Award recordCONTRACT

DECATUR CONSTRUCTION, INC

PIID VA786AC0102· NCA· NATIONAL CEMETERY ADMINISTRATION· Y299 · CONTRUCT/ALL OTHER NON-BLDG FACS· FY2008· $6,158,484 net obligations· UEI RANGRLTPV1K9· TX

Description

TO PROVIDE ADDITIONAL SURVEY WORK TO LAYOUT IRRIGATION LATERAILS; INSTALL 3 PRESSURE REGULATINS VALVES AND APPURTENANCES; REMOVE TWO DEAD TREES & GRIND STUMPS; AND PLANT 13 QUEEN PALMS AT HOUSTON NATIONAL CEMETERY.

Base award description: THE INSTALLATION OF CRYPTS, DRAINAGE ITEMS, ROAD WORK LANDSCAPING AND IRRIGATION AT HOUSTON NATIONAL CEMETERY.

First action · last action
2008-07-07 · 2010-04-06
Transactions
10
First transaction's obligation
$5,942,286
Base + all options value (sum of deltas)
$6,158,484
Extent competed
FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
Other than full & open authority
—
Set-aside
SERVICE DISABLED VETERAN OWNED SMALL BUSINESS SET-ASIDE
Offers received
4
SDVOSB flag on record
Yes (self-representation)
NAICS
237990 · OTHER HEAVY AND CIVIL ENGINEERING CONSTRUCTION

Modification chain · 10 transactions

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$6,158,484$0Base award · 2008-07-07 · this action $5,942,286 · running total $5,942,286Modification SA1 · 2008-10-10 · this action $22,350 · running total $5,964,636Modification SA2 · 2008-11-20 · this action $56,943 · running total $6,021,579Modification SA3 · 2009-03-24 · this action $9,089 · running total $6,030,668Modification SA4 · 2009-06-12 · this action $13,947 · running total $6,044,615Modification SA7 · 2009-09-27 · this action $13,636 · running total $6,058,252Modification SA5 · 2009-11-06 · this action $40,577 · running total $6,098,829Modification SA6 · 2009-11-06 · this action $14,412 · running total $6,113,240Modification SA9 · 2009-12-18 · this action $11,772 · running total $6,125,012Modification SA8 · 2010-04-06 · this action $33,472 · running total $6,158,484
  • Base2008-07-07+$5,942,286= $5,942,286
  • Mod SA12008-10-10+$22,350= $5,964,636
  • Mod SA22008-11-20+$56,943= $6,021,579
  • Mod SA32009-03-24+$9,089= $6,030,668
  • Mod SA42009-06-12+$13,947= $6,044,615
  • Mod SA72009-09-27+$13,636= $6,058,252
  • Mod SA52009-11-06+$40,577= $6,098,829
  • Mod SA62009-11-06+$14,412= $6,113,240
  • Mod SA92009-12-18+$11,772= $6,125,012
  • Mod SA82010-04-06+$33,472= $6,158,484
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2008-07-07+$5,942,286$5,942,286THE INSTALLATION OF CRYPTS, DRAINAGE ITEMS, ROAD WORK LANDSCAPING AND IRRIGATION AT HOUSTON NATIONAL CEMETERY.
Mod SA1· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2008-10-10+$22,350$5,964,636THE INSTALLATION OF CRYPTS, DRAINAGE ITEMS, ROAD WORK LANDSCAPING AND IRRIGATION AT HOUSTON NATIONAL CEMETERY.
Mod SA2· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2008-11-20+$56,943$6,021,579THE INSTALLATION OF CRYPTS, DRAINAGE ITEMS, ROAD WORK LANDSCAPING AND IRRIGATION AT HOUSTON NATIONAL CEMETERY.
Mod SA3· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-03-24+$9,089$6,030,668TO INSTALL APPROXIMATELY 300 FEET OF 4" CLASS 900 PIPE AND NEW ELECTRIC SERVICE IN CONDUIT AT HOUSTON NATIONAL…
Mod SA4· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-06-12+$13,947$6,044,615TO INSTALL APPROXIMATELEY 20 FEET OF 8" CLASS 900 PIPE AND APPROXIMATELY 26 CUBIC YARDS OF CONCRETE SIDEWALK A…
Mod SA7· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-09-27+$13,636$6,058,252TO PROVIDE ADDITIONAL SURVEY WORK TO LAYOUT IRRIGATION LATERAILS; INSTALL 3 PRESSURE REGULATINS VALVES AND APP…
Mod SA5· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-11-06+$40,577$6,098,829TO INSTALL APPROXIMATELY 1,450 SQUARE FEET OF ROAD BASE AND 20 PALLETS OF BERMUDA GRASS SOD FOR THE FAST TRACK…
Mod SA6· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-11-06+$14,412$6,113,240TO INSTALL APPROXIMATELY 6,200 SQUARE FEET OF ROAD BASE AND ASPHALT WEARING COURSE AT HOUSTON NATIONAL CEMETER…
Mod SA9· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2009-12-18+$11,772$6,125,012TO PROVIDE ADDITIONAL SURVEY WORK TO LAYOUT IRRIGATION LATERAILS; INSTALL 3 PRESSURE REGULATINS VALVES AND APP…
Mod SA8· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-04-06+$33,472$6,158,484TO PROVIDE ADDITIONAL SURVEY WORK TO LAYOUT IRRIGATION LATERAILS; INSTALL 3 PRESSURE REGULATINS VALVES AND APP…

Related awards · 11

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other VA awards to the same recipient (UEI RANGRLTPV1K9)

AwardOffice · PSC / listingNet obligationsFY
36C10F21C0016OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) · Y1PC · CONSTRUCTION OF UNIMPROVED REAL PROPERTY (LAND)$32,094,482FY2021
36C78619C0131NATIONAL CEMETERY ADMIN (36C786) · Y1PZ · CONSTRUCTION OF OTHER NON-BUILDING FACILITIES$4,665,019FY2019
36C78618C0238NATIONAL CEMETERY ADMIN (36C786) · Y1PZ · CONSTRUCTION OF OTHER NON-BUILDING FACILITIES$3,859,479FY2018
36C78618C0105NATIONAL CEMETERY ADMIN (36C786) · Y1AZ · CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS$902,593FY2018
VA786A17C0031NATIONAL CEMETERY ADMIN (36C786) · Y1PZ · CONSTRUCTION OF OTHER NON-BUILDING FACILITIES$863,241FY2017
VA786A17C0017NATIONAL CEMETERY ADMIN (36C786) · Y1PZ · CONSTRUCTION OF OTHER NON-BUILDING FACILITIES$3,795,664FY2017

Other recipients under Y299 from NATIONAL CEMETERY ADMINISTRATION (most recent first)

AwardRecipientOfficeNet obligationsFY
VA786AC0454AMERICAN ARTISANS GROUP LLCNATIONAL CEMETERY ADMINISTRATION$212,000FY2011
VA786AC0457MARE SOLUTIONS INCNATIONAL CEMETERY ADMINISTRATION$370,000FY2011
VA786AC0455DANIELS BUILDING CO INCNATIONAL CEMETERY ADMINISTRATION$649,540FY2011
VA786AC0440PARADIGM CONSTRUCTION, L.L.CNATIONAL CEMETERY ADMINISTRATION$3,544,801FY2011
VA786AC04533 D CONTRACTING INC.NATIONAL CEMETERY ADMINISTRATION$23,870FY2011

Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA786AC0102_3600_-NONE-_-NONE- · retrieved 2026-09-26.