Award recordCONTRACT

VETERAN CONSTRUCTION SERVICES, INC.

PIID VA786AC0111· NCA· NATIONAL CEMETERY ADMINISTRATION· Y299 · CONTRUCT/ALL OTHER NON-BLDG FACS· FY2008· $2,435,768 net obligations· UEI D32JNTLE7QR5· KY

Description

CONTRACTOR SHALL PERFORM SILT SEEDING OF ALL BARE GRAVESITES, ALONG THE PEDESTRIAN WALKWAY ANAD OTHER BARE AREAS EXCEPT THE CRYPT SOD AREA AT MOUND CITY NATIONAL CEMETERY.

Base award description: DEVELOP 3 ACRES AND INSTALL 868 CRYPTS AT MOUND CITY NATIONAL CEMETERY, MOUND CITY, IL (PROJECT NO. 863CM3010)

First action · last action
2008-09-17 · 2010-09-14
Transactions
10
First transaction's obligation
$2,274,000
Base + all options value (sum of deltas)
$4,694,777
Extent competed
NOT AVAILABLE FOR COMPETITION
Other than full & open authority
AUTHORIZED BY STATUTE
Set-aside
SDVOSB SOLE SOURCE
Offers received
1
SDVOSB flag on record
Yes (self-representation)
NAICS
237990 · OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION

Modification chain · 10 transactions

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$2,435,768$0Base award · 2008-09-17 · this action $2,274,000 · running total $2,274,000Modification SA7 · 2009-02-25 · this action $25,717 · running total $2,299,717Modification SA1 · 2009-03-24 · this action $14,991 · running total $2,314,708Modification SA2 · 2009-03-24 · this action $45,375 · running total $2,360,083Modification SA3 · 2009-04-17 · this action $17,402 · running total $2,377,486Modification SA4 · 2009-04-17 · this action $6,217 · running total $2,383,702Modification SA5 · 2009-07-01 · this action $22,184 · running total $2,405,886Modification SA6 · 2009-08-20 · this action $12,477 · running total $2,418,363Modification SA8 · 2010-07-13 · this action $7,432 · running total $2,425,795Modification SA9 · 2010-09-14 · this action $9,974 · running total $2,435,768
  • Base2008-09-17+$2,274,000= $2,274,000
  • Mod SA72009-02-25+$25,717= $2,299,717
  • Mod SA12009-03-24+$14,991= $2,314,708
  • Mod SA22009-03-24+$45,375= $2,360,083
  • Mod SA32009-04-17+$17,402= $2,377,486
  • Mod SA42009-04-17+$6,217= $2,383,702
  • Mod SA52009-07-01+$22,184= $2,405,886
  • Mod SA62009-08-20+$12,477= $2,418,363
  • Mod SA82010-07-13+$7,432= $2,425,795
  • Mod SA92010-09-14+$9,974= $2,435,768
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2008-09-17+$2,274,000$2,274,000DEVELOP 3 ACRES AND INSTALL 868 CRYPTS AT MOUND CITY NATIONAL CEMETERY, MOUND CITY, IL (PROJECT NO. 863CM3010)
Mod SA7· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-02-25+$25,717$2,299,717FABRICATE AND INSTALL CONSTRUCTION/PROJECT SIGN AT MOUND CITY NATIONAL CEMETERY.
Mod SA1· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-03-24+$14,991$2,314,708TO ADD 2" ASPHALT OVERLAY WORK FOR MOUND CITY NATIONAL CEMETERY.
Mod SA2· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-03-24+$45,375$2,360,083INSTALLATION OF ADDITIONAL STORM SEWER LINES AND UNDER DRAINS AT MOUND CITY NATIONAL CEMETERY.
Mod SA3· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-04-17+$17,402$2,377,486REPAIR DAMAGED FENCE PANELS AND REPAIR ELECTRICAL POWER LINE AND PLACE THEM UNDERGROUND AT MOUND CITY NATIONAL…
Mod SA4· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-04-17+$6,217$2,383,702FABRICATE AND INSTALL CONSTRUCTION/PROJECT SIGN AT MOUND CITY NATIONAL CEMETERY.
Mod SA5· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-07-01+$22,184$2,405,886CONTRACTOR IS TO INSTALL OF GEO-PROB FOR WATERING TESTING; CORRECT FAULT DESIGN OF ROAD A NEAR ROSTRUM WALK WA…
Mod SA6· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-08-20+$12,477$2,418,363INSTALL ADDITIONAL PARKING AREAS ADJACENT TO THE NEWLY INSTALLED ROADWAY LEADING TO THE NEWLY EXPANDED GRAVESI…
Mod SA8· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-07-13+$7,432$2,425,795INSTALL & REROUTE A NEW WATER LINE & METERS; PROVIDE ADDITIONAL TRAINING FOR THE IRRIGATION & PUMP SYSTEM AT M…
Mod SA9· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-09-14+$9,974$2,435,768CONTRACTOR SHALL PERFORM SILT SEEDING OF ALL BARE GRAVESITES, ALONG THE PEDESTRIAN WALKWAY ANAD OTHER BARE ARE…

Related awards · 5

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other recipients under Y299 from NATIONAL CEMETERY ADMINISTRATION (most recent first)

AwardRecipientOfficeNet obligationsFY
VA786AC0454AMERICAN ARTISANS GROUP LLCNATIONAL CEMETERY ADMINISTRATION$212,000FY2011
VA786AC0457MARE SOLUTIONS INCNATIONAL CEMETERY ADMINISTRATION$370,000FY2011
VA786AC0455DANIELS BUILDING CO INCNATIONAL CEMETERY ADMINISTRATION$649,540FY2011
VA786AC0440PARADIGM CONSTRUCTION, L.L.CNATIONAL CEMETERY ADMINISTRATION$3,544,801FY2011
VA786AC04533 D CONTRACTING INC.NATIONAL CEMETERY ADMINISTRATION$23,870FY2011

Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA786AC0111_3600_-NONE-_-NONE- · retrieved 2026-09-26.