Description
THE WORK WAS DELAYED DUE TO A DELAY IN ANOTHER CONTRACT CHANGE ORDER REGARDING UTILITY RELOCATIONS FOR THE DEMOLITION PROJECT RELATED TO THE GREENHOUSE PROJECT. EXTENDED 148 CALENDAR DAYS.
Base award description: MATERIAL AND SUPERVISION TO ACCOMPLISH THE MOVE OF BOTH THE FIBER OPTICS AND PHONE LINES THAT SERVE THE ENERGY CENTER. THIS MOVE WILL ALLEVIATE PAST SERVICE PROBLEMS/TROUBLE DUE TO FLOODED TUNNELS IN WHICH THE LINES WERE PREVIOUSLY RUN.
Modification chain · 2 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2010-11-19+$16,646= $16,646
- Mod 12011-04-25+$16,646= $33,292
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2010-11-19 | +$16,646 | $16,646 | MATERIAL AND SUPERVISION TO ACCOMPLISH THE MOVE OF BOTH THE FIBER OPTICS AND PHONE LINES THAT SERVE THE ENERGY… |
| Mod 1· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-04-25 | +$16,646 | $33,292 | THE WORK WAS DELAYED DUE TO A DELAY IN ANOTHER CONTRACT CHANGE ORDER REGARDING UTILITY RELOCATIONS FOR THE DEM… |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI JBZELFBMX1J4)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C25222C0044 | 252-NETWORK CONTRACT OFFICE 12 (36C252) · Z2DA · REPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES | $539,344 | FY2022 |
| 36C26120P0981 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · J041 · MAINT/REPAIR/REBUILD OF EQUIPMENT- REFRIGERATION, AIR CONDITIONING, AND AIR CIRCULATING EQUIPMENT | $290,888 | FY2020 |
| 36C25220P0454 | 252-NETWORK CONTRACT OFFICE 12 (36C252) · J061 · MAINT/REPAIR/REBUILD OF EQUIPMENT- ELECTRIC WIRE AND POWER DISTRIBUTION EQUIPMENT | $5,399 | FY2020 |
| 36C26120P0093 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · W041 · LEASE OR RENTAL OF EQUIPMENT- REFRIGERATION, AIR CONDITIONING, AND AIR CIRCULATING EQUIPMENT | $196,980 | FY2020 |
| 36C25220K0016 | 252-NETWORK CONTRACT OFFICE 12 (36C252) · S119 · UTILITIES- OTHER | $2,076,294 | FY2020 |
| 36C26119P1682 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · J041 · MAINT/REPAIR/REBUILD OF EQUIPMENT- REFRIGERATION, AIR CONDITIONING, AND AIR CIRCULATING EQUIPMENT | $301,842 | FY2019 |
Other recipients under Z149 from 69D-NETWORK CONTRACT OFFICE 12 (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA69D578C10553 | VSGI LLC | 69D-NETWORK CONTRACT OFFICE 12 | $5,156 | FY2011 |
| VA69D578C10548 | LEE & RYAN ENVIRONMENTAL CONSULTING, INCORPORATED | 69D-NETWORK CONTRACT OFFICE 12 | $18,076 | FY2011 |
| VA69D578C10549 | LEE & RYAN ENVIRONMENTAL CONSULTING, INCORPORATED | 69D-NETWORK CONTRACT OFFICE 12 | $176,470 | FY2011 |
| VA69D578C10542 | LEE & RYAN ENVIRONMENTAL CONSULTING, INCORPORATED | 69D-NETWORK CONTRACT OFFICE 12 | $243,497 | FY2011 |
| VA69D578C10554 | VSGI LLC | 69D-NETWORK CONTRACT OFFICE 12 | $223,100 | FY2011 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA69D556C10153_3600_-NONE-_-NONE- · retrieved 2026-09-26.