Description
IGF::OT::IGF DE-OBLIGATION OF REMAINING FUNDS.
Base award description: IGF::OT::IGF WORK INCLUDES, BUT IS NOT LIMITED TO, PREPARING SITE FOR CONSTRUCTION OPERATIONS, INCLUDING DEMOLITION AND REMOVAL OF EXISTING STRUCTURES AND SITE ELEMENTS INCLUDING BUT NOT LIMITED TO WALLS, PORTIONS OF WALLS, ROOFING, AND OTHER SITE FEATURES AND PERFORM WORK FOR RESTORATION OR REPLACEMENT OF WALLS, GATES AND APPURTENANCES AND MISCELLANEIOUS GRADING, DRAINAG, PAVING AND OTHER SITE FEATURES AS REQUIRED BY THE DRAWINGS AND SPECIFICATIONS AT ALEXANDRIA NATIONAL CEMETERY.
Modification chain · 11 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2013-05-01+$1,392,250= $1,392,250
- Mod P000012013-10-02+$0= $1,392,250
- Mod P000022013-10-08+$0= $1,392,250
- Mod P000042014-02-28+$8,900= $1,401,150
- Mod P000032014-04-02+$8,140= $1,409,290
- Mod P000052014-04-08+$3,639= $1,412,929
- Mod P000062014-09-10+$83,388= $1,496,317
- Mod P000072014-09-10+$0= $1,496,317
- Mod P000082015-01-30+$4,178= $1,500,496
- Mod P000092015-02-11+$0= $1,500,496
- Mod P000102015-06-05-$7,565= $1,492,931
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2013-05-01 | +$1,392,250 | $1,392,250 | IGF::OT::IGF WORK INCLUDES, BUT IS NOT LIMITED TO, PREPARING SITE FOR CONSTRUCTION OPERATIONS, INCLUDING DEMOL… |
| Mod P00001· OTHER ADMINISTRATIVE ACTION | 2013-10-02 | +$0 | $1,392,250 | IGF::OT::IGF SUSPENSION OF WORK AT ALEXANDRIA NATIONAL CEMETERY. |
| Mod P00002· OTHER ADMINISTRATIVE ACTION | 2013-10-08 | +$0 | $1,392,250 | IGF::OT::IGF SUSPENSION OF WORK AT ALEXANDRIA NATIONAL CEMETERY. |
| Mod P00004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-02-28 | +$8,900 | $1,401,150 | IGF::OT::IGF CONTRACTOR SHALL PROVIDE AN ADA COMPLIANT ENTRY/EGRESS DOOR AND OPENING. FILL IN MASONRY VOIDS.… |
| Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-04-02 | +$8,140 | $1,409,290 | IGF::OT::IGF CONTRACTOR SHALL REPLACE THE EXISTING ELECTRICAL PANEL WITH A CODE COMPLIANT MODEL. ADD ONE HAND… |
| Mod P00005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-04-08 | +$3,639 | $1,412,929 | IGF::OT::IGF CONTRACTOR SHALL REMOVE CARPET AND PROVIDE WOOD FLOORING IN THE FRONT OFFICE, PER BULLETIN 003.… |
| Mod P00006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-09-10 | +$83,388 | $1,496,317 | IGF::OT::IGF CONTRACTOR SHALL PROVIDE INTERIOR MASONRY WORK, WORK BELOW GRADE, AND ABOVE THE WATER TABLE PER B… |
| Mod P00007· OTHER ADMINISTRATIVE ACTION | 2014-09-10 | +$0 | $1,496,317 | IGF::OT::IGF THIS IS A NO COST CONTRACT MODIFICATION FOR ALEXANDRIA NATIONAL CEMETERY TO ADD 35 CALENDAR DAYS… |
| Mod P00008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-01-30 | +$4,178 | $1,500,496 | IGF::OT::IGF CONTRACTOR SHALL REPLACE BROKEN RADIATOR AT ALEXANDRIA NATIONAL CEMETERY. |
| Mod P00009· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-02-11 | +$0 | $1,500,496 | IGF::OT::IGF CONTRACT DURATION WAS EXTENDED TO MARCH 31, 2015. |
| Mod P00010· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-06-05 | −$7,565 | $1,492,931 | IGF::OT::IGF DE-OBLIGATION OF REMAINING FUNDS. |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI GKUMJS8XRVP5)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C24225P1478 | 242-NETWORK CONTRACT OFFICE 02 (36C242) · J036 · MAINT/REPAIR/REBUILD OF EQUIPMENT- SPECIAL INDUSTRY MACHINERY | $244,837 | FY2025 |
| 36C24818N4749 | 248-NETWORK CONTRACT OFFICE 8 (36C248) · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES | $1,000 | FY2018 |
| 36C24818D0110 | 248-NETWORK CONTRACT OFFICE 8 (36C248) · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES | $0 | FY2018 |
| 36C24818C0024 | 248-NETWORK CONTRACT OFFICE 8 (36C248) · Z2DA · REPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES | $334,198 | FY2018 |
| VA24817C0225 | 248-NETWORK CONTRACT OFFICE 8 (36C248) · Z2DA · REPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES | $232,796 | FY2017 |
| VA24817P3530 | 248-NETWORK CONTRACT OFFICE 8 (36C248) · 4410 · INDUSTRIAL BOILERS | $50,000 | FY2017 |
Other recipients under Y1AZ from NATIONAL CEMETERY ADMINISTRATION (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA786A15C0031 | SABREE, INC. | NATIONAL CEMETERY ADMINISTRATION | $143,971 | FY2015 |
| VA786A15C0027 | US DIVERSIFIED CONTRACTING SERVICES INC. | NATIONAL CEMETERY ADMINISTRATION | $192,920 | FY2015 |
| VA786A15C0028 | REMSA INC | NATIONAL CEMETERY ADMINISTRATION | $34,308 | FY2015 |
| VA78615C0176 | US DIVERSIFIED CONTRACTING SERVICES INC. | NATIONAL CEMETERY ADMINISTRATION | $323,466 | FY2015 |
| VA78615C0150 | R&R CONSTRUCTION SERVICES, INC. | NATIONAL CEMETERY ADMINISTRATION | $17,700 | FY2015 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA786A13C0019_3600_-NONE-_-NONE- · retrieved 2026-09-26.