Description
S/A #17 IAW RFP 128,INSTALL ADDITIONAL LIGHTING IN ELEVATOR PIT AND ELEVATOR EQUIPMENT ROOM PER ELEVATOR INSPECTION. ADD (2) ADDITIONAL LIGHTS IN PHYSICAL THERAPY IN FRONT OF ELEVATOR AND TREATMENT ROOM. PRICE NOT TO EXCEED $1,638.00. IAW RFP 133, REPLACE EMPLOYEE HEALTH RECEPTION WINDOW WITH SPEAK HOLE AND DOCUMENT ACCESS. PRICE NOT TO EXCEED $716.00. IAW RFP 134, CONVERT REFRIGERATOR OUTLET TO EMERGENCY POWER, DISMANTLE AND DISPOSE OF LEKTRIEVER AND RELOCATE LEKTRIEVER FILES. PRICE NOT TO EXCEED $6,571.00. TOTAL PRICE OF CHANGE NOT TO EXCEED $8,925. THIS CHANGE WILL BE DEFINITIZED WITHIN 30 DAYS OF ISSUANCE. TAS::3600162
Base award description: RENOVATION OF ER/CT ROOMS.
Modification chain · 14 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2008-08-20+$1,246,000= $1,246,000
- Mod 62009-07-27+$1,911= $1,247,911
- Mod 72009-09-11+$13,748= $1,261,659
- Mod 82009-09-25+$9,433= $1,271,092
- Mod 92009-10-22+$96,902= $1,367,994
- Mod 102009-11-30+$0= $1,367,994
- Mod 112009-12-01+$0= $1,367,994
- Mod 122009-12-07+$0= $1,367,994
- Mod 132010-03-09+$12,328= $1,380,322
- Mod SA142010-04-08+$2,508= $1,382,830
- Mod 152010-05-07+$2,250= $1,385,080
- Mod 162010-07-15+$650= $1,385,730
- Mod COA2010-10-07+$0= $1,385,730
- Mod 172010-10-12+$8,925= $1,394,655
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2008-08-20 | +$1,246,000 | $1,246,000 | RENOVATION OF ER/CT ROOMS. |
| Mod 6· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-07-27 | +$1,911 | $1,247,911 | RFP 115: ADDITIONAL SAW CUTS FOR ELEVATOR DOOR OPENING. |
| Mod 7· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-09-11 | +$13,748 | $1,261,659 | S/A#7, RFP 116: RELOCATE AHU 1 TO A NEW LOCATION AND RELOCATE EXISTING STEAM LINES. |
| Mod 8· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-09-25 | +$9,433 | $1,271,092 | S/A #8 |
| Mod 9· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI | 2009-10-22 | +$96,902 | $1,367,994 | S/A #9. RFP'S 118 & 119. |
| Mod 10· OTHER ADMINISTRATIVE ACTION | 2009-11-30 | +$0 | $1,367,994 | S/A #10. SUSPENSION OF WORK. |
| Mod 11· OTHER ADMINISTRATIVE ACTION | 2009-12-01 | +$0 | $1,367,994 | S/A #11. RESUMPTION OF WORK IN AGENT CASHIER AREA. |
| Mod 12· OTHER ADMINISTRATIVE ACTION | 2009-12-07 | +$0 | $1,367,994 | S/A #12. RESUMPTION OF WORK IN ELEVATOR AREA. |
| Mod 13· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-03-09 | +$12,328 | $1,380,322 | S/A #13. RFP'S 120, 122,124,125. |
| Mod SA14· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-04-08 | +$2,508 | $1,382,830 | S/A #14. AGENT CASHIER: MOVE SAFE AND MONITORING EQUIPMENT ON 03/13/2010 |
| Mod 15· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-05-07 | +$2,250 | $1,385,080 | SUPPLEMENTAL AGREEMENT #15: OCCUPANTS ON THE ERCT ELEVATOR ARE ENTERING THE CLOSED PT AREA DURING OFF HOURS, W… |
| Mod 16· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-07-15 | +$650 | $1,385,730 | S/A #16. INSTALL SINGLE POLE LIGHT SWITCH NEXT TO ENTRYWAY TO CONFORM TO CODE. |
| Mod COA· CHANGE ORDER | 2010-10-07 | +$0 | $1,385,730 | TAS::3600162 CHANGE ORDER "A" RFP 133 - INSTALL PLEXIGLASS WINDOW W/SPEAK HOLE. RFP 128 - INSTALL ELEVATOR PI… |
| Mod 17· DEFINITIZE CHANGE ORDER | 2010-10-12 | +$8,925 | $1,394,655 | S/A #17 IAW RFP 128,INSTALL ADDITIONAL LIGHTING IN ELEVATOR PIT AND ELEVATOR EQUIPMENT ROOM PER ELEVATOR INSPE… |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI ZJE3GTWE6D36)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| VA69D16J6000 | 252-NETWORK CONTRACT OFFICE 12 (36C252) · Z1DZ · MAINTENANCE OF OTHER HOSPITAL BUILDINGS | $104,449 | FY2016 |
| VA69D16C0293 | 252-NETWORK CONTRACT OFFICE 12 (36C252) · Z1DA · MAINTENANCE OF HOSPITALS AND INFIRMARIES | $510,740 | FY2016 |
| VA69D16J5225 | 252-NETWORK CONTRACT OFFICE 12 (36C252) · Z1DZ · MAINTENANCE OF OTHER HOSPITAL BUILDINGS | $533,186 | FY2016 |
| VA69D16J4507 | 252-NETWORK CONTRACT OFFICE 12 (36C252) · Z1DA · MAINTENANCE OF HOSPITALS AND INFIRMARIES | $920,504 | FY2016 |
| VA69D16J3602 | 252-NETWORK CONTRACT OFFICE 12 (36C252) · Z1DZ · MAINTENANCE OF OTHER HOSPITAL BUILDINGS | $339,641 | FY2016 |
| VA69D16D0157 | 252-NETWORK CONTRACT OFFICE 12 (36C252) · Z1DZ · MAINTENANCE OF OTHER HOSPITAL BUILDINGS | $0 | FY2016 |
Other recipients under Z141 from 69D-NETWORK CONTRACT OFFICE 12 (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA69D537C10505 | INDUSTRIA INC | 69D-NETWORK CONTRACT OFFICE 12 | $67,476 | FY2011 |
| VA69D537C10501 | JDM LLC | 69D-NETWORK CONTRACT OFFICE 12 | $70,934 | FY2011 |
| VA69D537C10446 | INDUSTRIA INC | 69D-NETWORK CONTRACT OFFICE 12 | $152,773 | FY2011 |
| VA69D537C10492 | JDM LLC | 69D-NETWORK CONTRACT OFFICE 12 | $0 | FY2011 |
| VA69D556C10391 | LEE & RYAN ENVIRONMENTAL CONSULTING, INCORPORATED | 69D-NETWORK CONTRACT OFFICE 12 | $29,911 | FY2011 |