT" DEVICE OR I… |
| Mod SA669· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-05-31 | +$99,926 | $394,176,448 | TO EXTEND THE GLASS HANDRAIL AT THE CLERSTORY, LEVEL 2 AND 3, TO 84" AFF. |
| Mod SA673· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-05-31 | +$20,488 | $394,196,936 | TO REPLACE THE EXISTING WINDOWS AT THE PATIENTS ROOMS IN THE MENTAL HEALTH CLINIC WITH ANTI-LIGATURE WINDOWS. |
| Mod SA674· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-05-31 | +$9,105 | $394,206,041 | TO PROVIDE UTILITIES FOR VV EQUIPMENT AT VARIOUS LOCATIONS. |
| Mod SA671· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-07 | −$17,530 | $394,188,511 | TO PROVIDE A PRESSURE POWERED PUMP FOR THE BOILER PLANT LOW PRESSURE CONDENSATE SYSTEM. |
| Mod SA672· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-07 | −$33,224 | $394,155,287 | TO PROVIDE A FLASH TANK FOR THE BOILER PLANT HIGH PRESSURE CONDENSATE SYSTEM. |
| Mod SA610· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-08 | +$153,274 | $394,308,561 | TO RECONFIGURE PLUMBING, MECHANICAL PIPING, AND FIRE PROTECTION PIPES AFFECTED BY THE DUCTWORK REDESIGN. |
| Mod SA613· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-08 | +$183,377 | $394,491,938 | TO RECONFIGURE PLUMBING, MECHANICAL PIPING, AND FIRE PROTECTION PIPES AFFECTED BY THE DUCTWORK REDESIGN. |
| Mod SA526· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-11 | −$14,985 | $394,476,953 | TO PROVIDE A HARD CEILING IN 2D456 TO MEET ELEVATOR CODE. |
| Mod SA527· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-11 | +$28,000 | $394,504,953 | TO PROVIDE SUPPORT FOR THE BRIDGE CONNECTION EXPANSION JOINT MODIFICATION AT LEVEL 2 PHASE III TO PHASE IV |
| Mod SA528· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-11 | +$7,958 | $394,512,911 | TO PROVIDE A COVERING OVER THE SPANDREL GLASS AT THE CONNECTING BRIDGE TO PHASE III. THE CONTRACT DRAWINGS DI… |
| Mod SA529· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-11 | +$4,767 | $394,517,678 | TO PROVIDE A SIDEWALK AT THE NORTH WING AND SOUTH WING OF THE CLC. THE CONTRACT DRAWINGS DID NOT SHOW A SIDWA… |
| Mod SA530· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-11 | +$11,413 | $394,529,091 | TO PROVIDE THE MEDICAL CENTER WITH TEMPORARY CORES FOR THE DOOR HARDWARE IN ORDER TO SECURE AREAS FOR THEIR EQ… |
| Mod SA531· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-11 | +$6,597 | $394,535,688 | TO APPLY WATERRPOOFING AT DRIFT JOINT AT EXTERIOR EVEVATION ALONG COLUMN LINE 18. |
| Mod SA532· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-11 | −$24,522 | $394,511,166 | TO RECEIVE ADEQUATE COMPENSATION WORK MATERIAL NOT INSTALLED |
| Mod SA533· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-11 | −$25,948 | $394,485,218 | TO INSTALL A VAULT DOOR (CLASS 5) AND DAY GATE FOR THE PHARMACY VAULT SINCE THE SPECIFIED PHARMACY VAULT DOOR… |
| Mod SA534· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-11 | −$12,488 | $394,472,730 | TO PROVIDE COOLING FOR DUMBWAITER VESTIBULE 2D442. |
| Mod SA535· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-11 | +$15,990 | $394,488,720 | TO REBALANCE CHILL WATER FLOW RATES BASED ON AN OUTSIDE TEMEPERATURE OF 112 DEGREES 'F' IN LIEU OF THE ORIGINA… |
| Mod SA536· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-11 | +$5,309 | $394,494,029 | IN ORDER TO COORDINATE NEW WORK WITH THE VA-PURCHASED OPERATIONS CONTROL CASEWORK, ELECTRICAL AND TELEDATA RO… |
| Mod SA537· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-11 | +$3,626 | $394,497,655 | TO ADD MOTORS TO THE COILING SHUTTERS THAT ARE GREATER THAN 7' WIDE, AND NOT SUITABLE FOR MANUAL OPERATION. TH… |
| Mod SA538· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-11 | +$2,107 | $394,499,762 | TO PROVIDE POWER FOR THE NITROGEN AND NITROUS OXIDE GAS MANIFOILD VALVES. |
| Mod SA539· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-11 | +$78,627 | $394,578,389 | TO PROVIDE FUEL OIL FOR BOILER START-UP&EQUIPMENT TESTING. |
| Mod SA628· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-13 | +$76,908 | $394,655,297 | TO PROVIDE BOILER OPERATORS TO MONITOR NEWLY INSTALLED BOILERS 24 HOURS A DAY, 7 DAYS PER WEEK, IN ORDER TO SU… |
| Mod SA631· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-13 | +$5,385 | $394,660,682 | TP PROVIDE DUCT MOUNTED TEMPERATURE SENSORS IN LIEU OF WALL MOUNTED, IN ORDER TO ACCOMODATE CANTEEN STORE SHEL… |
| Mod SA675· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-13 | +$68,882 | $394,729,564 | TO PROVIDE POWER TO THE NEW EQUIPMENT IN LAB ROOM 2D326. THE MEDICAL CENTER CHANGED THE EQUIPMENT VENDOR THUS… |
| Mod SA677· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-13 | +$12,879 | $394,742,443 | TO INSTALL A PERMANENT PUMP ASSEMBLY TO BOOST THE PRESSURE FOR THE IRRIGATION SYSTEM. THE CITY WATER PRESSURE… |
| Mod SA678· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-13 | +$24,832 | $394,767,275 | TO PROVIDE A TEMPORARY PUMP TO PRESSURIZE THE IRRIGATION SYSTEM. |
| Mod SA679· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-13 | −$15,802 | $394,751,473 | TO MODIFY THE DOOR OPENING FRAMING, INSTALL ACCESS PANELS FOR THE VV SOUND BOOTHS AT THE AUDIOMETRIC SUITE. |
| Mod SA680· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-13 | +$300 | $394,751,773 | TO INSTALL GOVERNMENT FURNISHED (VV) TV MONITOR BRACKETS IN THE ORS. |
| Mod SA681· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-13 | +$782 | $394,752,555 | THIS MODIFICATION PROVIDES POWER FOR TWO SHREDDERS IN ROOM BB206. |
| Mod SA682· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-13 | +$1,500 | $394,754,055 | TO CHANGE THE FLOORING IN AUTOPSY VESTIBULE BD210 FROM RESILIENT FLOORING TO VINYL RESIN. |
| Mod SA683· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-13 | +$24,000 | $394,778,055 | TO PROVIDE A 2-HR SEPARATION FROM THE NEW MEDICAL CENTER AND THE CLC AT THE CONNECTING BRIDGE WITH THE INSTALL… |
| Mod SA684· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-13 | +$8,000 | $394,786,055 | TO CHANGE THE BASE AT THE RESILIENT SHEET FLOORING FROM RUBBER BASE TO INTEGRAL BASE. |
| Mod SA685· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-13 | +$8,000 | $394,794,055 | TO INSTALL PANEL BOARDS AT THE THREE (3) TRANSIT SHELTER LOCATIONS AS A MEANS OF DISCONNECT, AND FOR FUTURE US… |
| Mod SA686· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-13 | +$8,500 | $394,802,555 | TO COORDINATE THE ELECTRICAL PROVISIONS FOR THE FAN COIL UNITS IN THE UTILITY TUNNEL WITH THE MECHANICAL CONTR… |
| Mod SA687· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-13 | +$33,500 | $394,836,055 | TO CORRECT THE DIMENSIONS FOR THE CURTAIN WALL AT ENTRY LOBBY 1A256 AND AT AREA A AND AT AREA B. |
| Mod SA688· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-13 | +$600 | $394,836,655 | A PREVIOUS RFI RESPONSE RELOCATED DOORS BUT FAILED TO COORDINATE THE FIRE ALARM STROBE SPACING REQUIREMENTS. |
| Mod SA689· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-13 | +$8,800 | $394,845,455 | THIS MODIFICATION PROVIDES ELECTRICAL REVISIONS NECESSARY FOR COORDINATION AS A RESULT OF RFIS 2379 AND 2475. |
| Mod SA690· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-13 | +$10,150 | $394,855,605 | TO PROVIDE ADDITIONAL JOINTS AT THE TRESPA PANELS EAST OF VESTIBULE 1E215 |
| Mod SA691· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-13 | +$45,948 | $394,901,553 | TO INSTALL TAPERED INSULATION IN LIEU OF FLAT INSULATION AT THE ROOF LEVE, COURTYARD #2. |
| Mod SA692· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-13 | +$7,416 | $394,908,969 | TO PROVIDE TRIM AROUND THE LIGHT FIXTURES INSTALL IN A DRYWALL CEILING IN LIEU OF A ACOUSTICAL TILE CEILING. |
| Mod SA693· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-13 | +$25,804 | $394,934,773 | TOPROVIDE A TRENCH DRAIN AT VESTIBULE 1E143 SINCE THE CONTRACTDID NOT SHOW A TRENCH DRAIN AT THIS LOCATION. |
| Mod SA694· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-13 | +$10,525 | $394,945,298 | TO PROVIDE NON-POTABLE WATER, DRAIN, AND VENT PIPING TO THE CUP SINK IN ROOM 1B251 AS DIRECTED BY RFI 2871&DRA… |
| Mod SA695· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-13 | +$13,000 | $394,958,298 | PROVIDE CARD READERS AND PEDESTALS, FOR PARKING CONTROL, THAT WERE NOT DELINEATED ON THE CONTRACT DRAWINGS. |
| Mod SA696· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-13 | +$41,000 | $394,999,298 | TO MODIFY THE TRESPA PANELS TO ALLOW THE INSTALLATION OF THE WINDOW WASHING EQUIPMENT OUTRIGGERS AT LEVEL 7 RO… |
| Mod SA627· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-19 | +$591,354 | $395,590,652 | TO DETAIL THE CHANGES TO THE MECHANICAL AND PLUMBING SYSTEMS AND ELECTRICAL UTILITIES ABOVE THE CEILING AT THE… |
| Mod SA702· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-20 | +$2,400 | $395,593,052 | TO PROVIDE BACK BOXES AND CONDUIT FOR BURTON EXAM LIGHTS, IN DENTAL ROOM 2A111. |
| Mod SA697· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-28 | +$5,129 | $395,598,181 | TOMODIFY THE LAYOUT FO THE ICU HEADWALL AT LEVEL 5. |
| Mod SA698· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-28 | +$4,500 | $395,602,681 | TO PROVIDE A LEVEL CONCRETE SLAB AT THE POLICE SHELTERS AT THE SOUTH ENTRANCE TO THE COMPLEX. |
| Mod SA699· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-28 | +$3,500 | $395,606,181 | TO PROVIDE STORM PIPING AT THE SIDEWALKS BETWEEN THE HOSPITAL AND THE CLC. CONTRACT DRAWINGS DID NOT SHOW THE… |
| Mod SA700· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-28 | +$10,000 | $395,616,181 | TO PROVIDE BREAK METAL TO COVER THE EXPOSED STEEL AT THE ENTRY LOBBIES. |
| Mod SA701· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-28 | +$2,500 | $395,618,681 | TO RELOCATE THE SIDEWALK FROM THE SE PARKING LOT TO THE SOUTH ENTRANCE OF THE CLC. THE LOCATION OF THE SIDEWA… |
| Mod SA703· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-28 | +$8,053 | $395,626,734 | TO PROVIDE THE REQUIRED HEIGHT FOR THE ACCESS FLOORING IN ROOM 2E134. |
| Mod SA704· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-28 | +$12,617 | $395,639,351 | TO FIND AND REPAIR FIRE LINE LEAKS BETWEEN BLDG. #2 AND BLDG. #3. |
| Mod SA705· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-28 | +$18,200 | $395,657,551 | TO CORRECT CONFLICT BETWEEN THE CEILING HEIGHT AND THE WINDOW HEIGHT ON THE FIFTH FLOOR. |
| Mod SA706· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-28 | +$6,000 | $395,663,551 | TO INSTALL SMOKE VENTS ON THE WAREHOUSE ROOF. |
| Mod SA707· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-29 | +$6,900 | $395,670,451 | TO PROVIDE EQUIPMENT SPECIFICATION FOR PASS-THRU WINDOW BETWEEN ROOMS 1D352&1D354.. |
| Mod SA708· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-29 | +$7,000 | $395,677,451 | TO PROVIDE BAFFLES FOR ATRIUM WINDOWS SO THAT SPRINKLERS COULD BE INSTALLED IN ACCORDANCE WITH NFPA-13. |
| Mod SA709· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-29 | +$9,263 | $395,686,714 | TO PROVIDE TROUGH STYLE DRAINS, IN THE MECHANICAL ROOMS, TO MINIMIZE SPLASHING. |
| Mod SA710· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-29 | +$99,000 | $395,785,714 | PROVIDE NEW TRANSIENT VOLTAGE SURGE SUPPRESSORS (TVSS) FOR THE CUP AND CLC UNIT SUBSTATIONS, MEETING UL96A, SO… |
| Mod SA711· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-29 | +$12,189 | $395,797,903 | TO PROVIDE POWER AND A RACEWAY FOR THE STERILIZER DETERGENT DISPENSING SYSTEM IN SPD. THE CONTRACT DOCUMENT D… |
| Mod SA712· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-06-29 | −$25,000 | $395,772,903 | TO DELETE LEAD/LAG CONTROL SEQUENCE AS REQUESTED BY VAMC TO SATISFY VISN MANDATES. |
| Mod SA676· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-07-06 | +$616,754 | $396,389,657 | TO EXTEND THE GLASS HANDRAIL ASSEMBLY AT THE CLERSTORY, LEVEL 2 AND 3, TO 84" AFF. |
| Mod SA714· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-07-17 | +$13,600 | $396,403,257 | TO PROVIDE AUTOMATIC CONTROLS FOR THE REFRIGERATION CONDENSER WATER SYSTEM. |
| Mod SA716· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-07-17 | +$22,779 | $396,426,036 | TO PROVIDE A SINK AND PLASTER TRAP IN ROOM 1B247. |
| Mod SA717· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-07-17 | +$10,000 | $396,436,036 | TO PROVIDE PROPER CONTROLS FOR THE STAIR PRESSURIZATION SYSTEM. |
| Mod SA718· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-07-17 | +$6,468 | $396,442,504 | TO PROVIDE VENT PIPING FOR THE CONDENSATE COOLER SERVING HUMIDIFIER DSH-DT-1. |
| Mod SA719· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-07-19 | +$23,658 | $396,466,162 | TO PROVIDE ADDITIONAL INSULATION AND REVISE DUCTWORK IN BE101, IN TO REDUCE EXCESSIVE AMBIENT TEMPERATURE. |
| Mod SA713· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-07-20 | +$88,000 | $396,554,162 | TO REVISE THE EXISTING CONTRACT SPECIFIED PACS CARD READERS TO BE COMPATIBLE WITH THE HSPD-12 PIV II CREDENTIA… |
| Mod SA720· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-07-23 | +$40,000 | $396,594,162 | TO CLOSE THE GAP BETWEEN THE SLAB GAP AND THE EXTERIOR WINDOW ASSEMBLY. |
| Mod SA721· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-07-23 | +$41,000 | $396,635,162 | TO MODIFY THE JAMB DETAIL AT THE LOADING DOCK OVERHEAD DOORS SINCE THE CONTRACT DRAWINGS DID NOT SHOW THE CORR… |
| Mod SA722· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-07-23 | +$17,658 | $396,652,820 | TO MODIFY THE WIDTH OF THE 2-HR PARTITION IN ORDER TO ACCOMMODATE THE MED GAS PIPING AT VARIOUS LOCATIONS. |
| Mod SA723· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-07-23 | +$32,079 | $396,684,899 | TO INSTALL SIX (6) ADDITIONAL EXTERIOR SIGNS AT THE LOOP ROAD TO ENHANCE THE WAYFINDING. |
| Mod SA724· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-07-23 | +$14,691 | $396,699,590 | TO INSTALL THE CEILING MOUNTING PLATES FOR THE IMAGING EQUIPMENT IN ROOMS 1D244 AND 1D252. |
| Mod SA725· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-07-23 | +$86,820 | $396,786,410 | TO PROVIDE ADDITIONAL INTERIOR SIGNAGE AS A RESULT OF THE SUBMITTAL REVIEW. |
| Mod SA729· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-07-24 | +$25,000 | $396,811,410 | TO MODIFY THE EDGE OF SLAB AT LEVELS 2 AND 4 DUE TO CONFLICTS BETWEEN THE ARCHITECTURAL AND STRUCTURAL DRAWING… |
| Mod SA730· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-07-24 | +$6,882 | $396,818,292 | TO PROVIDE INTERCHANGEABLE CORE CYLINDERS FOR THE HORIZONTAL FIRE SHUTTERS SINCE THE SPECIFIATION DID NO PROVI… |
| Mod SA715· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-07-25 | +$15,000 | $396,833,292 | TO PROVIDE MEANS TO ACTIVATE THE EXHAUST SYSTEM, SHOULD THERE BE A HELIUM LEAK FROM MRI. |
| Mod SA726· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-07-25 | +$75,092 | $396,908,384 | TO MODIFY THE SCREEN WALL SUPPORTS AT LEVEL 7, EAST TO ACCOMMODATE THE DUCTWORK AND WIND LOADS. |
| Mod SA727· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-07-25 | +$15,526 | $396,923,910 | TO PROVIDE MED GASES FOR THREE (3) BIOHAZARD SAFETY CABINETS. |
| Mod SA728· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-07-27 | +$74,908 | $396,998,818 | TO MODIFY THE SCREEN WALL SUPPORTS AT LEVEL 7, WEST TO ACCOMMODATE THE DUCTWORK AND WIND LOADS. |
| Mod SA733· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-07-27 | +$2,000 | $397,000,818 | TO PROVIDE CORRECTLY SIZED TERMINAL UNITS AND EXHAUST GRILLES. |
| Mod SA734· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-07-27 | +$11,000 | $397,011,818 | TO PROVIDE PROPERLY SIZED STEAM FLOW METERS. |
| Mod SA735· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-07-31 | +$7,810 | $397,019,628 | TO STRIPE AND REFLECTORS ALONG THE LOOP ROAD SINCE IT WAS NOT SHOWN ON THE CONTRACT DRAWINGS. |
| Mod SA736· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-07-31 | +$12,250 | $397,031,878 | TO RELOCATE STEAM PIPING FOR DOMESTIC WATER HEATERS DWH-9 AND -10. |
| Mod SA737· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-07-31 | +$7,500 | $397,039,378 | TO PROVIDE A PURE WATER KIT TO ALLOW FOR USE OF RO WATER IN THE FINAL RINSE. |
| Mod SA738· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-07-31 | +$3,300 | $397,042,678 | PROVIDE A SMOKE DETECTOR AND FIRE ALARM RELAY THAT WAS OMITTED FROM THE CONTRACT DRAWINGS. |
| Mod SA739· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-07-31 | +$20,221 | $397,062,899 | TO MODIFY THE VERTICAL EXPANSION JOINT ALONG 5.5 AND 16.2 FROM 6" TO 4". |
| Mod SA740· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-08-01 | +$16,953 | $397,079,852 | TO PROVIDE CORRECTLY SIZED LOW TEMPERATURE HOT WATER PIPES TO AIR HANDLERS 2AHU-5 AND -6. |
| Mod SA743· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-08-09 | +$3,178 | $397,083,030 | TO BALANCE THE AIRFLOW IN THE LAB TO ACCOMMODATE THE BIOHAZARD SAFETY CABINETS. |
| Mod SA741· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-08-10 | +$25,495 | $397,108,525 | PROVIDE CONDUIT AND WIRING AS REQUIRED BY NALCO BOILER CHEMICAL FEED SYSTEM. |
| Mod SA742· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-08-10 | +$52,101 | $397,160,626 | TO PROVIDE MISCELLANEOUS ELECTRICAL CORRECTIONS IN ORDER TO ACCOMODATE UTILITY REQUIREMENTS FOR GOVERNMENT FUR… |
| Mod SA744· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-08-10 | +$0 | $397,160,626 | TO PROVIDE A COUPON RACK FOR THE LTHW SYSTEM IN THE CENTRAL PLANT. |
| Mod SA745· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-08-10 | +$2,532 | $397,163,158 | TO EXTEND A CHASE IN ROOM 3D392 BY 22 INCHES. |
| Mod SA747· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-08-13 | +$15,000 | $397,178,158 | TO PROVIDE A TRENCH FOR THE NATURAL GAS TIE-IN TO THE MEDICAL CENTER. |
| Mod SA748· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-08-13 | +$66,000 | $397,244,158 | TO MODIFY THE PARAPET FLASHING/ROOFING DETAIL AT ALL ROOF LEVELS DUE TO WARRANTY CONCERNS. |
| Mod SA746· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-08-14 | +$17,101 | $397,261,259 | TO PROVIDE MISCELLANEOUS ELECTRICAL CORRECTIONS IN ORDER TO ACCOMMODATE UTILITY REQUIREMENTS FOR GOVERNMENT FU… |
| Mod SA670· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-09-05 | +$988,367 | $398,249,626 | TO MODIFY THE MENTAL HEALTH CLINIC TO COMPLY WITH THE REQUIREMENTS OF THE DECEMBER 2010 DESIGN GUIDE. |
| Mod SA731· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-09-10 | +$60,000 | $398,309,626 | TO RECONFIGURE THE CONDENSER PUMP SUCTION PIPING IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATION. |
| Mod SA732· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-09-10 | +$105,000 | $398,414,626 | TO PROVIDE CIRCUIT SETTER VALVES FOR ALL CRAC AND FAN COIL UNITS AND UNIT HEATERS. |
| Mod SA751· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-09-27 | +$33,000 | $398,447,626 | SEPARATE FIRE STORAGE FROM POTABLE STORAGE BY CONNECTING INDUSTRIAL WATER LINES TO TANK 1 AND DOMESTIC WATER L… |
| Mod SA749· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-10-01 | +$5,700 | $398,453,326 | TO PROVIDE CIRCUIT SETTER VALVES TO BALANCE THE FLOW OF DOMESTIC HOT WATER ON LEVELS 3, 5, AND 6. |
| Mod SA752· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-10-01 | +$16,720 | $398,470,046 | TO MODIFY THE CONTRACT REQUIRED IRRIGATION SYSTEM AT COURTYARD 2 TO PROVIDE ADEQUATE COVERAGE. |
| Mod SA753· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-10-01 | +$32,375 | $398,502,421 | TO PROVIDE POWER TO COMBINATION CLOSER-HOLDER AR VARIOUS LOCATIONS THROUGHOUT THE MEDICAL CENTER SINCE THEY WE… |
| Mod SA754· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-10-01 | +$22,177 | $398,524,598 | TO ADD AND MODIFY DOWNSPOUTS TO THE WALKWAY CANOPIES. |
| Mod SA755· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-10-01 | +$54,991 | $398,579,589 | TO MODIFY THE WOOD SLOT CEILING SUPPORTS AT THE NE AND NW VESTIBULE RECEPTION COUNTER. |
| Mod SA756· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-10-01 | +$80,466 | $398,660,055 | TO CHANGE THE TRESPA PANEL COLOR AT ALL ENTRY VESTIBULES TO MATCH THE PANEL COLOR OF THE ADJACENT WING PANEL C… |
| Mod SA757· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-10-01 | +$10,434 | $398,670,489 | TO PROVIDE A LATCH/BOLT FOR THE EXAM ROOM DOORS ADJACENT TO NURSE STATION (ROOM 1A153). |
| Mod SA758· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-10-01 | +$10,730 | $398,681,219 | TO REPLACE PHOTOLUMINESCENT EXIT SIGNS WITH A TYPE OR TYPES THAT DO NOT CONTAIN RADIOACTIVE MATERIALS. |
| Mod SA760· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-10-01 | +$27,378 | $398,708,597 | TO PROVIDE A FEEDER THAT IS ADEQUATELY SIZED FOR MRI. |
| Mod SA761· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-10-01 | +$22,168 | $398,730,765 | TO MODIFY UTILITIES FOR THE NEW EQUIPMENT IN LAB ROOM 2D326. THE MEDICAL CENTER CHANGED THE EQUIPMENT VENDOR… |
| Mod SA762· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-10-01 | +$21,900 | $398,752,665 | TO PROVIDE ADDITIONAL VERTICAL SUPPORTS FOR THE SCREEN WALL PANELS AT LEVEL 4 AND 7. THE SCREEN WALL DETAILS… |
| Mod SA763· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-10-01 | +$38,130 | $398,790,795 | TO ADD/MODIFY UTILITIES FOR UNDERCOUNTER GLASSWARE WASHER IN ROOM 1D341. |
| Mod SA764· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-10-01 | +$16,066 | $398,806,861 | TO INSTALL A PASS-THROUGH WINDOW IN SPD. THE CONTRACT DRAWINGS WERE NOT CONSISTENT IN THE TYPE OF WINDOW TO… |
| Mod SA765· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-10-01 | +$27,677 | $398,834,538 | TO REVISE CANTEEN UTILITY CONNECTIONS IN ORDER TO ACCOMODATE EQUIPMENT PURCHASED BY THE MEDICAL CENTER. |
| Mod SA766· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-10-01 | +$29,884 | $398,864,422 | TO PROVIDE CHANGES TO THE PHARMACY SECURITY/ACCESS CONTROL AS REQUESTED BY THE MEDICAL CENTER, SO THAT THE PHA… |
| Mod SA767· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-10-01 | +$5,312 | $398,869,734 | TO PROVIDE ADDITIONAL 120V. ELECTRICAL OUTLETS TO ACCOMODATE EQUIPMENT PURCHASED BY THE MEDICAL CENTER, NOT OR… |
| Mod SA768· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-10-01 | +$1,369 | $398,871,103 | TO REPROGRAM THE FIRE ALARM MONITORING SYSTEM TO REPORT/DIAL NEW FIRE ALARM MONITORING COMPANY. |
| Mod SA769· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-10-01 | +$7,000 | $398,878,103 | TO PROVIDE ACCESS TO THE CHILLED WATER FLOW METER IN THE MENTAL HEALTH WING. |
| Mod SA770· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-10-01 | +$9,812 | $398,887,915 | TO PROVIDE MISCELLANEOUS ELECTRICAL CORRECTIONS IN ORDER TO ACCOMMODATE UTILITY REQUIREMENTS FOR GOVERNMENT FU… |
| Mod SA771· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-10-01 | +$2,029 | $398,889,944 | TO PROVIDE THE REQUIRED DEVICES SO THAT THE SECURITY SYSTEM OPERATES AS DESIGNED. |
| Mod SA772· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-10-01 | +$2,401 | $398,892,345 | TO PROVIDE COVERS FOR UNUSED PENETRATIONS FOR SAFETY PURPOSES. |
| Mod SA759· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-10-09 | +$28,237 | $398,920,582 | TO REVISE THE EXISTING CHILLED WATER SYSTEM SEQUENCE. |
| Mod SA773· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-10-11 | +$20,000 | $398,940,582 | TO PROVIDE COVERS FOR INSTALLATION OF FOUR BACK PRESSURE REGULATORS FOR THE FLASH TANKS IN RFI-1813. |
| Mod SA774· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-10-11 | +$25,000 | $398,965,582 | TO PROVIDE FOR WORK FOR ADDITIONAL MECHANICAL ROOM INSULATION. |
| Mod SA775· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-10-11 | +$31,623 | $398,997,205 | TO PROVIDE FOR WORK TO PROVIDE DRAINS AND FILTERED WATER FIR COUNTER MOUNTED ICE MAKERS. |
| Mod SA776· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-10-11 | +$12,648 | $399,009,853 | TO PROVIDE FOR WORK TO MODIFY FLOOR MOUNTED DORR CLOSURES AT COURTYARD 2, PROVIDE SPARE SECURITY POE SWITCHES,… |
| Mod SA777· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-10-30 | +$14,801 | $399,024,654 | TO PROVIDE FOR FOR BOILER COMBUSTION AIR FOR THE VENTILATION SYSTEM. |
| Mod SA750· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-11-01 | +$61,600 | $399,086,254 | THIS SUPPLEMENTAL AGREEMENT DEFINITIZES CO-09P THAT WAS ISSUED ON 5/6/2011 TO CHANGE THE PARAPET HEIGHTS AT L4… |
| Mod SA778· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-11-06 | +$67,263 | $399,153,517 | TO PROVIDE FOR THE WORK TO LEVEL THE CONCRETE FLOOR AT THE DOOR OPENINGS THROUGHOUT THE NEW MEDICAL CENTER. |
| Mod SA779· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-11-06 | +$13,500 | $399,167,017 | TO PROVIDE FOR THE WORK TO REPLACE THE FLOOR DRAINS IN STERILIZERS EQUIPMENT CLOSET IN SPD-ROOM 2D448. |
| Mod SA780· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-11-13 | +$28,976 | $399,195,993 | TO PROVIDE FOR MISCELLANEOUS ELECTRICAL CORRECTIONS IN ORDER TO ACCOMMODATE UTILITY REQUIREMENTS FOR GOVERNMEN… |
| Mod SA781· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-12-27 | +$17,919 | $399,213,912 | TO PROVIDE FOR NECESSARY POWER AND DATA TO THE ELECTRONIC MESSAGE CENTER AT THE MAIN ENTRANCE OF THE VAMC LAS… |
| Mod SA783· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-01-25 | +$21,000 | $399,234,912 | CRITICAL FUNCTION: FURNISH ALL LABOR AND MATERIAL NECESSARY TO ASSIST IN THE INSTALLATION OF THE MRI ROOM 1D26… |
| Mod SA784· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-01-25 | +$81,564 | $399,316,476 | CRITICAL FUNCTION: FURNISH LABOR AND MATERIAL TO MODIFY THE UTILITY AND LAYOUT FOR THE MRI EQUIPMENT ROOM 1D26… |
| Mod SA782· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-01-28 | +$22,766 | $399,339,242 | TO PROVIDE FOR LABOR AND MATERIALS TO PROVIDE ISOLATION RELAYS TO RUSSELECTRIC AUTOMATIC TRANSFER SWITCHES LOC… |
| Mod SA785· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-01-28 | +$78,737 | $399,417,979 | CRITICAL FUNCTION: FURNISH LABOR AND MATERIAL TO MODIFY VATIOUS SYSTEMS FOR THE MENTAL HEALTH UNIT AT THE VAMC… |
| Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-09-21 | −$143,228 | $399,274,751 | THIS ADMINISTRATIVE CHANGE IS TO DEOBLIGATE $143,228.01 THAT WERE OBLIGATED IN ERROR. |
| Mod P0004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-12-20 | +$0 | $399,274,751 | THIS ADMINISTRATIVE CHANGE IS TO EXTEND FUNDING TO SEPTEMBER 30, 2018. |
| Mod P00005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-05-24 | −$342,072 | $398,932,679 | THIS MODIFICATION SHALL BE DEEMED A FULL RELEASE AND WAIVER BY THE VA FOR CLARK/HUNT JV, SAFECO (LIBERTY MUTUA… |
Related awards · 5
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other recipients under Y141 from OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA101CFMC0168 | WALSH'DEMARIA JOINT VENTURE V | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | $126,493,873 | FY2011 |
| VA101CFMC0100 | KIEWIT-TURNER A JOINT VENTURE | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | $678,462,349 | FY2010 |
| VA101CFMC0206 | BRASFIELD & GORRIE LLC | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | $318,479,500 | FY2010 |
| VA101CFMC0205 | JAMES A. CUMMINGS, INC. | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | $41,922,305 | FY2010 |
| VA101183B4C0007 | WALSH DEMARIA JOINT VENTURE IV | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) | $4,033,647 | FY2008 |