Award recordCONTRACT

J. W. FULLER CONSTRUCTION, L.L.C.

PIID VA786A14C0032· NCA· NATIONAL CEMETERY ADMINISTRATION· Y1AZ · CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS· FY2014· $1,041,783 net obligations· UEI C6JJDQTNLSK5· MO

Description

IGF::OT::IGF - CONTRACTOR SHALL WORK INSTALL INDOOR FILTER SYSTEM INCLUDING ALL RELATED DUCT WORK.

Base award description: IGF::OT::IGF - CONTRACTOR SHALL RENOVATE 7,264 SF TO INCLUDE STRUCTURAL REINFORCEMENT OF THE UPPER STORAGE AREA; NEW INTERIOR LIGHTING; REPLACE THE FLOOR&REINFORCE THE STRUCTURE ABOVE THE BASEMENT. ELIMINATE MOISTURE IN THE BASEMENT; INSTALL A RESTROOM; UPGRADE THE EXISTING RESTROOM&PROVIDE ACCESSIBILITY. PROVIDE OUTSIDE SECURITY LIGHTING. UPGRADE THE ELECTRICAL WIRING; PROVIDE LEAD BASED PAINT&ASBETOS ABATEMENT; PROVIDE FOUR TEMPORARY STORAGE CONTAINERS DURING CONSTRUCTION AT JEFFERSON BARRACKS NATIONAL CEMETERY.

First action · last action
2014-09-25 · 2015-10-19
Transactions
6
First transaction's obligation
$1,121,000
Base + all options value (sum of deltas)
$1,041,783
Extent competed
FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
Other than full & open authority
—
Set-aside
SERVICE DISABLED VETERAN OWNED SMALL BUSINESS SET-ASIDE
Offers received
4
SDVOSB flag on record
Yes (self-representation)
NAICS
236220 · COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION

Modification chain · 6 transactions

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$1,124,593$0Base award · 2014-09-25 · this action $1,121,000 · running total $1,121,000Modification P00001 · 2015-04-07 · this action $3,593 · running total $1,124,593Modification P00002 · 2015-05-08 · this action -$130,750 · running total $993,843Modification P00003 · 2015-06-10 · this action $9,944 · running total $1,003,788Modification P00004 · 2015-08-07 · this action $1,637 · running total $1,005,424Modification P00005 · 2015-10-19 · this action $36,358 · running total $1,041,783
  • Base2014-09-25+$1,121,000= $1,121,000
  • Mod P000012015-04-07+$3,593= $1,124,593
  • Mod P000022015-05-08-$130,750= $993,843
  • Mod P000032015-06-10+$9,944= $1,003,788
  • Mod P000042015-08-07+$1,637= $1,005,424
  • Mod P000052015-10-19+$36,358= $1,041,783
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2014-09-25+$1,121,000$1,121,000IGF::OT::IGF - CONTRACTOR SHALL RENOVATE 7,264 SF TO INCLUDE STRUCTURAL REINFORCEMENT OF THE UPPER STORAGE ARE…
Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-04-07+$3,593$1,124,593IGF::OT::IGF - CONTRACTOR SHALL RENOVATE 7,264 SF TO INCLUDE STRUCTURAL REINFORCEMENT OF THE UPPER STORAGE ARE…
Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-05-08−$130,750$993,843IGF::OT::IGF - CONTRACTOR SHALL RENOVATE 7,264 SF TO INCLUDE STRUCTURAL REINFORCEMENT OF THE UPPER STORAGE ARE…
Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-06-10+$9,944$1,003,788IGF::OT::IGF - CONTRACTOR SHALL RENOVATE 7,264 SF TO INCLUDE STRUCTURAL REINFORCEMENT OF THE UPPER STORAGE ARE…
Mod P00004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-08-07+$1,637$1,005,424IGF::OT::IGF - CONTRACTOR SHALL WORK WEEKEND HOURS TO COMPLETE THE INSTALLATION OF FIBER OPTIC SYSTEM.
Mod P00005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-10-19+$36,358$1,041,783IGF::OT::IGF - CONTRACTOR SHALL WORK INSTALL INDOOR FILTER SYSTEM INCLUDING ALL RELATED DUCT WORK.

Related awards · 11

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other VA awards to the same recipient (UEI C6JJDQTNLSK5)

AwardOffice · PSC / listingNet obligationsFY
36C25519C0035255-NETWORK CONTRACT OFFICE 15 (36C255) · J063 · MAINT/REPAIR/REBUILD OF EQUIPMENT- ALARM, SIGNAL, AND SECURITY DETECTION SYSTEMS$218,400FY2019
36C78618C0219NATIONAL CEMETERY ADMIN (36C786) · N099 · INSTALLATION OF EQUIPMENT- MISCELLANEOUS$31,000FY2018
36C78618C0215NATIONAL CEMETERY ADMIN (36C786) · J042 · MAINT/REPAIR/REBUILD OF EQUIP- FIRE FIGHTING/RESCUE/SAFETY EQUIP; ENVIRON PROTECT EQUIP/MATLS$18,365FY2018
36C78618C0130NATIONAL CEMETERY ADMIN (36C786) · 5430 · STORAGE TANKS$128,500FY2018
VA25517J4311255-NETWORK CONTRACT OFFICE 15 (36C255) · Z2DZ · REPAIR OR ALTERATION OF OTHER HOSPITAL BUILDINGS$1,000FY2017
VA25517D0143255-NETWORK CONTRACT OFFICE 15 (36C255) · Z2DZ · REPAIR OR ALTERATION OF OTHER HOSPITAL BUILDINGS$0FY2017

Other recipients under Y1AZ from NATIONAL CEMETERY ADMINISTRATION (most recent first)

AwardRecipientOfficeNet obligationsFY
VA786A15C0031SABREE, INC.NATIONAL CEMETERY ADMINISTRATION$143,971FY2015
VA786A15C0027US DIVERSIFIED CONTRACTING SERVICES INC.NATIONAL CEMETERY ADMINISTRATION$192,920FY2015
VA786A15C0028REMSA INCNATIONAL CEMETERY ADMINISTRATION$34,308FY2015
VA78615C0176US DIVERSIFIED CONTRACTING SERVICES INC.NATIONAL CEMETERY ADMINISTRATION$323,466FY2015
VA78615C0150R&R CONSTRUCTION SERVICES, INC.NATIONAL CEMETERY ADMINISTRATION$17,700FY2015