Award recordCONTRACT

TL SERVICES, INC.

PIID VA701RA0050· VA Staff Offices· PCAC NATIONAL ENERGY BUSINESS CENTER· Y249 · CONSTRUCTION OF OTHER UTILITIES· FY2010· $6,247,382 net obligations· UEI PKY8AMMMHL38· AR

Description

THIS MODIFICATION IS TO PROVIDE A NO COST 45 DAY TIME EXTENSION TO THE CONTRACT. THE ORIGINAL CONTRACT WAS TO CONSTRUCT A WATER AND STEAM METER SYSTEM IN MISSISSIPPI.

Base award description: ADVANCED UTILITY METERING - VISN 16 TAS::36 0158::TAS

First action · last action
2010-05-28 · 2013-04-05
Transactions
18
First transaction's obligation
$6,039,810
Base + all options value (sum of deltas)
$6,325,382
Extent competed
FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
Other than full & open authority
—
Set-aside
SERVICE DISABLED VETERAN OWNED SMALL BUSINESS SET-ASIDE
Offers received
7
SDVOSB flag on record
Yes (self-representation)
NAICS
236220 · COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION

Modification chain · 18 transactions

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$6,247,382$0Base award · 2010-05-28 · this action $6,039,810 · running total $6,039,810Modification SA1 · 2011-03-04 · this action $0 · running total $6,039,810Modification SA2 · 2011-08-25 · this action $0 · running total $6,039,810Modification SA3 · 2011-10-06 · this action $0 · running total $6,039,810Modification P00004 · 2011-12-15 · this action $0 · running total $6,039,810Modification P00006 · 2012-01-31 · this action $0 · running total $6,039,810Modification P00005 · 2012-02-23 · this action $99,983 · running total $6,139,793Modification P00007 · 2012-03-13 · this action $0 · running total $6,139,793Modification P00008 · 2012-05-10 · this action $57,845 · running total $6,197,638Modification P00009 · 2012-05-24 · this action $0 · running total $6,197,638Modification P00011 · 2012-07-13 · this action $0 · running total $6,197,638Modification P00012 · 2012-07-20 · this action $0 · running total $6,197,638Modification P00013 · 2012-09-21 · this action $0 · running total $6,197,638Modification P00014 · 2012-11-06 · this action $0 · running total $6,197,638Modification P00015 · 2012-11-23 · this action $0 · running total $6,197,638Modification P00016 · 2013-01-25 · this action $0 · running total $6,197,638Modification P00010 · 2013-01-31 · this action $49,744 · running total $6,247,382Modification P00017 · 2013-04-05 · this action $0 · running total $6,247,382
  • Base2010-05-28+$6,039,810= $6,039,810
  • Mod SA12011-03-04+$0= $6,039,810
  • Mod SA22011-08-25+$0= $6,039,810
  • Mod SA32011-10-06+$0= $6,039,810
  • Mod P000042011-12-15+$0= $6,039,810
  • Mod P000062012-01-31+$0= $6,039,810
  • Mod P000052012-02-23+$99,983= $6,139,793
  • Mod P000072012-03-13+$0= $6,139,793
  • Mod P000082012-05-10+$57,845= $6,197,638
  • Mod P000092012-05-24+$0= $6,197,638
  • Mod P000112012-07-13+$0= $6,197,638
  • Mod P000122012-07-20+$0= $6,197,638
  • Mod P000132012-09-21+$0= $6,197,638
  • Mod P000142012-11-06+$0= $6,197,638
  • Mod P000152012-11-23+$0= $6,197,638
  • Mod P000162013-01-25+$0= $6,197,638
  • Mod P000102013-01-31+$49,744= $6,247,382
  • Mod P000172013-04-05+$0= $6,247,382
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2010-05-28+$6,039,810$6,039,810ADVANCED UTILITY METERING - VISN 16 TAS::36 0158::TAS
Mod SA1· CHANGE ORDER2011-03-04+$0$6,039,810ADVANCED UTILITY METERING - VISN 16 TAS::36 0158::TAS
Mod SA2· CHANGE ORDER2011-08-25+$0$6,039,810MODIFICATION TO EXTEND THE PERIOD OF PERFORMANCE BY 45 DAYS.
Mod SA3· CHANGE ORDER2011-10-06+$0$6,039,81045 DAY NO COST TIME EXTENSION TO ALLOW THE CONTRACTOR TO FINISH WORK ON THE SITE.
Mod P00004· CHANGE ORDER2011-12-15+$0$6,039,81045 DAY NO COST TIME EXTENSION TO ALLOW THE CONTRACTOR TO FINISH WORK ON THE SITE.
Mod P00006· CHANGE ORDER2012-01-31+$0$6,039,81059 DAY NO COST TIME EXTENSION TO ALLOW THE CONTRACTOR TO FINISH WORK ON THE SITE.
Mod P00005· CHANGE ORDER2012-02-23+$99,983$6,139,793THIS MODIFICATION ADDS ADDITIONAL METERS IN GULF COAST HEALTH CARE SYSTEM'S JOINT AMBULATORY CARE CENTER.
Mod P00007· CHANGE ORDER2012-03-13+$0$6,139,793OTHER FUNCTIONS - THIS MODIFICATION WILL ADD 59 DAYS TO THE PERIOD OF PERFORMANCE OF THE CONTRACT IN ORDER TO…
Mod P00008· CHANGE ORDER2012-05-10+$57,845$6,197,638OTHER FUNCTIONS - THE CONTRACT IS TO INSTALL UTILITY METERS IN MEDICAL CENTERS IN MISSISSIPPI.
Mod P00009· CHANGE ORDER2012-05-24+$0$6,197,638OTHER FUNCTIONS - THE CONTRACT IS TO INSTALL UTILITY METERS IN MEDICAL CENTERS IN AND THE MODIFICATION IS FOR…
Mod P00011· CHANGE ORDER2012-07-13+$0$6,197,638OTHER FUNCTIONS - THE CONTRACT IS TO INSTALL UTILITY METERS IN MEDICAL CENTERS IN THE SHREVEPORT MEDICAL CENTE…
Mod P00012· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-07-20+$0$6,197,638THIS MODIFICATION IS FOR A NO COST 59 DAY TIME EXTENSION.
Mod P00013· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-09-21+$0$6,197,638THIS MODIFICATION IS FOR A NO COST 45 DAY TIME EXTENSION.
Mod P00014· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-11-06+$0$6,197,638OTHER FUNCTIONS THIS MODIFICATION IS FOR A NO COST 30 DAY TIME EXTENSION. THE ORIGINAL CONTRACT WAS FOR A UTL…
Mod P00015· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-11-23+$0$6,197,638OTHER FUNCTIONS THIS MODIFICATION IS FOR A NO COST 59 DAY TIME EXTENSION. THE ORIGINAL CONTRACT WAS FOR UTILI…
Mod P00016· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-01-25+$0$6,197,638OTHER FUNCTIONS THIS MODIFICATION IS FOR A NO COST 59 DAY TIME EXTENSION. THE ORIGINAL CONTRACT WAS FOR UTILI…
Mod P00010· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-01-31+$49,744$6,247,382OTHER FUNCTIONS THIS MODIFICATION IS TO ADD INTEGRATION TO THE MUSKOGEE SITE.
Mod P00017· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-04-05+$0$6,247,382THIS MODIFICATION IS TO PROVIDE A NO COST 45 DAY TIME EXTENSION TO THE CONTRACT. THE ORIGINAL CONTRACT WAS TO…

Related awards · 11

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other VA awards to the same recipient (UEI PKY8AMMMHL38)

AwardOffice · PSC / listingNet obligationsFY
36C10X26P0030SAC FREDERICK (36C10X) · 4120 · AIR CONDITIONING EQUIPMENT$62,364FY2026
36C24826F0113248-NETWORK CONTRACT OFFICE 8 (36C248) · 4130 · REFRIGERATION AND AIR CONDITIONING COMPONENTS$50,705FY2026
36C25226P0158252-NETWORK CONTRACT OFFICE 12 (36C252) · J041 · MAINT/REPAIR/REBUILD OF EQUIPMENT- REFRIGERATION, AIR CONDITIONING, AND AIR CIRCULATING EQUIPMENT$943,415FY2026
36C77625C0146252-NETWORK CONTRACT OFFICE 12 (36C252) · Z1DA · MAINTENANCE OF HOSPITALS AND INFIRMARIES$4,498,691FY2025
36C25225P0793252-NETWORK CONTRACT OFFICE 12 (36C252) · J047 · MAINT/REPAIR/REBUILD OF EQUIPMENT- PIPE, TUBING, HOSE, AND FITTINGS$9,175FY2025
36C77625C0067PCAC (36C776) · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES$21,130,821FY2025

Other recipients under Y249 from PCAC NATIONAL ENERGY BUSINESS CENTER (most recent first)

AwardRecipientOfficeNet obligationsFY
VA701C0170SOLAR POWER INTEGRATORS, INC.PCAC NATIONAL ENERGY BUSINESS CENTER$6,096,802FY2011
VA701C0169SOLAR POWER INTEGRATORS, INC.PCAC NATIONAL ENERGY BUSINESS CENTER$1,199,303FY2011
VA701C0107DEMARIA BUILDING COMPANY, INC.PCAC NATIONAL ENERGY BUSINESS CENTER$19,637,389FY2011
VA701C0105CONCENTRIC GROUP, LLCPCAC NATIONAL ENERGY BUSINESS CENTER$409,370FY2011
VA701C0104CONCENTRIC GROUP, LLCPCAC NATIONAL ENERGY BUSINESS CENTER$459,242FY2011

Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA701RA0050_3600_-NONE-_-NONE- · retrieved 2026-09-26.