Description
TAS::36 0158::TAS RECOVERY ACT - REPLACE HEATING, VENTILATION AND AIR CONDITIONING IN BLDG 13 (CONSTRUCTION) STATEMENT OF WORK ADD ADDITIONAL PROPYLENE GLYCOL TO THE CHILLED WATER SYSTEM TO BRING THE PERCENTAGE TO 20% GLYCOL TO WATER. THE VA WILL DISPOSE OF THE EXISTING PROPYLENE GLYCOL THAT WAS REMOVED FROM THE SYSTEM. THE ADDITIONAL GLYCOL IS REQUIRED AS THE CHILLED WATER RISERS DIDN T HAVE ISOLATION VALVES PER THE CONSTRUCTION PLANS AND HAD TO BE DRAINED. GLYCOL FOR THE CHILLER AND CHILLED WATER LINES THAT WERE MODIFIED IS REQUIRED PER THE CONTRACT DRAWINGS AND SPECIFICATIONS AND NO COST INCREASE WILL BE ISSUED FOR THAT WORK. SHEET M2.00 IS REVISED PER VA SKETCH CHW LOOP CONTROL REVISION 2-1-11 . PROVIDE COST PROPOSAL TO INSTALL CHILLED WATER CONTROL VALVE AND FLOW SENSORS PER THIS REVISED SHEET. FLOW CONTROL VALVE AND SENSORS SHALL BE INSTALLED, CONNECTED, AND PROGRAMMED INTO THE BUILDING CONTROL SYSTEM. CHW LOOP CAPACITY AND PUMP CONTROL SHALL FOLLOW SEQUENCE OF OPERATIONS AS DETAILED ON THE PLAN. EXCEPT AS PROVIDED HEREIN, ALL TERMS AND CONDITIONS OF THE DOCUMENT REFERENCED IN ITEM 9A OR 10A, AS HERETOFORE CHANGED, REMAINS UNCHANGED AND IN FULL FORCE AND EFFECT.
Base award description: TAS::36 0158::TAS RECOVERY ACT - REPLACE HEATING, VENTILATION AND AIR CONDITIONING IN BLDG 13 (CONSTRUCTION)
Modification chain · 8 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2010-06-25+$560,089= $560,089
- Mod 22010-12-17+$0= $560,089
- Mod 12011-01-05+$4,198= $564,287
- Mod 32011-01-20+$6,377= $570,665
- Mod 42011-01-25+$0= $570,665
- Mod 52011-02-11+$3,104= $573,768
- Mod 62011-06-03+$14,347= $588,115
- Mod 72011-07-18+$8,852= $596,967
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2010-06-25 | +$560,089 | $560,089 | TAS::36 0158::TAS RECOVERY ACT - REPLACE HEATING, VENTILATION AND AIR CONDITIONING IN BLDG 13 (CONSTRUCTION) |
| Mod 2· CHANGE ORDER | 2010-12-17 | +$0 | $560,089 | TAS::36 0158::TAS RECOVERY ACT - REPLACE HEATING, VENTILATION AND AIR CONDITIONING IN BLDG 13 (CONSTRUCTION) |
| Mod 1· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-01-05 | +$4,198 | $564,287 | TAS::36 0158::TAS RECOVERY ACT - REPLACE HEATING, VENTILATION AND AIR CONDITIONING IN BLDG 13 (CONSTRUCTION) |
| Mod 3· CHANGE ORDER | 2011-01-20 | +$6,377 | $570,665 | TAS::36 0158::TAS RECOVERY ACT - REPLACE HEATING, VENTILATION AND AIR CONDITIONING IN BLDG 13 (CONSTRUCTION) |
| Mod 4· CHANGE ORDER | 2011-01-25 | +$0 | $570,665 | TAS::36 0158::TAS RECOVERY ACT - REPLACE HEATING, VENTILATION AND AIR CONDITIONING IN BLDG 13 (CONSTRUCTION) 1… |
| Mod 5· CHANGE ORDER | 2011-02-11 | +$3,104 | $573,768 | TAS::36 0158::TAS RECOVERY ACT - REPLACE HEATING, VENTILATION AND AIR CONDITIONING IN BLDG 13 (CONSTRUCTION) S… |
| Mod 6· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-06-03 | +$14,347 | $588,115 | TAS::36 0158::TAS RECOVERY ACT - REPLACE HEATING, VENTILATION AND AIR CONDITIONING IN BLDG 13 (CONSTRUCTION) S… |
| Mod 7· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-07-18 | +$8,852 | $596,967 | TAS::36 0158::TAS RECOVERY ACT - REPLACE HEATING, VENTILATION AND AIR CONDITIONING IN BLDG 13 (CONSTRUCTION) S… |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI RPQ6W8NYFFL5)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C26025C0024 | 260-NETWORK CONTRACT OFFICE 20 (36C260) · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES | $13,113,718 | FY2025 |
| 36C26021N0120 | 260-NETWORK CONTRACT OFFICE 20 (36C260) · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES | $6,072,438 | FY2021 |
| 36C26019N0731 | 260-NETWORK CONTRACT OFFICE 20 (36C260) · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES | $377,171 | FY2019 |
| 36C26019N0739 | 260-NETWORK CONTRACT OFFICE 20 (36C260) · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES | $354,769 | FY2019 |
| 36C26018N1312 | 260-NETWORK CONTRACT OFFICE 20 (36C260) · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES | $3,436,295 | FY2018 |
| 36C26018N1320 | 260-NETWORK CONTRACT OFFICE 20 (36C260) · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES | $2,000 | FY2018 |
Other recipients under Y141 from 260-NETWORK CONTRACT OFFICE 20 (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA648C12029 | COLAMETTE CONSTRUCTION COMPANY | 260-NETWORK CONTRACT OFFICE 20 | $541,737 | FY2011 |
| VA531C15107 | JHC FIRE CONTAINMENT SOLUTIONS INC | 260-NETWORK CONTRACT OFFICE 20 | $447,369 | FY2011 |
| VA260C0960 | KEVCON, INC | 260-NETWORK CONTRACT OFFICE 20 | $3,758,694 | FY2011 |
| VA648C12028 | GLEN/MAR CONSTRUCTION, INC. | 260-NETWORK CONTRACT OFFICE 20 | $419,678 | FY2011 |
| VA668C15056 | DWG & ASSOCIATES, INC. | 260-NETWORK CONTRACT OFFICE 20 | $137,594 | FY2011 |