Description
A/E DESIGN FOR SCI CONNECTING CORRIDOR.SA-4: REVIEW EQUITABLE ADJUSTMENT DOCUMENTS ON PLATT S DELAY CLAIM.
Base award description: A/E DESIGN FOR SCI CONNECTING CORRIDOR.
Modification chain · 5 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2009-04-09+$458,346= $458,346
- Mod 22009-06-08+$458,346= $916,692
- Mod 12009-06-10-$458,346= $458,346
- Mod P000032013-01-25+$53,115= $511,461
- Mod P000042013-02-05+$22,500= $533,961
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2009-04-09 | +$458,346 | $458,346 | A/E DESIGN FOR SCI CONNECTING CORRIDOR. |
| Mod 2· OTHER ADMINISTRATIVE ACTION | 2009-06-08 | +$458,346 | $916,692 | A/E DESIGN FOR SCI CONNECTING CORRIDOR. |
| Mod 1· OTHER ADMINISTRATIVE ACTION | 2009-06-10 | −$458,346 | $458,346 | A/E DESIGN FOR SCI CONNECTING CORRIDOR. |
| Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-01-25 | +$53,115 | $511,461 | A/E DESIGN FOR SCI CONNECTING CORRIDOR.-SA-03 DESCOPE ELEVATOR |
| Mod P00004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-02-05 | +$22,500 | $533,961 | A/E DESIGN FOR SCI CONNECTING CORRIDOR.SA-4: REVIEW EQUITABLE ADJUSTMENT DOCUMENTS ON PLATT S DELAY CLAIM. |
Related awards · 7
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI CD6BUUEWMTV8)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| VA24415J5073 | 244-NETWORK CONTRACT OFFICE 4 · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $19,998 | FY2015 |
| VA69D14J0258 | 69D-NETWORK CONTRACT OFFICE 12 · C219 · ARCHITECT AND ENGINEERING- GENERAL: OTHER | $98,020 | FY2015 |
| VA69D14J4884 | 69D-NETWORK CONTRACT OFFICE 12 · C214 · ARCHITECT AND ENGINEERING- GENERAL: MANAGEMENT ENGINEERING | $23,910 | FY2014 |
| VA69D14J3875 | 69D-NETWORK CONTRACT OFFICE 12 · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES | $55,549 | FY2014 |
| VA69D14J3885 | 69D-NETWORK CONTRACT OFFICE 12 · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $42,113 | FY2014 |
| VA69D14J3512 | 252-NETWORK CONTRACT OFFICE 12 (36C252) · C219 · ARCHITECT AND ENGINEERING- GENERAL: OTHER | $97,728 | FY2014 |
Other recipients under C119 from 69D-NETWORK CONTRACT OFFICE 12 (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA69D695C00624 | IBC ENGINEERING SERVICES, INC. | 69D-NETWORK CONTRACT OFFICE 12 | $62,627 | FY2010 |