Description
MODIFICATION P00013: ADDITIONAL AE SERVICES FOR PIPE STRESS ANALYSIS, NEW AIR PERMITTING REQUIREMENTS, AND TIME EXTENSION TO JULY 21, 2020 IN SUPPORT OF THE CONSTRUCTION OF THE PHYSICAL PLANT (BOILER) AT HINES VA HOSPITAL, HINES, ILLINOIS.
Base award description: ITAS: 578-3610162-6975-854200-3220 23NRNR003 AE DESIGN TO BUILD PHYSICAL PLANT (BOILER)
Modification chain · 14 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2011-08-18+$3,352,619= $3,352,619
- Mod P000012012-09-12+$24,746= $3,377,365
- Mod P000022013-08-19+$0= $3,377,365
- Mod P000032014-10-20+$99,230= $3,476,595
- Mod P000042014-10-20+$83,669= $3,560,264
- Mod P000052014-10-20+$90,005= $3,650,269
- Mod P000062014-12-23+$452,680= $4,102,949
- Mod P000072016-08-15+$1,365,431= $5,468,380
- Mod P000082016-08-26-$933,629= $4,534,751
- Mod P000092017-09-15+$40,495= $4,575,246
- Mod P000102018-07-16+$64,915= $4,640,161
- Mod P000112019-07-02+$0= $4,640,161
- Mod P000122019-12-26+$0= $4,640,161
- Mod P000132020-03-25+$47,855= $4,688,015
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2011-08-18 | +$3,352,619 | $3,352,619 | ITAS: 578-3610162-6975-854200-3220 23NRNR003 AE DESIGN TO BUILD PHYSICAL PLANT (BOILER) |
| Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-09-12 | +$24,746 | $3,377,365 | OTHER FUNCTION - S/A #1 ADDITIONAL AE DESIGN SERVICES TO BUILD PHYSICAL PLANT (BOILER) |
| Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-08-19 | +$0 | $3,377,365 | OTHER FUNCTION - NOT TO EXCEED $272,904.00 PROCEED ORDER FOR AE DESIGN SERVICES FOR PHYSICAL PLANT (BOILER)AT… |
| Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-10-20 | +$99,230 | $3,476,595 | OTHER FUNCTION - P00003: DEFINITIZE CO # 2 - DESIGN REVISIONS FOR CHANGES UNDER THE HINES BOULEVARD&REVISE THE… |
| Mod P00004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-10-20 | +$83,669 | $3,560,264 | OTHER FUNCTION - P00004; MODIFICATION FOR DESIGN REVISIONS ASSOCIATED WITH REMOVAL OF STEAM ABSORPTION CHILLER… |
| Mod P00005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-10-20 | +$90,005 | $3,650,269 | OTHER FUNCTION - P00005 -MODIFICATIONS FOR DEFINITIZING THE NOT TO EXCEED PROCEED ORDER P00002, DESIGN REVISIO… |
| Mod P00006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-12-23 | +$452,680 | $4,102,949 | OTHER FUNCTION - MODIFICATION P00006: DESIGN REVISIONS TO THE ORIGINAL CONSTRUCTION DOCUMENTS DUE TO FUNDING A… |
| Mod P00007· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-15 | +$1,365,431 | $5,468,380 | OTHER FUNCTION - MODIFICATION P00007: UPDATE CONSTRUCTION PERIOD SERVICES FEES AND UPDATE EXPIRED FISCAL YEAR… |
| Mod P00008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-08-26 | −$933,629 | $4,534,751 | OTHER FUNCTION - MODIFICATION P00008: DEOBLIGATE FY 2011 FUNDING FOR THE CONSTRUCTION PERIOD SERVICES FOR THE… |
| Mod P00009· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-09-15 | +$40,495 | $4,575,246 | OTHER FUNCTION - MODIFICATION P00009: INCORPORATE A MODIFICATION FOR ADDITIONAL DESIGN SERVICES REQUIRED DUE T… |
| Mod P00010· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-07-16 | +$64,915 | $4,640,161 | OTHER FUNCTION - MODIFICATION P00010: INCORPORATE A MODIFICATION FOR ADDITIONAL DESIGN SERVICES REQUIRED TO UP… |
| Mod P00011· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-07-02 | +$0 | $4,640,161 | MODIFICATION P00011: INCORPORATE A 184 CALENDAR DAY TIME EXTENSION FOR COMPLETION OF CONSTRUCTION PERIOD SERVI… |
| Mod P00012· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-12-26 | +$0 | $4,640,161 | MODIFICATION P00012: INCORPORATE A NO COST TIME EXTENSION THROUGH MARCH 1, 2020 FOR COMPLETION OF CONSTRUCTION… |
| Mod P00013· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2020-03-25 | +$47,855 | $4,688,015 | MODIFICATION P00013: ADDITIONAL AE SERVICES FOR PIPE STRESS ANALYSIS, NEW AIR PERMITTING REQUIREMENTS, AND TIM… |
Related awards · 9
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI JHWHH59LBAW3)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C25024P1828 | 250-NETWORK CONTRACT OFFICE 10 (36C250) · H345 · INSPECTION- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT | $106,600 | FY2024 |
| VA24515C0111 | 245-NETWORK CONTRACT OFFICE 5 (36C245) · C219 · ARCHITECT AND ENGINEERING- GENERAL: OTHER | $362,766 | FY2015 |
| VA25113P1387 | 515-BATTLE CREEK · C1NB · ARCHITECT AND ENGINEERING- CONSTRUCTION: HEATING AND COOLING PLANTS | $27,428 | FY2013 |
| VA69D12C0047 | 252-NETWORK CONTRACT OFFICE 12 (36C252) · C1DZ · ARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER HOSPITAL BUILDINGS | $825,170 | FY2012 |
Other recipients under C211 from 252-NETWORK CONTRACT OFFICE 12 (36C252) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| 36C25219C0190 | PENN CONSTRUCTION GROUP, INCORPORATED | 252-NETWORK CONTRACT OFFICE 12 (36C252) | $1,059,959 | FY2019 |
| 36C25219C0121 | VIRTUAL ENERGY SOLUTIONS INC | 252-NETWORK CONTRACT OFFICE 12 (36C252) | $202,830 | FY2019 |
| 36C25219N0324 | GUIDON-CMTA SDVOSB JV, LLC | 252-NETWORK CONTRACT OFFICE 12 (36C252) | $24,016 | FY2019 |
| 36C25218C0256 | APOGEE CONSULTING GROUP, P.A. | 252-NETWORK CONTRACT OFFICE 12 (36C252) | $271,334 | FY2018 |
| 36C25218N0313 | FOURFRONT DESIGN INC | 252-NETWORK CONTRACT OFFICE 12 (36C252) | $318,657 | FY2018 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA69DP1890_3600_-NONE-_-NONE- · retrieved 2026-09-26.