Description
OTHER FUNCTION THIS MODIFICATION IS TO ALLOW FOR COMPENSATION FOR GOVERNMENT CAUSED DELAY. THE ORIGINAL CONTRACT WAS FOR A STEAM TUNNEL WORK IN PERRYPOINT MARYLAND.
Base award description: TAS:: 36 0162:: CONSTRUCTION SERVICES
Modification chain · 15 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2010-09-13+$1,656,662= $1,656,662
- Mod SA12011-05-19+$0= $1,656,662
- Mod SA22011-06-28+$43,390= $1,700,052
- Mod SA32011-07-05+$0= $1,700,052
- Mod SA42011-08-25+$0= $1,700,052
- Mod SA52011-09-20+$0= $1,700,052
- Mod SA62011-09-20+$21,936= $1,721,989
- Mod SA72011-09-22+$10,893= $1,732,881
- Mod P000092011-11-15+$0= $1,732,881
- Mod P000102012-01-13+$0= $1,732,881
- Mod P000112012-07-20+$0= $1,732,881
- Mod P000122012-08-27+$5,100= $1,737,981
- Mod P000132012-09-14+$0= $1,737,981
- Mod P000142012-10-10+$5,711= $1,743,693
- Mod P000082012-10-31+$36,755= $1,780,448
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2010-09-13 | +$1,656,662 | $1,656,662 | TAS:: 36 0162:: CONSTRUCTION SERVICES |
| Mod SA1· OTHER ADMINISTRATIVE ACTION | 2011-05-19 | +$0 | $1,656,662 | CONSTRUCTION WIND AND SOLAR ENERGY GENERATION DEVICES |
| Mod SA2· OTHER ADMINISTRATIVE ACTION | 2011-06-28 | +$43,390 | $1,700,052 | CONSTRUCTION WIND AND SOLAR ENERGY GENERATION DEVICES |
| Mod SA3· OTHER ADMINISTRATIVE ACTION | 2011-07-05 | +$0 | $1,700,052 | CONSTRUCTION WIND AND SOLAR ENERGY GENERATION DEVICES |
| Mod SA4· OTHER ADMINISTRATIVE ACTION | 2011-08-25 | +$0 | $1,700,052 | REPEAL MODIFICATION 3 TO CHANGE THE CONCRETE STRUCTURE OF THE PAD. |
| Mod SA5· OTHER ADMINISTRATIVE ACTION | 2011-09-20 | +$0 | $1,700,052 | ADDS 45 DAYS TO THE PERIOD OF PERFORMANCE OF THIS CONTRACT. |
| Mod SA6· OTHER ADMINISTRATIVE ACTION | 2011-09-20 | +$21,936 | $1,721,989 | MODIFICATION TO ADD VALVES TO THE TOP OF THE MAN HOLES THAT ARE BEING REPLACED AT THE PERRY POINT MEDICAL CENT… |
| Mod SA7· OTHER ADMINISTRATIVE ACTION | 2011-09-22 | +$10,893 | $1,732,881 | MODIFICATION TO REPLACE THE JOINTS FOR THE MAN HOLE AT THE PERRY POINT MEDICAL CENTER. |
| Mod P00009· OTHER ADMINISTRATIVE ACTION | 2011-11-15 | +$0 | $1,732,881 | OTHER FUNCTION THIS MODIFICATION IS FOR A 59 DAY NO COST TIME EXTENSION IN ORDER TO COMPLETE THE WORK OF THE C… |
| Mod P00010· OTHER ADMINISTRATIVE ACTION | 2012-01-13 | +$0 | $1,732,881 | OTHER FUNCTION THIS MODIFICATION IS FOR A 59 DAY NO COST TIME EXTENSION IN ORDER TO COMPLETE THE WORK OF THE C… |
| Mod P00011· OTHER ADMINISTRATIVE ACTION | 2012-07-20 | +$0 | $1,732,881 | OTHER FUNCTIONS - THIS MODIFICATION IS TO LIFT THE SUSPENSION OF WORK THAT IS CURRENTLY IN PLACE. |
| Mod P00012· OTHER ADMINISTRATIVE ACTION | 2012-08-27 | +$5,100 | $1,737,981 | THIS MODIFICATION IS TO ALLOW FOR ASBESTOS ABATEMENT. |
| Mod P00013· OTHER ADMINISTRATIVE ACTION | 2012-09-14 | +$0 | $1,737,981 | THIS MODIFICATION IS TO ALLOW FOR A NO COST 45 DAY TIME EXTENSION TO COMPLETE THE WORK IN PERRY POINT. |
| Mod P00014· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-10-10 | +$5,711 | $1,743,693 | OTHER FUNCTIONS THIS MODIFICATION IS TO ALLOW FOR COMPENSATION FOR A SHUTDOWN ON THE STEAM LINE. THIS CONTRAC… |
| Mod P00008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-10-31 | +$36,755 | $1,780,448 | OTHER FUNCTION THIS MODIFICATION IS TO ALLOW FOR COMPENSATION FOR GOVERNMENT CAUSED DELAY. THE ORIGINAL CONTR… |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI KN2NKAC3AQD1)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C78622C0017 | NATIONAL CEMETERY ADMIN (36C786) · Y1AZ · CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS | $4,346 | FY2022 |
| 36C78621C0086 | NATIONAL CEMETERY ADMIN (36C786) · Z1AZ · MAINTENANCE OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS | $4,784 | FY2021 |
| 36C78621P0327 | NATIONAL CEMETERY ADMIN (36C786) · 4410 · INDUSTRIAL BOILERS | $0 | FY2021 |
| 36C78621P0328 | NATIONAL CEMETERY ADMIN (36C786) · 4410 · INDUSTRIAL BOILERS | $2,169 | FY2021 |
| 36C78621P0194 | NATIONAL CEMETERY ADMIN (36C786) · J047 · MAINT/REPAIR/REBUILD OF EQUIPMENT- PIPE, TUBING, HOSE, AND FITTINGS | $4,297 | FY2021 |
| 36C78620C0294 | NATIONAL CEMETERY ADMIN (36C786) · Z1AZ · MAINTENANCE OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS | $4,750 | FY2020 |
Other recipients under Y249 from PCAC NATIONAL ENERGY BUSINESS CENTER (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA701C0170 | SOLAR POWER INTEGRATORS, INC. | PCAC NATIONAL ENERGY BUSINESS CENTER | $6,096,802 | FY2011 |
| VA701C0169 | SOLAR POWER INTEGRATORS, INC. | PCAC NATIONAL ENERGY BUSINESS CENTER | $1,199,303 | FY2011 |
| VA701C0107 | DEMARIA BUILDING COMPANY, INC. | PCAC NATIONAL ENERGY BUSINESS CENTER | $19,637,389 | FY2011 |
| VA701C0109 | TL SERVICES, INC. | PCAC NATIONAL ENERGY BUSINESS CENTER | $316,627 | FY2011 |
| VA701C0108 | TL SERVICES, INC. | PCAC NATIONAL ENERGY BUSINESS CENTER | $328,747 | FY2011 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA701C0068_3600_-NONE-_-NONE- · retrieved 2026-09-26.