Description
IDIQ CONTRACT: PROVIDE 20 ADDITIONAL CONSTRUCTION SITE VISITS AT SAN JOAQUIN VALLEY NATIONAL CEMETERY.
Base award description: IDIQ: CONTRACTO SHALL PREPARE, SUBMIT AND OBTAIN A PERMIT APPLICATION PACKAGE TO THE STATE OF CALIFORNIA TO COMPLY WITH THE EPA RULES AND REGULATIOSN FOR A STORM WATER DISCHARGE GENERAL PERMIT AT SAN JOAQUIN VALLEY NATIONAL CEMETERY.
Modification chain · 4 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2009-05-21+$2,993= $2,993
- Mod SA22009-10-07+$375= $3,368
- Mod SA32010-01-13+$17,070= $20,438
- Mod SA42010-09-24+$27,621= $48,059
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2009-05-21 | +$2,993 | $2,993 | IDIQ: CONTRACTO SHALL PREPARE, SUBMIT AND OBTAIN A PERMIT APPLICATION PACKAGE TO THE STATE OF CALIFORNIA TO CO… |
| Mod SA2· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-10-07 | +$375 | $3,368 | IDIQ CONTRACT - REIMBURSEMENT FOR THE PERMIT APPLICATION FEE CHARGED BY THE CALIFORNIA STATE WATER RESOURCES C… |
| Mod SA3· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-01-13 | +$17,070 | $20,438 | IDIQ CONTRACT FOR AE SERVICES FOR DEPT OF VETERANS AFFAIRS, NATIONAL CEMETERY ADMINISTRATION. BASE + 4 OPTION… |
| Mod SA4· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-24 | +$27,621 | $48,059 | IDIQ CONTRACT: PROVIDE 20 ADDITIONAL CONSTRUCTION SITE VISITS AT SAN JOAQUIN VALLEY NATIONAL CEMETERY. |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI X852ZBNHTCY9)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| V908Z10001 | NATIONAL CEMETERY ADMINISTRATION · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $16,570 | FY2011 |
| V833Z10001 | NATIONAL CEMETERY ADMINISTRATION · C219 · OTHER ARCHITECTS & ENGIN GEN | $143,403 | FY2011 |
| VA846J15534 | NATIONAL CEMETERY ADMINISTRATION · C211 · A/E SVCS. (INCL LANDSCAPING INTERIO | $9,000 | FY2011 |
| V851Z10001 | NATIONAL CEMETERY ADMINISTRATION · C211 · A/E SVCS. (INCL LANDSCAPING INTERIO | $4,611 | FY2011 |
| V906Z00004 | NATIONAL CEMETERY ADMINISTRATION · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $25,048 | FY2011 |
| V870Z10001 | NATIONAL CEMETERY ADMINISTRATION · C211 · A/E SVCS. (INCL LANDSCAPING INTERIO | $381,687 | FY2011 |
Other recipients under C219 from NATIONAL CEMETERY ADMINISTRATION (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA101F16J0053 | LEO A. DALY LLC | NATIONAL CEMETERY ADMINISTRATION | $924,283 | FY2016 |
| VA786A16C0002 | SMITHGROUP, INC. | NATIONAL CEMETERY ADMINISTRATION | $96,815 | FY2016 |
| V876Z50001 | FOURFRONT DESIGN INC | NATIONAL CEMETERY ADMINISTRATION | $479,058 | FY2015 |
| V927Z50001 | FOURFRONT DESIGN INC | NATIONAL CEMETERY ADMINISTRATION | $244,998 | FY2015 |
| V885Z50001 | MTR LANDSCAPE ARCHITECTS, LLC | NATIONAL CEMETERY ADMINISTRATION | $227,466 | FY2015 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_V913Z90032_3600_VA786AP0082_3600 · retrieved 2026-09-26.