LOUISIANA NATIONAL CEMETERY: CREDIT
Base award description: IGF::OT::IGF THE CONTRACTOR SHALL CONSTRUCT THE ADMINISTRATION/PUBLIC INFORMATION CENTER BUILDING, COMMITTAL SHELTER(S), 1 COLUMBARIA, FLAG ASSEMBLY AREA, IRRIGATION SYSTEM (INCLUDING BOOSTER PUMP REPLACEMENT) ALONG WITH ASSOCIATED ROADWAYS, WALKS, UTILITIES, RESTORATION, PLANTING, IRRIGATION AND OTHER IMPROVEMENTS AS DEPICTED IN THE SOW AND SPECIFICATIONS. CONTRACTOR SHALL CONSTRUCT MEMORIAL WALLS ALONG WITH ADJACENT SIDEWALKS, UTILITY AND ASSOCIATED IMPROVEMENTS. CONSTRUCT MEMORIAL WALK ALONG WITH ADJACENT UTILITIES AND ASSOCIATED IMPROVEMENTS. CONSTRUCT IMPROVEMENTS TO SALVANT ROAD, INCLUDING MINOR GRADING, GRAVEL PLACEMENT AND BITUMINOUS PAVING AND RESTORATION FOR LOUISIANA NATIONAL CEMETERY.
Modification chain · 26 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2018-09-06+$5,777,944= $5,777,944
- Mod P000012019-01-24+$0= $5,777,944
- Mod P000022019-03-05+$22,581= $5,800,525
- Mod P000032019-04-02+$98,956= $5,899,481
- Mod P000042019-07-12+$132,689= $6,032,169
- Mod P000052019-11-25+$10,332= $6,042,501
- Mod P000062019-11-26+$0= $6,042,501
- Mod P000072019-12-18+$4,235= $6,046,736
- Mod P000082020-02-12+$0= $6,046,736
- Mod P000092020-04-27+$0= $6,046,736
- Mod P000102020-06-16+$13,661= $6,060,397
- Mod P000122020-07-27+$0= $6,060,397
- Mod P000112020-07-28+$2,925= $6,063,322
- Mod P000132020-09-09+$0= $6,063,322
- Mod P000142020-09-11+$740= $6,064,062
- Mod P000152020-10-16+$0= $6,064,062
- Mod P000162020-11-10+$0= $6,064,062
- Mod P000172020-11-20+$0= $6,064,062
- Mod P000182021-03-10+$0= $6,064,062
- Mod P000192021-06-08+$0= $6,064,062
- Mod P000202021-06-09+$0= $6,064,062
- Mod P000212021-08-09+$7,086= $6,071,148
- Mod P000222021-08-19+$0= $6,071,148
- Mod P000232021-10-23+$0= $6,071,148
- Mod P000242022-08-17+$0= $6,071,148
- Mod P000252022-08-17-$410= $6,070,738
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2018-09-06 | +$5,777,944 | $5,777,944 | IGF::OT::IGF THE CONTRACTOR SHALL CONSTRUCT THE ADMINISTRATION/PUBLIC INFORMATION CENTER BUILDING, COMMITTAL S… |
| Mod P00001· OTHER ADMINISTRATIVE ACTION | 2019-01-24 | +$0 | $5,777,944 | IGF::OT::IGF A TIME EXTENSION FOR WEATHER DELAYS AT LOUISIANA NATIONAL CEMETERY. |
| Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-03-05 | +$22,581 | $5,800,525 | IGF::OT::IGF THE CONTRACTOR SHALL PROVIDE A 3-SIDED PREFAB METAL BUILDING, APPROXIMATELY 27' X 80' AT LOUISIAN… |
| Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-04-02 | +$98,956 | $5,899,481 | UNFORESEEN SITE CONDITION&POP EXTENSION - THE CONTRACTOR SHALL PROVIDE A 3-SIDED PREFAB METAL BUILDING, APPROX… |
| Mod P00004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-07-12 | +$132,689 | $6,032,169 | UNFORESEEN SITE CONDITION&POP EXTENSION - THE CONTRACTOR SHALL PROVIDE A 3-SIDED PREFAB METAL BUILDING, APPROX… |
| Mod P00005· CHANGE ORDER | 2019-11-25 | +$10,332 | $6,042,501 | LOUISIANA NATIONAL CEMETERY: IRRIGATION RELOCATION |
| Mod P00006· OTHER ADMINISTRATIVE ACTION | 2019-11-26 | +$0 | $6,042,501 | LOUISIANA NATIONAL CEMETERY: CONTRACT EXTENSION DUE TO RAIN DELAYS. ADDITIONAL 59 DAYS |
| Mod P00007· CHANGE ORDER | 2019-12-18 | +$4,235 | $6,046,736 | LOUISIANA NATIONAL CEMETERY: BOUNDARY SURVEY |
| Mod P00008· OTHER ADMINISTRATIVE ACTION | 2020-02-12 | +$0 | $6,046,736 | LOUISIANA NATIONAL CEMETERY: NO COST TIME EXTENSION (18 DAYS) DUE TO RAIN DELAYS. |
| Mod P00009· CHANGE ORDER | 2020-04-27 | +$0 | $6,046,736 | LOUISIANA NATIONAL CEMETERY: NO COST TIME EXTENSION (24 DAYS) DUE TO RAIN DELAYS. |
| Mod P00010· CHANGE ORDER | 2020-06-16 | +$13,661 | $6,060,397 | LOUISIANA NATIONAL CEMETERY: CORRECT MEMORIAL WALL DISCREPANCIES |
| Mod P00012· OTHER ADMINISTRATIVE ACTION | 2020-07-27 | +$0 | $6,060,397 | LOUISIANA NATIONAL CEMETERY: NO COST TIME EXTENSION |
| Mod P00011· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED) | 2020-07-28 | +$2,925 | $6,063,322 | LOUISIANA NATIONAL CEMETERY: HOT WATER TANK |
| Mod P00013· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED) | 2020-09-09 | +$0 | $6,063,322 | LOUISIANA NATIONAL CEMETERY: NO COST TIME EXTENSION |
| Mod P00014· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED) | 2020-09-11 | +$740 | $6,064,062 | LOUISIANA NATIONAL CEMETERY: UTILITIES FEES |
| Mod P00015· OTHER ADMINISTRATIVE ACTION | 2020-10-16 | +$0 | $6,064,062 | LOUISIANA NATIONAL CEMETERY: NO COST TIME EXTENSION |
| Mod P00016· OTHER ADMINISTRATIVE ACTION | 2020-11-10 | +$0 | $6,064,062 | LOUISIANA NATIONAL CEMETERY: NO COST TIME EXTENSION |
| Mod P00017· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED) | 2020-11-20 | +$0 | $6,064,062 | LOUISIANA NATIONAL CEMETERY: NO COST TIME EXTENSION |
| Mod P00018· OTHER ADMINISTRATIVE ACTION | 2021-03-10 | +$0 | $6,064,062 | LOUISIANA NATIONAL CEMETERY: NO COST TIME EXTENSION |
| Mod P00019· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED) | 2021-06-08 | +$0 | $6,064,062 | LOUISIANA NATIONAL CEMETERY: NO COST TIME EXTENSION |
| Mod P00020· OTHER ADMINISTRATIVE ACTION | 2021-06-09 | +$0 | $6,064,062 | LOUISIANA NATIONAL CEMETERY: NO COST TIME EXTENSION |
| Mod P00021· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED) | 2021-08-09 | +$7,086 | $6,071,148 | LOUISIANA NATIONAL CEMETERY: ADDITIONAL WORK AND CREDITS TO HE GOV'T |
| Mod P00022· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED) | 2021-08-19 | +$0 | $6,071,148 | LOUISIANA NATIONAL CEMETERY: NO COST TIME EXTENSION |
| Mod P00023· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED) | 2021-10-23 | +$0 | $6,071,148 | LOUISIANA NATIONAL CEMETERY: NO COST TIME EXTENSION |
| Mod P00024· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED) | 2022-08-17 | +$0 | $6,071,148 | LOUISIANA NATIONAL CEMETERY: NO COST TIME EXTENSION |
| Mod P00025· ADDITIONAL WORK (NEW AGREEMENT, JUSTIFICATION REQUIRED) | 2022-08-17 | −$410 | $6,070,738 | LOUISIANA NATIONAL CEMETERY: CREDIT |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI MGGBMZVP2M17)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| VA70114C0027 | PCAC NATIONAL ENERGY BUSINESS CENTER (36E776) · Y1MZ · CONSTRUCTION OF EPG FACILITIES - OTHER, INCLUDING TRANSMISSION | $5,583,273 | FY2014 |
| VA25614C0079 | 256-NETWORK CONTRACT OFFICE 16 · Y1LZ · CONSTRUCTION OF PARKING FACILITIES | $1,437,027 | FY2014 |
| VA25714C0018 | 674-TEMPLE (00674) · Y1AA · CONSTRUCTION OF OFFICE BUILDINGS | $7,784,006 | FY2014 |
| VA25613C0228 | 256-NETWORK CONTRACT OFFICE 16 · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES | $2,371,321 | FY2013 |
| VA25613C0207 | 256-NETWORK CONTRACT OFFICE 16 · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES | $350,903 | FY2013 |
| VA25613C0198 | 256-NETWORK CONTRACT OFFICE 16 · Y1JZ · CONSTRUCTION OF MISCELLANEOUS BUILDINGS | $436,300 | FY2013 |
Other recipients under Y1AZ from NATIONAL CEMETERY ADMIN (36C786) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| 36C78626N0468 | IRON SWORD ENTERPRISES, LLC | NATIONAL CEMETERY ADMIN (36C786) | $7,800 | FY2026 |
| 36C78626C0020 | C & C CONTRACTORS LLC | NATIONAL CEMETERY ADMIN (36C786) | $31,145,450 | FY2026 |
| 36C78626N0428 | US DIVERSIFIED CONTRACTING SERVICES INC. | NATIONAL CEMETERY ADMIN (36C786) | $51,552 | FY2026 |
| 36C78626N0394 | VENERGY GROUP LLC | NATIONAL CEMETERY ADMIN (36C786) | $60,232 | FY2026 |
| 36C78626N0353 | DRI, INC. | NATIONAL CEMETERY ADMIN (36C786) | $176,980 | FY2026 |