Description
THE CONTRACTOR SHALL RESURFACE, AND RESTORE THE PAVEMENT ON THE MAIN ENTRANCE ROAD AT BALTIMORE NATIONAL CEMETERY.
Base award description: IGF::OT::IGF - THE CONTRACTOR SHALL INSTALL COLUMBARIUM NICHES&IN-GROUND CREMAINS, WITH MISCELLANEOUS SITE IMPROVEMENTS AT THE ENTRANCE TO THE SITE, MAIN ENTRANCE ROAD&THE FLAG POLE AREA. IMPROVEMENT AT HE ENTRANCE INCLUDE CLEANING&REPOINTING THE STONE ENTRY COLUMNS&REPLACEMENT OF A DAMAGED SECTION OF CONCRETE SIDEWALK. THE IRON FENCE ALONG FREDERICK AVENUE MUST BE RESTORED. THE MAIN ENTRANCE ROAD WILL BE MILLED&REPAVED AS SHOWN ON DRAWINGS INCLUDING THE LOOP IN FRONT OF THE ADMINISTRATION BUILDING. WORK INCLUDES REPLACEMENT OF APPROXIMATELY 60 LINEAR FEET OF CONCRETE CURBING. THE FLAGPOLE AREA WORK WILL CONSIST OF REPLACING THE EXISTING FLAGPOLE LIGHTING FIXTURES WITH ENERGY EFFICIENT LED UNITS&RESTORING THE FLAGPOLE TO ORIGINAL CONDITION. PROJECT ALSO INCLUDES SITE CLEARING&DEMOLITION, LANDSCAPING, SITE FURNISHING,&IRRIGATION AT BALTIMORE NATIONAL CEMETERY.
Modification chain · 13 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2016-09-15+$2,444,000= $2,444,000
- Mod P000012017-04-14+$21,360= $2,465,360
- Mod P000032017-05-19+$22,915= $2,488,275
- Mod P000022017-05-23+$130,659= $2,618,935
- Mod P000042017-06-01+$20,284= $2,639,219
- Mod P000052017-06-15+$25,919= $2,665,138
- Mod P000062017-06-16+$4,002= $2,669,140
- Mod P000072017-09-28+$99,956= $2,769,096
- Mod P000082017-10-26+$2,039= $2,771,135
- Mod P000092018-02-13+$10,696= $2,781,831
- Mod P000102018-03-27+$0= $2,781,831
- Mod P000112018-05-04+$219,273= $3,001,104
- Mod P000172021-01-05+$0= $3,001,104
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2016-09-15 | +$2,444,000 | $2,444,000 | IGF::OT::IGF - THE CONTRACTOR SHALL INSTALL COLUMBARIUM NICHES&IN-GROUND CREMAINS, WITH MISCELLANEOUS SITE IMP… |
| Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-04-14 | +$21,360 | $2,465,360 | IGF::OT::IGF - THE CONTRACTOR SHALL REMOVE 12 TREES AT BALTIMORE NATIONAL CEMETERY. |
| Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-05-19 | +$22,915 | $2,488,275 | IGF::OT::IGF - THE CONTRACTOR SHALL REPLACE FORTY-THREE (43) DAMAGED AND BROKEN GRANITE CURBS WITH NEW ONESAT… |
| Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-05-23 | +$130,659 | $2,618,935 | IGF::OT::IGF - THE CONTRACTOR SHALL INSTALL COLUMBARIUM NICHES&IN-GROUND CREMAINS, WITH MISCELLANEOUS SITE IMP… |
| Mod P00004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-06-01 | +$20,284 | $2,639,219 | IGF::OT::IGF - THE CONTRACTOR SHALL REMOVE 14 TREES WITHIN THE CONSTRUCTION AREA LOCATED AT BALTIMORE NATIONAL… |
| Mod P00005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-06-15 | +$25,919 | $2,665,138 | IGF::OT::IGF - THE CONTRACTOR SHALL REMOVE OF AND DISPOSE OF 309 CUBIC YARDS (167 TONS) OF ROCK OFF SITE AT BA… |
| Mod P00006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-06-16 | +$4,002 | $2,669,140 | IGF::OT::IGF - THE CONTRACTOR SHALL RELOCATE ALL UTILITY POLE GUY WIRES AND THEIR ANCHORS THAT ARE DIRECTLY IN… |
| Mod P00007· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-09-28 | +$99,956 | $2,769,096 | IGF::OT::IGF - THE CONTRACTOR SHALL INSTALL 310 LINEAR FEET OF 18 INCH DIAMETER HDPE STORM WATER PIPE AND 3 MA… |
| Mod P00008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-10-26 | +$2,039 | $2,771,135 | IGF::OT::IGF - THE CONTRACTOR SHALL INSTALL CONCRETE FOOTING AND WATERING STATION AT BALTIMORE NATIONAL CEMETE… |
| Mod P00009· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-02-13 | +$10,696 | $2,781,831 | IGF::OT::IGF - THE CONTRACTOR SHALL REPLACE 45 LF OF SIDEWALK, EXCAVATE, FRACTURE AND DISPOSE OF 53 CY OF SUB-… |
| Mod P00010· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-03-27 | +$0 | $2,781,831 | IGF::OT::IGF - A TIME EXTENSION WAS PROVIDED DUE TO UNUSUALLY SEVERE WEATHER AT BALTIMORE NATIONAL CEMETERY. |
| Mod P00011· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-05-04 | +$219,273 | $3,001,104 | IGF::OT::IGF - THE CONTRACTOR SHALL RESURFACE, AND RESTORE THE PAVEMENT ON THE MAIN ENTRANCE ROAD AT BALTIMORE… |
| Mod P00017· CLOSE OUT | 2021-01-05 | +$0 | $3,001,104 | THE CONTRACTOR SHALL RESURFACE, AND RESTORE THE PAVEMENT ON THE MAIN ENTRANCE ROAD AT BALTIMORE NATIONAL CEMET… |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI Z3T9HM7NBZX3)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C78618C0268 | NATIONAL CEMETERY ADMIN (36C786) · Y1PZ · CONSTRUCTION OF OTHER NON-BUILDING FACILITIES | $3,101,395 | FY2018 |
| VA78617C0256 | NATIONAL CEMETERY ADMIN (36C786) · Z1PZ · MAINTENANCE OF OTHER NON-BUILDING FACILITIES | $15,575 | FY2017 |
| VA101F17C3041 | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) · Y1KF · CONSTRUCTION OF DREDGING FACILITIES | $16,532,001 | FY2017 |
| VA786A17C0006 | NATIONAL CEMETERY ADMIN (36C786) · Y1LB · CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS | $4,109,326 | FY2017 |
| VA786A16C0034 | NATIONAL CEMETERY ADMIN (36C786) · Y1PZ · CONSTRUCTION OF OTHER NON-BUILDING FACILITIES | $3,939,106 | FY2016 |
| VA786A16C0009 | NATIONAL CEMETERY ADMIN (36C786) · Y1PZ · CONSTRUCTION OF OTHER NON-BUILDING FACILITIES | $3,673,000 | FY2016 |
Other recipients under Y1PZ from NATIONAL CEMETERY ADMIN (36C786) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| 36C78626N0454 | US DIVERSIFIED CONTRACTING SERVICES INC. | NATIONAL CEMETERY ADMIN (36C786) | $301,173 | FY2026 |
| 36C78626N0418 | US DIVERSIFIED CONTRACTING SERVICES INC. | NATIONAL CEMETERY ADMIN (36C786) | $59,741 | FY2026 |
| 36C78626N0443 | US DIVERSIFIED CONTRACTING SERVICES INC. | NATIONAL CEMETERY ADMIN (36C786) | $53,627 | FY2026 |
| 36C78626N0448 | US DIVERSIFIED CONTRACTING SERVICES INC. | NATIONAL CEMETERY ADMIN (36C786) | $20,506 | FY2026 |
| 36C78626N0441 | US DIVERSIFIED CONTRACTING SERVICES INC. | NATIONAL CEMETERY ADMIN (36C786) | $18,843 | FY2026 |