Award recordCONTRACT

ECRMJV LLC

PIID 36C10F21C0011· VA Staff Offices· OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)· Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES· FY2021· $54,324,060 net obligations· UEI UU5ML2N1FWL5· FL

Description

MODIFICATION EXTEND PM ONSITE SUPPORT AND MOLD MONITORING SERVICES AT BAY PINES VAMC.

Base award description: RENOVATION OF BUILDING ONE

First action · last action
2021-07-28 · 2026-08-28
Transactions
99
First transaction's obligation
$41,332,664
Base + all options value (sum of deltas)
$54,328,790
Extent competed
FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
Other than full & open authority
—
Set-aside
SERVICE DISABLED VETERAN OWNED SMALL BUSINESS SET-ASIDE
Offers received
2
SDVOSB flag on record
Yes (self-representation)
NAICS
236220 · COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION

Modification chain · 99 transactions

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$54,324,060$0Base award · 2021-07-28 · this action $41,332,664 · running total $41,332,664Modification A00001 · 2022-01-25 · this action $15,000 · running total $41,347,664Modification A00002 · 2022-02-18 · this action $23,100 · running total $41,370,764Modification A00003 · 2022-02-18 · this action $2,214 · running total $41,372,978Modification A00004 · 2022-02-28 · this action $3,500 · running total $41,376,478Modification A00005 · 2022-03-14 · this action $47,000 · running total $41,423,478Modification A00006 · 2022-03-14 · this action $1,496 · running total $41,424,974Modification A00007 · 2022-03-17 · this action $68,600 · running total $41,493,574Modification A00008 · 2022-03-18 · this action $15,515 · running total $41,509,089Modification A00009 · 2022-04-04 · this action $5,479 · running total $41,514,568Modification A00010 · 2022-04-05 · this action $11,770 · running total $41,526,338Modification A00012 · 2022-04-05 · this action $13,000 · running total $41,539,338Modification A00011 · 2022-04-07 · this action $750 · running total $41,540,088Modification A00013 · 2022-05-10 · this action $5,432 · running total $41,545,520Modification A00014 · 2022-06-15 · this action $16,531 · running total $41,562,051Modification A00015 · 2022-08-09 · this action $14,768 · running total $41,576,819Modification A00016 · 2022-09-09 · this action $25,298 · running total $41,602,117Modification A00017 · 2022-09-14 · this action $29,675 · running total $41,631,792Modification A00021 · 2023-01-05 · this action $52,000 · running total $41,683,792Modification A00019 · 2023-01-23 · this action $38,889 · running total $41,722,681Modification A00022 · 2023-01-23 · this action $76,663 · running total $41,799,344Modification A00024 · 2023-02-03 · this action $71,621 · running total $41,870,965Modification A00018 · 2023-02-13 · this action $64,660 · running total $41,935,625Modification A00023 · 2023-03-01 · this action $49,032 · running total $41,984,657Modification A00025 · 2023-03-01 · this action $180 · running total $41,984,837Modification A00026 · 2023-03-01 · this action $45,460 · running total $42,030,297Modification A00028 · 2023-04-17 · this action $7,957 · running total $42,038,254Modification A00027 · 2023-04-19 · this action $11,017 · running total $42,049,271Modification A00030 · 2023-04-28 · this action $88,568 · running total $42,137,839Modification A00031 · 2023-04-28 · this action $22,476 · running total $42,160,315Modification A00032 · 2023-05-25 · this action $22,387 · running total $42,182,702Modification A00033 · 2023-05-25 · this action $7,618 · running total $42,190,320Modification A00034 · 2023-05-25 · this action $30,154 · running total $42,220,474Modification A00035 · 2023-05-25 · this action $10,711 · running total $42,231,185Modification P00036 · 2023-05-26 · this action $0 · running total $42,231,185Modification A00037 · 2024-03-01 · this action $22,825 · running total $42,254,010Modification A00042 · 2024-05-14 · this action $36,361 · running total $42,290,371Modification A00043 · 2024-05-14 · this action $10,197 · running total $42,300,568Modification A00040 · 2024-05-21 · this action $12,274 · running total $42,312,842Modification A00041 · 2024-05-21 · this action $6,801 · running total $42,319,643Modification A00039 · 2024-05-31 · this action $12,195 · running total $42,331,838Modification A00044 · 2024-06-13 · this action $3,421 · running total $42,335,259Modification P00049 · 2024-07-09 · this action $0 · running total $42,335,259Modification P00051 · 2024-07-29 · this action -$748 · running total $42,334,511Modification P00052 · 2024-08-01 · this action $271,889 · running total $42,606,401Modification A00047 · 2024-08-02 · this action $57,612 · running total $42,664,013Modification A00048 · 2024-08-02 · this action $24,403 · running total $42,688,416Modification A00045 · 2024-08-27 · this action $18,890 · running total $42,707,305Modification A00046 · 2024-09-27 · this action $218,809 · running total $42,926,114Modification A00050 · 2024-09-30 · this action $32,780 · running total $42,958,894Modification A00053 · 2024-11-12 · this action $3,010 · running total $42,961,905Modification P00055 · 2025-01-16 · this action $133,478 · running total $43,095,383Modification A00054 · 2025-01-21 · this action $83 · running total $43,095,465Modification P00056 · 2025-02-11 · this action $95,325 · running total $43,190,790Modification P00057 · 2025-02-13 · this action $81,447 · running total $43,272,237Modification A00058 · 2025-04-07 · this action $69,498 · running total $43,341,735Modification P00059 · 2025-05-02 · this action $304,247 · running total $43,645,982Modification P00062 · 2025-06-05 · this action $4,611,252 · running total $48,257,234Modification P00061 · 2025-06-09 · this action $1,006,208 · running total $49,263,442Modification P00063 · 2025-06-23 · this action $2,051,050 · running total $51,314,492Modification P00064 · 2025-06-26 · this action $268,433 · running total $51,582,924Modification A00060 · 2025-07-23 · this action $41,528 · running total $51,624,452Modification P00065 · 2025-07-30 · this action $420,750 · running total $52,045,202Modification A00066 · 2025-09-30 · this action $74,543 · running total $52,119,745Modification A00069 · 2025-09-30 · this action $53,678 · running total $52,173,423Modification A00071 · 2025-11-19 · this action $34,934 · running total $52,208,357Modification A00072 · 2025-12-18 · this action $36,429 · running total $52,244,786Modification P00067 · 2025-12-18 · this action $824,080 · running total $53,068,866Modification P00073 · 2025-12-18 · this action $46,449 · running total $53,115,316Modification P00074 · 2026-01-21 · this action $35,813 · running total $53,151,128Modification A00077 · 2026-01-23 · this action $28,449 · running total $53,179,578Modification P00076 · 2026-01-27 · this action $42,348 · running total $53,221,926Modification P00077 · 2026-01-28 · this action $44,711 · running total $53,266,636Modification P00078 · 2026-02-03 · this action $19,660 · running total $53,286,296Modification A00079 · 2026-02-11 · this action $28,461 · running total $53,314,758Modification P00079 · 2026-02-27 · this action $151,994 · running total $53,466,752Modification A00078 · 2026-03-10 · this action $18,316 · running total $53,485,068Modification A00082 · 2026-03-24 · this action $16,398 · running total $53,501,466Modification P00083 · 2026-04-01 · this action $12,379 · running total $53,513,845Modification P00080 · 2026-04-20 · this action $201,077 · running total $53,714,922Modification P00084 · 2026-04-20 · this action $16,559 · running total $53,731,481Modification A00084 · 2026-04-28 · this action $18,454 · running total $53,749,935Modification A00080 · 2026-05-05 · this action $21,614 · running total $53,771,549Modification A00086 · 2026-05-11 · this action $13,590 · running total $53,785,139Modification A00087 · 2026-05-19 · this action $53,880 · running total $53,839,019Modification A00085 · 2026-05-27 · this action $42,856 · running total $53,881,875Modification P00085 · 2026-06-02 · this action $34,790 · running total $53,916,665Modification P00086 · 2026-06-09 · this action $11,369 · running total $53,928,034Modification P00081 · 2026-06-10 · this action $25,671 · running total $53,953,705Modification A00088 · 2026-06-15 · this action $20,044 · running total $53,973,749Modification P00087 · 2026-06-16 · this action $26,864 · running total $54,000,613Modification P00089 · 2026-06-17 · this action $46,754 · running total $54,047,367Modification P00090 · 2026-06-25 · this action $14,868 · running total $54,062,235Modification P00092 · 2026-07-01 · this action $80,245 · running total $54,142,480Modification P00093 · 2026-07-01 · this action $5,291 · running total $54,147,771Modification A00094 · 2026-07-15 · this action $17,343 · running total $54,165,114Modification A00095 · 2026-07-23 · this action $6,993 · running total $54,172,107Modification P00096 · 2026-08-25 · this action $65,874 · running total $54,237,981Modification P00097 · 2026-08-28 · this action $86,079 · running total $54,324,060
  • Base2021-07-28+$41,332,664= $41,332,664
  • Mod A000012022-01-25+$15,000= $41,347,664
  • Mod A000022022-02-18+$23,100= $41,370,764
  • Mod A000032022-02-18+$2,214= $41,372,978
  • Mod A000042022-02-28+$3,500= $41,376,478
  • Mod A000052022-03-14+$47,000= $41,423,478
  • Mod A000062022-03-14+$1,496= $41,424,974
  • Mod A000072022-03-17+$68,600= $41,493,574
  • Mod A000082022-03-18+$15,515= $41,509,089
  • Mod A000092022-04-04+$5,479= $41,514,568
  • Mod A000102022-04-05+$11,770= $41,526,338
  • Mod A000122022-04-05+$13,000= $41,539,338
  • Mod A000112022-04-07+$750= $41,540,088
  • Mod A000132022-05-10+$5,432= $41,545,520
  • Mod A000142022-06-15+$16,531= $41,562,051
  • Mod A000152022-08-09+$14,768= $41,576,819
  • Mod A000162022-09-09+$25,298= $41,602,117
  • Mod A000172022-09-14+$29,675= $41,631,792
  • Mod A000212023-01-05+$52,000= $41,683,792
  • Mod A000192023-01-23+$38,889= $41,722,681
  • Mod A000222023-01-23+$76,663= $41,799,344
  • Mod A000242023-02-03+$71,621= $41,870,965
  • Mod A000182023-02-13+$64,660= $41,935,625
  • Mod A000232023-03-01+$49,032= $41,984,657
  • Mod A000252023-03-01+$180= $41,984,837
  • Mod A000262023-03-01+$45,460= $42,030,297
  • Mod A000282023-04-17+$7,957= $42,038,254
  • Mod A000272023-04-19+$11,017= $42,049,271
  • Mod A000302023-04-28+$88,568= $42,137,839
  • Mod A000312023-04-28+$22,476= $42,160,315
  • Mod A000322023-05-25+$22,387= $42,182,702
  • Mod A000332023-05-25+$7,618= $42,190,320
  • Mod A000342023-05-25+$30,154= $42,220,474
  • Mod A000352023-05-25+$10,711= $42,231,185
  • Mod P000362023-05-26+$0= $42,231,185
  • Mod A000372024-03-01+$22,825= $42,254,010
  • Mod A000422024-05-14+$36,361= $42,290,371
  • Mod A000432024-05-14+$10,197= $42,300,568
  • Mod A000402024-05-21+$12,274= $42,312,842
  • Mod A000412024-05-21+$6,801= $42,319,643
  • Mod A000392024-05-31+$12,195= $42,331,838
  • Mod A000442024-06-13+$3,421= $42,335,259
  • Mod P000492024-07-09+$0= $42,335,259
  • Mod P000512024-07-29-$748= $42,334,511
  • Mod P000522024-08-01+$271,889= $42,606,401
  • Mod A000472024-08-02+$57,612= $42,664,013
  • Mod A000482024-08-02+$24,403= $42,688,416
  • Mod A000452024-08-27+$18,890= $42,707,305
  • Mod A000462024-09-27+$218,809= $42,926,114
  • Mod A000502024-09-30+$32,780= $42,958,894
  • Mod A000532024-11-12+$3,010= $42,961,905
  • Mod P000552025-01-16+$133,478= $43,095,383
  • Mod A000542025-01-21+$83= $43,095,465
  • Mod P000562025-02-11+$95,325= $43,190,790
  • Mod P000572025-02-13+$81,447= $43,272,237
  • Mod A000582025-04-07+$69,498= $43,341,735
  • Mod P000592025-05-02+$304,247= $43,645,982
  • Mod P000622025-06-05+$4,611,252= $48,257,234
  • Mod P000612025-06-09+$1,006,208= $49,263,442
  • Mod P000632025-06-23+$2,051,050= $51,314,492
  • Mod P000642025-06-26+$268,433= $51,582,924
  • Mod A000602025-07-23+$41,528= $51,624,452
  • Mod P000652025-07-30+$420,750= $52,045,202
  • Mod A000662025-09-30+$74,543= $52,119,745
  • Mod A000692025-09-30+$53,678= $52,173,423
  • Mod A000712025-11-19+$34,934= $52,208,357
  • Mod A000722025-12-18+$36,429= $52,244,786
  • Mod P000672025-12-18+$824,080= $53,068,866
  • Mod P000732025-12-18+$46,449= $53,115,316
  • Mod P000742026-01-21+$35,813= $53,151,128
  • Mod A000772026-01-23+$28,449= $53,179,578
  • Mod P000762026-01-27+$42,348= $53,221,926
  • Mod P000772026-01-28+$44,711= $53,266,636
  • Mod P000782026-02-03+$19,660= $53,286,296
  • Mod A000792026-02-11+$28,461= $53,314,758
  • Mod P000792026-02-27+$151,994= $53,466,752
  • Mod A000782026-03-10+$18,316= $53,485,068
  • Mod A000822026-03-24+$16,398= $53,501,466
  • Mod P000832026-04-01+$12,379= $53,513,845
  • Mod P000802026-04-20+$201,077= $53,714,922
  • Mod P000842026-04-20+$16,559= $53,731,481
  • Mod A000842026-04-28+$18,454= $53,749,935
  • Mod A000802026-05-05+$21,614= $53,771,549
  • Mod A000862026-05-11+$13,590= $53,785,139
  • Mod A000872026-05-19+$53,880= $53,839,019
  • Mod A000852026-05-27+$42,856= $53,881,875
  • Mod P000852026-06-02+$34,790= $53,916,665
  • Mod P000862026-06-09+$11,369= $53,928,034
  • Mod P000812026-06-10+$25,671= $53,953,705
  • Mod A000882026-06-15+$20,044= $53,973,749
  • Mod P000872026-06-16+$26,864= $54,000,613
  • Mod P000892026-06-17+$46,754= $54,047,367
  • Mod P000902026-06-25+$14,868= $54,062,235
  • Mod P000922026-07-01+$80,245= $54,142,480
  • Mod P000932026-07-01+$5,291= $54,147,771
  • Mod A000942026-07-15+$17,343= $54,165,114
  • Mod A000952026-07-23+$6,993= $54,172,107
  • Mod P000962026-08-25+$65,874= $54,237,981
  • Mod P000972026-08-28+$86,079= $54,324,060
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2021-07-28+$41,332,664$41,332,664RENOVATION OF BUILDING ONE
Mod A00001· CHANGE ORDER2022-01-25+$15,000$41,347,664RENOVATION OF BUILDING ONE
Mod A00002· CHANGE ORDER2022-02-18+$23,100$41,370,764RENOVATION OF BUILDING ONE
Mod A00003· CHANGE ORDER2022-02-18+$2,214$41,372,978RENOVATION OF BUILDING ONE
Mod A00004· CHANGE ORDER2022-02-28+$3,500$41,376,478RENOVATION OF BUILDING ONE
Mod A00005· CHANGE ORDER2022-03-14+$47,000$41,423,478RENOVATION OF BUILDING ONE
Mod A00006· CHANGE ORDER2022-03-14+$1,496$41,424,974RENOVATION OF BUILDING ONE
Mod A00007· CHANGE ORDER2022-03-17+$68,600$41,493,574RENOVATION OF BUILDING ONE
Mod A00008· CHANGE ORDER2022-03-18+$15,515$41,509,089RENOVATION OF BUILDING ONE
Mod A00009· CHANGE ORDER2022-04-04+$5,479$41,514,568RENOVATION OF BUILDING ONE
Mod A00010· CHANGE ORDER2022-04-05+$11,770$41,526,338RENOVATION OF BUILDING ONE
Mod A00012· CHANGE ORDER2022-04-05+$13,000$41,539,338RENOVATION OF BUILDING ONE
Mod A00011· CHANGE ORDER2022-04-07+$750$41,540,088RENOVATION OF BUILDING ONE
Mod A00013· CHANGE ORDER2022-05-10+$5,432$41,545,520RENOVATION OF BUILDING ONE
Mod A00014· CHANGE ORDER2022-06-15+$16,531$41,562,051RENOVATION OF BUILDING ONE
Mod A00015· CHANGE ORDER2022-08-09+$14,768$41,576,819RENOVATION OF BUILDING ONE
Mod A00016· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2022-09-09+$25,298$41,602,117RENOVATION OF BUILDING ONE
Mod A00017· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2022-09-14+$29,675$41,631,792RENOVATION OF BUILDING ONE
Mod A00021· CHANGE ORDER2023-01-05+$52,000$41,683,792RENOVATION OF BUILDING ONE
Mod A00019· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2023-01-23+$38,889$41,722,681RENOVATION OF BUILDING ONE
Mod A00022· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2023-01-23+$76,663$41,799,344RENOVATION OF BUILDING ONE
Mod A00024· CHANGE ORDER2023-02-03+$71,621$41,870,965RENOVATION OF BUILDING ONE
Mod A00018· DEFINITIZE CHANGE ORDER2023-02-13+$64,660$41,935,625RENOVATION OF BUILDING ONE
Mod A00023· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2023-03-01+$49,032$41,984,657RENOVATION OF BUILDING ONE
Mod A00025· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2023-03-01+$180$41,984,837RENOVATION OF BUILDING ONE
Mod A00026· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2023-03-01+$45,460$42,030,297RENOVATION OF BUILDING ONE
Mod A00028· CHANGE ORDER2023-04-17+$7,957$42,038,254RENOVATION OF BUILDING ONE
Mod A00027· CHANGE ORDER2023-04-19+$11,017$42,049,271RENOVATION OF BUILDING ONE
Mod A00030· CHANGE ORDER2023-04-28+$88,568$42,137,839RENOVATION OF BUILDING ONE
Mod A00031· CHANGE ORDER2023-04-28+$22,476$42,160,315RENOVATION OF BUILDING ONE
Mod A00032· CHANGE ORDER2023-05-25+$22,387$42,182,702RENOVATION OF BUILDING ONE
Mod A00033· CHANGE ORDER2023-05-25+$7,618$42,190,320RENOVATION OF BUILDING ONE
Mod A00034· CHANGE ORDER2023-05-25+$30,154$42,220,474RENOVATION OF BUILDING ONE
Mod A00035· CHANGE ORDER2023-05-25+$10,711$42,231,185RENOVATION OF BUILDING ONE
Mod P00036· OTHER ADMINISTRATIVE ACTION2023-05-26+$0$42,231,185RENOVATION OF BUILDING ONE
Mod A00037· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2024-03-01+$22,825$42,254,010RENOVATION OF BUILDING ONE
Mod A00042· CHANGE ORDER2024-05-14+$36,361$42,290,371RENOVATION OF BUILDING ONE
Mod A00043· CHANGE ORDER2024-05-14+$10,197$42,300,568RENOVATION OF BUILDING ONE
Mod A00040· CHANGE ORDER2024-05-21+$12,274$42,312,842RENOVATION OF BUILDING ONE
Mod A00041· CHANGE ORDER2024-05-21+$6,801$42,319,643RENOVATION OF BUILDING ONE
Mod A00039· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2024-05-31+$12,195$42,331,838RENOVATION OF BUILDING ONE
Mod A00044· CHANGE ORDER2024-06-13+$3,421$42,335,259RENOVATION OF BUILDING ONE
Mod P00049· OTHER ADMINISTRATIVE ACTION2024-07-09+$0$42,335,259RENOVATION OF BUILDING ONE: CONTRACTING OFFICER CHANGE
Mod P00051· OTHER ADMINISTRATIVE ACTION2024-07-29−$748$42,334,511RENOVATION OF BUILDING ONE: CONTRACTING OFFICER CHANGE
Mod P00052· CHANGE ORDER2024-08-01+$271,889$42,606,401RENOVATION OF BUILDING ONE: CONTRACTING OFFICER CHANGE
Mod A00047· CHANGE ORDER2024-08-02+$57,612$42,664,013RENOVATION OF BUILDING ONE
Mod A00048· CHANGE ORDER2024-08-02+$24,403$42,688,416RENOVATION OF BUILDING ONE
Mod A00045· CHANGE ORDER2024-08-27+$18,890$42,707,305RENOVATION OF BUILDING ONE
Mod A00046· CHANGE ORDER2024-09-27+$218,809$42,926,114RFP 051 ABATE MASTIC ON CRAWLSPACE PIPES FOR DEMOLITION
Mod A00050· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2024-09-30+$32,780$42,958,894RENOVATION OF BUILDING ONE: CONTRACTING OFFICER CHANGE
Mod A00053· CHANGE ORDER2024-11-12+$3,010$42,961,905RENOVATION OF BUILDING ONE: CONTRACTING OFFICER CHANGE
Mod P00055· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2025-01-16+$133,478$43,095,383DIFFERING SITE CONDITION - COR 13
Mod A00054· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2025-01-21+$83$43,095,465TO COMPENSATE THE CONTRACTOR FOR THE WORK REQUIRED IN RFPS 034, 046, 047, 052, 054, 056, 062, 063, 064, 067, 0…
Mod P00056· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2025-02-11+$95,325$43,190,790TO COMPENSATE THE CONTRACTOR FOR THE WORK REQUIRED IN RFPS 034, 046, 047, 052, 054, 056, 062, 063, 064, 067, 0…
Mod P00057· CHANGE ORDER2025-02-13+$81,447$43,272,237CAPTURE THE SOW TO FURTHER ADDRESS A00010/RFP 007 AS WELL AS COR 11
Mod A00058· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2025-04-07+$69,498$43,341,735TO COMPENSATE THE THE CONTRACTOR FOR THE WORK REQUIRED PER CORS 41, 42, 43, 45, 46, 55, 57 AND RFPS 009B,49, 5…
Mod P00059· CHANGE ORDER2025-05-02+$304,247$43,645,982COR 059 OUTFITTING
Mod P00062· CHANGE ORDER2025-06-05+$4,611,252$48,257,234COR 060
Mod P00061· CHANGE ORDER2025-06-09+$1,006,208$49,263,442RFP 85 CRAWLSPACE
Mod P00063· CHANGE ORDER2025-06-23+$2,051,050$51,314,492REA 1
Mod P00064· CHANGE ORDER2025-06-26+$268,433$51,582,924COR 61 - PROVIDE ON-SITE PM
Mod A00060· CHANGE ORDER2025-07-23+$41,528$51,624,452RFP 044, 065, A00031
Mod P00065· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2025-07-30+$420,750$52,045,202COR 65 - DUCT CLEANING
Mod A00066· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2025-09-30+$74,543$52,119,745TO COMPENSATE THE CONTRACTOR FOR THE WORK REQUIRED UNDER CORS 50, 64, 71 AND RFP 60B.
Mod A00069· CHANGE ORDER2025-09-30+$53,678$52,173,423TO COMPENSATE THE CONTRACTOR FOR THE WORK REQUIRED IN: COR 056 VERTICAL ADJUSTMENTS AT EXISTING WATERLINE COR…
Mod A00071· CHANGE ORDER2025-11-19+$34,934$52,208,357TO COMPENSATE THE CONTRACTOR FOR THE WORK REQUIRED TO CONTROL WATER LEAKS AND STANDING WATER THAT PROMOTES MOL…
Mod A00072· CHANGE ORDER2025-12-18+$36,429$52,244,786ELECTRICAL GROUND RISER
Mod P00067· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2025-12-18+$824,080$53,068,866COR 74 - EXTENDED TEMPORARY GENERATOR RENTAL
Mod P00073· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2025-12-18+$46,449$53,115,316COR 85 REPLACE CONDENSATE PUMP
Mod P00074· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2026-01-21+$35,813$53,151,128TO COMPENSATE THE CONTRACTOR FOR THE WORK REQUIRED FOR VENTILATION AND ADDITIONAL FASTENERS.
Mod A00077· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2026-01-23+$28,449$53,179,578TO COMPENSATE THE CONTRACTOR FOR WORK REQUIRED UNDER RFP 068
Mod P00076· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2026-01-27+$42,348$53,221,926COR 75 GREASE DUCT REROUTE.
Mod P00077· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2026-01-28+$44,711$53,266,636TO COMPENSATE THE CONTRACTOR FOR WORK/DAMAGED MATERIALS REQUIRED UNDER COR 078.
Mod P00078· CHANGE ORDER2026-02-03+$19,660$53,286,296INSTALL TEMPORARY CONDENSATE PUMP.
Mod A00079· CHANGE ORDER2026-02-11+$28,461$53,314,758TO COMPENSATE THE CONTRACTOR FOR THE REPLACEMENT OF A DAMAGED SQUARE HEAD VALVE (EXISTING) AND FOR THE WORKS R…
Mod P00079· CHANGE ORDER2026-02-27+$151,994$53,466,7524 ADDITIONAL MONTHS OF ON-SITE PM
Mod A00078· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2026-03-10+$18,316$53,485,068TO COMPENSATE THE CONTRACTOR FOR WORK REQUIRED UNDER CORS 68 AND 88, THE FOLLOWING TASKS ARE SPECIFIED: 1) INS…
Mod A00082· CHANGE ORDER2026-03-24+$16,398$53,501,466TO COMPENSATE THE CONTRACTOR FOR THE RELOCATION OF A DOMESTIC WATER PIPE THAT IS IN CONFLICT WITH THE INSTALLA…
Mod P00083· CHANGE ORDER2026-04-01+$12,379$53,513,845TO COMPENSATE THE CONTRACTOR FOR THE INSTALLATION FOR EQUIPMENT PAD FOR THE NEW CONDENSATE PUMP.
Mod P00080· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2026-04-20+$201,077$53,714,922TO COMPENSATE THE CONTRACTOR FOR WORK REQUIRED UNDER CORS 68 GENERATOR EXTENSION.
Mod P00084· CHANGE ORDER2026-04-20+$16,559$53,731,481TO COMPENSATE THE CONTRACTOR FOR THE INSTALLATION FOR SITE POLE RELOCATION.
Mod A00084· CHANGE ORDER2026-04-28+$18,454$53,749,935TO COMPENSATE THE CONTRACTOR FOR THE WORK REQUIRED IN CLARIFICATIONS PROVIDED TO RFIS 667 AND 647. REPLACE DAM…
Mod A00080· CHANGE ORDER2026-05-05+$21,614$53,771,549THIS CONTRACT MODIFICATION IS TO COMPENSATE THE CONTRACTOR FOR SUPPLYING EMERGENCY CALL STATION EQUIPMENT THAT…
Mod A00086· CHANGE ORDER2026-05-11+$13,590$53,785,139TO COMPENSATE THE CONTRACTOR TO REVISE AND RECONSTRUCT THE SOUTH SIDE PARKING AREA RAMP IN ACCORDANCE WITH THE…
Mod A00087· CHANGE ORDER2026-05-19+$53,880$53,839,019TO COMPENSATE THE CONTRACTOR FOR THE FOLLOWING WORK: 1) INSTALLATION OF A FAN COIL UNIT IN THE ATTIC MACHINERY…
Mod A00085· CHANGE ORDER2026-05-27+$42,856$53,881,875TO COMPENSATE THE CONTRACTOR FOR THE ASBESTOS ABATEMENT WORK AND NEW FLOOR TILE INSTALLATION REQUIRED IN THE C…
Mod P00085· CHANGE ORDER2026-06-02+$34,790$53,916,665TO COMPENSATE THE CONTRACTOR FOR MAINTENANCE OF EQUIPMENT.
Mod P00086· CHANGE ORDER2026-06-09+$11,369$53,928,034WORK WITHIN SOW, SUMP PUMP WIRING AND INSTALLATION.
Mod P00081· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2026-06-10+$25,671$53,953,705COR 77 - SAG AND PARTNERING EXPENSES
Mod A00088· CHANGE ORDER2026-06-15+$20,044$53,973,749TO MODIFY THE RE-CIRCULATION PUMP EQUIPMENT AND ELECTRICAL CONNECTIONS DUE TO CONFLICTING INFORMATION INCLUDED…
Mod P00087· CHANGE ORDER2026-06-16+$26,864$54,000,613WORK WITHIN SOW, SITE RAMP REPLACEMENT.
Mod P00089· CHANGE ORDER2026-06-17+$46,754$54,047,367TO PROVIDE ADDITIONAL MOLD SAMPLE TESTING IN THE CRAWL SPACE.
Mod P00090· CHANGE ORDER2026-06-25+$14,868$54,062,235TO INVESTIGATE EXHAUST CHAISE IN CUPOLA.
Mod P00092· CHANGE ORDER2026-07-01+$80,245$54,142,480EXTENDING ON SITE PM SERVICES.
Mod P00093· CHANGE ORDER2026-07-01+$5,291$54,147,771PROVIDING SEWER CAMERA INVESTIGATION.
Mod A00094· CHANGE ORDER2026-07-15+$17,343$54,165,114EMERGENCY GENERATOR IS CURRENTLY PROVIDING SERVICE TO THE VAMC HOWEVER, THE EQUIPMENT HAS NOT YET BEEN FORMALL…
Mod A00095· CHANGE ORDER2026-07-23+$6,993$54,172,107EMERGENCY GENERATOR IS CURRENTLY PROVIDING SERVICE TO THE VAMC HOWEVER, THE EQUIPMENT HAS NOT YET BEEN FORMALL…
Mod P00096· CHANGE ORDER2026-08-25+$65,874$54,237,981MODIFICATION TO RESOLVE BAS FIBER RUN NEEDED AT BAY PINES VAMC.
Mod P00097· CHANGE ORDER2026-08-28+$86,079$54,324,060MODIFICATION EXTEND PM ONSITE SUPPORT AND MOLD MONITORING SERVICES AT BAY PINES VAMC.

Related awards · 7

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other VA awards to the same recipient (UEI UU5ML2N1FWL5)

AwardOffice · PSC / listingNet obligationsFY
36C24823P0055248-NETWORK CONTRACT OFFICE 8 (36C248) · 4110 · REFRIGERATION EQUIPMENT$51,810FY2023
36C24821C0050248-NETWORK CONTRACT OFFICE 8 (36C248) · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES$15,874,293FY2021

Other recipients under Y1DA from OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) (most recent first)

AwardRecipientOfficeNet obligationsFY
36C10F26C0014PROJECT MANAGEMENT SOLUTIONS LLCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$2,229,000FY2026
36C10F26C0013V&C GENERAL CONTRACTOR LLCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$2,518,650FY2026
36C10F23C0007WALSH CONSTRUCTION COMPANY II, LLCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$215,172,226FY2023
36C10F23N0064SSPC LLCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$421,407FY2023
36C10F23C0003DAV ENERGY SOLUTIONS, INC.OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$175,181FY2023

Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_36C10F21C0011_3600_-NONE-_-NONE- · retrieved 2026-09-26.