Description
TAS::36 0158::TAS RECOVERY ACT, PROJECT 620A4-09-117, REPLACE STEAM TRAPS AT CASTLE POINT, A/E A) PROVIDE ALL NECESSARY LABOR AND MATERIAL TO PREPARE CONSTRUCTION DOCUMENTS TO REMOVE AND REPLACE ALL EXISTING STEAM TRAPS IN THE PENTHOUSE, LAB PENTHOUSE OF BUILDING 15. B) PROVIDE ALL NECESSARY LABOR AND MATERIAL TO REMOVE AND REPLACE ALL EXISTING STEAM TRAPS AND CONDENSATE PUMPS IN THE BASEMENT OF BUILDING #15E. C) PROVIDE ALL NECESSARY LABOR AND MATERIAL TO PREPARE CONSTRUCTION DOCUMENTS TO REMOVE AND REPLACE ALL EXISTING STEAM TRAPS AND CONDENSATE PUMP ON THE BASEMENT FLOOR OF BUILDING #15H. D) PROVIDE ALL NECESSARY LABOR AND MATERIAL TO PREPARE CONSTRUCTION DOCUMENTS TO REMOVE AND REPLACE ALL EXISTING STEAM TRAPS IN THE 1ST FLOOR OF BUILDING #15H. E) PROVIDE ALL NECESSARY LABOR AND MATERIAL TO PREPARE CONSTRUCTION DOCUMENTS TO REMOVE TO AND REPLACE ALL THE EXISTING STEAM TRAPS AND CONDENSATE PUMP IN THE BASEMENT AND PENTHOUSE OF BUILDING #16. F) PROVIDE ALL NECESSARY LABOR AND MATERIAL TO PREPARE CONSTRUCTION DOCUMENTS FOR RELOCATION OF AN UNDERGROUND PORTION OF THE CONDENSATES PIPES AND ALL ASSOCIATED WORK IN CORRIDOR OF BUILDING 16. G) PROVIDE ALL NECESSARY LABOR AND MATERIAL TO DESIGN THE STEAM TRAP MONITORING SYSTEM. ALL NEW STEAM TRAPS SHALL BE CONNECTED TO THE STEAM TRAP MONITORING SYSTEM. H) ALL DESIGNS SHALL BE COMPLETED IN ACCORDANCE WITH THE VA DESIGN CRITERIA AND ALL APPLICABLE NFPA, NEC AND ASHRAE CODES AND STANDARDS. I) INCLUSIVE OF FIVE (5) ADDITIONAL SITE VISITS AT $1,086.40 PER VISIT.
Base award description: TAS::36 0158 000::TAS RECOVERY ACT, PROJECT 620A4-09-117, REPLACE STEAM TRAPS AT CASTLE POINT, A/E THE AE DESIGN FIRM IS TO PROVIDE A/E SERVICES TO EVALUATE AND DESIGN OF THE STEAM TRAP REPLACEMENT AND REMOTE MONITORING EQUIPMENT IMPROVEMENTS FOR THE STEAM SYSTEMS AND RETURN LINES AT THE CASTLE POINT CAMPUS. WORK INCLUDES, BUT IS NOT LIMITED TO THE FOLLOWING: A/E TO PERFORM DESIGN SERVICES: 1. FIELD SURVEY OF ALL BUILDINGS TO LOCATE, IDENTIFY, RECORD CONDITION AND DEFIENTECIES, SIZING, CAPACITY, ETC. AND DEVELOPMENT OF A PLAN OF THE (STEAM SUPPLY AND CONDENSATE RETURN) SYSTEMS. PERFORM THE COMPUTATION OF BUILDING LOADS, CURRENT CONSUMPTION USAGES, COMPUTATION AND ANALYSIS OF SUPPLY AND RETURN PIPE SIZES AND RETURN PUMP SIZE. THE DESIGN TO EXISTING SYSTEMS TO LOCATE AND REPLACE, RELOCATE AND INSTALL, AND CALCULATE SIZING, CAPACITIES OF NEW STEAM TRAPS. 2. DESIGN OF RENOVATIONS TO THE MECHANICAL ROOMS, INCLUDING: NECESSARY ROOM CONFIGURATION AND RE-CONSTRUCTION OF PIPING AND EQUIPMENT SUPPORT PADS, VENTILATION AS NEEDED, 3. DESIGN OF RETURN (CONDENSATE) LINE IMPROVEMENTS AND CONDENSATE PUMPING SYSTEMS. 4. IMPLEMENT NEW TRAP MONITORING SYSTEM INTO SYSTEM DESIGN FOR REMOTE MONITORING. 5. DESIGN FOR ABANDONMENT AND REMOVAL OF STEAM SUPPLY AND RETURN LINES INCLUDING ASBESTOS ABATEMENT. 6. A/E SHALL PERFORM SURVEYS OF MECHANICAL ROOMS, INTERNAL VIDEO INSPECTION OF TUNNELS, SITE VISITS AND PREPARE LOGS OF FINDINGS. 7. PROCURE AND COORDINATE INCLUSION OF ASBESTOS AND LEAD SURVEY AND DESIGN FOR ABATEMENT INCLUDING DOMESTIC WATER PIPING WITHIN TUNNEL, BASEMENT AND CRAWLSPACE AREAS TO PROVIDE ABATED AREAS FOR SUBSEQUENT CONSTRUCTION ACTIVITIES. 8. DESIGN FOR TEMPORARY RE-INSULATION OF PIPING IN ABATED AREAS UNTIL SUBSEQUENT CONSTRUCTION ACTIVITIES.
Modification chain · 4 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2009-05-13+$153,792= $153,792
- Mod 12009-10-21+$0= $153,792
- Mod 22009-12-30+$69,972= $223,764
- Mod 32012-04-10+$0= $223,764
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2009-05-13 | +$153,792 | $153,792 | TAS::36 0158 000::TAS RECOVERY ACT, PROJECT 620A4-09-117, REPLACE STEAM TRAPS AT CASTLE POINT, A/E THE AE DES… |
| Mod 1· OTHER ADMINISTRATIVE ACTION | 2009-10-21 | +$0 | $153,792 | TAS::36 0158::TAS RECOVERY ACT, PROJECT 620A4-09-117, REPLACE STEAM TRAPS AT CASTLE POINT, A/E COMPLETION DAT… |
| Mod 2· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-12-30 | +$69,972 | $223,764 | TAS::36 0158::TAS RECOVERY ACT, PROJECT 620A4-09-117, REPLACE STEAM TRAPS AT CASTLE POINT, A/E A) PROVIDE ALL… |
| Mod 3· OTHER ADMINISTRATIVE ACTION | 2012-04-10 | +$0 | $223,764 | TAS::36 0158::TAS RECOVERY ACT, PROJECT 620A4-09-117, REPLACE STEAM TRAPS AT CASTLE POINT, A/E A) PROVIDE ALL… |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI VF8FSTA437A1)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C24225N0466 | 242-NETWORK CONTRACT OFFICE 02 (36C242) · M1NE · OPERATION OF WATER SUPPLY FACILITIES | $260,673 | FY2025 |
| 36C24224P1186 | 242-NETWORK CONTRACT OFFICE 02 (36C242) · M1ND · OPERATION OF SEWAGE AND WASTE FACILITIES | $1,955,520 | FY2024 |
| 36C24224P0964 | 242-NETWORK CONTRACT OFFICE 02 (36C242) · B533 · SPECIAL STUDIES/ANALYSIS- WATER QUALITY | $4,178 | FY2024 |
| 36C24224P0969 | 242-NETWORK CONTRACT OFFICE 02 (36C242) · M1NE · OPERATION OF WATER SUPPLY FACILITIES | $102,872 | FY2024 |
| 36C24224N0307 | 242-NETWORK CONTRACT OFFICE 02 (36C242) · M1NE · OPERATION OF WATER SUPPLY FACILITIES | $943,339 | FY2024 |
| 36C24224F0029 | 242-NETWORK CONTRACT OFFICE 02 (36C242) · B533 · SPECIAL STUDIES/ANALYSIS- WATER QUALITY | $50,514 | FY2024 |
Other recipients under C211 from 243-NETWORK CONTRACTING OFFICE 03 (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA24316P0487 | FEDERAL PRISON INDUSTRIES, INC | 243-NETWORK CONTRACTING OFFICE 03 | $2,240 | FY2016 |
| VA24314P4980 | ARRAY ARCHITECTS, P.C. | 243-NETWORK CONTRACTING OFFICE 03 | $4,963 | FY2014 |
| VA24314C0191 | HATCH MOTT MACDONALD NY INC. | 243-NETWORK CONTRACTING OFFICE 03 | $101,750 | FY2014 |
| VA24314C0071 | KENNETH IRVING, ARCHITECT P.C. | 243-NETWORK CONTRACTING OFFICE 03 | $17,767 | FY2014 |
| VA24314C0027 | WM GROUP ENGINEERS, P.C. | 243-NETWORK CONTRACTING OFFICE 03 | $44,245 | FY2014 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VARA620C91176_3600_VA243P0219_3600 · retrieved 2026-09-26.