Award recordCONTRACT

BOILER INSPECTION & ENGINEERING INC

PIID 36C24118P1685· VHA· 241-NETWORK CONTRACT OFFICE 01 (36C241)· H344 · INSPECTION- FURNACE, STEAM PLANT, AND DRYING EQUIPMENT; NUCLEAR REACTORS· FY2018· $2,342 net obligations· UEI MQ4KFN2NM1G5· CT

Description

BOILER PLANT INSPECTIONS AT WEST HAVEN AND NEWINGTON CAMPUSES.

First action · last action
2018-09-12 · 2020-05-26
Transactions
4
First transaction's obligation
$4,250
Base + all options value (sum of deltas)
$24,182
Extent competed
COMPETED UNDER SAP
Other than full & open authority
—
Set-aside
SMALL BUSINESS SET ASIDE - TOTAL
Offers received
4
SDVOSB flag on record
No
NAICS
811310 · COMMERCIAL AND INDUSTRIAL MACHINERY AND EQUIPMENT (EXCEPT AUTOMOTIVE AND ELECTRONIC) REPAIR AND MAINTENANCE

Modification chain · 4 transactions

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$11,210$0Base award · 2018-09-12 · this action $4,250 · running total $4,250Modification P00001 · 2019-09-05 · this action $6,960 · running total $11,210Modification P00002 · 2019-10-24 · this action -$3,500 · running total $7,710Modification P00003 · 2020-05-26 · this action -$5,368 · running total $2,342
  • Base2018-09-12+$4,250= $4,250
  • Mod P000012019-09-05+$6,960= $11,210
  • Mod P000022019-10-24-$3,500= $7,710
  • Mod P000032020-05-26-$5,368= $2,342
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2018-09-12+$4,250$4,250BOILER PLANT INSPECTIONS AT WEST HAVEN AND NEWINGTON CAMPUSES.
Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-09-05+$6,960$11,210BOILER PLANT INSPECTIONS AT WEST HAVEN AND NEWINGTON CAMPUSES.
Mod P00002· FUNDING ONLY ACTION2019-10-24−$3,500$7,710BOILER PLANT INSPECTIONS AT WEST HAVEN AND NEWINGTON CAMPUSES.
Mod P00003· FUNDING ONLY ACTION2020-05-26−$5,368$2,342BOILER PLANT INSPECTIONS AT WEST HAVEN AND NEWINGTON CAMPUSES.

Related awards · 7

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other VA awards to the same recipient (UEI MQ4KFN2NM1G5)

AwardOffice · PSC / listingNet obligationsFY
36C24118P0234241-NETWORK CONTRACT OFFICE 01 (36C241) · H141 · QUALITY CONTROL- REFRIGERATION, AIR CONDITIONING, AND AIR CIRCULATING EQUIPMENT$425FY2018
VA630C11260243-NETWORK CONTRACTING OFFICE 03 · H344 · INSPECT SVCS/FURNACE-NUCLEAR REAC$15,250FY2011
VA631C01067631-LEEDS · H245 · EQ TEST SVCS/PLUMBING-HEATING EQ$2,200FY2010
V00241P00826689-WEST HAVEN · J045 · MAINT-REP OF PLUMBING-HEATING EQ$11,940FY2008
V6308F3918243S-NETWORK CONTRACT OFFICE 03 SMALL PURCHASE · H399 · INSPECT SVCS/MISC EQ$2,825FY2008

Other recipients under H344 from 241-NETWORK CONTRACT OFFICE 01 (36C241) (most recent first)

AwardRecipientOfficeNet obligationsFY
VA24117F1754BOILER EFFICIENCY INSTITUTE, LLC241-NETWORK CONTRACT OFFICE 01 (36C241)$4,700FY2017
VA24113C0135DESTINATION ZERO, LLC241-NETWORK CONTRACT OFFICE 01 (36C241)$42,964FY2013

Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_36C24118P1685_3600_-NONE-_-NONE- · retrieved 2026-09-26.