Award recordCONTRACT

RBVETCO, LLC

PIID 36C10F19C0016· VA Staff Offices· OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)· Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES· FY2019· $2,953,068 net obligations· UEI GH24ZFQWHST9· PA

Description

A00040.SA-24 - DEFINITIZE OPEN COS

Base award description: CONSTRUCTION OF RESEARCH OFFICE BUILDING (ROB) BRIDGE, VA PITTSBURGH PA

First action · last action
2019-08-26 · 2023-03-28
Transactions
47
First transaction's obligation
$2,180,000
Base + all options value (sum of deltas)
$2,953,248
Extent competed
FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
Other than full & open authority
—
Set-aside
SERVICE DISABLED VETERAN OWNED SMALL BUSINESS SET-ASIDE
Offers received
4
SDVOSB flag on record
Yes (self-representation)
NAICS
236220 · COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION

Modification chain · 47 transactions

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$2,964,868$0Base award · 2019-08-26 · this action $2,180,000 · running total $2,180,000Modification A00002 · 2020-06-29 · this action $2,672 · running total $2,182,672Modification A00003 · 2020-06-29 · this action $12,861 · running total $2,195,533Modification A00004 · 2020-06-29 · this action $12,252 · running total $2,207,785Modification P00001 · 2020-06-29 · this action $6,700 · running total $2,214,485Modification P00005 · 2020-10-20 · this action $0 · running total $2,214,485Modification P00006 · 2020-11-18 · this action $0 · running total $2,214,485Modification P00007 · 2020-12-02 · this action $23,660 · running total $2,238,145Modification P00008 · 2021-01-21 · this action $0 · running total $2,238,145Modification A00005 · 2021-02-14 · this action $1,351 · running total $2,239,496Modification A00006 · 2021-02-14 · this action $2,445 · running total $2,241,941Modification A00007 · 2021-02-14 · this action $32,570 · running total $2,274,511Modification A00008 · 2021-02-14 · this action $11,776 · running total $2,286,287Modification A00009 · 2021-02-14 · this action $0 · running total $2,286,287Modification A00010 · 2021-11-30 · this action $96,894 · running total $2,383,181Modification A00011 · 2021-11-30 · this action $49,610 · running total $2,432,791Modification A00012 · 2021-11-30 · this action $4,010 · running total $2,436,801Modification A00014 · 2021-11-30 · this action $3,400 · running total $2,440,201Modification A00015 · 2021-11-30 · this action $0 · running total $2,440,201Modification A00016 · 2021-11-30 · this action $6,237 · running total $2,446,438Modification A00017 · 2021-11-30 · this action $7,629 · running total $2,454,067Modification A00018 · 2021-11-30 · this action $0 · running total $2,454,067Modification A00019 · 2021-11-30 · this action $86,787 · running total $2,540,854Modification A00020 · 2021-11-30 · this action $0 · running total $2,540,854Modification A00021 · 2021-11-30 · this action $32,844 · running total $2,573,698Modification A00022 · 2021-11-30 · this action $9,390 · running total $2,583,088Modification A00023 · 2021-11-30 · this action $8,176 · running total $2,591,264Modification A00024 · 2021-11-30 · this action $27,146 · running total $2,618,410Modification A00025 · 2021-11-30 · this action $4,785 · running total $2,623,195Modification A00026 · 2021-11-30 · this action $47,200 · running total $2,670,395Modification A00027 · 2021-11-30 · this action $94,174 · running total $2,764,569Modification A00028 · 2021-11-30 · this action $0 · running total $2,764,569Modification A00029 · 2021-11-30 · this action $0 · running total $2,764,569Modification A00030 · 2021-11-30 · this action $0 · running total $2,764,569Modification A00033 · 2021-12-10 · this action $0 · running total $2,764,569Modification A00034 · 2022-01-02 · this action $0 · running total $2,764,569Modification A00001 · 2022-09-13 · this action $6,700 · running total $2,771,269Modification A00013 · 2022-09-13 · this action $3,041 · running total $2,774,310Modification A00031 · 2022-09-13 · this action $38,677 · running total $2,812,987Modification A00032 · 2022-09-13 · this action $21,608 · running total $2,834,595Modification A00035 · 2022-09-13 · this action $4,556 · running total $2,839,151Modification A00036 · 2022-09-13 · this action $7,481 · running total $2,846,632Modification A00037 · 2022-09-13 · this action $59,802 · running total $2,906,434Modification A00038 · 2022-09-13 · this action $37,303 · running total $2,943,737Modification A00039 · 2022-09-13 · this action $21,131 · running total $2,964,868Modification A00040 · 2022-09-13 · this action $0 · running total $2,964,868Modification P00041 · 2023-03-28 · this action -$11,800 · running total $2,953,068
  • Base2019-08-26+$2,180,000= $2,180,000
  • Mod A000022020-06-29+$2,672= $2,182,672
  • Mod A000032020-06-29+$12,861= $2,195,533
  • Mod A000042020-06-29+$12,252= $2,207,785
  • Mod P000012020-06-29+$6,700= $2,214,485
  • Mod P000052020-10-20+$0= $2,214,485
  • Mod P000062020-11-18+$0= $2,214,485
  • Mod P000072020-12-02+$23,660= $2,238,145
  • Mod P000082021-01-21+$0= $2,238,145
  • Mod A000052021-02-14+$1,351= $2,239,496
  • Mod A000062021-02-14+$2,445= $2,241,941
  • Mod A000072021-02-14+$32,570= $2,274,511
  • Mod A000082021-02-14+$11,776= $2,286,287
  • Mod A000092021-02-14+$0= $2,286,287
  • Mod A000102021-11-30+$96,894= $2,383,181
  • Mod A000112021-11-30+$49,610= $2,432,791
  • Mod A000122021-11-30+$4,010= $2,436,801
  • Mod A000142021-11-30+$3,400= $2,440,201
  • Mod A000152021-11-30+$0= $2,440,201
  • Mod A000162021-11-30+$6,237= $2,446,438
  • Mod A000172021-11-30+$7,629= $2,454,067
  • Mod A000182021-11-30+$0= $2,454,067
  • Mod A000192021-11-30+$86,787= $2,540,854
  • Mod A000202021-11-30+$0= $2,540,854
  • Mod A000212021-11-30+$32,844= $2,573,698
  • Mod A000222021-11-30+$9,390= $2,583,088
  • Mod A000232021-11-30+$8,176= $2,591,264
  • Mod A000242021-11-30+$27,146= $2,618,410
  • Mod A000252021-11-30+$4,785= $2,623,195
  • Mod A000262021-11-30+$47,200= $2,670,395
  • Mod A000272021-11-30+$94,174= $2,764,569
  • Mod A000282021-11-30+$0= $2,764,569
  • Mod A000292021-11-30+$0= $2,764,569
  • Mod A000302021-11-30+$0= $2,764,569
  • Mod A000332021-12-10+$0= $2,764,569
  • Mod A000342022-01-02+$0= $2,764,569
  • Mod A000012022-09-13+$6,700= $2,771,269
  • Mod A000132022-09-13+$3,041= $2,774,310
  • Mod A000312022-09-13+$38,677= $2,812,987
  • Mod A000322022-09-13+$21,608= $2,834,595
  • Mod A000352022-09-13+$4,556= $2,839,151
  • Mod A000362022-09-13+$7,481= $2,846,632
  • Mod A000372022-09-13+$59,802= $2,906,434
  • Mod A000382022-09-13+$37,303= $2,943,737
  • Mod A000392022-09-13+$21,131= $2,964,868
  • Mod A000402022-09-13+$0= $2,964,868
  • Mod P000412023-03-28-$11,800= $2,953,068
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2019-08-26+$2,180,000$2,180,000CONSTRUCTION OF RESEARCH OFFICE BUILDING (ROB) BRIDGE, VA PITTSBURGH PA
Mod A00002· OTHER ADMINISTRATIVE ACTION2020-06-29+$2,672$2,182,672CONSTRUCTION OF RESEARCH OFFICE BUILDING (ROB) BRIDGE, VA PITTSBURGH PA - A00002.SA#01 - REMOVE EXISTING ELECT…
Mod A00003· OTHER ADMINISTRATIVE ACTION2020-06-29+$12,861$2,195,533CONSTRUCTION OF RESEARCH OFFICE BUILDING (ROB) BRIDGE, VA PITTSBURGH PA - A00003.SA#012 ~ DIFFERING SITE CONDI…
Mod A00004· DEFINITIZE CHANGE ORDER2020-06-29+$12,252$2,207,785A00004.SA#03 - EXTEND CAISSON PER CPR #01R1 DATED 2-10-2020 (DEFINITIZE P00001.CO-01A)
Mod P00001· CHANGE ORDER2020-06-29+$6,700$2,214,485CONSTRUCTION OF RESEARCH OFFICE BUILDING (ROB) BRIDGE, VA PITTSBURGH PA - P00001.CO-01A ~ EXTEND THE DEPTH OF…
Mod P00005· CHANGE ORDER2020-10-20+$0$2,214,485CONSTRUCTION OF RESEARCH OFFICE BUILDING (ROB) BRIDGE, VA PITTSBURGH PA - P00005 CHANGE ORDER TO EXTEND CONTRA…
Mod P00006· CHANGE ORDER2020-11-18+$0$2,214,485CONSTRUCTION OF RESEARCH OFFICE BUILDING (ROB) BRIDGE, VA PITTSBURGH PA - P00006 MODIFICATION TO EXTEND CONTRA…
Mod P00007· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2020-12-02+$23,660$2,238,145CONSTRUCTION OF RESEARCH OFFICE BUILDING (ROB) BRIDGE, VA PITTSBURGH PA - P00007 TO DEFINITIZE P00005 FOR THE…
Mod P00008· OTHER ADMINISTRATIVE ACTION2021-01-21+$0$2,238,145CONSTRUCTION OF RESEARCH OFFICE BUILDING (ROB) BRIDGE, VA PITTSBURGH PA - P00008 FOR ADDITIONAL TIME DUE TO CO…
Mod A00005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2021-02-14+$1,351$2,239,496A00005.SA-04 - REROUTE LIGHTNING PROTECTION AT B#01.
Mod A00006· CHANGE ORDER2021-02-14+$2,445$2,241,941A00006.CO-01D - INCREASED IN SIZE OF CONCRETE DUMPSTER PAD IN THE ALLEY.
Mod A00007· CHANGE ORDER2021-02-14+$32,570$2,274,511A00007.CO-01E - COSTS FOR STEEL REVISIONS AT THE B#30 WINDOWS (RFCO #05)
Mod A00008· CHANGE ORDER2021-02-14+$11,776$2,286,287A00008.CO-01F - COSTS TO CUT THE SOG AT B#01 2W AND ROOF FOR RELOCATED DUCTWORK.
Mod A00009· CHANGE ORDER2021-02-14+$0$2,286,287A00009.CO-01G - ISSUED FOR 65 CALENDAR DAYS FOR RFCO #05 STEEL AT B#30 WINDOWS (A00007.CO-01E WAS FOR COSTS).
Mod A00010· CHANGE ORDER2021-11-30+$96,894$2,383,181A00010.CO-01H - CPR#04 & #05 (RFCOS #08 & #13)
Mod A00011· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2021-11-30+$49,610$2,432,791A00011.SA-05 - EXTENDED OH COSTS 65 DAYS (RFCO #05 STEEL)
Mod A00012· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2021-11-30+$4,010$2,436,801A00012.SA-06 CPR #05 (RFCO #19 CRASH RAIL)
Mod A00014· CHANGE ORDER2021-11-30+$3,400$2,440,201A00014.CO-01K CPR #05 (RFCO #11) - WALL 5A
Mod A00015· CHANGE ORDER2021-11-30+$0$2,440,201A00015.CO-01J - EXTEND CC 31 DAYS TO 5.08.2021
Mod A00016· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2021-11-30+$6,237$2,446,438A00016.SA-08 - RFCO #15 INT. FRAMING
Mod A00017· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2021-11-30+$7,629$2,454,067A00017.SA-09 - CPR #04 (RFCO #10 - RAMP + WALL TYPES
Mod A00018· CHANGE ORDER2021-11-30+$0$2,454,067A00018.CO-01K - EXTEND CC 47 DAYS TO 6.24.2021
Mod A00019· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2021-11-30+$86,787$2,540,854A00019.SA-10 - EXTEND CC 36 DAYS TO 7.31.2021
Mod A00020· CHANGE ORDER2021-11-30+$0$2,540,854A00020.CO-01L - EXTEND CC 35 DAYS TO 9.03.2021
Mod A00021· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2021-11-30+$32,844$2,573,698A00021.SA-11 - RFCO #16 LIGHTING CONTROLS
Mod A00022· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2021-11-30+$9,390$2,583,088A00022.SA-12 - RFCO #25 & #30 FP
Mod A00023· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2021-11-30+$8,176$2,591,264A00023.SA-13 CPR #04 & #05 ADD ICRA WALL (RFCO#20)
Mod A00024· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2021-11-30+$27,146$2,618,410A00024.SA-14 - CPR#06 & RFI #27 (RFCOS #26 & #31)
Mod A00025· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2021-11-30+$4,785$2,623,195A00025.SA-15 - RFCO #27 ADD LIGHTNING PROTECTION
Mod A00026· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2021-11-30+$47,200$2,670,395A00026.SA-26 EXTEND CC 62 DAYS WITH OH $
Mod A00027· CHANGE ORDER2021-11-30+$94,174$2,764,569A00027.CO-01M - CPR #06 (RFCO #22 - HVAC)
Mod A00028· CHANGE ORDER2021-11-30+$0$2,764,569A00028.CO-01L - EXTEND CC 20 DAYS TO 10.20.2021
Mod A00029· CHANGE ORDER2021-11-30+$0$2,764,569A00029.CO-01N - EXTEND CC 29 DAYS TO 11.19.2021
Mod A00030· CHANGE ORDER2021-11-30+$0$2,764,569A00030.CO-01O - EXTEND CC 21 DAYS TO 12.10.2021
Mod A00033· CHANGE ORDER2021-12-10+$0$2,764,569A00033.CO-01P - EXTEND CC TO 12.31.2021
Mod A00034· CHANGE ORDER2022-01-02+$0$2,764,569A00033.CO-01P - EXTEND CC TO 12.31.2021
Mod A00001· CHANGE ORDER2022-09-13+$6,700$2,771,269A00001.CO-01A EXTEND CAISSON DEPTH 15FT
Mod A00013· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2022-09-13+$3,041$2,774,310A00013.SA-07
Mod A00031· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2022-09-13+$38,677$2,812,987A00031.SA-17 - RFCO #32 (CPR #04)
Mod A00032· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2022-09-13+$21,608$2,834,595A00032.SA-18 - RFCO #29 EXTERIOR METAL PANELS
Mod A00035· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2022-09-13+$4,556$2,839,151A00035.SA-19 - RFCO #39 - SPRINKLER CALCS AND TWO HEADS
Mod A00036· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2022-09-13+$7,481$2,846,632A00036.SA-20 - RFCO #37 RA 2W DUCT
Mod A00037· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2022-09-13+$59,802$2,906,434A00037.SA-21 - RFCO #38 BALANCE OF HEN DUCT
Mod A00038· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2022-09-13+$37,303$2,943,737A00038.SA-22 - EXTENDED OH COSTS TO NOV 2021
Mod A00039· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2022-09-13+$21,131$2,964,868A00039.SA-23 - RFCO 317 MISC ELEC CHANGES
Mod A00040· DEFINITIZE CHANGE ORDER2022-09-13+$0$2,964,868A00040.SA-24 - DEFINITIZE OPEN COS
Mod P00041· OTHER ADMINISTRATIVE ACTION2023-03-28−$11,800$2,953,068A00040.SA-24 - DEFINITIZE OPEN COS

Related awards · 11

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other VA awards to the same recipient (UEI GH24ZFQWHST9)

AwardOffice · PSC / listingNet obligationsFY
36C78626P0055NATIONAL CEMETERY ADMIN (36C786) · Y1PZ · CONSTRUCTION OF OTHER NON-BUILDING FACILITIES$34,653FY2026
36C78626C0008NATIONAL CEMETERY ADMIN (36C786) · Y1EB · CONSTRUCTION OF MAINTENANCE BUILDINGS$3,400,000FY2026
36C24426N0368244-NETWORK CONTRACT OFFICE 4 (36C244) · Z1DA · MAINTENANCE OF HOSPITALS AND INFIRMARIES$5,000FY2026
36C24426D0034244-NETWORK CONTRACT OFFICE 4 (36C244) · Z1DA · MAINTENANCE OF HOSPITALS AND INFIRMARIES$0FY2026
36C24426N0064244-NETWORK CONTRACT OFFICE 4 (36C244) · Z1DA · MAINTENANCE OF HOSPITALS AND INFIRMARIES$376,054FY2026
36C24425N1329244-NETWORK CONTRACT OFFICE 4 (36C244) · Z1DA · MAINTENANCE OF HOSPITALS AND INFIRMARIES$182,175FY2025

Other recipients under Y1DA from OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) (most recent first)

AwardRecipientOfficeNet obligationsFY
36C10F26C0014PROJECT MANAGEMENT SOLUTIONS LLCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$2,229,000FY2026
36C10F26C0013V&C GENERAL CONTRACTOR LLCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$2,518,650FY2026
36C10F23C0007WALSH CONSTRUCTION COMPANY II, LLCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$215,172,226FY2023
36C10F23N0064SSPC LLCOFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$421,407FY2023
36C10F23C0003DAV ENERGY SOLUTIONS, INC.OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F)$175,181FY2023