Description
IDIQ - PREPARE CONSTRUCTION INSPECTION AND CONSTRUCTION PERIOD SERVICES NEEDED TO CONVERT THE EXISTING TRADITIONAL BURIAL SPACE TO 2,500 PRE-PLACED CRYPTS AT CAMP NELSON NATIONAL CEMETERY.
Modification chain · 1 transaction
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2011-02-02+$143,403= $143,403
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2011-02-02 | +$143,403 | $143,403 | IDIQ - PREPARE CONSTRUCTION INSPECTION AND CONSTRUCTION PERIOD SERVICES NEEDED TO CONVERT THE EXISTING TRADITI… |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI X852ZBNHTCY9)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| V908Z10001 | NATIONAL CEMETERY ADMINISTRATION · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $16,570 | FY2011 |
| VA846J15534 | NATIONAL CEMETERY ADMINISTRATION · C211 · A/E SVCS. (INCL LANDSCAPING INTERIO | $9,000 | FY2011 |
| V851Z10001 | NATIONAL CEMETERY ADMINISTRATION · C211 · A/E SVCS. (INCL LANDSCAPING INTERIO | $4,611 | FY2011 |
| V906Z00004 | NATIONAL CEMETERY ADMINISTRATION · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $25,048 | FY2011 |
| V870Z10001 | NATIONAL CEMETERY ADMINISTRATION · C211 · A/E SVCS. (INCL LANDSCAPING INTERIO | $381,687 | FY2011 |
| V870Z00004 | NATIONAL CEMETERY ADMINISTRATION · C211 · A/E SVCS. (INCL LANDSCAPING INTERIO | $458,078 | FY2011 |
Other recipients under C219 from NATIONAL CEMETERY ADMINISTRATION (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA101F16J0053 | LEO A. DALY LLC | NATIONAL CEMETERY ADMINISTRATION | $924,283 | FY2016 |
| VA786A16C0002 | SMITHGROUP, INC. | NATIONAL CEMETERY ADMINISTRATION | $96,815 | FY2016 |
| V876Z50001 | FOURFRONT DESIGN INC | NATIONAL CEMETERY ADMINISTRATION | $479,058 | FY2015 |
| V927Z50001 | FOURFRONT DESIGN INC | NATIONAL CEMETERY ADMINISTRATION | $244,998 | FY2015 |
| V885Z50001 | MTR LANDSCAPE ARCHITECTS, LLC | NATIONAL CEMETERY ADMINISTRATION | $227,466 | FY2015 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_V833Z10001_3600_VA786AP0082_3600 · retrieved 2026-09-26.