SCI CONNECTING CORRIDOR P00037-INCORPORATES RFPS 187,188,189, AND 190. NET CHANGE TO CONTRACT ADDITIONAL $3,479.00
Base award description: SCI CONNECTING CORRIDOR - CONSTRUCTION OF A CORRIDOR BETWEEN THE NEW SPINAL CORD INJURY DISORDER BUILDING AND THE MAIN HOSPITAL, BUILDING 111 AT THE CLEMENT J. ZABLOCKI VA MEDICAL CENTER, MILWAUKEE, WISCONSIN.
Modification chain · 43 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2010-04-08+$1,380,315= $1,380,315
- Mod COA2010-04-14+$0= $1,380,315
- Mod SA012010-10-08+$12,019= $1,392,334
- Mod SA022010-11-30+$0= $1,392,334
- Mod SA032010-12-09+$0= $1,392,334
- Mod SA042010-12-17+$63,201= $1,455,535
- Mod 22011-02-18+$0= $1,455,535
- Mod COB2011-04-20+$0= $1,455,535
- Mod SA052011-04-20+$0= $1,455,535
- Mod SA062011-05-19+$20,035= $1,475,570
- Mod SA072011-06-06+$97,420= $1,572,990
- Mod SA082011-06-10+$52,653= $1,625,643
- Mod SA092011-06-21+$13,473= $1,639,116
- Mod 72011-07-26+$1,244= $1,640,360
- Mod COC2011-07-26+$0= $1,640,360
- Mod SA112011-08-17+$30,118= $1,670,478
- Mod COD2011-08-24+$0= $1,670,478
- Mod SA122011-10-03+$29,321= $1,699,799
- Mod COE2011-10-26+$0= $1,699,799
- Mod SA132011-11-02+$31,489= $1,731,288
- Mod 142011-11-15+$20,143= $1,751,431
- Mod 152011-11-23+$0= $1,751,431
- Mod COAN2011-11-30+$0= $1,751,431
- Mod 172011-12-05+$0= $1,751,431
- Mod 182011-12-08+$0= $1,751,431
- Mod 192011-12-15+$0= $1,751,431
- Mod 202011-12-21+$0= $1,751,431
- Mod 212011-12-28+$5,582= $1,757,013
- Mod 222012-01-27+$13,909= $1,770,922
- Mod 232012-02-02+$0= $1,770,922
- Mod 242012-03-02+$0= $1,770,922
- Mod 252012-05-18+$0= $1,770,922
- Mod 262012-05-18+$0= $1,770,922
- Mod 272012-06-26+$0= $1,770,922
- Mod P00282012-08-29+$0= $1,770,922
- Mod P00292012-09-28+$0= $1,770,922
- Mod P000302012-10-31+$0= $1,770,922
- Mod P000312012-12-28+$0= $1,770,922
- Mod P000322013-02-25+$0= $1,770,922
- Mod P000332013-04-26+$0= $1,770,922
- Mod P000342013-12-06+$621,314= $2,392,236
- Mod P000362014-07-03+$49,006= $2,441,242
- Mod P000372014-10-20+$3,479= $2,444,721
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2010-04-08 | +$1,380,315 | $1,380,315 | SCI CONNECTING CORRIDOR - CONSTRUCTION OF A CORRIDOR BETWEEN THE NEW SPINAL CORD INJURY DISORDER BUILDING AND… |
| Mod COA· CHANGE ORDER | 2010-04-14 | +$0 | $1,380,315 | PURCHASE ORDER NUMBER IS CURRENTLY A "C" NUMBER. MUST BE A "Z" NUMBER BECAUSE IT IS A MINOR PROJECT. THIS CH… |
| Mod SA01· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-10-08 | +$12,019 | $1,392,334 | S/A#01: CO 101, 102,&103 |
| Mod SA02· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-11-30 | +$0 | $1,392,334 | S/A#02: SUSPEND WORK ORDER |
| Mod SA03· OTHER ADMINISTRATIVE ACTION | 2010-12-09 | +$0 | $1,392,334 | S/A#03: RESUME WORK ORDER |
| Mod SA04· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-17 | +$63,201 | $1,455,535 | SCI CONNECTING CORRIDOR S/A#04 FOR RFP'S: 104, 106, 108, 109, 110, 111, 112R, 113, 114 |
| Mod 2· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-02-18 | +$0 | $1,455,535 | S/A#02 SUSPENSION OF WORK ORDER |
| Mod COB· CHANGE ORDER | 2011-04-20 | +$0 | $1,455,535 | CHANGE ORDER B FOR CONSTRUCTION BULLETIN #3 |
| Mod SA05· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-20 | +$0 | $1,455,535 | S/A#05-ADDS BOND COSTS TO CHANGE ORDER PRICING |
| Mod SA06· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-19 | +$20,035 | $1,475,570 | SCI CONNECTING CORRIDOR S/A #06 - ADDITIONAL ABATEMENT AND INSULATION OF PIPES, ELIMINATE SLIDING WINDOW AND A… |
| Mod SA07· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-06-06 | +$97,420 | $1,572,990 | SCI CONNECTING CORRIDOR S/A #07- DIFINITIZES RFPS 115,118,119,AND 121 |
| Mod SA08· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-06-10 | +$52,653 | $1,625,643 | SCI CONNECTING CORRIDOR S/A #08 DEFINITIZES RFPS 117,123,124,129,130 AND 132 |
| Mod SA09· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-06-21 | +$13,473 | $1,639,116 | SCI CONNECTING CORRIDOR S/A #09 DEFINITIZES RFPS 131, 136, AND 107 |
| Mod 7· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-07-26 | +$1,244 | $1,640,360 | S/A#07 ADDITIONAL DATA/COM CHANGES IN B0622&B0622A |
| Mod COC· CHANGE ORDER | 2011-07-26 | +$0 | $1,640,360 | SCI CONNECTING CORRIDOR CO C DUCT RECONFIGURATION AT POOL |
| Mod SA11· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-08-17 | +$30,118 | $1,670,478 | SCI CONNECTING CORRIDOR S/A#11 DRYWALL/45 DAYCONTRACT EXTENSION |
| Mod COD· CHANGE ORDER | 2011-08-24 | +$0 | $1,670,478 | SCI CONNECTING CORRIDOR CO D PROVIDE TESTING OF DEXPAN PRODUCT |
| Mod SA12· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-10-03 | +$29,321 | $1,699,799 | SCI CONNECTING CORRIDOR SA12-45 DAY TE, RFPS 156, 122 AND SA04 CORRECTION |
| Mod COE· CHANGE ORDER | 2011-10-26 | +$0 | $1,699,799 | SCI CONNECTING CORRIDOR CO E ELECTRICAL DEMOLITION, MINIMUM LABOR/EQUIPMENT CHARGE USE FOR INVESTIGATIONS |
| Mod SA13· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-02 | +$31,489 | $1,731,288 | SCI CONNECTING CORRIDOR SA12 ADDS MULTIPLE RFPS. TOTAL COST OF CHANGE IS $31,489.00. |
| Mod 14· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-15 | +$20,143 | $1,751,431 | SCI CONNECTING CORRIDOR SA14 EXTENDS CONTRACT 46 DAYS. TOTAL COST OF CHANGE IS $20,143.00. |
| Mod 15· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-11-23 | +$0 | $1,751,431 | SCI CONNECTING CORRIDOR SA0015 DIRECTS THE CONTRACTOR TO CONTINUE WORK ON OTHER THAN THE ELEVATOR PORTION OF T… |
| Mod COAN· CHANGE ORDER | 2011-11-30 | +$0 | $1,751,431 | SCI CONNECTING CORRIDOR CO "AN" 7 DAY SUSPEND WORK ORDER |
| Mod 17· CHANGE ORDER | 2011-12-05 | +$0 | $1,751,431 | SCI CONNECTING CORRIDOR SA17: NO CHARGE 7 DAY SUSPEND WORK ORDER |
| Mod 18· CHANGE ORDER | 2011-12-08 | +$0 | $1,751,431 | SCI CONNECTING CORRIDOR SA0018:7 DAY SUSPEND WORK ORDER |
| Mod 19· CHANGE ORDER | 2011-12-15 | +$0 | $1,751,431 | SCI CONNECTING CORRIDOR SA0019:7 DAY SUSPEND WORK ORDER |
| Mod 20· CHANGE ORDER | 2011-12-21 | +$0 | $1,751,431 | SCI CONNECTING CORRIDOR SA-20, VA CO #BA - 45 DAY SUSPEND WORK ORDER |
| Mod 21· CHANGE ORDER | 2011-12-28 | +$5,582 | $1,757,013 | SCI CONNECTING CORRIDOR SA-21, VA CO #BB - INSTALL HEAT SENSORS |
| Mod 22· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-27 | +$13,909 | $1,770,922 | SCI CONNECTING CORRIDOR SA0022: THE PURPOSE OF THIS MODIFICATION IS TO DEFINITIZE PERFORMANCE CHANGES UNDER TH… |
| Mod 23· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-02-02 | +$0 | $1,770,922 | SCI CONNECTING CORRIDOR SA23: SUSPENSION OF WORK |
| Mod 24· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-02 | +$0 | $1,770,922 | SCI CONNECTING CORRIDOR SA24: SUSPENSION OF WORK |
| Mod 25· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-05-18 | +$0 | $1,770,922 | SCI CONNECTING CORRIDOR SA25: SUSPENSION OF WORK |
| Mod 26· CHANGE ORDER | 2012-05-18 | +$0 | $1,770,922 | SCI CONNECTING CORRIDOR CHANGE ORDER BS-FIRE STOPPING |
| Mod 27· CHANGE ORDER | 2012-06-26 | +$0 | $1,770,922 | SCI CONNECTING CORRIDOR SA27-SUSPEND WORK ORDER |
| Mod P0028· CHANGE ORDER | 2012-08-29 | +$0 | $1,770,922 | SCI CONNECTING CORRIDOR SA27-SUSPEND WORK ORDER |
| Mod P0029· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-09-28 | +$0 | $1,770,922 | SCI CONNECTING CORRIDOR SA28-SUSPEND WORK ORDER |
| Mod P00030· CHANGE ORDER | 2012-10-31 | +$0 | $1,770,922 | SCI CONNECTING CORRIDOR SA28-SUSPEND WORK ORDER |
| Mod P00031· CHANGE ORDER | 2012-12-28 | +$0 | $1,770,922 | SCI CONNECTING CORRIDOR SA31-SUSPEND WORK ORDER |
| Mod P00032· CHANGE ORDER | 2013-02-25 | +$0 | $1,770,922 | SCI CONNECTING CORRIDOR SA32-SUSPEND WORK ORDER |
| Mod P00033· CHANGE ORDER | 2013-04-26 | +$0 | $1,770,922 | SCI CONNECTING CORRIDOR P00033-SUSPEND WORK ORDER |
| Mod P00034· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-12-06 | +$621,314 | $2,392,236 | SCI CONNECTING CORRIDOR P00034-FINALIZE PRICING FOR CHANGE ORDER BU AND ASSOCIATED DELAY CLAIMS. |
| Mod P00036· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-07-03 | +$49,006 | $2,441,242 | SCI CONNECTING CORRIDOR P00036-INCORPORATES RFPS 178, 179, 182, 183, 184, 185, AND 186 NET CHANGE TO CONTRACT… |
| Mod P00037· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-10-20 | +$3,479 | $2,444,721 | SCI CONNECTING CORRIDOR P00037-INCORPORATES RFPS 187,188,189, AND 190. NET CHANGE TO CONTRACT ADDITIONAL $3,47… |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI SPAJKLTSHGR8)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C25221C0077 | 252-NETWORK CONTRACT OFFICE 12 (36C252) · Z2JZ · REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS | $447,543 | FY2021 |
| 36C25220P0530 | 252-NETWORK CONTRACT OFFICE 12 (36C252) · Z2DA · REPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES | $9,555 | FY2020 |
| 36C25220C0088 | 252-NETWORK CONTRACT OFFICE 12 (36C252) · J065 · MAINT/REPAIR/REBUILD OF EQUIPMENT- MEDICAL, DENTAL, AND VETERINARY EQUIPMENT AND SUPPLIES | $140,096 | FY2020 |
| 36C25220C0072 | 252-NETWORK CONTRACT OFFICE 12 (36C252) · Z1DZ · MAINTENANCE OF OTHER HOSPITAL BUILDINGS | $1,410,857 | FY2020 |
| 36C25218C0245 | 252-NETWORK CONTRACT OFFICE 12 (36C252) · Z1DZ · MAINTENANCE OF OTHER HOSPITAL BUILDINGS | $1,304,540 | FY2018 |
| 36C25218P4815 | 252-NETWORK CONTRACT OFFICE 12 (36C252) · J041 · MAINT/REPAIR/REBUILD OF EQUIPMENT- REFRIGERATION, AIR CONDITIONING, AND AIR CIRCULATING EQUIPMENT | $4,300 | FY2018 |
Other recipients under Z141 from 69D-NETWORK CONTRACT OFFICE 12 (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA69D537C10505 | INDUSTRIA INC | 69D-NETWORK CONTRACT OFFICE 12 | $67,476 | FY2011 |
| VA69D537C10501 | JDM LLC | 69D-NETWORK CONTRACT OFFICE 12 | $70,934 | FY2011 |
| VA69D537C10446 | INDUSTRIA INC | 69D-NETWORK CONTRACT OFFICE 12 | $152,773 | FY2011 |
| VA69D537C10492 | JDM LLC | 69D-NETWORK CONTRACT OFFICE 12 | $0 | FY2011 |
| VA69D556C10391 | LEE & RYAN ENVIRONMENTAL CONSULTING, INCORPORATED | 69D-NETWORK CONTRACT OFFICE 12 | $29,911 | FY2011 |