PIID VA786AC0416· NCA· NATIONAL CEMETERY ADMINISTRATION· Y1PZ · CONSTRUCTION OF OTHER NON-BUILDING FACILITIES· FY2012· $2,846,780 net obligations· UEI KNHQKE9VHTP5· MI

Description

THE CONTRACTOR SHALL PLACEN AN ADDITIONAL 2" OF GENERAL FILL COVER OVER THE CRYPT FIELD. DELETED WORK: 745 TONS OF PEA STONE OVER THE CRYPT FIELD. CREDIT TO GOVERNMENT: ELEMINATION OF PEDESTAL SUPPORT BOXES AT FORT CUSTER NATIONAL CEMETERY.

Base award description: CONTRACTOR SHALL DEMO AND REMOVE EXISTING STRUCTURES AND PAVEMENTS, GRADING, GENERAL CONSTRUCTION, VEHICULAR AND PEDESTRIAN PAVING, DRAINAGE, LANDSCAPE PLANTING AND TURF, SITE FURNISHING, IRRIGATION AND CERTAIN OTHER ITEMS AS INDICATED IN THE SPECIFICATIOSN AND DRAWINGS. CONTRACTOR SHALL ALSO INSTALL CRYPTS AND CRYPT LIDS. CONTRACTOR SHALL MANUFACTURE AND DELIVER TO THE SITE 3,101 DOUBLE-DEPTH PRE-CAST CONCRETE CRYPTS, PLUS TWENTY EXTRA CRYPT LIDS, AND THREE CRYPT LID LIFTING DEVICES. CONTRACTOR SHALL MANUFACTURE AND DELIVER 3,101 REMOVABLE FLAT MARKER SUPPORTS TO THE SITE PLUS TWENTY EXTRA SUPPORTS. CONTRACTOR SHALL PROVIDE ALL LABOR, TOOLS, MATERIALS, AND EQUIPMENT NECESSARY TO ENCLOSE THE OPEN SIDED MAINTENANCE STRUCTURE IN THE MAINTENANCE COMPLEX AT FORT CUSTER NATIONAL CEMETERY.

First action · last action
2011-10-18 · 2013-01-15
Transactions
8
First transaction's obligation
$2,853,000
Base + all options value (sum of deltas)
$2,846,780
Extent competed
FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
Other than full & open authority
—
Set-aside
SERVICE DISABLED VETERAN OWNED SMALL BUSINESS SET-ASIDE
Offers received
9
SDVOSB flag on record
Yes (self-representation)
NAICS
237990 · OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION

Modification chain · 8 transactions

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$2,961,394$0Base award · 2011-10-18 · this action $2,853,000 · running total $2,853,000Modification SA001 · 2011-11-03 · this action $0 · running total $2,853,000Modification SA002 · 2012-09-12 · this action $1,430 · running total $2,854,430Modification SA003 · 2012-09-12 · this action $0 · running total $2,854,430Modification SA004 · 2012-09-12 · this action $16,980 · running total $2,871,410Modification SA005 · 2013-01-03 · this action $74,814 · running total $2,946,224Modification SA006 · 2013-01-04 · this action $15,170 · running total $2,961,394Modification SA7 · 2013-01-15 · this action -$114,613 · running total $2,846,780
  • Base2011-10-18+$2,853,000= $2,853,000
  • Mod SA0012011-11-03+$0= $2,853,000
  • Mod SA0022012-09-12+$1,430= $2,854,430
  • Mod SA0032012-09-12+$0= $2,854,430
  • Mod SA0042012-09-12+$16,980= $2,871,410
  • Mod SA0052013-01-03+$74,814= $2,946,224
  • Mod SA0062013-01-04+$15,170= $2,961,394
  • Mod SA72013-01-15-$114,613= $2,846,780
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2011-10-18+$2,853,000$2,853,000CONTRACTOR SHALL DEMO AND REMOVE EXISTING STRUCTURES AND PAVEMENTS, GRADING, GENERAL CONSTRUCTION, VEHICULAR A…
Mod SA001· OTHER ADMINISTRATIVE ACTION2011-11-03+$0$2,853,000TO CHANGE THE CONTRACT DURATION OF THE PROJECT TO 365 CALENDAR DAYS AT FORT CUSTER NATIONAL CEMETERY.
Mod SA002· OTHER ADMINISTRATIVE ACTION2012-09-12+$1,430$2,854,430CONTRACTOR SHALL INSTALL APPROX. 12' X 85' LONG SOD ALONG THE NEW SIDEWALK AT THE NORTH EAST SIDE OF CORTEGE R…
Mod SA003· OTHER ADMINISTRATIVE ACTION2012-09-12+$0$2,854,430TO CEASE BACKFILL FOR CRYPT FIELD 4A AT FORT CUSTER NATIONAL CEMETERY.
Mod SA004· OTHER ADMINISTRATIVE ACTION2012-09-12+$16,980$2,871,410THE CONTRACTOR SHALL SUPPLY THE FOLLOWING AT FORT CUSTER NATIONAL CEMETERY: A. SUPPLY AND INSTALL EXPANSION JO…
Mod SA005· OTHER ADMINISTRATIVE ACTION2013-01-03+$74,814$2,946,224CONTRACTOR SHALL REMOVE THE EXISTING PAVEMENT UNDERNEATH THE MAINTENANCE STORAGE BUILDING AND CONSTRUCT A NEW…
Mod SA006· OTHER ADMINISTRATIVE ACTION2013-01-04+$15,170$2,961,394CONTRACTOR SHALL RELOCATE THE LOW AREA AT CORTEGE LANE AND RAISE THE GRADES AT THE MANHOLE AND WATER STATION A…
Mod SA7· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-01-15−$114,613$2,846,780THE CONTRACTOR SHALL PLACEN AN ADDITIONAL 2" OF GENERAL FILL COVER OVER THE CRYPT FIELD. DELETED WORK: 745 TO…

Related awards · 7

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other VA awards to the same recipient (UEI KNHQKE9VHTP5)

AwardOffice · PSC / listingNet obligationsFY
VA25112C0074553-DETROIT · Z1DA · MAINTENANCE OF HOSPITALS AND INFIRMARIES$2,572,132FY2012
VA25512C0190255-NETWORK CONTRACT OFFICE 15 · T006 · PHOTO/MAP/PRINT/PUBLICATION- FILM/VIDEO TAPE PRODUCTION$164,185FY2012

Other recipients under Y1PZ from NATIONAL CEMETERY ADMINISTRATION (most recent first)

AwardRecipientOfficeNet obligationsFY
VA786A15C0026DECATUR CONSTRUCTION, INCNATIONAL CEMETERY ADMINISTRATION$654,877FY2015
VA786A15C0018WSP USA ENVIRONMENT & INFRASTRUCTURE INC.NATIONAL CEMETERY ADMINISTRATION$54,784FY2015
VA78615P1059H L SERVICES INCNATIONAL CEMETERY ADMINISTRATION$4,950FY2015
VA786A15C0010C & C CONTRACTORS LLCNATIONAL CEMETERY ADMINISTRATION$5,306,326FY2015
VA786A14C0024G&C FAB-CON, LLCNATIONAL CEMETERY ADMINISTRATION$0FY2014

Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA786AC0416_3600_-NONE-_-NONE- · retrieved 2026-09-26.