Award recordCONTRACT

EASTERN IRRIGATION AND PUMP COMPANY LLC

PIID VA786A13C0022· NCA· NATIONAL CEMETERY ADMINISTRATION· Z2NZ · REPAIR OR ALTERATION OF OTHER UTILITIES· FY2013· $51,395 net obligations· UEI UP1RNY36H6C1· PA

Description

IGF::OT::IGF TIME EXTENSION GRANTED TO REPLACE THE CONTROL PANEL FOR WASHINGTON CROSSING NATIONAL CEMETERY.

Base award description: IGF::OT::IGF CONTRACTOR SHALL REPAIR, REPLACE AND UPGRADE THE DAMAGED IRRIGATION CONTROL SYSTEM. PROVIDE AND REPLACE THE DAMAGED VFD AND IRRIGATION CONTROL PANEL, PUMP LOG ADDITION AND ALL OTHER REQIREMENTS PER THE STATEMENT OF WORK FOR WASHINGTON CROSSING NATIONAL CEMETERY.

First action · last action
2013-05-30 · 2013-09-06
Transactions
3
First transaction's obligation
$51,395
Base + all options value (sum of deltas)
$51,395
Extent competed
FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
Other than full & open authority
BRAND NAME DESCRIPTION
Set-aside
SMALL BUSINESS SET ASIDE - TOTAL
Offers received
1
SDVOSB flag on record
No
NAICS
237110 · WATER AND SEWER LINE AND RELATED STRUCTURES CONSTRUCTION

Modification chain · 3 transactions

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$51,395$0Base award · 2013-05-30 · this action $51,395 · running total $51,395Modification P00001 · 2013-07-10 · this action $0 · running total $51,395Modification P00002 · 2013-09-06 · this action $0 · running total $51,395
  • Base2013-05-30+$51,395= $51,395
  • Mod P000012013-07-10+$0= $51,395
  • Mod P000022013-09-06+$0= $51,395
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2013-05-30+$51,395$51,395IGF::OT::IGF CONTRACTOR SHALL REPAIR, REPLACE AND UPGRADE THE DAMAGED IRRIGATION CONTROL SYSTEM. PROVIDE AND…
Mod P00001· OTHER ADMINISTRATIVE ACTION2013-07-10+$0$51,395IGF::OT::IGF CONTRACTOR SHALL REPAIR, REPLACE AND UPGRADE THE DAMAGED IRRIGATION CONTROL SYSTEM. PROVIDE AND…
Mod P00002· OTHER ADMINISTRATIVE ACTION2013-09-06+$0$51,395IGF::OT::IGF TIME EXTENSION GRANTED TO REPLACE THE CONTROL PANEL FOR WASHINGTON CROSSING NATIONAL CEMETERY.

Related awards · 6

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other VA awards to the same recipient (UEI UP1RNY36H6C1)

AwardOffice · PSC / listingNet obligationsFY
VA78613P1625NATIONAL CEMETERY ADMINISTRATION · S114 · UTILITIES- WATER$32,508FY2013

Other recipients under Z2NZ from NATIONAL CEMETERY ADMINISTRATION (most recent first)

AwardRecipientOfficeNet obligationsFY
VA78616C0048GCH CONSTRUCTION COMPANYNATIONAL CEMETERY ADMINISTRATION$213,351FY2016
VA78615C0122WEISINGER INCORPORATEDNATIONAL CEMETERY ADMINISTRATION$0FY2015
VA78614C0064US DIVERSIFIED CONTRACTING SERVICES INC.NATIONAL CEMETERY ADMINISTRATION$732,984FY2014
VA786A13C0042TEAM WEST CONTRACTING CORPORATIONNATIONAL CEMETERY ADMINISTRATION$114,176FY2013
VA786A13C0048HYDROZONE LANDSCAPE CORPORATIONNATIONAL CEMETERY ADMINISTRATION$23,750FY2013

Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA786A13C0022_3600_-NONE-_-NONE- · retrieved 2026-09-26.